10th Running Account Bill Summary

The document outlines the financial details of the 10th Running Account Bill for a construction project involving the plugging of Nallah gaps with RCC Box Bridges in Tripura. It includes total work value, payments made, and deductions for taxes and security deposits, resulting in a net payment due of Rs. 25,297,334. The document also provides a theoretical consumption statement of steel and an abstract of costs related to the work executed.

Uploaded by

jayantacpwd
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
78 views213 pages

10th Running Account Bill Summary

The document outlines the financial details of the 10th Running Account Bill for a construction project involving the plugging of Nallah gaps with RCC Box Bridges in Tripura. It includes total work value, payments made, and deductions for taxes and security deposits, resulting in a net payment due of Rs. 25,297,334. The document also provides a theoretical consumption statement of steel and an abstract of costs related to the work executed.

Uploaded by

jayantacpwd
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

III Memorandum of Payments

Rs. P.
1. Total value of work actually measured, as per Acct. 1, col. 5 entry (A) 126472323.93
2. Total up-to-date, advance payment for work not yet measured, as per details given 0.00
below : Rs.
a) Total as per Previous bill 0.00
b) Since previous bill

3. Total 'up-to-date secured advance on security of materials as per Annexure Form 0.00
(26-A) Col. 8 Entry (G) ….. …… 0.00
4. Total Items (1+2+3) ….. …… 126472323.93
5. Deduct Amount withheld -----
Figure for work abstract (a) From Previous bill as per last Running Account bill ….
Rs. P. (b) From this bill
6 Balance i.e. "up-to-date" payments item 4--5) 126472323.93
7. Total amount of payment made as per entry (K) of last
Running Account Bill+ SEC. ADV. 99478216.46

8. Payment now to be made as detailed below : 26994107.47


NIL Say Rs. P. 26994107.00
a) By recovery of amount creditable
to this work (a)
………C.O.T.….………………
Total 5 (b) + 8 (a)+(G)
b) By recovery amount creditable to
other work or heads of account--- (b)
i) Security Deposit @ 2.5% 674853.00
ii) Income tax @ 1% 269941.00
1696773.00
iv) LWC @1% 269941.00
v) SGST @ 1% 241019.00
vi) CGST @ 1% 241019.00
Total Recovery 1696773.00
Net Amount 25297334.00
25297334.00 c) by Cheque 25297334.00
26994107.00 Total 8 (b) + (c) .... (H) 26994107.00
Pay Rs.

Dated initials of Disbursing Officer


Received Rs.

Dated ………………………
STAMP STAMP

* Witness ………………… Signature of Contractor

Paid by me vide cheque **No. Dayed ..........................


Dated initials of person actually making the payment
This figure should be tested to see that it agree with the total of item 7 & 8.
If the net amount be paid is less than Rs.10 and it cannot be included in cheque the payment should be made in cash this
entry being
@ Here altered
specify thesuitably, and the
net amount alteration
payable attested
vide item (8C)by dated initials.
The Payee's acknowledgement should be for the amount paid as per item 8 (i.e.a+b+c)
Payment should be attested by some known person when payee's acknowledgement is given by a mark seal or thumb
impression.
IV---REMARKS
This space is reserved for any remarks which the Disbursing Officer of the Divisional Officer may wish to recorded in
respect of the execution of the work check of measurements or the state of contractor's amount.

FOR USE IN DIVISIONAL OFFICE


Checked

Account Clerk Divisional Accountant Divisional Accountant

FOR USE IN ACCOUNTANT GENERAL'S OFFICE

Computed Classification Reviewed


Checked with schedule Checked
of rates / checked with Reviewed
rates as per agreement

Auditor Superintendent Gazetted Officer


1 CPWD-26(Revised)

10th RUNNING ACCOUNT BILL


(Referred to in Paragraph 10-2-10 and 10-2-12)
(Final payment must invariably be made on forms printed on Yellow Paper which should not be used for
intermediate payment)
[For contractor: This form provides for (1) advance payments (2) Payment for Measured Works. The form of
Account Secured advance which has been printed separately should be attached, where necessary)

Division:- BFD-III Sub-Division:-III, SABROOM


Cash book Voucher No.
Name of Contractor: Shri Uttam Deb
Name of Work :- Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under
Udaipur, Gukulnagar, Teliamura & Panisagar Sector in Tripura SH: GIN No. 697A,
697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur Sector
Serial No. of this Bill: 10th R/A Bill
No. of date of the previous bill of this work:-
Agreement. No :
Date of written order to commence work :- 09.04.2021
Date of actual completion of work : In progress

ACCOUNT FOR WORK EXECUTED


Payment on the basis of
Item of works actual measurement
(grouped under Quantity executed
“Sub-Head” and Unit Rate up-to-date as per Since Remarks
Sub-Works” of measurement book Up-to-date previous
estimate) bill
1 2 3 4 5 6 7

[SHEDULE OF QUANTITY ATTACHED]

Carried over
2
Payment on the basis of
Item of works actual measurement
(grouped under Quantity executed
“Sub-Head” and Unit Rate up-to-date as per Since Remarks
Sub-Works” of measurement book Up-to-date previous
estimate) bill
1 2 3 4 5 6 7
Total value of work done- 126472323.93

Total Value of work done to date (a) Rs. 126472323.93


Deduct-Value of work shown on previous bill 99478216.46
Gross amount of this bill 26994107.00

Figure(F) in words Rupees Two Crore Sixty Nine Lakh Ninety Four Thousand One Hundred Seven only.

N.B. When there are two or more entries in column 6 relating to each Sub-Head of estimate they should, in case of
work the accounts of which are kept by Sub-Head, be totalled and the total recorded in column 7 for positing the
work abstract.

II. Certificate & Signature


1. The measurement on which are based the entries in column 1 to 13 of account were made by
Saurabh Singh JE on 04 /03 /2022 and are recorded at page 01 to of 58 . Measurement Book No -
…...…./CMB/BFD-III
2. Certificated that in addition to and quite apart from the quantities of work actually executed as shown
in column 4 of the account 1, some work has actually been done in connection with several items and the
value of such work (after deducting there from proportionate amount ………………… of secured advance
payments as per item 2 of the memorandum if payments made or proposed to be made for the
convenience of the contractor in anticipation of and subject to the result of detailed measurement which
will be made as soon as possible.

Dated Signature of Officer(……………………………..


Preparing the bill (Rank) Assistant Engineer
(BFSD-II, SABROOM)

Dated Signature of Officer……………………..…………


Authoriing Payment (Rank) Executive Engineer
BFD-III, AGARTALA
Dated Signature of Contractor

**This certificate must be signed by Sub-divisional Officer or Divisional Officer.


*This signature is necessary only when the officer who prepares the bills is not he officer who authorise
the payment in such a case the two signature are essential.
THEORETICAL CONSUMPTION STATEMENT OF STEEL
Name of Work: - Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar, Teliamura & Panisagar Sector in
Tripura SH: GIN No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur Sector
Location of Work:- BFSD-III
Name of the Contractor :Shri Uttam deb
Reference to Agreement no:-02/EE/BFD-III/AGT/2021-2022
Date of written order to commence work :09.04.2021
Stipulated date of completion of work:- 02.07.2022
Date of actual completion of work:- in progress
Date of Abstract: - 09.10.2023
Reference to previous measurements, if any:-
Serial no of this bill :- 10th R/A BILL
Referance of M.B. No. & Page 8 mm in Kg 10mm in Kg 12mm in Kg 16mm in Kg 20mm in Kg 25mm in Kg Total
Up to 9th RA 0.000 78048.320 28242.72 109988.090 30279.640 6600.570 253159.340
B/F P. No- of TCMB 0.000 1412.890 1541.050 1740.420 0.000 0.000 4694.360
B/F P. No- of TCMB 0.000 784.190 825.540 781.750 0.000 0.000 2391.480
B/F P. No- of TCMB 0.000 1784.240 2288.730 4072.190 0.000 0.000 8145.160
B/F P. No- of TCMB 0.000 1165.270 1382.000 3192.640 201.230 0.000 5941.140
B/F P. No- of TCMB 0.000 376.210 545.340 627.250 0.000 0.000 1548.800
B/F P. No- of TCMB 0.000 506.340 0.000 1698.330 0.000 0.000 2204.670
B/F P. No- of TCMB 0.000 512.940 0.000 1698.330 0.000 0.000 2211.270
B/F P. No- of TCMB 0.000 4708.070 6821.910 2596.200 0.000 0.000 14126.180
0.000 1679.100 41.950 2015.170 339.850 0.000 4076.070
0.000 1809.130 0.000 0.000 0.000 0.000 1809.130
Total 0.000 92786.70 41689.24 128410.37 30820.72 6600.57 300307.600
Add. 2% Variation 0.000 1855.73 833.78 2568.21 616.41 132.01 6006.152
Total 0.000 94642.43 42523.02 130978.58 31437.13 6732.58 306313.75
Total Qty. Brought at site 0.000 96915.00 45358.00 134110.00 41510.00 8850.00 326743.00

Contractor Signature JE AE
ABSTRACT OF COST
Name of Work: - Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar, Teliamura & Panisagar Sector in Tripura SH: GIN No. 697A,
697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur Sector
Location of Work:- BFSD-III
Name of the Contractor :Shri Uttam deb
Reference to Agreement no:-02/EE/BFD-III/AGT/2021-2022
Date of written order to commence work :09.04.2021
Stipulated date of completion of work:- 02.07.2022
Date of actual completion of work:- in progress
Date of Abstract: - 09.10.2023
Reference to previous measurements, if any:-
Serial no of this bill :-10th R/A BILL
Quantity Up to date
Since
ITEM Quantity as Executed up Payment on the
Sub-Head and Item of works UNIT Full rate Previous Bill previous
NO. per BOQ to date as basis of actual
Amt.
per MB measurements
1 Sub Head - I : Earth Work
1.1 Banking excavated earth in layers not exceeding 20 cm in depth, breaking
clods, watering, rolling each layer with ½ tonne roller, or wooden or steel
rammers, and rolling every 3rd and top-most layer with power roller of
minimum 8 tonnes and dressing up, in embankments for roads, flood
banks, marginal banks, and guide
banks etc., lead upto 50 m and lift upto 1.5 m :

1.1.1 All kinds of soil cum 5359 363.30


Total
1.2 Earth work in excavation by mechanical means (Hydraulic
excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in
width as well as 10 sqm on plan) including getting out and disposal of
excavated earth lead upto 50 m and lift upto 1.5 m, as directed by
Engineer-in-charge

1.2.1 All kinds of soil cum 7237 158.55


B/F P. No-07 of CMB-03 10099.96
B/F P. No-01 of TCMB 673.32
B/F P. No- of TCMB 427.60
Qty. Deviated upto 30% sanctioned by EE vide ltr. No. 9408.10 158.55 1491654.26 1262058 229596.26
23(60)/BFD-III/AGT/2023/426 dated 19.08.2023
Qty. beyond 30%(A) 900.00 159.98 M/R 143982.00 0 143982
Qty. restricted due to non sanction of deviation
Total 11200.88
1.3 Filling available excavated earth (excluding rock) in trenches, plinth, sides Cum 2412 169.60
of foundations etc. in layers not exceeding 20cm in depth, consolidating
each deposited layer by ramming and watering, lead up to 50 m and lift
upto 1.5 m.
B/F P. No-07 of CMB-03 1661.08
B/F P. No- of TCMB- 479.59
Total 169.60 2140.67 363057.63 281719.17 81338.46

Page 65
1.4 Supplying of local earth (including cum 534 109.80 0.00
royalty) by mechanical transport upto
a lead of 5km
Total 109.8 0.00 0 0 0
1.5 Extra for every additional lift of 1.5 m or part thereof in excavation /
banking excavated or stacked materials.
1.5.1 All kinds of soil Cum 4458 69.55
B/F P. No-08 of CMB-03 4420.26
B/F P. No-01 of TCMB 306.53
B/F P. No- of TCMB 77.72
Total 69.55 4804.51 334153.67 307429.08 26724.59
1.6 Clearing jungle including uprooting of rank vegetation, grass, brush wood, sqm 3572 9.60
trees and saplings of girth up to 30 cm measured at a height of 1 m above
ground level and removal of rubbish up to a distance of 50 m outside the
periphery of the area cleared.
B/F P. No-40 of CMB-03 1642.94
B/F P. No-01 of TCMB 406.00
B/F P. No- of TCMB 469.20
Total 9.60 2518.14 24174.14 15772.22 8401.92
Sub Head - II : Structural Work
2.1 Providing and laying in position machine batched and machine mixed
design mix cement concrete for plain cement concrete work, using cement
content as per approved design mix, including pumping of concrete to site
of laying, finishing but excluding the cost of centering, shuttering,
including admixtures in recommended proportions as per IS: 9103 to
accelerate, retard setting of concrete, improve workability without
impairing strength and durability as per direction of Engineer-in-charge.
(Note :- Excess/ less cement used as per design mix is
payable/recoverable separately).

2.1.1 All works upto plinth level :


[Link] M-15 grade plain cement concrete (cement content considered @ 240 cum 761 13937.05
kg/cum)

B/F P. No-08 of CMB-03 756.58


B/F P. No- of TCMB- 35.04
Total 13937.05 791.62 11032847.52 10544493.29 488354.23
[Link] M-10 grade plain cement concrete (cement content considered @ 220 cum 378 13749.00
kg/cum)
B/F P. No- 08 of CMB-03 186.29
B/F P. No- 02 of TCMB 31.10
B/F P. No- of TCMB 25.63
B/F P. No- of TCMB 23.11
Total 13749.00 266.13 3659021.37 2561301.21 1097720.16
[Link] M-7.5 grade plain cement concrete (cement content considered @ 200 cum 415 13560.90
kg/cum)

B/F P. No-08 of CMB-03 222.30


Total 13560.90 222.30 3014588.07 3014588.07 0

Page 66
2.2 Centering and shuttering including strutting, propping etc. and removal of
form for :
2.2.1 Foundations, footings, bases of columns, etc. for mass concrete Sqm 2158 303.40

B/F P. No- 09 of CMB-36 1134.38


B/F P. No- 02 of TCMB- 26.98
B/F P. No- 16 of TCMB- 131.46
B/F P. No- of TCMB- 27.63
B/F P. No- of TCMB- 145.69
B/F P. No- of TCMB- 222.29
Total 303.40 1688.43 512269.66 344170.89 168098.77
2.2.2 Walls (any thickness) including attached pilasters, butteresses, plinth and Sqm 4919 575.80
string courses etc.
B/F P. No- 09 of CMB-03 8804.27
B/F P. No-17 of TCMB- 581.80
B/F P. No- of TCMB- 492.13
Qty. Deviated upto 30% sanctioned by SE ltr. No. 6394.7 575.80 3682068.26 2832360.2 849708.06
23(13)/SE/BFC-I/CPWD/SIL/2023/238(H) dated 06.10.2023
Qty. beyond 30%(B) 3483.5 610.75 M/R 2127547.63 0 2127547.63
Total Qty 9878.20
2.2.3 Suspended floors, roofs, landings, balconies and access platform Sqm 936 662.00
B/F P. No-09 of CMB-03 483.71
B/F P. No-24 of TCMB 184.72
Total 662.00 668.43 442500.66 320216.02 122284.64
2.2.4 Columns, Pillars, Piers, Abutments, Posts and Struts Sqm 814 757.55
B/F P. No- 09 of CMB-03 343.64
B/F P. No- of TCMB- 246.66
Total 757.55 590.30 447181.77 260324.48 186857.29
2.3 Extra for additional height in centering, shuttering where ever required
with adequate bracing, propping etc., including cost of deshuttering and
decentering at all levels, over a height of 3.5 m, for every additional height
of 1 metre or part thereof (Plan area to be measured).

2.3.1 Suspended floors, roofs, landings, balconies (Plan area to be measured) Sqm 2609 642.45

B/F P. No- 09 of CMB-03 1575.00


B/F P. No-24 of TCMB 450.00
Total 642.45 2025.00 1300961.25 1011858.75 289102.5

Page 67
2.4 Steel reinforcement for R.C.C. work including straightening, cutting,
bending, placing in position and binding all complete upto all level.
2.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more. Kg 367141 104.65

B/F P. No- 09 of CMB-36 253159.341


B/F P. No- 03 of TCMB 4694.360
B/F P. No- 04 of TCMB 2391.480
B/F P. No- 05 of TCMB 8145.160
B/F P. No- 06 of TCMB 5941.140
B/F P. No- 07 of TCMB 1548.800
B/F P. No- 08 of TCMB 2204.670
B/F P. No- 09 of TCMB 2211.270
B/F P. No- of TCMB 14126.180
B/F P. No- of TCMB 4076.070
B/F P. No- of TCMB 1809.130
B/F P. No- of TCMB
Total 104.65 300307.601 31427190.44 26493125.04 4934065.40
2.5 Providing and laying in position machine batched and machine mixed
design mix M-25 grade cement concrete for reinforced cement concrete
work, using cement content as per approved design mix, including
pumping of concrete to site of laying but excluding the cost of centering,
shuttering, finishing and reinforcement, including admixtures in
recommended proportions as per IS: 9103 to accelerate, retard setting of
concrete, improve workability without impairing strength and durability to
get shutter finished surface as per direction of Engineer-in-charge.
(Note :- Cement content considered in this item is @ 330 kg/cum. Excess/
less cement used as per design mix is payable/recoverable separately).

2.5.1 All works upto plinth level cum 2116 14790.60

B/F P. No- 10 of CMB-03 2370.81


B/F P. No- 16 of TCMB 284.49
B/F P. No- of TCMB 150.51
Qty. Deviated upto 30% sanctioned by SE ltr. No.
23(13)/SE/BFC-I/CPWD/SIL/2023/238(H) dated 06.10.2023

Total PR 2805.81
Deviation up to 30% 14790.60 14750 2750.80 40574300 31211000 9363300.00
Qty beyond 30 % (C) 14784.20 14750 55.01 811397.5 0 811397.50

2.5.2 All works above plinth level upto floor V level cum 392.00 15864.65
B/F P. No- 10 of CMB-03 235.65
B/F P. No- 23 of TCMB 70.49
B/F P. No- of TCMB 19.91
Total 15864.65 326.05 5172669.13 3738504.77 1434164.36

Page 68
2.6 Add/deduct for using extra cement in the items of design mix over and Qtl 1219 915.00
above the specified cement content therein.
B/F P. No-10 of CMB-03 2644.69
B/F P. No- 02 of TCMB 12.44
B/F P. No- 14 of TCMB 219.06
B/F P. No- 18 of TCMB 54.28
B/F P. No- of TCMB 15.33
B/F P. No- of TCMB 7.69
B/F P. No- of TCMB 115.89
B/F P. No- of TCMB 23.13
B/F P. No- of TCMB 9.24
Total 3101.75
Total 915.00 1584.70 1450000.5 1450000.5 0
Qty Restricted upto 2000 vide ltr. No. 23(60)/BFD-III/AGT/2020/576 dt. 27.9.2022 915.00 415.30 379999.5 379999.5 0
3 Sub Head - III : Protection and Drainage Work
3.1 Providing and laying 110mm diametre unplasticised Rigid single socketed Meter 304 338.85
PVC pipes conforming to IS:13592 Type-A, across the RCC/ Random
Rubble masonary retaining wall or breast wall for function as weep holes
to reduce the horizontal pressure.
B/F P. No- 10 of CMB-03 149.20
B/F P. No- 10 of TCMB- 86.48
B/F P. No- of TCMB- 52.76
Total 288.44 97737.89 50556.42 47181.47

3.3 Providing and fixing drainage spoutswith 100 mm dia GI pipes as per Each 110 1687.45
drawing and 200 mm dia grating by Ms flat 25mm X 3mm thick welded
with 10mm dia MS bars. etc. complete.

B/F P. No- 10 of CMB-03 34.00


B/F P. No- of TCMB- 14.00
Total 1687.45 48.00 80997.6 57373.3 23624.3

Page 69
3.4 Providing and laying longitudinal drain of size 400mm at bottom, depth Meter 1116 4044.90
varying from 300mm to 500mm (all internal dimensions), made of full brick
masonry in 1:6 (1 cement : 6 fine sand) with 12 mm cement plaster
finished with a floating coat of neat cement of mix 1:4 (1 cement : 4 fine
sand) on internal & top surface including excavation, backfilling, PCC
[Link] (1 cement : 5 fine sand : 10 stone aggregate) at base, PCC [Link]
(1 cement : 2 fine sand : 4 stone aggregate) etc. complete as per drawing
and directions of Engineerin- charge.

B/F P. No- 10 of CMB-03 1032.35


B/F P. No- 10 of TCMB- 66.00
B/F P. No- of TCMB- 13.80
Total 4044.90 1112.15 4498535.54 4175752.52 322783.02
Sub Head- IV : Steel work- Grill Drop/Lifting

4.1 structural steel work in single section, fixed with or without connecting kg 4712 80.30
plate including cutting hoisting, fixing in position all complete.

B/F P. No-11 of CMB-03 2216.15


B/F P. No- of TCMB- 1370.08
Total 80.30 3586.23 287974.27 177956.85 110017.42

4.2 Steel work in built up tubular ( round, square or rectangular hollow tubes
etc.) trusses etc., including cutting, hoisting, fixing in position and applying
a priming coat of approved steel primer, including welding and bolted with
special shaped washers etc. complete.
4.2.1 Hot finished welded type tubes kg 2320 139.24
B/F P. No-11 of CMB-03 1627.43
B/F P. No- of TCMB- 1396.84
Qty. restricted due to non sanction of diviation Total 3024.27
Total 139.24 2320.00 323036.8 226603.35 96433.45
4.3 Steel work welded in built up sections/
framed work, including cutting,
hoisting, fixing in position using
structural steel etc. as required
4.3.1 In gratings, frames, guard bar, ladder, railings, brackets, gates and kg 53247 127.65
similar works
B/F P. No- 11 of CMB-03 21151.98
B/F P. No- of TCMB- 13080.06
Total P/R 125.00 34232.04 4279005 2643997.5 1635007.5
4.4 Providing and fixing hand rail of approved size by welding etc. to steel
ladder railing, balcony railing, staircase railing and similar works.
4.4.1 G.I. Pipes kg 637 168.05
B/F P. No- 11 of CMB-03 157.55
B/F P. No- of TCMB- 103.33
Total 168.05 260.88 43840.88 26476.28 17364.6
4.5 Providing and fixing precoated galvanised iron profile sheets (size, shape Sqm 569 878.55
and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm ( +
0.05 %), total coated thickness with zinc coating 120 gm per sqm as per
IS:277 in 240 mpa steel grade, 5-7 microns epoxy primer on both side of
the sheet and polyester top coat 15-18 microns. Sheet should have
protective guard film of 25 microns minimum to avoid scratches during
transportation and should be supplied in single length upto 12metre or as
desired by Engineer-in-charge. The sheet shall be fixed using self
drilling /self tapping screws of size (5.5x 55mm) with EPDM seal,
B/F P. No- 11 of CMB-03 187.55
Total 878.55 187.55 164772.05 164772.05 0

Page 70
4.6 Finishing with Epoxy paint (two or more coats) at all locations prepared Sqm 1414 181.90
and applied as per manufacturer's specifications including appropriate
priming coat, preparation of surface, etc. complete

4.6.1 On steel work


B/F P. No- 11 of CMB-03 884.00
B/F P. No- of TCMB- 624.96
Total 181.90 1508.96 274479.82 160799.6 113680.22
4.7 Providing and fixing in position chain pully block having ISI mark (IS - Nos. 110 19161.55
3832) of 2 tonne capacity and 3.00 metre Standard lift including
necessary chain, hook etc all complete as per direction of Engineer-in
charge

B/F P. No-12 of CMB-03 48.00


B/F P. No- of TCMB- 30.00
Total 19161.55 78.00 1494600.9 919754.4 574846.5
4.8 Extra for additional chain system etc for extra lift of chain & pully block Mtr. 80 691.80
beyond 3.00m standard lift

B/F P. No-12 of CMB-03 481.31


B/F P. No- of TCMB- 364.50
Qty. Deviated upto 30% sanctioned by SE ltr. No. 104.00 691.80 71947.2 55344 16603.2
23(13)/SE/BFC-I/CPWD/SIL/2023/238(H) dated 06.10.2023
Qty. beyond 30%(D) 741.81 693.65 M/R 514556.5065 0 514556.5065
Total 845.81

Sub Head-V : Fencing Work


5.2 Providing and fixing security fencing of GI barbed wire consisting of Mtr. 828 4834.70
copper enriched MS angle posts of 90mm x 90mm x 6mm, 3000mm
length above ground level (2000mm vertical and 1000mm slanting) duly
fabricated and welded at bend as per drawing and 1045 mm below
ground level placed at 3000mm centre to centre & embeded in cement
concrete blocks 600mm dia at bottom and 300mm at top 1295mm deep
placed at 1195 mm below ground level & every 10th post, end posts &
corner posts to be strutted with MS angle strut on both sides, of size
90mm x 90mm x 6mm & 3440mm in length (200mm vertical at top &
3240mm slanting
down) fabricated and welded as per drawing bolted to vertical posts with
two Nos. 12mm dia & 50 mm long MS bolts & nuts with washers, struts
embedded in cement concrete blocks of 1400mm x 300mm upto 300mm
height at bottom and sloped towards top of area 300mm x 300mm of CC
block at overall depth of 1295mm size placed at 1195mm below ground
level
B/F P. No-12 of CMB-03 130.95
Total 4834.70 130.95 633103.97 633103.97 0

Page 71
5.3 Providing and fixing security fencing of GI barbed wire consisting of Mtr. 754 1741.35
copper enriched MS angle posts of 65mm x 65mm x 6mm 1500mm
length above ground level & 645mm below ground level including
providing one number 75mm long pointed spike made of 12mm dia MS
round bar welded to angle iron post at corner for min 25mm length (as per
standard drawing attached) MS angle posts placed at 3000mm centre to
centre embedded in cement concrete blocks 300mm dia 895mm deep
placed at 795mm below ground level as every 10th post, end posts &
corner posts to be strutted with MS angle struts on both sides of size
65mm x 65mm x 6mm & 2400mm long (200mm vertical at top & 2200mm
slanting down) fabricated & welded as per drawing bolted to vertical posts
with 2 Nos 12mm dia 50mm long bolts & nuts with washers struts
embedded in cement concrete blocks of size 1000mm x 1000mm upto
300mm height at bottom slopes towards top CC block of area 300mm
x300mm at overall depth of 895mm placed at 795mm below ground level
as per drawing attached including providing & fixing galvanised iron wire
duly painted bydipping in paint twice with anti corrosive bitumastic paint
(IS:158) of approved brand & manufacturer black shade to give a smooth
& even surface, size of GI barbed wire 2.5 mm x 2.0mm (weight to be not
less than 108gms per metre length) conforming to IS.278-1978 in 10
horizontal rows to be fixed & stretched with MS hooks/tightening bolts as
per drawing and properly woven with two diagonal of same GI barbed
B/F P. No-12 of CMB-03 130.95
Total 1741.35 130.95 228029.78 228029.78 0
5.4 Providing, laying & fixing of galvanised punched tape concertina coil of each 446 3115.90
unstretched dia 1050mm having galvanised spring steel core of wire
2.5mm dia of cold drawn steel punched tape of low carbon steel having
series of sharp barbs uniformly punched along its length 55 barbs on
periphery per revolution crimped on steel spring core wire. Galvanised
clips GI steel wire handles hooked to coils for handling MS square bar
spikes hooked to coil having pointed faces for anchorage & weight 15.20
kg per coil including spreading of each coil 10 metre length adequately
tied to GI barbed wire fencing & fencing post with GI wire of not less than
16 guage at every 1000mm spacing tying of handles of succeeding coil
with preceding coil with GI wire of not less than 16 guage, properly
anchoring of spikes at start & end of coil in precast cement concrete block
of size 20cm x 20cm x 20cm of mix [Link] (1 cement: 2 fine sand: 4 stone
aggregate 20mm nominal size) of bottom layer & applying anticorrosive
bitumastic paint (IS:158) of approved brand & manufacture in black shade
to give a smooth & even surface by dipping in paint twice over punched
tape concertina coil complete as per drawings & directios of the Engineer
in-Charge.

B/F P. No-13 of CMB-03 92.97


B/F P. No- of TCMB- 25.21
Total 3115.90 118.18 368237.06 289685.22 78551.84
Single Row Fencing
5.6.1 Providing and fixing security fencing of GI barbed wire consisting of Mtr. 162 7686.70
Copper Enriched MS angle post of section 90mm x 90mm x 6 mm 6982
mm total length, above CC pavement (4732 mm vertical and 1000 mm
slanting) duly fabricated and welded at bend as per drawing and 1250 mm
below CC pavement placed at 3300 mm centre to centre and embedded
in cement concrete blocks 900 mm dia meter at bottom and 600 mm dia
at top 1900 mm deep placed at 1975 mm below top of CC pavement
including
providing and fixing galvanised iron barbed wire duly painted by dipping in
paint twice with anticorrosive bitumastic paint (IS-158) of approved brnad
and manufacture in black shade to give a smooth and even surface, size
of barbed wire 2.5 x 2 mm (Weight to be not less than 108 gms. per meter
length) conforming to IS 26 rows in vertical portion and 7 rows in slanting
B/F P. No-13 of CMB-03 58.25
Page 72
B/F P. No- of TCMB- 51.40
Total 7686.70 109.65 842846.66 447750.28 395096.38

Page 73
Fencing on culvert
5.6.2 Providing and fixing security fencing of GI barbed wire consisting of Mtr. 295 3354.05
copper enriched MS angle posts of 90mm x 90mm x6mm 3000mm length
above RCC Culvert slab (2000mm vertical and 1000mm slanting) duly
fabricated and welded at bend as per drawing and placed at 3000mm
centre to centre & fixed with MS plate 250 mm x250mm size 8mm Thick
by 4 Nos. dash fastner of 16mm dia & every 10th post, end posts & corner
posts to be strutted with MS angle strut on both sides, of size 90mm x
90mm x 6mm & 2245mm in length (200mm vertical at top & 2045mm
slanting down) fabricated and welded as per drawing bolted to vertical
posts with two Nos. 12mm dia & 50mm long MS bolts & nuts with
washers, struts fixed with MS plate 250 mm x 250mm size 8mm thick by 4
Nos. dash fastner 16mm dia as per standard drawing attached including
providing & fixing
B/F P. No-13 of CMB-03 115.20
B/F P. No- of CMB- 43.05
Total 3354.05 158.25 530778.41 386386.56 144391.85
5.7 Drilling and providing carbon steel galvanished dash fastner (Hilty or Nos. 5940 347.58
Fisher) of size drill bit dia 16 mm, length 140 mm etc. all complete as per
direction of Engineer-in-charge.
B/F P. No-14 of CMB-03 1513.00
B/F P. No- of TCMB- 957.00
Total 347.58 2470.00 858522.6 525888.54 332634.06

Sub-Total 123984567.89 97199151.81 26785416.08


Above @ 0.9%(Except A, B, C &D) 1,083,483.76 874,792.37 208,691.39

Total 125068051.65 98073944.18 26994107.47


EI-I/I Providing and laying Non Pressure NP-3 class (Medium duty) R.C.C.
pipes including collars/spigot jointed with stiff mixture of cement mortar in
the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc.
Complete

900 mm dia RCC pipes. (Laying by manual/ machanical means) Mtr. 70 12557.70
B/F P. No-14 of CMB-03 70.00
Extra Item Sanctioned vide letter No.
Dated:
Total M/R 12557.70 70.00 879039 879039 0

Page 74
EI-I/II Supplying and filling in plinth with sand under floors, including watering,
ramming, consolidating and dressing complete. Cum 85 2255.20

B/F P. No-14 of CMB-03 13.80


Total F/R 2255.20 13.80 31121.76 31121.76 0
EI-I/III Bamboo pile walling made of 65 mm. to 75 mm. dia 2.25 m. average long
bamboo in single line driven half length of each pipe into the ground at a
very close spacing but not more than 8 cm. center to center and side by
side with struts / stays of same length & dia at an interval of 1.00 m. and
three Nos. of half split bamboo of 65 mm. to 75 mm. dia runner fitted and Mtr. 30 3505.75
fixed to the piles inside and outside with iron nails etc. with G.I. binding
wires complete as per direction of the Engineer-in-charge.

B/F P. No-14 of CMB-03 24.00


Total F/R 3505.75 24.00 84138 84138 0
EI-I/IV Supplying and stacking at site.
Over burnt (Jhama) brick aggregate 90 mm to 45 mm (Net quantity shall Cum 85 6235.30
be after deducting void @ 7.5% of loose quantity).
B/F P. No-14 of CMB-03 52.33
Total F/R 6235.30 52.33 326293.25 326293.25 0
EI-I/V Extra for laying brick work in or under water and/or liquid mud including
cost of pumping or bailing out water and removing slush etc. complete.
NOTE :- The quantity will be calculated by multiplying the depth measured
from sub - soil water level up to the centre of gravity of brick work under
sub - soil water with the quantity of brick work in cum. executed under the cum 85 622.55
sub - soil water. The depth of centre of gravity shall be reckoned correct to
0.1 m, 0.05 m or more shall be taken as 0.1 m and less than 0.05 m
ignored.

B/F P. No-14 of CMB-03 52.33


Total P/R 622.55 52.33 32578.04 32578.04 0.00
EI-II Centering and shuttering including strutting, propping etc. and removal of
form for : Sqm 85 620.7

Lintels, beams, plinth beams, girders, bressumers and cantilevers

B/F P. No-14 of CMB-03 82.33


Total P/R 620.70 82.33 51102.23 51102.23 0.00

Total Rs. (A) 126472323.93 99478216.46 26994107.47

Page 75
Say Rs. 126472324.00 99478216.00 26994107.00
Upto date work done 126472324.00 99478216.00 26994107.00
Less already paid previous bill(B) 99478216.46 99478216.00 26994107.00
Gross amount of this bill ......(A-B) 26994107.47
Say Rs. 26994107.00 26994107.00
Total 26994107.00 26994107.00
Recovery Details Total 26994107.00 26994107.00
(i)SD @ 2.5% on Rs. 126472324/- 126472324.00 3,161,808.00
Less already deducted 2,486,955.00
Now to be recovered 674,853.00 674853.00
(ii) Income Tax @ 1% on Rs. 126472324/- 126472324.00 1,264,723.00
Less already deducted 994,782.00
Now to be recovered 269,941.00 269941.00
(iii) CGST @ 1% on Rs. 42435464/- 42435464.00 424,355.00
Less already deducted 424,355.00
Now to be recovered 0.00 0.00
(iii) CGST @ 1% on Rs. 84036860/- 75032911.00 750,329.00
Less already deducted 509,310.00
Now to be recovered 241019.00 241019.00
(iv) SGST @ 1% on Rs. 42435464/- 42435464.00 424,355.00
Less already deducted 424,355.00
Now to be recovered 0.00 0.00
(iv) SGST @ 1% on Rs. 84036860/- 75032911.00 750,329.00
Less already deducted 509,310.00
Now to be recovered 241019.00 241019.00
(v) Labour Cess @1% on Rs. 126472324/- 126472324.00 1,264,723.00
Less already deducted 994,782.00
Now to be recovered 269941.00 269941.00
(VI) Withheld @ 4% of tender Amount Rs. 137161143.00/- 137161143 5486446.00
Less already deducted 5486446.00
Now to be recovered 0.00 0.00
Total 1696773.00
Total Recoveries….(D) 1,696,773.00
Net Amount of this Bill (C-D) 25,297,334.00
Rupees (Two Crore Fifty Two Lakh Ninety Seven Thousand Three Hundred Thirty Four) only

Certified That :
1. The work has been executed as per terms and conditions of the agreement.
2. No material and T & P has been issued by the department.
3. Arrangements for water has been made by Contractor..
4. Requisite technical staff has been employed as per clause 36 of agreement.
5. Upto date recoveries have been effected in this bill.
6. Labour report submitted up to date .e.i / /
[Link] madatory test has been carried out at site as per specification.
Bill and measurment accepted by me.

Signature of the Contractor Signature of JE

The 10th R/A bill in favour of Shri Uttam Deb submitted to D/o for pass & payment please.
Page 76
Signature of AE

Page 77
RECORD OF MEASUREMENT
Name of Work: - Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar,
Teliamura & Panisagar Sector in Tripura SH: GIN No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur
Sector

Location of Work:- BFSD-III


Name of the Contractor :Shri Uttam deb
Reference to Agreement no:-02/EE/BFD-III/AGT/2021-2022
Date of written order to commence work :09.04.2021
Stipulated date of completion of work:- 02.07.2022
Date of actual completion of work:- in progress
Reference to previous measurements, if any:-
Serial no of this bill :- 10th R/A BILL
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured
1.6 at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area
cleared.
Details of Actual Measurement Content
1.6 s of
Description of item Area

No. No. Length Breadth Depth


GIN NO. 698 2 3 4 5 6 7
U-Shape [Link] Single Fenching Side 1 1 6.00 5.50 - 33
Gin No. 697-1A
U-Shape & Single [Link] BSF Tower Side 1 1 17.00 8.00 - 136
Gin 697-2A
Single [Link] BSF Tower Side 1 1 17.00 6.00 - 102
U-Shape [Link] BSF Tower Oppo. Side 1 1 5.00 5.00 - 25
Gin 703
U-Shape [Link] BSF Tower Oppo. Side 1 1 5.00 6.00 - 30
U-Shape [Link] BSF Tower Side 1 1 16.00 5.00 80
Total 406.00
Sqm

Measured on : 22/06/2023 Signature of cotractor Signature of JE

Page 1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth,
1.2 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto
1.5 m, as di

1.2.1 All kinds of soil


Details of Actual Measurement Content
Description of item s of
No. No. Length Breadth Depth
Gin no. 703 2 3 4 5 6 Area
7
U-Shape [Link] BSF Tower Oppo. Side
L=(4.7+4.5+4)/3= 4.4m 1 1 4.40 5.50 3.80 91.96
H= (4+3.6)/2= 3.8m
U-Shape [Link] BSF Tower Side
L=(6.8+5.5)/2= 6.15m 1 1 6.15 5.50 3.60 121.77
H= (3.95+3.25)/2= 3.6m
Gin 698
U-Shape [Link] Single Fenching Side
L= (4.8+4.5)/2= 4.65m 1 1 4.65 5.50 4.66 119.18
H= (5+4.6+4.4)/3= 4.66m
Gin No. 697-2A
U-Shape [Link] BSF Tower Oppo. Side
H=(1.4+1.6)/2 =1.5m 1 1 5.00 5.50 1.50 41.25
BSF Tower side 5m Height Single [Link] Right Side
H=(3.8+3.5+2.9)= 3.4m 1 1 6.00 3.50 3.40 71.40
Key 1 1 6.00 0.60 0.70 2.52
BSF Tower side 3m Height Single [Link] Right Side
H=(1.9+1.5+1.2)/3=1.53m 1 1 10.70 2.20 1.53 36.02
Key 1 1 10.70 0.30 0.35 1.12
BSF Tower side 5m Height Single [Link] Left Side
H=(3.1+2.8+2.4)/3= 2.76m 1 1 5.40 3.50 2.76 52.16
Key 1 1 5.40 0.60 0.70 2.27
BSF Tower side 3m Height Single [Link] Left Side
H=(1.1+.8)/2= 0.95m 1 1 4.80 2.20 0.95 10.03
Key 1 1 4.80 0.30 0.35 0.50
Gin No. 697-1A
U-Shape [Link] BSF Tower Side
H=(3.5+3+2.8)/3= 3.1m 1 1 2.80 5.30 3.10 46.00
BSF Tower side 5m Height Single [Link] Right Side
H=(1.6+1.2+0.9)/3= 1.23m 1 1 6.30 3.50 1.23 27.12
Key 1 1 6.30 0.60 0.70 2.65
BSF Tower side 3m Height Single [Link] Right Side
H=(1.45+1.2+1)/3= 1.2m 1 1 7.40 2.20 1.20 19.54
Key 1 1 7.40 0.30 0.35 0.78
BSF Tower side 5m Height Single [Link] Left Side
H=(3.5+3+2.8)/3= 3.1m 1 1 2.40 3.50 3.10 26.04
Key 1 1 2.40 0.60 0.70 1.01
Total 673.32
cum

Measured on : 22/06/2023 Signature of cotractor Signature of JE

Page 2
Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials.
1.5

1.5.1 All kinds of soil


Details Contents
of of Area
Actual
Description of item Measu
rement
No. No. Length Breadth Depth
1 2 3 4 5 6 7
Gin no. 703 2 3 4 5 6 7
U-Shape [Link] BSF Tower Oppo. Side
L=(4.7+4.5+4)/3= 4.4m 1 1 4.40 5.50 2.30 55.66
H= (4+3.6)/2= 3.8m
U-Shape [Link] BSF Tower Side
L=(6.8+5.5)/2= 6.15m 1 1 6.15 5.30 2.10 68.45
H= (3.95+3.25)/2= 3.6m
Gin 698
U-Shape [Link] Single Fenching Side
L= (4.8+4.5)/2= 4.65m 1 1 4.65 5.50 3.16 80.82
H= (5+4.6+4.4)/3= 4.66m
Gin No. 697-2A
BSF Tower side 5m Height Single [Link] Right Side
H=(3.8+3.5+2.9)= 3.4m 1 1 6.00 3.50 1.90 39.90
BSF Tower side 3m Height Single [Link] Right Side
H=(1.9+1.5+1.2)/3=1.53m 1 1 10.70 2.20 0.03 0.71
BSF Tower side 5m Height Single [Link] Left Side
H=(3.1+2.8+2.4)/3= 2.76m 1 1 5.40 3.50 1.26 23.81
Gin No. 697-1A
U-Shape [Link] BSF Tower Side
H=(3.5+3+2.8)/3= 3.1m 1 1 2.80 5.30 1.60 23.74
BSF Tower side 5m Height Single [Link] Left Side
H=(3.5+3+2.8)/3= 3.1m 1 1 2.40 3.50 1.60 13.44

Total 306.53
cum

Measured on : 22/06/2023 Signature of cotractor Signature of JE

Page 3
Item
. Providing and laying in position machine batched and machine mixed design mix cement concrete for plain cement concrete
work, using cement content as per approved design mix, including pumping of concrete to site of laying, finishing but
No- excluding the cos
2.1
2.1.1 All works upto plinth level :
2.1.2 M-10 grade plain cement concrete (cement content considered @ 220 kg/cum)
Detail Content
Description of item s No.
of s of
No. Length Breadth Depth
1 Actua
2 3 4 5 6 Area
7
l
GIN No- 703 0
U-Shape [Link] BSF Tower Oppo. Side
1 1 4.35 5.30 0.15 3.46
L=(4.7+4)/2= 4.35m
U-Shape [Link] BSF Tower Side
1 1 6.15 5.30 0.15 4.89
L=(5.5+6.8)/2= 6.15m
Gin No- 698
U-Shape [Link] Single Fenching Side 1 1 4.80 5.30 0.15 3.82
L= (4.8+4.5)/2= 4.65m 0
Gin No- 697-2A 0
U-Shape [Link] BSF Tower Oppo. Side 1 1 5.00 5.30 0.15 3.98
BSF Tower side 5m Height Single [Link] Right Side 1 1 6.00 3.20 0.10 1.92
Key 1 1 6.00 0.60 0.10 0.36
BSF Tower side 3m Height Single [Link] Right Side 1 1 10.70 2.00 0.10 2.14
Key 1 1 10.70 0.25 0.10 0.27
BSF Tower side 5m Height Single [Link] Left Side 1 1 5.40 3.20 0.10 1.73
Key 1 1 5.40 0.60 0.10 0.32
BSF Tower side 3m Height Single [Link] Left Side 1 1 4.80 2.00 0.10 0.96
Key 1 1 4.80 0.25 0.10 0.12
Gin No. 697-1A
U-Shape [Link] BSF Tower Side
1 1 2.70 5.30 0.15 2.15
L=(3+2.4)/2= 2.7m
BSF Tower side 5m Height Single [Link] Right Side 1 1 6.30 3.20 0.10 2.02
Key 1 1 6.30 0.60 0.10 0.38
BSF Tower side 3m Height Single [Link] Right Side 1 1 7.40 2.00 0.10 1.48
Key 1 1 7.40 0.25 0.10 0.19
BSF Tower side 5m Height Single [Link] Left Side 1 1 2.40 3.20 0.10 0.77
Key 1 1 2.40 0.60 0.10 0.14
Total 31.10
cum

2.6 Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
Detail Contents
s of of Area
Actual
Description of item Meas
ureme
nt
No. No. Length Breadth Depth
1 2 3 4 5 6 7
Qty as per item no. [Link] 1.00 31.10 0.40
12.44
Extra cement =(260-220)=40 kg/cum
Total 12.44
Qtl

Measured on :12/07/2023 Signature of Contractor Signature of JE

Page 4
2.2 Centering and shuttering including strutting, propping etc. and removal of form for :
2.2.
Foundations, footings, bases of columns, etc. for mass concrete
1
Details Contents
of of Area
Actual
Description of item Measu
rement

No. No. Length Breadth Depth


1 2 3 4 5 6 7
GIN No- 703
U-Shape [Link] BSF Tower Oppo. Side
1 2 4.35 - 0.15 1.31
L=(4.7+4)/2= 4.35m
1 2 - 5.30 0.15 1.59
U-Shape [Link] BSF Tower Side
1 2 6.15 - 0.15 1.85
L=(5.5+6.8)/2= 6.15m
1 2 - 5.30 0.15 1.59
Gin No- 698 1 2
U-Shape [Link] Single Fenching Side 1 2 4.80 - 0.15 1.44
1 2 - 5.30 0.15 1.59
Gin No- 697-2A
U-Shape [Link] BSF Tower Oppo. Side 1 2 5.00 - 0.15 1.5
1 2 - 5.30 0.15 1.59
BSF Tower side 5m Height Single [Link] Right Side 1 2 6.00 - 0.10 1.2
1 2 - 3.20 0.10 0.64
BSF Tower side 3m Height Single [Link] Right Side 1 2 10.70 - 0.10 2.14
1 2 - 2.00 0.10 0.4
BSF Tower side 5m Height Single [Link] Left Side 1 2 5.40 - 0.10 1.08
1 2 - 3.20 0.10 0.64
BSF Tower side 3m Height Single [Link] Left Side 1 2 4.80 - 0.10 0.96
1 2 - 2.00 0.10 0.4
Gin No- 697-1A
U-Shape [Link] BSF Tower Side
1 2 - 0.81
L=(3+2.4)/2= 2.7m 2.70 0.15
1 2 - 5.3 0.15 1.59
BSF Tower side 5m Height Single [Link] Right Side 1 2 6.30 - 0.10 1.26
1 2 - 3.2 0.10 0.64
BSF Tower side 3m Height Single [Link] Right Side 1 2 7.40 - 0.10 1.48
1 2 - 2 0.10 0.4
BSF Tower side 5m Height Single [Link] Left Side 1 2 2.40 - 0.10 0.48
1 2 - 2.00 0.10 0.4
Total 26.98
C/O to Page No. Of TCMB Sqm

Measured on :12/07/2023 Signature of Contractor Signature of JE

Page 5
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to all
height.
2.4.1 (a) Thermo-Mechanically Treated bars.
GIN No 703 ( Ghagrabasti )
M Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm
U-Shape [Link] BSF Tower Oppo. SideBottom slab
5 Base Slab -bottom main bar 12 1 24 6.900 165.60
9 Distribution steel for Bottom 98.90
10 1 23 4.300
main bar
4 Base slab - Top steel 16 1 24 5.750 138.00
4A Base slab - Top steel 16 1 24 5.750 138.00
8 Distribution steel for Top main 98.90
12 1 23 4.300
bar
Chair 16 1 12 2.000 24.00
10 Haunch 10 2 24 2.026 97.25
Side walls ( bottom of base to Top of Roof)
3 side walls Other face main steel 10 2 24 4.925 236.40
7 side walls other face Distribution 137.60
10 2 16 4.30
steel
1 side wall earth face Main steel 12 2 24 4.375 210.00
2 side wall earth face Main steel 16 2 24 3.35 160.80
6 side wall earth face Distribution 137.60
10 2 16 4.30
steel
Spacer 10 1 40 1.00 40.00
Expension joint Proposed WallSide ( bottom of base to top of
roof)
side walls earth face main steel 12 1 33 4.725 155.93
side walls other face main steel 12 1 33 4.73 155.93
side wall earth face Distribution 10 1 26 4.90 127.40
side wall other face Distribution 10 1 26 4.90 127.40
Spacer 10 1 30 1.00 30.00
U-Shape [Link] BSF Tower SideBottom slab
5 Base Slab -bottom main bar 12 1 34 6.900 234.60
9 Distribution steel for Bottom 138.00
main bar 10 1 23 6.000

4 Base slab - Top steel 16 1 34 5.750 195.50


4A Base slab - Top steel 16 1 34 5.750 195.50
8 Distribution steel for Top main 12 1 23 6.000 138.00
bar
Chair 16 1 14 2.000 28.00
10 Haunch 10 2 34 2.026 137.77
Side walls ( bottom of base to Top of Roof)
3 side walls Other face vert. main 10 2 34 4.975 338.30
steel
7 side walls other face Distribution 192.00
10 2 16 6.000
steel
1 side wall earth face vert. Main 300.90
12 2 34 4.425
steel
2 side wall earth face vert. Main 228.75
16 2 34 3.364
steel
6 side wall earth face Distribution 192.00
10 2 16 6.000
steel
Spacer 10 1 40 1.000 40.00
Expension joint Proposed WallSide ( bottom of base to top of
roof)
side walls earth face main steel 12 1 33 4.175 137.78
side walls other face main steel 12 1 33 4.18 137.78
side wall earth face Distribution 107.80
steel 10 1 22 4.90

side wall other face Distribution 107.80


steel 10 1 22 4.90

Spacer 10 1 30 1.00 30.00

Total length in M 0.000 2316.220 1735.420 1108.550 0.000


Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 1412.890 1541.050 1740.420 0.000
Grand Total in Kg= 4694.360
Net Payble [Link] Kg 4694.360

Page 6
Measured on :15/07/2023 Signature of Contractor/Representative Signature of JE

Page 7
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete
up to all height.
2.4. (a) Thermo-Mechanically Treated bars.
1 GIN No-698 ( Kathalcheri )
M Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm
U-Shape [Link] Single Fenching Side
5 Base Slab -bottom main bar 12 1 26 6.900 179.40
9 Distribution steel for Bottom 103.50
main bar 10 1 23 4.500

4 Base slab - Top steel 16 1 26 5.750 149.50


4A Base slab - Top steel 16 1 26 5.750 149.50
8 Distribution steel for Top 103.50
12 1 23 4.500
main bar
Chair 16 1 12 2.000 24.00
10 Haunch 10 2 26 2.026 105.35
Side walls ( bottom of base to Top of Roof)
3 side walls Other face main 10 2 26 5.975 310.70
steel
7 side walls other face 10 2 21 4.550 191.10
Distribution steel
1 side wall earth face Main 12 2 26 5.425 282.10
steel
2 side wall earth face Main 16 2 26 3.364 174.93
steel
6 side wall earth face 10 2 21 4.550 191.10
Distribution steel
Spacer 10 1 45 1.000 45.00
Expension joint Proposed WallSide ( bottom of base to top
of roof)
side walls earth face main 12 1 33 5.525 182.33
steel
side walls other face main 12 1 33 5.525 182.33
steel
side wall earth face 10 1 31 4.90 151.90
Distribution steel
side wall other face 10 1 31 4.90 151.90
Distribution steel
Spacer 10 1 35 1.00 35.00

Total length in M 0.000 1285.550 929.660 497.930 0.000


Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 784.190 825.540 781.750 0.000
Grand Total in Kg= 2391.480
Net Payble [Link] Kg 2391.480

Measured on :12/07/2023 Signature of Contractor/Representative Signature of JE

Page 8
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to all height.
2.4.1 (a) Thermo-Mechanically Treated bars.
GIN No-697 -2A ( Sabroom )
M Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm
U-Shape [Link] BSF Tower Oppo. Side
5 Base Slab -bottom main bar 12 1 29 6.800 197.20
9 Distribution steel for Bottom main bar 10 1 20 4.850 97.00
4 Base slab - Top steel 16 1 29 5.650 163.85
4A Base slab - Top steel 16 1 29 5.650 163.85
8 Distribution steel for Top main bar 10 1 28 4.850 135.80
Chair 16 1 12 2.000 24.00
10 Haunch 10 2 29 1.885 109.33
Side walls ( bottom of base to Top of Roof)
3 side walls Other face main steel 10 2 29 2.875 166.75
7 side walls other face Distribution steel 10 2 6 4.900 58.80
1 side wall earth face Main steel 12 2 29 2.375 137.75
2 side wall earth face Main steel 16 2 29 2.375 137.75
6 side wall earth face Distribution steel 10 2 6 4.900 58.80
Spacer 10 1 20 1.000 20.00
Expension joint Proposed WallSide ( bottom of base to top of roof)
side walls earth face main steel 12 1 33 5.500 181.50
side walls other face main steel 12 1 33 5.50 181.50
side wall earth face Distribution steel 10 1 34 4.90 166.60
side wall other face Distribution steel 10 1 34 4.90 166.60
Spacer 10 1 15 1.00 15.00
BSF Tower side 5m Height Single [Link] Right Side
Footing(L=6m)
Main Bar Top & Bottom 16 2 40 4.00 320.00
Distribution Steel 12 2 21 5.85 245.70
Chair 16 1 14 2.00 28.00
Key
Main Bar 16 2 40 1.55 124.00
Distribution 12 2 5 5.85 58.50
Stem
Vertical Main Bar 325.50
16 2 30 5.425
H=(4.6+4.5)/2= 4.55m
Vertical Main Bar 16 2 30 4.375 262.50
Distribution 10 2 30 5.90 354.00
Spacer 10 1 56 1.00 56.00
BSF Tower side 3m Height Single [Link] Right Side
Footing(L=10.7m)
Main Bar Top & Bottom 12 2 71 2.40 340.80
Distribution Steel 10 2 13 10.60 275.60
Chair 16 1 25 2.00 50.00
Key
Main Bar 12 2 71 0.70 99.40
Distribution 10 2 4 10.60 84.80
Stem
Vertical Main Bar 12 2 71 3.175 450.85
Distribution 10 2 17 10.60 360.40
Spacer 10 1 50 1.00 50.00
BSF Tower side 5m Height Single [Link] Left Side
Footing(L=5.4m)
Main Bar Top & Bottom 16 2 36 4.00 288.00
Distribution Steel 12 2 21 5.25 220.50
Chair 16 1 14 2.00 28.00
Key
Main Bar 16 2 36 1.55 111.60
Distribution 12 2 5 5.25 52.50
Stem
Vertical Main Bar 306.45
16 2 27 5.675
H=(4.9+4.7)/2= 4.8m
Vertical Main Bar 16 2 27 4.375 236.25
Distribution 10 2 32 5.32 340.48
Spacer 10 1 54 1.00 54.00
BSF Tower side 3m Height Single [Link] Left Side
Footing(L=4.8m)
Main Bar Top & Bottom 12 2 32 2.40 153.60
Distribution Steel 10 2 13 4.65 120.90
Chair 16 1 12 2.00 24.00
Key
Main Bar 12 2 32 0.70 44.80
Distribution 10 2 4 4.65 37.20
Stem
Vertical Main Bar 212.80
H=(2.8+2.5)/2= 2.65m 12 2 32 3.325

Distribution 10 2 18 4.72 169.92


Spacer 10 1 27 1.00 27.00

Total length in M 0.000 0.000 2924.980 2577.400 2593.750 0.000


Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 0.000 1784.240 2288.730 4072.190 0.000
Grand Total in Kg= 8145.160
Net Payble [Link] Kg 8145.160

Page 9
Measured on 15/07/2023 Signature of Contractor/Representative Signature of JE

Page 10
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to all height.
2.4.1 (a) Thermo-Mechanically Treated bars.
GIN No-697-1A( Sabroom)
M Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm
(U-Shape [Link] BSF Tower Side - L=2.7m)
5 Base Slab -bottom main bar 16 1 14 7.000 98.00
9 Distribution steel for Bottom main 10 1 20 2.550 51.00
bar
4 Base slab - Top steel 20 1 14 5.850 81.90
4A Base slab - Top steel 16 1 14 5.850 81.90
8 Distribution steel for Top main bar 12 1 20 2.550 51.00
Chair 16 1 8 2.000 16.00
10 Haunch 10 2 14 2.168 60.70
Side walls ( bottom of base to Top of Roof)
3 side walls Other face main steel 10 2 14 7.075 198.10
7 side walls other face Distribution 10 2 22 2.600 114.40
1 steelMain steel
side wall earth face 16 2 14 6.475 181.30
2 side wall earth face Main steel 16 2 14 3.576 100.13
6 side wall earth face Distribution 10 2 22 2.600 114.40
steel Spacer 10 1 36 1.000 36.00
Expension joint Proposed WallSide ( bottom of base to top of roof)
side walls earth face main steel 12 1 33 6.575 216.98
side walls other face main steel 12 1 33 6.575 216.98
side wall earth face Distribution 10 1 35 2.60 91.00
steel
side wall other face Distribution 10 1 35 2.60 91.00
steel Spacer 10 1 50 1.00 50.00
BSF Tower side 5m Height Single [Link] Right Side
Footing(L=6.3m)
Main Bar Top & Bottom 16 2 42 4.00 336.00
Distribution Steel 12 2 21 6.15 258.30
Chair 16 1 14 2.00 28.00
Key
Main Bar 16 2 42 1.55 130.20
Distribution 12 2 5 6.15 61.50
Stem
Vertical Main Bar 296.00
16 2 32 4.625
H=(3.4+4.1)/2= 3.75m
Vertical Main Bar 16 2 32 4.375 280.00
Distribution 10 2 25 6.15 307.50
Spacer 10 1 49 1.00 49.00
BSF Tower side 3m Height Single [Link] Right Side
Footing(L=7.4m)
Main Bar Top & Bottom 12 2 49 2.40 235.20
Distribution Steel 10 2 13 7.25 188.50
Chair 16 1 18 2.00 36.00
Key
Main Bar 12 2 49 0.70 68.60
Distribution 10 2 4 7.25 58.00
Stem
Vertical Main Bar 12 2 49 3.375 330.75
Distribution 10 2 18 7.25 261.00
Spacer 10 1 40 1.00 40.00
BSF Tower side 5m Height Single [Link] Left Side
Footing(L=2.4m)
Main Bar Top & Bottom 16 2 16 4.00 128.00
Distribution Steel 12 2 21 2.25 94.50
Chair 16 1 6 2.00 12.00
Key
Main Bar 16 2 16 1.55 49.60
Distribution 12 2 5 2.25 22.50
Stem
Vertical Main Bar
16 2 12 6.475 155.40
H=(3.4+4.1)/2= 3.75m
Vertical Main Bar 16 2 12 4.375 105.00
Distribution 10 2 37 2.32 171.68
Spacer 10 1 28 1.00 28.00
Total length in M 0.000 1910.280 1556.310 2033.530 81.900
Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 1165.270 1382.000 3192.640 201.230
Grand Total in Kg= 5941.140
Net Payble [Link] Kg 5941.140

Measured on : 20/07/2023 Signature of Contractor/Representative Signature of JE

Page 11
Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete
2.4 up to all height.

2.4. (a) Thermo-Mechanically Treated bars.


1 GIN No-703 ( Ghagrabasti)
M Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm
Top Slab (L=14.1m)
9 Top Slab bottom main bar 16 1 26 14.550 378.30
Lap 16 1 26 0.816 21.22
14A Bottom distribution bar 10 1 57 5.410 308.37
10 Top Slab Top main bar 12 1 26 13.950 362.70
Lap 12 2 26 0.612 31.82
14 Top distribution bar 10 1 57 5.410 308.37
11 Additional Steel 12 3 26 2.200 171.60
Chair 12 4 6 2.000 48.00

Total length in M 0.000 0.000 616.740 614.120 399.520 0.000


Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 376.210 545.340 627.250 0.000
Grand Total in Kg= 1548.800
Net Payble [Link] Kg 1548.80

Measured on : 22/07/2023 Signature of Contractor/Representative Signature of JE

Page 12
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete
up to all height.
2.4. (a) Thermo-Mechanically Treated bars.
1 GIN No 698 ( Kathalcheri)
M Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm
Single Fenching Side Half Portion Top Slab (L=14.5m)
9 Top Slab bottom main bar 16 1 34 14.985 509.49
Lap 16 1 34 0.816 27.74
14A Bottom distribution bar 10 1 58 5.410 313.78
10 Top Slab Top main bar 16 1 30 14.385 431.55
Lap 16 2 30 0.816 48.96
14 Top distribution bar 10 1 58 5.410 313.78
11 Additional Steel 10 3 30 2.250 202.50
Chair 16 4 8 2.000 64.00

Total length in M 0.000 0.000 830.060 0.000 1081.740 0.000


Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 0.000 506.340 0.000 1698.330 0.000
Grand Total in Kg= 2204.670
Net Payble [Link] Kg 2204.670

Measured on :25/07/2023 Signature of Contractor/Representative Signature of JE

Page 13
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete
up to all height.
2.4. (a) Thermo-Mechanically Treated bars.
1 GIN No 698 ( Kathalcheri)
M Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm

Beyond Expension joint Top Slab (L=14.5m)


9B Top Slab bottom main bar 16 1 34 14.985 509.49
Lap 16 1 34 0.816 27.74
14c Bottom distribution bar 10 1 59 5.410 319.19
10B Top Slab Top main bar 16 1 30 14.385 431.55
Lap 16 2 30 0.816 48.96
14B Top distribution bar 10 1 59 5.410 319.19
11 Additional Steel 10 3 30 2.250 202.50
Chair 16 4 8 2.000 64.00

Total length in M 0.000 840.880 0.000 1081.740 0.000


Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 512.940 0.000 1698.330 0.000
Grand Total in Kg= 2211.270
Net Payble [Link] Kg 2211.270

Measured on : 05/08/2023 Signature of Contractor/Representative Signature of JE

Page 14
Item. Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement
concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding th
No-
2.5
2.5.1 All works upto plinth level
Detail Contents
Description of item s No.
of of Area
No. Length Breadth Depth
Actual
1 2 3 4 5 6 7
Meas
Gin no. 703
U-Shape [Link] BSF Tower Oppo. Side 0
Foundation L=(4.7+4.5+4)/3= 4.4m 1 1 4.40 5.00 0.60 13.2
Haunch 2 0.5 4.40 0.30 0.30 0.4
Side Wall (H=3.9+3.2/2= 3.55m)
1 2 4.40 0.40 3.55 12.5
B=(0.550+0.250/2= 0.400m)
Expension Joint Proposed Wall (H=3.9m)
1 1 4.50 0.35 3.90 6.14
B=(0.45+0.25)/2= 0.350m
U-Shape [Link] BSF Tower Side
Foundatiom L=(6.8+5.5)/2= 6.15m 1 1 6.15 5.00 0.60 18.45
Haunch 2 0.5 6.15 0.30 0.30 0.55
Side Wall H= (3.95+3.25)/2= 3.6m
1 2 6.15 0.40 3.60 17.71
B=(0.550+0.250/2= 0.400m)
Expension Joint Proposed Wall (H=3.25m)
1 1 4.50 0.35 3.25 5.12
B=(0.45+0.25)/2= 0.350m
Gin 698
U-Shape [Link] Single Fenching Side
Foundation L= (4.8+4.5)/2= 4.65m 1 1 4.65 5.00 0.60 13.95
Haunch 2 0.5 4.65 0.30 0.30 0.42
Side Wall H= 4.6m
1 2 4.65 0.40 4.66 17.34
B=(0.550+0.250/2= 0.400m)
Expension Joint Proposed Wall (H=4.6m)
1 1 4.50 0.35 4.60 7.25
B=(0.45+0.25)/2= 0.350m
Gin No. 697-2A
U-Shape [Link] BSF Tower Oppo. Side
Foundation 1 1 5.00 5.00 0.55 13.75
Haunch 2 0.5 5.00 0.30 0.30 0.45
Side Wall H= 1.6
1 2 5.00 0.375 1.60 6
B=(0.500+0.250/2= 0.375m)
Expension Joint Proposed Wall (H=5.2m)
1 1 5.00 0.35 5.20 9.1
B=(0.45+0.25)/2= 0.350m
BSF Tower side 5m Height Single [Link] Right Side
Foundation L=6m 1 1 6.00 3.20 0.55 10.56
Key 1 1 6.00 0.55 0.60 1.98
Wall H=(4.6+4.5)/2= 4.55m
1 1 6.00 0.40 4.55 10.92
B=(0.55+0.25/2= 0.4m)
BSF Tower side 3m Height Single [Link] Right Side 0
Foundation (L=10.7m) 1 1 10.70 2.00 0.35 7.49
Key 1 1 10.70 0.30 0.25 0.8
Wall H= 2.5m
7.36
B=(0.35+0.20/2= 0.275m) 1 1 10.70 0.275 2.50
BSF Tower side 5m Height Single [Link] Left Side
Foundation L=5.4m 1 1 5.40 3.20 0.55 9.5
Key 1 1 5.40 0.55 0.60 1.78
Wall H=(4.9+4.7)/2= 4.8m
1 1 5.40 0.40 4.80 10.37
B=(0.55+0.25/2= 0.4m)
BSF Tower side 3m Height Single [Link] Left Side
Foundation (L=4.8m) 1 1 4.80 2.00 0.35 3.36
Key 1 1 4.80 0.30 0.25 0.36
Wall (H= 2.8+2.5/2= 2.65m)
1 1 4.80 0.275 2.65 3.5
B=(0.35+0.20/2= 0.275m)
C/O 210.31

Measured on : 10/08/2023 Signature of Contractor/Representative Signature of JE

Page 15
Gin No. 697-1A B/F 210.31
U-Shape [Link] BSF Tower Side
Foundation L= (3+2.4)/2= 2.7m 1 1 2.70 5.00 0.65 8.78
Haunch 2 0.5 2.70 0.30 0.30 0.24
Side Wall H= 5.6m
B=(0.550+0.250/2= 0.400m) 12.1
1 2 2.70 0.40 5.60
Expension Joint Proposed Wall (H=5.6m)
B=(0.45+0.25)/2= 0.350m 8.82
1 1 4.50 0.35 5.60
BSF Tower side 5m Height Single [Link] Right Side 0
Foundation L=6.3m 1 1 6.30 3.20 0.55 11.09
Key 1 1 6.30 0.55 0.60 2.08
Wall H=(4.1+3.4)/2= 3.75m
1 1 6.30 0.40 3.75 9.45
B=(0.55+0.25/2= 0.4m)
BSF Tower side 3m Height Single [Link] Right Side 0
Foundation (L=7.4m) 1 1 7.40 2.00 0.35 5.18
Key 1 1 7.40 0.30 0.25 0.56
Wall (H= 2.7m)
B=(0.35+0.20/2= 0.275m) 1 1 7.40 0.275 2.70 5.49

BSF Tower side 5m Height Single [Link] Left Side 0


Foundation L=2.4m 1 1 2.40 3.20 0.55 4.22
Key 1 1 2.40 0.55 0.60 0.79
Wall H=5.6m
B=(0.55+0.25/2= 0.4m) 1 1 2.40 0.40 5.60 5.38

Total 284.49
cum

2.6 Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
Details of Actual Measurement Content
Description of item s of
No. No. Length Breadth Depth
1 2 3 4 5 6 Area
7
Qty as per item no. 2.5.1 1.00 284.49 0.77
219.06
Extra cement =(407-330)=77 kg/cum
Total 219.06

Measured on :10/08/2023 Signature of Contractor/Representative Signature of JE

Page 16
Providing and laying longitudinal drain of size 400mm at bottom, depth varying from 300mm to 500mm (all internal
3.4 dimensions), made of full
brick masonry in 1:6 (1 cement : 6 fine sand) with 12 mm cement plaster finished with a floating coat of neat cement

Details of Actual Measurement Contents


of Area
Description of item
No. No. Length Breadth Depth
1 2 3 4 5 6 7
Drain 1.00 1.00 66.00 66.00
Total 66.00
m

Measured on :10/08/2023 Signature of Contractor/Representative Signature of JE

Page 17
2.2 Centering and shuttering including strutting, propping etc. and removal of form for :
2.2.1 Foundations, footings, bases of columns, etc. for mass concrete
Details of Actual Measurement Content
s of
Description of item Area
No. No. Length Breadth Depth
1 2 3 4 5 6 7
Gin no. 703
U-Shape [Link] BSF Tower Oppo. Side 0
Foundation L=(4.7+4.5+4)/3= 4.4m 1 2 4.40 - 0.60 5.28
1 2 - 5.00 0.60 6
U-Shape [Link] BSF Tower Side
Foundatiom L=(6.8+5.5)/2= 6.15m 1 2 6.15 - 0.60 7.38
1 2 - 5.00 0.60 6
Gin 698
U-Shape [Link] Single Fenching Side
Foundation L= (4.8+4.5)/2= 4.65m 1 2 4.65 - 0.60 5.58
1 2 - 5.00 0.60 6
Gin No. 697-2A
U-Shape [Link] BSF Tower Oppo. Side
Foundation 1 2 5.00 - 0.55 5.5
1 2 - 5.00 0.55 5.5
BSF Tower side 5m Height Single [Link] Right Side
Foundation L=6m 1 2 6.00 - 0.55 6.6
1 2 - 3.20 0.55 3.52
Key 1 1 6.00 - 0.60 3.6
BSF Tower side 3m Height Single [Link] Right Side
Foundation (L=10.7m) 1 2 10.70 - 0.35 7.49
1 2 - 2.00 0.35 1.4
Key 1 1 10.70 - 0.25 2.68
BSF Tower side 5m Height Single [Link] Left Side
Foundation L=5.4m 1 2 5.40 - 0.55 5.94
1 2 - 3.20 0.55 3.52
Key 1 1 5.40 - 0.60 3.24
BSF Tower side 3m Height Single [Link] Left Side
Foundation (L=4.8m) 1 2 4.80 - 0.35 3.36
1 2 - 2.00 0.35 1.4
Key 1 1 4.80 - 0.25 1.2
Gin No. 697-1A
U-Shape [Link] BSF Tower Side
Foundation L= (3+2.4)/2= 2.7m 1 2 2.70 - 0.65 3.51
1 2 - 5.00 0.65 6.5
BSF Tower side 5m Height Single [Link] Right Side
Foundation L=6.3m 1 2 6.30 - 0.55 6.93
1 2 - 3.20 0.55 3.52
Key 1 1 6.30 - 0.60 3.78
BSF Tower side 3m Height Single [Link] Right Side
Foundation (L=7.4m) 1 2 7.40 - 0.35 5.18
1 2 - 2.00 0.35 1.4
Key 1 1 7.40 - 0.25 1.85
BSF Tower side 5m Height Single [Link] Left Side
Foundation L=2.4m 1 2 2.40 - 0.55 2.64
1 2 - 3.20 0.55 3.52
Key 1 1 2.40 - 0.60 1.44
Total 131.46
Sqm
Measured on :10/08/2023 Signature of Contractor Signature of JE

Page 18
2.2 Centering and shuttering including strutting, propping etc. and removal of form for :
2.2.1 Foundations, footings, bases of columns, etc. for mass concrete

Gin No. 697-1A


U-Shape [Link] BSF Tower Side
Haunch 1 2 2.70 - 0.42 2.27
Side Wall H= 5.6m 1 2 2.70 - 5.60 30.24
B=(0.550+0.250/2= 0.400m) 2 2 - 0.40 5.60 8.96
Side Wall EarthFace Side 1 2 2.70 - 5.30 28.62

Expension Joint Proposed Wall (H=5.6m)


25.2
B=(0.45+0.25)/2= 0.350m 1 1 4.50 - 5.60
1 2 - 0.35 5.60 3.92
BSF Tower side 5m Height Single [Link] Right Side

Wall H=(4.1+3.4)/2= 3.75m


1 2 6.30 - 3.75 47.25
B=(0.55+0.25/2= 0.4m)
1 2 - 0.40 3.75 3
BSF Tower side 3m Height Single [Link] Right Side
Wall (H= 2.7m)
1 2 7.40 - 2.70 39.96
B=(0.35+0.20/2= 0.275m)
1 2 - 0.28 2.70 1.51
BSF Tower side 5m Height Single [Link] left Side 1 2 2.40 - 5.60 26.88
1 2 - 0.40 5.60 4.48
Total 222.29
Sqm

Measured on : 10/08/2023 Signature of Contractor Signature of JE

Page 19
2.2 Centering and shuttering including strutting, propping etc. and removal of form for :
2.2.2 Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Details of Actual Measurement Contents
Description of item of Area
No. No. Length Breadth Depth
1 2 3 4 5 6 7
Gin no. 703
U-Shape [Link] BSF Tower Oppo. Side
Haunch 1 2 4.40 - 0.42 3.7
Side Wall Other Side (H=3.9+3.2/2= 3.55m)
1 2 4.40 - 3.55 31.24
B=(0.550+0.250/2= 0.400m)
Side Wall EarthFace Side 1 2 4.40 - 3.25 28.6
2 2 - 0.40 3.55 5.68
Expension Joint Proposed Wall (H=3.9m)
1 1 4.50 - 3.90 17.55
B=(0.45+0.25)/2= 0.350m
1 2 - 0.35 3.90 2.73
U-Shape [Link] BSF Tower Side

Haunch 1 2 6.15 - 0.42 5.17


Side Wall H= (3.95+3.25)/2= 3.6m
1 2 6.15 - 3.60 44.28
B=(0.550+0.250/2= 0.400m)
2 2 - 0.40 3.60 5.76
Side Wall EarthFace Side 1 2 6.15 - 3.35 41.21
Expension Joint Proposed Wall (H=3.25m)
1 1 4.50 - 3.25 14.63
B=(0.45+0.25)/2= 0.350m
1 2 - 0.35 3.25 2.28
Gin 698
U-Shape [Link] Single Fenching Side
Haunch 1 2 4.65 - 0.42 3.91
Side Wall H= 4.6m
1 2 4.65 - 4.60 42.78
B=(0.550+0.250/2= 0.400m)
2 2 - 0.40 4.60 7.36
Side Wall EarthFace Side 1 2 4.65 - 4.30 39.99
Expension Joint Proposed Wall (H=4.6m)
1 1 4.50 - 4.60 20.7
B=(0.45+0.25)/2= 0.350m
1 2 - 0.35 4.60 3.22
Gin No. 697-2A
U-Shape [Link] BSF Tower Oppo. Side

Haunch 1 2 5.00 - 0.42 4.2


Side Wall H= 1.6
1 2 5.00 - 1.60 16
B=(0.500+0.250/2= 0.375m)
2 2 - 0.38 1.60 2.43
Side Wall EarthFace Side 1 2 5.00 - 1.30 13
Expension Joint Proposed Wall (H=5.2m)
1 1 5.00 - 5.20 26
B=(0.45+0.25)/2= 0.350m
1 2 - 0.35 5.20 3.64
BSF Tower side 5m Height Single [Link] Right Side 0
Wall H=(4.6+4.5)/2= 4.55m
1 2 6.00 - 4.55 54.6
B=(0.55+0.25/2= 0.4m)
1 2 - 0.40 4.55 3.64
BSF Tower side 3m Height Single [Link] Right Side
Wall H= 2.5m 1 2 10.70 - 2.50 53.5
1 2 - 0.28 2.50 1.4
BSF Tower side 5m Wall
HeightH=(4.9+4.7)/2=
Single [Link] 4.8m
Left Side
1 2 5.40 - 4.80 51.84
B=(0.55+0.25/2= 0.4m)
1 2 - 0.40 4.80 3.84
BSF Tower side 3m Height Single [Link] Left Side
Wall (H= 2.8+2.5/2= 2.65m) 1 2 4.80 - 2.65 25.44
1 2 - 0.28 2.65 1.48
Total 581.80

Measured on: 10/08/2023 Signature of Contructor Signature of JE

Page 20
Providing and laying 110mm diametre unplasticised Rigid single socketed PVC pipes conforming to IS:13592 Type-A,
3.1 across the RCC/ Random Rubble masonary retaining wall or breast wall for function as weep holes to reduce the horizontal
pressure.

Details of Actual Measurement Content


Description of item s of
No. No. Length Breadth Depth Area
1 2 3 4 5 6 7
Gin no. 703
U-Shape [Link] BSF Tower Oppo. Side
Foundation L=(4.7+4.5+4)/3= 4.4m 2 4 0.55 - - 4.4
2 4 0.45 - - 3.6
2 4 0.40 - - 3.2
U-Shape [Link] BSF Tower Side 0
Foundatiom L=(6.8+5.5)/2= 6.15m 2 6 0.55 - - 6.6
2 5 0.45 - - 4.5
2 5 0.375 - - 3.75
Gin 698
U-Shape [Link] Single Fenching Side
Foundation L= (4.8+4.5)/2= 4.65m 2 4 0.55 - - 4.4
2 4 0.45 - - 3.6
2 4 0.40 - - 3.2
2 4 0.35 - - 2.8
Gin 697-2B
U-Shape [Link] BSF Tower Oppo. Side
Foundation 2 2 0.45 - - 1.8
2 2 0.35 - - 1.4
BSF Tower side 5m Height Single [Link] Right Side
-
Foundation L=6m 1 5 0.45 - - 2.25
1 5 0.40 - - 2
1 5 0.35 - - 1.75
1 4 0.30 - - 1.2
BSF Tower side 3m Height Single [Link] Right Side -
Foundation (L=10.7m) 1 8 0.30 - - 2.4
1 8 0.25 - - 2
BSF Tower side 5m Height Single [Link] Left Side -
Foundation L=5.4m 1 5 0.45 - - 2.25
1 5 0.40 - - 2
1 5 0.35 - - 1.75
1 5 0.30 - - 1.5
BSF Tower side 3m Height Single [Link] Left Side
Foundation (L=4.8m) 1 4 0.30 - - 1.2
1 4 0.25 - - 1
Gin No. 697-1A
U-Shape [Link] BSF Tower Side
Foundation L= (3+2.4)/2= 2.7m 2 3 0.55 - - 3.3
2 3 0.45 - - 2.7
2 3 0.375 - - 2.25
2 3 0.30 - - 1.8
BSF Tower side 5m Height Single [Link] Right Side 0
Foundation L=6.3m 1 5 0.45 - - 2.25
1 5 0.375 - - 1.875
1 5 0.30 - - 1.5
BSF Tower side 3m Height Single [Link] Right Side 0
Foundation (L=7.4m) 1 6 0.30 - - 1.8
1 6 0.25 - - 1.5
BSF Tower side 5m Height Single [Link] Left Side 0
Foundation L=2.4m 1 2 0.45 - - 0.9
1 2 0.40 - - 0.8
1 2 0.35 - - 0.7
1 2 0.275 - - 0.55
Total 86.48
m

Measured on : 19/08/2023 Signature of Contractor Signature of JE

Page 21
Item Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced
. cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but
excluding th
No-
2.5
2.5.2 All works above plinth level upto floor V level
Details Contents
of of Area
Description of item Actual
Measu
No. No. Length Breadth Depth

1 2 3 4 5 6 7
Gin no 703 Top Slab 1 1 14.10 5.00 0.325 22.91
Extended Wall Earth Side 1 2 0.45 0.30 0.325 0.09
Extended Wall Internal Side 1 3 0.40 0.30 0.325 0.12
Gin no. 698 Top Slab Half Portion 1 1 14.50 5.00 0.325 23.56
Extended Wall Earth Side 1 1 0.70 0.30 0.325 0.07
Extended Wall Internal Side 1 4 0.45 0.30 0.325 0.18
Gin no. 698 Top Slab Expension Joint Portion 1 1 14.50 5.00 0.325 23.56
Extended Wall Earth Side 1 1 0.70 0.30 0.325 0.07
Extended Wall Internal Side 1 4 0.45 0.30 0.325 0.18
Total 70.49
C/O to Page No. Of TCMB cum

2.6 Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
Detail Contents
s of of Area
Actual
Meas
Description of item ureme
nt

No. No. Length Breadth Depth


1 2 3 4 5 6 7
Qty as per item no. 2.5.1
1.00 70.49 0.77 54.28
Extra cement =(407-330)=77 kg/cum
Total 54.28

Measured on :19/08/2023 Signature of Contractor Signature of JE

Page 22
2.3 Extra for additional height in centering, shuttering where ever required with adequate bracing, propping etc., including cost
2.3. of deshuttering
Suspended androofs,
floors, decentering at balconies
landings, all levels, over a heightplatform
and access of 3.5 m, for every additional height of 1 metre or part thereof (Pl
1
Details Content
of s of
Actual
Measu Area
Description of item rement

No. No. Length Breadth Depth


1 2 3 4 5 6 7
Gin no. 703
Top Slab 4.00 1.00 - 5 3 60.00
Extra Height (4.700-3.5)=1.200m say 60.00 @ 1.5 90.00
Gin no. 698
Top Slab (half portion) 4.00 1.00 - 5 3 60.00
Extra Height (6.500-3.5)=3m say 60.00 @ 3 180.00

Top Slab (Expension joint portion) 4.00 1.00 - 5 3 60.00


Extra Height (6.500-3.5)=3m say 60.00 @ 3 180.00

Total 450.00
sqm

2.2. Centering and shuttering including strutting, propping etc. and removal of form for :
3 Suspended floors, roofs, landings, balconies and access platform
Details Content
of
Actual s of
Measur Area
Description of item ement

No. No. Length Breadth Depth


1 2 3 4 5 6 7
Gin no. 703
Top Slab 4.00 1.00 5.00 2.4 - 48.00
1.00 2.00 14.10 - 0.325 9.17
1.00 2.00 - 5 0.325 3.25
2.00 5.00 0.30 - 0.325 0.98
Gin no. 698 4.00 1.00 5.00 2.4 - 48.00
Top Slab (half portion) 1.00 2.00 14.50 - 0.325 9.43
1.00 2.00 - 5 0.325 3.25
2.00 5.00 0.30 - 0.325 0.98
Top Slab (Expension joint portion) 4.00 1.00 5.00 2.4 - 48.00
1.00 2.00 14.50 - 0.325 9.43
1.00 2.00 - 5 0.325 3.25
2.00 5.00 0.30 - 0.325 0.98
Total 184.72
sqm

Measured on: 19/08/2023 Signature Of Contructor Signature of JE

Page 23
RECORD OF MEASUREMENT
Name of Work: - Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar, Teliamura & Panisagar Sector in
Tripura SH: GIN No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur Sector
Location of Work:- BFSD-III
Name of the Contractor :Shri Uttam deb
Reference to Agreement no:-02/EE/BFD-III/AGT/2021-2022
Date of written order to commence work :09.04.2021
Stipulated date of completion of work:- 02.07.2022
Date of actual completion of work:- in progress
Reference to previous measurements, if any:-
Serial no of this bill :- 9th R/A BILL

Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and
1.6 removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.

1.6 Details of Actual Measurement Contents of


Description of item Area
No. No. Length Breadth Depth
1 2 3 4 5 6 7

Gin 703 1 1 15.00 10.20 - 153

Deduct mid portion 1 1 3.50 10.20 -35.7

Gin 698 1 1 30.00 10.20 - 306

Deduct mid portion 1 1 10.00 10.20 -102

Gin 697-1A 1 1 15.80 10.20 - 161.16

Gin 697-2A 1 1 11.00 10.20 - 112.2

Total 594.66
Sqm
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as
10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge
1.2
1.2.1 All kinds of soil
Details of Actual Measurement Contents
Description of item of Area
Cum
No. No. Length Breadth Depth
1 2 3 4 5 6 7
GIN No- 703
U- shape [Link] BSF Tower Oppo. Side
Avg.L=(4.7+4.5+4)/3=4.4 1 1 4.40 5.5 3.8 91.96
Avg.H=(4+3.6)/2=3.8
U- shape [Link] BSF Tower side
Avg.L=(6.8+4.5)/2=5.65 1 1 5.65 5.30 3.65 109.3
Avg.H=(4.05+3.25)/2=3.65

GIN No- 698


U-Shape [Link] single Fencing Side
Avg. L=(4.8+4.5)/2=4.65 1 1 4.65 5.50 4.66 119.18
Avg.H=(5+4.6+4.4)/3=4.66

GIN No- 697-2A


U- shape [Link] BSF Tower Oppo. Side
Avg.H=(2.3+.7)/2=1.5 1 1 5.00 5.00 1.50 37.5
BSF Tower side 5m Height Single [Link] Rigth Side
Avg.H=(3.8+3.6+2.9)/3=3.4 1 1 6.00 3.50 3.40 71.4
BSF Tower side 3m Height Single [Link] Rigth Side
Avg.H=(1.9+1.5+1.2)/3=1.53 1 1 10.70 2.20 1.53 36.02
BSF Tower side 5m Height Single [Link] Left Side
Avg.H=(3.1+2.8+2.4)/3=2.76 1 1 5.4 3.5 2.76 52.16
BSF Tower side 3m Height Single [Link] Left Side
Avg.H=(1.1+0.8)/2=0.95 1 1 4.80 2.2 0.95 10.03
GIN No- 697-1A
U-Shape [Link] BSF Tower Side
Avg.H=(3.5+3+2.8)/3=3.1 1 1 2.80 5.30 3.10 46.00
BSF Tower side 5m Height Single [Link] Rigth Side
Avg.H=(1.6+1.2+0.9)/3=1.23 1 1 6.30 3.50 1.23 27.12
BSF Tower side 3m Height Single [Link] Rigth Side
Avg.H=(1.45+1.2+1)/3=1.20 1 1 7.40 2.20 1.20 19.54
BSF Tower side 5m Height Single [Link] Left Side
Avg.H=(3.5+3+2.8)/3=3.1 1 1 2.40 3.50 3.10 26.04
Total 646.25
cum

Page 24
C/O to Page No. Of TCMB

1.5 Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials.
1.5.1 All kinds of soil
Details of Actual Measurement Contents
Description of item of Volume
Cum
No. No. Length Breadth Depth
1 2 3 4 5 6 7
GIN No- 703
U- shape [Link] BSF Tower Oppo. Side
Avg.L=(4.7+4.5+4)/3=4.4 1 1 4.40 5.5 2.3 55.66
Avg.H=(4+3.6)/2=3.8
U- shape [Link] BSF Tower side
Avg.L=(6.8+4.5)/2=5.65 1 1 5.65 5.30 2.15 64.38
Avg.H=(4.05+3.25)/2=3.65

GIN No- 698


U-Shape [Link] single Fencing Side
Avg. L=(4.8+4.5)/2=4.65 1 1 4.65 5.50 3.16 80.82
Avg.H=(5+4.6+4.4)/3=4.66

GIN No- 697-2A


U- shape [Link] BSF Tower Oppo. Side
Avg.H=(2.3+.7)/2=1.5 1 1 5.00 5.00 0.00 0
BSF Tower side 5m Height Single [Link] Rigth Side
Avg.H=(3.8+3.6+2.9)/3=3.4 1 1 6.00 3.50 1.90 39.9
BSF Tower side 3m Height Single [Link] Rigth Side
Avg.H=(1.9+1.5+1.2)/3=1.53 1 1 10.70 2.20 0.03 0.71
BSF Tower side 5m Height Single [Link] Left Side
Avg.H=(3.1+2.8+2.4)/3=2.76 1 1 5.4 3.5 1.26 23.81
BSF Tower side 3m Height Single [Link] Left Side
Avg.H=(1.1+0.8)/2=0.95 1 1 4.80 2.2 0 0.00
GIN No- 697-1A
U-Shape [Link] BSF Tower Side
Avg.H=(3.5+3+2.8)/3=3.1 1 1 2.80 5.30 1.60 23.74
BSF Tower side 5m Height Single [Link] Rigth Side
Avg.H=(1.6+1.2+0.9)/3=1.23 1 1 6.30 3.50 0.00 0.00
BSF Tower side 3m Height Single [Link] Rigth Side
Avg.H=(1.45+1.2+1)/3=1.20 1 1 7.40 2.20 0.00 0.00
BSF Tower side 5m Height Single [Link] Left Side
Avg.H=(3.5+3+2.8)/3=3.1 1 1 2.40 3.50 1.60 13.44
Total 302.46
cum

Measured on : 30.03.2023 Signature of Contractor Signature of JE

Page 25
cum
Item. Providing and laying in position machine batched and machine mixed design mix cement concrete for plain cement concrete work, using cement
content as per approved design mix, including pumping of concrete to site of laying, finishing but excluding the cost of centering, shuttering, including
No- admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and
2.1 durability as per direction of Engineer-in-charge. (Note :- Excess/ less cement used as per design mix is payable/recoverable separately).
2.1.1 All works upto plinth level :
[Link] M-10 grade plain cement concrete (cement content considered @ 220 kg/cum)

Details Contents
Description of item of of Area
No. No. Length Breadth Depth
Actual Cum
1 2
Measu 3 4 5 6 7
GIN No- 703
U- shape [Link] BSF Tower Oppo. Side
Avg. L=(4.7+4)/2=4.35 1 1 4.35 5.30 0.15 3.46
U- shape [Link] BSF Tower Side
Avg. L=(4.5+6.8)/2=4.35 1 1 5.65 5.3 0.15 4.49
GIN No- 698
U-Shape [Link] single Fencing Side
Avg.L=(4.8+4.5)/2=4.65m 1 1 4.65 5.30 0.15 3.7
GIN No- 697-2A
U- shape [Link] BSF Tower Oppo. Side 1 1 5.00 5.30 0.15 3.98
BSF Tower side 5m Height Single [Link] Rigth Side 1 1 6.00 3.20 0.10 1.92
Key 1 1 6.00 0.10 0.60 0.36
BSF Tower side 3m Height Single [Link] Right Side(Base) 1 1 10.70 2.00 0.10 2.14
Key 1 1 10.70 0.10 0.25 0.27
BSF Tower side 5m Height Single [Link] Left Side(Base) 1 1 5.40 3.20 0.10 1.73
Key 1 1 5.40 0.10 0.60 0.32
BSF Tower side 3m Height Single [Link] Left Side(Base) 1 1 4.80 2.00 0.10 0.96
Key 1 1 4.80 0.10 0.25 0.12
Gin No. 697-1A
U-Shape [Link] BSF Tower Side
L=(3+2.4)/2= 2.7m 1 1 2.70 5.30 0.15 2.15
BSF Tower side 5m Height Single [Link] Right Side(Base) 1 1 6.30 3.20 0.10 2.02
Key 1 1 6.30 0.10 0.60 0.38
BSF Tower side 3m Height Single [Link] Right Side(Base) 1 1 7.40 2.00 0.10 1.48
Key 1 1 7.40 0.10 0.25 0.19
BSF Tower side 5m Height Single [Link] Left Side(Base) 1 1 2.40 3.20 0.10 0.77
Key 1 1 2.40 0.10 0.60 0.14
Total 30.58
cum
2.6 Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
Details Contents
Description of item of of weight
No. No. Length Breadth Depth
Actual
1 2
Measu 3 4 5 6 7
Qty as per item no. [Link] 1.00 30.58 0.40 12.23
Extra cement =(260-220)=40 kg/cum
Total 12.23
Qtl
2.2 Centering and shuttering including strutting, propping etc. and removal of form for :
2.2.1 Foundations, footings, bases of columns, etc. for mass concrete

Description of item Details of Actual Measurement Contents


of Area
No. No. Length Breadth Depth
1 2 3 4 5 6 7
GINBSF
U-Shape [Link] No-Tower
703 Oppo. Side
L=(4.7+4)/2= 4.35m 1 2 4.35 - 0.15 1.31
U-Shape [Link] BSF Tower Side
1 2 5.30 0.15 1.59
L=(4.5+6.8)/2= 5.65m 1 2 5.65 - 0.15 1.70
1 2 - 5.30 0.15 1.59
GIN No- 698
U-Shape [Link] Single Fenching Side 1 2 4.80 - 0.15 1.44
1 2 - 5.30 0.15 1.59
GIN No- 697-2A
U-Shape [Link] BSF Tower Oppo. Side 1 2 5.00 - 0.15 1.50
1 2 5.30 0.15 1.59
BSF Tower side 5m Height Single [Link] Right Side 1 2 6.00 - 0.10 1.20
1 2 3.20 0.10 0.64
Key 1 1 6 0.6 3.60
BSF Tower side 3m Height Single [Link] Right Side 1 2 10.70 - 0.10 2.14

Page 26
1 2 2.00 0.10 0.40
key 1 1 10.7 0.25 2.68
BSF Tower side 5m Height Single [Link] Left Side 1 2 5.40 - 0.10 1.08
1 2 3.20 0.10 0.64
key 1 1 5.4 0.6 3.24
BSF Tower side 3m Height Single [Link] Left Side 1 2 4.80 - 0.10 0.96
1 2 2.00 0.10 0.40
key 1 1 4.8 0.25 1.20
GIN No- 697-1A
U-Shape [Link] BSF Tower Side
L=(3+2.4)/2= 2.7m 1 2 2.70 - 0.15 0.81
1 2 5.3 0.15 1.59
BSF Tower side 5m Height Single [Link] Right Side 1 2 6.30 - 0.10 1.26
1 2 3.2 0.10 0.64
key 1 1 6.3 0.6 3.78
BSF Tower side 3m Height Single [Link] Right Side 1 2 7.40 - 0.10 1.48
1 2 2 0.10 0.40
key 1 1 7.4 0.25 1.85
BSF Tower side 5m Height Single [Link] Left Side 1 2 2.40 - 0.10 0.48
1 2 2.00 0.10 0.40
Key 1 1 2.4 0.6 1.44
Total 44.62
C/O to Page No. Of TCMB Sqm

Measured on : 30.03.2023 Signature of Contractor Signature of JE

Page 27
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to all height.
2.4.1 (a) Thermo-Mechanically Treated bars.
GIN No 703 ( Ghagrabasti )
M Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm
Bottom slab
1 bottom main bar 16 1 28 17.520 490.56
17A Bottom distribution bar 10 1 57 5.750 327.75
Lap in bottom main bar 16 1 28 0.816 22.85
2 Additional steel 10 3 28 2.200 184.80
4 Top main bar 16 1 28 14.550 407.40
17 Top distribution bar 10 1 57 5.750 327.75
Lap in top main bar 16 1 28 0.816 22.85
Chair 16 1 10 2.000 20.00
30 shear links (28*3*6+168)=672 10 1 672 0.500 336.00
13 Haunch steel side walls 10 2 28 1.673 93.69
8 Haunch steel internal walls 10 2 28 1.652 92.51
8 Haunch steel internal walls 10 2 28 1.652 92.51
` Haunch steel internal walls 10 2 28 1.652 92.51
Side walls ( bottom to 3.50 m from top of base)
3 side walls earth face main steel 12 1 28 5.150 144.20

5 side walls other face main steel 16 1 28 4.41 123.48


15 side wall earth face Distribution 82.46
10 1 14 5.89
steel
26 side wall other face Distribution 82.46
10 1 14 5.89
steel
31 shear links (28*3)=84 10 1 84 0.54 44.94
Column C 12 1 2 4.18 8.36
Ring 10 1 31 1.22 37.82
Ring 10 1 31 0.35 10.85
Side walls ( bottom to 3.50 m from top of base)
3 side walls earth face main steel 12 1 28 5.150 144.20
5 side walls other face main steel 16 1 28 4.41 123.48
15 side wall earth face Distribution steel 10 1 14 5.89 82.46
26 side wall other face Distribution steel 10 1 14 5.89 82.46
31 shear links (28*3)=84 10 1 84 0.54 44.94
Column C 12 1 2 4.18 8.36
Ring 10 1 31 1.22 37.82
Ring 10 1 31 0.35 10.85
Internal walls ( bottom to 3.50 m from top of base)
6 internal walls vertical main steel 16 2 28 4.18 234.08
16 internal wall distribution steel 10 2 18 5.86 210.96
Spacer 10 1 30 0.50 15.00
column D 16 1 2 4.180 8.36
ties column D 10 1 31 1.120 34.72
10 1 31 0.350 10.85
Internal walls ( bottom to 3.50 m from top of base)
6 internal walls vertical main steel 16 2 28 4.18 234.08
16 internal wall distribution steel 10 2 18 5.86 210.96
Spacer 10 1 30 0.50 15.00
column D 16 1 2 4.180 8.36
ties column D 10 1 31 1.120 34.72
10 1 31 0.350 10.85
Internal walls ( bottom to 2.00 m from top of base)
6 internal walls vertical main steel 16 2 28 4.18 234.08
16 internal wall distribution steel 10 2 18 5.86 210.96
Spacer 10 1 30 0.50 15.00
column D 16 1 2 4.180 8.36
ties column D 10 1 31 1.120 34.72
10 1 31 0.350 10.85
250mm×250mm column 16 5 4 4.180 83.60
Ties of 250mm×250mm column 10 5 31 0.72 111.60
Cut -off walls
Horizontal 10 4 8 9.20 294.40
verticle 10 4 47 1.90 357.20
Spacer 10 2 9 0.50 9.00
Total length in M 0.000 3651.370 305.120 2021.540 0.000
Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 2227.340 270.950 3173.820 0.000
Grand Total in Kg= 5672.110
Net Payble [Link] Kg 5672.110

Page 28
Measured on : 04.04.2023 Signature of Contractor/Representative Signature of JE

Page 29
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to all height.
2.4.1 (a) Thermo-Mechanically Treated bars.
GIN No-697 -2A ( Sabroom )
M Description Dia Nos Nos lenth 8mm 10 mm 12 mm 16 mm
GIN no -703
U-Shape [Link] BSF Tower Oppo.
SideBottom slab
5 Base slab-Bottom Steel 12 1 24 6.900 165.60
9 Distribution steel for bottom base slab 10 1 23 4.200 96.60
4 Base slab - Top steel 16 1 24 5.750 138.00
4A Base slab - Top steel 16 1 24 5.750 138.00
8 Distribution steel for Top base slab 12 1 23 4.200 96.60
Chair 16 1 12 2.000 24.00
10 Haunch 10 2 24 2.026 97.25
Side walls ( bottom of base to Top of Roof)
3 Vertical bar at other side 10 2 24 4.925 236.40
7 Distribution steel for vertical wall at 137.60
10 2 16 4.30
other side
1 Vertical bar at earth face 12 2 24 4.38 210.00
2 vertical bar at earthface curtailment at 161.47
650mm abive top of base slab 16 2 24 3.36

6 Distribution steel for vertical wall at earth face 10 2 16 4.30 137.60


spacer 10 1 40 1.00 40.00
Expension joint Proposed
WallSide ( bottom of base to
top of roof)
side walls earth face main 12 1 33 1.350 44.55
steel
side walls other face main steel 12 1 33 3.25 107.25
side wall earth face Distribution steel 10 1 26 3.900 101.40
side wall other face Distribution steel 10 1 26 3.25 84.50
Spacer 10 1 30 2.200 66.00

U-Shape [Link] BSF Tower Side


Bottom slab
5 Base slab-Bottom Steel 12 1 34 6.900 234.60
9 Distribution steel for bottom base slab10 1 23 6.00 138.00
4 Base slab - Top steel 16 1 34 5.750 195.50
4A Base slab - Top steel 16 1 34 5.75 195.50
8 Distribution steel for Top 12 1 23 6.000 138.00
base slab
Chair 16 1 14 2.00 28.00
10 Haunch 10 2 34 2.026 137.77
Side walls ( bottom of base to 2 22 2.85
Top of Roof)
3 Vertical bar at other side 10 2 34 4.475 304.30
7 Distribution steel for vertical wall at other side 10 2 17 6 204.00
1 Vertical bar at earth face 12 2 34 4.425 300.90
vertical bar at earthface
2 228.75
curtailment at 650mm abive 16 2 34 3.36
top of base slab
6 Distribution steel for vertical wall at earth face10 2 16 6.000 192.00
Spacer 10 1 40 1.000 40.00
Expension joint Proposed
WallSide ( bottom of base
to top of roof)
side walls earth face main steel 12 1 33 4.175 137.78
side walls other face main 12 1 33 4.175 137.78
steelDistribution steel10
side wall earth face 1 22 4.90 107.80
side wall other face Distribution steel10 1 22 4.90 107.80
Spacer 10 1 30 1.000 30.00

GIN no -698 12 2 22 0.61 26.84


U-Shape [Link] BSF Single fancing
side
5 Base slab-Bottom Steel 12 1 26 6.900 179.40
9 Distribution steel for bottom base slab 10 1 23 4.500 103.50
4 Base slab - Top steel 16 1 26 5.750 149.50

Page 30
4A Base slab - Top steel 16 1 26 5.750 149.50
8 Distribution steel for Top base slab 12 1 23 4.500 103.50
Chair 16 1 12 2.000 24.00
10 Haunch 10 2 26 2.026 105.35
Side walls ( bottom of base to Top of Roof)
3 Vertical bar at other side 10 2 26 5.975 310.70
7 Distribution steel for vertical wall at 191.10
10 2 21 4.55
other side
1 Vertical bar at earth face 12 2 26 5.43 282.10
2 vertical bar at earthface curtailment at 174.93
650mm abive top of base slab 16 2 26 3.36

6 Distribution steel for vertical wall at earth face 10 2 21 4.55 191.10


spacer 10 1 45 1.00 45.00
Expension joint Proposed
WallSide ( bottom of base to
top of roof)
side walls earth face main 12 1 33 5.525 182.33
steel
side walls other face main steel 12 1 33 5.53 182.33
side wall earth face Distribution steel 10 1 31 4.900 151.90
side wall other face Distribution steel 10 1 31 4.90 151.90
Spacer 10 1 35 1.000 35.00

GIN no -697-2A
U-Shape [Link] BSF Tower
Oppo. Side
5 Base slab-Bottom Steel 12 1 29 6.800 197.20
9 Distribution steel for bottom base slab 10 1 20 4.850 97.00
4 Base slab - Top steel 16 1 29 5.650 163.85
4A Base slab - Top steel 16 1 29 5.650 163.85
8 Distribution steel for Top base slab 10 1 28 4.825 135.10
Chair 16 1 12 2.000 24.00
10 Haunch 10 2 29 1.885 109.33
Side walls ( bottom of base to Top of Roof)
3 Vertical bar at other side 10 2 29 2.875 166.75
7 Distribution steel for vertical wall at 58.80
10 2 6 4.90
other side
1 Vertical bar at earth face 12 2 29 2.38 137.75
2 vertical bar at earthface curtailment at 137.75
650mm abive top of base slab 16 2 29 2.38

6 Distribution steel for vertical wall at earth face 10 2 6 4.90 58.80


spacer 10 1 20 1.00 20.00
Expension joint Proposed
WallSide ( bottom of base to
top of roof)
side walls earth face main 12 1 33 5.525 182.33
steel
side walls other face main steel 12 1 33 5.53 182.33
side wall earth face Distribution steel 10 1 34 4.900 166.60
side wall other face Distribution steel 10 1 34 4.90 166.60
Spacer 10 1 15 1.000 15.00
Total length in M 0.000 4538.550 3229.170 2096.600
Weight in kg/m 0.395 0.610 0.888 1.570
Total weight in kg 0.000 2768.516 2867.503 3291.662
Grand Total in Kg= 8927.680
Net Payble [Link] Kg 8927.680
Carried over to Page No. of TCMB

Measured on : 04.04.2023 Signature of Contractor/Representative Signature of JE

Page 31
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to all height.
2.4.1 (a) Thermo-Mechanically Treated bars.
GIN No-697 -1A ( Sabroom )
M Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm
Bottom slab
1 bottom main bar 20 1 30 19.610 588.30
17A Bottom distribution bar 10 1 118 6.150 725.70
Lap in bottom main bar 20 1 30 1.020 30.60
4 Top main bar 16 1 30 15.200 456.00
17 Top distribution bar 10 1 118 6.150 725.70
4 Lap Top main bar 16 1 30 0.816 24.48
Chair 16 1 40 2.000 80.00
30 shear links (30*3*8)=720 10 1 720 0.800 576.00
13 Haunch steel side walls 10 2 30 2.455 147.30
8 Haunch steel internal walls 10 2 30 2.090 125.40
8 Haunch steel internal walls 10 2 30 2.090 125.40
8 Haunch steel internal walls 10 2 30 2.090 125.40
Side walls ( bottom to 3.50 m from top of base)
3 side walls earth face main steel 16 1 30 6.121 183.63
5 side walls other face main steel 20 1 30 4.96 148.80
15 side wall earth face Distribution steel 10 1 18 6.89 124.02
26 side wall other face Distribution steel 10 1 18 6.89 124.02
31 shear links (30*3)=90 10 1 90 1.04 93.60
Column C 20 1 4 4.23 16.90
Ring 10 1 31 1.62 50.22
Ring 10 1 31 0.93 28.89
Ring 10 1 31 0.70 21.70
Side walls ( bottom to 3.50 m from top of base)
3 side walls earth face main steel 16 1 30 6.121 183.63
5 side walls other face main steel 20 1 30 4.96 148.80

15 side wall earth face Distribution steel 10 1 18 6.89 124.02


26 side wall other face Distribution steel 10 1 18 6.89 124.02

31 shear links (30*3)=90 10 1 90 1.04 93.60


Column C 20 1 4 4.23 16.90
Ring 10 1 31 1.62 50.22
Ring 10 1 31 0.93 28.89
Ring 10 1 31 0.70 21.70
Internal walls ( bottom to 3.50 m from top of base)
6 internal walls vertical main steel 16 2 54 4.23 456.30
16 internal wall distribution steel 10 2 24 6.38 306.24
Spacer 10 1 30 0.50 15.00
column D 16 1 2 4.230 8.46
ties column D 10 1 31 1.220 37.82
10 1 31 0.350 10.85
Internal walls ( bottom to 3.50 m from top of base)
6 internal walls vertical main steel 16 2 54 4.23 456.84
16 internal wall distribution steel 10 2 24 6.38 306.24
Spacer 10 1 30 0.50 15.00
column D 16 1 2 4.230 8.46
ties column D 10 1 31 1.220 37.82
10 1 31 0.350 10.85
Internal walls ( bottom to 3.50 m from top of base)
6 internal walls vertical main steel 16 2 54 4.23 456.84
16 internal wall distribution steel 10 2 24 6.38 306.24
Spacer 10 1 30 0.50 15.00
column D 16 1 2 4.230 8.46
ties column D 10 1 31 1.220 37.82
10 1 31 0.350 10.85
250mm×250mm column 16 5 4 4.230 84.60
Ties of 250mm×250mm column 10 5 31 0.72 111.60
Cut -off walls
Horizontal 10 4 8 9.20 294.40
verticle 10 4 47 1.90 357.20
Spacer 10 2 9 0.50 9.00
Total length in M 0.000 5317.730 0.000 2407.700 950.300
Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 3243.820 0.000 3780.090 2334.890
Grand Total in Kg= 9358.800
Net Payble [Link] Kg 9358.800
Carried over to Page No. of TCMB

Measured on : 07.04.2023 Signature of Contractor/Representative Signature of JE

Page 32
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to all height.
2.4.1 (a) Thermo-Mechanically Treated bars.
GIN No-698 ( Kathalcheri)
M Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm
Bottom slab (Up to Expansion Joint)
1 bottom main bar 20 1 32 17.185 549.92
17A Bottom distribution bar 10 1 116 5.750 667.00
Lap in bottom main bar 20 1 32 1.020 32.64
4 Top main bar 16 1 32 14.800 473.60
17 Top distribution bar 10 1 116 5.750 667.00
4 Lap Top main bar 16 1 32 0.816 26.11
Chair 16 1 40 2.000 80.00
30 shear links (32*3*8)=768 10 1 768 0.500 384.00
13 Haunch steel side walls 10 1 32 2.026 64.83
8 Haunch steel internal walls 10 2 32 1.722 110.21
8 Haunch steel internal walls 10 2 32 1.722 110.21
8 Haunch steel internal walls 10 2 32 1.722 110.21
8 Haunch steel internal walls 10 1 32 1.722 55.10
Side walls ( bottom to 3.50 m from top of base)
3 side walls earth face main steel 16 1 32 5.400 172.80
5 side walls other face main steel 20 1 32 4.66 149.12
15 side wall earth face Distribution steel 10 1 18 6.39 115.02
26 side wall other face Distribution steel 10 1 18 6.39 115.02
31 shear links (32*3)=96 10 1 96 0.79 75.36
Column C 20 1 6 4.18 25.08
Ring 10 1 31 1.72 53.32
Ring 10 1 31 1.10 34.10
Ring 10 1 31 0.75 23.25
Internal walls ( bottom to 3.50 m from top of base)
6 internal walls vertical main steel 16 2 39 4.18 326.04
16 internal wall distribution steel 10 2 24 5.96 286.08
Spacer 10 1 30 0.90 27.00
column D 16 1 2 4.180 8.36
ties column D 10 1 31 1.220 37.82
10 1 31 0.350 10.85
Internal walls ( bottom to 3.50 m from top of base)
6 internal walls vertical main steel 16 2 39 4.18 326.04
16 internal wall distribution steel 10 2 24 5.96 286.08
Spacer 10 1 30 0.90 27.00
column D 16 1 2 4.180 8.36
ties column D 10 1 31 1.220 37.82
10 1 31 0.350 10.85
Internal walls ( bottom to 3.50 m from top of base)
6 internal walls vertical main steel 16 2 39 4.18 326.04
16 internal wall distribution steel 10 2 24 5.96 286.08
Spacer 10 1 30 0.90 27.00
column D 16 1 2 4.180 8.36
ties column D 10 1 31 1.220 37.82
10 1 31 0.350 10.85
Internal walls ( bottom to 3.50 m from top of base)
6 internal walls vertical main steel 16 2 39 4.18 326.04
16 internal wall distribution steel 10 2 24 5.96 286.08
Spacer 10 1 30 0.90 27.00
column D 16 1 2 4.180 8.36
ties column D 10 1 31 1.220 37.82
10 1 31 0.350 10.85
250mm×250mm column 16 5 4 4.180 83.60
Ties of 250mm×250mm column 10 5 31 0.72 111.60
Cut -off walls
Horizontal 10 4 8 9.20 294.40
verticle 10 4 47 1.90 357.20
Spacer 10 2 9 0.50 9.00
Total length in M 0.000 4803.830 0.000 2173.710 756.760
Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 0.000 2930.340 0.000 3412.720 1859.360
Grand Total in Kg= 8202.420
Net Payble [Link] Kg 8202.420
Carried over to Page No. of TCMB

Measured on : 11.04.2023 Signature of Contractor/Representative Signature of JE

Page 33
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to all height.

2.4.1 (a) Thermo-Mechanically Treated bars.


GIN No-698 ( Kathalcheri)
M Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm
Bottom slab (beyond Expansion
Joint) 20 1 32 17.075
1 bottom main bar 546.40
17A Bottom distribution bar 10 1 116 5.750 667.00
Lap in bottom main bar 20 2 32 1.020 65.28
4 Top main bar 16 1 32 14.690 470.08
17 Top distribution bar 10 1 116 5.750 667.00
4 Lap Top main bar 16 2 32 0.816 52.22
Chair 16 1 40 2.000 80.00
30 shear links (32*3*8)=768 10 1 768 0.500 384.00
13 Haunch steel side walls 10 1 32 2.026 64.83
8 Haunch steel internal walls 10 2 32 1.722 110.21
8 Haunch steel internal walls 10 2 32 1.722 110.21
8 Haunch steel internal walls 10 2 32 1.722 110.21
8 Haunch steel internal walls 10 1 32 1.722 55.10
Side walls ( bottom to 3.50 m from top of base)
3 side walls earth face main steel 16 1 32 5.400 172.80
5 side walls other face main steel 20 1 32 4.66 149.12
15 side wall earth face Distribution 10 1 18 6.39 115.02
26 steel
side wall other face Distribution 10 1 18 6.39 115.02
31 steel shear links (32*3)=96 10 1 96 0.79 75.36
Column C 20 1 6 4.18 25.08
Ring 10 1 31 1.72 53.32
Ring 10 1 31 1.10 34.10
Ring 10 1 31 0.75 23.25
Internal walls ( bottom to 3.50 m from top of base)
6 internal walls vertical main steel 16 2 39 4.18 326.04
16 internal wall distribution steel 10 2 24 5.96 286.08
Spacer 10 1 30 0.90 27.00
column D 16 1 2 4.180 8.36
ties column D 10 1 31 1.220 37.82
10 1 31 0.350 10.85
Internal walls ( bottom to 3.50 m from top of base)
6 internal walls vertical main steel 16 2 39 4.18 326.04
16 internal wall distribution steel 10 2 24 5.96 286.08
Spacer 10 1 30 0.90 27.00
column D 16 1 2 4.180 8.36
ties column D 10 1 31 1.220 37.82
10 1 31 0.350 10.85
Internal walls ( bottom to 3.50 m from top of base)
6 internal walls vertical main steel 16 2 39 4.18 326.04
16 internal wall distribution steel 10 2 24 5.96 286.08
Spacer 10 1 30 0.90 27.00
column D 16 1 2 4.180 8.36
ties column D 10 1 31 1.220 37.82
10 1 31 0.350 10.85
Internal walls ( bottom to 3.50 m from top of base)
6 internal walls vertical main steel 16 2 39 4.18 326.04
16 internal wall distribution steel 10 2 24 5.96 286.08
Spacer 10 1 30 0.90 27.00
column D 16 1 2 4.180 8.36
ties column D 10 1 31 1.220 37.82
10 1 31 0.350 10.85
250mm×250mm column 16 5 4 4.180 83.60
Ties of 250mm×250mm column 10 5 31 0.72 111.60
Total length in M 0.000 4143.230 0.000 2196.300 785.880
Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 2527.370 0.000 3448.190 1930.910
Grand Total in Kg= 7906.470
Net Payble [Link] Kg 7906.470
Carried over to Page No. of TCMB

Measured on : 26.04.2023 Signature of Contractor/Representative Signature of JE

Page 34
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to all height.
2.4.1 (a) Thermo-Mechanically Treated bars.
GIN No 703 ( Ghagrabasti )
M Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm
Side walls ( 3.50 m to top slab)
3 side walls earth face main steel 12 1 28 2.760 77.28
Laping 12 1 28 0.612 17.14
5 side walls other face main steel 16 1 28 1.69 47.18
Laping 16 1 28 0.816 22.85
15 side wall earth face Distribution 10 1 8 5.89 47.12
26 steel
side wall other face Distribution 10 1 8 5.89 47.12
31 steel shear links (28*3)=84 10 1 84 0.54 44.94
12 Haunch Steel Top Slab Side Wall 10 1 28 1.55 43.29
10 Top Slab Top Main Steel 12 1 26 1.79 46.41
Column C 12 1 2 1.53 3.05
Laping 12 1 2 0.61 1.22
Ring 10 1 13 1.22 15.86
Ring 10 1 13 0.35 4.55
Side walls ( 3.50 m to top slab)
3 side walls earth face main steel 12 1 28 2.760 77.28
Laping 12 1 28 0.612 17.14
5 side walls other face main steel 16 1 28 1.69 47.32
Laping 16 1 28 0.82 22.85
15 side wall earth face Distribution 10 1 8 5.89 47.12
26 steel
side wall other face Distribution 10 1 8 5.89 47.12
31 steel shear links (28*3)=84 10 1 84 0.54 44.94
12 Haunch Steel Top Slab Side Wall 10 1 28 1.55 43.29
10 Top Slab Top Main Steel 12 1 26 1.79 46.41
Column C 12 1 2 1.53 3.06
Laping 12 1 3 0.61 1.84
Ring 10 1 13 1.22 15.86
Ring 10 1 13 0.35 4.55
Internal walls ( 3.50 m to top slab)
6 internal walls vertical main steel 16 2 28 1.78 99.68
Laping 16 2 28 0.82 45.70
16 internal wall distribution steel 10 2 10 5.86 117.20
7 Haunch 10 2 28 1.52 85.34
Spacer 10 1 10 0.50 5.00
column D 16 1 2 1.530 3.06
Laping 16 1 2 0.816 1.63
ties column D 10 1 13 1.120 14.56
10 1 13 0.350 4.55
Internal walls ( 3.50 m to top slab)
6 internal walls vertical main steel 16 2 28 1.78 99.68
Laping 16 2 28 0.82 45.70
16 internal wall distribution steel 10 2 10 5.86 117.20
7 Haunch Steel Top Slab Internal Wall 10 2 28 1.52 85.34
Spacer 10 1 10 0.50 5.00
column D 16 1 2 1.530 3.06
Laping 16 1 2 0.816 1.63
ties column D 10 1 13 1.120 14.56
10 1 13 0.350 4.55
Internal walls ( 3.50 m to top slab)
6 internal walls vertical main steel 16 2 28 1.78 99.68
Laping 16 2 28 0.82 45.70
16 internal wall distribution steel 10 2 10 5.86 117.20
7 Haunch Steel Top Slab Internal Wall 10 2 28 1.52 85.34
Spacer 10 1 10 0.50 5.00
column D 16 1 2 1.530 3.06
Laping 16 1 2 0.816 1.63
ties column D 10 1 13 1.120 14.56
10 1 13 0.350 4.55
250mm×250mm column 16 5 4 1.530 30.60
Laping 16 5 4 0.816 16.32
Ties of 250mm×250mm column 10 5 13 0.72 46.80
Total length in M 0.000 1132.510 290.830 637.330 0.000
Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 0.000 690.830 258.260 1000.610 0.000
Grand Total in Kg= 1949.700
Net Payble [Link] Kg 1949.700
Carried over to Page No. of TCMB

Measured on : 28.04.2023 Signature of Contractor/Representative Signature of JE

Page 35
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to all height.
2.4.1 (a) Thermo-Mechanically Treated bars.
GIN No-697 -2A ( Sabroom )
M Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm

Side walls ( From 3.50 m to Top of top slab)


3 side walls earth face main steel 12 1 30 3.310 99.30
lap 12 1 30 0.612 18.36
5 side walls other face main steel 16 1 30 2.19 65.55
lap 16 1 30 0.82 24.48
15 side wall earth face Distribution 10 1 10 5.99 59.90
26 steel
side wall other face Distribution 10 1 10 5.99 59.90
31 steel shear links (30*3)=90 10 1 90 0.59 52.65
12 Haunch Steel Top Slab Side Wall 10 1 30 1.62 48.48
10 Top Slab Top Main Steel 12 1 29 1.94 56.12
Column C 16 1 4 2.03 8.12
lap 16 1 4 0.82 3.26
Ring 10 1 17 1.32 22.44
Ring 10 1 17 0.55 9.35
Ring 10 1 17 0.59 10.03
Side walls ( From 3.50 m to Top of top slab)
3 side walls earth face main steel 12 1 30 3.310 99.30
lap 12 1 30 0.612 18.36
5 side walls other face main steel 16 1 30 2.19 65.70
lap 16 1 30 0.82 24.48
15 side wall earth face Distribution 10 1 10 5.99 59.90
26 steel
side wall other face Distribution 10 1 10 5.99 59.90
31 steel shear links (30*3)=90 10 1 90 0.59 52.65
12 Haunch Steel Top Slab Side Wall 10 1 30 1.62 48.48
10 Top Slab Top Main Steel 12 1 29 1.94 56.12
Column C 16 1 4 2.03 8.12
lap 16 1 4 0.82 3.26
Ring 10 1 17 1.32 22.44
Ring 10 1 17 0.55 9.35
Ring 10 1 17 0.59 10.03
Internal walls ( From 3.50 m to Top of top slab))
6 internal walls vertical main steel 16 2 30 2.28 136.80
lap 16 2 30 0.82 48.96
16 internal wall distribution steel 10 2 12 5.86 140.64
7 Haunch Steel Top Slab internal Wall 10 1 30 1.52 45.72
Spacer 10 1 15 0.50 7.50
column D 16 1 2 2.030 4.06
lap 16 1 2 0.82 1.63
ties column D 10 1 17 1.120 19.04
10 1 17 0.290 4.93
Internal walls ( From 3.50 m to Top of top slab)
6 internal walls vertical main steel 16 2 30 2.28 136.80
lap 16 2 30 0.82 48.96
16 internal wall distribution steel 10 2 12 5.86 140.64
7 Haunch Steel Top Slab internal Wall 10 1 30 1.52 45.72
Spacer 10 1 15 0.50 7.50
column D 16 1 2 2.030 4.06
lap 16 1 2 0.82 1.63
ties column D 10 1 17 1.120 19.04
10 1 17 0.290 4.93
250mm×250mm column 16 4 4 2.030 32.48
lap 16 4 4 0.816 13.06
Ties of 250mm×250mm column 10 4 17 0.72 48.96
Total length in M 0.000 1010.120 347.560 631.410 0.000
Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 0.000 616.170 308.630 991.310 0.000
Grand Total in Kg= 1916.110
Net Payble [Link] Kg 1916.110
Carried over to Page No. of TCMB

Measured on : 28.04.2023 Signature of Contractor/Representative Signature of JE

Page 36
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to all height.
2.4.1 (a) Thermo-Mechanically Treated bars.
GIN No-697 -1A ( Sabroom )
M Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm
Side walls ( From 3.50 m to top slab)
3 side walls earth face main steel 16 1 30 4.781 143.43
Lap 16 1 30 0.816 24.48
5 side walls other face main steel 20 1 30 3.82 114.60
Lap 20 1 30 1.020 30.60
15 side wall earth face Distribution 10 1 16 6.89 110.24
26 steel
side wall other face Distribution 10 1 16 6.39 102.24
10 steel Top Slab Top main steel 16 1 29 2.55 73.95
12 Haunch bar 10 1 30 2.40 71.94
31 Shear link(30*3=90) 10 1 90 0.95 85.50
Column C 20 1 4 2.60 10.40
Lap 20 1 4 1.02 4.08
Ring 10 1 21 1.62 34.02
Ring 10 1 21 0.93 19.57
Ring 10 1 21 0.70 14.70
Side walls ( From 3.50 m to Top slab)
3 side walls earth face main steel 16 1 30 4.781 143.43
Lap 16 1 30 0.816 24.48
5 side walls other face main steel 20 1 30 3.82 114.60
Lap 20 1 30 1.020 30.60
15 side wall earth face Distribution 10 1 16 6.89 110.24
26 steel
side wall other face Distribution 10 1 16 6.39 102.24
10 steel Top Slab Top main steel 16 1 29 2.55 73.95
12 Haunch bar 10 1 30 2.40 71.94
31 Shear link(30*3=90) 10 1 90 0.95 85.50
Column C 20 1 4 2.60 10.40
Lap 20 1 4 1.02 4.08
Ring 10 1 21 1.62 34.02
Ring 10 1 21 0.93 19.57
Ring 10 1 21 0.70 14.70
Internal walls ( From 3.50 m to Top slab)
6 internal walls vertical main steel 16 2 54 2.88 311.04
Lap 16 2 54 0.82 88.13
16 internal wall distribution steel 10 2 14 6.38 178.64
8 Haunch bar 10 2 30 2.09 125.40
Spacer 10 1 15 0.50 7.50
column D 16 1 2 2.600 5.20
Lap 16 2 2 0.82 3.26
ties column D 10 1 21 1.220 25.62
10 1 21 0.350 7.35
Internal walls ( From 3.50 m to Top slab)
6 internal walls vertical main steel 16 2 54 2.88 311.04
Lap 16 2 54 0.82 88.13
16 internal wall distribution steel 10 2 14 6.38 178.64
8 Haunch bar 10 2 30 2.09 125.40
Spacer 10 1 15 0.50 7.50
column D 16 1 2 2.600 5.20
Lap 16 2 2 0.82 3.26
ties column D 10 1 21 1.220 25.62
10 1 21 0.350 7.35
Internal walls( From 3.50 m to Top slab)
6 internal walls vertical main steel 16 2 54 2.88 311.04
Lap 16 2 54 0.82 88.13
16 internal wall distribution steel 10 2 14 6.38 178.64
8 Haunch bar 10 2 30 2.09 125.40
Spacer 10 1 15 0.50 7.50
column D 16 1 2 2.600 5.20
Lap 16 2 2 0.82 3.26
ties column D 10 1 21 1.220 25.62
10 1 21 0.350 7.35
250mm×250mm column 16 5 4 2.600 52.00
Lap 16 2 4 0.82 6.53
Ties of 250mm×250mm column 10 5 21 0.72 75.60
Total length in M 0.000 1985.550 0.000 1765.140 319.360
Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 0.000 1211.190 0.000 2771.270 784.670
Grand Total in Kg= 4767.130
Net Payble [Link] Kg 4767.130

Measured on : 28.04.2023 Signature of Contractor/Representative Signature of JE

Page 37
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to all height.
2.4.1 (a) Thermo-Mechanically Treated bars.
GIN No-698 ( Kathalcheri)
M Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm
Side walls ( From 3.50 m to Top slab)
3 side walls earth face main steel 16 1 32 4.810 153.92
laping 16 1 32 0.816 26.11
5 side walls other face main steel 20 1 32 3.49 111.52
laping 20 1 32 1.020 32.64
15 side wall earth face Distribution 10 1 18 6.39 115.02
26 steel
side wall other face Distribution 10 1 18 6.39 115.02
10 steel Top slab top main steel 16 1 30 2.685 80.55
12 Haunch steel 10 1 32 1.899 60.77
31 shear link (32*3=96) 10 1 96 0.785 75.36
Column C 20 1 6 3.30 19.80
laping 20 1 6 1.020 6.12
Ring 10 1 27 1.72 46.44
Ring 10 1 27 1.10 29.70
Ring 10 1 27 0.75 20.25
Internal walls ( From 3.50 m to Top slab)
6 internal walls vertical main steel 16 2 39 3.58 279.24
laping 16 2 39 0.82 63.65
16 internal wall distribution steel 10 2 25 5.96 298.00
7 Haunch steel 10 2 32 1.60 102.08
Spacer 10 1 20 0.90 18.00
column D 16 1 2 3.300 6.60
laping 16 1 2 0.82 1.63
ties column D 10 1 27 1.220 32.94
10 1 27 0.350 9.45
Internal walls ( From 3.50 m to Top slab)
6 internal walls vertical main steel 16 2 39 3.58 279.24
laping 16 2 39 0.82 63.65
16 internal wall distribution steel 10 2 25 5.96 298.00
7 Haunch steel 10 2 32 1.60 102.08
Spacer 10 1 20 0.90 18.00
column D 16 1 2 3.300 6.60
laping 16 1 2 0.82 1.63
ties column D 10 1 27 1.220 32.94
10 1 27 0.350 9.45
Internal walls ( From 3.50 m to Top slab)
6 internal walls vertical main steel 16 2 39 3.58 279.24
laping 16 2 39 0.82 63.65
16 internal wall distribution steel 10 2 25 5.96 298.00
7 Haunch steel 10 2 32 1.60 102.08
Spacer 10 1 20 0.90 18.00
column D 16 1 2 3.300 6.60
laping 16 1 2 0.82 1.63
ties column D 10 1 27 1.220 32.94
10 1 27 0.350 9.45
Internal walls ( From 3.50 m to Top slab)
6 internal walls vertical main steel 16 2 39 3.58 279.24
laping 16 2 39 0.82 63.65
16 internal wall distribution steel 10 2 25 5.96 298.00
7 Haunch steel 10 2 32 1.60 102.08
Spacer 10 1 20 0.90 18.00
column D 16 1 2 3.300 6.60
laping 16 1 2 0.82 1.63
ties column D 10 1 27 1.220 32.94
10 1 27 0.350 9.45
250mm×250mm column 16 5 4 3.300 66.00
laping 16 5 4 0.82 16.32
Ties of 250mm×250mm column 10 5 27 0.72 97.20
Total length in M 0.000 2401.640 0.000 1747.380 170.080
Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 0.000 1465.000 0.000 2743.390 417.890
Grand Total in Kg= 4626.280
Net Payble [Link] Kg 4626.280

Measured on : 28.04.2023 Signature of Contractor/Representative Signature of JE

Page 38
2.4 Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to all height.
2.4.1 (a) Thermo-Mechanically Treated bars.
GIN No-698 ( Kathalcheri)
M Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm

Side walls( From 3.50 m to Top slab)


3 side walls earth face main steel 16 1 32 4.810 153.92
laping 16 1 32 0.816 26.11
5 side walls other face main steel 20 1 32 3.49 111.52
laping 20 1 32 1.020 32.64
15 side wall earth face Distribution 10 1 18 6.39 115.02
26 steel
side wall other face Distribution 10 1 18 6.39 115.02
10 steel Top slab top main steel 16 1 30 2.685 80.55
12 Haunch steel 10 1 32 1.899 60.77
31 shear link (32*3=96) 10 1 96 0.785 75.36
Column C 20 1 6 3.30 19.80
laping 20 1 6 1.020 6.12
Ring 10 1 27 1.72 46.44
Ring 10 1 27 1.10 29.70
Ring 10 1 27 0.75 20.25
Internal walls ( From 3.50 m to Top slab)
6 internal walls vertical main steel 16 2 39 3.58 279.24
laping 16 2 39 0.82 63.65
16 internal wall distribution steel 10 2 25 5.96 298.00
7 Haunch steel 10 2 32 1.60 102.08
Spacer 10 1 20 0.90 18.00
column D 16 1 2 3.300 6.60
laping 16 1 2 0.82 1.63
ties column D 10 1 27 1.220 32.94
10 1 27 0.350 9.45
Internal walls ( From 3.50 m to Top slab)
6 internal walls vertical main steel 16 2 39 3.58 279.24
laping 16 2 39 0.82 63.65
16 internal wall distribution steel 10 2 25 5.96 298.00
7 Haunch steel 10 2 32 1.60 102.08
Spacer 10 1 20 0.90 18.00
column D 16 1 2 3.300 6.60
laping 16 1 2 0.82 1.63
ties column D 10 1 27 1.220 32.94
10 1 27 0.350 9.45
Internal walls ( From 3.50 m to Top slab)
6 internal walls vertical main steel 16 2 39 3.58 279.24
laping 16 2 39 0.82 63.65
16 internal wall distribution steel 10 2 25 5.96 298.00
7 Haunch steel 10 2 32 1.60 102.08
Spacer 10 1 20 0.90 18.00
column D 16 1 2 3.300 6.60
laping 16 1 2 0.82 1.63
ties column D 10 1 27 1.220 32.94
10 1 27 0.350 9.45
Internal walls ( From 3.50 m to Top slab)
6 internal walls vertical main steel 16 2 39 3.58 279.24
laping 16 2 39 0.82 63.65
16 internal wall distribution steel 10 2 25 5.96 298.00
7 Haunch steel 10 2 32 1.60 102.08
Spacer 10 1 20 0.90 18.00
column D 16 1 2 3.300 6.60
laping 16 1 2 0.82 1.63
ties column D 10 1 27 1.220 32.94
10 1 27 0.350 9.45
250mm×250mm column 16 5 4 3.300 66.00
laping 16 5 4 0.82 16.32
Ties of 250mm×250mm column 10 5 27 0.72 97.20
Total length in M 0.000 2401.640 0.000 1747.380 170.080
Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 0.000 1465.000 0.000 2743.390 417.890
Grand Total in Kg= 4626.280
Net Payble [Link] Kg 4626.280

Measured on : 28.04.2023 Signature of Contractor/Representative Signature of JE

Page 39
Agt
No- Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all level.
2.4 Thermo-Mechanically Treated bars of grade Fe-500D or more.
2.4.1
M
Description Dia Nos Nos Lenth 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm

curtain wall (697-1A)


india side

main bar both side 10 2 49 2.000 196.00


binder 10 2 9 14.50 261.00
spacer 10 1 29 0.50 14.50
lap 10 1 9 0.50 4.50
curtain wall (697-2A)
india side
main bar both side 10 2 36 2.000 144.00
binder 10 2 9 10.65 191.70
spacer 10 1 20 0.50 10.00
Bangladesh side
main bar both side 10 2 36 2.350 169.20
binder 10 2 9 10.65 191.70
spacer 10 1 20 0.50 10.00
curtain wall (703)
india side
main bar both side 10 2 47 2.000 188.00
binder 10 2 9 13.95 251.10
spacer 10 1 25 0.50 12.50
Bangladesh side
main bar both side 10 2 47 2.350 220.90
binder 10 2 13 13.95 362.70
spacer 10 1 25 0.50 12.50
curtain wall (698)
india side
main bar both side 10 2 97 2.000 388.00
binder 10 2 9 28.89 520.02
spacer 10 1 50 0.50 25.00
laping 10 3 9 0.50 13.50
Bangladesh side
main bar both side 10 2 97 2.350 455.90
binder 10 2 13 28.89 751.14
spacer 10 1 50 0.50 25.00
laping 10 3 9 0.50 13.50
Total length in M 0.000 4432.360 0.000 0.000 0.000 0.000
Weight in kg/m 0.395 0.610 0.888 1.570 2.457 3.858
Total weight in kg 0.000 2703.740 0.000 0.000 0.000 0.000
Grand Total in Kg= 2703.740
Net Payble [Link] Kg 2703.740
Carried over to Page No. of TCMB

Measured on : 1.05.2023 Signature of Contractor Signature of JE

Page 40
Item. Providing and laying in position machine batched and machine mixed design mix cement concrete for plain cement concrete work, using cement
content as per approved design mix, including pumping of concrete to site of laying, finishing but excluding the cost of centering, shuttering, including
No- admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and
2.1 durability as per direction of Engineer-in-charge. (Note :- Excess/ less cement used as per design mix is payable/recoverable separately).
2.1.1 All works upto plinth level :
[Link] M-7.5 grade plain cement concrete (cement content considered @ 200 kg/cum)
Details Contents
Description of item of of Area
No. No. Length Breadth Depth
Actual
1 2
Measu 3 4 5 6 7
GIN No- 703 (Apron)
India side 1 1 13.50 1.50 0.10 2.03
Bangledesh side 1 1 13.50 2.50 0.10 3.38
Gin No- 698 (Apron)
India side 1 1 28.44 1.50 0.10 4.27
Bangledesh side 1 1 28.44 2.50 0.10 7.11
Gin No- 697-1A (Apron)
India side 1 1 14.05 1.50 0.10 2.11
Gin No- 697-2A (Apron)
India side 1 1 10.20 1.50 0.10 1.53
Bangledesh side 1 1 10.20 2.50 0.10 2.55
Total 22.98
cum
2.6 0
Details Contents
Description of item of of Area
No. No. Length Breadth Depth
Actual
1 2
Measu 3 4 5 6 7
Qty as per item no. [Link] 1.00 22.98 0.30
6.89
Extra cement =(230-200)=30 kg/cum

Total 6.89
Qtl

Measured on : 04.05.2023 Signature of Contractor Signature of JE

Page 41
Agt
No- Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all level.
2.4 Thermo-Mechanically Treated bars of grade Fe-500D or more.
2.4.1
M
Description Dia Nos Nos Lenth 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm

Apron (697-1A)
india side
main bar 10 1 49 1.450 71.05
binder 10 1 8 14.50 116.00
lap 10 1 106 0.50 53.00
curtain wall (697-2A)
india side
main bar 10 1 37 1.450 53.65
binder 10 1 8 10.65 85.20
lap 10 1 90 0.50 45.00
Bangladesh side
main bar 10 1 37 2.450 90.65
binder 10 1 13 10.65 138.45
lap 10 1 100 0.50 50.00
curtain wall (703)
india side
main bar 10 1 48 1.450 69.60
binder 10 1 8 13.95 111.60
lap 10 1 112 0.50 56.00
Bangladesh side
main bar both 10 1 48 2.450 117.60
binder 10 1 13 13.95 181.35
lap 10 1 122 0.50 61.00
curtain wall (698)
india side
main bar 10 1 97 1.450 140.65
binder 10 1 8 28.89 231.12
laping 10 1 240 0.50 120.00
Bangladesh side
main bar 10 1 97 2.450 237.65
binder 10 1 13 28.89 375.57
laping 10 1 240 0.50 120.00
Total length in M 0.000 2525.140 0.000 0.000 0.000 0.000
Weight in kg/m 0.395 0.610 0.888 1.570 2.457 3.858
Total weight in kg 0.000 1540.340 0.000 0.000 0.000 0.000
Grand Total in Kg= 1540.340
Net Payble [Link] Kg 1540.340
Carried over to Page No. of TCMB

Measured on : 08.05.2023 Signature of Contractor Signature of JE

Page 42
Item. Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work,
using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering,
No- finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve
2.5 workability without impairing strength and durability to get shutter finished surface as per direction of Engineer-in-charge. (Note :- Cement content
considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately).
2.5.1 All works upto plinth level
Details Contents
Description of item of of Area
No. No. Length Breadth Depth
Actual
1 2
Measu 3 4 5 6 7
GIN No-703 1 1 14.10 5.30 0.45 33.63
Haunch 8 0.5 5.30 0.30 0.30 1.91
Gin No- 698 1 1 29.04 5.30 0.45 69.26
Haunch 16 0.5 5.30 0.30 0.30 3.82
Gin No- 697-1A 1 1 14.65 5.30 0.50 38.82
Haunch 8 0.5 5.30 0.30 0.30 1.91
Gin No- 697-2A 1 1 10.80 5.30 0.45 25.76
Haunch 6 0.5 5.30 0.30 0.30 1.43
Total 176.54
C/O to cum
Page No.
2.6 Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
Of TCMB
Details of Actual Measurement Contents
Description of item of Qtl
No. No. Length Breadth Depth
1 2 3 4 5 6 7
Qty as per item no. 2.5.1 1.00 176.54 0.77
135.94
Extra cement =(407-330)=77 kg/cum

Total 135.94

2.2 Centering and shuttering including strutting, propping etc. and removal of form for :
2.2.1 Foundations, footings, bases of columns, etc. for mass concrete
Details of Actual Measurement Contents
Description of item of Area
No. No. Length Breadth Depth
1 2 3 4 5 6 7
GIN No-703 1 2 14.10 0.45 12.69

1 2 5.30 0.45 4.77


Haunch 8 1 5.30 0.42 17.81
Gin No- 698 1 2 29.04 0.45 26.14
1 2 5.30 0.45 4.77
Haunch 16 1 5.30 0.42 35.62
Gin No- 697-1A 1 2 14.65 0.50 14.65
1 2 5.30 0.50 5.3
Haunch 8 1 5.30 0.42 17.81
Gin No- 697-2A 1 2 10.80 0.45 9.72
1 2 5.30 0.45 4.77
Haunch 6 1 5.30 0.42 13.36
Total 167.41
C/O to Sqm
Page No.
Of TCMB

Measured on : 19.05.2023 Signature of Contractor Signature of JE

Page 43
2.2 Centering and shuttering including strutting, propping etc. and removal of form for :

2.2.2 Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Details of Actual Measurement Contents
Description of item of Area
No. No. Length Breadth Depth
1 2 3 4 5 6 7
GIN No-703

Side walls (OUTER SIDE) 1 2 5.30 4.70 49.82


Side walls (INNER SIDE) 1 2 5.30 4.10 43.46
FACE 2 2 0.45 4.70 8.46
Internal walls 2 3 5.30 4.10 130.38
FACE 2 3 0.40 4.70 11.28
TOP Haunch 8 1 5.00 0.42 16.8
Gin No- 698
Side walls (OUTER SIDE) 1 2 5.30 6.50 68.9
Side walls (INNER SIDE) 1 2 5.30 5.90 62.54
FACE 2 2 0.70 6.50 18.2
Internal walls 2 7 5.30 5.90 437.78
FACE 2 8 0.45 6.50 46.8
TOP Haunch 16 1 5.00 0.42 33.6
Gin No- 697-1A
Side walls (OUTER SIDE) 1 2 5.30 5.70 60.42
Side walls (INNER SIDE) 1 2 5.30 5.10 54.06
FACE 2 2 0.65 5.70 14.82
Internal walls 2 3 5.30 5.10 162.18
FACE 2 3 0.45 5.70 15.39
TOP Haunch 8 1 5.00 0.42 16.8
Gin No- 697-2A
Side walls (OUTER SIDE) 1 2 5.30 5.20 55.12
Side walls (INNER SIDE) 1 2 5.30 4.60 48.76
FACE 2 2 0.50 5.20 10.4
Internal walls 2 2 5.30 4.60 97.52
FACE 2 2 0.40 5.20 8.32
Haunch 6 1 5.00 0.42 12.6
Total 1484.41
C/O to sqm
Page No.
Of TCMB

Measured on : 19.05.2023 Signature of Contractor Signature of JE

Page 44
Item. Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work,
using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering,
No- finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve
2.5 workability without impairing strength and durability to get shutter finished surface as per direction of Engineer-in-charge. (Note :- Cement content
2.5.1 All works upto plinth level
Details Contents
Description of item of of Area
No. No. Length Breadth Depth
Actual
1 2
Measu 3 4 5 6 7
GIN No-703
Side walls 1 2 5.30 0.45 4.70 22.42
Internal walls 1 3 5.30 0.40 4.70 29.89
Haunch 8 0.5 5.00 0.30 0.30 1.8
Gin No- 698
Side walls 1 2 5.30 0.70 6.50 48.23
Internal walls 1 8 5.30 0.45 6.50 124.02
Haunch 16 0.5 5.00 0.30 0.30 3.6
Gin No- 697-1A
Side walls 1 2 5.30 0.65 5.70 39.27
Internal walls 1 3 5.30 0.45 5.70 40.78
Haunch 8 0.5 5.00 0.30 0.30 1.8
Gin No- 697-2A
Side walls 1 2 5.30 0.50 5.20 27.56
Internal walls 1 2 5.30 0.40 5.20 22.05
Haunch 6 0.5 5.00 0.30 0.30 1.35
Total 362.77
cum
2.6 Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
Details Contents
Description of item of of Area
No. No. Length Breadth Depth
Actual
1 2
Measu 3 4 5 6 7
Qty as per item no. 2.5.1 1.00 362.77 0.77
279.33
Extra cement =(407-330)=77 kg/cum

Total 279.33

Measured on : 19.05.2023 Signature of Contractor Signature of JE

Page 45
Item. Providing and laying in position machine batched and machine mixed design mix cement concrete for plain cement concrete work, using cement
content as per approved design mix, including pumping of concrete to site of laying, finishing but excluding the cost of centering, shuttering, including
No- admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and
2.1 durability as per direction of Engineer-in-charge. (Note :- Excess/ less cement used as per design mix is payable/recoverable separately).
2.1.1 All works upto plinth level :
[Link] M-15 grade plain cement concrete (cement content considered @ 240 kg/cum)
Details Contents
Description of item of of Area
No. No. Length Breadth Depth
Actual
1 2
Measu 3 4 5 6 7
GIN No- 703 (Apron)
India side 1 1 13.50 1.50 0.30 6.08
Bangledesh side 1 1 13.50 2.50 0.30 10.13
Gin No- 698 (Apron)
India side 1 1 28.44 1.50 0.30 12.8
Bangledesh side 1 1 28.44 2.50 0.30 21.33
Gin No- 697-1A (Apron)
India side 1 1 14.05 1.50 0.30 6.32
Gin No- 697-2A (Apron)
India side 1 1 10.20 1.50 0.30 4.59
Bangledesh side 1 1 10.20 2.50 0.30 7.65
Total 68.90
cum
2.6 Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
Details of Actual Measurement Contents
Description of item of Area
No. No. Length Breadth Depth
1 2 3 4 5 6 7
Qty as per item no. [Link] 1.00 68.90 0.66
45.47
Extra cement =(306-240)=66 kg/cum
Total 45.47
Qtl

Measured on : 19.05.2023 Signature of Contractor Signature of JE

Page 46
Item. Providing and laying in position machine batched and machine mixed design mix cement concrete for plain cement concrete work, using cement
content as per approved design mix, including pumping of concrete to site of laying, finishing but excluding the cost of centering, shuttering, including
No- admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and
2.1 durability as per direction of Engineer-in-charge. (Note :- Excess/ less cement used as per design mix is payable/recoverable separately).
2.1.1 All works upto plinth level :
[Link] M-15 grade plain cement concrete (cement content considered @ 240 kg/cum)
Details of Actual Measurement Contents
Description of item of Area
No. No. Length Breadth Depth
1 2 3 4 5 6 7
GIN No- 703 (cutt-off wall)
1 2 8.80 0.50 0.50 4.4
1 2 9.10 0.30 0.55 3
curtain walls
india side 1 1 14.10 0.75 0.70 7.4
1 1 14.10 0.45 0.50 3.17
1 1 14.10 0.20 0.45 1.27
Bangladesh side 1 1 14.10 0.75 0.75 7.93
1 1 14.10 0.45 0.75 4.76
1 1 14.10 0.25 0.45 1.59
GIN No- 698 (cutt-off wall)
1 2 8.80 0.50 0.50 4.4
1 2 9.10 0.30 0.55 3
curtain walls
india side 1 1 29.04 0.75 0.70 15.25
1 1 29.04 0.45 0.50 6.53
1 1 29.04 0.20 0.45 2.61
Bangladesh side 1 1 29.04 0.75 0.75 16.34
1 1 29.04 0.45 0.75 9.8
1 1 29.04 0.25 0.45 3.27
GIN No- 697-2A (cutt-off wall)
1 2 8.80 0.50 0.50 4.4
1 2 9.10 0.30 0.55 3
curtain walls
india side 1 1 10.80 0.75 0.70 5.67
1 1 10.80 0.45 0.50 2.43
1 1 10.80 0.20 0.45 0.97
Bangladesh side 1 1 10.80 0.75 0.75 6.08
1 1 10.80 0.45 0.75 3.65
1 1 10.80 0.25 0.45 1.22
GIN No- 697-1A (cutt-off wall)
1 2 8.80 0.50 0.50 4.4
1 2 9.10 0.30 0.55 3
curtain walls
india side 1 1 14.65 0.75 0.70 7.69
1 1 14.65 0.45 0.50 3.3
1 1 14.65 0.20 0.45 1.32
Total 141.85
cum
2.6 Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
Details Contents
Description of item of of Area
No. No. Length Breadth Depth
Actual
1 2
Measu 3 4 5 6 7
Qty as per item no. [Link] 1.00 141.85 0.66 93.62
Extra cement =(306-240)=66 kg/cum
Total 93.62
Qtl

Measured on : 19.05.2023 Signature of Contractor Signature of JE

Page 47
2.2.2 Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Details Contents
Description of item of of Area
No. No. Length Breadth Depth
Actual
1 2
Measu 3 4 5 6 7
GIN No- 703 (cutt-off wall)
2 2 8.80 0.50 17.6
2 2 0.50 0.50 1
2 2 9.10 0.55 20.02
2 2 0.30 0.55 0.66
curtain walls
india side 1 2 14.10 0.70 19.74
1 2 0.75 0.70 1.05
1 2 14.10 0.50 14.1
1 2 0.45 0.50 0.45
1 2 14.10 0.45 12.69
1 2 0.20 0.45 0.18
Bangladesh side 1 2 14.10 0.75 21.15
1 2 0.75 0.75 1.13
1 2 14.10 0.75 21.15
1 2 0.45 0.75 0.68
1 2 14.10 0.45 12.69
1 2 0.25 0.45 0.23
GIN No- 698 (cutt-off wall)
2 2 8.80 0.50 17.6
2 2 0.50 0.50 1
2 2 9.10 0.55 20.02
2 2 0.30 0.55 0.66
curtain walls
india side 1 2 29.04 0.70 40.66
1 2 0.75 0.70 1.05
1 2 29.04 0.50 29.04
1 2 0.45 0.50 0.45
1 2 29.04 0.45 26.14
1 2 0.20 0.45 0.18
Bangladesh side 1 2 29.04 0.75 43.56
1 2 0.75 0.75 1.13
1 2 29.04 0.75 43.56
1 2 0.45 0.75 0.68
1 2 29.04 0.45 26.14
1 2 0.25 0.45 0.23
GIN No- 697-2A (cutt-off wall)
2 2 8.80 0.50 17.6
2 2 0.50 0.50 1
2 2 9.10 0.55 20.02
2 2 0.30 0.55 0.66
curtain walls
india side 1 2 10.80 0.70 15.12
1 2 0.75 0.70 1.05
1 2 10.80 0.50 10.8
1 2 0.45 0.50 0.45
1 2 10.80 0.45 9.72
1 2 0.20 0.45 0.18
Bangladesh side 1 2 10.80 0.75 16.2
1 2 0.75 0.75 1.13
1 2 10.80 0.75 16.2
1 2 0.45 0.75 0.68
1 2 10.80 0.45 9.72
1 2 0.25 0.45 0.23
GIN No- 697-2A (cutt-off wall)
2 2 8.80 0.50 17.6
2 2 0.50 0.50 1
2 2 9.10 0.55 20.02
2 2 0.30 0.55 0.66
curtain walls
india side 1 2 14.65 0.70 20.51
1 2 0.75 0.70 1.05
1 2 14.65 0.50 14.65
1 2 0.45 0.50 0.45
1 2 14.65 0.45 13.19
1 2 0.20 0.45 0.18
Total 606.69
Sqm

Measured on : 19.05.2023 Signature of Contractor Signature of JE

Page 48
Agt Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all level.
No-
2.4
2.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more.
M
Description Dia Nos Nos Lenth 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm

GIN No 703
Steel of Top Slab
10 Top Slab Top Main Bar 362.70
12 1 26 13.95

Lap 12 2 26 0.612 31.82


14 Top Slab Top Distribution Bar 10 1 57 5.41 308.37
9 Top Slab Bott. Main Bar 16 1 26 14.55 378.30
Lap 16 1 26 0.816 21.22
14a Top Slab Bott. Distribution Bar 10 1 57 5.41 308.37
11 Additional Bar Top slab 12 3 26 2.20 171.60
Chair 12 1 24 2.00 48.00
Total length in M 0.000 616.740 614.12 399.520 0.000 0.000
Weight in kg/m 0.395 0.610 0.888 1.570 2.457 3.858
Total weight in kg 0.000 376.210 545.340 627.250 0.000 0.000
Grand Total in Kg= 1548.800
Net Payble [Link] Kg 1548.800
Carried over to Page No. of TCMB

Agt Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all level.
No-
2.4
2.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more.
M
Description Dia Nos Nos Lenth 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm

GIN No 698 (part -1)


Steel of Top Slab
10 Top Slab Top Main Bar 16 1 30 14.385 431.55

Lap 16 2 30 0.816 48.96


14 Top Slab Top Distribution Bar 10 1 58 5.41 313.78
9 Top Slab Bott. Main Bar 16 1 34 14.985 509.49
Lap 16 1 34 0.816 27.74
14a Top Slab Bott. Distribution Bar 10 1 58 5.41 313.78
11 Additional Bar Top slab 10 3 30 2.25 202.50
Chair 16 1 32 2.00 64.00
Total length in M 0.000 830.060 0.00 1081.740 0.000 0.000
Weight in kg/m 0.395 0.610 0.888 1.570 2.457 3.858
Total weight in kg 0.000 506.340 0.000 1698.330 0.000 0.000
Grand Total in Kg= 2204.670
Net Payble [Link] Kg 2204.670
Carried over to Page No. of TCMB

Agt Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all level.
No-
2.4
2.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more.
M Description Dia Nos Nos Lenth 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm
GIN No 698 (part -2)
Steel of Top Slab
10 Top Slab Top Main Bar 16 1 30 14.385 431.55
Lap 16 2 30 0.816 48.96
14 Top Slab Top Distribution Bar 10 1 59 5.41 319.19
9 Top Slab Bott. Main Bar 16 1 34 14.985 509.49
Lap 16 1 34 0.816 27.74
14a Top Slab Bott. Distribution Bar 10 1 59 5.41 319.19
11 Additional Bar Top slab 10 3 30 2.25 202.50
Chair 16 1 32 2.00 64.00
Total length in M 0.000 840.880 0.00 1081.740 0.000 0.000
Weight in kg/m 0.395 0.610 0.888 1.570 2.457 3.858
Total weight in kg 0.000 512.940 0.000 1698.330 0.000 0.000
Grand Total in Kg= 2211.270
Net Payble [Link] Kg 2211.270
Carried over to Page No. of TCMB

Measured on : 31.05.2023 Signature of Contractor Signature of JE

Page 49
Item. Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work,
using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering,
No- finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve
2.5 workability without impairing strength and durability to get shutter finished surface as per direction of Engineer-in-charge. (Note :- Cement content
2.5.2 All works above plinth level upto floor V level
Details Contents
Description of item of of Area
No. No. Length Breadth Depth
Actual
1 2
Measu 3 4 5 6 7
GIN No-703

Slab 1 1 14.10 5.00 0.33 22.91


Extended wall earth side 1 2 0.45 0.30 0.33 0.09
Extended wall internal 1 3 0.40 0.30 0.33 0.12
GIN No-698 (Half Portin)

Slab 1 1 14.50 5.00 0.33 23.56


Extended wall earth side 1 1 0.70 0.30 0.33 0.07
Extended wall internal 1 4 0.45 0.30 0.33 0.18
GIN No-698 ( Half portion)

Slab 1 1 14.50 5.00 0.33 23.56


Extended wall earth side 1 1 0.70 0.30 0.33 0.07
Extended wall internal 1 4 0.45 0.30 0.33 0.18
Total 70.74
cum
2.6 Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
Details Contents
Description of item of of Area
No. No. Length Breadth Depth
Actual
1 2
Measu 3 4 5 6 7
Qty as per item no. 2.5.1 1.00 70.74 0.77
54.47
Extra cement =(407-330)=77 kg/cum

Total 54.47
Qtl
Centering & shuttering i/c strutting propping etc & removal of form for
2.2.2
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. Sqm
Description of item Details of Actual Measurement Contents
of Area
No. Length Breadth Depth
1 2 3 4 5 6
GIN No-703

Extended wall Earth side 2 2 0.65 - 0.425 1.11


Extended wall internal 3 2 0.45 - 0.425 1.15
GIN No-698

Extended wall Earth side 2 2 0.50 - 0.325 0.65


Extended wall internal 2 2 0.40 - 0.325 0.52
Total 3.430
Sqm

Measured on : 21.06.2023 Signature of Contractor Signature of JE

Page 50
Centering & shuttering i/c strutting propping etc & removal of form for
2.2.3
Suspended floors,roofs,landing,balconies Sqm
Description of item Details of Actual Measurement Contents
of Area
No. Length Breadth Depth
1 2 3 4 5 6
GIN No-703
Top Slab 4 1 5.00 2.40 48.00
1 2 5.00 0.425 4.25
1 2 14.65 0.425 12.45
Total 64.70
Carried over to Page No. of TCMB
Extra for additional height in centering shuttering where ever required……
2.3.1
Suspended floors,roofs,landing,balconies Sqm
Description of item Details of Actual Measurement Contents
of Area
No. Length Breadth Depth

1 2 3 4 5 6
GIN No-703
Top Slab 4 1 5.00 3.00 60.00
Total 60.00
Extra Height (5.7-3.50)=2.2 x 3
Toatl 180.00
Carried over to Page No. of TCMB
Centering & shuttering i/c strutting propping etc & removal of form for
2.2.3
Suspended floors,roofs,landing,balconies Sqm
Description of item Details of Actual Measurement Contents
of Area
No. Length Breadth Depth
1 2 3 4 5 6
GIN No-698
Top Slab 3 1 5.00 2.40 36.00
1 2 5.00 0.325 3.25
1 2 10.80 0.325 7.02
Total 46.27
Carried over to Page No. of TCMB
Extra for additional height in centering shuttering where ever required……
2.3.1
Suspended floors,roofs,landing,balconies Sqm
Description of item Details of Actual Measurement Contents
of Area
No. Length Breadth Depth
1 2 3 4 5 6
GIN No-698
Top Slab 3 1 5.00 3.00 45.00
Total 45.00
Extra Height (5.2-3.50)=1.7 x 2
Total 90.00
Carried over to Page No. of TCMB

Measured on : 21.06.2023 Signature of Contractor Signature of JE

Page 51
RECORD OF MEASUREMENT
Name of Work: - Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under
Udaipur, Gukulnagar, Teliamura & Panisagar Sector in Tripura SH: GIN No. 697A, 697B, 698, 699, 701, 703,
706, 707, 708A & 708B under Udaipur Sector
Location of Work:- BFSD-III
Name of the Contractor :Shri Uttam deb
Reference to Agreement no:-02/EE/BFD-III/AGT/2021-2022
Date of written order to commence work :09.04.2021
Stipulated date of completion of work:- 09.11.2023
Date of actual completion of work:- in progress
Reference to previous measurements, if any:-
Serial no of this bill :- 10th R/A BILL
Item Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5
No- m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m,
1.2.1 as directed by Engineer-in-charge All kinds of soil
Details of Actual Measurement Contents of
Description of item No. No. Length Breadt Depth Area
h
1 2 3 4 5 6 7
GIN No- 703
Base For Single R. Wall BSF Tower Left
Side 1 1 7.30 2.50 1.50 27.38 cum
Avg.H=(0.9+2+1.6)/3=1.5
Key 1 1 7.30 0.30 0.35 0.77 cum
Base For Single R. Wall BSF Tower Left
Side
Span-1 1 1 7.60 2.50 1.80 34.2 cum
Avg.H=(0.7+2.8+1.9)/3=1.8
Key 1 1 7.60 2.50 0.35 6.65 cum

Span-2 1 1 3.50 2.50 0.80 7 cum


Avg.H=(0.7+0.9)/2=0.8
Key 1 1 3.50 0.30 0.35 0.37 cum
GIN No- 698

Base For Single R. Wall Single Fenching cum


Right Side 1 1 6.60 2.50 2.22 36.63
Avg.H=(1.95+2.25+2.45)/3=2.22
Key 1 1 6.60 0.30 0.35 0.69 cum
Base For Single Guard wall Single cum
Fenching Right Side 1 1 9.40 2.50 1.70 39.95
Avg.H=(1.4+1.7+2)/3=1.7
Key 1 1 9.40 0.30 0.35 0.99 cum
Base For Single R. Wall Single Fenching cum
Left Side 1 1 7.25 2.50 1.35 24.47
Avg.H=(1.2+1.5)/2=1.35
Key 1 1 7.25 0.30 0.35 0.76 cum
C/O 179.86

Measured on : 21.08.2023 Signature of Contractor Signature of JE

Page 22
B/F 179.86
Base For Single Gaurd Wall Single
Fenching Left Side 1 1 8.60 2.50 1.10 23.65 cum
Avg.H=(1+1.2)/2=1.1
Key 1 1 8.60 0.30 0.35 0.90 cum
Base For U-Shape R. Wall BSF Side 1 1 1.50 5.50 6.75 55.69 cum
GIN No- 697-2A
Base For Single Guard wall BSF Tower cum
Oppo. Right Side 1 1 20.00 2.50 0.80 40.00
Avg.H=(0.9+0.7)/2=0.8m
Key 1 1 20.00 0.30 0.30 1.80 cum
Base For Single Guard wall BSF Tower cum
Oppo. Left Side 1 1 20.00 2.50 0.95 47.50
Avg.H=(0.9+1)/2=0.95m
Key 1 1 20.00 0.30 0.30 1.80 cum
GIN No- 697-1A
Base For Single R. wall BSF Tower cum
Oppo. Left Side 1 1 5.50 3.50 2.13 41.00
Avg.H=(3.1+1.8+1.5)/3=2.13m
Key 1 1 5.50 0.60 0.55 1.82 cum
Base For Single R. wall BSF Tower cum
Oppo. Left Side 1 1 9.00 2.50 1.45 32.63
Avg.H=(1.3+1.6)/2=1.45m
Key 1 1 9.00 0.30 0.35 0.95 cum
Total 427.60 cum

Measured on : 21.08.2023 Signature of Contractor Signature of JE

Page 23
Item Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked [Link] kinds of soil
No-
1.5.1

Details of Actual Measurement Contents of


Description of item No. No. Length Breadt Depth Area
h
1 2 3 4 5 6 7
[Link]-
Base For Single 703
Wall BSF Tower Left 0.00 cum
Side
Span-1 1 1 7.60 2.50 0.30 5.7 cum
Avg.H=(0.7+2.8+1.9)/3=1.8
GIN
Base For Single R. No-
Wall698
Single Fenching
Right Side 1 1 6.60 2.50 0.72 11.88 cum
Avg.H=(1.95+2.25+2.45)/3=2.22
Base For Single Guard wall Single
Fenching Right Side 1 1 9.40 2.50 0.20 4.70 cum
Avg.H=(1.4+1.7+2)/3=1.7
Base For U-Shape R. Wall BSF Side 1 1 1.50 5.50 5.25 43.31 cum
Base For GIN No-R.697-1A
Single wall BSF Tower
Oppo. Left Side 1 1 5.50 3.50 0.63 12.13 cum
Avg.H=(3.1+1.8+1.5)/3=2.13m Total 77.72 cum

Measured on : 21.08.2023 Signature of Contractor Signature of JE

Page 24
Item Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a
No- height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
1.6

Details of Actual Measurement Contents of


Description of item No. No. Length Breadt Depth Area
h
1 2 3 4 5 6 7
GIN No- 703
BSF Side
L=(11.1+7.3)/2=9.2 1 1 9.20 6.00 55.2 Sqm
GIN No- 698
Single Fenching Side 1 1 16.50 6.00 99 Sqm
BSF Side 1 1 6.50 6 39 Sqm
GIN No- 697-2A 0 Sqm
BSF Tower Oppo. Site 1 1 20.00 6.00 120 Sqm
GIN No- 697-1A
BSF Tower Oppo. Site 1 1 26.00 6.00 156 Sqm
Total 469.20 Sqm

Measured on : 21.08.2023 Signature of Contractor Signature of JE

Page 25
Providing and laying in position machine batched and machine mixed design mix cement concrete for plain cement concrete work, using cement
content as per approved design mix, including pumping of concrete to site of laying, finishing but excluding the cost of centering, shuttering,
including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing
2.1.1. strength and durability as per direction of Engineer-in-charge. (Note :- Excess/ less cement used as per design mix is payable/recoverable
2 separately).

M-10 grade plain cement concrete (cement content considered @ 220 kg/cum)
Details of Actual Measurement Contents of
Description of item No. No. Length Breadt Depth Area
h
1 2 3 4 5 6 7
GIN No- 703

Base For Single R. Wall BSF Tower Left cum


Side 1 1 7.30 2.00 0.10 1.46
Key 1 1 7.30 0.10 0.25 0.18 cum
Base For Single R. Wall BSF Tower
Right Side
Span-1 1 1 7.60 2.00 0.10 1.52 cum
Key 1 1 7.60 0.10 0.25 0.19 cum
Span-2 1 1 3.50 2.00 0.10 0.7 cum
Key 1 1 3.50 0.10 0.25 0.09 cum
GIN No- 698
Base For Single R. Wall Single Fenching cum
Right Side 1 1 6.60 2.00 0.10 1.32
Key 1 1 6.60 0.10 0.25 0.17 cum
Base For Single Guard Wall Single cum
Fenching Right Side 1 1 9.40 2.00 0.10 1.88
Key 1 1 9.40 0.10 0.25 0.24 cum
Base For Single R. Wall Single Fenching cum
Left Side 1 1 7.25 2.00 0.10 1.45
Key 1 1 7.25 0.10 0.25 0.18 cum
Base For Single Guard Wall Single cum
Fenching Left Side 1 1 8.60 2.00 0.10 1.72
Key 1 1 8.60 0.10 0.25 0.22 cum
Base For U-Shape R. Wall BSF Side 1 1 1.50 5.30 0.15 1.19 cum
GIN No- 697-2A
Base For Single Guard wall BSF Tower cum
Oppo. Right Side 1 1 20.00 2.00 0.10 4
Key 1 1 20.00 0.10 0.25 0.5 cum
Base For Single Guard wall BSF Tower cum
Oppo. Left Side 1 1 20.00 2.00 0.10 4
Key 1 1 20.00 0.10 0.25 0.5 cum
GIN No- 697-1A
Base For Single R. wall BSF Tower cum
Oppo. Left Side 1 1 5.50 3.20 0.10 1.76
Key 1 1 5.50 0.10 0.60 0.33 cum
Base For Single R. wall BSF Tower cum
Oppo. Left Side 1 1 9.00 2.00 0.10 1.8
Key 1 1 9.00 0.10 0.25 0.23 cum
Total 25.63 cum

2.6 Add/deduct for using extra cement in the items of design mix over and above the specified cement
content therein. Details of Actual Measurement Contents of
Description of item No. No. Length Breadt Depth Area
h
1 2 3 4 5 6 7
Qty as per item no. [Link] 1.00 25.63 0.30 7.69
Total 7.69 Qntl

Page 26
Measured on : 25.08.2023 Signature of Contractor Signature of JE

Page 27
Centering & shuttering i/c strutting propping etc & removal of form for
2.2.1
Foundations, footings, bases of columns, etc. for mass concrete
Details of Actual Measurement Contents of
Description of item
Area
No. No. Length Breadt Depth
h
1 2 3 4 5 6 7
GIN No- 703
Base For Single R. Wall BSF Tower Left
0.10 1.46 sqm
Side 1 2 7.30
1 2 2.00 0.10 0.40 sqm
Base For Single R. Wall BSF Tower
Right Side
Span-1 1 2 7.60 0.10 1.52 sqm
1 2 2.00 0.10 0.40 sqm
Span-2 1 2 3.50 0.10 0.70 sqm
1 2 2.00 0.10 0.40 sqm
GIN No- 698
Base For Single R. Wall Single Fenching 0.10 1.32 sqm
Right Side 1 2 6.60
1 2 2.00 0.10 0.40 sqm
Base For Single Guard Wall Single 0.10 1.88 sqm
Fenching Right Side 1 2 9.40
1 2 2.00 0.10 0.40 sqm
Base For Single R. Wall Single Fenching 0.10 1.45 sqm
Left Side 1 2 7.25
1 2 2.00 0.10 0.40 sqm
Base For Single Guard Wall Single 0.10 1.72 sqm
Fenching Left Side 1 2 8.60
1 2 2.00 0.10 0.40 sqm
Base For U-Shape R. Wall BSF Side 1 2 1.50 0.15 0.45 sqm
1 2 5.30 0.15 1.59 sqm
GIN No- 697-2A
Base For Single Guard wall BSF Tower 0.10 4.00 sqm
Oppo. Right Side 1 2 20.00
1 2 2.00 0.10 0.40 sqm
Base For Single Guard wall BSF Tower 0.10 4.00 sqm
Oppo. Left Side 1 2 20.00
1 2 2.00 0.10 0.40 sqm
GIN No- 697-1A
Base For Single R. wall BSF Tower 0.10 1.10 sqm
Oppo. Left Side 1 2 5.50
1 2 3.20 0.10 0.64 sqm
Base For Single R. wall BSF Tower 0.10 1.80 sqm
Oppo. Left Side 1 2 9.00
1 2 2.00 0.10 0.40 sqm

Total 27.63 sqm

Measured on : 25.08.2023 Signature of Contractor Signature of JE

Page 28
Agt Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all
No- complete up to all height.
2.4
.
2.4.1 (a) Thermo-Mechanically Treated bars
Description Dia Nos Nos lenth 8mm 10 mm 12 mm 16 mm
GIN no -703
Base For Single R. Wall BSF Tower Left Side
L=7.3m
Key Main Bar(Both Side) 12 2 49 0.70 68.60
Key Binder(Both Side) 10 2 4 7.15 57.20
Base Main Bar(T&B) 12 2 49 2.40 235.20
Base Binder (T&B) 10 2 14 7.15 200.20
Chair 16 1 16 2.00 32.00
Steel of wall Bott. ToTop
Main Bar(Both Side) 12 2 49 3.200 313.60
Binder(Both Side) 10 2 17 7.22 245.48
Spacer 10 1 36 1.000 36.00
Base For Single R. Wall BSF Tower Right Side
Span-1
L=7.6m
Key Main Bar(Both Side) 12 2 51 0.70 71.40
Key Binder(Both Side) 10 2 4 7.45 59.60
Base Main Bar(T&B) 12 2 51 2.40 244.80
Base Binder (T&B) 10 2 14 7.45 208.60
Chair 16 1 18 2.00 36.00
Steel of wall Bott. ToTop
Main Bar(Both Side) 12 2 51 2.900 295.80
Binder(Both Side) 10 2 15 7.52 225.60
Spacer 10 1 40 1.000 40.00
Span-2
L=3.5m
Key Main Bar(Both Side) 12 2 23 0.70 32.20
Key Binder(Both Side) 10 2 4 3.35 26.80
Base Main Bar(T&B) 12 2 23 2.40 110.40
Base Binder (T&B) 10 2 14 3.35 93.80
Chair 16 1 8 2.00 16.00
Steel of wall Bott. ToTop
Main Bar(Both Side) 12 2 23 1.950 89.70
Binder(Both Side) 10 2 8 3.42 54.72
Spacer 10 1 12 1.000 12.00
U-shape [Link] in BSF Side
Extra Height
Left Side
3 Vertical bar other face 10 2 38 0.850 64.60
Lap 10 2 38 0.510 38.76
1 Vertical bar Earth face 12 2 38 0.850 64.60
Lap 12 2 38 0.612 46.51
6&7 10 2 4 6.720 53.76
Distribution
Right Side
3 Vertical bar other face 10 1 31 0.850 26.35
Lap 10 1 31 0.510 15.81
C/O 0.00 1459.28 1572.81 84.00

Page 29
Measured on : 05.09.2023 Signature of Contractor Signature of JE
B/F 0.00 1459.28 1572.81 84.00
1 Vertical bar Earth face 12 1 31 0.850 26.35
Lap 12 1 31 0.612 18.97
6&7 43.36
Distribution 10 2 4 5.420
GIN No- 698
Base For Single R. Wall Single Fenching Right Side
L=6.6m
Key Main Bar(Both Side) 12 2 44 0.70 61.60
Key Binder(Both Side) 10 2 4 6.45 51.60
Base Main Bar(T&B) 12 2 44 2.40 211.20
Base Binder (T&B) 10 2 14 6.45 180.60
Chair 16 1 16 2.00 32.00
Steel of wall Bott. ToTop
Main Bar(Both Side) 12 2 44 3.600 316.80
Binder(Both Side) 10 2 19 6.52 247.76
Spacer 10 1 35 1.000 35.00
Base For Single Guard Wall Single Fenching Right Side
L=9.4m
Key Main Bar(Both Side) 12 2 63 0.70 88.20
Key Binder(Both Side) 10 2 4 9.25 74.00
Base Main Bar(T&B) 12 2 63 2.25 283.50
Base Binder (T&B) 10 2 14 9.25 259.00
Chair 16 1 20 2.00 40.00
Steel of wall Bott. ToTop
Main Bar(Both Side) 12 2 63 3.000 378.00
Binder(Both Side) 10 2 17 9.32 316.88
Spacer 10 1 48 1.000 48.00
Base For Single R. Wall Single Fenching Left Side
L=7.25m
Key Main Bar(Both Side) 12 2 48 0.70 67.20
Key Binder(Both Side) 10 2 4 7.10 56.80
Base Main Bar(T&B) 12 2 48 2.40 230.40
Base Binder (T&B) 10 2 14 7.10 198.80
Chair 16 1 16 2.00 32.00
Steel of wall Bott. ToTop
Main Bar(Both Side) 12 2 48 2.600 249.60
Binder(Both Side) 10 2 17 7.17 243.78
Spacer 10 1 25 1.000 25.00
Base For Single Guard Wall Single Fenching Left Side
L=8.6m
Key Main Bar(Both Side) 12 2 57 0.70 79.80
Key Binder(Both Side) 10 2 4 8.45 67.60
Base Main Bar(T&B) 12 2 57 2.25 256.50
Base Binder (T&B) 10 2 14 8.45 236.60
Chair 16 1 18 2.00 36.00
Steel of wall Bott. ToTop
Main Bar(Both Side) 12 2 57 2.500 285.00
Binder(Both Side) 10 2 13 8.52 221.52
Spacer 10 1 30 1.000 30.00
C/O 0.00 3795.58 4125.93 ###

Page 30
Measured on : 05.09.2023 Signature of Contractor Signature of JE
B/F 0.00 3795.58 4125.93 ###
Base For U-Shape R. Wall BSF Side (L=1.5m)
5 Base Slab - Bottom Steel 12 1 9 6.90 62.10
9 Distribution steel for bottom 10 1 23 1.50 34.50
4 Base Slab - Top Steel 16 1 9 5.75 51.75
4A Base Slab - Top Steel 16 1 9 5.75 51.75
8 Distribution steel for top 12 1 23 1.500 34.50
Chair 16 1 8 2.50 20.00
10 Haunch 10 2 9 2.03 36.47
3 Vert. Bar Other Face 10 2 9 7.95 143.10
7 Distriution Steel Otherface 10 2 30 1.50 90.00
1 Vert. Bar Earth Face 12 2 9 7.40 133.20
2 Vert. Bar Earth Face 16 2 9 3.36 60.55
6 Distriution Steel Earthface 10 2 30 1.50 90.00
GIN No- 697-2A
Base For Single Guard wall BSF Tower Oppo. Right Side
L=20m
Key Main Bar(Both Side) 12 2 133 0.70 186.20
Key Binder(Both Side) 10 2 4 19.85 158.80
Lap 10 2 4 0.51 4.08
Base Main Bar(T&B) 12 2 133 2.25 598.50
Base Binder (T&B) 10 2 14 19.85 555.80
Lap 10 2 14 0.51 14.28
Chair 16 1 44 2.00 88.00
Steel of wall Bott. ToTop
Main Bar(Both Side) 12 2 133 1.700 452.20
Binder(Both Side) 10 2 8 19.92 318.72
Lap 10 2 8 0.51 8.16
Spacer 10 1 30 1.000 30.00
Base For Single Guard wall BSF Tower Oppo. Left Side
L=20m
Key Main Bar(Both Side) 12 2 133 0.70 186.20
Key Binder(Both Side) 10 2 4 19.85 158.80
Lap 10 2 4 0.51 4.08
Base Main Bar(T&B) 12 2 133 2.25 598.50
Base Binder (T&B) 10 2 14 19.85 555.80
Lap 10 2 14 0.51 14.28
Chair 16 1 44 2.00 88.00
Steel of wall Bott. ToTop
Main Bar(Both Side) 12 2 133 1.750 465.50
Binder(Both Side) 10 2 8 19.92 318.72
Lap 10 2 8 0.51 8.16
Spacer 10 1 30 1.000 30.00
GIN No- 697-1A
Base For Single R. wall BSF Tower Oppo. Left Side
L=5.5m
Key Main Bar(Both Side) 16 2 37 1.55 ###
Key Binder(Both Side) 12 2 5 5.35 53.50
Base Main Bar(T&B) 16 2 37 4.00 ###
Base Binder (T&B) 10 2 21 5.35 224.70

Page 31
C/O 0.00 6594.03 6896.33 ###

Measured on : 05.09.2023 Signature of Contractor Signature of JE


B/F 0.00 6594.03 6896.33 ###
Chair 16 1 16 2.00 32.00
Steel of wall Bott. ToTop
Main Bar(Both Side) 16 2 28 6.100 ###
Main Bar(Both Side) 16 2 28 4.380 ###
Binder(Both Side) 10 2 35 5.42 379.40
Spacer 10 1 60 1.000 60.00
Base For Single R. wall BSF Tower Oppo. Left Side
L=9m
Key Main Bar(Both Side) 12 2 60 0.70 84.00
Key Binder(Both Side) 10 2 4 8.85 70.80
Base Main Bar(T&B) 12 2 60 2.40 288.00
Base Binder (T&B) 10 2 14 8.85 247.80
Chair 16 1 20 2.00 40.00
Steel of wall Bott. ToTop
Main Bar(Both Side) 12 2 60 3.450 414.00
Binder(Both Side) 10 2 18 8.92 321.12
Spacer 10 1 45 1.000 45.00
Total length in M 0.00 7718.15 7682.33 1653.63
Weight in kg/m 0.395 0.610 0.888 1.570
Total weight in kg 0.000 4708.070 6821.910 2596.20

Grand Total in Kg = 14126.180


Net Payble [Link] Kg 14126.18

Measured on : 05.09.2023 Signature of Contractor Signature of JE

Page 32
Agt Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all
No- complete up to all height.
2.4
.
2.4.1 (a) Thermo-Mechanically Treated bars
Description Dia Nos Nos lenth 10 mm 12 mm 16 mm 20mm 25 mm
Steel of Colm Roof to top(703)
Column-A (450mmx300mm)
Main Verl. Steel 16 2 5 3.350 33.50
12 2 3 3.350 20.10
Lap 16 2 5 0.816 8.16
Lap 12 2 3 0.612 3.67
Ring 10 2 34 1.28 87.04
Ring 10 2 34 0.40 27.20
Column-B (400mx300m)
Main Verl. Steel 16 3 8 3.35 80.40
Lap 16 3 8 0.816 19.58
Ring 10 3 34 1.26 128.52
Ring 10 3 34 0.40 40.80
Column-C (250mmx250mm)
Main Verl. Steel 16 5 4 3.35 67.00
Lap 16 5 4 0.816 16.32
Ring 10 5 12 0.86 51.60
Steel of Colm Roof to top(698)
Column-A (700mmx300mm)=2 nos
Main Verl. Steel 16 2 9 4.30 77.40
Main Verl. Steel 20 2 3 4.30 25.80
Lap 16 2 9 0.82 14.69
Lap 20 2 3 1.02 6.12
Ring 10 2 43 1.81 155.66
Ring 10 2 43 1.24 106.64
Ring 10 2 43 0.79 67.94
Column-B (450mx300m)=8 nos
Main Verl. Steel 16 8 8 4.30 275.20
Lap 16 8 8 0.82 52.22
Ring 10 8 43 1.28 440.32
Ties 10 8 43 0.40 137.60
Column-C (250mmx250mm)=10 nos
Main Verl. Steel 16 10 4 4.50 180.00
Lap 16 10 4 0.82 32.64
Ring 10 10 45 0.86 387.00
Steel of Colm Roof to top(697-2A)
Column-A (500mmx300mm)
Main Verl. Steel 16 2 7 3.30 46.20
Main Verl. Steel 12 2 3 3.30 19.80
Lap 16 2 7 0.82 11.42
Lap 12 2 3 0.61 3.67
Ring 10 2 33 1.46 96.36
Ring 10 2 33 0.90 59.40
Ties 10 2 33 0.61 40.26
C/O ### 47.24 914.73 31.92 0.00

Page 33
Measured on : 06.09.2023 Signature of Contractor Signature of JE
B/F ### 47.24 914.73 31.92 0.00
Column-B (0.400mx0.300m)
Main Verl. Steel 16 2 8 3.60 57.60
Lap 16 2 8 0.82 13.06
Ring 10 2 33 1.36 89.76
Ties 10 2 33 0.40 26.40
Column-C (250mmx250mm)
Main Verl. Steel 16 4 4 3.50 56.00
Lap 16 4 4 0.82 13.06
Ring 10 4 36 0.86 123.84
Steel of Colm Roof to top(697-1A)
Column-A (650mmx300mm)
Main Verl. Steel 20 2 10 4.30 86.00
Lap 20 2 10 1.02 20.40
Ring 10 2 43 1.58 135.88
Ring 10 2 43 0.90 77.40
Ring 10 2 43 0.61 52.46
Column-B (0.450mx0.300m)
Main Verl. Steel 16 3 8 4.30 103.20
Lap 16 3 8 0.82 19.58
Ring 10 3 43 1.36 175.44
Ties 10 3 43 0.40 51.60
Column-C (250mmx250mm)
Main Verl. Steel 16 5 4 4.50 90.00
Lap 16 5 4 0.82 16.32
Ring 10 5 45 0.86 193.50

Total length in M 2752.62 47.24 1283.55 138.32 0.00


Weight in kg/m 0.610 0.888 1.570 2.457 3.858
Total weight in kg 1679.1 41.95 2015.17 339.85 0
Grand Total in Kg = 4076.070
Net Payble [Link] Kg 4076.07

Measured on : 06.09.2023 Signature of Contractor Signature of JE

Page 34
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete
Agt work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering,
shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of
No- concrete, improve workability without impairing strength and durability to get shutter finished surface as per direction of Engineer-in-charge. (Note
2.5 :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately).

2.5.1 All works upto plinth level


Details of Actual Measurement Contents of
Description of item No. No. Length Breadt Depth Area
h
1 2 3 4 5 6 7
GIN No- 703
Base For Single R. Wall BSF Tower Left cum
Side 1 1 7.30 2.00 0.35 5.11
Key 1 1 7.30 0.30 0.25 0.55 cum
Wall Top of Base to Top 1 1 7.30 0.280 2.50 5.11 cum
Avg.B=(0.35+0.2)/2=0.28
Avg.H=(3+2)/2=2.5
Base For Single R. Wall BSF Tower
Right Side
Span-1 1 1 7.60 2.00 0.35 5.32 cum
Key 1 1 7.60 0.30 0.25 0.57 cum
Wall Top of Base to Top 1 1 7.60 0.280 2.20 4.68 cum
Avg.B=(0.35+0.200)/2=0.28
Avg.H=(3+1.4)/2=2.2m
Span-2 1 1 3.50 2.00 0.35 2.45 cum
Key 1 1 3.50 0.30 0.25 0.26 cum
Wall Top of Base to Top 1 1 3.50 0.280 1.25 1.23 cum
Avg.B=(0.35+0.200)/2=0.28
Avg.H=(1.5+1)/2=1.25
U-Shape Retaining Wall in BSF Side
Extra Height
Left side (0+1.7)/2=0.85m 1 1 6.80 0.25 0.85 1.45 cum
Right side (0+1.7)/2=0.85m 1 1 5.50 0.25 0.85 1.17 cum
GIN No- 698
Base For Single R. Wall Single Fenching cum
Right Side 1 1 6.60 2.00 0.35 4.62
Key 1 1 6.60 0.30 0.25 0.50 cum
Wall Top of Base to Top 1 1 6.60 0.280 2.90 5.36 cum
Avg.B=(0.35+0.200)/2=0.28
Avg.H=(3.2+2.6)/2=2.9
Base For Single Gaurd Wall Single cum
Fenching Right Side 1 1 9.40 2.00 0.25 4.70
Key 1 1 9.40 0.30 0.25 0.71 cum
Wall Top of Base to Top 1 1 9.40 0.23 2.50 5.41 cum
Avg.B=(0.25+0.200)/2=0.23
Avg.H=(2.4+2.6)/2=2.5
Base For Single R. Wall Single Fenching cum
Left Side 1 1 7.25 2.00 0.35 5.08
Key 1 1 7.25 0.30 0.25 0.54 cum
Wall Top of Base to Top 1 1 7.25 0.280 1.90 3.86 cum
Avg.B=(0.35+0.200)/2=0.28
Avg.H=(2+1.8)/2=1.9
Base For Single Gaurd Wall Single cum
Fenching Left Side 1 1 8.60 2.00 0.25 4.30
Key 1 1 8.60 0.30 0.25 0.65 cum
C/O 63.63

Page 35
Measured on : 08.09.2023 Signature of Contractor Signature of JE
B/F 63.63
Wall Top of Base to Top 1 1 8.60 0.23 2.10 4.15 cum
Avg.B=(0.25+0.200)/2=0.23
Avg.H=(2+2.2)/2=2.1

Base For U-Shape R. Wall BSF Side 1 1 1.50 5.00 0.60 4.50 cum
Avg.B=(0.55+0.25)/2=0.4m 2 0.5 1.50 0.30 0.30 0.14 cum
2 1 1.50 0.40 6.00 7.20 cum
GIN No- 697-2A
Base For Single Guard wall BSF Tower
Oppo. Right Side 1 1 20.00 2.00 0.25 10.00 cum
Key 1 1 20.00 0.30 0.25 1.50 cum
Wall Top of Base to Top 1 1 20.00 0.23 1.20 5.52 cum
Avg.B=(0.25+0.200)/2=0.23
Avg.H=1.2m
Base For Single Guard wall BSF Tower
Oppo. Left Side 1 1 20.00 2.00 0.25 10.00 cum
Key 1 1 20.00 0.30 0.25 1.50 cum
Wall Top of Base to Top 1 1 20.00 0.23 1.20 5.52 cum
Avg.B=(0.25+0.200)/2=0.23
Avg.H=1.2m
GIN No- 697-1A
Base For Single R. wall BSF Tower cum
Oppo. Left Side 1 1 5.50 3.20 0.55 9.68
Key 1 1 5.50 0.60 0.55 1.82 cum
Wall Top of Base to Top 1 1 5.50 0.40 5.20 11.44 cum
Avg.B=(0.55+0.250)/2=0.4
H=5.2m
Avg.B=(0.55+0.25)/2=0.4m
Base For Single R. wall BSF Tower
Oppo. Left Side 1 1 9.00 2.00 0.35 6.30 cum
Key 1 1 9.00 0.30 0.25 0.68 cum
Wall Top of Base to Top 1 1 9.00 0.28 2.75 6.93 cum
Avg.B=(0.35+0.200)/2=0.28m
Avg.H=(3+2.5)/2=2.75m
Total 150.51 cum

Measured on : 08.09.2023 Signature of Contractor Signature of JE

Page 36
2.6 Add/deduct for using extra cement in the items of design mix over and above the specified cement
content therein. Details of Actual Measurement Contents of
Description of item No. No. Length Breadt Depth Area
h
1 2 3 4 5 6 7
Qty as per item no. 2.5.1 1.00 150.51 0.77 115.89
Total 115.89 Qntl

Measured on : 08.09.2023 Signature of Contractor Signature of JE


Agt Centering & shuttering i/c strutting propping etc & removal of form for
No-
2.2.2
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Details of Actual Measurement Contents of
Description of item
Area
No. No. Length Breadt Depth
h
1 2 3 4 5 6 7
GIN No-
Base For Single R. Wall703
BSF Tower Left
Side
Wall Top of Base to Top 1 2 7.30 - 2.50 36.50 sqm
Avg.B=(0.35+0.2)/2=0.28 1 2 - 0.28 2.50 1.40 sqm
Base ForAvg.H=(3+2)/2=2.5
Single R. Wall BSF Tower
Right Side
Span-1
Wall Top of Base to Top 1 2 7.60 - 2.20 33.44 sqm
Avg.B=(0.35+0.200)/2=0.28 1 2 - 0.28 2.20 1.23 sqm
Avg.H=(3+1.4)/2=2.2m
Span-2
Wall Top of Base to Top 1 2 3.50 - 1.25 8.75 sqm
Avg.B=(0.35+0.200)/2=0.28 1 2 - 0.28 1.25 0.70 sqm
Avg.H=(1.5+1)/2=1.25
GIN
Base For Single [Link]-
Wall698
Single Fenching
Right Side
Wall Top of Base to Top 1 2 6.60 - 2.90 38.28 sqm
Avg.B=(0.35+0.200)/2=0.28 1 2 - 0.28 2.90 1.62 sqm
Avg.H=(3.2+2.6)/2=2.9
Base For Single Gaurd Wall Single
Fenching Right Side
Wall Top of Base to Top 1 2 9.40 - 2.50 47.00 sqm
Avg.B=(0.25+0.200)/2=0.23 1 2 - 0.23 2.50 1.15 sqm
Base ForAvg.H=(2.4+2.6)/2=2.5
Single R. Wall Single Fenching
Left Side
Wall Top of Base to Top 1 2 7.25 - 1.90 27.55 sqm
Avg.B=(0.35+0.200)/2=0.28 1 2 - 0.28 1.90 1.06 sqm
Avg.H=(2+1.8)/2=1.9
Base For Single Gaurd Wall Single
Fenching Left Side
Wall Top of Base to Top 1 2 8.60 - 2.10 36.12 sqm
C/O 234.80

Measured on : 07.09.2023 Signature of Contractor Signature of JE

Page 37
B/F 234.80
Avg.B=(0.25+0.200)/2=0.23 1 2 - 0.23 2.10 0.97 sqm
Avg.H=(2+2.2)/2=2.1
Base For U-Shape R. Wall BSF Side
Avg.B=(0.55+0.25)/2=0.4m
2 2 1.50 - 6.00 36.00 sqm
2 2 - 0.40 6.00 9.60 sqm
1 2 1.50 - 0.42 1.26 sqm
GIN No- 697-2A
Base For Single Guard wall BSF Tower
Oppo. Right Side
Wall Top of Base to Top 1 2 20.00 - 1.20 48.00 sqm
Avg.B=(0.25+0.200)/2=0.23 1 2 - 0.23 1.20 0.55 sqm
Avg.H=1.2m
Base For Single Guard wall BSF Tower
Oppo. Left Side

Wall Top of Base to Top 1 2 20.00 - 1.20 48.00 sqm


Avg.B=(0.25+0.200)/2=0.23 1 2 - 0.23 1.20 0.55 sqm
Avg.H=1.2m
GIN No- 697-1A
Base For Single R. wall BSF Tower
Oppo. Left Side
Wall Top of Base to Top
Avg.B=(0.55+0.250)/2=0.400 1 2 5.50 - 5.20 57.20 sqm
Avg.H=5.2m 1 2 - 0.40 5.20 4.16 sqm
Base For Single R. wall BSF Tower
Oppo. Left Side
Wall Top of Base to Top
Avg.B=(0.35+0.200)/2=0.28 1 2 9.00 - 2.75 49.50 sqm
Avg.H=(3+2.5)/2=2.75m 1 2 - 0.28 2.75 1.54 sqm
Total 492.13 sqm

Page 38
Agt Centering & shuttering i/c strutting propping etc & removal of form for
No-
2.2.1
Foundations, footings, bases of columns, etc. for mass concrete
Details of Actual Measurement Contents of
Description of item
Area
No. No. Length Breadt Depth
h
1 2 3 4 5 6 7
GIN No- 703
Base For Single R. Wall BSF Tower Left
Side 1 2 7.30 - 0.35 5.11 sqm
1 2 - 2.00 0.35 1.40 sqm
Base For SingleKey
R. Wall BSF Tower 1 1 7.30 0.25 1.83 sqm
Right Side
Span-1 1 2 7.60 - 0.35 5.32 sqm
1 2 - 2.00 0.35 1.40 sqm
Key 1 1 7.60 0.25 1.90 sqm
Span-2 1 2 3.50 - 0.35 2.45 sqm
1 2 - 2.00 0.35 1.40 sqm
Wall Top of Base to Top 1 2 3.50 - 1.25 8.75 sqm
Avg.B=(0.35+0.200)/2=0.28 1 2 - 0.28 1.25 0.70 sqm
Avg.H=(1.5+1)/2=1.25
Key 1 1 3.50 0.25 0.88 sqm
U-Shape [Link] in BSF Side
Left Side Wall 1 2 6.80 - 0.75 10.20 sqm
1 2 - 0.25 0.75 0.38 sqm
Right Side Wall 1 2 5.50 - 0.75 8.25 sqm
1 2 - 0.25 0.75 0.38 sqm
GIN
Base For Single [Link]-
Wall698
Single Fenching
Right Side 1 2 6.60 - 0.35 4.62 sqm
1 2 - 2.00 0.35 1.40 sqm
Base For SingleKey
Gaurd Wall Single 1 1 6.60 0.25 1.65 sqm
Fenching Right Side 1 2 9.40 - 0.25 4.70 sqm
1 2 - 2.00 0.25 1.00 sqm
Base For Single [Link]
Wall Single Fenching 1 1 9.40 0.25 2.35 sqm
Left Side 1 2 7.25 - 0.35 5.08 sqm
1 2 - 2.00 0.35 1.40 sqm
Base For SingleKey
Gaurd Wall Single 1 1 7.25 0.25 1.81 sqm
Fenching Left Side 1 2 8.60 - 0.25 4.30 sqm
1 2 - 2.00 0.25 1.00 sqm
C/O 79.66

Measured on : 07.09.2023 Signature of Contractor Signature of JE

Page 39
B/F 79.66
Key 1 1 8.60 0.25 2.15 sqm
Base For U-Shape R. Wall BSF Side 1 2 1.50 - 0.60 1.80 sqm
Avg.B=(0.55+0.25)/2=0.4m 1 2 - 5.00 0.60 6.00 sqm
1 2 1.50 - 0.42 1.26 sqm
GIN No- 697-2A
Base For Single Guard wall BSF Tower 10.00 sqm
Oppo. Right Side 1 2 20.00 - 0.25
1 2 - 2.00 0.25 1.00 sqm
Key 1 1 20.00 0.25 5.00 sqm
Base For Single Guard wall BSF Tower 10.00 sqm
Oppo. Left Side 1 2 20.00 - 0.25
1 2 - 2.00 0.25 1.00 sqm
Key 1 1 20.00 0.25 5.00 sqm
GIN No- 697-1A
Base For Single R. wall BSF Tower 6.05 sqm
Oppo. Left Side 1 2 5.50 - 0.55
Wall Top of Base to Top 1 2 - 3.20 0.55 3.52 sqm
Key 1 1 5.50 0.60 3.30 sqm
Base For Single R. wall BSF Tower 6.30 sqm
Oppo. Left Side 1 2 9.00 - 0.35
Wall Top of Base to Top 1 2 - 2.00 0.35 1.40 sqm
Key 1 1 9.00 0.25 2.25 sqm
Total 145.69 sqm

Measured on : 07.09.2023 Signature of Contractor Signature of JE

Page 40
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete
Agt work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering,
shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of
No- concrete, improve workability without impairing strength and durability to get shutter finished surface as per direction of Engineer-in-charge. (Note
2.5 :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately).

2.5.2 All works Above plinth


level Details of Actual Measurement Contents of
Description of item No. No. Length Breadt Depth Area
h
1 2 3 4 5 6 7
Colm Roof to top(703)
Column-A (450mmx300mm)=2 nos 1 2 0.45 0.30 3.35 0.90 cum
Column-B(400mmx300mm)= 3 nos 1 3 0.40 0.30 3.35 1.21 cum
Column-C(250mmx250mm)= 5 nos 1 5 0.25 0.25 3.35 1.05 cum
Colm Roof to top(698)
Column-A (700mmx300mm)=2 nos 1 2 0.70 0.30 4.30 1.81 cum
Column-B(400mmx300mm)= 8 nos 1 8 0.45 0.30 4.30 4.64 cum
Column-C(250mmx250mm)= 10 nos 1 10 0.25 0.25 4.50 2.81 cum
Colm Roof to top(697-2A)
Column-A (500mmx300mm)=2 nos 1 2 0.50 0.30 3.30 0.99 cum
Column-B(400mmx300mm)= 2 nos 1 2 0.40 0.30 3.30 0.79 cum
Column-C(250mmx250mm)= 4 nos 1 4 0.25 0.25 3.50 0.88 cum
Colm Roof to top(697-2A)
Column-A (650mmx300mm)=2 nos 1 2 0.65 0.30 4.30 1.68 cum
Column-B(450mmx300mm)= 3 nos 1 3 0.45 0.30 4.30 1.74 cum
Column-C(250mmx250mm)= 5nos 1 5 0.25 0.25 4.50 1.41 cum
Total 19.91 cum

Measured on : 18.09.2023 Signature of Contractor Signature of JE

Page 41
2.6 Add/deduct for using extra cement in the items of design mix over and above the specified cement
content therein. Details of Actual Measurement Contents of
Description of item No. No. Length Breadt Depth Area
h
1 2 3 4 5 6 7
Qty as per item no. 2.5.1 1.00 19.91 0.77 15.33
Total 15.33 Qntl

Measured on : 18.09.2023 Signature of Contractor Signature of JE

Page 42
Centering & shuttering i/c strutting propping etc & removal of form for
2.2.4
Columns,pillars,piers,Abutments,post & struts
Details of Actual Measurement Contents of
Description of item
Area
No. No. Length Breadt Depth
h
1 2 3 4 5 6 7
Colm Roof to top(703)
Column-A (450mmx300mm)=2 nos 2 2 0.45 3.35 6.03 sqm
2 2 0.30 3.35 4.02 sqm
Column-B(400mmx300mm)= 3 nos 3 2 0.40 3.35 8.04 sqm
3 2 0.30 3.35 6.03 sqm
Column-C(250mmx250mm)= 5 nos 5 4 0.25 3.35 16.75 sqm
Colm Roof to top(698)
Column-A (700mmx300mm)=2 nos 2 2 0.70 4.30 12.04 sqm
2 2 0.30 4.30 5.16 sqm
Column-B(450mmx300mm)= 8 nos 8 2 0.45 4.30 30.96 sqm
8 2 0.30 4.30 20.64 sqm
Column-C(250mmx250mm)= 10 nos 10 4 0.25 4.50 45.00 sqm
Colm Roof to top(697-2A)
Column-A (500mmx300mm)=2 nos 2 2 0.50 3.30 6.60 sqm
2 2 0.30 3.30 3.96 sqm
Column-B(400mmx300mm)= 2 nos 2 2 0.40 3.30 5.28 sqm
2 2 0.30 3.30 3.96 sqm
Column-C(250mmx250mm)= 4 nos 4 4 0.25 3.50 14.00 sqm
Colm Roof to top(697-1A)
Column-A (650mmx300mm)=2 nos 2 2 0.65 4.30 11.18 sqm
2 2 0.30 4.30 5.16 sqm
Column-B(450mmx300mm)= 3 nos 3 2 0.45 4.30 11.61 sqm
3 2 0.30 4.30 7.74 sqm
Column-C(250mmx250mm)= 5nos 5 4 0.25 4.50 22.50 sqm
Total 246.66 sqm

Measured on : 16.09.2023 Signature of Contractor Signature of JE

Page 43
4.1 structural steel work in single section, fixed with or without connecting plate including cutting hoisting,
fixing in position all complete.
Details of Actual Measurement Contents of
Description of item
Area
No. No. Length Breadt Unit weight in
h Kg/m or
Kg/Sqm
1 2 3 4 5 6 7
Colm Roof to top(703)
ISMB 200 1 1 14.10 25.40 358.14 KG
Colm Roof to top(698)
ISMB 200 1 1 29.04 25.40 737.62 KG
Colm Roof to top(697-2A)
ISMB 200 1 1 10.80 25.40 274.32 KG
Total 1370.08 KG

Measured on : 29.09.2023 Signature of Contractor Signature of JE

Page 44
Item Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in
No- depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
1.3

Details of Actual Measurement Contents of


Description of item No. No. Length Breadt Depth Area
h
1 2 3 4 5 6 7
GIN No- 703
U-Shape [Link] BSF Side 1 1 6.15 4.5 4.2 116.24 Cum
L=(6.8+5.5)/2=6.15m
Left Side Single [Link] 1 1 7.30 1.05 2.50 19.16 Cum
Right Side Single [Link]
Step-1 1 1 7.60 1.05 2.00 15.96 Cum
Step-2 1 1 3.50 1.05 1.00 3.68 Cum
Center Portion 1 1 9.20 2.80 0.62 15.97 Cum
Earthcutting H=(1.8+1.5+0.8)/3=1.36m
Wall Height H=(2.5+2.2+1.25)/2=1.98m
Avg. H=(1.98-1.36)=0.62m
B=(4.9-1.05-1.05)=2.8m
L=(11.1+7.3)/2=9.2
U-Shape [Link] OPPO. BSF Side 1 1 4.40 4.70 3.30 68.24 Cum
GIN No- 698
U-Shape [Link] Single Fenching Side 1 1 4.65 4.50 4.41 92.28 Cum
Right Side Single [Link] 1 1 6.60 1.05 2.7 18.71 Cum
Right Side Single [Link] 1 1 9.40 1.25 2.30 27.03 Cum
Left Side Single [Link] 1 1 7.25 1.05 1.80 13.7 Cum
Left Side Single [Link] 1 1 8.60 1.25 2.00 21.5 Cum
Center Portion 1 1 16.35 2.20 0.74 26.62 Cum
Earthcutting
H=(2.22+1.7+1.35+1.1)/4=1.59m

Wall Height H=(2.9+2.5+1.9+2)/4=2.33m


Avg. H=(2.325-1.59)=0.74m
B=(4.5-1.15-1.15)=2.2m
L=16.35m
U-Shape [Link] Single Fenching Side 1 1 1.50 4.50 6.00 40.5 Cum
Total 479.59 Cum

Measured on : 29.09.2023 Signature of Contractor Signature of JE

Page 45
Item. Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel
No- primer using structural steel etc. as required.a) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
4.3.1
Unit weight in
Description of Item No No L H/B Kg/m or Quantity Unit
Kg/Sqm
1 2 3 4 5 6 7 8
GIN NO. 703
Joint For Beam
8mm thick Plate 2 2 0.30 0.15 62.80 11.3 kg
Angle 50x50x6mm(support at Colm) 5 2 0.25 4.48 11.20 kg
For Pully
32mm thick Plate 4 1 0.43 0.10 251.20 42.7 kg
8mm thick Plate 4 2 0.15 0.08 62.80 6.03 kg
Gap-1
ISMC 75x40mm 1 2 7.30 7.34 107.16 kg
ISMC 75x40mm 1 2 5.50 7.34 80.74 kg
Flat 75x8mm 1 6 0.30 4.710 8.48 kg
Flat 75x8mm 1 6 0.40 4.710 11.30 kg
Flat 75x8mm 1 6 0.45 4.710 12.72 kg
Gap-2
ISMC 75x40mm 1 2 7.30 7.34 107.16 kg
ISMC 75x40mm 1 2 5.50 7.34 80.74 kg
Flat 75x8mm 1 6 0.30 4.710 8.48 kg
Flat 75x8mm 1 6 0.40 4.710 11.30 kg
Flat 75x8mm 1 6 0.45 4.710 12.72 kg
Gap-3
ISMC 75x40mm 1 2 7.30 7.34 107.16 kg
ISMC 75x40mm 1 2 5.50 7.34 80.74 kg
Flat 75x8mm 1 6 0.30 4.710 8.48 kg
Flat 75x8mm 1 6 0.40 4.710 11.30 kg
Flat 75x8mm 1 6 0.45 4.710 12.72 kg
Gap-4
ISMC 75x40mm 1 2 7.30 7.34 107.16 kg
ISMC 75x40mm 1 2 5.50 7.34 80.74 kg
Flat 75x8mm 1 6 0.30 4.710 8.48 kg
Flat 75x8mm 1 6 0.40 4.710 11.30 kg
Flat 75x8mm 1 6 0.45 4.710 12.72 kg

Bottom Gate
Angle 50x50x6mm(Horl) 4 1 2.86 4.48 51.25 kg
Angle 50x50x6mm(Horl) 4 1 3.19 4.48 57.16 kg
Angle 50x50x6mm(Verl) 4 2 2.7 4.48 96.77 kg
Sqr Bar 16x16mm(Horl) 4 1 2.35 1.992 18.72 kg
Sqr Bar 16x16mm(Horl) 4 14 2.85 1.992 317.92 kg
Sqr Bar 16x16mm(Horl) 4 2 0.42 1.992 6.69 kg
Sqr Bar 16x16mm(Verl) 4 2 2.85 1.992 45.42 kg
Sqr Bar 16x16mm(Verl) 4 11 3 1.992 262.94 kg
Sqr Bar 16x16mm(Verl) 4 2 2.7 1.992 43.03 kg
Angle 50x50x6mm(For Chain) 4 2 0.75 4.48 26.88 kg
ISMC 75x40mm(For Chain) 4 1 0.20 7.34 5.87 kg
Top Gate
Angle 50x50x6mm(Horl) 4 2 2.88 4.48 103.22 kg
C/O 1988.70

Page 46
Measured on : 29.09.2023 Signature of Contractor Signature of JE
B/F 1988.70
Angle 50x50x6mm(Verl) 4 2 3.00 4.48 107.52 kg
Sqr Bar 16x16mm(Horl) 4 15 2.87 1.992 343.02 kg
Sqr Bar 16x16mm(Verl) 4 15 3 1.992 358.56 kg
Angle 50x50x6mm(For Chain) 4 2 0.75 4.48 26.88 kg
ISMC 75x40mm(For Chain) 4 1 0.20 7.34 5.87 kg
Extra Flat 50x6 8 15 0.08 2.00 19.20 kg
Extra Flat 75x8 2 1 2.48 4.710 23.36 kg
Railing
Flat 50x6mm 1 1 13.55 2.40 32.52 kg
Sqr Bar 16x16mm(Verl) 1 81 0.85 1.992 137.15 kg
Sqr Bar 16x16mm 1 5 0.2 1.992 1.99 kg
For Culvert Angle
250mm*250mm*8mm Base Plate 1 10 0.25 0.25 62.8 39.25 kg
GIN NO. 698
Joint For Beam
8mm thick Plate 4 2 0.30 0.15 62.80 22.61 kg
Angle 50x50x6mm(support at Colm) 10 1 0.25 4.48 11.20 kg
For Pully
32mm thick Plate 8 1 0.43 0.10 251.20 85.41 kg
8mm thick Plate 8 2 0.15 0.08 62.80 12.06 kg
Gap-1
ISMC 75x40mm 1 2 9.45 7.34 138.73 kg
ISMC 75x40mm 1 2 6.85 7.34 100.56 kg
Flat 75x8mm 1 8 0.30 4.710 11.30 kg
Flat 75x8mm 1 8 0.40 4.710 15.07 kg
Flat 75x8mm 1 6 0.45 4.710 12.72 kg
Gap-2,3,4,5,6,7
ISMC 75x40mm 7 2 9.45 7.34 971.08 kg
ISMC 75x40mm 7 2 6.85 7.34 703.91 kg
Flat 75x8mm 7 8 0.30 4.710 79.13 kg
Flat 75x8mm 7 8 0.40 4.710 105.50 kg
Flat 75x8mm 7 6 0.45 4.710 89.02 kg
Bottom Gate
Angle 50x50x6mm(Horl) 8 1 2.94 4.48 105.19 kg
Angle 50x50x6mm(Horl) 8 1 3.19 4.48 114.33 kg
Angle 50x50x6mm(Verl) 8 2 2.7 4.48 193.54 kg
Sqr Bar 16x16mm(Horl) 8 1 2.35 1.992 37.45 kg
Sqr Bar 16x16mm(Horl) 8 15 2.925 1.992 699.19 kg
Sqr Bar 16x16mm(Horl) 8 2 0.42 2.992 20.11 kg
Sqr Bar 16x16mm(Verl) 8 2 2.7 1.992 86.05 kg
Sqr Bar 16x16mm(Verl) 8 2 2.85 1.992 90.84 kg
Sqr Bar 16x16mm(Verl) 8 11 3 1.992 525.89 kg
Angle 50x50x6mm(For Chain) 8 2 0.74 4.48 53.04 kg
ISMC 75x40mm(For Chain) 8 1 0.20 7.34 11.74 kg
Top Gate
Angle 50x50x6mm(Horl) 8 2 2.935 4.48 210.38 kg
Angle 50x50x6mm(Verl) 8 2 3.00 4.48 215.04 kg
Sqr Bar 16x16mm(Horl) 8 16 2.925 1.992 745.80 kg
Sqr Bar 16x16mm(Verl) 8 15 3 1.992 717.12 kg
Angle 50x50x6mm(For Chain) 8 2 0.74 4.48 53.04 kg
C/O 9321.07

Page 47
Measured on : 29.09.2023 Signature of Contractor Signature of JE
B/F 9321.07
ISMC 75x40mm(For Chain) 8 1 0.20 7.34 11.74 kg
Extra Flat 50x6 16 20 0.08 2.00 51.20 kg
Fixed Grill
ISMC 75x40mm 8 2 1.00 7.34 117.44 kg
Angle 50x50x6mm(Horl) 8 1 2.90 4.48 103.94 kg
Angle 50x50x6mm(Horl) 8 1 3.03 4.48 108.60 kg
Angle 50x50x6mm(Verl) 8 2 0.82 4.48 58.78 kg
Sqr Bar 16x16mm(Horl) 8 1 2.43 1.992 38.72 kg
Sqr Bar 16x16mm(Horl) 8 1 2.8 1.992 44.62 kg
Sqr Bar 16x16mm(Horl) 8 4 2.9 1.992 184.86 kg
Sqr Bar 16x16mm(Verl) 8 2 0.82 1.992 26.14 kg
Sqr Bar 16x16mm(Verl) 8 13 0.99 1.992 205.10 kg
Railing
Flat 50x6mm 1 1 29.00 2.40 69.60 kg
Sqr Bar 16x16mm(Verl) 1 162 0.85 1.992 274.30 kg
Sqr Bar 16x16mm 1 10 0.2 1.992 3.98 kg
For Culvert Angle
250mm*250mm*8mm Base Plate 1 18 0.25 0.25 62.8 70.65 kg
GIN NO. 697-2A
Joint For Beam
8mm thick Plate 1 2 0.30 0.15 62.80 5.65 kg
Angle 50x50x6mm(support at Colm) 4 1 0.25 4.48 4.48 kg
For Pully
32mm thick Plate 3 1 0.43 0.10 251.20 32.03 kg
Angle 50x50x6mm(stopper) 3 2 0.08 4.48 2.15 kg
8mm thick Plate 3 2 0.15 0.08 62.80 4.52 kg
Gap-1,2&3
ISMC 75x40mm 3 2 7.86 7.34 346.15 kg
ISMC 75x40mm 3 2 5.88 7.34 258.96 kg
Flat 75x8mm 3 6 0.30 4.710 25.43 kg
Flat 75x8mm 3 6 0.40 4.710 33.91 kg
Flat 75x8mm 3 6 0.45 4.710 38.15 kg
Bottom Gate
Angle 50x50x6mm(Horl) 3 1 2.94 4.48 39.51 kg
Angle 50x50x6mm(Horl) 3 1 3.19 4.48 42.87 kg
Angle 50x50x6mm(Verl) 3 2 3 4.48 80.64 kg
Sqr Bar 16x16mm(Horl) 3 1 2.4 1.992 14.34 kg
Sqr Bar 16x16mm(Horl) 3 15 2.93 1.992 262.65 kg
Sqr Bar 16x16mm(Horl) 3 2 0.42 1.992 5.02 kg
Sqr Bar 16x16mm(Verl) 3 2 2.85 1.992 34.06 kg
Sqr Bar 16x16mm(Verl) 3 13 3 1.992 233.06 kg
Angle 50x50x6mm(For Chain) 3 2 0.74 4.48 19.89 kg
ISMC 75x40mm(For Chain) 3 1 0.20 7.34 4.40 kg
Top Gate
Angle 50x50x6mm(Horl) 3 2 2.94 4.48 79.03 kg
Angle 50x50x6mm(Verl) 3 2 3.00 4.48 80.64 kg
Sqr Bar 16x16mm(Horl) 3 16 2.93 1.992 280.15 kg
Sqr Bar 16x16mm(Verl) 3 15 3 1.992 268.92 kg
Angle 50x50x6mm(For Chain) 3 2 0.74 4.48 19.89 kg
ISMC 75x40mm(For Chain) 3 1 0.20 7.34 4.40 kg
Extra Flat 50x6 6 14 0.08 2.00 13.44 kg
Railing
Flat 50x6mm 1 1 10.20 2.00 20.40 kg
Sqr Bar 16x16mm(Verl) 1 60 0.85 1.992 101.59 kg
Sqr Bar 16x16mm 1 4 0.2 1.992 1.59 kg
250mm*250mm*8mm Base Plate 1 8 0.25 0.25 62.8 31.40 kg
Grand Total = 13080.06 kg

Page 48
Measured on : 29.09.2023 Signature of Contractor Signature of JE
Item. Steel work in built up tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and
No- applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded
4.2.1 type tubes
Unit weight in
Description of Item No No L H/B Kg/m or Quantity Unit
Kg/Sqm
1 2 3 4 5 6 7 8
For Truss
GIN NO. 703
Tube 50x25mm 1 9 2.20 2.70 53.46 kg
Tube 50x25mm 1 3 14.50 2.70 117.45 kg
Tube 96x48mm 1 2 14.50 6.70 194.30 kg
Tube 96x48mm 1 2 0.10 6.70 1.34 kg
GIN NO. 698
Angle 50x50x6mm(Verl) 9 1 0.25 4.48 10.08 kg
Tube 50x25mm 1 17 2.20 2.70 100.98 kg
Tube 50x25mm 1 3 29.64 2.70 240.08 kg
Tube 96x48mm 1 2 29.64 6.70 397.18 kg
Tube 96x48mm 1 2 0.10 6.70 1.34 kg
GIN NO. 697-1A
Angle 50x50x6mm(Verl) 3 1 0.25 4.48 3.36 kg
Tube 50x25mm 1 7 2.20 2.70 41.58 kg
Tube 50x25mm 1 3 10.90 2.70 88.29 kg
Tube 96x48mm 1 2 10.90 6.70 146.06 kg
Tube 96x48mm 1 2 0.10 6.70 1.34 kg
Grand Total = 1396.84 kg

Measured on : 29.09.2023 Signature of Contractor Signature of JE

Page 49
Item. Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including
No- applying priming coat of approved steel primer. G.I. Pipes
4.4.1

Unit
Description of Item No No L weight in Quantity Unit
Kg/m
1 2 3 4 5 6 7
Railing For Culvert
GIN NO. 703 1 1 13.55 1.955 26.49 kg
GIN NO. 698 1 1 29.00 1.955 56.7 kg
GIN NO. 697-2A 1 1 10.30 1.955 20.14 kg
Grand Total 103.33 kg

Measured on : 29.09.2023 Signature of Contractor Signature of JE

Page 50
Providing and fixing in position chain pully block having ISI mark (IS - 3832) of 2 tonne capacity and
Item. 3.00 metre Standard lift including necessary chain, hook etc all complete as per direction of Engineer-
No-4.7
in charge

Description of Item No No L H/B Quantity Unit


1 2 3 4 5 6 7
Pully For Gate
GIN NO. 703 4 2 8 nos
GIN NO. 698 8 2 16 nos
GIN NO. 697-2A 3 2 6 nos
Grand Total 30 nos

Measured on : 29.09.2023 Signature of Contractor Signature of JE

Page 51
Item. Extra for additional chain system etc for extra lift of chain & pully block beyond 3.00m standard lift
No-
4.8
Standard
Description of Item No No Total Lift Lift
Quantity Unit
1 2 3 4 5 6 7 8
Chain For Pully
GIN NO. 703 4 2 6.40 51.20 m
GIN NO. 698 8 2 9.00 144.00 m
GIN NO. 697-2A 3 2 6.40 38.40 m
Chain For Gate
GIN -703
Chain For Bott. Gate 4 1 7.50 30.00 m
Chain ForTop. Gate 4 1 4.30 17.20 m
GIN -698
Chain ForTop. Gate 8 1 6.60 52.80 m
GIN - 697-2A
Chain For Bott. Gate 3 1 6.90 20.70 m
Chain ForTop. Gate 2 1 5.10 10.20 m
Grand Total 364.50 m

Measured on : 29.09.2023 Signature of Contractor Signature of JE


Item. Drilling and providing carbon steel galvanished dash fastner (Hilty or Fisher) of size drill bit dia 16 mm, length
No- 140 mm etc. all complete as per direction of Engineer-in-charge.
5.7
Description of Item No No L H/B Quantity Unit
1 2 3 4 5 6 7
GIN NO. 703
For Fixing of Gate 4 40 160 nos
For Railing 1 15 15 nos
Fenching on Culvert Angle 4 10 40 nos
GIN NO. 698
For Fixing of Gate 8 60 480 nos
For Railing 1 30 30 nos
Fenching on Culvert Angle 4 18 72 nos
GIN NO. 697-2A
For Fixing of Gate 3 39 117 nos
For Railing 1 11 11 nos
Fenching on Culvert Angle 4 8 32 nos
Grand Total 957 nos

Measured on : 29.09.2023 Signature of Contractor Signature of JE

Page 52
Providing and laying in position machine batched and machine mixed design mix cement concrete for plain cement concrete work, using cement
Item. content as per approved design mix, including pumping of concrete to site of laying, finishing but excluding the cost of centering, shuttering,
including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing
strength and durability as per direction of Engineer-in-charge. (Note :- Excess/ less cement used as per design mix is payable/recoverable
No-
separately).
2.1.1.
2
All work up to PL M-10 grade plain cement concrete (cement content considered @ 220 kg/cum)
Details of Actual Measurement Contents of
Description of item No. No. Length Breadt Depth Area
h
1 2 3 4 5 6 7
GIN No- 703
Hilly Side 1 1 6.10 4.72 0.10 2.88 cum
Avg.B=(4.65+4.7+4.8)/3=4.716

BSF Side 1 1 16.70 4.70 0.10 7.85 cum


Avg.B=(4.8+4.9)/2=4.7
GIN No- 698
Single Fenching Side 1 1 21.00 4.50 0.10 9.45 cum
BSF Side 1 1 6.50 4.50 0.10 2.93 cum
Total 23.11 cum

Measured on : 30.09.2023 Signature of Contractor Signature of JE

Page 53
Add/deduct for using extra cement in the items of design mix over and above the specified cement
2.6 content therein.

Details of Actual Measurement Contents of


Description of item No. No. Length Breadt Depth Area
h
1 2 3 4 5 6 7
Qty as per item no. [Link] 1.00 23.11 0.40 9.24
Total 9.24 Qntl

Measured on : 30.09.2023 Signature of Contractor Signature of JE

Page 54
Providing and laying in position machine batched and machine mixed design mix cement concrete for plain cement concrete work, using cement
Item. content as per approved design mix, including pumping of concrete to site of laying, finishing but excluding the cost of centering, shuttering,
including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing
No- strength and durability as per direction of Engineer-in-charge. (Note :- Excess/ less cement used as per design mix is payable/recoverable
separately).
2.1.1.
1
All work up to PL M-15 grade plain cement concrete (cement content considered @ 240 kg/cum)
Details of Actual Measurement Contents of
Description of item No. No. Length Breadt Depth Area
h
1 2 3 4 5 6 7
GIN No- 703
Hilly Side 1 1 6.10 4.72 0.15 4.32 cum
Avg.B=(4.65+4.7+4.8)/3=4.72

BSF Side 1 1 16.70 4.85 0.15 12.15 cum


Avg.B=(4.8+4.9)/2=4.85
GIN No- 698
Single Fenching Side 1 1 21.00 4.50 0.15 14.18 cum
BSF Side 1 1 6.50 4.50 0.15 4.39 cum
Total 35.04 cum

Measured on : 02.10.2023 Signature of Contractor Signature of JE

Page 55
2.6 Add/deduct for using extra cement in the items of design mix over and above the specified cement
content therein. Details of Actual Measurement Contents of
Description of item No. No. Length Breadt Depth Area
h
1 2 3 4 5 6 7
Qty as per item no. [Link] 1.00 35.04 0.66 23.13
Total 23.13 Qntl

Measured on : 02.10.2023 Signature of Contractor Signature of JE

Page 56
Item. Providing and fixing drainage spoutswith 100 mm dia GI pipes as per drawing and 200 mm dia grating by
No-3.3 Ms flat 25mm X 3mm thick welded with 10mm dia MS bars. etc. complete.
Description of Item No No L H/B Quantity Unit
1 2 3 4 5 6 7
Pully For Gate
GIN NO. 703 1 6 6 nos
GIN NO. 698 1 8 8 nos
Grand Total 14 nos

Measured on : 02.10.2023 Signature of Contractor Signature of JE

Page 57
Agt Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all
No-
2.4 complete up to all height.
2.4.1 .
(a) Thermo-Mechanically Treated bars
Description Dia Nos Nos lenth 10 mm 12 mm 16 mm 20mm 25 mm
Gin no. 703
BSF Side(APPROCH)
491.40
Main Steel 10 1 84 5.850
L=(4.8+4.90/2)=4.85m
Inside Wall=(0.5+0.5)=1m
Lap 10 2 84 0.510 85.68
Distribution Steel 10 1 24 16.620 398.88
Lap 10 1 24 0.510 12.24
Hill Side (Approch)
Main Steel 177.20
L=(4.65+4.70+4.8/3)=4.716m 10 1 31 5.716
Inside Wall=(0.5+0.5)=1m
Lap 10 2 31 0.510 31.62
Distribution Steel 10 1 24 6.020 144.48
Gin no. 698
BSF Side(APPROCH)
614.25
Main Steel 10 1 105 5.850
L=(4.8+4.90/2)=4.85m
Inside Wall=(0.5+0.5)=1m
Lap 10 2 105 0.510 107.10
Distribution Steel 10 1 24 20.920 502.08
Lap 10 1 24 0.510 12.24
Hill Side (Approch)
Main Steel 188.63
L=(4.65+4.70+4.8/3)=4.716m 10 1 33 5.716
Inside Wall=(0.5+0.5)=1m
Lap 10 2 33 0.510 33.66
Distribution Steel 10 1 24 6.420 154.08

Lap 10 1 24 0.510 12.24


Total length in M 2965.78 0.00 0.00 0.00 0.00
Weight in kg/m 0.610 0.888 1.570 2.457 3.858
Total weight in kg 1809.13 0 0 0 0
Grand Total in Kg = 1809.130
Net Payble [Link] Kg 1809.13

Measured on : 01.10.2023 Signature of Contractor Signature of JE

Page 58
Providing and laying longitudinal drain of size 400mm at bottom, depth varying from 300mm to 500mm
(all internal dimensions), made of full brick masonry in 1:6 (1 cement : 6 fine sand) with 12 mm cement
Item. plaster finished with a floating coat of neat cement of mix 1:4 (1 cement : 4 fine sand) on internal & top
No- surface including excavation, backfilling, PCC [Link] (1 cement : 5 fine sand : 10 stone aggregate) at
3.4
base, PCC [Link] (1 cement : 2 fine sand : 4 stone aggregate) etc. complete as per drawing and
directions of Engineerin- charge.

No. No. Length Breadt Depth


Description of Item Quantity Unit
h
1 2 3 4 5 6 7 8
GIN NO.703 1 1 13.80 13.80 m
Total 13.80 m

Measured on : 02.10.2023 Signature of Contractor Signature of JE

Page 59
Item. Providing and laying 110mm diametre unplasticised Rigid single socketed PVC pipes conforming to
No- IS:13592 Type-A, across the RCC/ Random Rubble masonary retaining wall or breast wall for function as
3.1 weep holes to reduce the horizontal pressure.
No. No. Length Breadt Depth
Description of Item Quantity Unit
h
1 2 3 4 5 6 7 8
[Link]-
Base For Single 703
Wall BSF Tower Left
Side 1 7 0.30 2.10 m
Base For Single R. Wall BSF Tower 1 7 0.25 1.75 m
Right Side
Span-1 1 7 0.30 2.10 m
Key 1 6 0.25 1.50 m
Span-2
Key 1 3 0.30 0.90 m
Base For Single [Link]-
GIN Wall698
Single Fenching 0.00 m
Right Side 1 6 0.30 1.80 m
Base For SingleKey
Guard Wall Single 1 6 0.25 1.50 m
Fenching Right Side 1 9 0.22 1.98 m
Base For Single [Link]
Wall Single Fenching 1 8 0.20 1.60 m
Left Side 1 7 0.30 2.10 m
Base For SingleKey
Guard Wall Single 1 6 0.25 1.50 m
Fenching Left Side 1 8 0.22 1.76 m
Key 1 7 0.20 1.40 m
Base For U-Shape R. Wall BSF Side 2 2 0.55 2.20 m
2 2 0.45 1.80 m
2 2 0.40 1.60 m
2 2 0.35 1.40 m
2 2 0.28 1.12 m
GIN No-
Base For Single Guard697-2A
wall BSF Tower 0.00 m
Oppo. Right Side BSF Tower
Base For Single Guard wall 1 18 0.20 3.60 m
Oppo. Left Side 1 15 0.20 3.00 m
Base For GIN No-R.697-1A
Single wall BSF Tower 0.00 m
Oppo. Left Side 1 5 0.50 2.50 m
1 5 0.45 2.25 m
1 5 0.40 2.00 m
1 5 0.35 1.75 m
1 5 0.30 1.50 m
Base For Single R. wall BSF Tower 1 5 0.27 1.35 m
Oppo. Left Side 1 9 0.30 2.70 m
Key 1 8 0.25 2.00 m
Total 52.76 m

Measured on : 01.10.2023 Signature of Contractor Signature of JE

Page 60
Providing and fixing security fencing of GI barbed wire consisting of copper enriched MS angle posts of 90mm x 90mm x6mm
3000mm length above RCC Culvert slab (2000mm vertical and 1000mm slanting) duly fabricated and welded at bend as per
drawing and placed at 3000mm centre to centre & fixed with MS plate 250 mm x250mm size 8mm Thick by 4 Nos. dash fastner
of 16mm dia & every 10th post, end posts & corner posts to be strutted with MS angle strut on both sides, of size 90mm x 90mm
x 6mm & 2245mm in length (200mm vertical at top & 2045mm slanting down) fabricated and welded as per drawing bolted to
vertical posts with two Nos. 12mm dia & 50mm long MS bolts & nuts with washers, struts fixed with MS plate 250 mm x 250mm
Item. size 8mm thick by 4 Nos. dash fastner 16mm dia as per standard drawing attached including providing & fixing
No- galvanised iron barbed wire duly painted by dipping in paint twice with anticorrosive bitumastic paint (IS.158) of black shade to
5.6.2 give a smooth and even surface, size of barbed wire 2.5mm x 2mm (weight to be not less than 108gms per metre length)
conforming to IS.278-1978 in 20 horizontal rows (13 rows in vertical portion & 7 rows in slanting portion) to be fixed & stretched
with MS hooks/tightening bolts as per drawing) and properly woven with four diagonals (two in vertical portion & two in goose
neck portion) as per standard drawing of same GI barbed wire to be fixed to angle iron posts in holes with 2.5mm dia & 100mm
long GI staples/clips & providing vertical & diagonal strands of barbed wire properly inter woven with horizontal rows of barbed
wire at a spacing of 150mm upto a height of 7 rows of fencing above ground level, adequately tied at three places in staggered
manner with GI wire of not less than 16 guage as per standard drawing & providing two sets of spikes each set consisting of 75
mm MS Flat. 1000mm long with 10nos pointed spikes made of 75mm long 10mm dia MS rods welded to this MS flat & fixing the
No. No. Length Breadth Depth
Description of Item Quantity Unit
1 2 3 4 5 6 7 8
GIN NO.703 1 1 14.05 14.05 m
GIN NO.698 1 1 29.00 29.00 m
Total 43.05 m

Measured on : 01.10.2023 Signature of Contractor Signature of JE

Page 61
Providing and fixing security fencing of GI barbed wire consisting of Copper Enriched MS angle post of section
90mm x 90mm x 6 mm 6982 mm total length, above CC pavement (4732 mm vertical and 1000 mm slanting) duly
Item. fabricated and welded at bend as per drawing and 1250 mm below CC pavement placed at 3300 mm centre to
No- centre and embedded in cement concrete blocks 900 mm dia meter at bottom and 600 mm dia at top 1900 mm
5.6.1 deep placed at 1975 mm below top of CC pavement including
providing and fixing galvanised iron barbed wire duly painted by dipping in paint twice with anticorrosive bitumastic
paint (IS-158) of approved brnad and manufacture in black shade to give a smooth and even surface, size of
barbed wire 2.5 x 2 mm (Weight to be not less than 108 gms. per meter length) conforming to IS 26 rows in vertical
No. No. Length Breadth Depth
portion andDescription of Itemportion) to be fixed
7 rows in slanting & stretched with MS hooks/tightening bolts andQuantity Unit
properly woven
1 2 3 4 5 6 7 8
GIN NO.703 1 1 16.70 16.70 m
1 1 7.20 7.20 m
GIN NO.698 1 1 21.00 21.00 m
1 1 6.50 6.50 m
Total 51.40 m

Measured on : 01.10.2023 Signature of Contractor Signature of JE

Page 62
Providing, laying & fixing of galvanised punched tape concertina coil of unstretched dia 1050mm having galvanised
Item. spring steel core of wire 2.5mm dia of cold drawn steel punched tape of low carbon steel having series of sharp
No- barbs uniformly punched along its length 55 barbs on periphery per revolution crimped on steel spring core wire.
5.4
Galvanised clips GI steel wire handles hooked to coils for handling MS square bar spikes hooked to coil having
pointed faces for anchorage & weight 15.20 kg per coil including spreading of each coil 10 metre length adequately
Description of Item No. No. Length Breadt Depth Quantity Unit
1 2 3 4 h
5 6 7 8
GIN NO.703
Hill Side 1 3 0.72 2.16 nos
BSF Side 1 3 1.67 5.01 nos
Culvert 1 2 1.41 2.81 nos
GIN NO.698
Hill Side 1 3 2.48 7.44 nos
BSF Side 1 3 0.66 1.98 nos
Culvert 1 2 2.90 5.81 nos
Total 25.21 nos

Measured on : 01.10.2023 Signature of Contractor Signature of JE

Page 63
Item. Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate
No- priming coat, preparation of surface, etc. complete
4.6
4.6.1 On steel work
Description of Item No No L H/B Coefficient Quantity Unit
1 2 3 4 5 6 7 8
GIN - 703
Gate=(4x2)8 nos 8 2 2.88 3.10 0.50 71.42 sqm
Angle 50x50x6mm(For Chain) 8 2 0.75 0.20 1.00 2.40 sqm
ISMC 75x40mm(For Chain) 8 1 0.20 0.31 1.00 0.5 sqm
Chain For Bott. Gate 4 1 7.50 0.05 1.00 1.5 sqm
Chain ForTop. Gate 4 1 4.30 0.05 1.00 0.86 sqm
ISMB 200 1 1 14.10 0.60 1.00 8.46 sqm
For Pully
32mm thick Plate 4 2 0.43 0.10 1.00 0.34 sqm
8mm thick Plate 8 2 0.15 0.08 1.00 0.19 sqm
Gap-1
ISMC 75x40mm 1 2 7.30 0.16 1.00 2.34 sqm
ISMC 75x40mm 1 2 5.50 0.16 1.00 1.76 sqm
Flat 75x6mm 1 6 0.30 0.16 1.00 0.29 sqm
Flat 75x6mm 1 6 0.40 0.16 1.00 0.38 sqm
Flat 75x6mm 1 6 0.45 0.16 1.00 0.43 sqm
Gap-2
ISMC 75x40mm 1 2 7.30 0.16 1.00 2.34 sqm
ISMC 75x40mm 1 2 5.50 0.16 1.00 1.76 sqm
Flat 75x6mm 1 8 0.30 0.16 1.00 0.38 sqm
Flat 75x6mm 1 9 0.40 0.16 1.00 0.58 sqm
Flat 75x6mm 1 6 0.45 0.16 1.00 0.43 sqm
Gap-3
ISMC 75x40mm 1 2 7.30 0.16 1.00 2.34 sqm
ISMC 75x40mm 1 2 5.50 0.16 1.00 1.76 sqm
Flat 75x6mm 1 10 0.30 0.16 1.00 0.48 sqm
Flat 75x6mm 1 8 0.40 0.16 1.00 0.51 sqm
Flat 75x6mm 1 6 0.45 0.16 1.00 0.43 sqm
Gap-4
ISMC 75x40mm 1 2 7.30 0.16 1.00 2.34 sqm
ISMC 75x40mm 1 2 5.50 0.16 1.00 1.76 sqm
Flat 75x6mm 1 8 0.30 0.16 1.00 0.38 sqm
Flat 75x6mm 1 9 0.40 0.16 1.00 0.58 sqm
Flat 75x6mm 4 6 0.45 0.16 1.00 1.73 sqm
Railing 1 2 13.55 0.90 0.50 12.20 sqm
For Truss
Angle 50x50x6mm(Verl) 5 1 0.90 0.20 1.00 0.90 sqm
Tube 50x25mm 1 9 2.20 0.15 1.00 2.97 sqm
Tube 50x25mm 1 3 14.50 0.15 1.00 6.53 sqm
Tube 96x48mm 1 2 14.50 0.29 1.00 8.35 sqm
Tube 96x48mm 1 2 0.10 0.29 1.00 0.06 sqm
GIN NO. 698
Gate=(8x2)16 nos 16 2 2.94 3.10 0.50 145.82 sqm
Fixed Gate 16 1 2.90 1.00 1.50 69.60 sqm
Angle 50x50x6mm(For Chain) 16 2 0.74 0.20 1.00 4.74 sqm
ISMC 75x40mm(For Chain) 16 1 0.20 0.31 1.00 0.99 sqm
Chain For Bott. Gate 8 1 9.60 0.05 1.00 3.84 sqm
Chain ForTop. Gate 8 1 6.60 0.05 1.00 2.64 sqm
C/O 367.31

Page 64
Measured on : 02.10.203 Signature of Contractor Signature of JE
B/F 367.31
ISMB 200 1 1 29.04 0.60 1.00 17.42 sqm
For Pully
32mm thick Plate 8 2 0.43 0.10 1.00 0.69 sqm
8mm thick Plate 16 2 0.15 0.08 1.00 0.38 sqm
Fixed Grill
ISMC 75x40mm 8 2 1.00 0.16 1.00 2.56 sqm
Angle 50x50x6mm(Horl) 8 1 2.90 0.2 1.00 4.64 sqm
Angle 50x50x6mm(Horl) 8 1 3.03 0.2 1.00 4.85 sqm
Angle 50x50x6mm(Verl) 8 2 0.82 0.2 1.00 2.62 sqm
Gap-1
ISMC 75x40mm 1 2 9.65 0.16 1.00 3.09 sqm
ISMC 75x40mm 1 2 6.85 0.16 1.00 2.19 sqm
Flat 75x6mm 1 8 0.30 0.16 1.00 0.38 sqm
Flat 75x6mm 1 8 0.40 0.16 1.00 0.51 sqm
Flat 75x6mm 1 6 0.45 0.16 1.00 0.43 sqm
Gap-2,3,4,5,6
ISMC 75x40mm 7 2 9.65 0.16 1.00 21.62 sqm
ISMC 75x40mm 7 2 6.85 0.16 1.00 15.34 sqm
Flat 75x6mm 7 8 0.30 0.16 1.00 2.69 sqm
Flat 75x6mm 7 8 0.40 0.16 1.00 3.58 sqm
Flat 75x6mm 7 6 0.45 0.16 1.00 3.02 sqm
Railing 1 2 29.00 0.90 0.50 26.10 sqm
For Truss
Angle 50x50x6mm(Verl) 9 1 0.25 0.20 1.00 0.45 sqm
Tube 50x25mm 1 17 2.20 0.15 1.00 5.61 sqm
Tube 50x25mm 1 3 29.64 0.15 1.00 13.34 sqm
Tube 96x48mm 1 2 29.64 0.29 1.00 17.07 sqm
Tube 96x48mm 1 2 0.10 0.29 1.00 0.06 sqm
GIN NO. 697-2A
Gate=(3x2)6 nos 6 2 2.94 3.10 0.50 54.68 sqm
Angle 50x50x6mm(For Chain) 12 2 0.74 0.20 1.00 3.55 sqm
ISMC 75x40mm(For Chain) 12 1 0.20 0.31 1.00 0.74 sqm
Chain For Bott. Gate 6 1 6.90 0.05 1.00 2.07 sqm
Chain ForTop. Gate 6 1 5.10 0.05 1.00 1.53 sqm
ISMB 200 1 1 10.85 0.60 1.00 6.51 sqm
For Pully
32mm thick Plate 3 2 0.43 0.10 1.00 0.26 sqm
8mm thick Plate 6 2 0.15 0.08 1.00 0.14 sqm
Gap-1
ISMC 75x40mm 1 2 7.86 0.16 1.00 2.52 sqm
ISMC 75x40mm 1 2 5.88 0.16 1.00 1.88 sqm
Flat 75x6mm 1 6 0.30 0.16 1.00 0.29 sqm
Flat 75x6mm 1 6 0.40 0.16 1.00 0.38 sqm
Flat 75x6mm 1 6 0.45 0.16 1.00 0.43 sqm
Gap-2,3
ISMC 75x40mm 2 2 7.86 0.16 1.00 5.03 sqm
ISMC 75x40mm 2 2 5.88 0.16 1.00 3.76 sqm
Flat 75x6mm 2 6 0.30 0.16 1.00 0.58 sqm
Flat 75x6mm 2 6 0.40 0.16 1.00 0.77 sqm
Flat 75x6mm 2 6 0.45 0.16 1.00 0.86 sqm
Railing 1 2 10.30 0.90 0.50 9.27 sqm
For Truss
Angle 50x50x6mm(Verl) 4 1 0.25 0.20 1.00 0.20 sqm
Tube 50x25mm 1 7 2.20 0.15 1.00 2.31 sqm
Tube 50x25mm 1 3 10.90 0.15 1.00 4.91 sqm
Tube 96x48mm 1 2 10.90 0.29 1.00 6.28 sqm
Tube 96x48mm 1 2 0.10 0.29 1.00 0.06 sqm
Total 624.96 sqm

Page 65
Measured on : 02.10.2023 Signature of Contractor Signature of JE

Page 66
RECORD of MEASUREMENT
Name of Work: - Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar,
Teliamura & Panisagar Sector in Tripura SH: GIN No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under
Udaipur Sector
Location of Work:- BFSD-II
Name of the Contractor :Shri Uttam Deb
Reference to Agreement no:-02/EE/BFD-III/AGT/2021-2022
Date of written order to commence work :09.04.2021
Stipulated date of completion of work:- 02.07.2022
Date of actual completion of work:- in progress
Reference to previous measurements, if any:-
Serial no of this bill :- 6th R/A BILL
Same work same agency
Agt. Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as
Item 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge
No-
1.2.1 All kinds of soil
Description of item Details of Actual Measurement
No. No. Length Breadth Depth

GIN no -706 1 2 3 4 5
for single retaining wall hilly left side
Panel No-1 ,H=(4.2+4+3.7)/3=3.96 1 1 3.80 3.70 3.96
Key 1 1 3.80 0.85 0.60
Panel No-2 , H=(2+1.8)/2=1.90 1 1 2.50 3.70 1.90
key 1 1 2.50 0.85 0.60
For single Retaing wall village side near fencing 1 1 4.20 2.50 1.47
H=(1.30+1.50+1.60)=1.47
Key 1 1 4.2 0.6 0.25
Total
Carried over to Page No. of TCMB
Agt. Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials.
Item
No-1.5
1.5.1 All kinds of soil
Description of item Details of Actual Measurement
No. No. Length Breadth Depth
GIN NO. 706 1 2 3 4 5
For Single R. Wall . Hilly Left side.
Panel-1 1 1 3.80 3.70 2.47
Panel No-2 1 1 2.50 3.70 0.40
Total
Carried over to Page No. of TCMB
Agt. Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as
Item 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge
No-
1.2.1 All kinds of soil
Description of item Details of Actual Measurement
No. No. Length Breadth Depth

GIN NO. 708-A


For Single R. Wall Main Road Side along fencing 1 1 1.2 2.5 1.5

Key 1 1 1.2 0.6 0.25


For Single R. Wall Main Road Side
Base 1 1 2.5 2.5 1.5
Key 1 1 2.5 0.6 0.25
GIN NO. 699
For Single R. Wall Hill Right side.
Base 1 1 6.50 2.50 2.00
Key 1 1 6.50 0.50 0.25
For Single R. Wall B.S.F side.
Base 1 1 14.00 2.50 1.50
Key 1 1 14.00 0.60 0.25
GIN NO. 708-B
Hill. Side For Fenching Road
Avg. H (1.7+3.8+4.6+4.9+5.6)/5 = 4.12m 1 1 12.00 4.10 4.12
Avg. B - ( 3+4.4+4.9)/3 = 4.1m
Total
Carried over to Page No. of TCMB

Measured on : 06.06.2022 Signature of Contractor/Representative Signature of JE

1
Agt. Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials.
Item
No-1.5
1.5.1 All kinds of soil
Description of item Details of Actual Measurement
No. No. Length Breadth Depth

GIN NO. 699


For Single R. Wall Hill Right side.
Base 1 1 6.50 2.50 0.50
Total
Carried over to Page No. of TCMB

Measured on : 06.06.2022 Signature of Contractor/Representative Signature of JE

2
Same work same agency
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content
Agt as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including
admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability to get
No- shutter finished surface as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design
2.5 mix is payable/recoverable separately).

2.5.1 All works upto plinth level


Description of item Details of Actual Measurement
No. No. Length Breadth Depth

RE-MEASURMENT 1 2 3 4 5
GIN-701
Retaining Wall(BSF Side)
Span-1
side wall Top of culvert to top= 2 nos 2 0.50 3.50 0.25 0.40

Span-2
Base 1 1 4.30 5.00 0.65
Haunch 2 0.50 4.30 0.30 0.30
Side Wall top of Base to Top=2 nos 2 1 4.30 0.43 6.22
Avg.H=(5.92+6.52)/2=6.22
B=(0.600+0.250)/2=0.43
Retaining Wall(Village Side)Span-2
Side wall 1.90m(From top of base) to top= 2 nos 2 1 5.00 0.25 0.58

Less already paid in CMB no. 04/CMB/BFD-III/2022-2023 page no. 41

Total
Carried over to Page No. of TCMB

Agt No- Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
2.6

Description of item Details of Actual Measurement


No. Length Breadth Depth
1 2 3 4 5
Qty as per item no. 2.5.1 cum Qtl
Extra cement =(407-330)=77 kg/cum 1.00 18.23 0.77
Total
Carried over to Page No. of TCMB

Measured on : 06.06.2022 Signature of Contractor/Representative Signature of JE

3
Agt. Centering & shuttering i/c strutting propping etc & removal of form for
No- Foundations, footings, bases of columns, etc. for mass concrete
2.2.1

Description of item Details of Actual Measurement


RE-MEASURMENT No. No. Length Breadth Depth
GIN no -701
Retaining Wall(BSF Side)
Span-2 1 2 4.30 -- 0.65
1 2 -- 5.00 0.65
Less already paid in CMB no. 04/CMB/BFD-III/2022-2023 page no. 41

Total

Carried over to Page No. of TCMB


Agt No- Centering & shuttering i/c strutting propping etc & removal of form for
2.2.2 Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Details of Actual Measurement
Description of item
No. No. Length Breadth Depth
RE-MEASURMENT 1 2 3 4 5
GIN-701
Retaining Wall(BSF Side
Span-1
side wall Top of culvert to top= 2 nos 4 0.5 3.50 0.40
Span-2
Haunch 2 1 4.30 -- 0.42
Wall out side Top of Base to Top 2 1 4.30 6.22
Avg.H=(5.92+6.52)/2=6.22
Wall In side 2 1 4.30 5.92
Face 2 1 0.43 6.22
Retaining Wall(Village Side)Span-2
Side wall 1.90m(From top of base) to top= 2 nos 2 2 5.00 0.58
2 1 0.25 0.58
Total
Less already paid in CMB no. 04/CMB/BFD-III/2022-2023 page no. 42

Total

Measured on : 06.06.2022 Signature of Contractor/Representative Signature of JE

4
Same work same agency
Agmt
Item Providing and laying in position machine batched and machine mixed design mix cement concrete for plain cement concrete work, using cement
NO:- 2.1 content as per approved design mix, including pumping of concrete to site of laying, finishing but excluding the cost of centering, shuttering,
including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing
strength and durability as per direction of Engineer-in-charge. (Note :- Excess/ less cement used as per design mix is payable/recoverable
separately).
2.1.1 All works upto plinth level :
[Link] M-7.5 grade plain cement concrete (cement content considered @ 200 kg/cum)
Description of item Details of Actual Measurement
No. No. Length Breadth Depth

GIN NO. 706 1 2 3 4 5


For Single R. Wall . Hilly Left side.
Pane-1
Footing 1 1 3.60 2.65 0.10
Key 1 1 3.60 0.55 0.10
Pane-2
Footing 1 1 1.90 2.65 0.10
Key 1 1 1.90 0.55 0.10
For Single R. Wall Village side.
Footing 1 1 3.70 1.70 0.10
Key 2 1 3.70 0.30 0.10
GIN NO. 708-A
For Single R. Wall Main Road side (Along oldFenching )(3m Height)
Footing 1 1 1.00 1.70 0.10
Key 1 1 1.00 0.30 0.10
For Single R. Wall Main Road Side(3m Height)
Footing 1 1 2.20 1.70 0.10
Key 1 1 2.20 0.30 0.10
GIN NO. 699
For Single R. Wall Hill Right side.
Footing 1 1 6.05 1.70 0.10
Key 1 1 6.05 0.30 0.10
For Single R. Wall B.S.F side.
Footing 1 1 13.70 1.70 0.10
Key 1 1 13.70 0.30 0.10
Total

Measured on : 09.06.2022 Signature of Contractor/Representative Signature of JE

5
Agt No- Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
2.6

Description of item Details of Actual Measurement


No. No. Length Breadth Depth
Qty as per item no. [Link] 1 2 3 4 5
Extra cement =(230-200)=30 kg/cum cum Qtl
1.00 7.19 0.3
Total
Carried over to Page No. of TCMB
Agt. Centering & shuttering i/c strutting propping etc & removal of form for
No- Foundations, footings, bases of columns, etc. for mass concrete
2.2.1

Description of item Details of Actual Measurement


No. No. Length Breadth Depth
GIN NO. 706 1 2 3 4 5
For Single R. Wall . Hilly Left side.
Panel-1
For Base 1 2 3.60 0.10
1 2 - 3.2 0.10
Panel-2
Base 1 2 1.90 0.10
1 2 3.20 0.10
For single [Link] Village side (aproach)
Base 1 2 3.70 0.10
1 2 2.00 0.10
GIN NO. 708-A
For single [Link] Main Road Side
Base 1 2 1.00 0.10
1 2 2.00 0.10
For single [Link] Main Road Side
Base 1 2 2.20 0.10
1 2 2.00 0.10
GIN NO. 699
For single [Link] Hill Right Side
Base 1 2 6.05 0.10
1 2 2.00 0.10
For single [Link] B.S.F Side
Base 1 2 13.70 0.10
1 2 2.00 0.10
Total
Carried over to Page No. of TCMB

Measured on : 09.06.2022 Signature of Contractor/Representative Signature of JE

6
Same work same agency
Agt No- Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all level.
2.4

2.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more.


M
Description Dia Nos Nos Lenth 8 mm 10 mm 12 mm 16 mm 20 mm

GIN No 706
for single [Link] hill left side
(3.60 mtr)
Key main bar (both side) 16 2 25 1.35 67.50
Key binder (both side) 12 2 5 3.500 35.00
Base main bar (T&B) 16 2 25 3.90 195.00
Binder (T&B) 12 2 22 3.50 154.00
Chair 16 1 8 2.00 16.00
Steel of wall bottom to 2.00 m (from top of base)
main bar ( both side) 16 2 36 2.770 199.44
Binder (both side) 10 2 14 3.50 98.00
Spacer 10 1 6 1.00 6.00
for single [Link] hill left side
(1.90 mtr)
Key main bar (both side) 16 2 13 1.35 35.10
Key binder (both side) 12 2 5 1.800 18.00
Base main bar (T&B) 16 2 13 3.90 101.40
Binder (T&B) 12 2 22 1.90 83.60
Chair 16 1 4 2.00 8.00
Steel of wall bottom to 2.00 m (from top of base)
main bar ( both side) 16 2 19 2.770 105.26
Binder (both side) 10 2 14 1.90 53.20
Spacer 10 1 4 1.00 4.00
Total length in M 0.000 161.200 290.60 727.700 0.000
Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 98.332 258.053 1142.489 0.000
Grand Total in Kg= 1498.874
Net Payble [Link] Kg 1498.874
Carried over to Page No. of TCMB

Measured on : 11.06.2022 Signature of Contractor/Representative Signature of JE

7
Same work same agency
Agt No- Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all level.
2.4

2.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more.


M
Description Dia Nos Nos Lenth 8 mm 10 mm 12 mm 16 mm 20 mm

GIN No 708-A
for single [Link] main road side
along fencing (1.0 mtr)
Key main bar (both side) 12 2 7 0.70 9.80
Key binder (both side) 10 2 3 0.900 5.40
Base main bar (T&B) 12 2 7 2.40 33.60
Binder (T&B) 10 2 14 0.90 25.20
Chair 12 1 4 2.00 8.00
Steel of wall bottom to top
main bar ( both side) 12 2 7 3.025 42.35
Binder (both side) 10 2 17 0.90 30.60
Spacer 10 1 2 1.00 2.00
for single [Link] main road side
(2.20 mtr)
Key main bar (both side) 12 2 15 0.70 21.00
Key binder (both side) 10 2 3 2.100 12.60
Base main bar (T&B) 12 2 15 2.40 72.00
Binder (T&B) 10 2 14 2.10 58.80
Chair 12 1 4 2.00 8.00
Steel of wall bottom to top
main bar ( both side) 12 2 15 2.520 75.60
Binder (both side) 10 2 14 2.10 58.80
Spacer 10 1 4 1.00 4.00
U-Shape wall main road side
(3.7 m to top slope fininshing)
[Link] steel (out side) 12 2 28 1.60 89.60
ver. Distribution steel (out side) 10 2 7 5.350 74.90
[Link] steel (in side) 16 2 28 1.60 89.60
ver. Distribution steel (in side) 10 2 7 5.35 74.90
Spacer 10 2 10 0.70 14.00
for parapet (guard wall main road)
vertical main steel 16 7 10 0.500 35.00
lap 16 7 5 0.82 28.56
Total length in M 0.000 361.200 359.950 153.160 0.000
Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 220.332 319.636 240.461 0.000
Grand Total in Kg= 780.429
Net Payble [Link] Kg 780.429
Carried over to Page No. of TCMB

Measured on : 13.06.2022 Signature of Contractor/Representative Signature of JE

8
Same work same agency
Agt No- Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all level.
2.4

2.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more.


M
Description Dia Nos Nos Lenth 8 mm 10 mm 12 mm 16 mm 20 mm

GIN No 699
for single [Link] Hill right side
(6.05 mtr)
Key main bar (both side) 12 2 41 0.70 57.40
Key binder (both side) 10 2 3 5.950 35.70
Base main bar (T&B) 12 2 41 2.40 196.80
Binder (T&B) 10 2 14 5.95 166.60
Chair 12 1 10 2.00 20.00
Steel of wall bottom to top
main bar ( both side) 12 2 41 3.425 280.85
Binder (both side) 10 2 20 5.95 238.00
Spacer 10 1 12 1.00 12.00
for single [Link] main BSF side
(13.70 mtr)
Key main bar (both side) 12 2 92 0.70 128.80
Key binder (both side) 10 2 3 13.600 81.60
Base main bar (T&B) 12 2 92 2.40 441.60
Binder (T&B) 10 2 14 13.60 380.80
lap 10 2 14 0.51 14.28
Chair 12 1 25 2.00 50.00
Steel of wall bottom to top
main bar ( both side) 12 2 92 2.830 520.72
Binder (both side) 10 2 15 13.60 408.00
lap 10 2 15 0.51 15.30
Spacer 10 1 25 1.00 25.00
Total length in M 0.000 1377.280 1696.170 0.000 0.000
Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 840.141 1506.199 0.000 0.000
Grand Total in Kg= 2346.340
Net Payble [Link] Kg 2346.340
Carried over to Page No. of TCMB

Measured on : 16.06.2022 Signature of Contractor/Representative Signature of JE

9
Same work same agency
Agt No- Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all level.
2.4
2.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more.
M Description Dia Nos Nos Lenth 8 mm 10 mm 12 mm 16 mm 20 mm
GIN No 706
for single [Link] hill left side
(3.60 mtr)
Steel of wall 2.00m to top
main bar ( both side) 16 2 18 3.830 137.88
main bar ( both side) 16 2 18 1.500 54.00
Lap 16 2 18 0.816 29.38
Binder (both side) 10 2 26 3.50 182.00
Spacer 10 1 12 1.00 12.00
for single [Link] hill left side
(1.90 mtr)
Steel of wall 2.00 m to top
main bar ( both side) 16 2 19 0.900 34.20
Binder (both side) 10 2 6 1.90 22.80
Spacer 10 1 4 1.00 4.00
for single [Link] Village side
near fencing (4.20 mtr)
Key main bar (both side) 12 2 25 0.70 35.00
Key binder (both side) 10 2 3 3.600 21.60
Base main bar (T&B) 12 2 25 2.40 120.00
Binder (T&B) 10 2 14 3.60 100.80
Chair 12 1 6 2.00 12.00
Steel of wall bottom to top
main bar ( both side) 12 2 28 2.630 147.28
Binder (both side) 10 2 15 4.10 123.00
Spacer 10 1 10 1.00 10.00
Wing wall left side culvert (5 m)

main bar ( both side) 16 2 25 0.180 9.00


Binder (both side) 10 2 1 4.90 9.80
Wing wall Right side culvert (5
m)
main bar ( both side) 16 2 25 0.225 11.25
Binder (both side) 10 2 1 4.90 9.80
Wing wall Right side culvert
toward fencing (5 m)
main bar ( both side) 16 2 30 0.200 12.00
Binder (both side) 10 2 1 5.90 11.80
Total length in M 0.000 507.600 314.28 287.71 0.00
Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 309.636 279.081 451.705 0.000
Grand Total in Kg= 1040.422
Net Payble [Link] Kg 1040.422
Carried over to Page No. of TCMB

Measured on : 26.06.2022 Signature of Contractor/Representative Signature of JE

10
Same work same agency
Agt No- Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all level.
2.4
2.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more.
M Description Dia Nos Nos Lenth 8 mm 10 mm 12 mm 16 mm 20 mm
GIN No 699
U-shape Retaining wall Hill
side
(slope finishing)
Span-5
3 Vertical main steel (out side) 12 2 18 0.100 3.60
1 Vertical main steel (in side) 12 2 18 0.10 3.60
Span -5 for extra lift (both side)
3 Vertical main steel (out side) 12 2 10 0.800 16.00
Lap 12 2 5 0.612 6.12
7 Vertical Distribution (out side) 10 2 5 1.750 17.50
1 Vertical main steel (in side) 12 2 10 0.80 16.00
Lap 12 2 5 0.612 6.12
6 Vertical Distribution (in side) 10 2 5 1.70 17.00
Spacer 10 2 3 1.00 6.00
Span -6 for extra lift (left side)
3 Vertical main steel (out side) 12 1 7 0.800 5.60
Lap 12 1 2 0.612 1.22
7 Vertical Distribution (out side) 10 1 5 1.250 6.25
1 Vertical main steel (in side) 12 1 7 0.80 5.60
Lap 12 1 2 0.612 1.22
6 Vertical Distribution (in side) 10 1 5 1.25 6.25
Spacer 10 1 3 1.00 3.00
Span -6 for extra lift (right side)
3 Vertical main steel (out side) 12 1 10 0.800 8.00
Lap 12 1 5 0.612 3.06
7 Vertical Distribution (out side) 10 1 5 1.700 8.50
1 Vertical main steel (in side) 12 1 10 0.80 8.00
Lap 12 1 5 0.612 3.06
6 Vertical Distribution (in side) 10 1 5 1.70 8.50
Spacer 10 1 3 1.00 3.00
Span -7 (L=3.60 mt)
3 Vertical main steel (out side) 12 1 18 0.350 6.30
7 Vertical Distribution (out side) 10 1 1 3.500 3.50
1 Vertical main steel (in side) 12 1 18 0.35 6.30
6 Vertical Distribution (in side) 10 1 1 3.50 3.50
Span -7 for extra lift (left side)
3 Vertical main steel (out side) 12 1 10 0.800 8.00
Lap 12 1 5 0.612 3.06
7 Vertical Distribution (out side) 10 1 5 1.550 7.75
1 Vertical main steel (in side) 12 1 10 0.80 8.00
Lap 12 1 5 0.612 3.06
6 Vertical Distribution (in side) 10 1 5 1.55 7.75
Spacer 10 1 3 1.00 3.00
Span -7 for extra lift (Right side)
3 Vertical main steel (out side) 12 1 10 0.800 8.00
Lap 12 1 5 0.612 3.06
7 Vertical Distribution (out side) 10 1 5 1.700 8.50
1 Vertical main steel (in side) 12 1 10 0.80 8.00
Lap 12 1 5 0.612 3.06
6 Vertical Distribution (in side) 10 1 5 1.70 8.50
Spacer 10 1 3 1.00 3.00
Span -8 for extra lift (left side)
L= 1.67 m
3 Vertical main steel (out side) 12 1 10 0.800 8.00
Lap 12 1 5 0.612 3.06
7 Vertical Distribution (out side) 10 1 5 1.570 7.85
1 Vertical main steel (in side) 12 1 10 0.80 8.00
Lap 12 1 5 0.612 3.06
6 Vertical Distribution (in side) 10 1 5 1.57 7.85
C/O 137.20 166.16

11
Measured on : 22.06.2022 Signature of Contractor/Representative Signature of JE

12
B/F 137.20 166.16
Spacer 10 1 3 1.00 3.00
Span -8 for extra lift (Right side)
L=1.55
3 Vertical main steel (out side) 12 1 9 0.800 7.20
Lap 12 1 5 0.612 3.06
7 Vertical Distribution (out side) 10 1 5 1.450 7.25
1 Vertical main steel (in side) 12 1 9 0.80 7.20
Lap 12 1 5 0.612 3.06
6 Vertical Distribution (in side) 10 1 5 1.45 7.25
Spacer 10 1 3 1.00 3.00
Span -9 for extra lift
L= 3.6 mtr
3 Vertical main steel (out side) 12 1 18 0.880 15.84
7 Vertical Distribution (out side) 10 1 5 3.500 17.50
1 Vertical main steel (in side) 12 1 18 0.88 15.84
6 Vertical Distribution (in side) 10 1 5 3.50 17.50
Spacer 10 1 3 1.00 3.00
Slab for drain (4.8*1m) 10 1 32 0.90 28.80
L= 4.8 10 1 7 4.70 32.90
Slab for drain (5.15*1) 10 1 35 0.90 31.50
L= 5.15 10 1 7 5.05 35.35
Total length in M 0.000 324.250 218.360 0.000 0.000
Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 197.793 193.904 0.000 0.000
Grand Total in Kg= 391.697
Net Payble [Link] Kg 391.697
Carried over to Page No. of TCMB

Measured on : 22.06.2022 Signature of Contractor/Representative Signature of JE

13
Same work same agency
Agt No- Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all level.
2.4
2.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more.
M Description Dia Nos Nos Lenth 8 mm 10 mm 12 mm 16 mm 20 mm
GIN No 708-B
for single [Link] (Road side ) slope finishing span 1,2&3 (L=4.0 m)
3 Vertical main steel (out side) 10 2 23 0.300 13.80
7 Vert. Distribution steel (out side) 10 2 2 3.900 15.60
1 Vertical main steel (in side) 12 2 23 0.300 13.80
6 Vert. Distribution steel (in side) 10 2 2 3.90 15.60
Total length in M 0.000 45.000 13.80 0.00 0.00
Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.000 27.450 12.254 0.000 0.000
Grand Total in Kg= 39.704
Net Payble [Link] Kg 39.704
Carried over to Page No. of TCMB
Agt No- Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to all height.
2.4 .
2.4.1 (a) Thermo-Mechanically Treated bars
Description Dia Nos Nos lenth 8 mm 10 mm 12 mm 16 mm 20 mm
GIN NO. 699
Column-C (600mm*300mm)
Main Verl. Steel 16 2 10 2.70 54.00
Lap 16 2 10 0.82 16.32
Ties 10 2 26 1.52 79.04
Ties 10 2 26 0.91 47.32
Ties 10 2 26 0.69 35.88
Column-D (0.450m*0.300m)
Main Verl. Steel 16 3 8 2.70 64.80
Lap 16 3 8 0.82 19.58
Ties 10 3 26 1.26 98.28
Ties 10 3 26 0.32 24.96
Column (250mm*250mm)
Main Verl. Steel 16 5 4 2.70 54.00
Lap 16 5 4 0.82 16.32
Ties 10 5 26 0.84 109.20
GIN NO.-701
Column-C (550mm*300mm)
Main Verl. Steel 12 2 3 2.70 16.20
Lap 12 2 3 0.61 3.67
Main Verl. Steel 20 2 4 2.70 21.60
Lap 20 2 4 1.02 8.16
Main Verl. Steel 16 2 3 2.70 16.20
Lap 16 2 3 0.82 4.90
Ties 10 2 26 1.39 72.28
Ties 10 2 26 0.90 46.80
Ties 10 2 26 0.61 31.72
Column-D (0.400m*0.300m)
Main Verl. Steel 12 6 8 2.70 129.60
Lap 12 6 8 0.61 29.38
Ties 10 6 26 1.20 187.20
Ties 10 6 26 0.39 60.84
Column (250mm*250mm)
Main Verl. Steel 16 8 4 2.70 86.40
Lap 16 8 4 0.82 26.11
Ties 10 8 26 0.84 174.72
GIN NO.-706
Column-C (500mm*300mm)
Main Verl. Steel 16 2 10 2.70 54.00
Lap 16 2 10 0.82 16.32
Ties 10 2 26 1.45 75.40
Ties 10 2 26 0.90 46.80
Ties 10 2 26 0.61 31.72
Column-D (0.450m*0.300m)
Main Verl. Steel 16 5 8 2.70 108.00
C/O 1122.16 178.85 536.95 29.76

Measured on : 28.06.2022 Signature of Contractor/Representative Signature of JE

14
B/F 1122.16 178.85 536.95 29.76

Lap 16 5 8 0.82 32.64


Ties 10 5 26 1.35 175.50
Ties 10 5 26 0.40 52.00
Column (250mm*250mm)
Main Verl. Steel 16 7 4 2.70 75.60
Lap 16 7 4 0.82 22.85
Ties 10 7 26 0.84 152.88
GIN NO.-707
Column-C (950mm*300mm)
Main Verl. Steel 20 2 11 2.70 59.40
Lap 20 2 11 1.02 22.44
Main Verl. Steel 25 2 3 2.70
Lap 25 2 3 1.28
Ties 10 2 26 2.31 120.12
Ties 10 2 26 0.98 50.96
Ties 10 2 26 1.04 54.08
Column D (0.750m*0.300m)
Main Verl. Steel 20 1 12 2.70 32.40
Lap 20 1 12 1.02 12.24
Ties 10 1 26 1.94 50.44
Ties 10 1 26 1.20 31.20
Ties 10 1 26 0.86 22.36
Column-C (250mm*250mm)
Main Verl. Steel 16 3 4 2.70 32.40
Lap 16 3 4 0.82 9.79
Ties 10 3 26 0.84 65.52
GIN NO.-708-A
Column-C (700mm*300mm)
Main Verl. Steel 20 2 12 2.70 64.80
Lap 20 2 12 1.02 24.48
Ties 10 2 26 1.81 94.12
Ties 10 2 26 1.24 64.48
Ties 10 2 26 0.79 41.08
Column-D (0.550m*0.300m)
Main Verl. Steel 20 2 10 2.70 54.00
Lap 20 2 10 0.82 16.32
Ties 10 2 26 1.58 82.16
Ties 10 2 26 0.96 49.92
Ties 10 2 26 0.67 34.84
Column (250mm*250mm)
Main Verl. Steel 16 4 4 2.70 43.20
Lap 16 4 4 0.82 13.06
Ties 10 4 26 0.84 87.36
GIN NO.-708 B
Column-C (500mm*300mm)
Main Verl. Steel 12 2 3 2.70 16.20
Lap 12 2 3 0.61 3.67
Main Verl. Steel 16 2 7 2.70 37.80
Lap 16 2 7 0.82 11.42
Ties 10 2 26 1.45 75.40
Ties 10 2 26 0.90 46.80
Ties 10 2 26 0.61 31.72
Column-D (0.400m*0.300m)
Main Verl. Steel 16 2 8 2.70 43.20
Lap 16 2 8 0.82 13.06
Ties 10 2 26 1.25 65.00
Ties 10 2 26 0.39 20.28
Column (250mm*250mm)
Main Verl. Steel 16 4 4 2.70 43.20
Lap 16 4 4 0.82 13.06
Ties 10 4 26 0.84 87.36
Total length in M 0.00 2677.74 198.72 928.23 315.84
Weight in kg/m 0.395 0.610 0.888 1.570 2.457
Total weight in kg 0.00 1633.421 176.463 1457.321 776.019
Grand Total in Kg= 4135.238
Net Payble [Link] Kg 4135.238
Carried over to Page No. of TCMB

Measured on : 28.06.2022 Signature of Contractor/Representative Signature of JE

15
Agt. Centering & shuttering i/c strutting propping etc & removal of form for
No- Foundations, footings, bases of columns, etc. for mass concrete
2.2.1

Description of item Details of Actual Measurement


No. No. Length Breadth Depth
GIN NO. 706 1 2 3 4 5
For Single R. Wall . Hilly Left side.
Panel-1
For Base 1 2 3.60 0.55
1 2 - 3.2 0.55
Key 1 1 3.60 0.60
Panel-2
Base 1 2 1.90 0.55
1 2 3.20 0.55
Key 1 1 1.90 0.60
For single [Link] Village side (aproach)
Base 1 2 3.70 0.35
1 2 2.00 0.35
Key 1 1 3.70 0.25
GIN NO. 708-A
For single [Link] Main Road Side
Base 1 2 1.00 0.35
1 2 2.00 0.35
Key 1 1 1.00 0.25
For single [Link] Main Road Side
Base 1 2 2.20 0.35
1 2 2.00 0.35
1 1 2.20 0.25
GIN NO. 699
For single [Link] Hill Right Side
Base 1 2 6.05 0.35
1 2 2.00 0.35
Key 1 1 6.05 0.25
For single [Link] B.S.F Side
Base 1 2 13.70 0.35
1 2 2.00 0.35
Key 1 1 13.70 0.25
Total
Carried over to Page No. of TCMB

Measured on : 30.06.2022 Signature of Contractor/Representative Signature of JE

16
Same work same agency
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content
as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including
Agt admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability to get
No- shutter finished surface as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design
2.5 mix is payable/recoverable separately).

2.5.1 All works upto plinth level


Description of item Details of Actual Measurement
No. No. Length Breadth Depth

1 2 3 4 5
GIN No-706
for single [Link] hill left side

Base (Footing) 1 1 3.60 3.20 0.55


key 1 1 3.60 0.55 0.60
Wall (stem) B=(0.55+.250)/2=0.4 1 1.00 3.60 0.40 5.88
H=(5.6+6.175)/2=5.88

for single [Link] hill left side


Base (Footing) 1 1 1.90 3.20 0.55
key 1 1 1.90 0.55 0.60
Wall (stem) B=(0.55+.250)/2=0.4 1 1 1.90 0.40 3.00

for single [Link] BSF(village) camp fencing side


Base (Footing) 1 1 3.70 2.00 0.35
key 1 1 3.70 0.30 0.25
Wall (stem) B=(0.350+.200)/2=0.28 1 1 4.20 0.28 2.20
Wing wall left side of culvert
Wall top to slope finishing H=(0.05+0.4)/2=0.23 1 1 5 0.25 0.23
Wing wall Right side of culvert
Wall top to slope finishing H=(0.150+0.4)/2=0.28 1 1 5.00 0.25 0.28
Wing wall Right side of culvert toward fencing
Wall top to slope finishing H=(0.150+0.350)/2=0.25 1 1 6.00 0.25 0.25

Total
Carried over to Page No. of TCMB

Agt No- Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
2.6

Description of item Details of Actual Measurement


No. Length Breadth Depth
1 2 3 4 5
Qty as per item no. 2.5.1 cum Qtl
Extra cement =(407-330)=77 kg/cum 1.00 28.73 0.77
Total
Carried over to Page No. of TCMB

Measured on : 22.09.2022 Signature of Contractor/Representative Signature of JE

17
Agt No- Centering & shuttering i/c strutting propping etc & removal of form for
2.2.2 Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Details of Actual Measurement
Description of item
No. No. Length Breadth Depth
1 2 3 4 5
GIN No-706
for single [Link] hill left side
Wall (stem) B=(0.55+.250)/2=0.4 1 2.00 3.60 5.88
faces 1 1.00 0.40 5.88
for single [Link] hill left side
Wall (stem) B=(0.55+.250)/2=0.4 1 2 1.90 3.00
faces 1 1 0.40 3.00
for single [Link] BSF(village) camp fencing side
Wall (stem) B=(0.350+.200)/2=0.28 1 2 4.20 2.20
faces 1 1 0.28 2.20
Wing wall left side of culvert
Wall top to slope finishing H=(0.05+0.4)/2=0.23 1 2 5 0.23
1 1 0.25 0.23
Wing wall Right side of culvert
Wall top to slope finishing H=(0.150+0.4)/2=0.28 1 2 5.00 0.28
1 1 0.25 0.28
Wing wall Right side of culvert toward fencing
Wall top to slope finishing H=(0.150+0.350)/2=0.25 1 2 6.00 0.25
1 1 0.25 0.25
Total
Carried over to Page No. of TCMB
Same work same agency
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content
Agt as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including
admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability to get
No- shutter finished surface as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design
2.5 mix is payable/recoverable separately).

2.5.1 All works upto plinth level


Description of item Details of Actual Measurement
No. No. Length Breadth Depth

1 2 3 4 5
GIN No-708-A
for single [Link] Main road side along fencing

Base (Footing) 1 1 1.00 2.00 0.35


key 1 1 1.00 0.30 0.25
Wall (stem) B=(0.350+.200)/2=0.28 1 1.00 1.00 0.28 2.50

for single [Link] Main road side


Base (Footing) 1 1 2.20 2.00 0.35
key 1 1 2.20 0.30 0.25
Wall (stem) B=(0.350+.250)/2=0.28 1 1 2.20 0.28 2.00

U-shape wall main road side


3.7 m to finishing slope (top) 1 2 5.50 0.25 1.68
H=(.150+3.20)/2=1.68
For Guard wall above R. wall main road side 1 7 0.90 0.25 0.60
Total
Carried over to Page No. of TCMB

Agt No- Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
2.6

Description of item Details of Actual Measurement


No. Length Breadth Depth
1 2 3 4 5
Qty as per item no. 2.5.1 cum Qtl
Extra cement =(407-330)=77 kg/cum 1.00 9.99 0.77
Total
Carried over to Page No. of TCMB

Measured on : 22.09.2022 Signature of Contractor/Representative Signature of JE

18
Agt No- Centering & shuttering i/c strutting propping etc & removal of form for
2.2.2 Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Details of Actual Measurement
Description of item
No. No. Length Breadth Depth
1 2 3 4 5
GIN No-708-A
for single [Link] Main road side along fencing
Wall (stem) B=(0.350+.200)/2=0.28 1 2.00 1.00 2.50
1 2.00 0.28 2.50
for single [Link] Main road side
Wall (stem) B=(0.350+.250)/2=0.28 1 2 2.20 2.00
1 2 0.28 2.00
U-shape wall main road side
3.7 m to finishing slope (top) 2 2 5.50 1.68
H=(.150+3.20)/2=1.68
2 2 0.25 1.68
For Guard wall above R. wall main road side 2 7 0.90 0.60
2 7 0.25 0.60
Total
Carried over to Page No. of TCMB

Measured on :22.09.2022 Signature of Contractor/Representative Signature of JE

19
Same work same agency
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content
as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including
Agt admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability to get
No- shutter finished surface as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design
mix is payable/recoverable separately).
2.5

2.5.1 All works upto plinth level


Description of item Details of Actual Measurement
No. No. Length Breadth Depth

1 2 3 4 5
GIN No-699
for single [Link] Hill Right side

Base (Footing) 1 1 6.05 2.00 0.35


key 1 1 6.05 0.30 0.25
Wall (stem) B=(0.350+.200)/2=0.28 1 1.00 6.05 0.28 2.90
H=(3.08+2.73)/2=2.9

for single [Link] BSF side


Base (Footing) 1 1 13.70 2.00 0.35
key 1 1 13.70 0.30 0.25
Wall (stem) B=(0.350+.250)/2=0.28 1 1 13.70 0.28 2.30

U-shape wall Hilly side


Span no. 5 1 2 3.6 0.25 0.15
Extra lift (both side) 1 2 1.85 0.25 0.85
Span no. 6 1 2 3.5 0.25 0.1
Extra lift ( left side) 1 1 1.35 0.25 0.85
Extra lift ( Right side) 1 1 1.8 0.85 0.25
Span no. 7 1 2 3.6 0.25 0.4
Extra lift ( left side) 1 1 1.65 0.25 0.85
Extra lift ( Right side) 1 1 1.8 0.25 0.85
Span no. 8
Extra lift ( left side) 1 1 1.67 0.25 0.85
Extra lift ( Right side) 1 1 1.55 0.25 0.85
Span no. 9 H=(1.950+3.30)/2-1.7=.925 1 2 3.6 0.25 0.925
Total
Carried over to Page No. of TCMB

Agt No- Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
2.6

Description of item Details of Actual Measurement


No. Length Breadth Depth
1 2 3 4 5
Qty as per item no. 2.5.1 cum Qtl
Extra cement =(407-330)=77 kg/cum 1.00 34.75 0.77
Total
Carried over to Page No. of TCMB

Measured on : 22.09.2022 Signature of Contractor/Representative Signature of JE

20
Agt No- Centering & shuttering i/c strutting propping etc & removal of form for
2.2.2 Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Details of Actual Measurement
Description of item
No. No. Length Breadth Depth
1 2 3 4 5
GIN No-699
for single [Link] Hill Right side

Wall (stem) 1 2.00 6.05 2.90


H=(3.08+2.73)/2=2.9

Faces , B=(0.350+.200)/2=0.28 1 2.00 0.28 2.90

for single [Link] BSF side


Wall (stem) B=(0.55+.250)/2=0.4 1 2 13.70 2.30

Faces , B=(0.350+.200)/2=0.28 1 2.00 0.28 2.90

U-shape R. wall Hilly side (Slope finishing)


Span no. 5 2 2 3.6 0.15
2 1 0.25 0.15
Extra lift (both side) 2 2 1.85 0.85
2 1 0.25 0.85
Span no. 6 (2m to 2.100 mtr)=2 nos 2 2 3.5 0.1
2 1 0.25 0.1
Extra lift ( left side) 1 2 1.35 0.85
1 1 0.25 0.85
Extra lift ( Right side) 1 2 1.8 0.25
1 1 0.85 0.25
Span no. 7 2 2 3.6 0.4
1 1 0.25 0.4
Extra lift ( left side) 1 2 1.65 0.85
1 1 0.25 0.85
Extra lift ( Right side) 1 2 1.8 0.85
1 1 0.25 0.85
Span no. 8 1
Extra lift ( left side) 1 2 1.67 0.85
1 2 0.25 0.85
Extra lift ( Right side) 1 2 1.55 0.85
1 2 0.25 0.85
Span no. 9 H=(1.950+3.30)/2-1.7=.925 2 2 3.6 0.925
1 2 0.25 0.925

Measured on : 22.09.2022 Signature of Contractor/Representative Signature of JE

21
Same work same agency
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content
as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including
Agt admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability to get
No- shutter finished surface as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design
mix is payable/recoverable separately).
2.5

2.5.1 All works upto plinth level


Description of item Details of Actual Measurement
No. No. Length Breadth Depth

1 2 3 4 5
GIN No-708B
Span no. 1,2&3

single wall top of roof to top of slope finishing


H=(0.00+.80)/2=0.4 1 2 4.00 0.25 0.40
Total
Carried over to Page No. of TCMB

Agt No- Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
2.6

Description of item Details of Actual Measurement


No. Length Breadth Depth
1 2 3 4 5
Qty as per item no. 2.5.1 cum Qtl
Extra cement =(407-330)=77 kg/cum 1.00 0.80 0.77
Total
Carried over to Page No. of TCMB
Agt No- Centering & shuttering i/c strutting propping etc & removal of form for
2.2.2 Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Details of Actual Measurement
Description of item
No. No. Length Breadth Depth
1 2 3 4 5
GIN No-708B
Span no. 1,2&3

single wall top of roof to top of slope finishing

H=(0.00+.80)/2=0.4 1 2 4.00 0.40


1 1 0.25 0.40
Total

Measured on : 22.09.2022 Signature of Contractor/Representative Signature of JE

22
Same work same agency
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content
Agt as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including
No- admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability to get
shutter finished surface as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design
2.5 mix is payable/recoverable separately).

2.5.2 All works above plinth level up to floor V level


Description of item Details of Actual Measurement
No. No. Length Breadth Depth
1 2 3 4 5
GIN NO. 699
Column-C (600mm*300mm)=2 nos 2 1 0.60 0.30 2.70
Column-D(450mm*300mm)= 3 nos 3 1 0.45 0.30 2.70
Column- (250mm*250mm)= 5 nos 5 1 0.25 0.25 2.70
GIN NO. 701 2.70
Column-C (550mm*300mm)=2 nos 2 1 0.55 0.30 2.70
Column-D(400mm*300mm)= 6 nos 6 1 0.40 0.30 2.70
Column- (250mm*250mm)= 8 nos 8 1 0.25 0.25 2.70
GIN NO. 706 2.70
Column-C (500mm*300mm)=2 nos 2 1 0.50 0.30 2.70
Column-D (450mm*300mm)= 5 nos 5 1 0.45 0.30 2.70
Column- (250mm*250mm)= 7 nos 7 1 0.25 0.25 2.70
GIN NO. 707 2.70
Column-C (950mm*300mm)=2 nos 2 1 0.95 0.30 2.70
Column-D(750mm*300mm)= 1 nos 1 1 0.75 0.30 2.70
Column- (250mm*250mm)= 3 nos 3 1 0.25 0.25 2.70
GIN NO. 708-A 2.70
Column-C (700mm*300mm)=2 nos 2 1 0.70 0.30 2.70
Column-D (550mm*300mm)= 2 nos 2 1 0.55 0.30 2.70
Column- (250mm*250mm)= 4 nos 4 1 0.25 0.25 2.70
GIN NO. 708-B 2.70
Column-C (500mm*300mm)=2 nos 2 1 0.50 0.30 2.70
Column-D (400mm*300mm)= 2 nos 2 1 0.40 0.30 2.70
Column- (250mm*250mm)= 4nos 4 1 0.25 0.25 2.70
Total
Carried over to Page No. of TCMB

Agt No- Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
2.6

Description of item Details of Actual Measurement


No. Length Breadth Depth
1 2 3 4 5
Qty as per item no. 2.5.1 cum Qtl
Extra cement =(407-330)=77 kg/cum 1.00 18.39 0.77
Total
Carried over to Page No. of TCMB

Measured on : 22.09.2022 Signature of Contractor/Representative Signature of JE

23
Centering and shuttering including strutting, propping etc. and removal of form for :
2.2
2.2.4 Columns, Pillars, Piers, Abutments, Posts and Struts
Description of item Details of Actual Measurement
No. No. Length Breadth Depth
1 2 3 4 5
GIN NO. 699
Column-C (600mm*300mm)=2 nos 2 2 0.60 2.70
2 2 0.30 2.70
Column-D (450mm*300mm)= 3 nos 3 2 0.45 2.70
3 2 0.30 2.70
Column- (250mm*250mm)= 5 nos 5 2 0.25 2.70

5 2 0.25 2.70
GIN NO. 701 2.70
Column-C (550mm*300mm)=2 nos 2 2 0.55 2.70
2 2 0.30 2.70
Column-D (400mm*300mm)= 6 nos 6 2 0.40 2.70
6 2 0.30 2.70
Column- (250mm*250mm)= 8 nos 8 2 0.25 2.70
8 2 0.25 2.70
GIN NO. 706 2.70
Column-C (500mm*300mm)=2 nos 2 2 0.50 2.70
2 2 0.30 2.70
Column-D (450mm*300mm)= 5 nos 5 2 0.45 2.70
5 2 0.30 2.70
Column- (250mm*250mm)= 7 nos 7 2 0.25 2.70
7 2 0.25 2.70
GIN NO. 707 2.70
Column-C (950mm*300mm)=2 nos 2 2 0.95 2.70
2 2 0.30 2.70
Column-D (750mm*300mm)= 1 nos 1 2 0.75 2.70
1 2 0.30 2.70
Column-(250mm*250mm)= 3 nos 3 2 0.25 2.70
3 2 0.25 2.70
GIN NO. 708-A 2.70
Column-C (700mm*300mm)=2 nos 2 2 0.70 2.70
2 2 0.30 2.70
Column-D (550mm*300mm)= 2 nos 2 2 0.55 2.70
2 2 0.30 2.70
Column- (250mm*250mm)= 4 nos 4 2 0.25 2.70
4 2 0.25 2.70
GIN NO. 708-B 2.70
Column-C (500mm*300mm)=2 nos 2 2 0.50 2.70
2 2 0.30 2.70
Column-D (400mm*300mm)= 2 nos 2 2 0.40 2.70
2 2 0.30 2.70
Column- (250mm*250mm)= 4 nos 4 2 0.25 2.70
4 2 0.25 2.70
Total

Carried over to Page No. of TCMB

Measured on : 22.09.2022 Signature of Contractor/Representative Signature of JE


Agt Providing and laying longitudinal drain of size 400mm at bottom, depth varying from 300mm to 500mm (all internal dimensions), made of full brick masonary in 1:6 (1 cement : 6 fine
No. sand) with 12mm cement plaster finished with a floating coat of neat cement of mix 1:4 (1 cement : 4 fine sand) on internal & top surface including excavation, backfilling, PCC [Link]
(1 cement : 5 fine sand : 10 stone aggregate) at base, PCC [Link] (1 cement : 2 fine sand : 4 aggregate) etc. complete as per drawing and directions of Engineer-in charge.
3.4

Description of item Details of Actual Measurement


No. No. Length Breadth Depth
Gin No. 699 1 2 3 4 5
Hill Side L=(30+30+10)=70 mtr 1 1 70.00
B.S.F Side (Fenching Side) , L=(30+30+30+14.5)=104.50 Mtr 1 1 104.50
B.S.F Side (Hill Side), L=(30+30+30+27.25)=117.25 Mtr 1 1 117.25
Gin No. 707
B.S.F Side (Hill side) ,L=(30+30+30+1)=91 Mtr 1 1 91.00
B.S.F Side (Fenching side) 1 1 19.50
Oppo. B.S.F Side (Fenching Side), L=(30+30+30+30+11)=131 Mtr 1 1 131.00
Oppo. B.S.F Side (Hill Side) ,L=(30+30+3)=63 Mtr 1 1 63.00
Gin No. 708 A
Hill Side, L=(30+30+30+30+30+6)=156 Mtr 1 1 156.00
Total

Measured on : 22.09.2022 Signature of Contractor/Representative Signature of JE

24
Same work same agency
Providing and laying 110mm diametre unplasticised Rigid single socketed PVC pipes conforming to IS:13592 Type-A, across the RCC/ Random
3.1 Rubble masonary retaining wall or breast wall for function as weep holes to reduce the horizontal pressure.

Description of item Details of Actual Measurement


No. No. Length Breadth Depth
1 2 3 4 5
GIN NO. 699
U-Shape Retaining Wall Hill Side
Span-1,2,3 2 17 0.435
Pipe L = (0.600+0.270) = 0.435m
U-Shape Retaining Wall B.S.F Side
Span- 1 & 2 2 17 0.435
Pipe L = (0.600+0.270) = 0.435m
Single Retaining Wall Hill Side (3m Height) 1 6 0.25
Pipe L = 0.250m
Single Retaining Wall B.S.F Side (3m Height)
Pipe L = 0.250m 1 22 0.25
GIN NO. - 701
U-Shape Retaining Wall Village Side
Pipe L = (0.400+0.270) = 0.325m 2 25 0.325
U-Shape Retaining Wall B.S.F Side
Pipe L = (0.400+0.270) = 0.325m 2 10 0.325
2 4 0.25
GIN NO. - 706
Single Retaining Wall Oppo. Right & Left Side (H-5m) 1 12 0.325
Pipe L = (0.400+0.270) = 0.325m 1 8 0.325
Single Retaining Wall Fenching Side (3m Height) 1 4 0.25
GIN NO. - 708-A
U-Shape Retaining Wall Road Side 2 6 0.25
Single Retaining wall Road side 1 6 0.27
GIN NO. - 708-B
U-Shape Retaining Wall Road Side
Span-1,2,3,&4 2 7 0.25
Total

Measured on : 22.09.2022 Signature of Contractor/Representative Signature of JE

25
Same work same agency
Agmt
Item Providing and laying in position machine batched and machine mixed design mix cement concrete for plain cement concrete work, using cement
NO:- 2.1 content as per approved design mix, including pumping of concrete to site of laying, finishing but excluding the cost of centering, shuttering,
including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing
strength and durability as per direction of Engineer-in-charge. (Note :- Excess/ less cement used as per design mix is payable/recoverable
separately).
2.1.1 All works upto plinth level :
[Link] M-15 grade plain cement concrete (cement content considered @ 240 kg/cum)
Description of item Details of Actual Measurement
No. No. Length Breadth Depth

GIN NO. 699 1 2 3 4 5


For Drain slab
Hill side
Bsf Side 1 1 5.15 1 0.1
1 1 4.80 1.00 0.08
Total
Agt No- Add/deduct for using extra cement in the items of design mix over and above the specified cement content therein.
2.6

Description of item Details of Actual Measurement


No. No. Length Breadth Depth
Qty as per item no. [Link] 1 2 3 4 5
Extra cement =(230-200)=66 kg/cum cum Qtl
1.00 0.90 0.66
Total
Carried over to Page No. of TCMB
Agt. Centering & shuttering i/c strutting propping etc & removal of form for
No- Foundations, footings, bases of columns, etc. for mass concrete
2.2.1

Description of item Details of Actual Measurement


No. No. Length Breadth Depth
GIN NO. 706 1 2 3 4 5
For Drain slab
Hill side 1 2 5.15 0.1
1 2 1 0.1
Bsf Side 1 1 4.80 0.08
1 2 1.00 0.08
Total
Carried over to Page No. of TCMB

Measured on : 22.09.2022 Signature of Contractor/Representative Signature of JE

26
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content
as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including
Agt admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability to get
No- shutter finished surface as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design
2.5 mix is payable/recoverable separately).

2.5.1 All works upto plinth level


Description of item Details of Actual Measurement
No. No. Length Breadth Depth
Re-Measurment 1 2 3 4 5
RCC Wall(Filling)Culvert side
Gap fillling, GIN no -707 1 1 0.97 5.00 3.50
B=(.5+1.5+.9)/3=0.97
GIN No-707
U Shape Retaining Wall (Hill Side)
Base 1 1 3.00 5.00 0.65
Haunch 2 0.50 3.00 0.30 0.30
Side Wall top of Base to Top=2 nos 2 1 3.00 0.43 6.30
Avg.B=(0.6+0.250)/2=0.43
Culvert Side Wall top of Base to Culvert slab 1 1 3.86 0.35 6.30
Avg.B=(0.45+0.25)/2=0.35
U Shape Retaining Wall (BSF Side) old Drawaing
Base ,L=(4.10+5.30)/2=4.7 1 1 4.70 5.00 0.25
Haunch 1 0.50 5.30 0.30 0.30
Haunch 1 0.50 4.10 0.30 0.30
Side Wall top of Base to Top=2 nos 1 1 5.30 0.25 1.75
Avg.H=(1.30+2.20)/2=1.75 1 1 4.10 0.25 1.75
Single Retaining Wall (Hill Side)
Key 1 1 5.00 0.55 0.60
Base 1 1 5.00 3.20 0.55
Wall Top of Base to Top 1 1 5.00 0.40 4.90
Avg.B=(0.55+0.25)/2=0.40
Single Retaining Wall (Hill Side)
Key 1 1 3.00 0.55 0.60
Base 1 1 3.00 3.20 0.55
Wall Top of Base to Top 1 1 3.00 0.40 3.00
Avg.B=(0.55+0.25)/2=0.40
Total
Less already paid in CMB no. 04/CMB/BFD-III/2022-2023 page no. 45

Total
Carried over to Page No. of TCMB

Measured on : 22.09.2022 Signature of Contractor/Representative Signature of JE

27
er Udaipur, Gukulnagar,
8A & 708B under

cum

Contents of
Area

55.68
1.94
17.58
1.28
15.44

0.63
92.55

cum

Contents of
Area

34.73
3.7
38.43

cum

Contents of
Area

0.00
4.50
0.00
0.18
0.00
9.38
0.38
0.00
0.00
32.50
0.81
0.00
52.50
2.10
0.00
0.00
202.70

305.05

Signature of JE

28
cum

Contents of
Area

8.13
8.13

Signature of JE

29
cum

Contents of
Area

0.35

13.98
0.39
23.00

1.45

39.17
-20.94

18.23

cum

Contents of
Area
6

14.04
14.04
e No. of TCMB

Signature of JE

30
Sqm

Contents of
Area

5.59
6.50
-4.65

7.44
Sqm

Sqm
Contents of
Area
6

2.80

3.61
53.49

50.91
5.35

11.60
0.29
128.05
-125.81

2.24

Signature of JE

31
Cum

Contents of
Area

0.95
0.20

0.5
0.1

0.63
0.22

0.17
0.03

0.37
0.07

1.03
0.18

2.33
0.41
7.19

Signature of JE

32
cum

Contents of
Area

2.16
2.16

Sqm

Contents of
Area

0.72
0.64

0.38
0.64

0.74
0.4

0.20
0.4

0.44
0.4

1.21
0.4

2.74
0.4
9.71

Signature of JE

33
e upto all level.

25 mm

0.000
3.858
0.000

e No. of TCMB

Signature of JE

34
e upto all level.

25 mm

0.000
3.858
0.000

e No. of TCMB

Signature of JE

35
e upto all level.

25 mm

0.000
3.858
0.000

e No. of TCMB

Signature of JE

36
e upto all level.

25 mm

0.00
3.858
0.000

e No. of TCMB

Signature of JE

37
e upto all level.

25 mm

38
Signature of JE

39
0.000
3.858
0.000

e No. of TCMB

Signature of JE

40
e upto all level.

25 mm

0.00
3.858
0.000

e No. of TCMB
e up to all height.

25 mm

0.00

Signature of JE

41
0.00

16.20
7.65

23.85
3.858
92.013

Signature of JE

42
Sqm

Contents of
Area

3.96
3.52
2.16

2.09
3.52
1.14

2.59
1.4
0.93

0.70
1.4
0.25

1.54
1.4
0.55

4.24
1.4
1.51

9.59
1.4
3.43
48.72

Signature of JE

43
cum

Contents of
Area

6.34
1.19
8.47

3.34
0.63
2.28

2.59
0.28
2.59

0.29

0.35
0.00
0.38
0.00
28.73

cum

Contents of
Area
6

22.12
22.12
e No. of TCMB

Signature of JE

44
Sqm
Contents of
Area
6

42.34
2.35

11.40
1.20

18.48
0.62

2.30
0.06

2.80
0.07
0.00
3.00
0.06
84.68

cum

Contents of
Area

0.70
0.08
0.70

1.54
0.17
1.23

4.62

0.95
9.99

cum

Contents of
Area
6

7.69
7.69
e No. of TCMB

Signature of JE

45
Sqm
Contents of
Area
6

5.00
1.40

8.80
1.12

36.96

1.68
7.56
2.10
64.62

Signature of JE

46
cum

Contents of
Area

4.24
0.45
4.91

9.59
1.03
8.82

0.00
0.27
0.79
0.18
0.29
0.38
0.72
0.35
0.38
0.00
0.35
0.33
1.67
34.75

cum

Contents of
Area
6

26.76
26.76
e No. of TCMB

Signature of JE

47
Sqm
Contents of
Area
6

35.09

1.62

63.02

1.62

2.16
0.08
6.29
0.43
1.40
0.05
2.30
0.21
0.90
0.21
5.76
0.10
2.81
0.21
3.06
0.21
0.00
2.84
0.43
2.64
0.43
13.32
0.46
147.65
Signature of JE

48
cum

Contents of
Area

0.80
0.80

cum

Contents of
Area
6

0.62
0.62
e No. of TCMB

Sqm
Contents of
Area
6

3.20
0.10
3.30
Sqm

Signature of JE

49
cum

Contents of
Area
6

0.97
1.09
0.84

0.89
1.94
1.35

0.81
1.82
1.18

1.54
0.61
0.51

1.13
0.89
0.68

0.81
0.65
0.68
18.39
cum

cum

Contents of
Area
6

14.16
14.16
e No. of TCMB

Signature of JE

50
Contents of
Area
6

6.48
3.24
7.29
4.86
6.75

6.75

5.94
3.24
12.96
9.72
10.80
10.80

5.40
3.24
12.15
8.10
9.45
9.45

10.26
3.24
4.05
1.62
4.05
4.05

7.56
3.24
5.94
3.24
5.40
5.40

5.40
3.24
4.32
3.24
5.40
5.40
221.67
Sqm
CMB

Signature of JE
k masonary in 1:6 (1 cement : 6 fine
g excavation, backfilling, PCC [Link]
of Engineer-in charge.

Contents of
Length
6
70.00
104.50
117.25

91.00
19.50
131.00
63.00

156.00
752.25
Mtr

Signature of JE

51
cum

Contents of
Area

14.79

14.79

1.50

5.50

16.25

6.50
2.00

3.90
2.60
1.00

3.00
1.62

3.50
76.95
Mtr

Signature of JE

52
Cum

Contents of
Area

0.52
0.38
0.90

cum

Contents of
Area

0.59
0.59

Sqm

Contents of
Area

1.03
0.2
0.38
0.16
1.77

Signature of JE

53
cum

Contents of
Area
6

16.98

9.75
0.27
16.25

8.51

5.88
0.24
0.18
2.32
1.79

1.65
8.80
9.80

0.99
5.28
3.60

92.29
-88.57

3.72
cum

Signature of JE

54
THEORETICAL CONSUMTION STATEMENT OF Paint

Name of Work: - Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar, Teliamura & Panisagar Sector in
Tripura SH: GIN No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur Sector
Location of Work:- BFSD-III
Name of the Contractor :Shri Uttam deb
Reference to Agreement no:-02/EE/BFD-III/AGT/2021-2022
Date of written order to commence work :09.04.2021
Stipulated date of completion of work:- 02.07.2022
Date of actual completion of work:- in progress
Date of Abstract: -09.10.2023
Reference to previous measurements, if any:-
Serial no of this bill :- 10th R/A BILL

Item No. Brief Description Qty. Co-efficient Paint Req. Remarks


4.6 Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per
manufacturer's specifications including appropriate priming coat, preparation of surface, etc.
4.6.1 complete
On steel work 1508.96 Sqm 0.125 Ltr./Sqm 188.62
Total 188.62
Say 188.62 Litre
Quantity Received by the Agency 260 Litre
Quantity consumed 188.62 Litre
Balance Quantity under custody of Agency 71.38 Litre

Contractor Junior Engineer


AE
THEORETICAL CONSUMTION STATEMENT OF CEMENT

Name of Work: - Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar, Teliamura & Panisagar Sector in Tripura SH: GIN No. 697A,
697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur Sector
Location of Work:- BFSD-III
Name of the Contractor :Shri Uttam deb
Reference to Agreement no:-02/EE/BFD-III/AGT/2021-2022
Date of written order to commence work :09.04.2021
Stipulated date of completion of work:- 02.07.2022
Date of actual completion of work:- in progress
Date of Abstract: -09.10.2023
Reference to previous measurements, if any:-
Serial no of this bill :- 10th R/A BILL

Item No. Brief Description Qty. Co-efficient Cement Req. Remarks


2.1 Providing and laying in position machine batched and machine mixed design mix cement concrete for plain cement
concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying,
2.1.1 finishing
All worksbut excluding
upto the: cost of centering, shuttering, including admixtures in recommended proportions as per
plinth level
IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as
[Link] M-15 grade plain cement concrete (cement content considered @ 240 kg/cum) 791.62 Cum 3.060 Qtl/Cum 2422.36 Qtl.
[Link] M-10 grade plain cement concrete (cement content considered @ 220 kg/cum) 266.13 Cum 2.600 Qtl/Cum 691.94 Qtl.
[Link] M-7.5 grade plain cement concrete (cement content considered @ 200 kg/cum) 222.30 Cum 2.300 Qtl/Cum 511.29 Qtl.
2.5 Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for
reinforced cement concrete work, using cement content as per approved design mix, including pumping of
concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including
admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve
workability without impairing strength and durability to get shutter finished surface as per direction of Engineer-in-
charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design
mix is payable/recoverable separately).

2.5.1 All works upto plinth level 2805.81 Cum 4.070 Qtl/Cum 11419.65 Qtl.
2.5.2 All works above plinth level upto floor V level 326.05 Cum 4.070 Qtl/Cum 1327.02 Qtl.
3.4 Providing and laying longitudinal drain of size 400mm at bottom, depth varying from 300mm to 500mm (all internal
dimensions), made of full
brick masonry in 1:6 (1 cement : 6 fine sand) with 12 mm cement plaster finished with a floating coat of neat
cement of mix 1:4 (1 cement : 4 fine sand) on internal & top surface including excavation, backfilling, PCC [Link]
(1 cement : 5 fine sand : 10 stone aggregate) at base, PCC [Link] (1 cement : 2 fine sand : 4 stone aggregate) etc.
complete as per drawing and directions of Engineerin- charge.

PCC ([Link]) 93.42 cum 1.300 Qtl/Cum 121.45 Qtl.


PCC ([Link]) 22.24 cum 3.200 Qtl/Cum 71.18 Qtl.
Brick masonary (1:6) 250.23 cum 0.625 Qtl/Cum 156.40 Qtl.
12 mm cement plaster finished with a floating coat of neat cement of mix 1:4 1612.62 Sqm 0.077 Qtl/Sqm 123.69 Qtl.
Total 16844.98
variation @+,- 2% 336.90
Total = 17181.880
Say 1718.19 M.T
Quantity Received by the Agency Bag Bag

Quantity consumed Bag

Balance Quantity under custody of Agency Bag

Contractor Junior Engineer


AE
10th R.A Bill
MANDATORY TEST STSTEMENT
Name of Work: - Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar, Teliamura &
Panisagar Sector in Tripura SH: GIN No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur Sector
Dvision: Border Fencing Division-III, Agartala
Reference to Agreement no:-02/EE/BFD-III/AGT/2021-2022 Sub-Divn.: Border Fencing Sub-Division-III, Sabroom
Date of written order to commence work :09.04.202
Date of completion : In progress

QTY as Upto No. Of No. of test


Sl. Details of Frequency as per
Details of tests to be carried out per Agt date Test actually Remarks
No. Item specification
(m3) Qty(m3) Required carried out
Specific Gravity
Stone A.I.V. of stone aggregate
50 cum or Each Change of
1 Aggregate Aggregate crushing Value 804 850.00 17.00 17.00
source
40 mm Gradation of stone aggregate
Water absorption

Specific Gravity
Stone A.I.V. of stone aggregate
2 Aggregate 1716 50 cum or Each Change of 2250.00 45.00 45
Aggregate crushing Value
20 mm source
Gradation of stone aggregate
Water absorption

Specific Gravity
Stone A.I.V. of stone aggregate
3 Aggregate 786 50 cum or Each Change of 880.00 17.00 17
Aggregate crushing Value
10 mm source
Gradation of stone aggregate
Water absorption
PH Value
4 Water Limit of Acidity 3 month or Each Change of
source
10 10
Limit of Alkality
Percentage of Solids
RCC Work Compressuve strength
5 415 222.30 5.00 5
M-7.5 Workability sample test
RCC Work Compressuve strength
6 378 266.13 6.00 6
M-10 Workability sample test
1test/50 cum
RCC Work Compressuve strength
7 761 791.62 16.00 16
M-15 Workability sample test
RCC Work Compressuve strength
8 2508 3131.86 63.00 63
M-25 Workability sample test
10 mm 1test/35 tonnes 92.79 3.00 3
12 mm 1test/35 tonnes 41.69 1.00 1
367.141 1test/45 tonnes
9 Steel 16 mm 128.41 3.00 3
MT
20 mm 1test/45 tonnes 30.82 1.00 1
25 mm 1test/35 tonnes 6.60 1.00 1
silt content
10(a For CC
)
sand bulking of sand --- 1test/50 cum 1950.00 33.00 33
works
Gradation of sand
silt content
11(b
sand bulking of sand 1test/20 cum 380.00 18.00 18 For Drain
)
Gradation of sand
Standard Consistency, percent
Initial Setting Time, minutes
Final Setting Time, minutes 1421.05
12 Cement 1test/50 tonnes 1718.19 35 35
Soundness, mm MT
Fineness, percent
Specific Gravity

Junior Engineer Assistant Engineer


Agency / BFSD-III Sub- BFSD-III Sub-Division
Representative Division Sabroom
Sabroom
RUNNING ACCOUNT BILL
Name of Work: - Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar, Teliamura & Panisagar Sector in Tripura SH: GIN
No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur Sector
Location of Work:- BFSD-III
Name of the Contractor :Shri Uttam Deb
Reference to Agreement no:-02/EE/BFD-III/AGT/2021-2022
Date of written order to commence work :09.04.2021
Stipulated date of completion of work:- 02.07.2022
Date of actual completion of work:- in progress
Date of Abstract: - 09.10.2023
Reference to previous measurements, if any:-
Serial no of this bill :- 9th R/A BILL

ITEM NO.
Sub-Head and Item of works UNIT Rate Qty Amount Previous Bill

SH: Sub Head - I : Earth Work


1.2 Earth work in excavation by mechanical means (Hydraulic excavator)/manual
means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on
plan) including getting out and disposal of excavated earth lead upto 50 m and lift
upto 1.5 m, as directed by Engineer-in-charge

1.2.1 All kinds of soil


Full
cum 158.55 9408.10 1491654.26 1262058.00
Rate
(A)
M/R 159.98 900.00 143982.00 0.00

1.3 Filling available excavated earth (excluding rock) in trenches, plinth, sides of
foundations etc. in layers not exceeding 20cm in depth, consolidating each Full
cum 169.60 2140.67 363057.63 281719.17
deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. Rate

1.5 Extra for every additional lift of 1.5 m or part thereof in excavation / banking
excavated or stacked materials.
1.5.1 All kinds of soil Full
cum 69.55 4804.51 334153.67 307429.08
Rate
1.6 Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees
and saplings of girth up to 30 cm measured at a height of 1 m above ground level Full
and removal of rubbish up to a distance of 50 m outside the periphery of the area Sqm 9.60 2518.14 24174.14 15772.22
Rate
cleared.

2.1 Providing and laying in position machine batched and machine mixed design mix
cement concrete for plain cement concrete work, using cement content as per
approved design mix, including pumping of concrete to site of laying, finishing but
excluding the cost of centering, shuttering, including admixtures in recommended
proportions as per IS: 9103 to accelerate, retard setting of concrete, improve
workability without impairing strength and durability as per direction of Engineer-in-
charge. (Note :- Excess/ less cement used as per design mix is
payable/recoverable separately).

2.1.1 All works upto plinth level :


[Link] M-15 grade plain cement concrete (cement content considered @ 240 kg/cum)
Full
cum 13937.05 791.62 11032847.52 10544493.29
Rate
[Link] M-10 grade plain cement concrete (cement content considered @ 220 kg/cum)
Full
cum 13749.00 266.13 3659021.37 2561301.21
Rate
[Link] M-7.5 grade plain cement concrete (cement content considered @ 200 kg/cum)
Full
cum 13560.90 222.30 3014588.07 3014588.07
Rate
2.2 Centering and shuttering including strutting, propping etc. and removal of form for :

2.2.1 Foundations, footings, bases of columns, etc. for mass concrete


Full
Sqm 303.40 1688.43 512269.66 344170.89
Rate
2.2.2 Walls (any thickness) including attached pilasters, butteresses, plinth and string courses Full
Sqm 575.80 6394.70 3682068.26 2832360.20
etc. Rate

M/R 610.75 3483.50 2127547.63 0.00


(B)
2.2.3 Suspended floors, roofs, landings, balconies and access platform
Sqm 662.00 668.43 442500.66 320216.02
2.2.4 Columns, Pillars, Piers, Abutments, Posts and Struts Full
Sqm 757.55 590.30 447181.77 260324.48
Rate
2.3
Extra for additional height in centering, shuttering where ever required with adequate
bracing, propping etc., including cost of deshuttering and decentering at all levels, over a
height of 3.5 m, for every additional height of 1 metre or part thereof (Plan area to be
measured).
2.3.1 Suspended floors, roofs, landings, balconies (Plan area to be measured) Sqm 642.45 2025.00 1300961.25 1011858.75
2.4 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto all level.

2.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more. Full


KG 104.65 300307.60 31427190.44 26493125.04
Rate
2.5
Providing and laying in position machine batched and machine mixed design mix M-25
grade cement concrete for reinforced cement concrete work, using cement content as per
approved design mix, including pumping of concrete to site of laying but excluding the cost
of centering, shuttering, finishing and reinforcement, including admixtures in recommended
proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability
without impairing strength and durability to get shutter finished surface as per direction of
Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum.
Excess/ less cement used as per design mix is payable/recoverable separately).
2.5.1 All works upto plinth level cum P/R 14750.00 2750.80 40574300.00 31211000.00
(C ) P/R 14750.00 55.01 811397.50 0.00
2.5.2 All works above plinth level upto floor V level cum F/R 15864.65 326.05 5172669.13 3738504.77
2.6 Add/deduct for using extra cement in the items of design mix over and above the specified
cement content therein. Qtl F/R 915.00 1584.70 1450000.50 1450000.50
915.00 415.30 379999.50 379999.50
3.1
Providing and laying 110mm diametre unplasticised Rigid single socketed PVC pipes Mtr F/R 338.85 288.44 97737.89 50556.42
conforming to IS:13592 Type-A, across the RCC/ Random Rubble masonary retaining wall
or breast wall for function as weep holes to reduce the horizontal pressure.
3.3
Providing and fixing drainage spoutswith 100 mm dia GI pipes as per drawing and 200 mm Each P/R 1687.45 48.00 80997.60 57373.30
dia grating by Ms flat 25mm X 3mm thick welded with 10mm dia MS bars. etc. complete.
3.4 Providing and laying longitudinal drain of size 400mm at bottom, depth varying from
300mm to 500mm (all internal dimensions), made of full brick masonry in 1:6 (1 cement : 6
fine sand) with 12 mm cement plaster finished with a floating coat of neat cement of mix 1:4
(1 cement : 4 fine sand) on internal & top surface including excavation, backfilling, PCC F/R 4498535.54 4175752.52
[Link] (1 cement : 5 fine sand : 10 stone aggregate) at base, PCC [Link] (1 cement : 2 fine
sand : 4 stone aggregate) etc. complete as per drawing and directions of Engineerin-
charge. Meter 4044.90 1112.15

Sub Head- IV : Steel work- Grill Drop/Lifting


4.1
structural steel work in single section, fixed with or without connecting plate including 287974.27 177956.85
cutting hoisting, fixing in position all complete. kg 80.30 3586.23
4.2
Steel work in built up tubular ( round, square or rectangular hollow tubes etc.) trusses etc.,
including cutting, hoisting, fixing in position and applying a priming coat of approved steel
primer, including welding and bolted with special shaped washers etc. complete.
4.2.1 Hot finished welded type tubes kg 139.24 2320.00 323036.80 226603.35
4.3 Steel work welded in built up sections/
framed work, including cutting,
hoisting, fixing in position using
structural steel etc. as required
4.3.1 In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works kg P/R 125.00 34232.04 4279005.00 2643997.50
4.4 Providing and fixing hand rail of approved size by welding etc. to steel ladder railing,
balcony railing, staircase railing and similar works.
4.4.1 G.I. Pipes kg 168.05 260.88 43840.88 26476.28
Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of
4.5
corrugation as approved by Engineer-in-charge) 0.50 mm ( + 0.05 %), total coated
thickness with zinc coating 120 gm per sqm as per IS:277 in 240 mpa steel grade, 5-7
microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. 164772.05 164772.05
Sheet should have protective guard film of 25 microns minimum to avoid scratches during
transportation and should be supplied in single length upto 12metre or as desired by Sqm 878.55 187.55
4.6 Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per
manufacturer's specifications including appropriate priming coat, preparation of surface,
etc. complete
4.6.1 On steel work Sqm 181.90 1508.96 274479.82 160799.60
4.7 Providing and fixing in position chain pully block having ISI mark (IS - 3832) of 2 tonne
capacity and 3.00 metre Standard lift including necessary chain, hook etc all complete as 1494600.90 919754.40
per direction of Engineer-in charge
Nos. 19161.55 78.00
4.8 Extra for additional chain system etc for extra lift of chain & pully block beyond 3.00m
standard lift Mtr 691.80 104.00 71947.20 55344.00

(D) 693.65 741.81 514556.51 0.00


Sub Head-V : Fencing Work
5.2 Providing and fixing security fencing of GI barbed wire consisting of copper enriched MS
angle posts of 90mm x 90mm x 6mm, 3000mm length above ground level (2000mm
vertical and 1000mm slanting) duly fabricated and welded at bend as per drawing and
1045 mm below ground level placed at 3000mm centre to centre & embeded in cement
concrete blocks 600mm dia at bottom and 300mm at top 1295mm deep placed at 1195
mm below ground level & every 10th post, end posts & corner posts to be strutted with MS
angle strut on both sides, of size 90mm x 90mm x 6mm & 3440mm in length (200mm
vertical at top & 3240mm slanting
down) fabricated and welded as per drawing bolted to vertical posts with two Nos. 12mm
dia & 50 mm long MS bolts & nuts with washers, struts embedded in cement concrete
blocks of 1400mm x 300mm upto 300mm height at bottom and sloped towards top of Mtr 4834.70 130.95 633103.97 633103.97
area 300mm x 300mm of CC block at overall depth of 1295mm size placed at 1195mm
below ground level
as per standard drawing attached including providing & fixing galvanised iron barbed wire
duly
painted by dipping in paint twice with anticorrosive bitumastic paint (IS.158) of approved
brand & manufacture in black shade to give a smooth and even surface, size of barbed
wire 2.5mm x 2mm (weight to be not less than 108gms per metre length) conforming to
IS.278-1978 in 20 horizontal rows (13 rows in vertical portion & 7 rows in slanting portion)
to be fixed & stretched with MS hooks/tightening bolts as per drawing) and properly woven
with four diagonals (two in vertical portion & two in goose neck portion as per standard
5.3 Providing and fixing security fencing of GI barbed wire consisting of
copper enriched MS angle posts of 65mm x 65mm x 6mm 1500mm length above ground
level & 645mm below ground level including providing one number 75mm long pointed
spike made of 12mm dia MS round bar welded to angle iron post at corner for min 25mm
length (as per standard drawing attached) MS angle posts placed at 3000mm centre to
centre embedded in cement concrete blocks 300mm dia 895mm deep placed at 795mm
below ground level as every 10th post, end posts & corner posts to be strutted with MS
angle struts on both sides of size 65mm x 65mm x 6mm & 2400mm long (200mm vertical
at top & 2200mm slanting down) fabricated & welded as per drawing bolted to vertical
posts with 2 Nos 12mm dia 50mm long bolts & nuts with washers struts embedded in
cement concrete blocks of size 1000mm x 1000mm upto 300mm height at bottom slopes Mtr 1741.35 130.95 228029.78 228029.78
towards top CC block of area 300mm x300mm at overall depth of 895mm placed at 795mm
below ground level
as per drawing attached including providing & fixing galvanised iron wire duly painted
bydipping in paint twice with anti corrosive bitumastic paint (IS:158) of approved brand &
manufacturer black shade to give a smooth & even surface, size of GI barbed wire 2.5 mm
x 2.0mm (weight to be not less than 108gms per metre length) conforming to IS.278-1978
in 10 horizontal rows to be fixed & stretched with MS hooks/tightening bolts as per drawing
and properly woven with two diagonal of same GI barbed wire to be fixed to angle irons
posts in holes with 2.5mm dia & 100mm long GI staples/clips as per standard drawing
including applying red oxide zinc chromate primer & painting with exterior grade synthetic
5.4 Providing, laying & fixing of galvanised punched tape concertina coil of unstretched dia
1050mm having galvanised spring steel core of wire 2.5mm dia of cold drawn steel
punched tape of low carbon steel having series of sharp barbs uniformly punched along its
length 55 barbs on periphery per revolution crimped on steel spring core wire. Galvanised
clips GI steel wire handles hooked to coils for handling MS square bar spikes hooked to
coil having pointed faces for anchorage & weight 15.20 kg per coil including spreading of
each coil 10 metre length adequately tied to GI barbed wire fencing & fencing post with GI
wire of not less than 16 guage at every 1000mm spacing tying of handles of succeeding
coil with preceding coil with GI wire of not less than 16 guage, properly anchoring of spikes Mtr 3115.90 118.18 368237.06 289685.22
at start & end of coil in precast cement concrete block of size 20cm x 20cm x 20cm of mix
[Link] (1 cement: 2 fine sand: 4 stone aggregate 20mm nominal size) of bottom layer &
applying anticorrosive bitumastic paint (IS:158) of approved brand & manufacture in black
shade to give a smooth & even surface by dipping in paint twice over punched tape
concertina coil complete as per drawings & directios of the Engineer in-Charge.

Single Row Fencing


5.6.1 Providing and fixing security fencing of GI barbed wire consisting of Copper Enriched MS
angle post of section 90mm x 90mm x 6 mm 6982 mm total length, above CC pavement
(4732 mm vertical and 1000 mm slanting) duly fabricated and welded at bend as per
drawing and 1250 mm below CC pavement placed at 3300 mm centre to centre and
embedded in cement concrete blocks 900 mm dia meter at bottom and 600 mm dia at top
1900 mm deep placed at 1975 mm below top of CC pavement including
providing and fixing galvanised iron barbed wire duly painted by dipping in paint twice with Mtr 7686.70 109.65 842846.66 447750.28
anticorrosive bitumastic paint (IS-158) of approved brnad and manufacture in black shade
to give a smooth and even surface, size of barbed wire 2.5 x 2 mm (Weight to be not less
than 108 gms. per meter length) conforming to IS 26 rows in vertical portion and 7 rows in
slanting portion) to be fixed & stretched with MS hooks/tightening bolts and properly woven
with four diagonals, two in vertical portion, two
in goose neck portion of same G.I. barbed wire to be fixed to angle iron posts in holes with
split cotter pins 5 x 22 (conforming to IS 549 steel) and extra strands of barbed wire
properly inter woven with horizontal Fencing on culvert
rows of barbed wire at a spacing of 180 mm up to a
5.6.2 height of 7and
Providing rows of the
fixing fencing
security aboveofCC
fencing GIpavement in adequately
barbed wire consisting oftied at three
copper placesMS
enriched in
angle posts of 90mm x 90mm x6mm 3000mm length above RCC Culvert slab (2000mm
vertical and 1000mm slanting) duly fabricated and welded at bend as per drawing and
placed at 3000mm centre to centre & fixed with MS plate 250 mm x250mm size 8mm Thick
by 4 Nos. dash fastner of 16mm dia & every 10th post, end posts & corner posts to be
strutted with MS angle strut on both sides, of size 90mm x 90mm x 6mm & 2245mm in
length (200mm vertical at top & 2045mm slanting down) fabricated and welded as per
drawing bolted to vertical posts with two Nos. 12mm dia & 50mm long MS bolts & nuts with
washers, struts fixed with MS plate 250 mm x 250mm size 8mm thick by 4 Nos. dash
fastner 16mm dia as per standard drawing attached including providing & fixing
galvanised iron barbed wire duly painted by dipping in paint twice with anticorrosive Mtr 3354.05 158.25 530778.41 386386.56
bitumastic paint (IS.158) of black shade to give a smooth and even surface, size of barbed
wire 2.5mm x 2mm (weight to be not less than 108gms per metre length) conforming to
IS.278-1978 in 20 horizontal rows (13 rows in vertical portion & 7 rows in slanting portion)
to be fixed & stretched with MS hooks/tightening bolts as per drawing) and properly woven
with four diagonals (two in vertical portion & two in goose neck portion) as per standard
drawing of same GI barbed wire to be fixed to angle iron posts in holes with 2.5mm dia &
100mm long GI staples/clips & providing vertical & diagonal strands of barbed wire properly
inter woven with horizontal rows of barbed wire at a spacing of 150mm upto a height of 7
rows of fencing above ground level, adequately tied at three places in staggered manner
with GI wire of not less than 16 guage as per standard drawing & providing two sets of
5.7
Drilling and providing carbon steel galvanished dash fastner (Hilty or Fisher) of size drill bit Nos. 347.58 2470.00 858522.60 525888.54
dia 16 mm, length 140 mm etc. all complete as per direction of Engineer-in-charge.
Total 123984567.90 97199151.81
Say 123984567.90 97199151.81
Above @0.9% (Except A, B, C & D) 1083483.76 874792.37
Total 125068051.66 98073944.18
Providing and laying Non Pressure NP-3 class (Medium duty) R.C.C. pipes including
collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement :
EI-I/I 2 fine sand) including testing of joints etc. Complete
900 mm dia RCC pipes. (Laying by manual/ machanical means) Mtr. MR 12557.70 70.00 879039.00 879039.00
Supplying and filling in plinth with sand under floors, including watering, ramming,
consolidating and dressing complete. Cum F/R 2255.20 13.80 31121.76 31121.76
EI-I/II
Bamboo pile walling made of 65 mm. to 75 mm. dia 2.25 m. average long bamboo in single
line driven half length of each pipe into the ground at a very close spacing but not more
than 8 cm. center to center and side by side with struts / stays of same length & dia at an
interval of 1.00 m. and three Nos. of half split bamboo of 65 mm. to 75 mm. dia runner fitted Mtr. F/R 3505.75 24.00 84138.00 84138.00
and fixed to the piles inside and outside with iron nails etc. with G.I. binding wires complete
as per direction of the Engineer-in-charge.
EI-I/III
Supplying and stacking at site.
Over burnt (Jhama) brick aggregate 90 mm to 45 mm (Net quantity shall be after deducting Cum F/R 6235.30 52.33 326293.25 326293.25
EI-I/IV void @ 7.5% of loose quantity).
EI-I/V Extra for laying brick work in or under water and/or liquid mud including cost of pumping or
bailing out water and removing slush etc. complete. NOTE :- The quantity will be calculated
by multiplying the depth measured from sub - soil water level up to the centre of gravity of
brick work under sub - soil water with the quantity of brick work in cum. executed under the
cum F/R 622.55 52.33 32578.04 32578.04
sub - soil water. The depth of centre of gravity shall be reckoned correct to 0.1 m, 0.05 m or
more shall be taken as 0.1 m and less than 0.05 m ignored.

EI-II Centering and shuttering including strutting, propping etc. and removal of form for :

Lintels, beams, plinth beams, girders, bressumers and cantilevers Sqm 620.70 82.33 51102.23 51102.23
Upto date work done(A) Total 126472323.94 99478216.46

Say Rs. 126472324.00 99478216.00


Less already paid Previous Bill(B) 99478216.46
Gross Amount of this bill (A-B) 26994107.48
Gross Amount of this bill 26994107.00
Total Recovery 1696773.00
Net Amount 25297334.00
Rupees (Two Crore Fifty Two Lakh Ninety Seven Thousand Three Hundred Thirty Four) only
1. The measurement on which are based the entries in column 1 to 6 of account were made by Shri Uttam deb (Contractor) and are recorded at page 1 to 76 of Measurement Book No EE/BFD-III/CMB/____
and checked by Sh. Manoj Dey.

2. Certificated that in addition to and quite apart from the quantities of work actually executed as shown in column 4 of the account 1, some work has actually been done in connection with several items and the value of such
work (after deducting therefrom proportionate amount of secured advance if any ultimately recoverable on account of the quantities of the materials used therein) is in no case less than the advance payments as per item 2 of
the memorandum if payment or proposed t6o be made for the convenience of the contractor in anticipation of and subject to the result of detailed measurements which will be made as soon as possible.

Certified that
1. The work has been executed as per terms and conditions of the agreement.
2. No material and T & P has been issued by the department.
3. Arrangements for water has been made by Contractor..
4. Requisite technical staff has been employed as per clause 36 of agreement.
5. Upto date recoveries have been effected in this bill.
6. Labour report submitted up to date .e.i
[Link] madatory test has been carried out at site as per specification. Dated Signature of Officer ………………………………
(Rank) ………………………

Dated Signature of Officer ………………………………


……………………………………………………
Authorising Payment (Rank) ………………………

Dated Signature of Contractor


[Link]

229596.26

143982.00

81338.46

26724.59

8401.92
488354.23

1097720.16

0.00

168098.77

849708.06

2127547.63

122284.64

186857.29

289102.50

4934065.40

9363300.00
811397.50
1434164.36

0.00
0.00

47181.47
23624.30

322783.02

110017.42

96433.45

1635007.50

17364.60

0.00

113680.22

574846.50

16603.20

514556.51
0.00

0.00

78551.84
395096.38

144391.85

332634.06

26785416.09
26785416.09
208691.39
26994107.48
0.00

0.00

0.00

0.00

0.00

0.00
26994107.48

26994107.00

26994107.00
/CMB/____

ems and the value of such


payments as per item 2 of
ble.
Recovery Statement
Name of Work: - Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar, Teliamura & Panisagar Sector in
Tripura SH: GIN No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur Sector
Location of Work:- BFSD-III
Name of the Contractor :Shri Uttam Deb
Reference to Agreement no:-02/EE/BFD-III/AGT/2021-2022
Date of written order to commence work :09.04.2021
Stipulated date of completion of work:- 02.07.2022
Date of actual completion of work:- in progress
Reference to previous measurements, if any:NIL
Serial no of this bill :- 10th R/A BILL
Gross Amount Up-to-date………….Rs. 126,472,324.00
Gross Amount since previous bill….Rs. 26,994,107.00
Up-to-date Recoveries in this
Description of Recoveries Already recovered Remark
Recoveries bill

(i)SD @ 2.5% on Rs. 126472324/- 3161808.00 2486955.00 674853.00

(ii) Income Tax @ 1% on Rs. 126472324/- 1264723.00 994782.00 269941.00

(iii) CGST @ 1% on Rs. 42435464/- 424355.00 424355.00 0.00

(iii) CGST @ 1% on Rs. 84036860/- 750329.00 509310.00 241019.00

(iv) SGST @ 1% on Rs. 42435464/- 424355.00 424355.00 0.00

(iv) SGST @ 1% on Rs. 84036860/- 750329.00 509310.00 241019.00

(v) Labour Cess @1% on Rs. 126472324/- 1264723.00 994782.00 269941.00

(VI) Withheld @4% of tender Amount Rs.


5486446.00 5486446.00 0.00
137161143.00/-
Total Recovery 1696773.00

Signature of Contractor Signature of AE Signature of EE


Test Check Statement
Name of Work: - Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar, Teliamura & Panisagar
Sector in Tripura SH: GIN No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur Sector
Location of Work:- BFSD-III
Name of the Contractor :Shri Uttam Deb
Reference to Agreement no:-02/EE/BFD-III/AGT/2021-2022
Date of written order to commence work :09.04.2021
Stipulated date of completion of work:- 02.07.2022
Date of actual completion of work:- in progress
Date of Abstract: - 09.10.2023
Reference to previous measurements, if any:-
Serial no of this bill :- 10th R/A BILL

Amount of Test Check By


[Link]./ Item No. Description of items Ref. to M.B. No. & Page
A.E. E.E.

1 Upto 9th R/A 53524933.00 5968406.00

2 In this bill

Total

Gross Amount of work done = Rs. 126472324.00

Assistant Engineer
BFSD-III, CPWD, Sabroom
FORM 26 A
ACCOUNT OF SECURED ADVANCES
(Referred to in paragraph 10.2.14, 10.2.20 and 10.7.5 of CPWA Code)
(To be Annexed to form 26 where necessary)
Division:- Border Fencing Division-III, CPWD, Agartala Sub Division:- Border Fencing Sub-Division-II, Sabroom
Name of the Contractor :Shri Uttam Deb
Name of Work: - Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar, Teliamura & Panisagar Sector in Tripura SH: GIN
No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur Sector.
Sl. No. of the Bill to which the Account pertains:- 10th RA Bill
Account of Secured Advance Allowed on the Security of Materials Brought to Site

Deduct Quantity Full Rate as Reduced Reference of Reason for non-


Qty outstanding utilised in work Quantity outstanding assessed by Rate at Up to date Outstanding Divisional Officer's clearance of advance
from prev. bill measured since including qty brought the Divisional Description of Materials Unit which Amount written orders when outstanding for
prev. bill to site since prev. bill Officer Advance is Authorising the more than 3 months
made Advance

1 2 3 4 5 6 7 8 9 10

1) Thermo-Mechanically Treated
24810.00 24810.00 0.00 62.50 bars of Kg 46.88 0.00
grade Fe-500D or more.

376.08 376.08 0.00 4650.00 2) Stone Aggregate 40mm Cum 3487.50 0.00

169.83 169.83 0.00 4950.00 3) Stone Aggreegate 20 mm 3712.50 0.00

0.00 0.00 0.00 4800.00 3) Stone Aggreegate 10 mm 3600.00 0.00

Total -

Total amount outstanding as per this acount (c) 0.00


Deduct - Amount Outstanding as per entry ( c ) of annexture to the previous bill 0.00
Net Amount of Since previous Bill ) . 0.00

Cetificate and Signatures

Certified(1) that the plus quanities of materials shown in column 3 of the Account above have actually been brought by the Contractor to the site of the work and the contractor
has not previously received any advance on their security (2) that these materials of an imperishable nature are all required by the Contractor for use on the work in
connection with the items for which rates for finished work have been agreed upon, and(3) that a formal agreement in Form 31 signed and executed by the contractor in
accordance with paragraphs 10.2,24 (a) of the Central Works Accounts Code is recorded in the Divisional Office.

Dated Signature of the Officer prepareing the bill

Dated Signature of the Officer authorising Payment


COMPUTERISED MEASUREMENT BOOK
Measurement of 10th R/A Bill

No.- /CMB/BFD-III/2023-24

Certified that this Measurement Book Contains Page from 1 to 76

Name of Work: - Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence
under Udaipur, Gukulnagar, Teliamura & Panisagar Sector in Tripura SH: GIN No. 697A, 697B, 698,
699, 701, 703, 706, 707, 708A & 708B under Udaipur Sector.

Agt No : 02/EE/BFD-III/AGT/2021-2022

Agency: Shri Uttam Deb


Executive Engineer
Border Fencing Division-III
CPWD, Agartala
REVIEW NOTES

Date Pages recording Value of Result of the Dated intials and


measurements measurements check exercised designation of the
subjected to checked Checking Officer
test - check
By Divisional Accountant

Pages reviewed Calculation selected by Defects, discrepancies, Dated Initials of


generally Divisional
Pages Officer for re-check
Dated Intials etc., noticed Divil. Acctt. Divil. Officer
INDEX

Full Name of work or Purpose of Supply Name of Contractor Value of work done Pages

Name of Work: - Plugging of 18 Nos. Nallah Shri Uttam deb 126472324.00


Gaps with RCC Box Bridge with Sluice and
Fence under Udaipur, Gukulnagar, Teliamura
& Panisagar Sector in Tripura SH: GIN No.
697A, 697B, 698, 699, 701, 703, 706, 707,
708A & 708B under Udaipur Sector
CHECK-LIST OF BILLS AT DIVISIONAL LEVEL
10th RA BILL
1 Name of Work: - Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under
Udaipur, Gukulnagar, Teliamura & Panisagar Sector in Tripura SH: GIN No. 697A, 697B, 698, 699, 701,
703, 706, 707, 708A & 708B under Udaipur Sector.
2 Agreement No. 02/EE/BFD-III/AGT/2021-2022
3 Name of Agency : Shri Uttam Deb
4 Date of Start : 09.04.2021
5 Due date of completion : 02.07.2022
6 Probable date of completion : Work in progress.
7 Estimated Cost : Rs.135937704
8 Tendered Cost : Rs. 137161143
9 Gross value of bill : 126,472,324.00
10 Is E.O.T. required ? N/A
11 If yes, E.O.T. submitted : N/A

12 Is Extra/Substituted items considered in bill is initiated ? yes


13 Is deviation statement needed ? yes
14 Has deviation statement submitted ? yes
15 Has Test Check done
By AE more than 50% YES
By EE more than 10% YES
16 Has bill checked at sub-divisional level? YES
Has contractor complied with CI.36 condition regarding
employment of Engineer and certificated given by the A.E. YES
17 in M.B. ?
18 Has any non-stipulated materials issued to contractor? NO
Testing of materials done/got done as per frequency laid
19 down in specification (To be certified by the AE) YES
Has contractor submitted fortnightly labour return and
20 same is submitted to divisional office? YES
21 Is progress of work is as per our target? YES
22 Is any minus Extra/Reduced rate item involved? NO
Has quality control observation complied and report
23 submitted? N/A
24 Is bill accepted by the Contractor? YES
If yes, has it been written as - "Bill with measurement
accepted in full" in case of R/A bill and bill with
measurement accepted in full & final settlement "in case of
final bill" both in M.B. & bill. YES

Signature of AE
EXERCISE BY ASSISTANT ENGINEER(P)
(a) Theoretical consumption of materials checked :
(b) Double rate recovery if any may be mentioned :
(c) Deviation items :
(d) Is quality control observation pending ?
Any item to be declared as Sub-Standard with reference to
(e) theoretical consumption :
(f) Has part rate been checked ?

Assistant Engineer (P)

EXERCISE BY DIVISIONAL ACCOUNTANT


(a) Chargeable head of Account :
Bill checked at Divisional level and has cross check of
(b) measurement done by the Divisional Accountant
(c) A/A & E/S no. and date.

(d) Has technical sanction done by the Competent Authority?


(e) Has NIT approved by the Competent Authority?
(f) Bill may be paid.
(g) Action by D.A. for availability of fund.
Items exceeding agreement quantities. (Item nos. be
(h) mentioned).
(i) Any other remarks.

Signature of Divisional Accountant


DIVISION :- Border Fencing Division-III, CPWD, Agartala

SUB-DIVISION:-Border Fencing Sub-Division-III,Sabroom

10th RA BILL

COMPUTERISED BILL

C. B. NO.- /CMB/BFD-III/2023-24

Name of work :- Plugging of 18 Nos. Nallah Gaps with RCC Box


Bridge with Sluice and Fence under Udaipur,
Gukulnagar, Teliamura & Panisagar Sector in
Tripura SH: GIN No. 697A, 697B, 698, 699, 701,
703, 706, 707, 708A & 708B under Udaipur
Sector.

Name of the Contractor :- Shri uttam Deb

Agreement No:- 02/EE/BFD-III/AGT/2021-2022


PART RATE STATEMENT
Name of Work: - Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar,
Teliamura & Panisagar Sector in Tripura SH: GIN No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur Sector
Location of Work:- BFSD-III
Name of the Contractor :Shri Uttam Deb
Reference to Agreement no:-02/EE/BFD-III/AGT/2021-2022
Date of written order to commence work :09.04.2021
Stipulated date of completion of work:- 02.07.2022
Date of actual completion of work:- in progress
Reference to previous measurements, if any:NIL
Serial no of this bill :- 10th R/A BILL

Provisional Provision
Item No. Brief description Full Rate Rate in al Rate in Remarks
previous bill this bill

2.5 Providing and laying in position machine batched and machine mixed design mix M-25 grade cement
concrete for reinforced cement concrete work, using cement content as per approved design mix,
including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing
and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard
setting of concrete, improve workability without impairing strength and durability to get shutter finished
surface as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330
kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately).

2.5.1 All works upto plinth level Curring is in


14790.60 14750 14750.00 progress.
Steel work welded in built up sections/
framed work, including cutting,
4.3 hoisting, fixing in position using Minor welding
structural steel etc. as required joints finishing
127.65 125.00 to be required

Signature of Contractor Signature of AE Signature EE

83
Page-76
LABOUR REPORT
Name of work:-Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar,
Teliamura & Panisagar Sector in Tripura SH: GIN No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur
Sector
Agreement No. 02/EE/BFD-III/AGT/2021-2022

Agency: Shri Uttam Deb


For the fortnight ending:- 22.06.2023 to 30.06.2023

Accident that occurred


No of female workers
Nos of Labour employed Category during the said fortnight
Wages paid to them who have been
on the work wise showing the circumstances
Working allowed maternity
under which them
Hours benefit according to
happened of the entent of
clause of the amount
Nos Work during Manager & the injury
Category Rate Amount paid to them
employed the fortnight caused by them

Skilled 4 Rs. 695 Rs. 22,240

9 A.M. to 1
Semi-Skilled 7 P.M & 2 Rs. 577 Rs. 32,312
8 Days NIL NIL
P.M. to 5
P.M.
Rs. 494 Rs. 31,616
Un-Skilled 8
Total Rs. 86,168

Signature of Contractor
LABOUR REPORT
Name of work:-Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar,
Teliamura & Panisagar Sector in Tripura SH: GIN No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur
Sector
Agreement No. 02/EE/BFD-III/AGT/2021-2022

Agency: Shri Uttam Deb


For the fortnight ending:- 01.07.2023 to 15.07.2023

Accident that occurred


No of female workers
Nos of Labour employed Category during the said fortnight
Wages paid to them who have been
on the work wise showing the circumstances
Working allowed maternity
under which them
Hours benefit according to
happened of the entent of
clause of the amount
Nos Work during Manager & the injury
Category Rate Amount paid to them
employed the fortnight caused by them

Skilled 4 Rs. 695 Rs. 38,920

9 A.M. to 1
Semi-Skilled 7 P.M & 2 Rs. 577 Rs. 56,546
14 Days NIL NIL
P.M. to 5
P.M.
Rs. 494 Rs. 55,328
Un-Skilled 8
Total Rs. 150,794

Signature of Contractor
LABOUR REPORT
Name of work:-Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar,
Teliamura & Panisagar Sector in Tripura SH: GIN No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur
Sector
Agreement No. 02/EE/BFD-III/AGT/2021-2022

Agency: Shri Uttam Deb


For the fortnight ending:- 16.07.2023 to 31.07.2023

Accident that occurred


No of female workers
Nos of Labour employed Category during the said fortnight
Wages paid to them who have been
on the work wise showing the circumstances
Working allowed maternity
under which them
Hours benefit according to
happened of the entent of
clause of the amount
Nos Work during Manager & the injury
Category Rate Amount paid to them
employed the fortnight caused by them

Skilled 4 Rs. 695 Rs. 38,920

9 A.M. to 1
Semi-Skilled 7 P.M & 2 Rs. 577 Rs. 56,546
14 Days NIL NIL
P.M. to 5
P.M.
Rs. 494 Rs. 55,328
Un-Skilled 8
Total Rs. 150,794

Signature of Contractor
LABOUR REPORT
Name of work:-Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar,
Teliamura & Panisagar Sector in Tripura SH: GIN No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur
Sector
Agreement No. 02/EE/BFD-III/AGT/2021-2022

Agency: Shri Uttam Deb


For the fortnight ending:- 01.08.2023 to 15.08.2023

Accident that occurred


No of female workers
Nos of Labour employed Category during the said fortnight
Wages paid to them who have been
on the work wise showing the circumstances
Working allowed maternity
under which them
Hours benefit according to
happened of the entent of
clause of the amount
Nos Work during Manager & the injury
Category Rate Amount paid to them
employed the fortnight caused by them

Skilled 4 Rs. 695 Rs. 36,140

9 A.M. to 1
Semi-Skilled 7 P.M & 2 Rs. 577 Rs. 52,507
13 Days NIL NIL
P.M. to 5
P.M.
Rs. 494 Rs. 51,376
Un-Skilled 8
Total Rs. 140,023

Signature of Contractor
LABOUR REPORT
Name of work:-Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar,
Teliamura & Panisagar Sector in Tripura SH: GIN No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur
Sector
Agreement No. 02/EE/BFD-III/AGT/2021-2022

Agency: Shri Uttam Deb


For the fortnight ending:- 16.08.2023 to 31.08.2023

Accident that occurred


No of female workers
Nos of Labour employed Category during the said fortnight
Wages paid to them who have been
on the work wise showing the circumstances
Working allowed maternity
under which them
Hours benefit according to
happened of the entent of
clause of the amount
Nos Work during Manager & the injury
Category Rate Amount paid to them
employed the fortnight caused by them

Skilled 4 Rs. 695 Rs. 38,920

9 A.M. to 1
Semi-Skilled 7 P.M & 2 Rs. 577 Rs. 56,546
14 Days NIL NIL
P.M. to 5
P.M.
Rs. 494 Rs. 55,328
Un-Skilled 8
Total Rs. 150,794

Signature of Contractor
LABOUR REPORT
Name of work:-Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar,
Teliamura & Panisagar Sector in Tripura SH: GIN No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur
Sector
Agreement No. 02/EE/BFD-III/AGT/2021-2022

Agency: Shri Uttam Deb


For the fortnight ending:- 01.09.2023 to 15.09.2023

Accident that occurred


No of female workers
Nos of Labour employed Category during the said fortnight
Wages paid to them who have been
on the work wise showing the circumstances
Working allowed maternity
under which them
Hours benefit according to
happened of the entent of
clause of the amount
Nos Work during Manager & the injury
Category Rate Amount paid to them
employed the fortnight caused by them

Skilled 4 Rs. 695 Rs. 36,140

9 A.M. to 1
Semi-Skilled 7 P.M & 2 Rs. 577 Rs. 52,507
13 Days NIL NIL
P.M. to 5
P.M.
Rs. 494 Rs. 51,376
Un-Skilled 8
Total Rs. 140,023

Signature of Contractor
LABOUR REPORT
Name of work:-Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar,
Teliamura & Panisagar Sector in Tripura SH: GIN No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur
Sector
Agreement No. 02/EE/BFD-III/AGT/2021-2022

Agency: Shri Uttam Deb


For the fortnight ending:- 16.09.2023 to 30.09.2023

Accident that occurred


No of female workers
Nos of Labour employed Category during the said fortnight
Wages paid to them who have been
on the work wise showing the circumstances
Working allowed maternity
under which them
Hours benefit according to
happened of the entent of
clause of the amount
Nos Work during Manager & the injury
Category Rate Amount paid to them
employed the fortnight caused by them

Skilled 4 Rs. 695 Rs. 38,920

9 A.M. to 1
Semi-Skilled 7 P.M & 2 Rs. 577 Rs. 56,546
14 Days NIL NIL
P.M. to 5
P.M.
Rs. 494 Rs. 55,328
Un-Skilled 8
Total Rs. 150,794

Signature of Contractor
LABOUR REPORT
Name of work:-Plugging of 18 Nos. Nallah Gaps with RCC Box Bridge with Sluice and Fence under Udaipur, Gukulnagar,
Teliamura & Panisagar Sector in Tripura SH: GIN No. 697A, 697B, 698, 699, 701, 703, 706, 707, 708A & 708B under Udaipur
Sector
Agreement No. 02/EE/BFD-III/AGT/2021-2022

Agency: Shri Uttam Deb


For the fortnight ending:- 01.10.2023 to 02.10.2023

Accident that occurred


No of female workers
Nos of Labour employed Category during the said fortnight
Wages paid to them who have been
on the work wise showing the circumstances
Working allowed maternity
under which them
Hours benefit according to
happened of the entent of
clause of the amount
Nos Work during Manager & the injury
Category Rate Amount paid to them
employed the fortnight caused by them

Skilled 4 Rs. 695 Rs. 5,560

9 A.M. to 1
Semi-Skilled 7 P.M & 2 Rs. 577 Rs. 8,078
02 Days NIL NIL
P.M. to 5
P.M.
Rs. 494 Rs. 7,904
Un-Skilled 8
Total Rs. 21,542

Signature of Contractor
[Link]. date of testing length of sample actual weight average weight in kg
1 MS flat (75*6) 3.5
3.6 3.5
3.4
2 MS flat (50*6)

3 ISMB-200

4 MS angle (90*90*6) 8.2


8.18 8.2
8.22

5 MS angle (65*65*6)

6 MS angle (50*50*6)

7 ISMC-75

8 MS Tube (50*30)

9 MS Tube (100*50)

10 G.I Pipe 40 mm dia

11 MS plate 32 mm
stantard weight
Comrehenshive maintenance
Steel 3086.58 140.26 432938 108234.4
Soling 358.88 1223.30 439019 109754.8
1st RA 9377153 140657.3
Nallah
7th Ra 2339538 23395.38
8th Ra 12395859 123958.6
Drain 149.1 4081.30 608522.44 152130.6
10CC 2764315 27643.15
Total 685774.3
Comrehenshive maintenance
Steel 3086.58 140.26 432938
Soling 358.88 1223.30 439019
1st RA 9377153
Nallah
7th Ra 2339538
8th Ra 12395859
Drain 149.1 4081.30 608522.44
10CC 2764315
Total
86587.5509478
87803.8571376
93771.53

23395.38
123958.59
121704.488262
27643.15
564864.5463474

You might also like