Hydropower Engineering123 1
Hydropower Engineering123 1
(3-2-1)
• Solution:-
• Annual sediment = 13.3333*104 𝑡𝑜𝑛𝑛𝑒𝑠 = 13.3333 ∗ 104 ∗ 103 𝐾𝑔 = 13.3333 ∗ 107 𝑘𝑔
13.3333∗107
• Volume of annual sediment = = 60605.909 𝑚3
2.2∗1000
• Stage- I (20 % of reservoir filling )
20
• 20% of reservoir capacity = 20% *20 Mm3 = ∗ 20 = 4𝑀𝑚3
100
𝐶𝑎𝑝𝑎𝑐𝑖𝑡𝑦 𝑜𝑓 𝑟𝑒𝑠𝑒𝑟𝑣𝑜𝑖𝑟 20
• Initial, capacity inflow ratio = = = 0.5
𝑇𝑜𝑡𝑎𝑙 𝐼𝑛𝑓𝑙𝑜𝑤 𝑖𝑛 𝑡ℎ𝑒 𝑟𝑒𝑠𝑒𝑟𝑣𝑜𝑖𝑟 40
• Corresponding Trap Efficiency (ɳ𝐼 ) = 96% = 0.96
𝐶𝑎𝑝𝑎𝑐𝑖𝑡𝑦 𝑜𝑓 𝑟𝑒𝑠𝑒𝑟𝑣𝑜𝑖𝑟 20−4
• Capacity –inflow ratio at the end of the interval (𝐶𝐼𝑅)𝐹 = = =
𝑇𝑜𝑡𝑎𝑙 𝑖𝑛𝑓𝑙𝑜𝑤 𝑖𝑛 𝑡ℎ𝑒 𝑟𝑒𝑠𝑒𝑟𝑣𝑜𝑖𝑟 20
0.4
• Corresponding Trap efficiency (ɳ𝐹 ) = 95% = 0.95
(0.96+0.95)
• Therefore, average trap efficiency, at 20% of reservoir filling (ɳ20% ) = = 0.955
2
𝑇𝑜𝑡𝑎𝑙 𝑠𝑒𝑑𝑖𝑚𝑒𝑛𝑡 𝑑𝑒𝑝𝑜𝑠𝑖𝑡𝑒𝑑 𝑖𝑛 𝑟𝑒𝑠𝑒𝑟𝑣𝑜𝑖𝑟
• We know, trap efficiency (ɳ) =
𝑇𝑜𝑡𝑎𝑙 𝑠𝑒𝑑𝑖𝑚𝑒𝑛𝑡 𝑓𝑙𝑜𝑤𝑖𝑛𝑔 𝑖𝑛 𝑡ℎ𝑒 𝑟𝑖𝑣𝑒𝑟
•
𝑇𝑜𝑡𝑎𝑙 𝑠𝑒𝑑𝑖𝑚𝑒𝑛𝑡 𝑑𝑒𝑝𝑜𝑠𝑖𝑡𝑒𝑑 𝑖𝑛 𝑟𝑒𝑠𝑒𝑟𝑣𝑜𝑖𝑟
• 0.955= ⇒ 𝑇𝑜𝑡𝑎𝑙 𝑠𝑒𝑑𝑖𝑚𝑒𝑡 𝑑𝑒𝑝𝑜𝑠𝑖𝑡𝑒𝑑 𝑖𝑛 𝑟𝑒𝑠𝑒𝑟𝑣𝑜𝑖𝑟 =
60605.904
57878.6431
4∗106
• No of years to fill 20 % of capacity or 4 Mm3= = 69.11 𝑦𝑒𝑎𝑟𝑠.
57876.6431
Hydropower
• Hydropower is the power generated from force of moving water.
Energy involved in moving water is kinetic energy, pressure energy
and potential energy, which are used to produce rotational mechanical
energy thigh turbines in power house.
• The mechanical energy is used to rotate shaft of generator to produce
electricity. Hence hydropower is generated from flowing water by
converting mechanical energy into electrical energy through turbine
and generators
• The high head required for running the turbine is either created by
construction of dam across a river or diverting its flow to a location
lower than head pond or a fore bay.
Advantages of Hydropower
[Link] source of energy
[Link] source of power
3. Reliable energy source (90% availability)
[Link] generation cost
5. Long span of life
6 Low operation and maintenance cost
7. Quick start and stop arrangement.
8. High efficiency (Turbine efficiency 90-95%)
[Link] polluting system
10. Very efficient for peaking load
Disadvantages of hydropower
1. Takes large time for construction
2. High initial cost
[Link] of large land due to submergence in reservoir
4. Long term flow data is essential
5 Displacement of large population from reservoir area and
their rehabilitation
6. Suitable site for the construction of dam is difficult to
available.
7. High cost of transmission system for remote sites.
Sources of energy
conventional sources
a) Hydropower (power obtained from the energy of falling water)
b) Thermal Power (fuel such as coal, diesel, gases or combination of fuel etc. used
to drive steam turbine)
c) Nuclear power (its similar to thermal plants except that nuclear disintegration of
fissionable material like Uranium. The fuel used is plutonium and Uranium.)
unconventional sources
a) Tidal power
b) Solar power
c) Geo thermal (the internal energy of earth in different part of the earth is used
for power production.)
d) Wind power
Advantage of Hydropower plant over thermal plant
• Useful life of thermal plant in 20-25 years as Against more than 100
years for hydropower plant and annual operation and maintenance of
thermal plant is 5-6 times than that of hydropower of equal capacity.
• The fuel needed for thermal plant has to the purchased where fuel cost
for hydropower plant is zero.
• There is no health problem due to not having air pollution.
• Usually hydropower stations are situated the away from the urban area
as cost of land is not a major problem.
• Full output can be reached in about 100 %.
• The number of operation required is considerably small as compared
to thermal
• Additional benefit such as water supply, food control, irrigation can be
achieved.
Disadvantage
•Capital cost is very high
• Power generation from hydropower depend upon quantity of
water
• The site of hydropower station is selected on basis of water
availability and head
• The site is always away from load center
• The cost of transmission fee is very high
• It takes considerably a very long time for erection as
compared to thermal pant
History of the hydropower development in Nepal
• Pharping hydropower plant (500 Kw) was the first hydropower plant in
Nepal established in 1911 AD. It was connected to Kathmandu by 12km
of 11kv line was later extended to run Matatirtha-Dhorsing Ropeway.
• but after a long interval in 1935AD sundarijal plant having capacity (900
Kw)
• after that in 1965 AD Panauti Hydropower was constructed of capacity
(2.4 MW) and came in operation. in ten year period from 1965 to 1975
the installed capacity of hydropower increased almost 20 times.
• Trishuli hydropower plant(12 MW)—1964/68 supported by India and
later the capacity of the plant is increased to 21MW.
• Sunkoshi hydropower plant (10MW)-1973AD
• Devighat hydropower plant(14MW)-1983AD
History….
• 60 MW kulekhani-i-1982AD & 32MW kulekhani-ii storage hydropower station -
1986AD, with the loan assistance of government of japan and multilateral agencies.
• 60 MW Marsyandi power station-1989AD, with the loan assistance of Germany.
OECE japan,Kuwait government and multilateral agencies.
• Small hydropower project:1971-73AD, small hydropower project were to supply
remote area of the kingdom.
• The hydropower development policy "2001" of Nepal provides the guidelines for
hydropower development in Nepal in line with these policy objectives.
The government of Nepal has adopted liberal policy to attract private investment for
the development of small hydropower projects.
Nepal electricity Authority (NEA) has announced its policy to purchase the power
produced by the private developers of small hydropower project up to 25 MW
capacities.
• Electricity act 2049 has facilitated wide business opportunities to local and foreign
investor for developing hydropower project.
History…
• 144 MW kaligandaki-A -2002 the project constructed by NEA with
the loan assistance of OECE japan, ADB and joint funding of
government of Nepal and NEA.
• The independent power producers (IPP) contribute more than 25%
of the total installed capacity of Nepal's power system eg. Khimti
60 MW); Chillime (20MW), Bhotekoshi (36MW) etc.
• In 1996 first tunneling 500 Kw hydropower project in Tinau River
of Butwal was commissioned through Butwal Power Company
(BPC) limited.
• NORAD(Norwegian Agency for Development Cooperation)
successively assistance to develop 5.1 Mw Aandhikhola
Multipurpose Hydropower with irrigation project and jhimruk
Hydropower project in 1995 and 2000 AD respectively through
BPC to the Government.
Hydropower development policy
• Water is considered as a prime natural resource for overall economic
development of Nepal. The major policy objective of Government of
Nepal(GON) is to develop the nations vast hydropower resource
potential to serve the electricity needs of the people and to generate
revenue. With this objective in mind
"Hydropower Development Policy 2058”
It attempts to make the hydropower development procedures "simple,
clear, investment friendly and transparent to hydropower projects for
domestic use as well as for export purposes"
This new policy builds on experiences gained from the implementation
of the earlier hydropower development policy, 2049.
Objectives of hydropower development policy 2049
25 50 75 100
% of Time
Steps for computation of flow duration Curve:-
• Daily/Monthly flows are arranged in descending order of magnitude, from highest to the lowest flow value, with
each flow value being assigned a rank.
• The highest flow would get a rank of 1 , the next highest flow value being assigned lowest flow would get a rank
‘N’, where, ‘N’ is the total number of days record.
𝑛
• For each value percent of time is computed as 𝑁 ∗ 100 , where ‘n’ is rank assigned to the follow.
• The flow duration curve is obtained by plotting percentage of time as abscissa and the flow value rate as the
ordinates.
• In a wet year, the flow will be higher so the flow duration curve will be above the Flow Duration Curve of normal
year.
• In a dry year, the flow will be less and Flow Duration Curve will be below the FDC in normal year as shown in
figure.
Uses of Flow Duration Curve:-
• FDC is generally used to determine the installed capacity, firm energy and
secondary energy.
• FDC is also used to plot the power duration curve.
• A flow duration curve allows the evaluation of low levels flows.
• The flow duration curve is highly useful in planning and design of water
resource projects.
• FDC is used to determine firm power generation.
• The FDC used in design of drainage systems and in flood control systems.
• FDC provides a qualitative description of the runoff variability in the
stream.
Note:- If the curve have steep slope, it indicates a stream with highly variable
discharge. And if curve have flat slope it indicates small variability.
The long term monthly flow of a small stream is shown in table below:-
Calculate the Flow duration Curve.
Solution:- Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Flow(m3/ 0.36 0.38 0.40 0.50 0.76 1.67 2.59 2.49 1.45 0.94 0.56 0.43
sec)
Load curve
• Load curve is graph of load consumption with respect to any time, so this
curve gives an indication of power used at any time. load curve may be
daily, monthly or yearly.
• Peak load
The highest demand in a day is called peak load. The load is defined as that
part of the load carried at intensity greater than 4/3 times than mean load
intensity.
• Average load
Average load is defined as the average consumption over a defined time
period. Area under the load curve divided by time gives the average load.
𝐴𝑣𝑒𝑟𝑎𝑔𝑒 𝑙𝑜𝑎𝑑
Load factor=
𝑃𝑒𝑎𝑘 𝑙𝑜𝑎𝑑
Mass curve (Ripple Mass Curve):-
• The graph of cumulative values of a water quantity (runoff) against time is called mass curve. It is an integral
curve of a hydrograph which express the area under hydrograph from one time to another time. It is also
known as Ripple mass curve and made from mean monthly flow records of a stream.
• Uses of Mass curve:-
• To determine reservoir capacity for a given yield.
• To determine yield from a reservoir of given capacity.
• To determine water to spill out through reservoir.
• Characteristics of mass curve:-
• The mass curve is a continuously raising curve as it shows the accumulated inflow volume with time.
• The slope of the curve at any point indicates the rate of inflow at that particular time.
• If the curve becomes horizontal at some point, it indicates that rate of flow at that particular time is zero. But
mass curve never fall down.
• If the curve rises sharply, it indicates the high rate of inflow within that period.
• The point A and B in mass curve indicate the dry periods whereas Point C and D indicates high flow.
Site Selection for hydropower project
(Accessibility, Near to load centre, High topographic variation, Sound
Geological condition, Less variation of flow in different season)
• The site for the intake and the power house should be easily accessible
to economizes the cost of transportation
• The power plant should be near to the load centre to reduce cost of
transmission as well as reduce power loss in transmission system.
• Intake should be sited at a place where the stream is permanent. For
example, flowing over bed rock and not prone to accumulation of site.
• The stream should not have a large gradient up-stream of intake.
• The stream should be relatively straight path up-stream and down-
stream of the intake to avoid damage from sharp turning flood waters.
• cont……..
....Site Selection for hydropower
• Intake should be placed on outside of a bend but not inside of the bend.
• A gravel trap is constructed close to the intake in order to prevent gravel
from getting into the approach channel.
• Settling basin should be located as close to the intake as possible.
• The settling basin shall be designed to be functional easily operable and
economical both for construction and operation.
• The location of fore bay should be such that desire head is available for
required power production.
• Structure must be located at stable site and not threaten by landslide,
falling stones as far as possible.
• Power house should be located at place to drain out the water from power
to river through tailrace canal.
Reservoir:-
When a barrier is constructed across the river in the form of a dam,
water gets stored on the upstream side of the barrier forming a pool of
water is called a reservoir.
Water stored in the reservoir may be used for various purposes. for
irrigation, water supply, and hydropower and so on. So, reservoir store
water during the period of excess supply and release it during the period
of low flow to meet the d/s demand.
Classification of reservoir
Based on specific purpose reservoir may be classified as :-
• Flood control reservoir:- The aim of flood control is to store some of the flood
water river when discharge rate a stage is likely to cause damage of the valley.
• Storage or conservation reservoir:- water store for purpose like, Hydropower,
Irrigation, Public and industrial water supply, sediment control of river,
Navigation etc.
• Multipurpose reservoir:- A reservoir is called single purpose reservoir if it serves
only one purpose and is called multipurpose if it used for almost all the purposes
as hydropower, irrigation , water supply, sediment control etc.
• Distribution reservoir:- A reservoir is called a distribution reservoir without a
dam in which water from river is pumped into some concrete tank constructed at
stable places.
Reservoir regulation
• It is defined as rational distribution of river flow in time and space
among different field of water resources like consumptive used field (
water supply, irrigation etc.) and non consumptive use field
(navigation, water power etc.). depending upon the relative reservoir
capacity and period of its regulation, reservoir regulation is categories
as:-
• Short term regulation:- Regulation period is less than or equal to one
year.
• Long term regulation:- Regulation period is more than one year.
Reservoir planning
• Maximum water level:- It is the maximum level to which the water surface will raise when the design flood pass over
the spillway.
• Minimum water level:-It is the lowest level up to which the water is withdraw from the reservoir under ordinary
condition. Minimum water level generally corresponds to the elevation of the lowest outlet of the dam.
• Useful storage /Live storage:- It is the volume of water stored between the normal water level and minimum water
level.
• Surcharge storage:- It is the volume of water stored above the NWL up to maximum level.
• Dead storage:- It is the volume of water stored below the minimum water level. It is not used for any purpose on the
normal condition. Dead storage is usually taken equal to the sediment volume during the life period of storage.
Generally, it is 15 to 25% of reservoir capacity.
• Valley storage :-The volume of water help by natural river channel in its valley up to the top of it’s bank before the
construction of reservoir. The valley storage depends on cross-section of river, its length and water level. So net
storage capacity = storage capacity of reservoir (Total)- Valley storage.
• Bank storage:-If the bank of the reservoir is porous then some amount of water is temporarily stored by them but when
the reservoir is full the stored water in banks later drains into the reservoir when water level in the reservoir falls. This
volume of water is bank storage. Its volume depends on geological feature of area.
Location of site for reservoir:-
In site selection of reservoir following points should be considered:-
• It is located in the area in minimum percolation and maximum runoff
( sufficient inflow)
• Leakage in the selected area should be minimum.
• It should be located on highly impermeable rock like slate, granite etc.
• To reduce length of the dam, narrow opening of the basin is essential.
• Site should be easily accessible by road if required to construct them
cost of construction should be minimum.
• Located area should provide sufficient water depth with smaller area.
• Construction material for dam should be locally available.
• Less submergence of habitant area, fertile land etc.
Reservoir sedimentation
• Every river carries certain amount of sediment load especially in monsoon.
The sediment particles try to settle down to the river bottom due to the
gravitational force, but may be kept in suspension due to the upward
current in the turbulent flow.
• fine sediment in suspension as suspended load and large body in bed load.
• This deposition of sediment in the reservoir is known as reservoir
sedimentation or reservoir silting.
Deposition of sediment reduces the water holding capacity of reservoir. The
sediment load of river depends on the following factor:-
• Nature of soil I catchment
• Vegetal cover around the reservoir.
• Topography of nature (Steep or plain)
• Intensity of flow.
• Origin of flow.
Control of sediment in reservoirs:-
• rate of deposit of sediments in reservoir should be decreased
• As reservoir sedimentation cannot be prevented it may be reduced to some
extent.
The following points should be considered to control and reduce the sediments
flow in the reservoir:-
• Proper selection of reservoir site.
• Series of small low dams in Sandy River should be constructed to arrest the
sediment upstream of the reservoir.
• Control of sediment flow
• Sediment deposited may be removed by excavation, draining and flushing by
sluice disturbing the sediment by some mechanical and hydraulic method.
• Construction of dam should be in stages.
• Construction of check dams in series in upstream tributaries of the river having
huge sediment content.
• Sediment removal by sluices during flood time.
Sediment control should be divided into two parts
• Pre-construction Measure:- they are those measure which are adopted before and
during the execution of the project. They are as follows:-
• Selection of dam site.
• Construction of the dam in stages.
• Construction of check dam.
• Vegetation screens.
• Construction of under sluices in the dam.
• Post-Construction measures:- These measures are under taken during the
operation of the project. They are as follows:-
• Removal of post flood water.
• Mechanical stirring of the sediment
• Erosion control and soil conservation.
• Plantation.
• Dredging by mechanically or manually.
Life of reservoir
• All the reservoir ultimately get filled with sediments. Depending upon
the sediments load in the river and type of catchment, the deposition
of silt will vary from reservoir to reservoir. Deposition of sediment
gradually decreases the available storage capacity of reservoir.
• The rate of sedimentation in the reservoir depends on the trap
efficiency (ɳ𝑡 ).
𝑇𝑜𝑡𝑎𝑙 𝑆𝑒𝑑𝑖𝑚𝑒𝑛𝑡 𝑑𝑒𝑝𝑜𝑠𝑖𝑡𝑒𝑑 𝑖𝑛 𝑟𝑒𝑠𝑒𝑟𝑣𝑜𝑖𝑟
• Trap efficiency(ɳ𝑡 ) = ∗ 100%
𝑇𝑜𝑡𝑎𝑙 𝑠𝑒𝑑𝑖𝑚𝑒𝑛𝑡 𝑖𝑛𝑓𝑙𝑜𝑤 𝑡𝑜 𝑡ℎ𝑒 𝑟𝑒𝑠𝑒𝑟𝑣𝑜𝑖𝑟
Generally, Varies from 95 to 100%. Trap efficiency depends on the
reservoir capacity inflow rate.
𝑅𝑒𝑠𝑒𝑟𝑣𝑜𝑖𝑟 𝐶𝑎𝑝𝑎𝑐𝑖𝑡𝑦
Capacity Inflow rate=
𝑇𝑜𝑡𝑎𝑙 𝐼𝑛𝑓𝑙𝑜𝑤 𝑉𝑜𝑙𝑢𝑚𝑒
The volume of a reservoir at NWL is estimated for 9 billion Cubic meter and mean annual flow of the river
is 150 Cubic meter per sec along with its sediment transportation (Suspended) Capacity of 2.6 kg/m3. The
volume weight of suspended sediment having 1.6 tones/m3 is 1.25 less than the bed sediments. Determine
the service life of the reservoir if the mean annual volume of sediments due to erosion of its banks and some
of the sediment passing in the downstream are 25% and 23% of the gross storage.
• Solution:-
• Volume of reservoir(V) = 9 ∗ 109 𝑚3
• Mean annual flow of river (Q)= 150 𝑚3 /𝑠𝑒𝑐
• Suspended sediment transportation capacity= 2.6 𝑘𝑔/𝑚3
• 𝛾𝑆𝑢𝑠𝑝𝑒𝑛𝑑𝑒𝑑 = 16 𝑡𝑜𝑛𝑛𝑒𝑠/𝑚3 =1600 kg/𝑚3
• 𝛾𝐵𝑒𝑑 𝐿𝑜𝑎𝑑 = 1.25 ∗ 16 𝑡𝑜𝑛𝑛𝑒𝑠/𝑚3 = 2000 kg/𝑚3
• Service life of reservoir (T)= ?
25
• Mean annual volume of the sediments due to erosion of banks = 25% of gross storage (V= ∗ 9 ∗ 109 = 2.25 ∗ 109 𝑚3
100
• Mean volume of sediment passing through downstream = 23% of gross storage (V)
23
• = ∗ 9 ∗ 109 = 2.07 ∗ 109 𝑚3
100
• Therefore, Volume of sediment deposited in the reservoir (V1)= 2.25 ∗ 109 − 2.07 ∗ 109 = 0.18 ∗ 109 𝑚3
• Weight of sediment (Suspended) transported by river = Mean annual volume of river * suspended capacity = Q*t *2.6 kg/m3 =
150*365*24*60*60*2.6 = 1.23 *1010 𝑘𝑔
𝑊𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑠𝑒𝑑𝑖𝑚𝑒𝑛𝑡 𝑡𝑟𝑎𝑛𝑠𝑝𝑜𝑟𝑡𝑒𝑑 𝑏𝑦 𝑟𝑖𝑣𝑒𝑟 𝑊 1.23∗1010
• Volume of the sediment transported by river 𝑉2 = = = 7687500 𝑚3
𝛾𝑆𝑢𝑠𝑝𝑒𝑛𝑑𝑒𝑑 1600
• Therefore, total volume of sediment = Volume of sediment due to transported + Volume of remaining sediment deposited due to erosion
of Bank
• V3= V1+V2 = 0.18 ∗ 109 +7687500 = 187687500 m3 per year.
𝑽𝒐𝒍𝒖𝒎𝒆 𝒐𝒇 𝒓𝒆𝒔𝒆𝒓𝒗𝒐𝒊𝒓 𝑽 𝟎.𝟗∗𝟏𝟎𝟗
• Therefore, Life of reservoir = = = = 𝟒𝟕. 𝟗𝟓 𝒚𝒆𝒂𝒓 = 𝟒𝟖 𝒚𝒆𝒂𝒓.
𝑻𝒐𝒕𝒂𝒍 𝒗𝒐𝒍𝒖𝒎𝒆 𝒐𝒇 𝒔𝒆𝒅𝒊𝒎𝒆𝒏𝒕 𝒅𝒆𝒑𝒐𝒔𝒊𝒕𝒆𝒅 𝑽𝟑 𝟏𝟖𝟕𝟔𝟖𝟕𝟓𝟎𝟎
Chapter 3:- Power And Energy Potential Study
• Gross head :is the difference between the water level in the head race
and water level in the tail race.
• For hydropower project with Pelton turbine gross head (𝑯𝒈 ) = 𝒘𝒂𝒕𝒆𝒓 𝒍𝒆𝒗𝒆𝒍 𝒂𝒕 𝒊𝒏𝒕𝒂𝒌𝒆 − 𝑻𝒖𝒓𝒃𝒊𝒏𝒆 𝑨𝒙𝒊𝒔 𝑳𝒆𝒗𝒆𝒍
• For hydropower project with Francis turbine gross head (𝑯𝒈 ) = 𝒘𝒂𝒕𝒆𝒓 𝒍𝒆𝒗𝒆𝒍 𝒂𝒕 𝒊𝒏𝒕𝒂𝒌𝒆 − 𝑻𝒂𝒊𝒍 𝑾𝒂𝒕𝒆𝒓 𝑳𝒆𝒗𝒆𝒍
Net head(𝑯𝒏𝒆𝒕 ): −
• is the head available for the turbine after deducting the head losses with
the system.
• It is the difference in total head at the point of entry and at the point of
exit of the turbine. This includes the respective pressure and velocity
heads at both places.
• For impulse turbine, 𝐻𝑛𝑒𝑡 = 𝐻𝑔𝑟 − 𝑍 − ℎ𝑙
𝑣2
• For reaction turbine, 𝐻𝑛𝑒𝑡 = 𝐻𝑔𝑟 − − ℎ𝑙
2𝑔
Where, 𝐻𝑛𝑒𝑡 = 𝑛𝑒𝑡 ℎ𝑒𝑎𝑑, 𝐻𝑔𝑟 = 𝑔𝑟𝑜𝑠𝑠 ℎ𝑒𝑎𝑑, 𝑍=
ℎ𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑝𝑒𝑙𝑡𝑜𝑛 𝑤ℎ𝑒𝑒𝑙 𝑒𝑥𝑖𝑡 𝑎𝑏𝑜𝑣𝑒 𝑡ℎ𝑒 𝑡𝑎𝑖𝑙 𝑟𝑎𝑐𝑒.
ℎ𝑙 = ℎ𝑒𝑎𝑑 𝑙𝑜𝑠𝑠 𝑖𝑛 𝑡ℎ𝑒 𝑝𝑒𝑛𝑠𝑡𝑜𝑐𝑘, 𝑣 = 𝑣𝑒𝑙𝑜𝑐𝑖𝑡𝑦 𝑎𝑡 𝑒𝑥𝑖𝑡.
Operating head:-
It is the simultaneous difference of water surface elevation in the forebay
and tailrace, after making due to allowance of approach velocity and exit
velocity head.
Operating head = T.E.L at Forebay – T.E.L at exit
Design head:-
• It is the net head under which the turbine reaches peak efficiency at
synchronous speed.
Hydraulic efficiency of plant:-
It is the ratio of net head to the gross head. This efficiency indicates the
total losses from intake to powerhouse. Higher losses in the system lower
the hydraulic efficiency. So we always tried to minimize the losses while
designing the project.
Firm (Primary Power):-
• power insured to a consumer at any time of the day is known as firm power.
• Firm power is completely dependable and available 100% of time. Such power corresponds to
minimum stream flow.
• The firm power could be increased by use of poundage.
Secondary power:- The secondary power is the amount of power which is excess of the firm power
during off peak hours during monsoon season etc. It is called surplus or non-firm power.
Installed Capacity:-
• The plant capacity, which is economically available, is known as installed
capacity. It is also defined as the maximum power, which can be developed by
all generators of the plant at the normal head and with full flow.
𝑛 𝑛∗ɳ∗𝛾∗𝑄𝑑 ∗𝐻
•𝑃= σ𝑖=1 where, 𝑄𝑑 = 𝐷𝑒𝑠𝑖𝑔𝑛 𝑑𝑖𝑠𝑐ℎ𝑎𝑟𝑔𝑒 𝑚3/𝑠𝑒𝑐 , ɳ= overall
100
efficiency, 𝛾 = 9.81 KN/m3
A reservoir has the following available data. Find the probable useful life of the reservoir.
• Reservoir capacity = 20 Mm3 (Million Cubic meter)
• Average annual flood Volume = 40 Mm3
• Annual sediment = 13.3333* 𝟏𝟎𝟒tonnes
• Specific gravity of sediment = 2.2 gm/cc
• Life of reservoir terminates when 80% of initial capacity is filled up.
Capacit 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1
• Capacity inflow ratio v/s trap efficiency is given by :- y inflow
ratio
Assume 20% of the capacity is filled up in first interval.
Trap 86 92 94 95 96 96.5 97 97 97 97.5
efficien
cy %
Solution:-
• Annual sediment = 13.3333*104 𝑡𝑜𝑛𝑛𝑒𝑠 = 13.3333 ∗ 104 ∗ 103 𝐾𝑔 = 13.3333 ∗ 107 𝑘𝑔
13.3333∗107
• Volume of annual sediment = = 60605.909 𝑚3
2.2∗1000
• Stage- I (20 % of reservoir filling )
20
• 20% of reservoir capacity = 20% *20 Mm3 = ∗ 20 = 4𝑀𝑚3
100
𝐶𝑎𝑝𝑎𝑐𝑖𝑡𝑦 𝑜𝑓 𝑟𝑒𝑠𝑒𝑟𝑣𝑜𝑖𝑟 20
• Initial, capacity inflow ratio = = = 0.5
𝑇𝑜𝑡𝑎𝑙 𝐼𝑛𝑓𝑙𝑜𝑤 𝑖𝑛 𝑡ℎ𝑒 𝑟𝑒𝑠𝑒𝑟𝑣𝑜𝑖𝑟 40
• Corresponding Trap Efficiency (ɳ𝐼 ) = 96% = 0.96
𝐶𝑎𝑝𝑎𝑐𝑖𝑡𝑦 𝑜𝑓 𝑟𝑒𝑠𝑒𝑟𝑣𝑜𝑖𝑟 20−4
• Capacity –inflow ratio at the end of the interval (𝐶𝐼𝑅)𝐹 = = =
𝑇𝑜𝑡𝑎𝑙 𝑖𝑛𝑓𝑙𝑜𝑤 𝑖𝑛 𝑡ℎ𝑒 𝑟𝑒𝑠𝑒𝑟𝑣𝑜𝑖𝑟 20
0.4
• Corresponding Trap efficiency (ɳ𝐹 ) = 95% = 0.95
(0.96+0.95)
• Therefore, average trap efficiency, at 20% of reservoir filling (ɳ20% ) = = 0.955
2
𝑇𝑜𝑡𝑎𝑙 𝑠𝑒𝑑𝑖𝑚𝑒𝑛𝑡 𝑑𝑒𝑝𝑜𝑠𝑖𝑡𝑒𝑑 𝑖𝑛 𝑟𝑒𝑠𝑒𝑟𝑣𝑜𝑖𝑟
• We know, trap efficiency (ɳ) =
𝑇𝑜𝑡𝑎𝑙 𝑠𝑒𝑑𝑖𝑚𝑒𝑛𝑡 𝑓𝑙𝑜𝑤𝑖𝑛𝑔 𝑖𝑛 𝑡ℎ𝑒 𝑟𝑖𝑣𝑒𝑟
•
𝑇𝑜𝑡𝑎𝑙 𝑠𝑒𝑑𝑖𝑚𝑒𝑛𝑡 𝑑𝑒𝑝𝑜𝑠𝑖𝑡𝑒𝑑 𝑖𝑛 𝑟𝑒𝑠𝑒𝑟𝑣𝑜𝑖𝑟
• 0.955= ⇒ 𝑇𝑜𝑡𝑎𝑙 𝑠𝑒𝑑𝑖𝑚𝑒𝑡 𝑑𝑒𝑝𝑜𝑠𝑖𝑡𝑒𝑑 𝑖𝑛 𝑟𝑒𝑠𝑒𝑟𝑣𝑜𝑖𝑟 =
60605.904
57878.6431
4∗106
• No of years to fill 20 % of capacity or 4 Mm3= = 69.11 𝑦𝑒𝑎𝑟𝑠.
57876.6431
In the second interval (20% of reservoir filling )
16
• Initial, capacity inflow ration (𝐶𝐼𝑅)𝐼 = = 0.40
40
• Corresponding Trap efficiency (ɳ𝐼 ) = 95% = 0.95
• Capacity –inflow ratio at the end of the interval (𝐶𝐼𝑅)𝐹 =
𝐶𝑎𝑝𝑎𝑐𝑖𝑡𝑦 𝑜𝑓 𝑟𝑒𝑠𝑒𝑟𝑣𝑜𝑖𝑟 16−4
= = 03
𝑇𝑜𝑡𝑎𝑙 𝑖𝑛𝑓𝑙𝑜𝑤 𝑖𝑛 𝑡ℎ𝑒 𝑟𝑒𝑠𝑒𝑟𝑣𝑜𝑖𝑟 40
• Corresponding Trap efficiency (ɳ𝐹 ) = 94% = 0.94
• Average trap efficiency, at 20% of reservoir filling (ɳ20% ) =
(0.95+0.94)
= 0.945
2
• ⇒ 𝑇𝑜𝑡𝑎𝑙 𝑠𝑒𝑑𝑖𝑚𝑒𝑡 𝑑𝑒𝑝𝑜𝑠𝑖𝑡𝑒𝑑 𝑖𝑛 𝑟𝑒𝑠𝑒𝑟𝑣𝑜𝑖𝑟 = 0.945 ∗ 60605.904 =
57272.11
4∗106
• No of years to fill 20 % of capacity or 4 Mm3= =
57272.11
69.841 𝑦𝑒𝑎𝑟𝑠.
In third interval,
12
Initial, capacity inflow ration (𝐶𝐼𝑅)𝐼 = = 0.30
40
• Corresponding Trap efficiency (ɳ𝐼 ) = 94% = 0.94
• Capacity –inflow ratio at the end of the interval (𝐶𝐼𝑅)𝐹 =
𝐶𝑎𝑝𝑎𝑐𝑖𝑡𝑦 𝑜𝑓 𝑟𝑒𝑠𝑒𝑟𝑣𝑜𝑖𝑟 12−4
= = 0.2
𝑇𝑜𝑡𝑎𝑙 𝑖𝑛𝑓𝑙𝑜𝑤 𝑖𝑛 𝑡ℎ𝑒 𝑟𝑒𝑠𝑒𝑟𝑣𝑜𝑖𝑟 40
• Corresponding Trap efficiency (ɳ𝐹 ) = 92% = 0.92
• Average trap efficiency, at 20% of reservoir filling (ɳ20% ) =
(0.94+0.92)
= 0.93
2
• ⇒ 𝑇𝑜𝑡𝑎𝑙 𝑠𝑒𝑑𝑖𝑚𝑒𝑡 𝑑𝑒𝑝𝑜𝑠𝑖𝑡𝑒𝑑 𝑖𝑛 𝑟𝑒𝑠𝑒𝑟𝑣𝑜𝑖𝑟 = 0.93 ∗ 60605.904 =
56363.03
4∗106
• No of years to fill 20 % of capacity or 4 Mm3= =
56363.03
70.97 𝑦𝑒𝑎𝑟𝑠.
In fourth interval,
8
• Initial, (𝐶𝐼𝑅)𝐼 = = 0.20
40
• Corresponding Trap efficiency (ɳ𝐼 ) = 92% = 0.92
𝐶𝑎𝑝𝑎𝑐𝑖𝑡𝑦 𝑜𝑓 𝑟𝑒𝑠𝑒𝑟𝑣𝑜𝑖𝑟 12−8
• Final, (𝐶𝐼𝑅)𝐹 = = = 0.1
𝑇𝑜𝑡𝑎𝑙 𝑖𝑛𝑓𝑙𝑜𝑤 𝑖𝑛 𝑡ℎ𝑒 𝑟𝑒𝑠𝑒𝑟𝑣𝑜𝑖𝑟 40
• Corresponding Trap efficiency (ɳ𝐹 ) = 86% = 0.86
(0.92+0.86)
• Average trap efficiency, at 20% of reservoir filling (ɳ20% ) = =
2
0.89
• ⇒ 𝑇𝑜𝑡𝑎𝑙 𝑠𝑒𝑑𝑖𝑚𝑒𝑡 𝑑𝑒𝑝𝑜𝑠𝑖𝑡𝑒𝑑 𝑖𝑛 𝑟𝑒𝑠𝑒𝑟𝑣𝑜𝑖𝑟 = 0.89 ∗ 60605.904 =
53938.81
4∗106
• No of years to fill 20 % of capacity or 4 Mm3= = 74.16 𝑦𝑒𝑎𝑟𝑠.
53938.81
Marginal Cost and Benefit approach:-
The installed capacity or economical plant capacity is determined by
equating the marginal cost and benefits for that project, while determining
the fixed cost of the project assumed to be constant.
Let X % of the duration corresponds to the best installed capacity for 1 Kw
power generation with energy price= US $𝐸/𝑀𝑊𝐻
Variable cost = US $ 𝑉𝐶𝑜𝑠𝑡 /𝑘𝑤 (the variable cost is the electromechanical
installed cost. The civil cost is not included in the variable cost because it is
fixed cost)
O&M cost= certain percentage of variable cost and life of plant = N years.
Now, analyzing by the marginal benefit and marginal cost approach,
1
Energy generated = 𝑀𝑊 ∗ 𝑋 ∗ 365 ∗ 24 = 8.76 𝑋(𝑀𝑊𝐻)
1000
%of time 8.33 16.67 25 33.33 41.67 50 58.33 66.67 75 83.33 91.67 100
Power(MW) 703 588 537 305 256 183 147 107 82 72 59 51
• Determine the best installed capacity of the power plant with following data.
• Interest Rate = 10%
• Energy price = US $𝟑𝟎/𝑴𝒘𝒉
• Variable Cost = US $𝟔𝟎𝟎/𝑲𝑾 (Electro mechanical)
• Fixed cost = US $𝟐𝟎𝟎𝟎/𝑲𝑾
• O&M cost = 2% of variable cost
• Economic life of the plant = 40 years
Solution:-
Let us analyze marginal benefit and cost for 1 Kw installation.
Assuming “X” % of the duration corresponds to the best installed capacity for 1
Kw power generation.
Then,
1
Total energy generated = 1000 ∗ 𝑋% ∗ 365 ∗ 24 𝑀𝑊𝐻 = 8.76𝑋% 𝑀𝑊𝐻 𝐴𝑛𝑛𝑢𝑎𝑙 = 0.0876𝑋 𝑀𝑊𝐻 𝑃𝑒𝑟 𝐾𝑤.
1+𝑖 𝑁∗𝑖
= 𝑉𝐶𝑜𝑠𝑡 𝑁
+ % 𝑜𝑓 𝑂 & 𝑀 ∗ 𝑉𝐶𝑜𝑠𝑡
1+𝑖 −1
Here, fixed cost is civil cost and not taken in total cost.
1+0.1 40 ∗0.1 2
⇒Total Marginal cost = 𝑈$600 1+0.1 40 −1
+
100
∗ 𝑈$600 = 𝑈$ 73.36 … … … … … … 2
𝑷−𝟓𝟑𝟕 𝟑𝟎𝟓−𝟓𝟑𝟕
• =
𝟐𝟕.𝟗𝟏𝟓−𝟐𝟓 𝟑𝟑.𝟑𝟑−𝟐𝟓
−𝟐𝟖𝟐
• P= 537 +2.915 *( ) = 𝟒𝟑𝟓. 𝟖𝟏𝟒 𝑴𝑾
𝟖.𝟑𝟑
• Which is the best install capacity of the power plant.
Installed Capacity Optimum approach:-
Peak load
Average load
Base load
Load curve may be
Daily load curve:-
Weekly load curve
Seasonal Load Curve
The value of utilization factors varies from 0.40 to 0.90 for a hydropower plant
depending upon the plant capacity, load factors and storage.
Diversity factors:-
• The consumer uses power as per his demand if he uses whole of the
connected load his load factor is 100%, if he uses less than connected
load his load factor is less than 100%. The ratio of sum of the individual
maximum demand of all the consumers supplied by it to the maximum
demand of the power station is called the diversity factors. It is always
greater than unity.
𝑺𝒖𝒎 𝒐𝒇 𝒊𝒏𝒅𝒊𝒗𝒊𝒅𝒖𝒂𝒍 𝒎𝒂𝒙𝒊𝒎𝒖𝒎 𝒅𝒆𝒎𝒂𝒏𝒅
• Diversity factors:-
𝑴𝒂𝒙𝒊𝒎𝒖𝒎 𝒅𝒆𝒎𝒂𝒏𝒅 𝒐𝒇 𝒑𝒐𝒘𝒆𝒓 𝒔𝒕𝒂𝒕𝒊𝒐𝒏
• Demand Factor:-
𝑴𝒂𝒙𝒊𝒎𝒖𝒎 𝑫𝒆𝒎𝒂𝒏𝒅
• Demand Factor=
𝑪𝒐𝒏𝒏𝒆𝒄𝒕𝒆𝒅 𝑳𝒐𝒂𝒅
Significance of load factors and diversity factors:-
• Load factors and diversity factors play an important part in the cost of
the supply of electrical energy.
• Higher the value of load and diversity factor, lower will be the overall
cost per unit generated.
• Higher load factor means greater average load, resulting in greater
number of unit generated for a given maximum demand. Thus the
standing charges which are proportional to the maximum demand and
independent of number of units generated can be distributed over a
larger number of units supplied and therefore overall cost per unit of
electrical energy generated will be reduced.
• Lower the maximum demand of the power station, the lower is the
capacity required and therefore lower is the capital cost of the plant.
Power Grid:-
System of transmission of high voltage is called power grid. Modern power system is served by
several power plants which are interconnected to form a power grid. Such power system is
designed to supply sufficient capacity to supply peak load and small additional capacity to take the
care of break down and necessary maintenance. The hydropower station connected with the
national power grid system may be in one river or its basin or different part of country. In this
system, shut down of any power station for maintenance will not affect the working process of the
people as a whole. Thus power system interconnection is known as power grid system. Except micro
hydropower and few mini hydropower projects all the small and large hydropower system is
interconnected to grid. For isolated system, there is no linkage with national grid.
The advantage of integrated grid over isolated grid is :-
• It increases reliability, in the event of a force or planned outage of power station.
• Reduction in the total capacity, by effective utilization of plants and by desired degree of service
reliability.
• Economic operation by combination of different sources of energy such as coal, thermal etc.
Component of power grid system are:-
• Component of power grid system are:-
• Generation station ( Power house, Generator) LDC
• Transmission Line
• Sub-Station
• Distribution lines
• Distribution transformers
• Household / consumer
• Load dispatch center(LDC)
Function of grid
• The power system planning is connected with the reliable supply with
minimum losses.
• Electric power is generated at a low voltage 6 to 25 KV which is then stepped
up to the transmission level in the range of 66 KV to 4O0 KV. As the
transmission capability of line is proportional to the square of its voltage it has
to raise transmission voltage with increase in transmission voltage efficiency in
transmission increases for these reason it is always advantageous to transmit
power at high voltage..
• Finally, the electricity is connected to consumers in 220 V voltage level by 11
KV/220 V distribution transformers.
• Whole supply of electricity from power house to all distribution lines of a
power grid is controlled by Load Dispatch Centre (LDC).
Component of power system:-
• Generators:-
generate electrical power /have a speed range of 70 to 1000 rpm/ generators can
have either a vertical shaft alignment or a horizontal shaft alignment. The main
components of generator are:-
Stator:- stationary part of the generator it consists of frame, core, winding.
Rotor:- Rotating element of generators it consists of hub, rim, poles, excitation.
Bearing:- It minimized frictional losses while operating the generator and
improves the efficiency
• Transformers:-
These are the device which increase(for transmission) or decrease(for
distribution)the voltages. It consists of a core made from laminated silicon alloy
steel having 0.35 mm to 0.50 mm thick each layer being insulated by thin paper
or varnish.
Switch Gear:-
• The power houses are designed to give continuous service without
interruption of power. But sometimes faults may develop in the system due
to manmade or natural causes. In such cases suitable protective devices
have to be provided to locate faults, isolate the faulty circuits from the
system and to clear the faults as quick as possible. It consists of breakers,
relax and equipment for controlling and measuring such as currents and
potential transformers, isolators, control panels, switches and fuses etc.
Substations:-
• It is generally located just outside the power station building on the ground
or sometime on the RCC roof of the power house. It consists incoming line,
outgoing line, bus bars, transformer, metering panels, dropout fuse station
earthling system, low and high voltage, switch gear like circuit breaker etc.
Control room equipment:-
• It consists of switches to control the operation of units, recording and
signaling equipment. Instruments measuring of controlling voltages,
currents and frequencies of generation, outage feeders, battery charging
equipment , telephone equipment etc. Reservoir and tail race water
level indicator.
A run of river plant is constructed across a river at a site having net head 50 m. The river carries a sustained minimum flow of 20
cumec as a dry weather flow. Behind the power station sufficient water poundage has been provided to supply daily peak load of
demand with a load factor 70%. Assuming the plant efficiency of 65% determine:-
The maximum generating capacity of the generators to be installed at the powerhouse.
The volume of poundage to be provided to supply the daily demand assuming that the daily load pattern consist of average load for 21
hours and peak load for 3 hours?
• The power produced ( At dry weather flow ) is given by , P=ɳ ∗ 𝛾 ∗ 𝑄 ∗ 𝐻 = 0.65 ∗ 9.81 ∗ 20 ∗
50 = 6376.5 𝐾𝑤 = 𝟔. 𝟑𝟕𝟔𝟓𝑴𝑾
• We know,
𝐴𝑣𝑒𝑟𝑎𝑔𝑒 𝐿𝑜𝑎𝑑 6376.5
• Load factor= ⇒ 𝑝𝑒𝑎𝑘 𝐿𝑜𝑎𝑑 = = 9109.29𝐾𝑤.
𝑃𝑒𝑎𝑘 𝐿𝑜𝑎𝑑 0.7
[Link] there is no reservoir capacity. We have the maximum capacity of the generators to be
installed = 9109.29 KW.
[Link] water from poundage is drawn in order to meet the excess demand for 3 hour.
• Excess power required to be developed during 3 hour = 9109.29 – 6376.5 = 2732.79 KW.
• Excess discharge required for developing this excess power is given by,
• 𝑃 = ɳ∗𝛾∗𝑄∗𝐻
• 2732.79 = 0.65 ∗ 9.81 ∗ 𝑄 ∗ 50
3
• ∴ 𝑄 = 8.57 𝑚 Τ𝑠𝑒𝑐
• Required poundage per day = 8.57*3*60*60 = 92556 cum
A power station has to supply the following loads on an average day. Calculate the daily load factor. What will be the plant
capacity factor and utilization factor if it has reserve capacity of 1000 Kw?
Time (T) 11pm to 5 5 am to 6 6 am to 7 7 am to 9 9 am to 12 am to 1 pm to 5 5 pm to 7 7 pm to 9 9 pm to
am am am am 12 am 1 pm pm pm pm 11 pm
Load(Kw) 500 750 1000 2000 2500 1500 2500 2000 2500 1000
• Solution:-
• Net head(H)= 10 m Efficiency (ɳ)= 89%
• The power installed capacity of the plant is fixed based on 25% of the time
availability of flow so , 𝑄25 = 475 m3/sec.
𝑥−500 450−500
• = ⇒ 𝑥 = 475 𝑚3/𝑠𝑒𝑐
25−20 30−20
• Power (Installed Capacity) P= ɳ𝛾𝑄ℎ =0.89*9.81*475*40 = 41471.775 Kw=
41.472MW
𝑡𝑛 −𝑡𝑛−1 𝑃 𝐴𝑐𝑡𝑢𝑎𝑙 𝑛+ 𝑃 𝐴𝑐𝑡𝑢𝑎𝑙 𝑛−1 365∗24
• Energy = ∗ ∗ 𝑖𝑛 𝐺𝑤ℎ
100 2 1000
∴ 𝐷𝑒𝑡𝑎𝑖𝑙 𝑐𝑎𝑙𝑐𝑢𝑙𝑎𝑡𝑖𝑜𝑛 𝑖𝑠 𝑠ℎ𝑜𝑤𝑛 𝑖𝑛 𝑡𝑎𝑏𝑙𝑒: −
S.N Flow(m3/sec) % of time Power(MW) Actual Power(MW) Energy (Gwh)
1 900 1 78.578 41.472 3.633
2 600 10 52.385 41.472 32.697
3 500 20 43.655 41.472 36.329
4 475 25 41.472 41.472 18.165
5 450 30 39.289 39.289 17.687
6 400 40 34.924 34.924 32.505
7 350 50 30.558 30.558 28.681
8 340 60 29.685 29.685 26.387
9 300 70 26.193 26.193 24.475
10 280 80 24.447 24.447 22.180
11 240 90 17.462 17.462 18.356
12 140 93 12.223 12.223 3.901
13 100 100 8.731 8.731 6.425
271.421
.
• The area under the power duration curve gives the energy generated. So the energy under different area is calculated
as,
𝑡𝑛 −𝑡𝑛−1 𝑃 𝐴𝑐𝑡𝑢𝑎𝑙 𝑛+ 𝑃 𝐴𝑐𝑡𝑢𝑎𝑙 𝑛−1 365∗24 10−0 41.472+41.427 365∗24
• 𝐸1 = ∗ ∗ 𝑖𝑛 𝐺𝑤ℎ = ∗ ∗ 1000 = 3.633 𝐺𝑤ℎ
100 2 1000 100 2
𝑡 −𝑡 𝑃 𝑃 365∗24 10−1 41.472+41.427 365∗24
• 𝐸2 = 𝑛 𝑛−1 ∗ 𝐴𝑐𝑡𝑢𝑎𝑙 𝑛+ 𝐴𝑐𝑡𝑢𝑎𝑙 𝑛−1 ∗ 𝑖𝑛 𝐺𝑤ℎ = ∗ ∗ = 32.697 𝐺𝑤ℎ
100 2 1000 100 2 1000
𝑡 −𝑡 𝑃 𝑃 365∗24 20−10 41.472+41.427 365∗24
• 𝐸3 = 𝑛 100𝑛−1 ∗ 𝐴𝑐𝑡𝑢𝑎𝑙 𝑛+2 𝐴𝑐𝑡𝑢𝑎𝑙 𝑛−1 ∗ 1000 𝑖𝑛 𝐺𝑤ℎ = 100 ∗ ∗ 1000 = 36.329𝐺𝑤ℎ
2
𝑡 −𝑡 𝑃 𝑃 365∗24 25−20 41.472+41.427 365∗24
• 𝐸4 = 𝑛 100𝑛−1 ∗ 𝐴𝑐𝑡𝑢𝑎𝑙 𝑛+2 𝐴𝑐𝑡𝑢𝑎𝑙 𝑛−1 ∗ 1000 𝑖𝑛 𝐺𝑤ℎ = 100 ∗ ∗ 1000 = 18.165 𝐺𝑤ℎ
2
𝑡 −𝑡 𝑃 𝑃 365∗24 30−25 39.289+41.427 365∗24
• 𝐸5 = 𝑛 100𝑛−1 ∗ 𝐴𝑐𝑡𝑢𝑎𝑙 𝑛+2 𝐴𝑐𝑡𝑢𝑎𝑙 𝑛−1 ∗ 1000 𝑖𝑛 𝐺𝑤ℎ = 100 ∗ ∗ 1000 = 17.687𝐺𝑤ℎ
2
𝑡 −𝑡 𝑃 𝑃 365∗24 40−30 34.924+39.289 365∗24
• 𝐸6 = 𝑛 100𝑛−1 ∗ 𝐴𝑐𝑡𝑢𝑎𝑙 𝑛+2 𝐴𝑐𝑡𝑢𝑎𝑙 𝑛−1 ∗ 1000 𝑖𝑛 𝐺𝑤ℎ = 100 ∗ ∗ 1000 = 32.505 𝐺𝑤ℎ
2
𝑡 −𝑡 𝑃 𝑃 365∗24 50−40 30.558+34.924 365∗24
• 𝐸7 = 𝑛 100𝑛−1 ∗ 𝐴𝑐𝑡𝑢𝑎𝑙 𝑛+2 𝐴𝑐𝑡𝑢𝑎𝑙 𝑛−1 ∗ 1000 𝑖𝑛 𝐺𝑤ℎ = 100 ∗ ∗ 1000 = 28.681 𝐺𝑤ℎ
2
𝑡𝑛 −𝑡𝑛−1 𝑃 𝐴𝑐𝑡𝑢𝑎𝑙 𝑛+ 𝑃 𝐴𝑐𝑡𝑢𝑎𝑙 𝑛−1 365∗24 60−50 26.685+30.558 365∗24
• 𝐸8 = 100 ∗ ∗ 𝑖𝑛 𝐺𝑤ℎ = ∗ ∗ 1000 = 26.387 𝐺𝑤ℎ
2 1000 100 2
𝑡 −𝑡 𝑃 𝑃 365∗24 70−60 26.193+26.685 365∗24
• 𝐸9 = 𝑛 100𝑛−1 ∗ 𝐴𝑐𝑡𝑢𝑎𝑙 𝑛+2 𝐴𝑐𝑡𝑢𝑎𝑙 𝑛−1 ∗ 1000 𝑖𝑛 𝐺𝑤ℎ = 100 ∗ ∗ 1000 = 24.475 𝐺𝑤ℎ
2
𝑡 −𝑡 𝑃 𝑃 365∗24 80−70 24.447+26.193 365∗24
• 𝐸10 = 𝑛 100𝑛−1 ∗ 𝐴𝑐𝑡𝑢𝑎𝑙 𝑛+2 𝐴𝑐𝑡𝑢𝑎𝑙 𝑛−1 ∗ 1000 𝑖𝑛 𝐺𝑤ℎ = 100 ∗ ∗ 1000 = 22.180 𝐺𝑤ℎ
2
𝑡 −𝑡 𝑃 𝑃 365∗24 90−80 17.462+24.447 365∗24
• 𝐸11 = 𝑛 100𝑛−1 ∗ 𝐴𝑐𝑡𝑢𝑎𝑙 𝑛+2 𝐴𝑐𝑡𝑢𝑎𝑙 𝑛−1 ∗ 1000 𝑖𝑛 𝐺𝑤ℎ = 100 ∗ ∗ 1000 = 18.356 𝐺𝑤ℎ
2
𝑡 −𝑡 𝑃 𝑃 365∗24 93−90 12.223+17.462 365∗24
• 𝐸12 = 𝑛 100𝑛−1 ∗ 𝐴𝑐𝑡𝑢𝑎𝑙 𝑛+2 𝐴𝑐𝑡𝑢𝑎𝑙 𝑛−1 ∗ 1000 𝑖𝑛 𝐺𝑤ℎ = 100 ∗ 2
∗ 1000 = 3.901 𝐺𝑤ℎ
𝑡𝑛 −𝑡𝑛−1 𝑃 𝐴𝑐𝑡𝑢𝑎𝑙 𝑛+ 𝑃 𝐴𝑐𝑡𝑢𝑎𝑙 𝑛−1 365∗24 100−93 8.731+12.223 365∗24
• 𝐸13 = 100 ∗ 2
∗ 1000
𝑖𝑛 𝐺𝑤ℎ = 100
∗ 2
∗ 1000 = 6.425 𝐺𝑤ℎ
100−0 365∗24
• Firm energy or Primary energy (Available at 100% of time)= 100 ∗ 8.731 ∗ 1000 = 76.484 𝐺𝑤ℎ
• ∴ 𝑆𝑒𝑐𝑜𝑛𝑑𝑎𝑟𝑦 𝑒𝑛𝑒𝑟𝑔𝑦 = 𝑇𝑜𝑡𝑎𝑙 𝑒𝑛𝑒𝑟𝑔𝑦 − 𝑃𝑟𝑖𝑚𝑎𝑟𝑦 𝐸𝑛𝑒𝑟𝑔𝑦 = 271.421 − 76.484 = 194.937 𝐺𝑤ℎ