1" x 1" x 1/8 ANGLE
BAR TOP BOTTOM
SCHEDULE OF ROOF BEAMS 0.40 0.40 0.40 0.40
CHORD
DIMENSION(MM) REBAR ARRANGEMENT STIRRUPS
LEVEL MARK
B H BAR POSITION SUPPORT MID-SPAN SIZE SPACING (FROM SUPPORT FACE TO BEAM CENTER)
1" x 1" x 1/8 FLAT BAR
0.40
TOP BAR 3-Ø16 2-Ø16 WEB MEMBERS
ROOF
RB 200 300 WEB BAR - - Ø10 2@50MM, 8@100MM, REST@150MM
FASCIA FRAME DETAIL
BOTTOM BAR 2-Ø16 3-Ø16
A B C D A B C D
1400 4775 4775 1400 4775 4775
2" x 6" x 2mm
RECTANGULAR TUBE
2" x 3" x 2mm C-PURLINS
RB RB RB RB SPACED @ .70M 0.C.
4 4
C2 C2 C2 C2 C2 C2
2" x 4" x 2mm
RECTANGULAR TUBE
3275
3275
RB
RB
B6
B6
3 3
C2 C2 C2 C2 C2 C2
3275
3275
RB
RB
2 2
C2 C2 C2 C2
1400
1400
1 1
C2 C2 C2 C2 C2 C2
ROOF BEAM FRAMING PLAN ROOF FRAMING PLAN
PREPARED AND SIGNED BY: SEAL: PROJECT TITLE: CONFORMED BY: SHEET CONTENTS: SET NUMBER: SHEET NUMBER:
PRC No: 0168735
PTR No: 4068671
PROPOSED
S-7
RICK EMMANUEL B. VALENCIA ISSUED: 01-22-25 AS SHOWN
CIVIL ENGINEER
TIN: 720-374-938
S 9
LOCATION: BRGY. NAPOLAN, PAGADIAN CITY OWNER/REPRESENTATIVE