ID TaskTask Name Duration Start Finish Resource Names
Mode M A
M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T
1 ABO MAZORIA PARK 20 days Mon 03/03/25 Thu 13/03/25
2 1 Toilet Fri 21/03/25 21/03
3 1.1footings 15.2 days Sat 15/03/25 Sat 22/03/25 daily labour,forman/gang chief,carpenters daily labour,forman/gang chief,carpenters
4 1.2grade beam 4 days Sat 22/03/25 Mon 24/03/25 carpenters,daily carpenters,daily labour,general dailylabors,site engineer
labour,general
5 1.3 1st floor slab 10 days Fri 21/03/25 Wed 26/03/25 dailylabors,site
carpenters,forman/gang carpenters,forman/gang chief,general dailylabors,site engineer
chief,general
6 1.4 hcb 5 days Wed Fri 28/03/25 dailylabors,site
daily daily labour,masonary
26/03/25 labour,masonary
7 1.5 plastering 5 days Mon Wed 16/04/25 daily daily labour,plasterers
14/04/25 labour,plasterers
8 1.6 gypsum 2 days Wed Thu 17/04/25 painters,plasterers painters,plasterers
16/04/25
9 1.7ceramic 4 days Wed Fri 18/04/25 daily daily labour,finshing worker
16/04/25 labour,finshing
10 2 Roundabout worker
11 2.1 backfill 2 days Sat 22/03/25 Sun 23/03/25 daily daily labour,general dailylabors,site engineer
labour,general
12 2.2masonary 6 days dailylabors,site
Sun 23/03/25 Wed 26/03/25 daily labour,forman/gang chief,masonary,site engineer daily labour,forman/gang chief,masonary,site engineer
13 2.3concerte works 15 days Thu 27/03/25 Thu 03/04/25 daily daily labour,forman/gang chief,masonary,site engineer
labour,forman/gang
14 2.4 greenary 20 days Mon 24/03/25 Thu 03/04/25 chief,masonary,site
daily labour,forman/gang chief,site engineer daily labour,forman/gang chief,site engineer
15 2.5 fountain at the 7 days Wed 26/03/25 Sat 29/03/25 forman/gang forman/gang chief,sanitary engineer supervisor,sanitary workers,site engineer
roundabout chief,sanitary
16 2.6 eletrical 2 days Thu 27/03/25 Fri 28/03/25 engineer
17 3 Café Structur e( lot
1)
18 3.1 footing 10 days Mon Sat 15/03/25 carpenters,daily carpenters,daily labour,forman/gang chief,site engineer
10/03/25 labour,forman/gang
19 3.2 grade beam 4 days Sat 22/03/25 Mon 24/03/25 chief,site
carpenters,daily carpenters,daily labour,general dailylabors,site engineer
labour,general
20 3.3 hcb 5 days Thu 10/04/25 Sat 12/04/25 dailylabors,site
forman/gang forman/gang chief,site engineer,masonary
chief,site
21 3.4 plastering 5 days Mon Wed 16/04/25 engineer,masonary
daily daily labour,plasterers,site engineer
14/04/25 labour,plasterers,site
22 3.5 gypsum 2 days Wed Thu 17/04/25 engineer
daily daily labour,painters,site engineer
16/04/25 labour,painters,site
23 3.5 ceramic 3 days Tue 15/04/25 Wed 16/04/25 engineer
ceramic tile ceramic tile worker,daily labour,finshi
worker,daily
24 3.6 aluminum 4 days Sat 12/04/25 Mon 14/04/25 labour,finshing
aluminum workers,daily labour,engineers and supervisors[11%],site engineer aluminum workers,daily labour,engineers and super
25 3.7 eletrical 4 days Wed 26/03/25 Fri 28/03/25 electrical enginer supervisor,electricians,site engineer electrical enginer supervisor,electricians,site engineer
26 3.8 sanitary 2 days Fri 21/03/25 Sat 22/03/25 sanitary engineer supervisor,sanitary workers,site engineer sanitary engineer supervisor,sanitary workers,site engineer
27 4 Amhi theater (lot 1 )
28 4.1 masonary 12 days Mon Sun 16/03/25 masonary,site masonary,site engineer
10/03/25 engineer
29 4.2 stair 3 days Fri 21/03/25 Sat 22/03/25
30 4.3 flooring 8 days Tue 01/04/25 Sat 05/04/25
31 5 Pond + flower box
(lot 1)
32 5.1 masonary 5 days Sat 15/03/25 Mon 17/03/25 daily labour,forman/gang chief,skilled workers daily labour,forman/gang chief,skilled workers
33 5.2 concret work 15 days Fri 21/03/25 Fri 28/03/25 carpenters,daily labour,forman/gang chief,site engineer carpenters,daily labour,forman/gang chief,site engineer
34 5.3 stairs 5 days Sat 29/03/25 Mon 31/03/25 carpenters,daily labour,forman/gang chief,site engineer,skilled workers carpenters,daily labour,forman/gang chief,site engineer,skilled workers
35 6 Fence (lot 1)
36 6.1 masonary 3 days Sat 15/03/25 Sun 16/03/25 daily daily labour,forman/gang chief,skilled workers
labour,forman/gang
37 6.2 grade beams 10 days Sun 30/03/25 Fri 04/04/25 chief,skilled
carpenters,daily carpenters,daily labour,forman/gang chief,skilled workers
labour,forman/gang
38 6.3 steel structures 12 days Fri 04/04/25 Thu 10/04/25 chief,skilled
barbeder,forman/gang barbeder,forman/gang chief,site engineer
chief,site
39 7 Footaball (lot 1) engineer
40 7.1 masonary 12 days Mon 24/03/25 Sun 30/03/25 daily labour,forman/gang chief,masonary daily labour,forman/gang chief,masonary
41 7.2 grade beams 10 days Wed Mon 07/04/25 carpenters,daily carpenters,daily labour,forman/gang chief,skilled workers
02/04/25 labour,forman/gang
42 7.3 ground floor 4 days Fri 11/04/25 Sun 13/04/25 chief,skilled
carpenters,daily carpenters,daily labour,forman/gang chief,skilled worker
slab labour,forman/gang
43 8 Play ground (lot 1) chief,skilled
abo mazoria park FINAL 1 Page 1
ID TaskTask Name Duration Start Finish Resource Names
Mode M A
M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T
44 8.1 masonary 14 days Sun 30/03/25 Sun 06/04/25 daily labour,general dailylabors,masonary daily labour,general dailylabors,masonary
45 8.2 concerte works 8 days Mon Fri 11/04/25 daily daily labour,forman/gang chief,masonary,site engineer
07/04/25 labour,forman/gang
46 9 Fountain at the play Sun 30/03/25 chief,masonary,site
ground ( lot1)
47 9.1 masonary 14 days Sun 30/03/25 Sun 06/04/25 daily labour,forman/gang chief,masonary daily labour,forman/gang chief,masonary
48 9.2 concerte works 7 days Mon Thu 10/04/25
07/04/25
49 9.3 electrical 4 days Sun 30/03/25 Tue 01/04/25
50 9.4 sanitary 4 days Sun 30/03/25 Tue 01/04/25
51 10 Grading (lot 1)
52 10.1 earth work 7 days Sat 22/03/25 Tue 25/03/25
53 11 Flooring work (lot 1)
54 11.1 concreting 18 days Fri 28/03/25 Sun 06/04/25 carpenters,daily labour,forman/gang chief,site engineer carpenters,daily labour,forman/gang chief,site engineer
55 12 Greenary (lot 1)
56 12.1 planting grass 16 days Tue 15/04/25 Wed 23/04/25 daily daily labo
and plants labour,forman/gang
57 13 Shops and or sahde ( chief,site
lot 1)
58 13.1 footings 8 days Tue 25/03/25 Sat 29/03/25 carpenters,daily carpenters,daily labour,engineers and supervisors[11%],forman/gang chief,site engineer
labour,engineers
59 13.2 grade beam 4 days Thu 27/03/25 Sat 29/03/25 and
carpenters,daily labour,forman/gang chief,site engineer carpenters,daily labour,forman/gang chief,site engineer
60 13.3 1st floor slab 10 days Fri 21/03/25 Wed 26/03/25 carpenters,daily carpenters,daily labour,engineers and supervisors[11%],forman/gang chief,quality inspector/safety officer,site engineer,skilled workers
labour,engineers
61 13.4 hcb 5 days Fri 28/03/25 Sun 30/03/25 and
daily daily labour,masonary
labour,masonary
62 13.4 plastering 5 days Mon Wed 09/04/25 daily daily labour,forman/gang chief,plasterers
07/04/25 labour,forman/gang
63 13.5 gypusum 3 days Tue 08/04/25 Wed 09/04/25 chief,plasterers
daily daily labour,forman/gang chief,painters,plasterers
labour,forman/gang
64 13.4 ceramics 4 days Fri 11/04/25 Sun 13/04/25 chief,painters,plasterers
ceramic tile ceramic tile worker,daily labour,finshing worker,skilled w
worker,daily
65 14 Grading ( lot 2) labour,finshing
66 14.1earth work 15 days Sat 22/03/25 Sat 29/03/25 forman/gang forman/gang chief,general dailylabors,site engineer,skilled workers
chief,general
67 15 Go kart ( lot 2) dailylabors,site
68 15.1 subrgade 7 days Sat 22/03/25 Tue 25/03/25 daily daily labour,forman/gang chief,skilled workers
labour,forman/gang
69 15.2 asphalt 7 days Sun 23/03/25 Wed 26/03/25 chief,skilled
daily daily labour,engineers and supervisors[11%],forman/gang chief,site engineer,skilled workers
labour,engineers
70 15.3 paving 5 days Tue 25/03/25 Fri 28/03/25 and
daily labour,forman/gang chief,site engineer,skilled workers daily labour,forman/gang chief,site engineer,skilled workers
71 16 Flooring work (lot 2)
72 16.1 concreting 25 days Sun 30/03/25 Fri 11/04/25 carpenters,daily labour,forman/gang chief,general dailylabors,site engineer carpenters,daily labour,forman/gang chief,general dailylabors
73 17 greenary (lot 2) 25 days Fri 28/03/25 Wed 09/04/25 daily labour,site engineer,skilled workers daily labour,site engineer,skilled workers
74 18 Lighting and electrical
75 18.1 underground 2 days Mon 10/03/25 Tue 11/03/25 electricians,engineers and supervisors[11%],forman/gang chief,quality inspector/safety officer,site engineer
76 18.2 pole 3 days Thu 10/04/25 Fri 11/04/25 daily labour,electrical enginer supervisor,electricians,site engineer daily labour,electrical enginer supervisor,electricians,site engi
77 18.3 fixtures 2 days Fri 11/04/25 Sat 12/04/25 electrical enginer supervisor,electricians,site engineer electrical enginer supervisor,electricians,site engineer
78 19 Drainage and
maintenace
79 19.1 stormwater 2 days Sat 29/03/25 Sun 30/03/25 daily daily labour,sanitary engineer supervisor,sanitary workers
drainge labour,sanitary
80 19.2 manholes and 2 days Sun 30/03/25 Mon 31/03/25 engineer
daily daily labour,sanitary engineer supervisor,sanitary workers
access points labour,sanitary
engineer
Task Summary Inactive Milestone Duration-only Start-only External Milestone Manual Progress
Project: abo mazoria park FINA
Split Project Summary Inactive Summary Manual Summary Rollup Finish-only Deadline
Date: Mon 24/03/25
Milestone Inactive Task Manual Task Manual Summary External Tasks Progress
abo mazoria park FINAL 1 Page 3
abo mazoria park FINAL 1 Page 2