Philippine Electrical Code Compliance Guide

The document outlines the electrical work requirements according to the Philippine Electrical Code, emphasizing compliance with local regulations and the necessity for licensed supervision. It specifies wiring methods, conduit types, and mounting heights for various electrical devices, ensuring safety and adherence to standards. Additionally, it includes load calculations and a layout for a mini grocery project, detailing the specifications for electrical installations.

Uploaded by

Ian Gutierrez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views7 pages

Philippine Electrical Code Compliance Guide

The document outlines the electrical work requirements according to the Philippine Electrical Code, emphasizing compliance with local regulations and the necessity for licensed supervision. It specifies wiring methods, conduit types, and mounting heights for various electrical devices, ensuring safety and adherence to standards. Additionally, it includes load calculations and a layout for a mini grocery project, detailing the specifications for electrical installations.

Uploaded by

Ian Gutierrez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

GENERAL NOTES:

1.1. All Electrical Work shall comply with the provisions of the latest edition of the Philippine Electrical Code (PEC).
1.2. Rules and regulations including Ordinances from the local enforcing authorities must be complied and followed accordingly
1.3. The electrical works shall be done based on the requirements of the local distribution company. LEGENDS/SYMBOLS
1.4. The electrical work shall be implemented under the immediate supervision of a duly licensed registered electrical engineer and/or
registered master electrician. Only competent and skilled personnel shall perform the work consistent with the best practices of the trade.
1.5. The electrical service entrance power supply is 230/240 volts Ac, three-phase, three wire with one neutral or ground wire as the Light Bulb To main
Electrical Room Mixer
M KWH Metering

fourth wire, and frequency of 60 hertz. M


1.6. All wiring method shall be as follows:
Water Heater Service Entrance
1.6.1. Feeder and/or Riser: It should be copper with insulated thermoplastic materials type THHN. The minimum size of wire should be PL Perimeter Light WH
Electric Cooking
ECA Appliance
2.0 mm². FAS
1.6.2. Lightning and Power: It should be Copper with insulated thermoplastic materials type THHN as per designer's discretion. The
Fire Alarm System
minimum size of wire should be 2.0 mm² for lightning and 3.5 mm2/ for the convenience outlet and other motor loads. S Switch
ACU
Airconditioning Unit
R
Electric Range
1.7. All conduits shall be as follows:
1.7.1. Feeder and/or Riser: it should be Intermediate Metallic Conduit (IMC). 3Ø
3 Phase Microwave Oven SB Sign Board
1.7.2. Lightning and Power: it should be Polyvinylchloride conduit (PVC) or embedded and covered installation. It should be Intermediate S2 2 Switch Airconditioning
MO
Metallic Conduit (IMC) for exposed and open installation. ACU Unit
1.8. All outlet boxes shall be galvanized gage no. 16, deep type with factory knockouts. Polyvinylchloride utility and splicing boxes can A Automatic Transfer
Coffee Maker T
be used if imbedded in concrete and/or not subject to any physical or mechanical damages. CM Swtich
S3 3 Switch
Freezer S
1.9. Grounding wire shall be provided to all lighting and power circuits based on the minimum requirements of the Philippine Electrical F
Code. Water Dispenser
WD
1.10. Mounting height of devices or equipment should be as follows: DP Distribution Panel G Generator
1.10.1. 10.1 Light Switch - maximum of 1.2 meters above the finished floor. Refrigirator
R
1.10.2. Convenience Outlet - minimum of 0.30 meter above the finished floor or as required based on its usage such as in kitchen Exhaust Fan
EX
and other working areas. Duplex Convenience CCTV
1.10.3. Panel board - maximum of 1.50 meters above the finished floor. 2 Outlet Domestic Water Pump
DWP
1.10.4. Auxiliary devices such as Fire Alarm devices must be based on the following: Dishwasher
D
a. Control Panel - maximum of 1.50 meters above the finished floor Convenience Outlet Xerox Machine
b. Manual Pull Station - maximum of 1.2 meters above the finished floor
c. Bell or Horn and Strobe - minimum of 0.30 meter below the ceiling
d. Annunciator - maximum of 1.5 meters above the fined floor.
Devices can also have a separate design by the Fire Alarm System
Supplier or Installer that can be followed
1.11. All equipment or devices to be installed outdoor and exposed to weather shall be waterproof.
1.12. 12. All materials and devices to be used should be brand new and approved type per PEC for the particular location and purpose
of usage
1.13. The Contractor shall be responsible for the securing of wiring permit and all fees required for the works up to the issuance of the
Certificate of Final Electrical Inspection.
1.14. In case of discrepancy between the plans and site condition, or specifications; revisions should be consulted to the responsible
electrical engineer on site. Commercial Layout Plan

VICINITY MAP
N
Mini grocery Restaurant Corporate
Coffee shop
store office
To Burgos Road

McDonald's Mercury Drug Site Admin

Burgos Road Burgos Road


Site Here
Shopwise
To City Homes

Burgos Road, City of


Santa Rosa, Laguna,
Bakery
Philippines
City Homes
Townhouse

CONTRACTOR PROJECT TITLE OWNER CONTENTS DESIGNED BY SHEET


ROLANDO C. FABROS
ALM SPARKS INC. PROFESSIONAL ELECTRICAL ENGINEER MODULE 2 DESIGN AZAÑA, MAC KLEINE D.
LOYOLA, JHONCELL H.
GENERAL NOTES
VICINITY MAP
ALM SPARKS INC. 1
PEE NO. 2923
PTR NO.
TIN: 118-007-051
DATE:
MOSTIZO, KYLA MARIE D.
LEGENDS/SYMBOLS
FLOOR PLAN LAYOUT E-7
Mini Grocery Lighting Layout Load Schedule for Mini Grocery

Single Phase current (I) 3 phase


Load Volt-Amp/HP Initial Amp Demand Final Current
Description No. of units Volts (V) Conductor Conduit CB
s s2 Panel VA/W/HP (I) Factor Amps (I)
L1N L2N L3N L123N
8 2# 2.0 mm^2 THHN
1 LO1 24 2400 230 10.43 100% 10.43 10.43 1# 16 mm ɸPVC 15AT
1# 2.0 mm^2 THHN
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
s 2 CO2 8 1440 230 6.26 100% 6.26 6.26 15 AT
1# 2.0 mm^2 THHN
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
3 CO1 8 1440 230 6.26 100% 6.26 6.26 15 AT
1# 2.0 mm^2 THHN
s3
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
4 CO3 8 1440 230 6.26 100% 6.26 6.26 15 AT
1# 2.0 mm^2 THHN
7 2# 2.0 mm^2 THHN
s s2 5 LO2 24 2400 230 10.43 100% 10.43 10.43
1# 2.0 mm^2 THHN
1# 16 mm ɸPVC 15 AT

2# 2.0 mm^2 THHN 1# 16 mm ɸPVC


6 LO3 24 2400 230 10.43 100% 10.43 10.43 15 AT
1# 2.0 mm^2 THHN
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
7 LO4 24 2400 230 10.43 100% 10.43 10.43 15 AT
5 1# 2.0 mm^2 THHN

Sign Board 2# 2.0 mm^2 THHN 1# 16 mm ɸPVC


s2 8 1 1500 230 6.52 100% 6.52 6.52 15 AT
1# 2.0 mm^2 THHN
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
9 LO5 24 2400 230 10.43 100% 10.43 10.43 15 AT
1# 2.0 mm^2 THHN

ACU(3HP) 2 2# 2.0 mm^2 THHN 1# 16 mm ɸPVC


10 1 3910 230 17 100% 17 17 60 AT
1# 2.0 mm^2 THHN
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
11 Water Heater 1 3000 230 13.04 100% 13.04 13.04 20 AT
3 1# 2.0 mm^2 THHN
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
12 Freezer 2HP 2 1 2760 230 12 100% 12 12 45 AT
s2 1# 2.0 mm^2 THHN

ACU(3HP) 1 2# 2.0 mm^2 THHN 1# 16 mm ɸPVC


13 1 3910 230 17 100% 17 17 60 AT
1# 2.0 mm^2 THHN
1 2# 2.0 mm^2 THHN
s2 14 ACU(1/2HP) 1 1127 230 4.9 100% 4.9 4.9
1# 2.0 mm^2 THHN
1# 16 mm ɸPVC 20 AT

2# 2.0 mm^2 THHN 1# 16 mm ɸPVC


15 Freezer 2HP 1 1 2760 230 12 100% 12 12 45 AT
s 1# 2.0 mm^2 THHN

Refrigerator 0.5HP 2 2# 2.0 mm^2 THHN 1# 16 mm ɸPVC


16 1 1127 230 4.9 100% 4.9 4.9 20 AT
1# 2.0 mm^2 THHN
SB SB
9 17 Refrigerator 0.5HP 1 1 1127 230 4.9 100% 4.9 4.9
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC 20 AT
1# 2.0 mm^2 THHN

Refrigerator 0.5HP 3 2# 2.0 mm^2 THHN 1# 16 mm ɸPVC


18 1 1127 230 4.9 100% 4.9 4.9 20 AT
1# 2.0 mm^2 THHN

ACU(5HP) 1 3# 2.0 mm^2 THHN 1# 16 mm ɸPVC


19 1 3880 400 9.7 100% 9.7 9.7 35AT
1# 2.0 mm^2 THHN
Mini Grocery Power Layout 3# 2.0 mm^2 THHN
20 ACU(5HP) 2 1 3880 400 9.7 100% 9.7 9.7 1# 16 mm ɸPVC 35AT
1# 2.0 mm^2 THHN
ACU WH 3# 2.0 mm^2 THHN
21 ACU(5HP) 3 1 3880 400 9.7 100% 9.7 9.7 1# 16 mm ɸPVC 35AT
F F 1# 2.0 mm^2 THHN
DP 2
R R R 3# 60 mm^2 THHN 1# 41 mm ɸ IMC √3 (56.85)+29.1+√3(0.25)(17)=134.9283043A=It
1# 38 mm^2 THHN "151.4283043"×70%=94.44981304A=In
225AT, 225AF, 400V, 3phase, 60Hz √3 (56.85)+29.1+√3(150%)(17)=171.734384A=Icb 55.54 56.85 55.7 29.1
21 20 19 6 12
18 17
2

To main
Electrical room 4 13

ACU
ACU Load Calculation for Mini Grocery

15
2

6 11
14
ACU
ACU


2

10
2

2 2 2
ACU

CONTRACTOR PROJECT TITLE OWNER CONTENTS DESIGNED BY SHEET


ROLANDO C. FABROS LIGHTING LAYOUT
ALM SPARKS INC. PROFESSIONAL ELECTRICAL ENGINEER MODULE 2 DESIGN AZAÑA, MAC KLEINE D.
LOYOLA, JHONCELL H.
POWER LAYOUT
LOAD SCHEDULE
ALM SPARKS INC. 2
PEE NO. 2923
PTR NO.
TIN: 118-007-051
DATE:
MOSTIZO, KYLA MARIE D. LOAD CALCULATION
(MINI GROCERY)
E-7
Restaurant Lighting Layout Load Schedule for Restaurant

Single Phase current (I) 3 phase


Load Volt-Amp/HP Initial Amp Demand Final Current
Description No. of units Volts (V) Conductor Conduit CB
Panel VA/W/HP (I) Factor Amps (I)
L1N L2N L3N L123N
s 1 LO1 40 4000 230 17.39 80% 13.91 13.91
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC 20 AT
1# 2.0 mm^2 THHN
s 2# 2.0 mm^2 THHN
2 LO2 40 4000 230 17.39 80% 13.91 13.91 1# 16 mm ɸPVC 20 AT
1# 2.0 mm^2 THHN
s 2# 2.0 mm^2 THHN
3 CO2 8 1440 230 6.26 80% 5 5 1# 16 mm ɸPVC 15 AT
1# 2.0 mm^2 THHN
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
4 CO4 8 1440 230 6.26 80% 5 5 15 AT
s2 2 1# 2.0 mm^2 THHN

Sign Board 2# 2.0 mm^2 THHN 1# 16 mm ɸPVC


5 1 1500 230 6.52 80% 5.22 5.22 15 AT
1# 2.0 mm^2 THHN
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
s 6 CO3 8 1440 230 6.26 80% 5 5 15 AT
1# 2.0 mm^2 THHN
s 7 CO1 8 1440 230 6.26 80% 5 5
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC 15 AT
1# 2.0 mm^2 THHN

Electric Range 3 2# 5.5 mm^2 THHN 1# 16 mm ɸPVC


s 8 1 8000 230 34.78 80% 27.83 27.83 35 AT
1# 2.0 mm^2 THHN

Electric Cooking Appliance 2# 8.0 mm^2 THHN 1# 21 mm ɸPVC


s 9 1 12000 230 52.17 80% 41.74 41.7 60 AT
1# 5.5 mm^2 THHN

Refrigerator 0.25HP 2 2# 2.0 mm^2 THHN 1# 16 mm ɸPVC


10 1 667 230 2.9 80% 2.32 2.32 15 AT
1# 2.0 mm^2 THHN

Electric Range 1 2# 5.5 mm^2 THHN 1# 16 mm ɸPVC


11 1 8000 230 34.78 80% 27.83 27.83 35 AT
s 1# 2.0 mm^2 THHN

Electric Range 2 2# 5.5 mm^2 THHN 1# 16 mm ɸPVC


12 1 8000 230 34.78 80% 27.83 27.83 35 AT
1# 2.0 mm^2 THHN
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
13 Freezer 1HP 1 1 1840 230 8 80% 6.4 6.4 20 AT
1# 2.0 mm^2 THHN
1 2# 2.0 mm^2 THHN
14 Exhaust Fan 1HP 1 1 1840 230 8 80% 6.4 6.4 1# 16 mm ɸPVC 20 AT
1# 2.0 mm^2 THHN
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
15 Exhaust Fan 1HP 2 1 1840 230 8 80% 6.4 6.4 20 AT
1# 2.0 mm^2 THHN

s s 16 Dishwasher 1 4000 230 17.39 80% 13.91 13.9


2# 2.0 mm^2 THHN
1# 2.0 mm^2 THHN
1# 16 mm ɸPVC 20 AT

5 SB Refrigerator 0.25HP 1 2# 2.0 mm^2 THHN 1# 16 mm ɸPVC


17 1 667 230 2.9 80% 2.32 2.32 15 AT
1# 2.0 mm^2 THHN
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
18 Freezer 1HP 2 1 1840 230 8 80% 6.4 6.4 20 AT
1# 2.0 mm^2 THHN
Restaurant Power Layout 19 ACU 7.5 (1) 1 5600 400 14 80% 11.2 11.2
3# 2.0 mm^2 THHN 1# 16 mm ɸPVC 40 AT
1# 2.0 mm^2 THHN
3# 2.0 mm^2 THHN

2
20 ACU 7.5 (1) 1 5600 400 14 80% 11.2 11.2 1# 16 mm ɸPVC 40 AT
2 2 3Ø 2 2 1# 2.0 mm^2 THHN
ACU
DP
ACU 7.5 (1) 3# 2.0 mm^2 THHN 1# 16 mm ɸPVC
21 1 5600 400 14 80% 11.2 11.2 40 AT
1# 2.0 mm^2 THHN
19 ACU 7.5 (1) 3# 2.0 mm^2 THHN 1# 16 mm ɸPVC
22 1 5600 400 14 80% 11.2 11.2 40 AT
To main 1# 2.0 mm^2 THHN
Electrical room 16 73.45 74.4 74.6 44.8

2
D

R R

10 17 2
15
Load Calculation for Restaurant
EX

12
R

4
11 6
R

2
F

13
7

9
F
ECA

18
2

14
EX

8
R

2
2

2
2

ACU

22

20 21
2

ACU 2 2 2 2
ACU 2 2
2

3Ø 3Ø

CONTRACTOR PROJECT TITLE OWNER CONTENTS DESIGNED BY SHEET


ROLANDO C. FABROS LIGHTING LAYOUT
ALM SPARKS INC. PROFESSIONAL ELECTRICAL ENGINEER MODULE 2 DESIGN AZAÑA, MAC KLEINE D.
LOYOLA, JHONCELL H.
POWER LAYOUT ALM SPARKS INC. 3
LOAD CALCULATION
PEE NO. 2923 TIN: 118-007-051
MOSTIZO, KYLA MARIE D. LOAD CALCULATION
(RESTAURANT)
E-7
PTR NO. DATE:
Corporate Office Lighting Layout Load Schedule Corporate Office
Single Phase current (I) 3 phase
Load Volt-Amp/HP Initial Amp Demand Final Current
Description No. of units Volts (V) Conductor Conduit CB
Panel VA/W/HP (I) Factor Amps (I)
L1N L2N L3N L123N
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
S S 1 LO1 35 3500 230 15.22 100% 15.22 15.22 25 AT
S 1# 2.0 mm^2 THHN
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
2 LO4 35 3500 230 15.22 100% 15.22 15.22 25 AT
s 1# 2.0 mm^2 THHN
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
3 LO2 35 3500 230 15.22 100% 15.22 15.2 25 AT
1# 2.0 mm^2 THHN
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
4 CO2 8 1440 230 6.26 100% 6.26 6.26 15 AT
s2 3 1# 2.0 mm^2 THHN
2 2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
s 5 LO3 35 3500 230 15.22 100% 15.22 15.22 25 AT
1# 2.0 mm^2 THHN
s 2# 2.0 mm^2 THHN
6 CO3 8 1440 230 6.26 100% 6.26 6.26 1# 16 mm ɸPVC 15 AT
1# 2.0 mm^2 THHN
s
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
7 CO1 8 1440 230 6.26 100% 6.26 6.26 15 AT
1# 2.0 mm^2 THHN

ACU 2HP (3) 2# 2.0 mm^2 THHN 1# 16 mm ɸPVC


8 1 2760 230 12 100% 12 12 40 AT
1# 2.0 mm^2 THHN
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
9 CO4 8 1440 230 6.26 100% 6.26 6.26 15 AT
1# 2.0 mm^2 THHN
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
s 10 CO5 8 1440 230 6.26 100% 6.26 6.26 15 AT
1# 2.0 mm^2 THHN
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
11 CO6 8 1440 230 6.26 100% 6.26 6.26 15 AT
5 1# 2.0 mm^2 THHN
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
12 Coffee Maker 1 3500 230 15.22 100% 15.22 15.22 20 AT
1# 2.0 mm^2 THHN
s2 2# 2.0 mm^2 THHN
13 Refrigerator 0.25HP 1 667 230 2.9 100% 2.9 2.9 1# 16 mm ɸPVC 15 AT
1# 2.0 mm^2 THHN
1
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
14 Xerox Machine 1 1500 230 6.52 100% 6.52 6.52 15 AT
1# 2.0 mm^2 THHN
s
ACU 2HP (1) 2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
15 1 2760 230 12 100% 12 12 40 AT
s 1# 2.0 mm^2 THHN
S s
ACU 2HP (2) 2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
16 1 2760 230 12 100% 12 12 40 AT
1# 2.0 mm^2 THHN
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
17 Microwave Oven 1 2000 230 8.7 100% 8.7 8.7 15 AT
1# 2.0 mm^2 THHN

Water Dispenser 2# 2.0 mm^2 THHN 1# 16 mm ɸPVC


18 1 1500 230 6.52 100% 6.52 6.52 15 AT
1# 2.0 mm^2 THHN
Corporate Office Power Layout ACU 5HP (1) 3# 2.0 mm^2 THHN 1# 16 mm ɸPVC
19 1 3880 400 9.7 100% 9.7 9.7 35 AT
1# 2.0 mm^2 THHN
ACU
ACU 5HP (2) 3# 2.0 mm^2 THHN 1# 16 mm ɸPVC
20 1 3880 400 9.7 100% 9.7 9.7 35 AT
XM

14
2 2 12 CM
1# 2.0 mm^2 THHN
DP

3# 2.0 mm^2 THHN

MO
17 21 ACU 5HP (3) 1 3880 400 9.7 100% 9.7 9.7 1# 16 mm ɸPVC 35 AT
WD

18
22
1# 2.0 mm^2 THHN
3# 2.0 mm^2 THHN
R
To main 13 22 ACU 5HP (4) 1 3880 400 9.7 100% 9.7 9.7 1# 16 mm ɸPVC 35 AT
Electrical room 1# 2.0 mm^2 THHN
2

7
58.12 58 58.18 38.8
2
2

Load Calculation Corporate Office


ACU

15
2

ACU

8 10
2

11

9
2
2

ACU
ACU

19 4 16
2
2

6
20 21
2

2 2 ACU 2 2 ACU 2 2 2
3Ø 3Ø

CONTRACTOR PROJECT TITLE OWNER CONTENTS DESIGNED BY SHEET


ROLANDO C. FABROS LIGHTING LAYOUT
ALM SPARKS INC. PROFESSIONAL ELECTRICAL ENGINEER MODULE 2 DESIGN AZAÑA, MAC KLEINE D. POWER LAYOUT ALM SPARKS INC. 4
LOYOLA, JHONCELL H. LOAD SCHEDULE
PEE NO. 2923 TIN: 118-007-051
MOSTIZO, KYLA MARIE D. LOAD CALCULATION
(CORPORATE OFFICE)
E-7
PTR NO. DATE:
Coffee Shop Lighting Layout Load Schedule for Coffee Shop

Single Phase current (I) 3 phase


Load Volt-Amp/HP Initial Amp Demand Final Current
Description No. of units Volts (V) Conductor Conduit CB
Panel VA/W/HP (I) Factor Amps (I)
L1N L2N L3N L123N
s s
s 7 2# 2.0 mm^2 THHN
1 LO1 16 1600 230 6.96 100% 6.96 6.96 1# 16 mm ɸPVC 15 AT
1# 2.0 mm^2 THHN
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
2 LO4 16 1600 230 6.96 100% 6.96 6.96 15 AT
1# 2.0 mm^2 THHN
6
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
3 CO1 8 1440 230 6.26 100% 6.26 6.26 15 AT
1# 2.0 mm^2 THHN
s2 2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
4 CO2 8 1440 230 6.26 100% 6.26 6.26 15 AT
1# 2.0 mm^2 THHN
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
5 LO2 16 1600 230 6.96 100% 6.96 6.96 15 AT
1# 2.0 mm^2 THHN
s s
5 2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
6 LO3 16 1600 230 6.96 100% 6.96 6.96 15 AT
1# 2.0 mm^2 THHN
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
7 LO5 16 1600 230 6.96 100% 6.96 6.96 15 AT
1# 2.0 mm^2 THHN

s ACU 2HP (1) 2# 2.0 mm^2 THHN 1# 16 mm ɸPVC


8 1 2760 230 12 100% 12 12 40 AT
s2 1# 2.0 mm^2 THHN
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
9 CO3 8 1440 230 6.26 100% 6.26 6.26 15 AT
1# 2.0 mm^2 THHN
2
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
10 CO4 8 1440 230 6.26 100% 6.26 6.26 15 AT
1# 2.0 mm^2 THHN
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
s2 11 Freezer 1HP 1 1840 230 8 100% 8 8 25 AT
1# 2.0 mm^2 THHN
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
12 Coffee Maker 2 1 1500 230 6.52 100% 6.52 6.52 15 AT
1# 2.0 mm^2 THHN
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
13 Coffee Maker 1 1 1500 230 6.52 100% 6.52 6.52 15 AT
1# 2.0 mm^2 THHN
1
Water Dispenser 2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
14 1 1500 230 6.52 100% 6.52 6.52 15 AT
1# 2.0 mm^2 THHN

s2 Refrigerator 0.25HP 2# 2.0 mm^2 THHN 1# 16 mm ɸPVC


15 1 667 230 2.9 100% 2.9 2.9 15 AT
1# 2.0 mm^2 THHN

Electric Range 2# 8.0 mm^2 THHN 1# 21 mm ɸPVC


16 1 8000 230 34.78 100% 34.78 34.78 45 AT
1# 5.5 mm^2 THHN
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
17 Mixer 1 1 2000 230 8.7 100% 8.7 8.7 15 AT
1# 2.0 mm^2 THHN
Coffee Shop Power Layout 2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
18 Mixer 2 1 2000 230 8.7 100% 8.7 8.7 15 AT
1# 2.0 mm^2 THHN

ACU 7.5HP (1) 3# 2.0 mm^2 THHN 1# 16 mm ɸPVC
19 1 5600 400 14 100% 14 14 45 AT
DP
2 2 2
ACU
2 1# 2.0 mm^2 THHN

ACU 7.5HP (2) 3# 2.0 mm^2 THHN 1# 16 mm ɸPVC


20 1 5600 400 14 100% 14 14 45 AT
10 1# 2.0 mm^2 THHN
20
2

To main
Electrical room 2 2
45.92 62.72 45.84 28
2

Load Calculation for Coffee Shop


2
2

R
2

F
CM CM
2
WD

12 13
11 15

14
M
M

9
2


17 18 19
ACU
2

4 8
ACU

16
R

2 2 2 2 2 2 2

CONTRACTOR PROJECT TITLE OWNER CONTENTS DESIGNED BY SHEET


ROLANDO C. FABROS LIGHTING LAYOUT
ALM SPARKS INC. PROFESSIONAL ELECTRICAL ENGINEER MODULE 2 DESIGN AZAÑA, MAC KLEINE D. POWER LAYOUT ALM SPARKS INC. 5
LOYOLA, JHONCELL H. LOAD SCHEDULE
PEE NO. 2923 TIN: 118-007-051
MOSTIZO, KYLA MARIE D. LOAD CALCULATION
(COFFEE SHOP)
E-7
PTR NO. DATE:
Load Schedule for Admin Office and
TO TO
Genset
TO MINI
TO MAIN GROCERY TO CORPORATE COFFEE 3 phase
Load Volt-Amp/HP Initial Amp Demand Final Single Phase current (I)
ELECTRICAL STORE RESTAURANT OFFICE SHOP Description No. of units Volts (V) Current Conductor Conduit CB
Admin Office and Genset Lighting ROOM
Panel VA/W/HP (I) Factor Amps (I)
L1N L2N L3N L123N
Layout 2# 2.0 mm^2 THHN
1 LO1 12 1200 230 5.22 100% 5.22 5.22 1# 16 mm ɸPVC 15 AT
1# 2.0 mm^2 THHN
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
2 LO2 12 1200 230 5.22 100% 5.22 5.22 15 AT
1# 2.0 mm^2 THHN
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
2 3 CO1 8 1440 230 6.26 100% 6.26 6.26 15 AT
2 ACU ACU
DP ECB ECB ECB ECB 1# 2.0 mm^2 THHN
13 2# 2.0 mm^2 THHN
CM
4 ACU 2HP 1 1 1840 230 12 100% 12 12 1# 16 mm ɸPVC 40 AT
12 XM 1# 2.0 mm^2 THHN
17 9
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
5 LO3 12 1200 230 5.22 100% 5.22 5.22 15 AT
1# 2.0 mm^2 THHN
R 8 2# 2.0 mm^2 THHN
6 LO4 12 1200 230 5.22 100% 5.22 5.22 1# 16 mm ɸPVC 15 AT
1# 2.0 mm^2 THHN

ECB
TO ADMIN 2# 5.5 mm^2 THHN
7 ACU 5HP 2 1 6440 230 28 100% 28 28 1# 16 mm ɸPVC 90 AT
1# 2.0 mm^2 THHN
WD

OFFICE
15 2# 2.0 mm^2 THHN
8 Refrigerator 0.5HP 1 1127 230 4.9 100% 4.9 4.9 1# 16 mm ɸPVC 20 AT
1# 2.0 mm^2 THHN
10
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
9 ACU 2HP 2 1 1840 230 12 100% 12 12 40 AT
2 2 1# 2.0 mm^2 THHN
MO
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
10 Microwave Oven 1 2500 230 10.87 100% 10.87 10.87 15 AT
1# 2.0 mm^2 THHN
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
11 CO2 8 1440 230 6.26 100% 6.26 6.26 15 AT
1# 2.0 mm^2 THHN

2
2 2
2# 5.5 mm^2 THHN 1# 16 mm ɸPVC
12 ACU 5HP 1 1 6440 230 28 100% 28 28 90 AT
1# 2.0 mm^2 THHN
2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
13 Xerox Machine 1 2000 230 8.7 100% 8.7 8.7 15 AT
1# 2.0 mm^2 THHN

Perimeter Light 2# 2.0 mm^2 THHN 1# 16 mm ɸPVC


14 10 750 230 3.26 100% 3.26 3.26 15 AT
1# 2.0 mm^2 THHN
2

Water Dispenser 2# 2.0 mm^2 THHN 1# 16 mm ɸPVC


15 1 1500 230 6.52 100% 6.52 6.52 15 AT
1# 2.0 mm^2 THHN
2

2# 2.0 mm^2 THHN 1# 16 mm ɸPVC


16 CCTV 1 1500 230 6.52 100% 6.52 6.52 15 AT
ACU 1# 2.0 mm^2 THHN
7 2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
17 Coffee Maker 1 1000 230 4.35 100% 4.35 4.35 15 AT
4 16 1# 2.0 mm^2 THHN
3 19
Fire Alarm System 2# 2.0 mm^2 THHN 1# 16 mm ɸPVC
18 1 1500 230 6.52 100% 6.52 6.52 15 AT
11 1# 2.0 mm^2 THHN

DWP Domestic Water Pump 2HP 3# 2.0 mm^2 THHN 1# 16 mm ɸPVC


2 ACU FAS 2 2 19 1 1720 400 4.3 100% 4.3 4.3 15 AT
1# 2.0 mm^2 THHN

55.3 54.17 55.57 4.3

16

Admin Office and Genset Power Load Calculation for Admin Office and
Layout Genset

ECB ECB ECB ECB


s ECB

s s

1
s

CONTRACTOR PROJECT TITLE OWNER CONTENTS DESIGNED BY SHEET


ROLANDO C. FABROS LIGHTING LAYOUT
ALM SPARKS INC. PROFESSIONAL ELECTRICAL ENGINEER MODULE 2 DESIGN AZAÑA, MAC KLEINE D.
LOYOLA, JHONCELL H.
POWER LAYOUT ALM SPARKS INC. 6
LOAD SCHEDULE
PEE NO. 2923 TIN: 118-007-051
MOSTIZO, KYLA MARIE D. LOAD CALCULATION
(ADMIN OFFICE)
E-7
PTR NO. DATE:
Distribution Panel per Building
Single Line Diagram UNIT 1 - MINI GROCERY
UNIT 2 - RESTAURANT
UNIT 3 - CORPORATE OFFICE
UNIT 4 - COFFEE SHOP MINI GROCERY
SERVICE 400/230V 3Φ
ENTRANCE
60HZ UNIT 5 - ADMINISTRATION OFFICE & GENERATOR HOUSE

225AT
2 SETS
3# 325mm2 THHN IN #1 91mmΦ IMC
1# 150mm2 THHN LIGHTING 1
1 15AT 15AT
2 CONVENIENCE
OUTLET 2
UNIT 5 UNIT 4 UNIT 3 UNIT 2 UNIT 1
CONVENIENCE
MOTHER
METER M CONVENIENCE
OUTLET 1 3 15AT 15AT
4 OUTLET 3

WIRE GUTTER, NEMA 3R


LIGHTING 2
5 15AT 15AT 6 LIGHTING 3

LIGHTING 4
7 15AT 15AT
8 SIGN BOARD LO

EXPOSED TO WEATHER 225AT, 200AT, 225AT, 250AT, 225AT,


ECB 225AF, 200AF, 225AF, 250AF, 225AF,
1000AT, 1200AF, 460V, 3Φ, 60HZ
NEMA R3 1 2 3 4 5 SUB
460V, 3Φ,
60HZ
460V, 3Φ,
60HZ
460V, 3Φ,
60HZ
460V, 3Φ,
60HZ
460V, 3Φ,
60HZ
LIGHTING 5
9 15AT 60AT
10 ACU (3HP) NO.2
METER

GROUND WIRE
WATER HEATER
11 20AT 45AT
12 FREEZER (2HP) NO.2

1# 100mm2 THHN
IN 21mmΦ IMC
225 AT 250 AT 200 AT 200 AT 225 AT WIRE GUTTER ACU (3HP) NO.1 13 60AT 20AT
14 ACU (1/2HP)

FREEZER (2HP) NO.1 15 45AT 20AT


16 REF (.5HP) NO.2

REF (0.5HP) NO.1


17 20AT 20AT
18 REF (0.5HP) NO.3

2 SETS
3# 325mm2 THHN IN #1 91mmΦ IMC
A
ACU (5HP) NO.1
19 50AT 50AT
20 ACU (5HP) NO.2

1# 150mm2 THHN T
S
3# 50mm2 THHN IN #1 41mmΦ IMC 3# 80mm2 THHN IN #1 53mmΦ IMC
ACU (5HP) NO.3 21 50AT
1# 30mm2 THHN 1# 38mm2 THHN 3# 60mm2 THHN IN #1 41mmΦ IMC
3# 100mm2 THHN IN #1 53mmΦ IMC 1# 38mm2 THHN
1000 Amps 1# 60mm2 THHN GROUND
1000 AT

G
CORPORATE OFFICE COFFEE SHOP
ADMINISTRATION OFFICE
RESTAURANT
225AT 200AT
225AT
250AT LIGHTING 1
1 25AT 25AT
2 LIGHTING 4
LIGHTING 1
1 2 LIGHTING 4
LIGHTING 1
1 2 LIGHTING 2
15AT 15AT LIGHTING 1
1 15AT 15AT
2 LIGHTING 2

20AT 20AT LIGHTING 2


3 4 CONVENIENCE

4 CONVENIENCE
25AT 15AT OUTLET 2 CONVENIENCE
OUTLET 1 3 15AT 15AT OUTLET 2 CONVENIENCE
3 4 ACU (2HP) NO.1
CONVENIENCE
OUTLET 2 3 4 CONVENIENCE
OUTLET 4 CONVENIENCE
OUTLET 1 15AT 40AT
15AT 15AT LIGHTING 3
5 25AT 15AT 6 OUTLET 3

SIGN BOARD LO
5 6 CONVENIENCE
OUTLET 3
LIGHTING 2
5 15AT 15AT 6 LIGHTING 3 LIGHTING 3
5 15AT 15AT
6 LIGHTING 4
15AT 15AT CONVENIENCE
OUTLET 1 7 15AT 40AT
8 ACU (2HP) NO.3

CONVENIENCE
OUTLET 1 7 15AT 35AT
8 ELECTRIC RANGE 3
CONVENIENCE
LIGHTING 5
7 15AT 40AT
8 ACU (2HP) NO.1 ACU (5HP) NO.2
7 90AT 20AT
8 REF (0.5HP)
CONVENIENCE
OUTLET 4 9 15AT 15AT
10 OUTLET 5
ELECTRIC COOKING APPLIANCE
9 60AT 15AT
10 REF (0.25HP) NO.2
CONVENIENCE
CONVENIENCE
OUTLET 3 9 15AT 15AT
10 CONVENIENCE
OUTLET 4
ACU (2HP) NO.2
9 40AT 15AT
10 MICROWAVE OVEN

OUTLET 6 11 15AT 20AT


12 COFFEE MAKER
CONVENIENCE
ELECTRIC RANGE 1 11 35AT
12 ELECTRIC RANGE 2 FREEZER (1HP) 11 12 COFFEE MAKER 2 OUTLET 2 11 15AT 90AT
12 ACU (5HP) NO.1
35AT REF (0.25HP)
13 15AT 15AT
14 XEROX MACHINE 25AT 15AT

FREEZER (1HP) NO.1 13 14 EXHAUST FAN (1HP) NO.1 XEROX MACHINE 13 14 PERIMETER LIGHT
20AT 20AT ACU (2HP) NO.1 15 16 ACU (2HP) NO.2
COFFEE MAKER 1
13 15AT 15AT
14 WATER DISPENSER 15AT 15AT
40AT 40AT
EXHAUST FAN (1HP) NO.2 15 16 DISHWASHER WATER DISPENSER
15 16 CCTV
20AT 20AT MICROWAVE OVEN
17 15AT 15AT
18 WATER DISPENSER REF (0.25HP)
15 15AT 45AT
16 ELECTRIC RANGE 15AT 15AT

REF (0.25HP) NO.1 17 15AT 20AT


18 FREEZER (1HP) NO.2 COFFEE MAKER
17 15AT 15AT
18 FIRE ALARM SYSTEM
ACU (5HP) NO.1 19 35AT 35AT
20 ACU (5HP) NO.2 MIXER 1
17 15AT 15AT
18 MIXER 2
ACU (3HP) NO.1
19 40AT 40AT
20 ACU (3HP) NO.2 DOMESTIC PUMP
15 15AT
ACU (5HP) NO.3 21 35AT 35AT
22 ACU (5HP) NO.4 ACU (7.5HP) NO.1 19 45AT 45AT
20 ACU (7.5HP) NO.2
ACU (3HP) NO.3 21 40AT 40AT
22 ACU (3HP) NO.4

GROUND
GROUND
GROUND
GROUND

CONTRACTOR PROJECT TITLE OWNER CONTENTS DESIGNED BY SHEET


ROLANDO C. FABROS
ALM SPARKS INC. PROFESSIONAL ELECTRICAL ENGINEER MODULE 2 DESIGN AZAÑA, MAC KLEINE D.
LOYOLA, JHONCELL H.
SINGLE LINE DIAGRAM
ALL DISTRIBUTIOM PANELS
ALM SPARKS INC. 7
PEE NO. 2923
PTR NO.
TIN: 118-007-051
DATE: