10th Running Account Bill Summary
10th Running Account Bill Summary
Rs. P.
1. Total value of work actually measured, as per Acct. 1, col. 5 entry (A) 126472323.93
2. Total up-to-date, advance payment for work not yet measured, as per details given 0.00
below : Rs.
a) Total as per Previous bill 0.00
b) Since previous bill
3. Total 'up-to-date secured advance on security of materials as per Annexure Form 0.00
(26-A) Col. 8 Entry (G) ….. …… 0.00
4. Total Items (1+2+3) ….. …… 126472323.93
5. Deduct Amount withheld -----
Figure for work abstract (a) From Previous bill as per last Running Account bill ….
Rs. P. (b) From this bill
6 Balance i.e. "up-to-date" payments item 4--5) 126472323.93
7. Total amount of payment made as per entry (K) of last
Running Account Bill+ SEC. ADV. 99478216.46
Dated ………………………
STAMP STAMP
Carried over
2
Payment on the basis of
Item of works actual measurement
(grouped under Quantity executed
“Sub-Head” and Unit Rate up-to-date as per Since Remarks
Sub-Works” of measurement book Up-to-date previous
estimate) bill
1 2 3 4 5 6 7
Total value of work done- 126472323.93
Figure(F) in words Rupees Two Crore Sixty Nine Lakh Ninety Four Thousand One Hundred Seven only.
N.B. When there are two or more entries in column 6 relating to each Sub-Head of estimate they should, in case of
work the accounts of which are kept by Sub-Head, be totalled and the total recorded in column 7 for positing the
work abstract.
Contractor Signature JE AE
ABSTRACT OF COST
Name of Work: - Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar, Teliamura & Panisagar Sector in Tripura SH: GIN No. 697A,
697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur Sector
Location of Work:- BFSD-III
Name of the Contractor :Shri Uttam deb
Reference to Agreement no:-02/EE/BFD-III/AGT/2021-2022
Date of written order to commence work :09.04.2021
Stipulated date of completion of work:- 02.07.2022
Date of actual completion of work:- in progress
Date of Abstract: - 09.10.2023
Reference to previous measurements, if any:-
Serial no of this bill :-10th R/A BILL
Quantity Up to date
Since
ITEM Quantity as Executed up Payment on the
Sub-Head and Item of works UNIT Full rate Previous Bill previous
NO. per BOQ to date as basis of actual
Amt.
per MB measurements
1 Sub Head - I : Earth Work
1.1 Banking excavated earth in layers not exceeding 20 cm in depth, breaking
clods, watering, rolling each layer with ½ tonne roller, or wooden or steel
rammers, and rolling every 3rd and top-most layer with power roller of
minimum 8 tonnes and dressing up, in embankments for roads, flood
banks, marginal banks, and guide
banks etc., lead upto 50 m and lift upto 1.5 m :
Page 65
1.4 Supplying of local earth (including cum 534 109.80 0.00
royalty) by mechanical transport upto
a lead of 5km
Total 109.8 0.00 0 0 0
1.5 Extra for every additional lift of 1.5 m or part thereof in excavation /
banking excavated or stacked materials.
1.5.1 All kinds of soil Cum 4458 69.55
B/F P. No-08 of CMB-03 4420.26
B/F P. No-01 of TCMB 306.53
B/F P. No- of TCMB 77.72
Total 69.55 4804.51 334153.67 307429.08 26724.59
1.6 Clearing jungle including uprooting of rank vegetation, grass, brush wood, sqm 3572 9.60
trees and saplings of girth up to 30 cm measured at a height of 1 m above
ground level and removal of rubbish up to a distance of 50 m outside the
periphery of the area cleared.
B/F P. No-40 of CMB-03 1642.94
B/F P. No-01 of TCMB 406.00
B/F P. No- of TCMB 469.20
Total 9.60 2518.14 24174.14 15772.22 8401.92
Sub Head - II : Structural Work
2.1 Providing and laying in position machine batched and machine mixed
design mix cement concrete for plain cement concrete work, using cement
content as per approved design mix, including pumping of concrete to site
of laying, finishing but excluding the cost of centering, shuttering,
including admixtures in recommended proportions as per IS: 9103 to
accelerate, retard setting of concrete, improve workability without
impairing strength and durability as per direction of Engineer-in-charge.
(Note :- Excess/ less cement used as per design mix is
payable/recoverable separately).
Page 66
2.2 Centering and shuttering including strutting, propping etc. and removal of
form for :
2.2.1 Foundations, footings, bases of columns, etc. for mass concrete Sqm 2158 303.40
2.3.1 Suspended floors, roofs, landings, balconies (Plan area to be measured) Sqm 2609 642.45
Page 67
2.4 Steel reinforcement for R.C.C. work including straightening, cutting,
bending, placing in position and binding all complete upto all level.
2.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more. Kg 367141 104.65
Total PR 2805.81
Deviation up to 30% 14790.60 14750 2750.80 40574300 31211000 9363300.00
Qty beyond 30 % (C) 14784.20 14750 55.01 811397.5 0 811397.50
2.5.2 All works above plinth level upto floor V level cum 392.00 15864.65
B/F P. No- 10 of CMB-03 235.65
B/F P. No- 23 of TCMB 70.49
B/F P. No- of TCMB 19.91
Total 15864.65 326.05 5172669.13 3738504.77 1434164.36
Page 68
2.6 Add/deduct for using extra cement in the items of design mix over and Qtl 1219 915.00
above the specified cement content therein.
B/F P. No-10 of CMB-03 2644.69
B/F P. No- 02 of TCMB 12.44
B/F P. No- 14 of TCMB 219.06
B/F P. No- 18 of TCMB 54.28
B/F P. No- of TCMB 15.33
B/F P. No- of TCMB 7.69
B/F P. No- of TCMB 115.89
B/F P. No- of TCMB 23.13
B/F P. No- of TCMB 9.24
Total 3101.75
Total 915.00 1584.70 1450000.5 1450000.5 0
Qty Restricted upto 2000 vide ltr. No. 23(60)/BFD-III/AGT/2020/576 dt. 27.9.2022 915.00 415.30 379999.5 379999.5 0
3 Sub Head - III : Protection and Drainage Work
3.1 Providing and laying 110mm diametre unplasticised Rigid single socketed Meter 304 338.85
PVC pipes conforming to IS:13592 Type-A, across the RCC/ Random
Rubble masonary retaining wall or breast wall for function as weep holes
to reduce the horizontal pressure.
B/F P. No- 10 of CMB-03 149.20
B/F P. No- 10 of TCMB- 86.48
B/F P. No- of TCMB- 52.76
Total 288.44 97737.89 50556.42 47181.47
3.3 Providing and fixing drainage spoutswith 100 mm dia GI pipes as per Each 110 1687.45
drawing and 200 mm dia grating by Ms flat 25mm X 3mm thick welded
with 10mm dia MS bars. etc. complete.
Page 69
3.4 Providing and laying longitudinal drain of size 400mm at bottom, depth Meter 1116 4044.90
varying from 300mm to 500mm (all internal dimensions), made of full brick
masonry in 1:6 (1 cement : 6 fine sand) with 12 mm cement plaster
finished with a floating coat of neat cement of mix 1:4 (1 cement : 4 fine
sand) on internal & top surface including excavation, backfilling, PCC
[Link] (1 cement : 5 fine sand : 10 stone aggregate) at base, PCC [Link]
(1 cement : 2 fine sand : 4 stone aggregate) etc. complete as per drawing
and directions of Engineerin- charge.
4.1 structural steel work in single section, fixed with or without connecting kg 4712 80.30
plate including cutting hoisting, fixing in position all complete.
4.2 Steel work in built up tubular ( round, square or rectangular hollow tubes
etc.) trusses etc., including cutting, hoisting, fixing in position and applying
a priming coat of approved steel primer, including welding and bolted with
special shaped washers etc. complete.
4.2.1 Hot finished welded type tubes kg 2320 139.24
B/F P. No-11 of CMB-03 1627.43
B/F P. No- of TCMB- 1396.84
Qty. restricted due to non sanction of diviation Total 3024.27
Total 139.24 2320.00 323036.8 226603.35 96433.45
4.3 Steel work welded in built up sections/
framed work, including cutting,
hoisting, fixing in position using
structural steel etc. as required
4.3.1 In gratings, frames, guard bar, ladder, railings, brackets, gates and kg 53247 127.65
similar works
B/F P. No- 11 of CMB-03 21151.98
B/F P. No- of TCMB- 13080.06
Total P/R 125.00 34232.04 4279005 2643997.5 1635007.5
4.4 Providing and fixing hand rail of approved size by welding etc. to steel
ladder railing, balcony railing, staircase railing and similar works.
4.4.1 G.I. Pipes kg 637 168.05
B/F P. No- 11 of CMB-03 157.55
B/F P. No- of TCMB- 103.33
Total 168.05 260.88 43840.88 26476.28 17364.6
4.5 Providing and fixing precoated galvanised iron profile sheets (size, shape Sqm 569 878.55
and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm ( +
0.05 %), total coated thickness with zinc coating 120 gm per sqm as per
IS:277 in 240 mpa steel grade, 5-7 microns epoxy primer on both side of
the sheet and polyester top coat 15-18 microns. Sheet should have
protective guard film of 25 microns minimum to avoid scratches during
transportation and should be supplied in single length upto 12metre or as
desired by Engineer-in-charge. The sheet shall be fixed using self
drilling /self tapping screws of size (5.5x 55mm) with EPDM seal,
B/F P. No- 11 of CMB-03 187.55
Total 878.55 187.55 164772.05 164772.05 0
Page 70
4.6 Finishing with Epoxy paint (two or more coats) at all locations prepared Sqm 1414 181.90
and applied as per manufacturer's specifications including appropriate
priming coat, preparation of surface, etc. complete
Page 71
5.3 Providing and fixing security fencing of GI barbed wire consisting of Mtr. 754 1741.35
copper enriched MS angle posts of 65mm x 65mm x 6mm 1500mm
length above ground level & 645mm below ground level including
providing one number 75mm long pointed spike made of 12mm dia MS
round bar welded to angle iron post at corner for min 25mm length (as per
standard drawing attached) MS angle posts placed at 3000mm centre to
centre embedded in cement concrete blocks 300mm dia 895mm deep
placed at 795mm below ground level as every 10th post, end posts &
corner posts to be strutted with MS angle struts on both sides of size
65mm x 65mm x 6mm & 2400mm long (200mm vertical at top & 2200mm
slanting down) fabricated & welded as per drawing bolted to vertical posts
with 2 Nos 12mm dia 50mm long bolts & nuts with washers struts
embedded in cement concrete blocks of size 1000mm x 1000mm upto
300mm height at bottom slopes towards top CC block of area 300mm
x300mm at overall depth of 895mm placed at 795mm below ground level
as per drawing attached including providing & fixing galvanised iron wire
duly painted bydipping in paint twice with anti corrosive bitumastic paint
(IS:158) of approved brand & manufacturer black shade to give a smooth
& even surface, size of GI barbed wire 2.5 mm x 2.0mm (weight to be not
less than 108gms per metre length) conforming to IS.278-1978 in 10
horizontal rows to be fixed & stretched with MS hooks/tightening bolts as
per drawing and properly woven with two diagonal of same GI barbed
B/F P. No-12 of CMB-03 130.95
Total 1741.35 130.95 228029.78 228029.78 0
5.4 Providing, laying & fixing of galvanised punched tape concertina coil of each 446 3115.90
unstretched dia 1050mm having galvanised spring steel core of wire
2.5mm dia of cold drawn steel punched tape of low carbon steel having
series of sharp barbs uniformly punched along its length 55 barbs on
periphery per revolution crimped on steel spring core wire. Galvanised
clips GI steel wire handles hooked to coils for handling MS square bar
spikes hooked to coil having pointed faces for anchorage & weight 15.20
kg per coil including spreading of each coil 10 metre length adequately
tied to GI barbed wire fencing & fencing post with GI wire of not less than
16 guage at every 1000mm spacing tying of handles of succeeding coil
with preceding coil with GI wire of not less than 16 guage, properly
anchoring of spikes at start & end of coil in precast cement concrete block
of size 20cm x 20cm x 20cm of mix [Link] (1 cement: 2 fine sand: 4 stone
aggregate 20mm nominal size) of bottom layer & applying anticorrosive
bitumastic paint (IS:158) of approved brand & manufacture in black shade
to give a smooth & even surface by dipping in paint twice over punched
tape concertina coil complete as per drawings & directios of the Engineer
in-Charge.
Page 73
Fencing on culvert
5.6.2 Providing and fixing security fencing of GI barbed wire consisting of Mtr. 295 3354.05
copper enriched MS angle posts of 90mm x 90mm x6mm 3000mm length
above RCC Culvert slab (2000mm vertical and 1000mm slanting) duly
fabricated and welded at bend as per drawing and placed at 3000mm
centre to centre & fixed with MS plate 250 mm x250mm size 8mm Thick
by 4 Nos. dash fastner of 16mm dia & every 10th post, end posts & corner
posts to be strutted with MS angle strut on both sides, of size 90mm x
90mm x 6mm & 2245mm in length (200mm vertical at top & 2045mm
slanting down) fabricated and welded as per drawing bolted to vertical
posts with two Nos. 12mm dia & 50mm long MS bolts & nuts with
washers, struts fixed with MS plate 250 mm x 250mm size 8mm thick by 4
Nos. dash fastner 16mm dia as per standard drawing attached including
providing & fixing
B/F P. No-13 of CMB-03 115.20
B/F P. No- of CMB- 43.05
Total 3354.05 158.25 530778.41 386386.56 144391.85
5.7 Drilling and providing carbon steel galvanished dash fastner (Hilty or Nos. 5940 347.58
Fisher) of size drill bit dia 16 mm, length 140 mm etc. all complete as per
direction of Engineer-in-charge.
B/F P. No-14 of CMB-03 1513.00
B/F P. No- of TCMB- 957.00
Total 347.58 2470.00 858522.6 525888.54 332634.06
900 mm dia RCC pipes. (Laying by manual/ machanical means) Mtr. 70 12557.70
B/F P. No-14 of CMB-03 70.00
Extra Item Sanctioned vide letter No.
Dated:
Total M/R 12557.70 70.00 879039 879039 0
Page 74
EI-I/II Supplying and filling in plinth with sand under floors, including watering,
ramming, consolidating and dressing complete. Cum 85 2255.20
Page 75
Say Rs. 126472324.00 99478216.00 26994107.00
Upto date work done 126472324.00 99478216.00 26994107.00
Less already paid previous bill(B) 99478216.46 99478216.00 26994107.00
Gross amount of this bill ......(A-B) 26994107.47
Say Rs. 26994107.00 26994107.00
Total 26994107.00 26994107.00
Recovery Details Total 26994107.00 26994107.00
(i)SD @ 2.5% on Rs. 126472324/- 126472324.00 3,161,808.00
Less already deducted 2,486,955.00
Now to be recovered 674,853.00 674853.00
(ii) Income Tax @ 1% on Rs. 126472324/- 126472324.00 1,264,723.00
Less already deducted 994,782.00
Now to be recovered 269,941.00 269941.00
(iii) CGST @ 1% on Rs. 42435464/- 42435464.00 424,355.00
Less already deducted 424,355.00
Now to be recovered 0.00 0.00
(iii) CGST @ 1% on Rs. 84036860/- 75032911.00 750,329.00
Less already deducted 509,310.00
Now to be recovered 241019.00 241019.00
(iv) SGST @ 1% on Rs. 42435464/- 42435464.00 424,355.00
Less already deducted 424,355.00
Now to be recovered 0.00 0.00
(iv) SGST @ 1% on Rs. 84036860/- 75032911.00 750,329.00
Less already deducted 509,310.00
Now to be recovered 241019.00 241019.00
(v) Labour Cess @1% on Rs. 126472324/- 126472324.00 1,264,723.00
Less already deducted 994,782.00
Now to be recovered 269941.00 269941.00
(VI) Withheld @ 4% of tender Amount Rs. 137161143.00/- 137161143 5486446.00
Less already deducted 5486446.00
Now to be recovered 0.00 0.00
Total 1696773.00
Total Recoveries….(D) 1,696,773.00
Net Amount of this Bill (C-D) 25,297,334.00
Rupees (Two Crore Fifty Two Lakh Ninety Seven Thousand Three Hundred Thirty Four) only
Certified That :
1. The work has been executed as per terms and conditions of the agreement.
2. No material and T & P has been issued by the department.
3. Arrangements for water has been made by Contractor..
4. Requisite technical staff has been employed as per clause 36 of agreement.
5. Upto date recoveries have been effected in this bill.
6. Labour report submitted up to date .e.i / /
[Link] madatory test has been carried out at site as per specification.
Bill and measurment accepted by me.
The 10th R/A bill in favour of Shri Uttam Deb submitted to D/o for pass & payment please.
Page 76
Signature of AE
Page 77
RECORD OF MEASUREMENT
Name of Work: - Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar,
Teliamura & Panisagar Sector in Tripura SH: GIN No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur
Sector
Page 1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth,
1.2 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto
1.5 m, as di
Page 2
Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials.
1.5
Total 306.53
cum
Page 3
Item
. Providing and laying in position machine batched and machine mixed design mix cement concrete for plain cement concrete
work, using cement content as per approved design mix, including pumping of concrete to site of laying, finishing but
No- excluding the cos
2.1
2.1.1 All works upto plinth level :
2.1.2 M-10 grade plain cement concrete (cement content considered @ 220 kg/cum)
Detail Content
Description of item s No.
of s of
No. Length Breadth Depth
1 Actua
2 3 4 5 6 Area
7
l
GIN No- 703 0
U-Shape [Link] BSF Tower Oppo. Side
1 1 4.35 5.30 0.15 3.46
L=(4.7+4)/2= 4.35m
U-Shape [Link] BSF Tower Side
1 1 6.15 5.30 0.15 4.89
L=(5.5+6.8)/2= 6.15m
Gin No- 698
U-Shape [Link] Single Fenching Side 1 1 4.80 5.30 0.15 3.82
L= (4.8+4.5)/2= 4.65m 0
Gin No- 697-2A 0
U-Shape [Link] BSF Tower Oppo. Side 1 1 5.00 5.30 0.15 3.98
BSF Tower side 5m Height Single [Link] Right Side 1 1 6.00 3.20 0.10 1.92
Key 1 1 6.00 0.60 0.10 0.36
BSF Tower side 3m Height Single [Link] Right Side 1 1 10.70 2.00 0.10 2.14
Key 1 1 10.70 0.25 0.10 0.27
BSF Tower side 5m Height Single [Link] Left Side 1 1 5.40 3.20 0.10 1.73
Key 1 1 5.40 0.60 0.10 0.32
BSF Tower side 3m Height Single [Link] Left Side 1 1 4.80 2.00 0.10 0.96
Key 1 1 4.80 0.25 0.10 0.12
Gin No. 697-1A
U-Shape [Link] BSF Tower Side
1 1 2.70 5.30 0.15 2.15
L=(3+2.4)/2= 2.7m
BSF Tower side 5m Height Single [Link] Right Side 1 1 6.30 3.20 0.10 2.02
Key 1 1 6.30 0.60 0.10 0.38
BSF Tower side 3m Height Single [Link] Right Side 1 1 7.40 2.00 0.10 1.48
Key 1 1 7.40 0.25 0.10 0.19
BSF Tower side 5m Height Single [Link] Left Side 1 1 2.40 3.20 0.10 0.77
Key 1 1 2.40 0.60 0.10 0.14
Total 31.10
cum
2.6 Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
Detail Contents
s of of Area
Actual
Description of item Meas
ureme
nt
No. No. Length Breadth Depth
1 2 3 4 5 6 7
Qty as per item no. [Link] 1.00 31.10 0.40
12.44
Extra cement =(260-220)=40 kg/cum
Total 12.44
Qtl
Page 4
2.2 Centering and shuttering including strutting, propping etc. and removal of form for :
2.2.
Foundations, footings, bases of columns, etc. for mass concrete
1
Details Contents
of of Area
Actual
Description of item Measu
rement
Page 5
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to all
height.
2.4.1 (a) Thermo-Mechanically Treated bars.
GIN No 703 ( Ghagrabasti )
M Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm
U-Shape [Link] BSF Tower Oppo. SideBottom slab
5 Base Slab -bottom main bar 12 1 24 6.900 165.60
9 Distribution steel for Bottom 98.90
10 1 23 4.300
main bar
4 Base slab - Top steel 16 1 24 5.750 138.00
4A Base slab - Top steel 16 1 24 5.750 138.00
8 Distribution steel for Top main 98.90
12 1 23 4.300
bar
Chair 16 1 12 2.000 24.00
10 Haunch 10 2 24 2.026 97.25
Side walls ( bottom of base to Top of Roof)
3 side walls Other face main steel 10 2 24 4.925 236.40
7 side walls other face Distribution 137.60
10 2 16 4.30
steel
1 side wall earth face Main steel 12 2 24 4.375 210.00
2 side wall earth face Main steel 16 2 24 3.35 160.80
6 side wall earth face Distribution 137.60
10 2 16 4.30
steel
Spacer 10 1 40 1.00 40.00
Expension joint Proposed WallSide ( bottom of base to top of
roof)
side walls earth face main steel 12 1 33 4.725 155.93
side walls other face main steel 12 1 33 4.73 155.93
side wall earth face Distribution 10 1 26 4.90 127.40
side wall other face Distribution 10 1 26 4.90 127.40
Spacer 10 1 30 1.00 30.00
U-Shape [Link] BSF Tower SideBottom slab
5 Base Slab -bottom main bar 12 1 34 6.900 234.60
9 Distribution steel for Bottom 138.00
main bar 10 1 23 6.000
Page 6
Measured on :15/07/2023 Signature of Contractor/Representative Signature of JE
Page 7
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete
up to all height.
2.4. (a) Thermo-Mechanically Treated bars.
1 GIN No-698 ( Kathalcheri )
M Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm
U-Shape [Link] Single Fenching Side
5 Base Slab -bottom main bar 12 1 26 6.900 179.40
9 Distribution steel for Bottom 103.50
main bar 10 1 23 4.500
Page 8
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to all height.
2.4.1 (a) Thermo-Mechanically Treated bars.
GIN No-697 -2A ( Sabroom )
M Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm
U-Shape [Link] BSF Tower Oppo. Side
5 Base Slab -bottom main bar 12 1 29 6.800 197.20
9 Distribution steel for Bottom main bar 10 1 20 4.850 97.00
4 Base slab - Top steel 16 1 29 5.650 163.85
4A Base slab - Top steel 16 1 29 5.650 163.85
8 Distribution steel for Top main bar 10 1 28 4.850 135.80
Chair 16 1 12 2.000 24.00
10 Haunch 10 2 29 1.885 109.33
Side walls ( bottom of base to Top of Roof)
3 side walls Other face main steel 10 2 29 2.875 166.75
7 side walls other face Distribution steel 10 2 6 4.900 58.80
1 side wall earth face Main steel 12 2 29 2.375 137.75
2 side wall earth face Main steel 16 2 29 2.375 137.75
6 side wall earth face Distribution steel 10 2 6 4.900 58.80
Spacer 10 1 20 1.000 20.00
Expension joint Proposed WallSide ( bottom of base to top of roof)
side walls earth face main steel 12 1 33 5.500 181.50
side walls other face main steel 12 1 33 5.50 181.50
side wall earth face Distribution steel 10 1 34 4.90 166.60
side wall other face Distribution steel 10 1 34 4.90 166.60
Spacer 10 1 15 1.00 15.00
BSF Tower side 5m Height Single [Link] Right Side
Footing(L=6m)
Main Bar Top & Bottom 16 2 40 4.00 320.00
Distribution Steel 12 2 21 5.85 245.70
Chair 16 1 14 2.00 28.00
Key
Main Bar 16 2 40 1.55 124.00
Distribution 12 2 5 5.85 58.50
Stem
Vertical Main Bar 325.50
16 2 30 5.425
H=(4.6+4.5)/2= 4.55m
Vertical Main Bar 16 2 30 4.375 262.50
Distribution 10 2 30 5.90 354.00
Spacer 10 1 56 1.00 56.00
BSF Tower side 3m Height Single [Link] Right Side
Footing(L=10.7m)
Main Bar Top & Bottom 12 2 71 2.40 340.80
Distribution Steel 10 2 13 10.60 275.60
Chair 16 1 25 2.00 50.00
Key
Main Bar 12 2 71 0.70 99.40
Distribution 10 2 4 10.60 84.80
Stem
Vertical Main Bar 12 2 71 3.175 450.85
Distribution 10 2 17 10.60 360.40
Spacer 10 1 50 1.00 50.00
BSF Tower side 5m Height Single [Link] Left Side
Footing(L=5.4m)
Main Bar Top & Bottom 16 2 36 4.00 288.00
Distribution Steel 12 2 21 5.25 220.50
Chair 16 1 14 2.00 28.00
Key
Main Bar 16 2 36 1.55 111.60
Distribution 12 2 5 5.25 52.50
Stem
Vertical Main Bar 306.45
16 2 27 5.675
H=(4.9+4.7)/2= 4.8m
Vertical Main Bar 16 2 27 4.375 236.25
Distribution 10 2 32 5.32 340.48
Spacer 10 1 54 1.00 54.00
BSF Tower side 3m Height Single [Link] Left Side
Footing(L=4.8m)
Main Bar Top & Bottom 12 2 32 2.40 153.60
Distribution Steel 10 2 13 4.65 120.90
Chair 16 1 12 2.00 24.00
Key
Main Bar 12 2 32 0.70 44.80
Distribution 10 2 4 4.65 37.20
Stem
Vertical Main Bar 212.80
H=(2.8+2.5)/2= 2.65m 12 2 32 3.325
Page 9
Measured on 15/07/2023 Signature of Contractor/Representative Signature of JE
Page 10
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to all height.
2.4.1 (a) Thermo-Mechanically Treated bars.
GIN No-697-1A( Sabroom)
M Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm
(U-Shape [Link] BSF Tower Side - L=2.7m)
5 Base Slab -bottom main bar 16 1 14 7.000 98.00
9 Distribution steel for Bottom main 10 1 20 2.550 51.00
bar
4 Base slab - Top steel 20 1 14 5.850 81.90
4A Base slab - Top steel 16 1 14 5.850 81.90
8 Distribution steel for Top main bar 12 1 20 2.550 51.00
Chair 16 1 8 2.000 16.00
10 Haunch 10 2 14 2.168 60.70
Side walls ( bottom of base to Top of Roof)
3 side walls Other face main steel 10 2 14 7.075 198.10
7 side walls other face Distribution 10 2 22 2.600 114.40
1 steelMain steel
side wall earth face 16 2 14 6.475 181.30
2 side wall earth face Main steel 16 2 14 3.576 100.13
6 side wall earth face Distribution 10 2 22 2.600 114.40
steel Spacer 10 1 36 1.000 36.00
Expension joint Proposed WallSide ( bottom of base to top of roof)
side walls earth face main steel 12 1 33 6.575 216.98
side walls other face main steel 12 1 33 6.575 216.98
side wall earth face Distribution 10 1 35 2.60 91.00
steel
side wall other face Distribution 10 1 35 2.60 91.00
steel Spacer 10 1 50 1.00 50.00
BSF Tower side 5m Height Single [Link] Right Side
Footing(L=6.3m)
Main Bar Top & Bottom 16 2 42 4.00 336.00
Distribution Steel 12 2 21 6.15 258.30
Chair 16 1 14 2.00 28.00
Key
Main Bar 16 2 42 1.55 130.20
Distribution 12 2 5 6.15 61.50
Stem
Vertical Main Bar 296.00
16 2 32 4.625
H=(3.4+4.1)/2= 3.75m
Vertical Main Bar 16 2 32 4.375 280.00
Distribution 10 2 25 6.15 307.50
Spacer 10 1 49 1.00 49.00
BSF Tower side 3m Height Single [Link] Right Side
Footing(L=7.4m)
Main Bar Top & Bottom 12 2 49 2.40 235.20
Distribution Steel 10 2 13 7.25 188.50
Chair 16 1 18 2.00 36.00
Key
Main Bar 12 2 49 0.70 68.60
Distribution 10 2 4 7.25 58.00
Stem
Vertical Main Bar 12 2 49 3.375 330.75
Distribution 10 2 18 7.25 261.00
Spacer 10 1 40 1.00 40.00
BSF Tower side 5m Height Single [Link] Left Side
Footing(L=2.4m)
Main Bar Top & Bottom 16 2 16 4.00 128.00
Distribution Steel 12 2 21 2.25 94.50
Chair 16 1 6 2.00 12.00
Key
Main Bar 16 2 16 1.55 49.60
Distribution 12 2 5 2.25 22.50
Stem
Vertical Main Bar
16 2 12 6.475 155.40
H=(3.4+4.1)/2= 3.75m
Vertical Main Bar 16 2 12 4.375 105.00
Distribution 10 2 37 2.32 171.68
Spacer 10 1 28 1.00 28.00
Total length in M 0.000 1910.280 1556.310 2033.530 81.900
Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 1165.270 1382.000 3192.640 201.230
Grand Total in Kg= 5941.140
Net Payble [Link] Kg 5941.140
Page 11
Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete
2.4 up to all height.
Page 12
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete
up to all height.
2.4. (a) Thermo-Mechanically Treated bars.
1 GIN No 698 ( Kathalcheri)
M Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm
Single Fenching Side Half Portion Top Slab (L=14.5m)
9 Top Slab bottom main bar 16 1 34 14.985 509.49
Lap 16 1 34 0.816 27.74
14A Bottom distribution bar 10 1 58 5.410 313.78
10 Top Slab Top main bar 16 1 30 14.385 431.55
Lap 16 2 30 0.816 48.96
14 Top distribution bar 10 1 58 5.410 313.78
11 Additional Steel 10 3 30 2.250 202.50
Chair 16 4 8 2.000 64.00
Page 13
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete
up to all height.
2.4. (a) Thermo-Mechanically Treated bars.
1 GIN No 698 ( Kathalcheri)
M Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm
Page 14
Item. Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement
concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding th
No-
2.5
2.5.1 All works upto plinth level
Detail Contents
Description of item s No.
of of Area
No. Length Breadth Depth
Actual
1 2 3 4 5 6 7
Meas
Gin no. 703
U-Shape [Link] BSF Tower Oppo. Side 0
Foundation L=(4.7+4.5+4)/3= 4.4m 1 1 4.40 5.00 0.60 13.2
Haunch 2 0.5 4.40 0.30 0.30 0.4
Side Wall (H=3.9+3.2/2= 3.55m)
1 2 4.40 0.40 3.55 12.5
B=(0.550+0.250/2= 0.400m)
Expension Joint Proposed Wall (H=3.9m)
1 1 4.50 0.35 3.90 6.14
B=(0.45+0.25)/2= 0.350m
U-Shape [Link] BSF Tower Side
Foundatiom L=(6.8+5.5)/2= 6.15m 1 1 6.15 5.00 0.60 18.45
Haunch 2 0.5 6.15 0.30 0.30 0.55
Side Wall H= (3.95+3.25)/2= 3.6m
1 2 6.15 0.40 3.60 17.71
B=(0.550+0.250/2= 0.400m)
Expension Joint Proposed Wall (H=3.25m)
1 1 4.50 0.35 3.25 5.12
B=(0.45+0.25)/2= 0.350m
Gin 698
U-Shape [Link] Single Fenching Side
Foundation L= (4.8+4.5)/2= 4.65m 1 1 4.65 5.00 0.60 13.95
Haunch 2 0.5 4.65 0.30 0.30 0.42
Side Wall H= 4.6m
1 2 4.65 0.40 4.66 17.34
B=(0.550+0.250/2= 0.400m)
Expension Joint Proposed Wall (H=4.6m)
1 1 4.50 0.35 4.60 7.25
B=(0.45+0.25)/2= 0.350m
Gin No. 697-2A
U-Shape [Link] BSF Tower Oppo. Side
Foundation 1 1 5.00 5.00 0.55 13.75
Haunch 2 0.5 5.00 0.30 0.30 0.45
Side Wall H= 1.6
1 2 5.00 0.375 1.60 6
B=(0.500+0.250/2= 0.375m)
Expension Joint Proposed Wall (H=5.2m)
1 1 5.00 0.35 5.20 9.1
B=(0.45+0.25)/2= 0.350m
BSF Tower side 5m Height Single [Link] Right Side
Foundation L=6m 1 1 6.00 3.20 0.55 10.56
Key 1 1 6.00 0.55 0.60 1.98
Wall H=(4.6+4.5)/2= 4.55m
1 1 6.00 0.40 4.55 10.92
B=(0.55+0.25/2= 0.4m)
BSF Tower side 3m Height Single [Link] Right Side 0
Foundation (L=10.7m) 1 1 10.70 2.00 0.35 7.49
Key 1 1 10.70 0.30 0.25 0.8
Wall H= 2.5m
7.36
B=(0.35+0.20/2= 0.275m) 1 1 10.70 0.275 2.50
BSF Tower side 5m Height Single [Link] Left Side
Foundation L=5.4m 1 1 5.40 3.20 0.55 9.5
Key 1 1 5.40 0.55 0.60 1.78
Wall H=(4.9+4.7)/2= 4.8m
1 1 5.40 0.40 4.80 10.37
B=(0.55+0.25/2= 0.4m)
BSF Tower side 3m Height Single [Link] Left Side
Foundation (L=4.8m) 1 1 4.80 2.00 0.35 3.36
Key 1 1 4.80 0.30 0.25 0.36
Wall (H= 2.8+2.5/2= 2.65m)
1 1 4.80 0.275 2.65 3.5
B=(0.35+0.20/2= 0.275m)
C/O 210.31
Page 15
Gin No. 697-1A B/F 210.31
U-Shape [Link] BSF Tower Side
Foundation L= (3+2.4)/2= 2.7m 1 1 2.70 5.00 0.65 8.78
Haunch 2 0.5 2.70 0.30 0.30 0.24
Side Wall H= 5.6m
B=(0.550+0.250/2= 0.400m) 12.1
1 2 2.70 0.40 5.60
Expension Joint Proposed Wall (H=5.6m)
B=(0.45+0.25)/2= 0.350m 8.82
1 1 4.50 0.35 5.60
BSF Tower side 5m Height Single [Link] Right Side 0
Foundation L=6.3m 1 1 6.30 3.20 0.55 11.09
Key 1 1 6.30 0.55 0.60 2.08
Wall H=(4.1+3.4)/2= 3.75m
1 1 6.30 0.40 3.75 9.45
B=(0.55+0.25/2= 0.4m)
BSF Tower side 3m Height Single [Link] Right Side 0
Foundation (L=7.4m) 1 1 7.40 2.00 0.35 5.18
Key 1 1 7.40 0.30 0.25 0.56
Wall (H= 2.7m)
B=(0.35+0.20/2= 0.275m) 1 1 7.40 0.275 2.70 5.49
Total 284.49
cum
2.6 Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
Details of Actual Measurement Content
Description of item s of
No. No. Length Breadth Depth
1 2 3 4 5 6 Area
7
Qty as per item no. 2.5.1 1.00 284.49 0.77
219.06
Extra cement =(407-330)=77 kg/cum
Total 219.06
Page 16
Providing and laying longitudinal drain of size 400mm at bottom, depth varying from 300mm to 500mm (all internal
3.4 dimensions), made of full
brick masonry in 1:6 (1 cement : 6 fine sand) with 12 mm cement plaster finished with a floating coat of neat cement
Page 17
2.2 Centering and shuttering including strutting, propping etc. and removal of form for :
2.2.1 Foundations, footings, bases of columns, etc. for mass concrete
Details of Actual Measurement Content
s of
Description of item Area
No. No. Length Breadth Depth
1 2 3 4 5 6 7
Gin no. 703
U-Shape [Link] BSF Tower Oppo. Side 0
Foundation L=(4.7+4.5+4)/3= 4.4m 1 2 4.40 - 0.60 5.28
1 2 - 5.00 0.60 6
U-Shape [Link] BSF Tower Side
Foundatiom L=(6.8+5.5)/2= 6.15m 1 2 6.15 - 0.60 7.38
1 2 - 5.00 0.60 6
Gin 698
U-Shape [Link] Single Fenching Side
Foundation L= (4.8+4.5)/2= 4.65m 1 2 4.65 - 0.60 5.58
1 2 - 5.00 0.60 6
Gin No. 697-2A
U-Shape [Link] BSF Tower Oppo. Side
Foundation 1 2 5.00 - 0.55 5.5
1 2 - 5.00 0.55 5.5
BSF Tower side 5m Height Single [Link] Right Side
Foundation L=6m 1 2 6.00 - 0.55 6.6
1 2 - 3.20 0.55 3.52
Key 1 1 6.00 - 0.60 3.6
BSF Tower side 3m Height Single [Link] Right Side
Foundation (L=10.7m) 1 2 10.70 - 0.35 7.49
1 2 - 2.00 0.35 1.4
Key 1 1 10.70 - 0.25 2.68
BSF Tower side 5m Height Single [Link] Left Side
Foundation L=5.4m 1 2 5.40 - 0.55 5.94
1 2 - 3.20 0.55 3.52
Key 1 1 5.40 - 0.60 3.24
BSF Tower side 3m Height Single [Link] Left Side
Foundation (L=4.8m) 1 2 4.80 - 0.35 3.36
1 2 - 2.00 0.35 1.4
Key 1 1 4.80 - 0.25 1.2
Gin No. 697-1A
U-Shape [Link] BSF Tower Side
Foundation L= (3+2.4)/2= 2.7m 1 2 2.70 - 0.65 3.51
1 2 - 5.00 0.65 6.5
BSF Tower side 5m Height Single [Link] Right Side
Foundation L=6.3m 1 2 6.30 - 0.55 6.93
1 2 - 3.20 0.55 3.52
Key 1 1 6.30 - 0.60 3.78
BSF Tower side 3m Height Single [Link] Right Side
Foundation (L=7.4m) 1 2 7.40 - 0.35 5.18
1 2 - 2.00 0.35 1.4
Key 1 1 7.40 - 0.25 1.85
BSF Tower side 5m Height Single [Link] Left Side
Foundation L=2.4m 1 2 2.40 - 0.55 2.64
1 2 - 3.20 0.55 3.52
Key 1 1 2.40 - 0.60 1.44
Total 131.46
Sqm
Measured on :10/08/2023 Signature of Contractor Signature of JE
Page 18
2.2 Centering and shuttering including strutting, propping etc. and removal of form for :
2.2.1 Foundations, footings, bases of columns, etc. for mass concrete
Page 19
2.2 Centering and shuttering including strutting, propping etc. and removal of form for :
2.2.2 Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Details of Actual Measurement Contents
Description of item of Area
No. No. Length Breadth Depth
1 2 3 4 5 6 7
Gin no. 703
U-Shape [Link] BSF Tower Oppo. Side
Haunch 1 2 4.40 - 0.42 3.7
Side Wall Other Side (H=3.9+3.2/2= 3.55m)
1 2 4.40 - 3.55 31.24
B=(0.550+0.250/2= 0.400m)
Side Wall EarthFace Side 1 2 4.40 - 3.25 28.6
2 2 - 0.40 3.55 5.68
Expension Joint Proposed Wall (H=3.9m)
1 1 4.50 - 3.90 17.55
B=(0.45+0.25)/2= 0.350m
1 2 - 0.35 3.90 2.73
U-Shape [Link] BSF Tower Side
Page 20
Providing and laying 110mm diametre unplasticised Rigid single socketed PVC pipes conforming to IS:13592 Type-A,
3.1 across the RCC/ Random Rubble masonary retaining wall or breast wall for function as weep holes to reduce the horizontal
pressure.
Page 21
Item Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced
. cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but
excluding th
No-
2.5
2.5.2 All works above plinth level upto floor V level
Details Contents
of of Area
Description of item Actual
Measu
No. No. Length Breadth Depth
1 2 3 4 5 6 7
Gin no 703 Top Slab 1 1 14.10 5.00 0.325 22.91
Extended Wall Earth Side 1 2 0.45 0.30 0.325 0.09
Extended Wall Internal Side 1 3 0.40 0.30 0.325 0.12
Gin no. 698 Top Slab Half Portion 1 1 14.50 5.00 0.325 23.56
Extended Wall Earth Side 1 1 0.70 0.30 0.325 0.07
Extended Wall Internal Side 1 4 0.45 0.30 0.325 0.18
Gin no. 698 Top Slab Expension Joint Portion 1 1 14.50 5.00 0.325 23.56
Extended Wall Earth Side 1 1 0.70 0.30 0.325 0.07
Extended Wall Internal Side 1 4 0.45 0.30 0.325 0.18
Total 70.49
C/O to Page No. Of TCMB cum
2.6 Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
Detail Contents
s of of Area
Actual
Meas
Description of item ureme
nt
Page 22
2.3 Extra for additional height in centering, shuttering where ever required with adequate bracing, propping etc., including cost
2.3. of deshuttering
Suspended androofs,
floors, decentering at balconies
landings, all levels, over a heightplatform
and access of 3.5 m, for every additional height of 1 metre or part thereof (Pl
1
Details Content
of s of
Actual
Measu Area
Description of item rement
Total 450.00
sqm
2.2. Centering and shuttering including strutting, propping etc. and removal of form for :
3 Suspended floors, roofs, landings, balconies and access platform
Details Content
of
Actual s of
Measur Area
Description of item ement
Page 23
RECORD OF MEASUREMENT
Name of Work: - Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar, Teliamura & Panisagar Sector in
Tripura SH: GIN No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur Sector
Location of Work:- BFSD-III
Name of the Contractor :Shri Uttam deb
Reference to Agreement no:-02/EE/BFD-III/AGT/2021-2022
Date of written order to commence work :09.04.2021
Stipulated date of completion of work:- 02.07.2022
Date of actual completion of work:- in progress
Reference to previous measurements, if any:-
Serial no of this bill :- 9th R/A BILL
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and
1.6 removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
Total 594.66
Sqm
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as
10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge
1.2
1.2.1 All kinds of soil
Details of Actual Measurement Contents
Description of item of Area
Cum
No. No. Length Breadth Depth
1 2 3 4 5 6 7
GIN No- 703
U- shape [Link] BSF Tower Oppo. Side
Avg.L=(4.7+4.5+4)/3=4.4 1 1 4.40 5.5 3.8 91.96
Avg.H=(4+3.6)/2=3.8
U- shape [Link] BSF Tower side
Avg.L=(6.8+4.5)/2=5.65 1 1 5.65 5.30 3.65 109.3
Avg.H=(4.05+3.25)/2=3.65
Page 24
C/O to Page No. Of TCMB
1.5 Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials.
1.5.1 All kinds of soil
Details of Actual Measurement Contents
Description of item of Volume
Cum
No. No. Length Breadth Depth
1 2 3 4 5 6 7
GIN No- 703
U- shape [Link] BSF Tower Oppo. Side
Avg.L=(4.7+4.5+4)/3=4.4 1 1 4.40 5.5 2.3 55.66
Avg.H=(4+3.6)/2=3.8
U- shape [Link] BSF Tower side
Avg.L=(6.8+4.5)/2=5.65 1 1 5.65 5.30 2.15 64.38
Avg.H=(4.05+3.25)/2=3.65
Page 25
cum
Item. Providing and laying in position machine batched and machine mixed design mix cement concrete for plain cement concrete work, using cement
content as per approved design mix, including pumping of concrete to site of laying, finishing but excluding the cost of centering, shuttering, including
No- admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and
2.1 durability as per direction of Engineer-in-charge. (Note :- Excess/ less cement used as per design mix is payable/recoverable separately).
2.1.1 All works upto plinth level :
[Link] M-10 grade plain cement concrete (cement content considered @ 220 kg/cum)
Details Contents
Description of item of of Area
No. No. Length Breadth Depth
Actual Cum
1 2
Measu 3 4 5 6 7
GIN No- 703
U- shape [Link] BSF Tower Oppo. Side
Avg. L=(4.7+4)/2=4.35 1 1 4.35 5.30 0.15 3.46
U- shape [Link] BSF Tower Side
Avg. L=(4.5+6.8)/2=4.35 1 1 5.65 5.3 0.15 4.49
GIN No- 698
U-Shape [Link] single Fencing Side
Avg.L=(4.8+4.5)/2=4.65m 1 1 4.65 5.30 0.15 3.7
GIN No- 697-2A
U- shape [Link] BSF Tower Oppo. Side 1 1 5.00 5.30 0.15 3.98
BSF Tower side 5m Height Single [Link] Rigth Side 1 1 6.00 3.20 0.10 1.92
Key 1 1 6.00 0.10 0.60 0.36
BSF Tower side 3m Height Single [Link] Right Side(Base) 1 1 10.70 2.00 0.10 2.14
Key 1 1 10.70 0.10 0.25 0.27
BSF Tower side 5m Height Single [Link] Left Side(Base) 1 1 5.40 3.20 0.10 1.73
Key 1 1 5.40 0.10 0.60 0.32
BSF Tower side 3m Height Single [Link] Left Side(Base) 1 1 4.80 2.00 0.10 0.96
Key 1 1 4.80 0.10 0.25 0.12
Gin No. 697-1A
U-Shape [Link] BSF Tower Side
L=(3+2.4)/2= 2.7m 1 1 2.70 5.30 0.15 2.15
BSF Tower side 5m Height Single [Link] Right Side(Base) 1 1 6.30 3.20 0.10 2.02
Key 1 1 6.30 0.10 0.60 0.38
BSF Tower side 3m Height Single [Link] Right Side(Base) 1 1 7.40 2.00 0.10 1.48
Key 1 1 7.40 0.10 0.25 0.19
BSF Tower side 5m Height Single [Link] Left Side(Base) 1 1 2.40 3.20 0.10 0.77
Key 1 1 2.40 0.10 0.60 0.14
Total 30.58
cum
2.6 Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
Details Contents
Description of item of of weight
No. No. Length Breadth Depth
Actual
1 2
Measu 3 4 5 6 7
Qty as per item no. [Link] 1.00 30.58 0.40 12.23
Extra cement =(260-220)=40 kg/cum
Total 12.23
Qtl
2.2 Centering and shuttering including strutting, propping etc. and removal of form for :
2.2.1 Foundations, footings, bases of columns, etc. for mass concrete
Page 26
1 2 2.00 0.10 0.40
key 1 1 10.7 0.25 2.68
BSF Tower side 5m Height Single [Link] Left Side 1 2 5.40 - 0.10 1.08
1 2 3.20 0.10 0.64
key 1 1 5.4 0.6 3.24
BSF Tower side 3m Height Single [Link] Left Side 1 2 4.80 - 0.10 0.96
1 2 2.00 0.10 0.40
key 1 1 4.8 0.25 1.20
GIN No- 697-1A
U-Shape [Link] BSF Tower Side
L=(3+2.4)/2= 2.7m 1 2 2.70 - 0.15 0.81
1 2 5.3 0.15 1.59
BSF Tower side 5m Height Single [Link] Right Side 1 2 6.30 - 0.10 1.26
1 2 3.2 0.10 0.64
key 1 1 6.3 0.6 3.78
BSF Tower side 3m Height Single [Link] Right Side 1 2 7.40 - 0.10 1.48
1 2 2 0.10 0.40
key 1 1 7.4 0.25 1.85
BSF Tower side 5m Height Single [Link] Left Side 1 2 2.40 - 0.10 0.48
1 2 2.00 0.10 0.40
Key 1 1 2.4 0.6 1.44
Total 44.62
C/O to Page No. Of TCMB Sqm
Page 27
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to all height.
2.4.1 (a) Thermo-Mechanically Treated bars.
GIN No 703 ( Ghagrabasti )
M Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm
Bottom slab
1 bottom main bar 16 1 28 17.520 490.56
17A Bottom distribution bar 10 1 57 5.750 327.75
Lap in bottom main bar 16 1 28 0.816 22.85
2 Additional steel 10 3 28 2.200 184.80
4 Top main bar 16 1 28 14.550 407.40
17 Top distribution bar 10 1 57 5.750 327.75
Lap in top main bar 16 1 28 0.816 22.85
Chair 16 1 10 2.000 20.00
30 shear links (28*3*6+168)=672 10 1 672 0.500 336.00
13 Haunch steel side walls 10 2 28 1.673 93.69
8 Haunch steel internal walls 10 2 28 1.652 92.51
8 Haunch steel internal walls 10 2 28 1.652 92.51
` Haunch steel internal walls 10 2 28 1.652 92.51
Side walls ( bottom to 3.50 m from top of base)
3 side walls earth face main steel 12 1 28 5.150 144.20
Page 28
Measured on : 04.04.2023 Signature of Contractor/Representative Signature of JE
Page 29
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to all height.
2.4.1 (a) Thermo-Mechanically Treated bars.
GIN No-697 -2A ( Sabroom )
M Description Dia Nos Nos lenth 8mm 10 mm 12 mm 16 mm
GIN no -703
U-Shape [Link] BSF Tower Oppo.
SideBottom slab
5 Base slab-Bottom Steel 12 1 24 6.900 165.60
9 Distribution steel for bottom base slab 10 1 23 4.200 96.60
4 Base slab - Top steel 16 1 24 5.750 138.00
4A Base slab - Top steel 16 1 24 5.750 138.00
8 Distribution steel for Top base slab 12 1 23 4.200 96.60
Chair 16 1 12 2.000 24.00
10 Haunch 10 2 24 2.026 97.25
Side walls ( bottom of base to Top of Roof)
3 Vertical bar at other side 10 2 24 4.925 236.40
7 Distribution steel for vertical wall at 137.60
10 2 16 4.30
other side
1 Vertical bar at earth face 12 2 24 4.38 210.00
2 vertical bar at earthface curtailment at 161.47
650mm abive top of base slab 16 2 24 3.36
Page 30
4A Base slab - Top steel 16 1 26 5.750 149.50
8 Distribution steel for Top base slab 12 1 23 4.500 103.50
Chair 16 1 12 2.000 24.00
10 Haunch 10 2 26 2.026 105.35
Side walls ( bottom of base to Top of Roof)
3 Vertical bar at other side 10 2 26 5.975 310.70
7 Distribution steel for vertical wall at 191.10
10 2 21 4.55
other side
1 Vertical bar at earth face 12 2 26 5.43 282.10
2 vertical bar at earthface curtailment at 174.93
650mm abive top of base slab 16 2 26 3.36
GIN no -697-2A
U-Shape [Link] BSF Tower
Oppo. Side
5 Base slab-Bottom Steel 12 1 29 6.800 197.20
9 Distribution steel for bottom base slab 10 1 20 4.850 97.00
4 Base slab - Top steel 16 1 29 5.650 163.85
4A Base slab - Top steel 16 1 29 5.650 163.85
8 Distribution steel for Top base slab 10 1 28 4.825 135.10
Chair 16 1 12 2.000 24.00
10 Haunch 10 2 29 1.885 109.33
Side walls ( bottom of base to Top of Roof)
3 Vertical bar at other side 10 2 29 2.875 166.75
7 Distribution steel for vertical wall at 58.80
10 2 6 4.90
other side
1 Vertical bar at earth face 12 2 29 2.38 137.75
2 vertical bar at earthface curtailment at 137.75
650mm abive top of base slab 16 2 29 2.38
Page 31
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to all height.
2.4.1 (a) Thermo-Mechanically Treated bars.
GIN No-697 -1A ( Sabroom )
M Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm
Bottom slab
1 bottom main bar 20 1 30 19.610 588.30
17A Bottom distribution bar 10 1 118 6.150 725.70
Lap in bottom main bar 20 1 30 1.020 30.60
4 Top main bar 16 1 30 15.200 456.00
17 Top distribution bar 10 1 118 6.150 725.70
4 Lap Top main bar 16 1 30 0.816 24.48
Chair 16 1 40 2.000 80.00
30 shear links (30*3*8)=720 10 1 720 0.800 576.00
13 Haunch steel side walls 10 2 30 2.455 147.30
8 Haunch steel internal walls 10 2 30 2.090 125.40
8 Haunch steel internal walls 10 2 30 2.090 125.40
8 Haunch steel internal walls 10 2 30 2.090 125.40
Side walls ( bottom to 3.50 m from top of base)
3 side walls earth face main steel 16 1 30 6.121 183.63
5 side walls other face main steel 20 1 30 4.96 148.80
15 side wall earth face Distribution steel 10 1 18 6.89 124.02
26 side wall other face Distribution steel 10 1 18 6.89 124.02
31 shear links (30*3)=90 10 1 90 1.04 93.60
Column C 20 1 4 4.23 16.90
Ring 10 1 31 1.62 50.22
Ring 10 1 31 0.93 28.89
Ring 10 1 31 0.70 21.70
Side walls ( bottom to 3.50 m from top of base)
3 side walls earth face main steel 16 1 30 6.121 183.63
5 side walls other face main steel 20 1 30 4.96 148.80
Page 32
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to all height.
2.4.1 (a) Thermo-Mechanically Treated bars.
GIN No-698 ( Kathalcheri)
M Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm
Bottom slab (Up to Expansion Joint)
1 bottom main bar 20 1 32 17.185 549.92
17A Bottom distribution bar 10 1 116 5.750 667.00
Lap in bottom main bar 20 1 32 1.020 32.64
4 Top main bar 16 1 32 14.800 473.60
17 Top distribution bar 10 1 116 5.750 667.00
4 Lap Top main bar 16 1 32 0.816 26.11
Chair 16 1 40 2.000 80.00
30 shear links (32*3*8)=768 10 1 768 0.500 384.00
13 Haunch steel side walls 10 1 32 2.026 64.83
8 Haunch steel internal walls 10 2 32 1.722 110.21
8 Haunch steel internal walls 10 2 32 1.722 110.21
8 Haunch steel internal walls 10 2 32 1.722 110.21
8 Haunch steel internal walls 10 1 32 1.722 55.10
Side walls ( bottom to 3.50 m from top of base)
3 side walls earth face main steel 16 1 32 5.400 172.80
5 side walls other face main steel 20 1 32 4.66 149.12
15 side wall earth face Distribution steel 10 1 18 6.39 115.02
26 side wall other face Distribution steel 10 1 18 6.39 115.02
31 shear links (32*3)=96 10 1 96 0.79 75.36
Column C 20 1 6 4.18 25.08
Ring 10 1 31 1.72 53.32
Ring 10 1 31 1.10 34.10
Ring 10 1 31 0.75 23.25
Internal walls ( bottom to 3.50 m from top of base)
6 internal walls vertical main steel 16 2 39 4.18 326.04
16 internal wall distribution steel 10 2 24 5.96 286.08
Spacer 10 1 30 0.90 27.00
column D 16 1 2 4.180 8.36
ties column D 10 1 31 1.220 37.82
10 1 31 0.350 10.85
Internal walls ( bottom to 3.50 m from top of base)
6 internal walls vertical main steel 16 2 39 4.18 326.04
16 internal wall distribution steel 10 2 24 5.96 286.08
Spacer 10 1 30 0.90 27.00
column D 16 1 2 4.180 8.36
ties column D 10 1 31 1.220 37.82
10 1 31 0.350 10.85
Internal walls ( bottom to 3.50 m from top of base)
6 internal walls vertical main steel 16 2 39 4.18 326.04
16 internal wall distribution steel 10 2 24 5.96 286.08
Spacer 10 1 30 0.90 27.00
column D 16 1 2 4.180 8.36
ties column D 10 1 31 1.220 37.82
10 1 31 0.350 10.85
Internal walls ( bottom to 3.50 m from top of base)
6 internal walls vertical main steel 16 2 39 4.18 326.04
16 internal wall distribution steel 10 2 24 5.96 286.08
Spacer 10 1 30 0.90 27.00
column D 16 1 2 4.180 8.36
ties column D 10 1 31 1.220 37.82
10 1 31 0.350 10.85
250mm×250mm column 16 5 4 4.180 83.60
Ties of 250mm×250mm column 10 5 31 0.72 111.60
Cut -off walls
Horizontal 10 4 8 9.20 294.40
verticle 10 4 47 1.90 357.20
Spacer 10 2 9 0.50 9.00
Total length in M 0.000 4803.830 0.000 2173.710 756.760
Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 0.000 2930.340 0.000 3412.720 1859.360
Grand Total in Kg= 8202.420
Net Payble [Link] Kg 8202.420
Carried over to Page No. of TCMB
Page 33
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to all height.
Page 34
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to all height.
2.4.1 (a) Thermo-Mechanically Treated bars.
GIN No 703 ( Ghagrabasti )
M Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm
Side walls ( 3.50 m to top slab)
3 side walls earth face main steel 12 1 28 2.760 77.28
Laping 12 1 28 0.612 17.14
5 side walls other face main steel 16 1 28 1.69 47.18
Laping 16 1 28 0.816 22.85
15 side wall earth face Distribution 10 1 8 5.89 47.12
26 steel
side wall other face Distribution 10 1 8 5.89 47.12
31 steel shear links (28*3)=84 10 1 84 0.54 44.94
12 Haunch Steel Top Slab Side Wall 10 1 28 1.55 43.29
10 Top Slab Top Main Steel 12 1 26 1.79 46.41
Column C 12 1 2 1.53 3.05
Laping 12 1 2 0.61 1.22
Ring 10 1 13 1.22 15.86
Ring 10 1 13 0.35 4.55
Side walls ( 3.50 m to top slab)
3 side walls earth face main steel 12 1 28 2.760 77.28
Laping 12 1 28 0.612 17.14
5 side walls other face main steel 16 1 28 1.69 47.32
Laping 16 1 28 0.82 22.85
15 side wall earth face Distribution 10 1 8 5.89 47.12
26 steel
side wall other face Distribution 10 1 8 5.89 47.12
31 steel shear links (28*3)=84 10 1 84 0.54 44.94
12 Haunch Steel Top Slab Side Wall 10 1 28 1.55 43.29
10 Top Slab Top Main Steel 12 1 26 1.79 46.41
Column C 12 1 2 1.53 3.06
Laping 12 1 3 0.61 1.84
Ring 10 1 13 1.22 15.86
Ring 10 1 13 0.35 4.55
Internal walls ( 3.50 m to top slab)
6 internal walls vertical main steel 16 2 28 1.78 99.68
Laping 16 2 28 0.82 45.70
16 internal wall distribution steel 10 2 10 5.86 117.20
7 Haunch 10 2 28 1.52 85.34
Spacer 10 1 10 0.50 5.00
column D 16 1 2 1.530 3.06
Laping 16 1 2 0.816 1.63
ties column D 10 1 13 1.120 14.56
10 1 13 0.350 4.55
Internal walls ( 3.50 m to top slab)
6 internal walls vertical main steel 16 2 28 1.78 99.68
Laping 16 2 28 0.82 45.70
16 internal wall distribution steel 10 2 10 5.86 117.20
7 Haunch Steel Top Slab Internal Wall 10 2 28 1.52 85.34
Spacer 10 1 10 0.50 5.00
column D 16 1 2 1.530 3.06
Laping 16 1 2 0.816 1.63
ties column D 10 1 13 1.120 14.56
10 1 13 0.350 4.55
Internal walls ( 3.50 m to top slab)
6 internal walls vertical main steel 16 2 28 1.78 99.68
Laping 16 2 28 0.82 45.70
16 internal wall distribution steel 10 2 10 5.86 117.20
7 Haunch Steel Top Slab Internal Wall 10 2 28 1.52 85.34
Spacer 10 1 10 0.50 5.00
column D 16 1 2 1.530 3.06
Laping 16 1 2 0.816 1.63
ties column D 10 1 13 1.120 14.56
10 1 13 0.350 4.55
250mm×250mm column 16 5 4 1.530 30.60
Laping 16 5 4 0.816 16.32
Ties of 250mm×250mm column 10 5 13 0.72 46.80
Total length in M 0.000 1132.510 290.830 637.330 0.000
Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 0.000 690.830 258.260 1000.610 0.000
Grand Total in Kg= 1949.700
Net Payble [Link] Kg 1949.700
Carried over to Page No. of TCMB
Page 35
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to all height.
2.4.1 (a) Thermo-Mechanically Treated bars.
GIN No-697 -2A ( Sabroom )
M Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm
Page 36
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to all height.
2.4.1 (a) Thermo-Mechanically Treated bars.
GIN No-697 -1A ( Sabroom )
M Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm
Side walls ( From 3.50 m to top slab)
3 side walls earth face main steel 16 1 30 4.781 143.43
Lap 16 1 30 0.816 24.48
5 side walls other face main steel 20 1 30 3.82 114.60
Lap 20 1 30 1.020 30.60
15 side wall earth face Distribution 10 1 16 6.89 110.24
26 steel
side wall other face Distribution 10 1 16 6.39 102.24
10 steel Top Slab Top main steel 16 1 29 2.55 73.95
12 Haunch bar 10 1 30 2.40 71.94
31 Shear link(30*3=90) 10 1 90 0.95 85.50
Column C 20 1 4 2.60 10.40
Lap 20 1 4 1.02 4.08
Ring 10 1 21 1.62 34.02
Ring 10 1 21 0.93 19.57
Ring 10 1 21 0.70 14.70
Side walls ( From 3.50 m to Top slab)
3 side walls earth face main steel 16 1 30 4.781 143.43
Lap 16 1 30 0.816 24.48
5 side walls other face main steel 20 1 30 3.82 114.60
Lap 20 1 30 1.020 30.60
15 side wall earth face Distribution 10 1 16 6.89 110.24
26 steel
side wall other face Distribution 10 1 16 6.39 102.24
10 steel Top Slab Top main steel 16 1 29 2.55 73.95
12 Haunch bar 10 1 30 2.40 71.94
31 Shear link(30*3=90) 10 1 90 0.95 85.50
Column C 20 1 4 2.60 10.40
Lap 20 1 4 1.02 4.08
Ring 10 1 21 1.62 34.02
Ring 10 1 21 0.93 19.57
Ring 10 1 21 0.70 14.70
Internal walls ( From 3.50 m to Top slab)
6 internal walls vertical main steel 16 2 54 2.88 311.04
Lap 16 2 54 0.82 88.13
16 internal wall distribution steel 10 2 14 6.38 178.64
8 Haunch bar 10 2 30 2.09 125.40
Spacer 10 1 15 0.50 7.50
column D 16 1 2 2.600 5.20
Lap 16 2 2 0.82 3.26
ties column D 10 1 21 1.220 25.62
10 1 21 0.350 7.35
Internal walls ( From 3.50 m to Top slab)
6 internal walls vertical main steel 16 2 54 2.88 311.04
Lap 16 2 54 0.82 88.13
16 internal wall distribution steel 10 2 14 6.38 178.64
8 Haunch bar 10 2 30 2.09 125.40
Spacer 10 1 15 0.50 7.50
column D 16 1 2 2.600 5.20
Lap 16 2 2 0.82 3.26
ties column D 10 1 21 1.220 25.62
10 1 21 0.350 7.35
Internal walls( From 3.50 m to Top slab)
6 internal walls vertical main steel 16 2 54 2.88 311.04
Lap 16 2 54 0.82 88.13
16 internal wall distribution steel 10 2 14 6.38 178.64
8 Haunch bar 10 2 30 2.09 125.40
Spacer 10 1 15 0.50 7.50
column D 16 1 2 2.600 5.20
Lap 16 2 2 0.82 3.26
ties column D 10 1 21 1.220 25.62
10 1 21 0.350 7.35
250mm×250mm column 16 5 4 2.600 52.00
Lap 16 2 4 0.82 6.53
Ties of 250mm×250mm column 10 5 21 0.72 75.60
Total length in M 0.000 1985.550 0.000 1765.140 319.360
Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 0.000 1211.190 0.000 2771.270 784.670
Grand Total in Kg= 4767.130
Net Payble [Link] Kg 4767.130
Page 37
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to all height.
2.4.1 (a) Thermo-Mechanically Treated bars.
GIN No-698 ( Kathalcheri)
M Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm
Side walls ( From 3.50 m to Top slab)
3 side walls earth face main steel 16 1 32 4.810 153.92
laping 16 1 32 0.816 26.11
5 side walls other face main steel 20 1 32 3.49 111.52
laping 20 1 32 1.020 32.64
15 side wall earth face Distribution 10 1 18 6.39 115.02
26 steel
side wall other face Distribution 10 1 18 6.39 115.02
10 steel Top slab top main steel 16 1 30 2.685 80.55
12 Haunch steel 10 1 32 1.899 60.77
31 shear link (32*3=96) 10 1 96 0.785 75.36
Column C 20 1 6 3.30 19.80
laping 20 1 6 1.020 6.12
Ring 10 1 27 1.72 46.44
Ring 10 1 27 1.10 29.70
Ring 10 1 27 0.75 20.25
Internal walls ( From 3.50 m to Top slab)
6 internal walls vertical main steel 16 2 39 3.58 279.24
laping 16 2 39 0.82 63.65
16 internal wall distribution steel 10 2 25 5.96 298.00
7 Haunch steel 10 2 32 1.60 102.08
Spacer 10 1 20 0.90 18.00
column D 16 1 2 3.300 6.60
laping 16 1 2 0.82 1.63
ties column D 10 1 27 1.220 32.94
10 1 27 0.350 9.45
Internal walls ( From 3.50 m to Top slab)
6 internal walls vertical main steel 16 2 39 3.58 279.24
laping 16 2 39 0.82 63.65
16 internal wall distribution steel 10 2 25 5.96 298.00
7 Haunch steel 10 2 32 1.60 102.08
Spacer 10 1 20 0.90 18.00
column D 16 1 2 3.300 6.60
laping 16 1 2 0.82 1.63
ties column D 10 1 27 1.220 32.94
10 1 27 0.350 9.45
Internal walls ( From 3.50 m to Top slab)
6 internal walls vertical main steel 16 2 39 3.58 279.24
laping 16 2 39 0.82 63.65
16 internal wall distribution steel 10 2 25 5.96 298.00
7 Haunch steel 10 2 32 1.60 102.08
Spacer 10 1 20 0.90 18.00
column D 16 1 2 3.300 6.60
laping 16 1 2 0.82 1.63
ties column D 10 1 27 1.220 32.94
10 1 27 0.350 9.45
Internal walls ( From 3.50 m to Top slab)
6 internal walls vertical main steel 16 2 39 3.58 279.24
laping 16 2 39 0.82 63.65
16 internal wall distribution steel 10 2 25 5.96 298.00
7 Haunch steel 10 2 32 1.60 102.08
Spacer 10 1 20 0.90 18.00
column D 16 1 2 3.300 6.60
laping 16 1 2 0.82 1.63
ties column D 10 1 27 1.220 32.94
10 1 27 0.350 9.45
250mm×250mm column 16 5 4 3.300 66.00
laping 16 5 4 0.82 16.32
Ties of 250mm×250mm column 10 5 27 0.72 97.20
Total length in M 0.000 2401.640 0.000 1747.380 170.080
Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 0.000 1465.000 0.000 2743.390 417.890
Grand Total in Kg= 4626.280
Net Payble [Link] Kg 4626.280
Page 38
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to all height.
2.4.1 (a) Thermo-Mechanically Treated bars.
GIN No-698 ( Kathalcheri)
M Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm
Page 39
Agt
No- Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all level.
2.4 Thermo-Mechanically Treated bars of grade Fe-500D or more.
2.4.1
M
Description Dia Nos Nos Lenth 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm
Page 40
Item. Providing and laying in position machine batched and machine mixed design mix cement concrete for plain cement concrete work, using cement
content as per approved design mix, including pumping of concrete to site of laying, finishing but excluding the cost of centering, shuttering, including
No- admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and
2.1 durability as per direction of Engineer-in-charge. (Note :- Excess/ less cement used as per design mix is payable/recoverable separately).
2.1.1 All works upto plinth level :
[Link] M-7.5 grade plain cement concrete (cement content considered @ 200 kg/cum)
Details Contents
Description of item of of Area
No. No. Length Breadth Depth
Actual
1 2
Measu 3 4 5 6 7
GIN No- 703 (Apron)
India side 1 1 13.50 1.50 0.10 2.03
Bangledesh side 1 1 13.50 2.50 0.10 3.38
Gin No- 698 (Apron)
India side 1 1 28.44 1.50 0.10 4.27
Bangledesh side 1 1 28.44 2.50 0.10 7.11
Gin No- 697-1A (Apron)
India side 1 1 14.05 1.50 0.10 2.11
Gin No- 697-2A (Apron)
India side 1 1 10.20 1.50 0.10 1.53
Bangledesh side 1 1 10.20 2.50 0.10 2.55
Total 22.98
cum
2.6 0
Details Contents
Description of item of of Area
No. No. Length Breadth Depth
Actual
1 2
Measu 3 4 5 6 7
Qty as per item no. [Link] 1.00 22.98 0.30
6.89
Extra cement =(230-200)=30 kg/cum
Total 6.89
Qtl
Page 41
Agt
No- Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all level.
2.4 Thermo-Mechanically Treated bars of grade Fe-500D or more.
2.4.1
M
Description Dia Nos Nos Lenth 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm
Apron (697-1A)
india side
main bar 10 1 49 1.450 71.05
binder 10 1 8 14.50 116.00
lap 10 1 106 0.50 53.00
curtain wall (697-2A)
india side
main bar 10 1 37 1.450 53.65
binder 10 1 8 10.65 85.20
lap 10 1 90 0.50 45.00
Bangladesh side
main bar 10 1 37 2.450 90.65
binder 10 1 13 10.65 138.45
lap 10 1 100 0.50 50.00
curtain wall (703)
india side
main bar 10 1 48 1.450 69.60
binder 10 1 8 13.95 111.60
lap 10 1 112 0.50 56.00
Bangladesh side
main bar both 10 1 48 2.450 117.60
binder 10 1 13 13.95 181.35
lap 10 1 122 0.50 61.00
curtain wall (698)
india side
main bar 10 1 97 1.450 140.65
binder 10 1 8 28.89 231.12
laping 10 1 240 0.50 120.00
Bangladesh side
main bar 10 1 97 2.450 237.65
binder 10 1 13 28.89 375.57
laping 10 1 240 0.50 120.00
Total length in M 0.000 2525.140 0.000 0.000 0.000 0.000
Weight in kg/m 0.395 0.610 0.888 1.570 2.457 3.858
Total weight in kg 0.000 1540.340 0.000 0.000 0.000 0.000
Grand Total in Kg= 1540.340
Net Payble [Link] Kg 1540.340
Carried over to Page No. of TCMB
Page 42
Item. Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work,
using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering,
No- finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve
2.5 workability without impairing strength and durability to get shutter finished surface as per direction of Engineer-in-charge. (Note :- Cement content
considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately).
2.5.1 All works upto plinth level
Details Contents
Description of item of of Area
No. No. Length Breadth Depth
Actual
1 2
Measu 3 4 5 6 7
GIN No-703 1 1 14.10 5.30 0.45 33.63
Haunch 8 0.5 5.30 0.30 0.30 1.91
Gin No- 698 1 1 29.04 5.30 0.45 69.26
Haunch 16 0.5 5.30 0.30 0.30 3.82
Gin No- 697-1A 1 1 14.65 5.30 0.50 38.82
Haunch 8 0.5 5.30 0.30 0.30 1.91
Gin No- 697-2A 1 1 10.80 5.30 0.45 25.76
Haunch 6 0.5 5.30 0.30 0.30 1.43
Total 176.54
C/O to cum
Page No.
2.6 Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
Of TCMB
Details of Actual Measurement Contents
Description of item of Qtl
No. No. Length Breadth Depth
1 2 3 4 5 6 7
Qty as per item no. 2.5.1 1.00 176.54 0.77
135.94
Extra cement =(407-330)=77 kg/cum
Total 135.94
2.2 Centering and shuttering including strutting, propping etc. and removal of form for :
2.2.1 Foundations, footings, bases of columns, etc. for mass concrete
Details of Actual Measurement Contents
Description of item of Area
No. No. Length Breadth Depth
1 2 3 4 5 6 7
GIN No-703 1 2 14.10 0.45 12.69
Page 43
2.2 Centering and shuttering including strutting, propping etc. and removal of form for :
2.2.2 Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Details of Actual Measurement Contents
Description of item of Area
No. No. Length Breadth Depth
1 2 3 4 5 6 7
GIN No-703
Page 44
Item. Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work,
using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering,
No- finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve
2.5 workability without impairing strength and durability to get shutter finished surface as per direction of Engineer-in-charge. (Note :- Cement content
2.5.1 All works upto plinth level
Details Contents
Description of item of of Area
No. No. Length Breadth Depth
Actual
1 2
Measu 3 4 5 6 7
GIN No-703
Side walls 1 2 5.30 0.45 4.70 22.42
Internal walls 1 3 5.30 0.40 4.70 29.89
Haunch 8 0.5 5.00 0.30 0.30 1.8
Gin No- 698
Side walls 1 2 5.30 0.70 6.50 48.23
Internal walls 1 8 5.30 0.45 6.50 124.02
Haunch 16 0.5 5.00 0.30 0.30 3.6
Gin No- 697-1A
Side walls 1 2 5.30 0.65 5.70 39.27
Internal walls 1 3 5.30 0.45 5.70 40.78
Haunch 8 0.5 5.00 0.30 0.30 1.8
Gin No- 697-2A
Side walls 1 2 5.30 0.50 5.20 27.56
Internal walls 1 2 5.30 0.40 5.20 22.05
Haunch 6 0.5 5.00 0.30 0.30 1.35
Total 362.77
cum
2.6 Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
Details Contents
Description of item of of Area
No. No. Length Breadth Depth
Actual
1 2
Measu 3 4 5 6 7
Qty as per item no. 2.5.1 1.00 362.77 0.77
279.33
Extra cement =(407-330)=77 kg/cum
Total 279.33
Page 45
Item. Providing and laying in position machine batched and machine mixed design mix cement concrete for plain cement concrete work, using cement
content as per approved design mix, including pumping of concrete to site of laying, finishing but excluding the cost of centering, shuttering, including
No- admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and
2.1 durability as per direction of Engineer-in-charge. (Note :- Excess/ less cement used as per design mix is payable/recoverable separately).
2.1.1 All works upto plinth level :
[Link] M-15 grade plain cement concrete (cement content considered @ 240 kg/cum)
Details Contents
Description of item of of Area
No. No. Length Breadth Depth
Actual
1 2
Measu 3 4 5 6 7
GIN No- 703 (Apron)
India side 1 1 13.50 1.50 0.30 6.08
Bangledesh side 1 1 13.50 2.50 0.30 10.13
Gin No- 698 (Apron)
India side 1 1 28.44 1.50 0.30 12.8
Bangledesh side 1 1 28.44 2.50 0.30 21.33
Gin No- 697-1A (Apron)
India side 1 1 14.05 1.50 0.30 6.32
Gin No- 697-2A (Apron)
India side 1 1 10.20 1.50 0.30 4.59
Bangledesh side 1 1 10.20 2.50 0.30 7.65
Total 68.90
cum
2.6 Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
Details of Actual Measurement Contents
Description of item of Area
No. No. Length Breadth Depth
1 2 3 4 5 6 7
Qty as per item no. [Link] 1.00 68.90 0.66
45.47
Extra cement =(306-240)=66 kg/cum
Total 45.47
Qtl
Page 46
Item. Providing and laying in position machine batched and machine mixed design mix cement concrete for plain cement concrete work, using cement
content as per approved design mix, including pumping of concrete to site of laying, finishing but excluding the cost of centering, shuttering, including
No- admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and
2.1 durability as per direction of Engineer-in-charge. (Note :- Excess/ less cement used as per design mix is payable/recoverable separately).
2.1.1 All works upto plinth level :
[Link] M-15 grade plain cement concrete (cement content considered @ 240 kg/cum)
Details of Actual Measurement Contents
Description of item of Area
No. No. Length Breadth Depth
1 2 3 4 5 6 7
GIN No- 703 (cutt-off wall)
1 2 8.80 0.50 0.50 4.4
1 2 9.10 0.30 0.55 3
curtain walls
india side 1 1 14.10 0.75 0.70 7.4
1 1 14.10 0.45 0.50 3.17
1 1 14.10 0.20 0.45 1.27
Bangladesh side 1 1 14.10 0.75 0.75 7.93
1 1 14.10 0.45 0.75 4.76
1 1 14.10 0.25 0.45 1.59
GIN No- 698 (cutt-off wall)
1 2 8.80 0.50 0.50 4.4
1 2 9.10 0.30 0.55 3
curtain walls
india side 1 1 29.04 0.75 0.70 15.25
1 1 29.04 0.45 0.50 6.53
1 1 29.04 0.20 0.45 2.61
Bangladesh side 1 1 29.04 0.75 0.75 16.34
1 1 29.04 0.45 0.75 9.8
1 1 29.04 0.25 0.45 3.27
GIN No- 697-2A (cutt-off wall)
1 2 8.80 0.50 0.50 4.4
1 2 9.10 0.30 0.55 3
curtain walls
india side 1 1 10.80 0.75 0.70 5.67
1 1 10.80 0.45 0.50 2.43
1 1 10.80 0.20 0.45 0.97
Bangladesh side 1 1 10.80 0.75 0.75 6.08
1 1 10.80 0.45 0.75 3.65
1 1 10.80 0.25 0.45 1.22
GIN No- 697-1A (cutt-off wall)
1 2 8.80 0.50 0.50 4.4
1 2 9.10 0.30 0.55 3
curtain walls
india side 1 1 14.65 0.75 0.70 7.69
1 1 14.65 0.45 0.50 3.3
1 1 14.65 0.20 0.45 1.32
Total 141.85
cum
2.6 Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
Details Contents
Description of item of of Area
No. No. Length Breadth Depth
Actual
1 2
Measu 3 4 5 6 7
Qty as per item no. [Link] 1.00 141.85 0.66 93.62
Extra cement =(306-240)=66 kg/cum
Total 93.62
Qtl
Page 47
2.2.2 Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Details Contents
Description of item of of Area
No. No. Length Breadth Depth
Actual
1 2
Measu 3 4 5 6 7
GIN No- 703 (cutt-off wall)
2 2 8.80 0.50 17.6
2 2 0.50 0.50 1
2 2 9.10 0.55 20.02
2 2 0.30 0.55 0.66
curtain walls
india side 1 2 14.10 0.70 19.74
1 2 0.75 0.70 1.05
1 2 14.10 0.50 14.1
1 2 0.45 0.50 0.45
1 2 14.10 0.45 12.69
1 2 0.20 0.45 0.18
Bangladesh side 1 2 14.10 0.75 21.15
1 2 0.75 0.75 1.13
1 2 14.10 0.75 21.15
1 2 0.45 0.75 0.68
1 2 14.10 0.45 12.69
1 2 0.25 0.45 0.23
GIN No- 698 (cutt-off wall)
2 2 8.80 0.50 17.6
2 2 0.50 0.50 1
2 2 9.10 0.55 20.02
2 2 0.30 0.55 0.66
curtain walls
india side 1 2 29.04 0.70 40.66
1 2 0.75 0.70 1.05
1 2 29.04 0.50 29.04
1 2 0.45 0.50 0.45
1 2 29.04 0.45 26.14
1 2 0.20 0.45 0.18
Bangladesh side 1 2 29.04 0.75 43.56
1 2 0.75 0.75 1.13
1 2 29.04 0.75 43.56
1 2 0.45 0.75 0.68
1 2 29.04 0.45 26.14
1 2 0.25 0.45 0.23
GIN No- 697-2A (cutt-off wall)
2 2 8.80 0.50 17.6
2 2 0.50 0.50 1
2 2 9.10 0.55 20.02
2 2 0.30 0.55 0.66
curtain walls
india side 1 2 10.80 0.70 15.12
1 2 0.75 0.70 1.05
1 2 10.80 0.50 10.8
1 2 0.45 0.50 0.45
1 2 10.80 0.45 9.72
1 2 0.20 0.45 0.18
Bangladesh side 1 2 10.80 0.75 16.2
1 2 0.75 0.75 1.13
1 2 10.80 0.75 16.2
1 2 0.45 0.75 0.68
1 2 10.80 0.45 9.72
1 2 0.25 0.45 0.23
GIN No- 697-2A (cutt-off wall)
2 2 8.80 0.50 17.6
2 2 0.50 0.50 1
2 2 9.10 0.55 20.02
2 2 0.30 0.55 0.66
curtain walls
india side 1 2 14.65 0.70 20.51
1 2 0.75 0.70 1.05
1 2 14.65 0.50 14.65
1 2 0.45 0.50 0.45
1 2 14.65 0.45 13.19
1 2 0.20 0.45 0.18
Total 606.69
Sqm
Page 48
Agt Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all level.
No-
2.4
2.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more.
M
Description Dia Nos Nos Lenth 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm
GIN No 703
Steel of Top Slab
10 Top Slab Top Main Bar 362.70
12 1 26 13.95
Agt Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all level.
No-
2.4
2.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more.
M
Description Dia Nos Nos Lenth 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm
Agt Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all level.
No-
2.4
2.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more.
M Description Dia Nos Nos Lenth 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm
GIN No 698 (part -2)
Steel of Top Slab
10 Top Slab Top Main Bar 16 1 30 14.385 431.55
Lap 16 2 30 0.816 48.96
14 Top Slab Top Distribution Bar 10 1 59 5.41 319.19
9 Top Slab Bott. Main Bar 16 1 34 14.985 509.49
Lap 16 1 34 0.816 27.74
14a Top Slab Bott. Distribution Bar 10 1 59 5.41 319.19
11 Additional Bar Top slab 10 3 30 2.25 202.50
Chair 16 1 32 2.00 64.00
Total length in M 0.000 840.880 0.00 1081.740 0.000 0.000
Weight in kg/m 0.395 0.610 0.888 1.570 2.457 3.858
Total weight in kg 0.000 512.940 0.000 1698.330 0.000 0.000
Grand Total in Kg= 2211.270
Net Payble [Link] Kg 2211.270
Carried over to Page No. of TCMB
Page 49
Item. Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work,
using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering,
No- finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve
2.5 workability without impairing strength and durability to get shutter finished surface as per direction of Engineer-in-charge. (Note :- Cement content
2.5.2 All works above plinth level upto floor V level
Details Contents
Description of item of of Area
No. No. Length Breadth Depth
Actual
1 2
Measu 3 4 5 6 7
GIN No-703
Total 54.47
Qtl
Centering & shuttering i/c strutting propping etc & removal of form for
2.2.2
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. Sqm
Description of item Details of Actual Measurement Contents
of Area
No. Length Breadth Depth
1 2 3 4 5 6
GIN No-703
Page 50
Centering & shuttering i/c strutting propping etc & removal of form for
2.2.3
Suspended floors,roofs,landing,balconies Sqm
Description of item Details of Actual Measurement Contents
of Area
No. Length Breadth Depth
1 2 3 4 5 6
GIN No-703
Top Slab 4 1 5.00 2.40 48.00
1 2 5.00 0.425 4.25
1 2 14.65 0.425 12.45
Total 64.70
Carried over to Page No. of TCMB
Extra for additional height in centering shuttering where ever required……
2.3.1
Suspended floors,roofs,landing,balconies Sqm
Description of item Details of Actual Measurement Contents
of Area
No. Length Breadth Depth
1 2 3 4 5 6
GIN No-703
Top Slab 4 1 5.00 3.00 60.00
Total 60.00
Extra Height (5.7-3.50)=2.2 x 3
Toatl 180.00
Carried over to Page No. of TCMB
Centering & shuttering i/c strutting propping etc & removal of form for
2.2.3
Suspended floors,roofs,landing,balconies Sqm
Description of item Details of Actual Measurement Contents
of Area
No. Length Breadth Depth
1 2 3 4 5 6
GIN No-698
Top Slab 3 1 5.00 2.40 36.00
1 2 5.00 0.325 3.25
1 2 10.80 0.325 7.02
Total 46.27
Carried over to Page No. of TCMB
Extra for additional height in centering shuttering where ever required……
2.3.1
Suspended floors,roofs,landing,balconies Sqm
Description of item Details of Actual Measurement Contents
of Area
No. Length Breadth Depth
1 2 3 4 5 6
GIN No-698
Top Slab 3 1 5.00 3.00 45.00
Total 45.00
Extra Height (5.2-3.50)=1.7 x 2
Total 90.00
Carried over to Page No. of TCMB
Page 51
RECORD OF MEASUREMENT
Name of Work: - Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under
Udaipur, Gukulnagar, Teliamura & Panisagar Sector in Tripura SH: GIN No. 697A, 697B, 698, 699, 701, 703,
706, 707, 708A & 708B under Udaipur Sector
Location of Work:- BFSD-III
Name of the Contractor :Shri Uttam deb
Reference to Agreement no:-02/EE/BFD-III/AGT/2021-2022
Date of written order to commence work :09.04.2021
Stipulated date of completion of work:- 09.11.2023
Date of actual completion of work:- in progress
Reference to previous measurements, if any:-
Serial no of this bill :- 10th R/A BILL
Item Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5
No- m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m,
1.2.1 as directed by Engineer-in-charge All kinds of soil
Details of Actual Measurement Contents of
Description of item No. No. Length Breadt Depth Area
h
1 2 3 4 5 6 7
GIN No- 703
Base For Single R. Wall BSF Tower Left
Side 1 1 7.30 2.50 1.50 27.38 cum
Avg.H=(0.9+2+1.6)/3=1.5
Key 1 1 7.30 0.30 0.35 0.77 cum
Base For Single R. Wall BSF Tower Left
Side
Span-1 1 1 7.60 2.50 1.80 34.2 cum
Avg.H=(0.7+2.8+1.9)/3=1.8
Key 1 1 7.60 2.50 0.35 6.65 cum
Page 22
B/F 179.86
Base For Single Gaurd Wall Single
Fenching Left Side 1 1 8.60 2.50 1.10 23.65 cum
Avg.H=(1+1.2)/2=1.1
Key 1 1 8.60 0.30 0.35 0.90 cum
Base For U-Shape R. Wall BSF Side 1 1 1.50 5.50 6.75 55.69 cum
GIN No- 697-2A
Base For Single Guard wall BSF Tower cum
Oppo. Right Side 1 1 20.00 2.50 0.80 40.00
Avg.H=(0.9+0.7)/2=0.8m
Key 1 1 20.00 0.30 0.30 1.80 cum
Base For Single Guard wall BSF Tower cum
Oppo. Left Side 1 1 20.00 2.50 0.95 47.50
Avg.H=(0.9+1)/2=0.95m
Key 1 1 20.00 0.30 0.30 1.80 cum
GIN No- 697-1A
Base For Single R. wall BSF Tower cum
Oppo. Left Side 1 1 5.50 3.50 2.13 41.00
Avg.H=(3.1+1.8+1.5)/3=2.13m
Key 1 1 5.50 0.60 0.55 1.82 cum
Base For Single R. wall BSF Tower cum
Oppo. Left Side 1 1 9.00 2.50 1.45 32.63
Avg.H=(1.3+1.6)/2=1.45m
Key 1 1 9.00 0.30 0.35 0.95 cum
Total 427.60 cum
Page 23
Item Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked [Link] kinds of soil
No-
1.5.1
Page 24
Item Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a
No- height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
1.6
Page 25
Providing and laying in position machine batched and machine mixed design mix cement concrete for plain cement concrete work, using cement
content as per approved design mix, including pumping of concrete to site of laying, finishing but excluding the cost of centering, shuttering,
including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing
2.1.1. strength and durability as per direction of Engineer-in-charge. (Note :- Excess/ less cement used as per design mix is payable/recoverable
2 separately).
M-10 grade plain cement concrete (cement content considered @ 220 kg/cum)
Details of Actual Measurement Contents of
Description of item No. No. Length Breadt Depth Area
h
1 2 3 4 5 6 7
GIN No- 703
2.6 Add/deduct for using extra cement in the items of design mix over and above the specified cement
content therein. Details of Actual Measurement Contents of
Description of item No. No. Length Breadt Depth Area
h
1 2 3 4 5 6 7
Qty as per item no. [Link] 1.00 25.63 0.30 7.69
Total 7.69 Qntl
Page 26
Measured on : 25.08.2023 Signature of Contractor Signature of JE
Page 27
Centering & shuttering i/c strutting propping etc & removal of form for
2.2.1
Foundations, footings, bases of columns, etc. for mass concrete
Details of Actual Measurement Contents of
Description of item
Area
No. No. Length Breadt Depth
h
1 2 3 4 5 6 7
GIN No- 703
Base For Single R. Wall BSF Tower Left
0.10 1.46 sqm
Side 1 2 7.30
1 2 2.00 0.10 0.40 sqm
Base For Single R. Wall BSF Tower
Right Side
Span-1 1 2 7.60 0.10 1.52 sqm
1 2 2.00 0.10 0.40 sqm
Span-2 1 2 3.50 0.10 0.70 sqm
1 2 2.00 0.10 0.40 sqm
GIN No- 698
Base For Single R. Wall Single Fenching 0.10 1.32 sqm
Right Side 1 2 6.60
1 2 2.00 0.10 0.40 sqm
Base For Single Guard Wall Single 0.10 1.88 sqm
Fenching Right Side 1 2 9.40
1 2 2.00 0.10 0.40 sqm
Base For Single R. Wall Single Fenching 0.10 1.45 sqm
Left Side 1 2 7.25
1 2 2.00 0.10 0.40 sqm
Base For Single Guard Wall Single 0.10 1.72 sqm
Fenching Left Side 1 2 8.60
1 2 2.00 0.10 0.40 sqm
Base For U-Shape R. Wall BSF Side 1 2 1.50 0.15 0.45 sqm
1 2 5.30 0.15 1.59 sqm
GIN No- 697-2A
Base For Single Guard wall BSF Tower 0.10 4.00 sqm
Oppo. Right Side 1 2 20.00
1 2 2.00 0.10 0.40 sqm
Base For Single Guard wall BSF Tower 0.10 4.00 sqm
Oppo. Left Side 1 2 20.00
1 2 2.00 0.10 0.40 sqm
GIN No- 697-1A
Base For Single R. wall BSF Tower 0.10 1.10 sqm
Oppo. Left Side 1 2 5.50
1 2 3.20 0.10 0.64 sqm
Base For Single R. wall BSF Tower 0.10 1.80 sqm
Oppo. Left Side 1 2 9.00
1 2 2.00 0.10 0.40 sqm
Page 28
Agt Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all
No- complete up to all height.
2.4
.
2.4.1 (a) Thermo-Mechanically Treated bars
Description Dia Nos Nos lenth 8mm 10 mm 12 mm 16 mm
GIN no -703
Base For Single R. Wall BSF Tower Left Side
L=7.3m
Key Main Bar(Both Side) 12 2 49 0.70 68.60
Key Binder(Both Side) 10 2 4 7.15 57.20
Base Main Bar(T&B) 12 2 49 2.40 235.20
Base Binder (T&B) 10 2 14 7.15 200.20
Chair 16 1 16 2.00 32.00
Steel of wall Bott. ToTop
Main Bar(Both Side) 12 2 49 3.200 313.60
Binder(Both Side) 10 2 17 7.22 245.48
Spacer 10 1 36 1.000 36.00
Base For Single R. Wall BSF Tower Right Side
Span-1
L=7.6m
Key Main Bar(Both Side) 12 2 51 0.70 71.40
Key Binder(Both Side) 10 2 4 7.45 59.60
Base Main Bar(T&B) 12 2 51 2.40 244.80
Base Binder (T&B) 10 2 14 7.45 208.60
Chair 16 1 18 2.00 36.00
Steel of wall Bott. ToTop
Main Bar(Both Side) 12 2 51 2.900 295.80
Binder(Both Side) 10 2 15 7.52 225.60
Spacer 10 1 40 1.000 40.00
Span-2
L=3.5m
Key Main Bar(Both Side) 12 2 23 0.70 32.20
Key Binder(Both Side) 10 2 4 3.35 26.80
Base Main Bar(T&B) 12 2 23 2.40 110.40
Base Binder (T&B) 10 2 14 3.35 93.80
Chair 16 1 8 2.00 16.00
Steel of wall Bott. ToTop
Main Bar(Both Side) 12 2 23 1.950 89.70
Binder(Both Side) 10 2 8 3.42 54.72
Spacer 10 1 12 1.000 12.00
U-shape [Link] in BSF Side
Extra Height
Left Side
3 Vertical bar other face 10 2 38 0.850 64.60
Lap 10 2 38 0.510 38.76
1 Vertical bar Earth face 12 2 38 0.850 64.60
Lap 12 2 38 0.612 46.51
6&7 10 2 4 6.720 53.76
Distribution
Right Side
3 Vertical bar other face 10 1 31 0.850 26.35
Lap 10 1 31 0.510 15.81
C/O 0.00 1459.28 1572.81 84.00
Page 29
Measured on : 05.09.2023 Signature of Contractor Signature of JE
B/F 0.00 1459.28 1572.81 84.00
1 Vertical bar Earth face 12 1 31 0.850 26.35
Lap 12 1 31 0.612 18.97
6&7 43.36
Distribution 10 2 4 5.420
GIN No- 698
Base For Single R. Wall Single Fenching Right Side
L=6.6m
Key Main Bar(Both Side) 12 2 44 0.70 61.60
Key Binder(Both Side) 10 2 4 6.45 51.60
Base Main Bar(T&B) 12 2 44 2.40 211.20
Base Binder (T&B) 10 2 14 6.45 180.60
Chair 16 1 16 2.00 32.00
Steel of wall Bott. ToTop
Main Bar(Both Side) 12 2 44 3.600 316.80
Binder(Both Side) 10 2 19 6.52 247.76
Spacer 10 1 35 1.000 35.00
Base For Single Guard Wall Single Fenching Right Side
L=9.4m
Key Main Bar(Both Side) 12 2 63 0.70 88.20
Key Binder(Both Side) 10 2 4 9.25 74.00
Base Main Bar(T&B) 12 2 63 2.25 283.50
Base Binder (T&B) 10 2 14 9.25 259.00
Chair 16 1 20 2.00 40.00
Steel of wall Bott. ToTop
Main Bar(Both Side) 12 2 63 3.000 378.00
Binder(Both Side) 10 2 17 9.32 316.88
Spacer 10 1 48 1.000 48.00
Base For Single R. Wall Single Fenching Left Side
L=7.25m
Key Main Bar(Both Side) 12 2 48 0.70 67.20
Key Binder(Both Side) 10 2 4 7.10 56.80
Base Main Bar(T&B) 12 2 48 2.40 230.40
Base Binder (T&B) 10 2 14 7.10 198.80
Chair 16 1 16 2.00 32.00
Steel of wall Bott. ToTop
Main Bar(Both Side) 12 2 48 2.600 249.60
Binder(Both Side) 10 2 17 7.17 243.78
Spacer 10 1 25 1.000 25.00
Base For Single Guard Wall Single Fenching Left Side
L=8.6m
Key Main Bar(Both Side) 12 2 57 0.70 79.80
Key Binder(Both Side) 10 2 4 8.45 67.60
Base Main Bar(T&B) 12 2 57 2.25 256.50
Base Binder (T&B) 10 2 14 8.45 236.60
Chair 16 1 18 2.00 36.00
Steel of wall Bott. ToTop
Main Bar(Both Side) 12 2 57 2.500 285.00
Binder(Both Side) 10 2 13 8.52 221.52
Spacer 10 1 30 1.000 30.00
C/O 0.00 3795.58 4125.93 ###
Page 30
Measured on : 05.09.2023 Signature of Contractor Signature of JE
B/F 0.00 3795.58 4125.93 ###
Base For U-Shape R. Wall BSF Side (L=1.5m)
5 Base Slab - Bottom Steel 12 1 9 6.90 62.10
9 Distribution steel for bottom 10 1 23 1.50 34.50
4 Base Slab - Top Steel 16 1 9 5.75 51.75
4A Base Slab - Top Steel 16 1 9 5.75 51.75
8 Distribution steel for top 12 1 23 1.500 34.50
Chair 16 1 8 2.50 20.00
10 Haunch 10 2 9 2.03 36.47
3 Vert. Bar Other Face 10 2 9 7.95 143.10
7 Distriution Steel Otherface 10 2 30 1.50 90.00
1 Vert. Bar Earth Face 12 2 9 7.40 133.20
2 Vert. Bar Earth Face 16 2 9 3.36 60.55
6 Distriution Steel Earthface 10 2 30 1.50 90.00
GIN No- 697-2A
Base For Single Guard wall BSF Tower Oppo. Right Side
L=20m
Key Main Bar(Both Side) 12 2 133 0.70 186.20
Key Binder(Both Side) 10 2 4 19.85 158.80
Lap 10 2 4 0.51 4.08
Base Main Bar(T&B) 12 2 133 2.25 598.50
Base Binder (T&B) 10 2 14 19.85 555.80
Lap 10 2 14 0.51 14.28
Chair 16 1 44 2.00 88.00
Steel of wall Bott. ToTop
Main Bar(Both Side) 12 2 133 1.700 452.20
Binder(Both Side) 10 2 8 19.92 318.72
Lap 10 2 8 0.51 8.16
Spacer 10 1 30 1.000 30.00
Base For Single Guard wall BSF Tower Oppo. Left Side
L=20m
Key Main Bar(Both Side) 12 2 133 0.70 186.20
Key Binder(Both Side) 10 2 4 19.85 158.80
Lap 10 2 4 0.51 4.08
Base Main Bar(T&B) 12 2 133 2.25 598.50
Base Binder (T&B) 10 2 14 19.85 555.80
Lap 10 2 14 0.51 14.28
Chair 16 1 44 2.00 88.00
Steel of wall Bott. ToTop
Main Bar(Both Side) 12 2 133 1.750 465.50
Binder(Both Side) 10 2 8 19.92 318.72
Lap 10 2 8 0.51 8.16
Spacer 10 1 30 1.000 30.00
GIN No- 697-1A
Base For Single R. wall BSF Tower Oppo. Left Side
L=5.5m
Key Main Bar(Both Side) 16 2 37 1.55 ###
Key Binder(Both Side) 12 2 5 5.35 53.50
Base Main Bar(T&B) 16 2 37 4.00 ###
Base Binder (T&B) 10 2 21 5.35 224.70
Page 31
C/O 0.00 6594.03 6896.33 ###
Page 32
Agt Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all
No- complete up to all height.
2.4
.
2.4.1 (a) Thermo-Mechanically Treated bars
Description Dia Nos Nos lenth 10 mm 12 mm 16 mm 20mm 25 mm
Steel of Colm Roof to top(703)
Column-A (450mmx300mm)
Main Verl. Steel 16 2 5 3.350 33.50
12 2 3 3.350 20.10
Lap 16 2 5 0.816 8.16
Lap 12 2 3 0.612 3.67
Ring 10 2 34 1.28 87.04
Ring 10 2 34 0.40 27.20
Column-B (400mx300m)
Main Verl. Steel 16 3 8 3.35 80.40
Lap 16 3 8 0.816 19.58
Ring 10 3 34 1.26 128.52
Ring 10 3 34 0.40 40.80
Column-C (250mmx250mm)
Main Verl. Steel 16 5 4 3.35 67.00
Lap 16 5 4 0.816 16.32
Ring 10 5 12 0.86 51.60
Steel of Colm Roof to top(698)
Column-A (700mmx300mm)=2 nos
Main Verl. Steel 16 2 9 4.30 77.40
Main Verl. Steel 20 2 3 4.30 25.80
Lap 16 2 9 0.82 14.69
Lap 20 2 3 1.02 6.12
Ring 10 2 43 1.81 155.66
Ring 10 2 43 1.24 106.64
Ring 10 2 43 0.79 67.94
Column-B (450mx300m)=8 nos
Main Verl. Steel 16 8 8 4.30 275.20
Lap 16 8 8 0.82 52.22
Ring 10 8 43 1.28 440.32
Ties 10 8 43 0.40 137.60
Column-C (250mmx250mm)=10 nos
Main Verl. Steel 16 10 4 4.50 180.00
Lap 16 10 4 0.82 32.64
Ring 10 10 45 0.86 387.00
Steel of Colm Roof to top(697-2A)
Column-A (500mmx300mm)
Main Verl. Steel 16 2 7 3.30 46.20
Main Verl. Steel 12 2 3 3.30 19.80
Lap 16 2 7 0.82 11.42
Lap 12 2 3 0.61 3.67
Ring 10 2 33 1.46 96.36
Ring 10 2 33 0.90 59.40
Ties 10 2 33 0.61 40.26
C/O ### 47.24 914.73 31.92 0.00
Page 33
Measured on : 06.09.2023 Signature of Contractor Signature of JE
B/F ### 47.24 914.73 31.92 0.00
Column-B (0.400mx0.300m)
Main Verl. Steel 16 2 8 3.60 57.60
Lap 16 2 8 0.82 13.06
Ring 10 2 33 1.36 89.76
Ties 10 2 33 0.40 26.40
Column-C (250mmx250mm)
Main Verl. Steel 16 4 4 3.50 56.00
Lap 16 4 4 0.82 13.06
Ring 10 4 36 0.86 123.84
Steel of Colm Roof to top(697-1A)
Column-A (650mmx300mm)
Main Verl. Steel 20 2 10 4.30 86.00
Lap 20 2 10 1.02 20.40
Ring 10 2 43 1.58 135.88
Ring 10 2 43 0.90 77.40
Ring 10 2 43 0.61 52.46
Column-B (0.450mx0.300m)
Main Verl. Steel 16 3 8 4.30 103.20
Lap 16 3 8 0.82 19.58
Ring 10 3 43 1.36 175.44
Ties 10 3 43 0.40 51.60
Column-C (250mmx250mm)
Main Verl. Steel 16 5 4 4.50 90.00
Lap 16 5 4 0.82 16.32
Ring 10 5 45 0.86 193.50
Page 34
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete
Agt work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering,
shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of
No- concrete, improve workability without impairing strength and durability to get shutter finished surface as per direction of Engineer-in-charge. (Note
2.5 :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately).
Page 35
Measured on : 08.09.2023 Signature of Contractor Signature of JE
B/F 63.63
Wall Top of Base to Top 1 1 8.60 0.23 2.10 4.15 cum
Avg.B=(0.25+0.200)/2=0.23
Avg.H=(2+2.2)/2=2.1
Base For U-Shape R. Wall BSF Side 1 1 1.50 5.00 0.60 4.50 cum
Avg.B=(0.55+0.25)/2=0.4m 2 0.5 1.50 0.30 0.30 0.14 cum
2 1 1.50 0.40 6.00 7.20 cum
GIN No- 697-2A
Base For Single Guard wall BSF Tower
Oppo. Right Side 1 1 20.00 2.00 0.25 10.00 cum
Key 1 1 20.00 0.30 0.25 1.50 cum
Wall Top of Base to Top 1 1 20.00 0.23 1.20 5.52 cum
Avg.B=(0.25+0.200)/2=0.23
Avg.H=1.2m
Base For Single Guard wall BSF Tower
Oppo. Left Side 1 1 20.00 2.00 0.25 10.00 cum
Key 1 1 20.00 0.30 0.25 1.50 cum
Wall Top of Base to Top 1 1 20.00 0.23 1.20 5.52 cum
Avg.B=(0.25+0.200)/2=0.23
Avg.H=1.2m
GIN No- 697-1A
Base For Single R. wall BSF Tower cum
Oppo. Left Side 1 1 5.50 3.20 0.55 9.68
Key 1 1 5.50 0.60 0.55 1.82 cum
Wall Top of Base to Top 1 1 5.50 0.40 5.20 11.44 cum
Avg.B=(0.55+0.250)/2=0.4
H=5.2m
Avg.B=(0.55+0.25)/2=0.4m
Base For Single R. wall BSF Tower
Oppo. Left Side 1 1 9.00 2.00 0.35 6.30 cum
Key 1 1 9.00 0.30 0.25 0.68 cum
Wall Top of Base to Top 1 1 9.00 0.28 2.75 6.93 cum
Avg.B=(0.35+0.200)/2=0.28m
Avg.H=(3+2.5)/2=2.75m
Total 150.51 cum
Page 36
2.6 Add/deduct for using extra cement in the items of design mix over and above the specified cement
content therein. Details of Actual Measurement Contents of
Description of item No. No. Length Breadt Depth Area
h
1 2 3 4 5 6 7
Qty as per item no. 2.5.1 1.00 150.51 0.77 115.89
Total 115.89 Qntl
Page 37
B/F 234.80
Avg.B=(0.25+0.200)/2=0.23 1 2 - 0.23 2.10 0.97 sqm
Avg.H=(2+2.2)/2=2.1
Base For U-Shape R. Wall BSF Side
Avg.B=(0.55+0.25)/2=0.4m
2 2 1.50 - 6.00 36.00 sqm
2 2 - 0.40 6.00 9.60 sqm
1 2 1.50 - 0.42 1.26 sqm
GIN No- 697-2A
Base For Single Guard wall BSF Tower
Oppo. Right Side
Wall Top of Base to Top 1 2 20.00 - 1.20 48.00 sqm
Avg.B=(0.25+0.200)/2=0.23 1 2 - 0.23 1.20 0.55 sqm
Avg.H=1.2m
Base For Single Guard wall BSF Tower
Oppo. Left Side
Page 38
Agt Centering & shuttering i/c strutting propping etc & removal of form for
No-
2.2.1
Foundations, footings, bases of columns, etc. for mass concrete
Details of Actual Measurement Contents of
Description of item
Area
No. No. Length Breadt Depth
h
1 2 3 4 5 6 7
GIN No- 703
Base For Single R. Wall BSF Tower Left
Side 1 2 7.30 - 0.35 5.11 sqm
1 2 - 2.00 0.35 1.40 sqm
Base For SingleKey
R. Wall BSF Tower 1 1 7.30 0.25 1.83 sqm
Right Side
Span-1 1 2 7.60 - 0.35 5.32 sqm
1 2 - 2.00 0.35 1.40 sqm
Key 1 1 7.60 0.25 1.90 sqm
Span-2 1 2 3.50 - 0.35 2.45 sqm
1 2 - 2.00 0.35 1.40 sqm
Wall Top of Base to Top 1 2 3.50 - 1.25 8.75 sqm
Avg.B=(0.35+0.200)/2=0.28 1 2 - 0.28 1.25 0.70 sqm
Avg.H=(1.5+1)/2=1.25
Key 1 1 3.50 0.25 0.88 sqm
U-Shape [Link] in BSF Side
Left Side Wall 1 2 6.80 - 0.75 10.20 sqm
1 2 - 0.25 0.75 0.38 sqm
Right Side Wall 1 2 5.50 - 0.75 8.25 sqm
1 2 - 0.25 0.75 0.38 sqm
GIN
Base For Single [Link]-
Wall698
Single Fenching
Right Side 1 2 6.60 - 0.35 4.62 sqm
1 2 - 2.00 0.35 1.40 sqm
Base For SingleKey
Gaurd Wall Single 1 1 6.60 0.25 1.65 sqm
Fenching Right Side 1 2 9.40 - 0.25 4.70 sqm
1 2 - 2.00 0.25 1.00 sqm
Base For Single [Link]
Wall Single Fenching 1 1 9.40 0.25 2.35 sqm
Left Side 1 2 7.25 - 0.35 5.08 sqm
1 2 - 2.00 0.35 1.40 sqm
Base For SingleKey
Gaurd Wall Single 1 1 7.25 0.25 1.81 sqm
Fenching Left Side 1 2 8.60 - 0.25 4.30 sqm
1 2 - 2.00 0.25 1.00 sqm
C/O 79.66
Page 39
B/F 79.66
Key 1 1 8.60 0.25 2.15 sqm
Base For U-Shape R. Wall BSF Side 1 2 1.50 - 0.60 1.80 sqm
Avg.B=(0.55+0.25)/2=0.4m 1 2 - 5.00 0.60 6.00 sqm
1 2 1.50 - 0.42 1.26 sqm
GIN No- 697-2A
Base For Single Guard wall BSF Tower 10.00 sqm
Oppo. Right Side 1 2 20.00 - 0.25
1 2 - 2.00 0.25 1.00 sqm
Key 1 1 20.00 0.25 5.00 sqm
Base For Single Guard wall BSF Tower 10.00 sqm
Oppo. Left Side 1 2 20.00 - 0.25
1 2 - 2.00 0.25 1.00 sqm
Key 1 1 20.00 0.25 5.00 sqm
GIN No- 697-1A
Base For Single R. wall BSF Tower 6.05 sqm
Oppo. Left Side 1 2 5.50 - 0.55
Wall Top of Base to Top 1 2 - 3.20 0.55 3.52 sqm
Key 1 1 5.50 0.60 3.30 sqm
Base For Single R. wall BSF Tower 6.30 sqm
Oppo. Left Side 1 2 9.00 - 0.35
Wall Top of Base to Top 1 2 - 2.00 0.35 1.40 sqm
Key 1 1 9.00 0.25 2.25 sqm
Total 145.69 sqm
Page 40
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete
Agt work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering,
shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of
No- concrete, improve workability without impairing strength and durability to get shutter finished surface as per direction of Engineer-in-charge. (Note
2.5 :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately).
Page 41
2.6 Add/deduct for using extra cement in the items of design mix over and above the specified cement
content therein. Details of Actual Measurement Contents of
Description of item No. No. Length Breadt Depth Area
h
1 2 3 4 5 6 7
Qty as per item no. 2.5.1 1.00 19.91 0.77 15.33
Total 15.33 Qntl
Page 42
Centering & shuttering i/c strutting propping etc & removal of form for
2.2.4
Columns,pillars,piers,Abutments,post & struts
Details of Actual Measurement Contents of
Description of item
Area
No. No. Length Breadt Depth
h
1 2 3 4 5 6 7
Colm Roof to top(703)
Column-A (450mmx300mm)=2 nos 2 2 0.45 3.35 6.03 sqm
2 2 0.30 3.35 4.02 sqm
Column-B(400mmx300mm)= 3 nos 3 2 0.40 3.35 8.04 sqm
3 2 0.30 3.35 6.03 sqm
Column-C(250mmx250mm)= 5 nos 5 4 0.25 3.35 16.75 sqm
Colm Roof to top(698)
Column-A (700mmx300mm)=2 nos 2 2 0.70 4.30 12.04 sqm
2 2 0.30 4.30 5.16 sqm
Column-B(450mmx300mm)= 8 nos 8 2 0.45 4.30 30.96 sqm
8 2 0.30 4.30 20.64 sqm
Column-C(250mmx250mm)= 10 nos 10 4 0.25 4.50 45.00 sqm
Colm Roof to top(697-2A)
Column-A (500mmx300mm)=2 nos 2 2 0.50 3.30 6.60 sqm
2 2 0.30 3.30 3.96 sqm
Column-B(400mmx300mm)= 2 nos 2 2 0.40 3.30 5.28 sqm
2 2 0.30 3.30 3.96 sqm
Column-C(250mmx250mm)= 4 nos 4 4 0.25 3.50 14.00 sqm
Colm Roof to top(697-1A)
Column-A (650mmx300mm)=2 nos 2 2 0.65 4.30 11.18 sqm
2 2 0.30 4.30 5.16 sqm
Column-B(450mmx300mm)= 3 nos 3 2 0.45 4.30 11.61 sqm
3 2 0.30 4.30 7.74 sqm
Column-C(250mmx250mm)= 5nos 5 4 0.25 4.50 22.50 sqm
Total 246.66 sqm
Page 43
4.1 structural steel work in single section, fixed with or without connecting plate including cutting hoisting,
fixing in position all complete.
Details of Actual Measurement Contents of
Description of item
Area
No. No. Length Breadt Unit weight in
h Kg/m or
Kg/Sqm
1 2 3 4 5 6 7
Colm Roof to top(703)
ISMB 200 1 1 14.10 25.40 358.14 KG
Colm Roof to top(698)
ISMB 200 1 1 29.04 25.40 737.62 KG
Colm Roof to top(697-2A)
ISMB 200 1 1 10.80 25.40 274.32 KG
Total 1370.08 KG
Page 44
Item Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in
No- depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
1.3
Page 45
Item. Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel
No- primer using structural steel etc. as required.a) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
4.3.1
Unit weight in
Description of Item No No L H/B Kg/m or Quantity Unit
Kg/Sqm
1 2 3 4 5 6 7 8
GIN NO. 703
Joint For Beam
8mm thick Plate 2 2 0.30 0.15 62.80 11.3 kg
Angle 50x50x6mm(support at Colm) 5 2 0.25 4.48 11.20 kg
For Pully
32mm thick Plate 4 1 0.43 0.10 251.20 42.7 kg
8mm thick Plate 4 2 0.15 0.08 62.80 6.03 kg
Gap-1
ISMC 75x40mm 1 2 7.30 7.34 107.16 kg
ISMC 75x40mm 1 2 5.50 7.34 80.74 kg
Flat 75x8mm 1 6 0.30 4.710 8.48 kg
Flat 75x8mm 1 6 0.40 4.710 11.30 kg
Flat 75x8mm 1 6 0.45 4.710 12.72 kg
Gap-2
ISMC 75x40mm 1 2 7.30 7.34 107.16 kg
ISMC 75x40mm 1 2 5.50 7.34 80.74 kg
Flat 75x8mm 1 6 0.30 4.710 8.48 kg
Flat 75x8mm 1 6 0.40 4.710 11.30 kg
Flat 75x8mm 1 6 0.45 4.710 12.72 kg
Gap-3
ISMC 75x40mm 1 2 7.30 7.34 107.16 kg
ISMC 75x40mm 1 2 5.50 7.34 80.74 kg
Flat 75x8mm 1 6 0.30 4.710 8.48 kg
Flat 75x8mm 1 6 0.40 4.710 11.30 kg
Flat 75x8mm 1 6 0.45 4.710 12.72 kg
Gap-4
ISMC 75x40mm 1 2 7.30 7.34 107.16 kg
ISMC 75x40mm 1 2 5.50 7.34 80.74 kg
Flat 75x8mm 1 6 0.30 4.710 8.48 kg
Flat 75x8mm 1 6 0.40 4.710 11.30 kg
Flat 75x8mm 1 6 0.45 4.710 12.72 kg
Bottom Gate
Angle 50x50x6mm(Horl) 4 1 2.86 4.48 51.25 kg
Angle 50x50x6mm(Horl) 4 1 3.19 4.48 57.16 kg
Angle 50x50x6mm(Verl) 4 2 2.7 4.48 96.77 kg
Sqr Bar 16x16mm(Horl) 4 1 2.35 1.992 18.72 kg
Sqr Bar 16x16mm(Horl) 4 14 2.85 1.992 317.92 kg
Sqr Bar 16x16mm(Horl) 4 2 0.42 1.992 6.69 kg
Sqr Bar 16x16mm(Verl) 4 2 2.85 1.992 45.42 kg
Sqr Bar 16x16mm(Verl) 4 11 3 1.992 262.94 kg
Sqr Bar 16x16mm(Verl) 4 2 2.7 1.992 43.03 kg
Angle 50x50x6mm(For Chain) 4 2 0.75 4.48 26.88 kg
ISMC 75x40mm(For Chain) 4 1 0.20 7.34 5.87 kg
Top Gate
Angle 50x50x6mm(Horl) 4 2 2.88 4.48 103.22 kg
C/O 1988.70
Page 46
Measured on : 29.09.2023 Signature of Contractor Signature of JE
B/F 1988.70
Angle 50x50x6mm(Verl) 4 2 3.00 4.48 107.52 kg
Sqr Bar 16x16mm(Horl) 4 15 2.87 1.992 343.02 kg
Sqr Bar 16x16mm(Verl) 4 15 3 1.992 358.56 kg
Angle 50x50x6mm(For Chain) 4 2 0.75 4.48 26.88 kg
ISMC 75x40mm(For Chain) 4 1 0.20 7.34 5.87 kg
Extra Flat 50x6 8 15 0.08 2.00 19.20 kg
Extra Flat 75x8 2 1 2.48 4.710 23.36 kg
Railing
Flat 50x6mm 1 1 13.55 2.40 32.52 kg
Sqr Bar 16x16mm(Verl) 1 81 0.85 1.992 137.15 kg
Sqr Bar 16x16mm 1 5 0.2 1.992 1.99 kg
For Culvert Angle
250mm*250mm*8mm Base Plate 1 10 0.25 0.25 62.8 39.25 kg
GIN NO. 698
Joint For Beam
8mm thick Plate 4 2 0.30 0.15 62.80 22.61 kg
Angle 50x50x6mm(support at Colm) 10 1 0.25 4.48 11.20 kg
For Pully
32mm thick Plate 8 1 0.43 0.10 251.20 85.41 kg
8mm thick Plate 8 2 0.15 0.08 62.80 12.06 kg
Gap-1
ISMC 75x40mm 1 2 9.45 7.34 138.73 kg
ISMC 75x40mm 1 2 6.85 7.34 100.56 kg
Flat 75x8mm 1 8 0.30 4.710 11.30 kg
Flat 75x8mm 1 8 0.40 4.710 15.07 kg
Flat 75x8mm 1 6 0.45 4.710 12.72 kg
Gap-2,3,4,5,6,7
ISMC 75x40mm 7 2 9.45 7.34 971.08 kg
ISMC 75x40mm 7 2 6.85 7.34 703.91 kg
Flat 75x8mm 7 8 0.30 4.710 79.13 kg
Flat 75x8mm 7 8 0.40 4.710 105.50 kg
Flat 75x8mm 7 6 0.45 4.710 89.02 kg
Bottom Gate
Angle 50x50x6mm(Horl) 8 1 2.94 4.48 105.19 kg
Angle 50x50x6mm(Horl) 8 1 3.19 4.48 114.33 kg
Angle 50x50x6mm(Verl) 8 2 2.7 4.48 193.54 kg
Sqr Bar 16x16mm(Horl) 8 1 2.35 1.992 37.45 kg
Sqr Bar 16x16mm(Horl) 8 15 2.925 1.992 699.19 kg
Sqr Bar 16x16mm(Horl) 8 2 0.42 2.992 20.11 kg
Sqr Bar 16x16mm(Verl) 8 2 2.7 1.992 86.05 kg
Sqr Bar 16x16mm(Verl) 8 2 2.85 1.992 90.84 kg
Sqr Bar 16x16mm(Verl) 8 11 3 1.992 525.89 kg
Angle 50x50x6mm(For Chain) 8 2 0.74 4.48 53.04 kg
ISMC 75x40mm(For Chain) 8 1 0.20 7.34 11.74 kg
Top Gate
Angle 50x50x6mm(Horl) 8 2 2.935 4.48 210.38 kg
Angle 50x50x6mm(Verl) 8 2 3.00 4.48 215.04 kg
Sqr Bar 16x16mm(Horl) 8 16 2.925 1.992 745.80 kg
Sqr Bar 16x16mm(Verl) 8 15 3 1.992 717.12 kg
Angle 50x50x6mm(For Chain) 8 2 0.74 4.48 53.04 kg
C/O 9321.07
Page 47
Measured on : 29.09.2023 Signature of Contractor Signature of JE
B/F 9321.07
ISMC 75x40mm(For Chain) 8 1 0.20 7.34 11.74 kg
Extra Flat 50x6 16 20 0.08 2.00 51.20 kg
Fixed Grill
ISMC 75x40mm 8 2 1.00 7.34 117.44 kg
Angle 50x50x6mm(Horl) 8 1 2.90 4.48 103.94 kg
Angle 50x50x6mm(Horl) 8 1 3.03 4.48 108.60 kg
Angle 50x50x6mm(Verl) 8 2 0.82 4.48 58.78 kg
Sqr Bar 16x16mm(Horl) 8 1 2.43 1.992 38.72 kg
Sqr Bar 16x16mm(Horl) 8 1 2.8 1.992 44.62 kg
Sqr Bar 16x16mm(Horl) 8 4 2.9 1.992 184.86 kg
Sqr Bar 16x16mm(Verl) 8 2 0.82 1.992 26.14 kg
Sqr Bar 16x16mm(Verl) 8 13 0.99 1.992 205.10 kg
Railing
Flat 50x6mm 1 1 29.00 2.40 69.60 kg
Sqr Bar 16x16mm(Verl) 1 162 0.85 1.992 274.30 kg
Sqr Bar 16x16mm 1 10 0.2 1.992 3.98 kg
For Culvert Angle
250mm*250mm*8mm Base Plate 1 18 0.25 0.25 62.8 70.65 kg
GIN NO. 697-2A
Joint For Beam
8mm thick Plate 1 2 0.30 0.15 62.80 5.65 kg
Angle 50x50x6mm(support at Colm) 4 1 0.25 4.48 4.48 kg
For Pully
32mm thick Plate 3 1 0.43 0.10 251.20 32.03 kg
Angle 50x50x6mm(stopper) 3 2 0.08 4.48 2.15 kg
8mm thick Plate 3 2 0.15 0.08 62.80 4.52 kg
Gap-1,2&3
ISMC 75x40mm 3 2 7.86 7.34 346.15 kg
ISMC 75x40mm 3 2 5.88 7.34 258.96 kg
Flat 75x8mm 3 6 0.30 4.710 25.43 kg
Flat 75x8mm 3 6 0.40 4.710 33.91 kg
Flat 75x8mm 3 6 0.45 4.710 38.15 kg
Bottom Gate
Angle 50x50x6mm(Horl) 3 1 2.94 4.48 39.51 kg
Angle 50x50x6mm(Horl) 3 1 3.19 4.48 42.87 kg
Angle 50x50x6mm(Verl) 3 2 3 4.48 80.64 kg
Sqr Bar 16x16mm(Horl) 3 1 2.4 1.992 14.34 kg
Sqr Bar 16x16mm(Horl) 3 15 2.93 1.992 262.65 kg
Sqr Bar 16x16mm(Horl) 3 2 0.42 1.992 5.02 kg
Sqr Bar 16x16mm(Verl) 3 2 2.85 1.992 34.06 kg
Sqr Bar 16x16mm(Verl) 3 13 3 1.992 233.06 kg
Angle 50x50x6mm(For Chain) 3 2 0.74 4.48 19.89 kg
ISMC 75x40mm(For Chain) 3 1 0.20 7.34 4.40 kg
Top Gate
Angle 50x50x6mm(Horl) 3 2 2.94 4.48 79.03 kg
Angle 50x50x6mm(Verl) 3 2 3.00 4.48 80.64 kg
Sqr Bar 16x16mm(Horl) 3 16 2.93 1.992 280.15 kg
Sqr Bar 16x16mm(Verl) 3 15 3 1.992 268.92 kg
Angle 50x50x6mm(For Chain) 3 2 0.74 4.48 19.89 kg
ISMC 75x40mm(For Chain) 3 1 0.20 7.34 4.40 kg
Extra Flat 50x6 6 14 0.08 2.00 13.44 kg
Railing
Flat 50x6mm 1 1 10.20 2.00 20.40 kg
Sqr Bar 16x16mm(Verl) 1 60 0.85 1.992 101.59 kg
Sqr Bar 16x16mm 1 4 0.2 1.992 1.59 kg
250mm*250mm*8mm Base Plate 1 8 0.25 0.25 62.8 31.40 kg
Grand Total = 13080.06 kg
Page 48
Measured on : 29.09.2023 Signature of Contractor Signature of JE
Item. Steel work in built up tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and
No- applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded
4.2.1 type tubes
Unit weight in
Description of Item No No L H/B Kg/m or Quantity Unit
Kg/Sqm
1 2 3 4 5 6 7 8
For Truss
GIN NO. 703
Tube 50x25mm 1 9 2.20 2.70 53.46 kg
Tube 50x25mm 1 3 14.50 2.70 117.45 kg
Tube 96x48mm 1 2 14.50 6.70 194.30 kg
Tube 96x48mm 1 2 0.10 6.70 1.34 kg
GIN NO. 698
Angle 50x50x6mm(Verl) 9 1 0.25 4.48 10.08 kg
Tube 50x25mm 1 17 2.20 2.70 100.98 kg
Tube 50x25mm 1 3 29.64 2.70 240.08 kg
Tube 96x48mm 1 2 29.64 6.70 397.18 kg
Tube 96x48mm 1 2 0.10 6.70 1.34 kg
GIN NO. 697-1A
Angle 50x50x6mm(Verl) 3 1 0.25 4.48 3.36 kg
Tube 50x25mm 1 7 2.20 2.70 41.58 kg
Tube 50x25mm 1 3 10.90 2.70 88.29 kg
Tube 96x48mm 1 2 10.90 6.70 146.06 kg
Tube 96x48mm 1 2 0.10 6.70 1.34 kg
Grand Total = 1396.84 kg
Page 49
Item. Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including
No- applying priming coat of approved steel primer. G.I. Pipes
4.4.1
Unit
Description of Item No No L weight in Quantity Unit
Kg/m
1 2 3 4 5 6 7
Railing For Culvert
GIN NO. 703 1 1 13.55 1.955 26.49 kg
GIN NO. 698 1 1 29.00 1.955 56.7 kg
GIN NO. 697-2A 1 1 10.30 1.955 20.14 kg
Grand Total 103.33 kg
Page 50
Providing and fixing in position chain pully block having ISI mark (IS - 3832) of 2 tonne capacity and
Item. 3.00 metre Standard lift including necessary chain, hook etc all complete as per direction of Engineer-
No-4.7
in charge
Page 51
Item. Extra for additional chain system etc for extra lift of chain & pully block beyond 3.00m standard lift
No-
4.8
Standard
Description of Item No No Total Lift Lift
Quantity Unit
1 2 3 4 5 6 7 8
Chain For Pully
GIN NO. 703 4 2 6.40 51.20 m
GIN NO. 698 8 2 9.00 144.00 m
GIN NO. 697-2A 3 2 6.40 38.40 m
Chain For Gate
GIN -703
Chain For Bott. Gate 4 1 7.50 30.00 m
Chain ForTop. Gate 4 1 4.30 17.20 m
GIN -698
Chain ForTop. Gate 8 1 6.60 52.80 m
GIN - 697-2A
Chain For Bott. Gate 3 1 6.90 20.70 m
Chain ForTop. Gate 2 1 5.10 10.20 m
Grand Total 364.50 m
Page 52
Providing and laying in position machine batched and machine mixed design mix cement concrete for plain cement concrete work, using cement
Item. content as per approved design mix, including pumping of concrete to site of laying, finishing but excluding the cost of centering, shuttering,
including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing
strength and durability as per direction of Engineer-in-charge. (Note :- Excess/ less cement used as per design mix is payable/recoverable
No-
separately).
2.1.1.
2
All work up to PL M-10 grade plain cement concrete (cement content considered @ 220 kg/cum)
Details of Actual Measurement Contents of
Description of item No. No. Length Breadt Depth Area
h
1 2 3 4 5 6 7
GIN No- 703
Hilly Side 1 1 6.10 4.72 0.10 2.88 cum
Avg.B=(4.65+4.7+4.8)/3=4.716
Page 53
Add/deduct for using extra cement in the items of design mix over and above the specified cement
2.6 content therein.
Page 54
Providing and laying in position machine batched and machine mixed design mix cement concrete for plain cement concrete work, using cement
Item. content as per approved design mix, including pumping of concrete to site of laying, finishing but excluding the cost of centering, shuttering,
including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing
No- strength and durability as per direction of Engineer-in-charge. (Note :- Excess/ less cement used as per design mix is payable/recoverable
separately).
2.1.1.
1
All work up to PL M-15 grade plain cement concrete (cement content considered @ 240 kg/cum)
Details of Actual Measurement Contents of
Description of item No. No. Length Breadt Depth Area
h
1 2 3 4 5 6 7
GIN No- 703
Hilly Side 1 1 6.10 4.72 0.15 4.32 cum
Avg.B=(4.65+4.7+4.8)/3=4.72
Page 55
2.6 Add/deduct for using extra cement in the items of design mix over and above the specified cement
content therein. Details of Actual Measurement Contents of
Description of item No. No. Length Breadt Depth Area
h
1 2 3 4 5 6 7
Qty as per item no. [Link] 1.00 35.04 0.66 23.13
Total 23.13 Qntl
Page 56
Item. Providing and fixing drainage spoutswith 100 mm dia GI pipes as per drawing and 200 mm dia grating by
No-3.3 Ms flat 25mm X 3mm thick welded with 10mm dia MS bars. etc. complete.
Description of Item No No L H/B Quantity Unit
1 2 3 4 5 6 7
Pully For Gate
GIN NO. 703 1 6 6 nos
GIN NO. 698 1 8 8 nos
Grand Total 14 nos
Page 57
Agt Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all
No-
2.4 complete up to all height.
2.4.1 .
(a) Thermo-Mechanically Treated bars
Description Dia Nos Nos lenth 10 mm 12 mm 16 mm 20mm 25 mm
Gin no. 703
BSF Side(APPROCH)
491.40
Main Steel 10 1 84 5.850
L=(4.8+4.90/2)=4.85m
Inside Wall=(0.5+0.5)=1m
Lap 10 2 84 0.510 85.68
Distribution Steel 10 1 24 16.620 398.88
Lap 10 1 24 0.510 12.24
Hill Side (Approch)
Main Steel 177.20
L=(4.65+4.70+4.8/3)=4.716m 10 1 31 5.716
Inside Wall=(0.5+0.5)=1m
Lap 10 2 31 0.510 31.62
Distribution Steel 10 1 24 6.020 144.48
Gin no. 698
BSF Side(APPROCH)
614.25
Main Steel 10 1 105 5.850
L=(4.8+4.90/2)=4.85m
Inside Wall=(0.5+0.5)=1m
Lap 10 2 105 0.510 107.10
Distribution Steel 10 1 24 20.920 502.08
Lap 10 1 24 0.510 12.24
Hill Side (Approch)
Main Steel 188.63
L=(4.65+4.70+4.8/3)=4.716m 10 1 33 5.716
Inside Wall=(0.5+0.5)=1m
Lap 10 2 33 0.510 33.66
Distribution Steel 10 1 24 6.420 154.08
Page 58
Providing and laying longitudinal drain of size 400mm at bottom, depth varying from 300mm to 500mm
(all internal dimensions), made of full brick masonry in 1:6 (1 cement : 6 fine sand) with 12 mm cement
Item. plaster finished with a floating coat of neat cement of mix 1:4 (1 cement : 4 fine sand) on internal & top
No- surface including excavation, backfilling, PCC [Link] (1 cement : 5 fine sand : 10 stone aggregate) at
3.4
base, PCC [Link] (1 cement : 2 fine sand : 4 stone aggregate) etc. complete as per drawing and
directions of Engineerin- charge.
Page 59
Item. Providing and laying 110mm diametre unplasticised Rigid single socketed PVC pipes conforming to
No- IS:13592 Type-A, across the RCC/ Random Rubble masonary retaining wall or breast wall for function as
3.1 weep holes to reduce the horizontal pressure.
No. No. Length Breadt Depth
Description of Item Quantity Unit
h
1 2 3 4 5 6 7 8
[Link]-
Base For Single 703
Wall BSF Tower Left
Side 1 7 0.30 2.10 m
Base For Single R. Wall BSF Tower 1 7 0.25 1.75 m
Right Side
Span-1 1 7 0.30 2.10 m
Key 1 6 0.25 1.50 m
Span-2
Key 1 3 0.30 0.90 m
Base For Single [Link]-
GIN Wall698
Single Fenching 0.00 m
Right Side 1 6 0.30 1.80 m
Base For SingleKey
Guard Wall Single 1 6 0.25 1.50 m
Fenching Right Side 1 9 0.22 1.98 m
Base For Single [Link]
Wall Single Fenching 1 8 0.20 1.60 m
Left Side 1 7 0.30 2.10 m
Base For SingleKey
Guard Wall Single 1 6 0.25 1.50 m
Fenching Left Side 1 8 0.22 1.76 m
Key 1 7 0.20 1.40 m
Base For U-Shape R. Wall BSF Side 2 2 0.55 2.20 m
2 2 0.45 1.80 m
2 2 0.40 1.60 m
2 2 0.35 1.40 m
2 2 0.28 1.12 m
GIN No-
Base For Single Guard697-2A
wall BSF Tower 0.00 m
Oppo. Right Side BSF Tower
Base For Single Guard wall 1 18 0.20 3.60 m
Oppo. Left Side 1 15 0.20 3.00 m
Base For GIN No-R.697-1A
Single wall BSF Tower 0.00 m
Oppo. Left Side 1 5 0.50 2.50 m
1 5 0.45 2.25 m
1 5 0.40 2.00 m
1 5 0.35 1.75 m
1 5 0.30 1.50 m
Base For Single R. wall BSF Tower 1 5 0.27 1.35 m
Oppo. Left Side 1 9 0.30 2.70 m
Key 1 8 0.25 2.00 m
Total 52.76 m
Page 60
Providing and fixing security fencing of GI barbed wire consisting of copper enriched MS angle posts of 90mm x 90mm x6mm
3000mm length above RCC Culvert slab (2000mm vertical and 1000mm slanting) duly fabricated and welded at bend as per
drawing and placed at 3000mm centre to centre & fixed with MS plate 250 mm x250mm size 8mm Thick by 4 Nos. dash fastner
of 16mm dia & every 10th post, end posts & corner posts to be strutted with MS angle strut on both sides, of size 90mm x 90mm
x 6mm & 2245mm in length (200mm vertical at top & 2045mm slanting down) fabricated and welded as per drawing bolted to
vertical posts with two Nos. 12mm dia & 50mm long MS bolts & nuts with washers, struts fixed with MS plate 250 mm x 250mm
Item. size 8mm thick by 4 Nos. dash fastner 16mm dia as per standard drawing attached including providing & fixing
No- galvanised iron barbed wire duly painted by dipping in paint twice with anticorrosive bitumastic paint (IS.158) of black shade to
5.6.2 give a smooth and even surface, size of barbed wire 2.5mm x 2mm (weight to be not less than 108gms per metre length)
conforming to IS.278-1978 in 20 horizontal rows (13 rows in vertical portion & 7 rows in slanting portion) to be fixed & stretched
with MS hooks/tightening bolts as per drawing) and properly woven with four diagonals (two in vertical portion & two in goose
neck portion) as per standard drawing of same GI barbed wire to be fixed to angle iron posts in holes with 2.5mm dia & 100mm
long GI staples/clips & providing vertical & diagonal strands of barbed wire properly inter woven with horizontal rows of barbed
wire at a spacing of 150mm upto a height of 7 rows of fencing above ground level, adequately tied at three places in staggered
manner with GI wire of not less than 16 guage as per standard drawing & providing two sets of spikes each set consisting of 75
mm MS Flat. 1000mm long with 10nos pointed spikes made of 75mm long 10mm dia MS rods welded to this MS flat & fixing the
No. No. Length Breadth Depth
Description of Item Quantity Unit
1 2 3 4 5 6 7 8
GIN NO.703 1 1 14.05 14.05 m
GIN NO.698 1 1 29.00 29.00 m
Total 43.05 m
Page 61
Providing and fixing security fencing of GI barbed wire consisting of Copper Enriched MS angle post of section
90mm x 90mm x 6 mm 6982 mm total length, above CC pavement (4732 mm vertical and 1000 mm slanting) duly
Item. fabricated and welded at bend as per drawing and 1250 mm below CC pavement placed at 3300 mm centre to
No- centre and embedded in cement concrete blocks 900 mm dia meter at bottom and 600 mm dia at top 1900 mm
5.6.1 deep placed at 1975 mm below top of CC pavement including
providing and fixing galvanised iron barbed wire duly painted by dipping in paint twice with anticorrosive bitumastic
paint (IS-158) of approved brnad and manufacture in black shade to give a smooth and even surface, size of
barbed wire 2.5 x 2 mm (Weight to be not less than 108 gms. per meter length) conforming to IS 26 rows in vertical
No. No. Length Breadth Depth
portion andDescription of Itemportion) to be fixed
7 rows in slanting & stretched with MS hooks/tightening bolts andQuantity Unit
properly woven
1 2 3 4 5 6 7 8
GIN NO.703 1 1 16.70 16.70 m
1 1 7.20 7.20 m
GIN NO.698 1 1 21.00 21.00 m
1 1 6.50 6.50 m
Total 51.40 m
Page 62
Providing, laying & fixing of galvanised punched tape concertina coil of unstretched dia 1050mm having galvanised
Item. spring steel core of wire 2.5mm dia of cold drawn steel punched tape of low carbon steel having series of sharp
No- barbs uniformly punched along its length 55 barbs on periphery per revolution crimped on steel spring core wire.
5.4
Galvanised clips GI steel wire handles hooked to coils for handling MS square bar spikes hooked to coil having
pointed faces for anchorage & weight 15.20 kg per coil including spreading of each coil 10 metre length adequately
Description of Item No. No. Length Breadt Depth Quantity Unit
1 2 3 4 h
5 6 7 8
GIN NO.703
Hill Side 1 3 0.72 2.16 nos
BSF Side 1 3 1.67 5.01 nos
Culvert 1 2 1.41 2.81 nos
GIN NO.698
Hill Side 1 3 2.48 7.44 nos
BSF Side 1 3 0.66 1.98 nos
Culvert 1 2 2.90 5.81 nos
Total 25.21 nos
Page 63
Item. Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate
No- priming coat, preparation of surface, etc. complete
4.6
4.6.1 On steel work
Description of Item No No L H/B Coefficient Quantity Unit
1 2 3 4 5 6 7 8
GIN - 703
Gate=(4x2)8 nos 8 2 2.88 3.10 0.50 71.42 sqm
Angle 50x50x6mm(For Chain) 8 2 0.75 0.20 1.00 2.40 sqm
ISMC 75x40mm(For Chain) 8 1 0.20 0.31 1.00 0.5 sqm
Chain For Bott. Gate 4 1 7.50 0.05 1.00 1.5 sqm
Chain ForTop. Gate 4 1 4.30 0.05 1.00 0.86 sqm
ISMB 200 1 1 14.10 0.60 1.00 8.46 sqm
For Pully
32mm thick Plate 4 2 0.43 0.10 1.00 0.34 sqm
8mm thick Plate 8 2 0.15 0.08 1.00 0.19 sqm
Gap-1
ISMC 75x40mm 1 2 7.30 0.16 1.00 2.34 sqm
ISMC 75x40mm 1 2 5.50 0.16 1.00 1.76 sqm
Flat 75x6mm 1 6 0.30 0.16 1.00 0.29 sqm
Flat 75x6mm 1 6 0.40 0.16 1.00 0.38 sqm
Flat 75x6mm 1 6 0.45 0.16 1.00 0.43 sqm
Gap-2
ISMC 75x40mm 1 2 7.30 0.16 1.00 2.34 sqm
ISMC 75x40mm 1 2 5.50 0.16 1.00 1.76 sqm
Flat 75x6mm 1 8 0.30 0.16 1.00 0.38 sqm
Flat 75x6mm 1 9 0.40 0.16 1.00 0.58 sqm
Flat 75x6mm 1 6 0.45 0.16 1.00 0.43 sqm
Gap-3
ISMC 75x40mm 1 2 7.30 0.16 1.00 2.34 sqm
ISMC 75x40mm 1 2 5.50 0.16 1.00 1.76 sqm
Flat 75x6mm 1 10 0.30 0.16 1.00 0.48 sqm
Flat 75x6mm 1 8 0.40 0.16 1.00 0.51 sqm
Flat 75x6mm 1 6 0.45 0.16 1.00 0.43 sqm
Gap-4
ISMC 75x40mm 1 2 7.30 0.16 1.00 2.34 sqm
ISMC 75x40mm 1 2 5.50 0.16 1.00 1.76 sqm
Flat 75x6mm 1 8 0.30 0.16 1.00 0.38 sqm
Flat 75x6mm 1 9 0.40 0.16 1.00 0.58 sqm
Flat 75x6mm 4 6 0.45 0.16 1.00 1.73 sqm
Railing 1 2 13.55 0.90 0.50 12.20 sqm
For Truss
Angle 50x50x6mm(Verl) 5 1 0.90 0.20 1.00 0.90 sqm
Tube 50x25mm 1 9 2.20 0.15 1.00 2.97 sqm
Tube 50x25mm 1 3 14.50 0.15 1.00 6.53 sqm
Tube 96x48mm 1 2 14.50 0.29 1.00 8.35 sqm
Tube 96x48mm 1 2 0.10 0.29 1.00 0.06 sqm
GIN NO. 698
Gate=(8x2)16 nos 16 2 2.94 3.10 0.50 145.82 sqm
Fixed Gate 16 1 2.90 1.00 1.50 69.60 sqm
Angle 50x50x6mm(For Chain) 16 2 0.74 0.20 1.00 4.74 sqm
ISMC 75x40mm(For Chain) 16 1 0.20 0.31 1.00 0.99 sqm
Chain For Bott. Gate 8 1 9.60 0.05 1.00 3.84 sqm
Chain ForTop. Gate 8 1 6.60 0.05 1.00 2.64 sqm
C/O 367.31
Page 64
Measured on : 02.10.203 Signature of Contractor Signature of JE
B/F 367.31
ISMB 200 1 1 29.04 0.60 1.00 17.42 sqm
For Pully
32mm thick Plate 8 2 0.43 0.10 1.00 0.69 sqm
8mm thick Plate 16 2 0.15 0.08 1.00 0.38 sqm
Fixed Grill
ISMC 75x40mm 8 2 1.00 0.16 1.00 2.56 sqm
Angle 50x50x6mm(Horl) 8 1 2.90 0.2 1.00 4.64 sqm
Angle 50x50x6mm(Horl) 8 1 3.03 0.2 1.00 4.85 sqm
Angle 50x50x6mm(Verl) 8 2 0.82 0.2 1.00 2.62 sqm
Gap-1
ISMC 75x40mm 1 2 9.65 0.16 1.00 3.09 sqm
ISMC 75x40mm 1 2 6.85 0.16 1.00 2.19 sqm
Flat 75x6mm 1 8 0.30 0.16 1.00 0.38 sqm
Flat 75x6mm 1 8 0.40 0.16 1.00 0.51 sqm
Flat 75x6mm 1 6 0.45 0.16 1.00 0.43 sqm
Gap-2,3,4,5,6
ISMC 75x40mm 7 2 9.65 0.16 1.00 21.62 sqm
ISMC 75x40mm 7 2 6.85 0.16 1.00 15.34 sqm
Flat 75x6mm 7 8 0.30 0.16 1.00 2.69 sqm
Flat 75x6mm 7 8 0.40 0.16 1.00 3.58 sqm
Flat 75x6mm 7 6 0.45 0.16 1.00 3.02 sqm
Railing 1 2 29.00 0.90 0.50 26.10 sqm
For Truss
Angle 50x50x6mm(Verl) 9 1 0.25 0.20 1.00 0.45 sqm
Tube 50x25mm 1 17 2.20 0.15 1.00 5.61 sqm
Tube 50x25mm 1 3 29.64 0.15 1.00 13.34 sqm
Tube 96x48mm 1 2 29.64 0.29 1.00 17.07 sqm
Tube 96x48mm 1 2 0.10 0.29 1.00 0.06 sqm
GIN NO. 697-2A
Gate=(3x2)6 nos 6 2 2.94 3.10 0.50 54.68 sqm
Angle 50x50x6mm(For Chain) 12 2 0.74 0.20 1.00 3.55 sqm
ISMC 75x40mm(For Chain) 12 1 0.20 0.31 1.00 0.74 sqm
Chain For Bott. Gate 6 1 6.90 0.05 1.00 2.07 sqm
Chain ForTop. Gate 6 1 5.10 0.05 1.00 1.53 sqm
ISMB 200 1 1 10.85 0.60 1.00 6.51 sqm
For Pully
32mm thick Plate 3 2 0.43 0.10 1.00 0.26 sqm
8mm thick Plate 6 2 0.15 0.08 1.00 0.14 sqm
Gap-1
ISMC 75x40mm 1 2 7.86 0.16 1.00 2.52 sqm
ISMC 75x40mm 1 2 5.88 0.16 1.00 1.88 sqm
Flat 75x6mm 1 6 0.30 0.16 1.00 0.29 sqm
Flat 75x6mm 1 6 0.40 0.16 1.00 0.38 sqm
Flat 75x6mm 1 6 0.45 0.16 1.00 0.43 sqm
Gap-2,3
ISMC 75x40mm 2 2 7.86 0.16 1.00 5.03 sqm
ISMC 75x40mm 2 2 5.88 0.16 1.00 3.76 sqm
Flat 75x6mm 2 6 0.30 0.16 1.00 0.58 sqm
Flat 75x6mm 2 6 0.40 0.16 1.00 0.77 sqm
Flat 75x6mm 2 6 0.45 0.16 1.00 0.86 sqm
Railing 1 2 10.30 0.90 0.50 9.27 sqm
For Truss
Angle 50x50x6mm(Verl) 4 1 0.25 0.20 1.00 0.20 sqm
Tube 50x25mm 1 7 2.20 0.15 1.00 2.31 sqm
Tube 50x25mm 1 3 10.90 0.15 1.00 4.91 sqm
Tube 96x48mm 1 2 10.90 0.29 1.00 6.28 sqm
Tube 96x48mm 1 2 0.10 0.29 1.00 0.06 sqm
Total 624.96 sqm
Page 65
Measured on : 02.10.2023 Signature of Contractor Signature of JE
Page 66
RECORD of MEASUREMENT
Name of Work: - Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar,
Teliamura & Panisagar Sector in Tripura SH: GIN No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under
Udaipur Sector
Location of Work:- BFSD-II
Name of the Contractor :Shri Uttam Deb
Reference to Agreement no:-02/EE/BFD-III/AGT/2021-2022
Date of written order to commence work :09.04.2021
Stipulated date of completion of work:- 02.07.2022
Date of actual completion of work:- in progress
Reference to previous measurements, if any:-
Serial no of this bill :- 6th R/A BILL
Same work same agency
Agt. Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as
Item 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge
No-
1.2.1 All kinds of soil
Description of item Details of Actual Measurement
No. No. Length Breadth Depth
GIN no -706 1 2 3 4 5
for single retaining wall hilly left side
Panel No-1 ,H=(4.2+4+3.7)/3=3.96 1 1 3.80 3.70 3.96
Key 1 1 3.80 0.85 0.60
Panel No-2 , H=(2+1.8)/2=1.90 1 1 2.50 3.70 1.90
key 1 1 2.50 0.85 0.60
For single Retaing wall village side near fencing 1 1 4.20 2.50 1.47
H=(1.30+1.50+1.60)=1.47
Key 1 1 4.2 0.6 0.25
Total
Carried over to Page No. of TCMB
Agt. Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials.
Item
No-1.5
1.5.1 All kinds of soil
Description of item Details of Actual Measurement
No. No. Length Breadth Depth
GIN NO. 706 1 2 3 4 5
For Single R. Wall . Hilly Left side.
Panel-1 1 1 3.80 3.70 2.47
Panel No-2 1 1 2.50 3.70 0.40
Total
Carried over to Page No. of TCMB
Agt. Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as
Item 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge
No-
1.2.1 All kinds of soil
Description of item Details of Actual Measurement
No. No. Length Breadth Depth
1
Agt. Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials.
Item
No-1.5
1.5.1 All kinds of soil
Description of item Details of Actual Measurement
No. No. Length Breadth Depth
2
Same work same agency
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content
Agt as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including
admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability to get
No- shutter finished surface as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design
2.5 mix is payable/recoverable separately).
RE-MEASURMENT 1 2 3 4 5
GIN-701
Retaining Wall(BSF Side)
Span-1
side wall Top of culvert to top= 2 nos 2 0.50 3.50 0.25 0.40
Span-2
Base 1 1 4.30 5.00 0.65
Haunch 2 0.50 4.30 0.30 0.30
Side Wall top of Base to Top=2 nos 2 1 4.30 0.43 6.22
Avg.H=(5.92+6.52)/2=6.22
B=(0.600+0.250)/2=0.43
Retaining Wall(Village Side)Span-2
Side wall 1.90m(From top of base) to top= 2 nos 2 1 5.00 0.25 0.58
Total
Carried over to Page No. of TCMB
Agt No- Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
2.6
3
Agt. Centering & shuttering i/c strutting propping etc & removal of form for
No- Foundations, footings, bases of columns, etc. for mass concrete
2.2.1
Total
Total
4
Same work same agency
Agmt
Item Providing and laying in position machine batched and machine mixed design mix cement concrete for plain cement concrete work, using cement
NO:- 2.1 content as per approved design mix, including pumping of concrete to site of laying, finishing but excluding the cost of centering, shuttering,
including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing
strength and durability as per direction of Engineer-in-charge. (Note :- Excess/ less cement used as per design mix is payable/recoverable
separately).
2.1.1 All works upto plinth level :
[Link] M-7.5 grade plain cement concrete (cement content considered @ 200 kg/cum)
Description of item Details of Actual Measurement
No. No. Length Breadth Depth
5
Agt No- Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
2.6
6
Same work same agency
Agt No- Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all level.
2.4
GIN No 706
for single [Link] hill left side
(3.60 mtr)
Key main bar (both side) 16 2 25 1.35 67.50
Key binder (both side) 12 2 5 3.500 35.00
Base main bar (T&B) 16 2 25 3.90 195.00
Binder (T&B) 12 2 22 3.50 154.00
Chair 16 1 8 2.00 16.00
Steel of wall bottom to 2.00 m (from top of base)
main bar ( both side) 16 2 36 2.770 199.44
Binder (both side) 10 2 14 3.50 98.00
Spacer 10 1 6 1.00 6.00
for single [Link] hill left side
(1.90 mtr)
Key main bar (both side) 16 2 13 1.35 35.10
Key binder (both side) 12 2 5 1.800 18.00
Base main bar (T&B) 16 2 13 3.90 101.40
Binder (T&B) 12 2 22 1.90 83.60
Chair 16 1 4 2.00 8.00
Steel of wall bottom to 2.00 m (from top of base)
main bar ( both side) 16 2 19 2.770 105.26
Binder (both side) 10 2 14 1.90 53.20
Spacer 10 1 4 1.00 4.00
Total length in M 0.000 161.200 290.60 727.700 0.000
Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 98.332 258.053 1142.489 0.000
Grand Total in Kg= 1498.874
Net Payble [Link] Kg 1498.874
Carried over to Page No. of TCMB
7
Same work same agency
Agt No- Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all level.
2.4
GIN No 708-A
for single [Link] main road side
along fencing (1.0 mtr)
Key main bar (both side) 12 2 7 0.70 9.80
Key binder (both side) 10 2 3 0.900 5.40
Base main bar (T&B) 12 2 7 2.40 33.60
Binder (T&B) 10 2 14 0.90 25.20
Chair 12 1 4 2.00 8.00
Steel of wall bottom to top
main bar ( both side) 12 2 7 3.025 42.35
Binder (both side) 10 2 17 0.90 30.60
Spacer 10 1 2 1.00 2.00
for single [Link] main road side
(2.20 mtr)
Key main bar (both side) 12 2 15 0.70 21.00
Key binder (both side) 10 2 3 2.100 12.60
Base main bar (T&B) 12 2 15 2.40 72.00
Binder (T&B) 10 2 14 2.10 58.80
Chair 12 1 4 2.00 8.00
Steel of wall bottom to top
main bar ( both side) 12 2 15 2.520 75.60
Binder (both side) 10 2 14 2.10 58.80
Spacer 10 1 4 1.00 4.00
U-Shape wall main road side
(3.7 m to top slope fininshing)
[Link] steel (out side) 12 2 28 1.60 89.60
ver. Distribution steel (out side) 10 2 7 5.350 74.90
[Link] steel (in side) 16 2 28 1.60 89.60
ver. Distribution steel (in side) 10 2 7 5.35 74.90
Spacer 10 2 10 0.70 14.00
for parapet (guard wall main road)
vertical main steel 16 7 10 0.500 35.00
lap 16 7 5 0.82 28.56
Total length in M 0.000 361.200 359.950 153.160 0.000
Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 220.332 319.636 240.461 0.000
Grand Total in Kg= 780.429
Net Payble [Link] Kg 780.429
Carried over to Page No. of TCMB
8
Same work same agency
Agt No- Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all level.
2.4
GIN No 699
for single [Link] Hill right side
(6.05 mtr)
Key main bar (both side) 12 2 41 0.70 57.40
Key binder (both side) 10 2 3 5.950 35.70
Base main bar (T&B) 12 2 41 2.40 196.80
Binder (T&B) 10 2 14 5.95 166.60
Chair 12 1 10 2.00 20.00
Steel of wall bottom to top
main bar ( both side) 12 2 41 3.425 280.85
Binder (both side) 10 2 20 5.95 238.00
Spacer 10 1 12 1.00 12.00
for single [Link] main BSF side
(13.70 mtr)
Key main bar (both side) 12 2 92 0.70 128.80
Key binder (both side) 10 2 3 13.600 81.60
Base main bar (T&B) 12 2 92 2.40 441.60
Binder (T&B) 10 2 14 13.60 380.80
lap 10 2 14 0.51 14.28
Chair 12 1 25 2.00 50.00
Steel of wall bottom to top
main bar ( both side) 12 2 92 2.830 520.72
Binder (both side) 10 2 15 13.60 408.00
lap 10 2 15 0.51 15.30
Spacer 10 1 25 1.00 25.00
Total length in M 0.000 1377.280 1696.170 0.000 0.000
Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 840.141 1506.199 0.000 0.000
Grand Total in Kg= 2346.340
Net Payble [Link] Kg 2346.340
Carried over to Page No. of TCMB
9
Same work same agency
Agt No- Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all level.
2.4
2.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more.
M Description Dia Nos Nos Lenth 8 mm 10 mm 12 mm 16 mm 20 mm
GIN No 706
for single [Link] hill left side
(3.60 mtr)
Steel of wall 2.00m to top
main bar ( both side) 16 2 18 3.830 137.88
main bar ( both side) 16 2 18 1.500 54.00
Lap 16 2 18 0.816 29.38
Binder (both side) 10 2 26 3.50 182.00
Spacer 10 1 12 1.00 12.00
for single [Link] hill left side
(1.90 mtr)
Steel of wall 2.00 m to top
main bar ( both side) 16 2 19 0.900 34.20
Binder (both side) 10 2 6 1.90 22.80
Spacer 10 1 4 1.00 4.00
for single [Link] Village side
near fencing (4.20 mtr)
Key main bar (both side) 12 2 25 0.70 35.00
Key binder (both side) 10 2 3 3.600 21.60
Base main bar (T&B) 12 2 25 2.40 120.00
Binder (T&B) 10 2 14 3.60 100.80
Chair 12 1 6 2.00 12.00
Steel of wall bottom to top
main bar ( both side) 12 2 28 2.630 147.28
Binder (both side) 10 2 15 4.10 123.00
Spacer 10 1 10 1.00 10.00
Wing wall left side culvert (5 m)
10
Same work same agency
Agt No- Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all level.
2.4
2.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more.
M Description Dia Nos Nos Lenth 8 mm 10 mm 12 mm 16 mm 20 mm
GIN No 699
U-shape Retaining wall Hill
side
(slope finishing)
Span-5
3 Vertical main steel (out side) 12 2 18 0.100 3.60
1 Vertical main steel (in side) 12 2 18 0.10 3.60
Span -5 for extra lift (both side)
3 Vertical main steel (out side) 12 2 10 0.800 16.00
Lap 12 2 5 0.612 6.12
7 Vertical Distribution (out side) 10 2 5 1.750 17.50
1 Vertical main steel (in side) 12 2 10 0.80 16.00
Lap 12 2 5 0.612 6.12
6 Vertical Distribution (in side) 10 2 5 1.70 17.00
Spacer 10 2 3 1.00 6.00
Span -6 for extra lift (left side)
3 Vertical main steel (out side) 12 1 7 0.800 5.60
Lap 12 1 2 0.612 1.22
7 Vertical Distribution (out side) 10 1 5 1.250 6.25
1 Vertical main steel (in side) 12 1 7 0.80 5.60
Lap 12 1 2 0.612 1.22
6 Vertical Distribution (in side) 10 1 5 1.25 6.25
Spacer 10 1 3 1.00 3.00
Span -6 for extra lift (right side)
3 Vertical main steel (out side) 12 1 10 0.800 8.00
Lap 12 1 5 0.612 3.06
7 Vertical Distribution (out side) 10 1 5 1.700 8.50
1 Vertical main steel (in side) 12 1 10 0.80 8.00
Lap 12 1 5 0.612 3.06
6 Vertical Distribution (in side) 10 1 5 1.70 8.50
Spacer 10 1 3 1.00 3.00
Span -7 (L=3.60 mt)
3 Vertical main steel (out side) 12 1 18 0.350 6.30
7 Vertical Distribution (out side) 10 1 1 3.500 3.50
1 Vertical main steel (in side) 12 1 18 0.35 6.30
6 Vertical Distribution (in side) 10 1 1 3.50 3.50
Span -7 for extra lift (left side)
3 Vertical main steel (out side) 12 1 10 0.800 8.00
Lap 12 1 5 0.612 3.06
7 Vertical Distribution (out side) 10 1 5 1.550 7.75
1 Vertical main steel (in side) 12 1 10 0.80 8.00
Lap 12 1 5 0.612 3.06
6 Vertical Distribution (in side) 10 1 5 1.55 7.75
Spacer 10 1 3 1.00 3.00
Span -7 for extra lift (Right side)
3 Vertical main steel (out side) 12 1 10 0.800 8.00
Lap 12 1 5 0.612 3.06
7 Vertical Distribution (out side) 10 1 5 1.700 8.50
1 Vertical main steel (in side) 12 1 10 0.80 8.00
Lap 12 1 5 0.612 3.06
6 Vertical Distribution (in side) 10 1 5 1.70 8.50
Spacer 10 1 3 1.00 3.00
Span -8 for extra lift (left side)
L= 1.67 m
3 Vertical main steel (out side) 12 1 10 0.800 8.00
Lap 12 1 5 0.612 3.06
7 Vertical Distribution (out side) 10 1 5 1.570 7.85
1 Vertical main steel (in side) 12 1 10 0.80 8.00
Lap 12 1 5 0.612 3.06
6 Vertical Distribution (in side) 10 1 5 1.57 7.85
C/O 137.20 166.16
11
Measured on : 22.06.2022 Signature of Contractor/Representative Signature of JE
12
B/F 137.20 166.16
Spacer 10 1 3 1.00 3.00
Span -8 for extra lift (Right side)
L=1.55
3 Vertical main steel (out side) 12 1 9 0.800 7.20
Lap 12 1 5 0.612 3.06
7 Vertical Distribution (out side) 10 1 5 1.450 7.25
1 Vertical main steel (in side) 12 1 9 0.80 7.20
Lap 12 1 5 0.612 3.06
6 Vertical Distribution (in side) 10 1 5 1.45 7.25
Spacer 10 1 3 1.00 3.00
Span -9 for extra lift
L= 3.6 mtr
3 Vertical main steel (out side) 12 1 18 0.880 15.84
7 Vertical Distribution (out side) 10 1 5 3.500 17.50
1 Vertical main steel (in side) 12 1 18 0.88 15.84
6 Vertical Distribution (in side) 10 1 5 3.50 17.50
Spacer 10 1 3 1.00 3.00
Slab for drain (4.8*1m) 10 1 32 0.90 28.80
L= 4.8 10 1 7 4.70 32.90
Slab for drain (5.15*1) 10 1 35 0.90 31.50
L= 5.15 10 1 7 5.05 35.35
Total length in M 0.000 324.250 218.360 0.000 0.000
Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 197.793 193.904 0.000 0.000
Grand Total in Kg= 391.697
Net Payble [Link] Kg 391.697
Carried over to Page No. of TCMB
13
Same work same agency
Agt No- Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all level.
2.4
2.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more.
M Description Dia Nos Nos Lenth 8 mm 10 mm 12 mm 16 mm 20 mm
GIN No 708-B
for single [Link] (Road side ) slope finishing span 1,2&3 (L=4.0 m)
3 Vertical main steel (out side) 10 2 23 0.300 13.80
7 Vert. Distribution steel (out side) 10 2 2 3.900 15.60
1 Vertical main steel (in side) 12 2 23 0.300 13.80
6 Vert. Distribution steel (in side) 10 2 2 3.90 15.60
Total length in M 0.000 45.000 13.80 0.00 0.00
Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 27.450 12.254 0.000 0.000
Grand Total in Kg= 39.704
Net Payble [Link] Kg 39.704
Carried over to Page No. of TCMB
Agt No- Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to all height.
2.4 .
2.4.1 (a) Thermo-Mechanically Treated bars
Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm
GIN NO. 699
Column-C (600mm*300mm)
Main Verl. Steel 16 2 10 2.70 54.00
Lap 16 2 10 0.82 16.32
Ties 10 2 26 1.52 79.04
Ties 10 2 26 0.91 47.32
Ties 10 2 26 0.69 35.88
Column-D (0.450m*0.300m)
Main Verl. Steel 16 3 8 2.70 64.80
Lap 16 3 8 0.82 19.58
Ties 10 3 26 1.26 98.28
Ties 10 3 26 0.32 24.96
Column (250mm*250mm)
Main Verl. Steel 16 5 4 2.70 54.00
Lap 16 5 4 0.82 16.32
Ties 10 5 26 0.84 109.20
GIN NO.-701
Column-C (550mm*300mm)
Main Verl. Steel 12 2 3 2.70 16.20
Lap 12 2 3 0.61 3.67
Main Verl. Steel 20 2 4 2.70 21.60
Lap 20 2 4 1.02 8.16
Main Verl. Steel 16 2 3 2.70 16.20
Lap 16 2 3 0.82 4.90
Ties 10 2 26 1.39 72.28
Ties 10 2 26 0.90 46.80
Ties 10 2 26 0.61 31.72
Column-D (0.400m*0.300m)
Main Verl. Steel 12 6 8 2.70 129.60
Lap 12 6 8 0.61 29.38
Ties 10 6 26 1.20 187.20
Ties 10 6 26 0.39 60.84
Column (250mm*250mm)
Main Verl. Steel 16 8 4 2.70 86.40
Lap 16 8 4 0.82 26.11
Ties 10 8 26 0.84 174.72
GIN NO.-706
Column-C (500mm*300mm)
Main Verl. Steel 16 2 10 2.70 54.00
Lap 16 2 10 0.82 16.32
Ties 10 2 26 1.45 75.40
Ties 10 2 26 0.90 46.80
Ties 10 2 26 0.61 31.72
Column-D (0.450m*0.300m)
Main Verl. Steel 16 5 8 2.70 108.00
C/O 1122.16 178.85 536.95 29.76
14
B/F 1122.16 178.85 536.95 29.76
15
Agt. Centering & shuttering i/c strutting propping etc & removal of form for
No- Foundations, footings, bases of columns, etc. for mass concrete
2.2.1
16
Same work same agency
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content
as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including
Agt admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability to get
No- shutter finished surface as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design
2.5 mix is payable/recoverable separately).
1 2 3 4 5
GIN No-706
for single [Link] hill left side
Total
Carried over to Page No. of TCMB
Agt No- Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
2.6
17
Agt No- Centering & shuttering i/c strutting propping etc & removal of form for
2.2.2 Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Details of Actual Measurement
Description of item
No. No. Length Breadth Depth
1 2 3 4 5
GIN No-706
for single [Link] hill left side
Wall (stem) B=(0.55+.250)/2=0.4 1 2.00 3.60 5.88
faces 1 1.00 0.40 5.88
for single [Link] hill left side
Wall (stem) B=(0.55+.250)/2=0.4 1 2 1.90 3.00
faces 1 1 0.40 3.00
for single [Link] BSF(village) camp fencing side
Wall (stem) B=(0.350+.200)/2=0.28 1 2 4.20 2.20
faces 1 1 0.28 2.20
Wing wall left side of culvert
Wall top to slope finishing H=(0.05+0.4)/2=0.23 1 2 5 0.23
1 1 0.25 0.23
Wing wall Right side of culvert
Wall top to slope finishing H=(0.150+0.4)/2=0.28 1 2 5.00 0.28
1 1 0.25 0.28
Wing wall Right side of culvert toward fencing
Wall top to slope finishing H=(0.150+0.350)/2=0.25 1 2 6.00 0.25
1 1 0.25 0.25
Total
Carried over to Page No. of TCMB
Same work same agency
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content
Agt as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including
admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability to get
No- shutter finished surface as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design
2.5 mix is payable/recoverable separately).
1 2 3 4 5
GIN No-708-A
for single [Link] Main road side along fencing
Agt No- Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
2.6
18
Agt No- Centering & shuttering i/c strutting propping etc & removal of form for
2.2.2 Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Details of Actual Measurement
Description of item
No. No. Length Breadth Depth
1 2 3 4 5
GIN No-708-A
for single [Link] Main road side along fencing
Wall (stem) B=(0.350+.200)/2=0.28 1 2.00 1.00 2.50
1 2.00 0.28 2.50
for single [Link] Main road side
Wall (stem) B=(0.350+.250)/2=0.28 1 2 2.20 2.00
1 2 0.28 2.00
U-shape wall main road side
3.7 m to finishing slope (top) 2 2 5.50 1.68
H=(.150+3.20)/2=1.68
2 2 0.25 1.68
For Guard wall above R. wall main road side 2 7 0.90 0.60
2 7 0.25 0.60
Total
Carried over to Page No. of TCMB
19
Same work same agency
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content
as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including
Agt admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability to get
No- shutter finished surface as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design
mix is payable/recoverable separately).
2.5
1 2 3 4 5
GIN No-699
for single [Link] Hill Right side
Agt No- Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
2.6
20
Agt No- Centering & shuttering i/c strutting propping etc & removal of form for
2.2.2 Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Details of Actual Measurement
Description of item
No. No. Length Breadth Depth
1 2 3 4 5
GIN No-699
for single [Link] Hill Right side
21
Same work same agency
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content
as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including
Agt admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability to get
No- shutter finished surface as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design
mix is payable/recoverable separately).
2.5
1 2 3 4 5
GIN No-708B
Span no. 1,2&3
Agt No- Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
2.6
22
Same work same agency
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content
Agt as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including
No- admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability to get
shutter finished surface as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design
2.5 mix is payable/recoverable separately).
Agt No- Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
2.6
23
Centering and shuttering including strutting, propping etc. and removal of form for :
2.2
2.2.4 Columns, Pillars, Piers, Abutments, Posts and Struts
Description of item Details of Actual Measurement
No. No. Length Breadth Depth
1 2 3 4 5
GIN NO. 699
Column-C (600mm*300mm)=2 nos 2 2 0.60 2.70
2 2 0.30 2.70
Column-D (450mm*300mm)= 3 nos 3 2 0.45 2.70
3 2 0.30 2.70
Column- (250mm*250mm)= 5 nos 5 2 0.25 2.70
5 2 0.25 2.70
GIN NO. 701 2.70
Column-C (550mm*300mm)=2 nos 2 2 0.55 2.70
2 2 0.30 2.70
Column-D (400mm*300mm)= 6 nos 6 2 0.40 2.70
6 2 0.30 2.70
Column- (250mm*250mm)= 8 nos 8 2 0.25 2.70
8 2 0.25 2.70
GIN NO. 706 2.70
Column-C (500mm*300mm)=2 nos 2 2 0.50 2.70
2 2 0.30 2.70
Column-D (450mm*300mm)= 5 nos 5 2 0.45 2.70
5 2 0.30 2.70
Column- (250mm*250mm)= 7 nos 7 2 0.25 2.70
7 2 0.25 2.70
GIN NO. 707 2.70
Column-C (950mm*300mm)=2 nos 2 2 0.95 2.70
2 2 0.30 2.70
Column-D (750mm*300mm)= 1 nos 1 2 0.75 2.70
1 2 0.30 2.70
Column-(250mm*250mm)= 3 nos 3 2 0.25 2.70
3 2 0.25 2.70
GIN NO. 708-A 2.70
Column-C (700mm*300mm)=2 nos 2 2 0.70 2.70
2 2 0.30 2.70
Column-D (550mm*300mm)= 2 nos 2 2 0.55 2.70
2 2 0.30 2.70
Column- (250mm*250mm)= 4 nos 4 2 0.25 2.70
4 2 0.25 2.70
GIN NO. 708-B 2.70
Column-C (500mm*300mm)=2 nos 2 2 0.50 2.70
2 2 0.30 2.70
Column-D (400mm*300mm)= 2 nos 2 2 0.40 2.70
2 2 0.30 2.70
Column- (250mm*250mm)= 4 nos 4 2 0.25 2.70
4 2 0.25 2.70
Total
24
Same work same agency
Providing and laying 110mm diametre unplasticised Rigid single socketed PVC pipes conforming to IS:13592 Type-A, across the RCC/ Random
3.1 Rubble masonary retaining wall or breast wall for function as weep holes to reduce the horizontal pressure.
25
Same work same agency
Agmt
Item Providing and laying in position machine batched and machine mixed design mix cement concrete for plain cement concrete work, using cement
NO:- 2.1 content as per approved design mix, including pumping of concrete to site of laying, finishing but excluding the cost of centering, shuttering,
including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing
strength and durability as per direction of Engineer-in-charge. (Note :- Excess/ less cement used as per design mix is payable/recoverable
separately).
2.1.1 All works upto plinth level :
[Link] M-15 grade plain cement concrete (cement content considered @ 240 kg/cum)
Description of item Details of Actual Measurement
No. No. Length Breadth Depth
26
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content
as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including
Agt admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability to get
No- shutter finished surface as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design
2.5 mix is payable/recoverable separately).
Total
Carried over to Page No. of TCMB
27
er Udaipur, Gukulnagar,
8A & 708B under
cum
Contents of
Area
55.68
1.94
17.58
1.28
15.44
0.63
92.55
cum
Contents of
Area
34.73
3.7
38.43
cum
Contents of
Area
0.00
4.50
0.00
0.18
0.00
9.38
0.38
0.00
0.00
32.50
0.81
0.00
52.50
2.10
0.00
0.00
202.70
305.05
Signature of JE
28
cum
Contents of
Area
8.13
8.13
Signature of JE
29
cum
Contents of
Area
0.35
13.98
0.39
23.00
1.45
39.17
-20.94
18.23
cum
Contents of
Area
6
14.04
14.04
e No. of TCMB
Signature of JE
30
Sqm
Contents of
Area
5.59
6.50
-4.65
7.44
Sqm
Sqm
Contents of
Area
6
2.80
3.61
53.49
50.91
5.35
11.60
0.29
128.05
-125.81
2.24
Signature of JE
31
Cum
Contents of
Area
0.95
0.20
0.5
0.1
0.63
0.22
0.17
0.03
0.37
0.07
1.03
0.18
2.33
0.41
7.19
Signature of JE
32
cum
Contents of
Area
2.16
2.16
Sqm
Contents of
Area
0.72
0.64
0.38
0.64
0.74
0.4
0.20
0.4
0.44
0.4
1.21
0.4
2.74
0.4
9.71
Signature of JE
33
e upto all level.
25 mm
0.000
3.858
0.000
e No. of TCMB
Signature of JE
34
e upto all level.
25 mm
0.000
3.858
0.000
e No. of TCMB
Signature of JE
35
e upto all level.
25 mm
0.000
3.858
0.000
e No. of TCMB
Signature of JE
36
e upto all level.
25 mm
0.00
3.858
0.000
e No. of TCMB
Signature of JE
37
e upto all level.
25 mm
38
Signature of JE
39
0.000
3.858
0.000
e No. of TCMB
Signature of JE
40
e upto all level.
25 mm
0.00
3.858
0.000
e No. of TCMB
e up to all height.
25 mm
0.00
Signature of JE
41
0.00
16.20
7.65
23.85
3.858
92.013
Signature of JE
42
Sqm
Contents of
Area
3.96
3.52
2.16
2.09
3.52
1.14
2.59
1.4
0.93
0.70
1.4
0.25
1.54
1.4
0.55
4.24
1.4
1.51
9.59
1.4
3.43
48.72
Signature of JE
43
cum
Contents of
Area
6.34
1.19
8.47
3.34
0.63
2.28
2.59
0.28
2.59
0.29
0.35
0.00
0.38
0.00
28.73
cum
Contents of
Area
6
22.12
22.12
e No. of TCMB
Signature of JE
44
Sqm
Contents of
Area
6
42.34
2.35
11.40
1.20
18.48
0.62
2.30
0.06
2.80
0.07
0.00
3.00
0.06
84.68
cum
Contents of
Area
0.70
0.08
0.70
1.54
0.17
1.23
4.62
0.95
9.99
cum
Contents of
Area
6
7.69
7.69
e No. of TCMB
Signature of JE
45
Sqm
Contents of
Area
6
5.00
1.40
8.80
1.12
36.96
1.68
7.56
2.10
64.62
Signature of JE
46
cum
Contents of
Area
4.24
0.45
4.91
9.59
1.03
8.82
0.00
0.27
0.79
0.18
0.29
0.38
0.72
0.35
0.38
0.00
0.35
0.33
1.67
34.75
cum
Contents of
Area
6
26.76
26.76
e No. of TCMB
Signature of JE
47
Sqm
Contents of
Area
6
35.09
1.62
63.02
1.62
2.16
0.08
6.29
0.43
1.40
0.05
2.30
0.21
0.90
0.21
5.76
0.10
2.81
0.21
3.06
0.21
0.00
2.84
0.43
2.64
0.43
13.32
0.46
147.65
Signature of JE
48
cum
Contents of
Area
0.80
0.80
cum
Contents of
Area
6
0.62
0.62
e No. of TCMB
Sqm
Contents of
Area
6
3.20
0.10
3.30
Sqm
Signature of JE
49
cum
Contents of
Area
6
0.97
1.09
0.84
0.89
1.94
1.35
0.81
1.82
1.18
1.54
0.61
0.51
1.13
0.89
0.68
0.81
0.65
0.68
18.39
cum
cum
Contents of
Area
6
14.16
14.16
e No. of TCMB
Signature of JE
50
Contents of
Area
6
6.48
3.24
7.29
4.86
6.75
6.75
5.94
3.24
12.96
9.72
10.80
10.80
5.40
3.24
12.15
8.10
9.45
9.45
10.26
3.24
4.05
1.62
4.05
4.05
7.56
3.24
5.94
3.24
5.40
5.40
5.40
3.24
4.32
3.24
5.40
5.40
221.67
Sqm
CMB
Signature of JE
k masonary in 1:6 (1 cement : 6 fine
g excavation, backfilling, PCC [Link]
of Engineer-in charge.
Contents of
Length
6
70.00
104.50
117.25
91.00
19.50
131.00
63.00
156.00
752.25
Mtr
Signature of JE
51
cum
Contents of
Area
14.79
14.79
1.50
5.50
16.25
6.50
2.00
3.90
2.60
1.00
3.00
1.62
3.50
76.95
Mtr
Signature of JE
52
Cum
Contents of
Area
0.52
0.38
0.90
cum
Contents of
Area
0.59
0.59
Sqm
Contents of
Area
1.03
0.2
0.38
0.16
1.77
Signature of JE
53
cum
Contents of
Area
6
16.98
9.75
0.27
16.25
8.51
5.88
0.24
0.18
2.32
1.79
1.65
8.80
9.80
0.99
5.28
3.60
92.29
-88.57
3.72
cum
Signature of JE
54
THEORETICAL CONSUMTION STATEMENT OF Paint
Name of Work: - Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar, Teliamura & Panisagar Sector in
Tripura SH: GIN No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur Sector
Location of Work:- BFSD-III
Name of the Contractor :Shri Uttam deb
Reference to Agreement no:-02/EE/BFD-III/AGT/2021-2022
Date of written order to commence work :09.04.2021
Stipulated date of completion of work:- 02.07.2022
Date of actual completion of work:- in progress
Date of Abstract: -09.10.2023
Reference to previous measurements, if any:-
Serial no of this bill :- 10th R/A BILL
Name of Work: - Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar, Teliamura & Panisagar Sector in Tripura SH: GIN No. 697A,
697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur Sector
Location of Work:- BFSD-III
Name of the Contractor :Shri Uttam deb
Reference to Agreement no:-02/EE/BFD-III/AGT/2021-2022
Date of written order to commence work :09.04.2021
Stipulated date of completion of work:- 02.07.2022
Date of actual completion of work:- in progress
Date of Abstract: -09.10.2023
Reference to previous measurements, if any:-
Serial no of this bill :- 10th R/A BILL
2.5.1 All works upto plinth level 2805.81 Cum 4.070 Qtl/Cum 11419.65 Qtl.
2.5.2 All works above plinth level upto floor V level 326.05 Cum 4.070 Qtl/Cum 1327.02 Qtl.
3.4 Providing and laying longitudinal drain of size 400mm at bottom, depth varying from 300mm to 500mm (all internal
dimensions), made of full
brick masonry in 1:6 (1 cement : 6 fine sand) with 12 mm cement plaster finished with a floating coat of neat
cement of mix 1:4 (1 cement : 4 fine sand) on internal & top surface including excavation, backfilling, PCC [Link]
(1 cement : 5 fine sand : 10 stone aggregate) at base, PCC [Link] (1 cement : 2 fine sand : 4 stone aggregate) etc.
complete as per drawing and directions of Engineerin- charge.
Specific Gravity
Stone A.I.V. of stone aggregate
2 Aggregate 1716 50 cum or Each Change of 2250.00 45.00 45
Aggregate crushing Value
20 mm source
Gradation of stone aggregate
Water absorption
Specific Gravity
Stone A.I.V. of stone aggregate
3 Aggregate 786 50 cum or Each Change of 880.00 17.00 17
Aggregate crushing Value
10 mm source
Gradation of stone aggregate
Water absorption
PH Value
4 Water Limit of Acidity 3 month or Each Change of
source
10 10
Limit of Alkality
Percentage of Solids
RCC Work Compressuve strength
5 415 222.30 5.00 5
M-7.5 Workability sample test
RCC Work Compressuve strength
6 378 266.13 6.00 6
M-10 Workability sample test
1test/50 cum
RCC Work Compressuve strength
7 761 791.62 16.00 16
M-15 Workability sample test
RCC Work Compressuve strength
8 2508 3131.86 63.00 63
M-25 Workability sample test
10 mm 1test/35 tonnes 92.79 3.00 3
12 mm 1test/35 tonnes 41.69 1.00 1
367.141 1test/45 tonnes
9 Steel 16 mm 128.41 3.00 3
MT
20 mm 1test/45 tonnes 30.82 1.00 1
25 mm 1test/35 tonnes 6.60 1.00 1
silt content
10(a For CC
)
sand bulking of sand --- 1test/50 cum 1950.00 33.00 33
works
Gradation of sand
silt content
11(b
sand bulking of sand 1test/20 cum 380.00 18.00 18 For Drain
)
Gradation of sand
Standard Consistency, percent
Initial Setting Time, minutes
Final Setting Time, minutes 1421.05
12 Cement 1test/50 tonnes 1718.19 35 35
Soundness, mm MT
Fineness, percent
Specific Gravity
ITEM NO.
Sub-Head and Item of works UNIT Rate Qty Amount Previous Bill
1.3 Filling available excavated earth (excluding rock) in trenches, plinth, sides of
foundations etc. in layers not exceeding 20cm in depth, consolidating each Full
cum 169.60 2140.67 363057.63 281719.17
deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. Rate
1.5 Extra for every additional lift of 1.5 m or part thereof in excavation / banking
excavated or stacked materials.
1.5.1 All kinds of soil Full
cum 69.55 4804.51 334153.67 307429.08
Rate
1.6 Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees
and saplings of girth up to 30 cm measured at a height of 1 m above ground level Full
and removal of rubbish up to a distance of 50 m outside the periphery of the area Sqm 9.60 2518.14 24174.14 15772.22
Rate
cleared.
2.1 Providing and laying in position machine batched and machine mixed design mix
cement concrete for plain cement concrete work, using cement content as per
approved design mix, including pumping of concrete to site of laying, finishing but
excluding the cost of centering, shuttering, including admixtures in recommended
proportions as per IS: 9103 to accelerate, retard setting of concrete, improve
workability without impairing strength and durability as per direction of Engineer-in-
charge. (Note :- Excess/ less cement used as per design mix is
payable/recoverable separately).
EI-II Centering and shuttering including strutting, propping etc. and removal of form for :
Lintels, beams, plinth beams, girders, bressumers and cantilevers Sqm 620.70 82.33 51102.23 51102.23
Upto date work done(A) Total 126472323.94 99478216.46
2. Certificated that in addition to and quite apart from the quantities of work actually executed as shown in column 4 of the account 1, some work has actually been done in connection with several items and the value of such
work (after deducting therefrom proportionate amount of secured advance if any ultimately recoverable on account of the quantities of the materials used therein) is in no case less than the advance payments as per item 2 of
the memorandum if payment or proposed t6o be made for the convenience of the contractor in anticipation of and subject to the result of detailed measurements which will be made as soon as possible.
Certified that
1. The work has been executed as per terms and conditions of the agreement.
2. No material and T & P has been issued by the department.
3. Arrangements for water has been made by Contractor..
4. Requisite technical staff has been employed as per clause 36 of agreement.
5. Upto date recoveries have been effected in this bill.
6. Labour report submitted up to date .e.i
[Link] madatory test has been carried out at site as per specification. Dated Signature of Officer ………………………………
(Rank) ………………………
229596.26
143982.00
81338.46
26724.59
8401.92
488354.23
1097720.16
0.00
168098.77
849708.06
2127547.63
122284.64
186857.29
289102.50
4934065.40
9363300.00
811397.50
1434164.36
0.00
0.00
47181.47
23624.30
322783.02
110017.42
96433.45
1635007.50
17364.60
0.00
113680.22
574846.50
16603.20
514556.51
0.00
0.00
78551.84
395096.38
144391.85
332634.06
26785416.09
26785416.09
208691.39
26994107.48
0.00
0.00
0.00
0.00
0.00
0.00
26994107.48
26994107.00
26994107.00
/CMB/____
2 In this bill
Total
Assistant Engineer
BFSD-III, CPWD, Sabroom
FORM 26 A
ACCOUNT OF SECURED ADVANCES
(Referred to in paragraph 10.2.14, 10.2.20 and 10.7.5 of CPWA Code)
(To be Annexed to form 26 where necessary)
Division:- Border Fencing Division-III, CPWD, Agartala Sub Division:- Border Fencing Sub-Division-II, Sabroom
Name of the Contractor :Shri Uttam Deb
Name of Work: - Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar, Teliamura & Panisagar Sector in Tripura SH: GIN
No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur Sector.
Sl. No. of the Bill to which the Account pertains:- 10th RA Bill
Account of Secured Advance Allowed on the Security of Materials Brought to Site
1 2 3 4 5 6 7 8 9 10
1) Thermo-Mechanically Treated
24810.00 24810.00 0.00 62.50 bars of Kg 46.88 0.00
grade Fe-500D or more.
376.08 376.08 0.00 4650.00 2) Stone Aggregate 40mm Cum 3487.50 0.00
Total -
Certified(1) that the plus quanities of materials shown in column 3 of the Account above have actually been brought by the Contractor to the site of the work and the contractor
has not previously received any advance on their security (2) that these materials of an imperishable nature are all required by the Contractor for use on the work in
connection with the items for which rates for finished work have been agreed upon, and(3) that a formal agreement in Form 31 signed and executed by the contractor in
accordance with paragraphs 10.2,24 (a) of the Central Works Accounts Code is recorded in the Divisional Office.
No.- /CMB/BFD-III/2023-24
Name of Work: - Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence
under Udaipur, Gukulnagar, Teliamura & Panisagar Sector in Tripura SH: GIN No. 697A, 697B, 698,
699, 701, 703, 706, 707, 708A & 708B under Udaipur Sector.
Agt No : 02/EE/BFD-III/AGT/2021-2022
Full Name of work or Purpose of Supply Name of Contractor Value of work done Pages
Signature of AE
EXERCISE BY ASSISTANT ENGINEER(P)
(a) Theoretical consumption of materials checked :
(b) Double rate recovery if any may be mentioned :
(c) Deviation items :
(d) Is quality control observation pending ?
Any item to be declared as Sub-Standard with reference to
(e) theoretical consumption :
(f) Has part rate been checked ?
10th RA BILL
COMPUTERISED BILL
C. B. NO.- /CMB/BFD-III/2023-24
Provisional Provision
Item No. Brief description Full Rate Rate in al Rate in Remarks
previous bill this bill
2.5 Providing and laying in position machine batched and machine mixed design mix M-25 grade cement
concrete for reinforced cement concrete work, using cement content as per approved design mix,
including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing
and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard
setting of concrete, improve workability without impairing strength and durability to get shutter finished
surface as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330
kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately).
83
Page-76
LABOUR REPORT
Name of work:-Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar,
Teliamura & Panisagar Sector in Tripura SH: GIN No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur
Sector
Agreement No. 02/EE/BFD-III/AGT/2021-2022
9 A.M. to 1
Semi-Skilled 7 P.M & 2 Rs. 577 Rs. 32,312
8 Days NIL NIL
P.M. to 5
P.M.
Rs. 494 Rs. 31,616
Un-Skilled 8
Total Rs. 86,168
Signature of Contractor
LABOUR REPORT
Name of work:-Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar,
Teliamura & Panisagar Sector in Tripura SH: GIN No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur
Sector
Agreement No. 02/EE/BFD-III/AGT/2021-2022
9 A.M. to 1
Semi-Skilled 7 P.M & 2 Rs. 577 Rs. 56,546
14 Days NIL NIL
P.M. to 5
P.M.
Rs. 494 Rs. 55,328
Un-Skilled 8
Total Rs. 150,794
Signature of Contractor
LABOUR REPORT
Name of work:-Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar,
Teliamura & Panisagar Sector in Tripura SH: GIN No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur
Sector
Agreement No. 02/EE/BFD-III/AGT/2021-2022
9 A.M. to 1
Semi-Skilled 7 P.M & 2 Rs. 577 Rs. 56,546
14 Days NIL NIL
P.M. to 5
P.M.
Rs. 494 Rs. 55,328
Un-Skilled 8
Total Rs. 150,794
Signature of Contractor
LABOUR REPORT
Name of work:-Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar,
Teliamura & Panisagar Sector in Tripura SH: GIN No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur
Sector
Agreement No. 02/EE/BFD-III/AGT/2021-2022
9 A.M. to 1
Semi-Skilled 7 P.M & 2 Rs. 577 Rs. 52,507
13 Days NIL NIL
P.M. to 5
P.M.
Rs. 494 Rs. 51,376
Un-Skilled 8
Total Rs. 140,023
Signature of Contractor
LABOUR REPORT
Name of work:-Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar,
Teliamura & Panisagar Sector in Tripura SH: GIN No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur
Sector
Agreement No. 02/EE/BFD-III/AGT/2021-2022
9 A.M. to 1
Semi-Skilled 7 P.M & 2 Rs. 577 Rs. 56,546
14 Days NIL NIL
P.M. to 5
P.M.
Rs. 494 Rs. 55,328
Un-Skilled 8
Total Rs. 150,794
Signature of Contractor
LABOUR REPORT
Name of work:-Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar,
Teliamura & Panisagar Sector in Tripura SH: GIN No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur
Sector
Agreement No. 02/EE/BFD-III/AGT/2021-2022
9 A.M. to 1
Semi-Skilled 7 P.M & 2 Rs. 577 Rs. 52,507
13 Days NIL NIL
P.M. to 5
P.M.
Rs. 494 Rs. 51,376
Un-Skilled 8
Total Rs. 140,023
Signature of Contractor
LABOUR REPORT
Name of work:-Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar,
Teliamura & Panisagar Sector in Tripura SH: GIN No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur
Sector
Agreement No. 02/EE/BFD-III/AGT/2021-2022
9 A.M. to 1
Semi-Skilled 7 P.M & 2 Rs. 577 Rs. 56,546
14 Days NIL NIL
P.M. to 5
P.M.
Rs. 494 Rs. 55,328
Un-Skilled 8
Total Rs. 150,794
Signature of Contractor
LABOUR REPORT
Name of work:-Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar,
Teliamura & Panisagar Sector in Tripura SH: GIN No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur
Sector
Agreement No. 02/EE/BFD-III/AGT/2021-2022
9 A.M. to 1
Semi-Skilled 7 P.M & 2 Rs. 577 Rs. 8,078
02 Days NIL NIL
P.M. to 5
P.M.
Rs. 494 Rs. 7,904
Un-Skilled 8
Total Rs. 21,542
Signature of Contractor
[Link]. date of testing length of sample actual weight average weight in kg
1 MS flat (75*6) 3.5
3.6 3.5
3.4
2 MS flat (50*6)
3 ISMB-200
5 MS angle (65*65*6)
6 MS angle (50*50*6)
7 ISMC-75
8 MS Tube (50*30)
9 MS Tube (100*50)
11 MS plate 32 mm
stantard weight
Comrehenshive maintenance
Steel 3086.58 140.26 432938 108234.4
Soling 358.88 1223.30 439019 109754.8
1st RA 9377153 140657.3
Nallah
7th Ra 2339538 23395.38
8th Ra 12395859 123958.6
Drain 149.1 4081.30 608522.44 152130.6
10CC 2764315 27643.15
Total 685774.3
Comrehenshive maintenance
Steel 3086.58 140.26 432938
Soling 358.88 1223.30 439019
1st RA 9377153
Nallah
7th Ra 2339538
8th Ra 12395859
Drain 149.1 4081.30 608522.44
10CC 2764315
Total
86587.5509478
87803.8571376
93771.53
23395.38
123958.59
121704.488262
27643.15
564864.5463474