0% found this document useful (0 votes)
85 views4 pages

EKO Electricity Environmental Audit Form

The document is an Environmental Audit Assessment Questionnaire for EKO Electricity Distribution PLC, designed to collect detailed information about the company's operations, environmental management, and waste management practices. It includes sections on general company information, administrative details, operational activities, building premises, environmental responsibilities, material procurement policies, energy inventory, and waste management. The questionnaire aims to ensure compliance with environmental standards and assess the company's impact on the environment.

Uploaded by

joshua.obeten
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
85 views4 pages

EKO Electricity Environmental Audit Form

The document is an Environmental Audit Assessment Questionnaire for EKO Electricity Distribution PLC, designed to collect detailed information about the company's operations, environmental management, and waste management practices. It includes sections on general company information, administrative details, operational activities, building premises, environmental responsibilities, material procurement policies, energy inventory, and waste management. The questionnaire aims to ensure compliance with environmental standards and assess the company's impact on the environment.

Uploaded by

joshua.obeten
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

EKO ELECTRICITY DISTRIBUTION PLC

ENVIRONMENTAL AUDIT ASSESSMENT QUESTIONNAIRE


(STRICTLY CONFIDENTIAL)

1. GENERAL COMPANY INFORMATION

Company Name:____________________________________________________________________

Name of Facility: ____________________________________________________________________

Location:__________________________________________________________________________

__________________________________________________________________________________

Telephone No: _____________________________________________________________________

Email Address: _____________________________________________________________________

Company Registration No:____________________________________________________________

Date of Incorporation: _______________________________________________________________

Date of Commencement of Operation: __________________________________________________

Estimated Age of Facility: _____________________________________________________________

2. ADMINISTRATIVE INFORMATION:

Number of Employees:

Full Time___________ Part Time ___________Contract Staff_____________ Total ____________

Normal Operating Schedule:

Hours per Day _______________Days per Week _______________Weekly Total _______________

No of Shifts per day __________ HoursperShift ___________

3. OPERATIONS

Itemise operations applicable to the facility in sequential manner





Are there areas where Respiratory Protection Equipment are required within the facility?



Are there areas where Noise Protection Equipment are required within the facility?


Are there routine programmes for periodic Measurement of levels of employee exposure to
Airborne Chemicals, Noise and Heat.

Are there any products manufactured/stored/used in this facility that reasonably might endanger
the environment if the products fails or is misused?

4. BUILDING PREMISES INFORMATION

Are the premises owned or leased? ..................................................................................

What are the different areas of the premises? (Give a breakdown by floor and functional area)

5. OVERALL ENVIRONMENTAL MANAGEMENT AND RESPOSIBILITIES

Who at this facility is responsible for:


Name/Job Title Time Spent(%) Reports To

Air Pollution Control ______________ ____________ ____________

Water Pollution Control ______________ ____________ ____________

Effluent Pollution Control ______________ ____________ ____________


Solid &Hazardous Waste Mgt ______________ ____________ ____________

Emergency Responses ______________ ____________ ____________

Occupational Health ______________ ____________ ____________

On-site Contractors ______________ ____________ ____________

Liaison with Govt, Agencies ______________ ____________ ____________

Coordinating Environmental Health ___________ ____________ ____________


6. MATERIAL PROCUREMENT POLICY
• Is there an inventory of all incoming supplies and material eg office supplies, computer
related supplies etc.............................................
• Are there defined procedures for inventory keeping, updating and checking?...................
• Is there a mechanism for verifying new supplies/ materials for nature, quality, quantity and
specification?................................................
• Is there a similar system of control of materials introduced to the premises (e.g by
contractors, laboratory samples etc)............................................
• Where are the laboratory analyses done.........................................
• Provide the name of the staff responsible for the facility procurement issues

Name and Title ______________________________________________________________

Location ____________________________________________________________________

Telephone No. _______________________________________________________________

E-mail address _______________________________________________________________

ENERGY INVENTORY:

Type of Energy/Fuel No of Equipment Quantity of Energy/fuel


used per month (kw or lit)

WASTE MANAGEMENT

What kind of waste do you generate?

_________________________________________________________________________________
__________________________________________________________________________________

Are there any licences, permits for management of waste? Yes/No.

If yes provide copies

How is non hazardous solid waste disposed of in this facility?

__________________________________________________________________________________

__________________________________________________________________________________

How is hazardous waste disposed of in this facility?


__________________________________________________________________________________

What system is in place for the management of on-site waste and disposal?

__________________________________________________________________________________

Do you have a system for pre-treatment of waste in place? If yes, provide the operational
specifications and maintenance schedules

__________________________________________________________________________________

Is there a waste recycle system or programme in place? If so, give a brief description.

What operations or activities generate the highest level of noise?

What applicable practice is being done to reduce the noise level within the premises?

Has there been any noise monitoring programme undertaken at the premises?

If so, describe briefly.

Have there been any formal complaints received on noise generated within the area?

If so, provide details.

Do you wear any protective equipment during operations? Yes/No If

yes, give a list of the protective equipment used

Do you hold regular meetings on improvement of the environment?

Do staffs undergo training programmes on environment health and industrial safety? Yes/No

If yes, how many workers have benefited from this_________________________

Have the participants been involved in training review process? Do

you have any Safety/Health Facility within the complex? Yes/No

If No, do staffs have access to any Health Facility?

You might also like