0% found this document useful (0 votes)
18 views5 pages

Bus and Branch Loading Summary Report

Uploaded by

Rifqi F
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views5 pages

Bus and Branch Loading Summary Report

Uploaded by

Rifqi F
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

ETAP

Project: Page: 1
12.6.0H
Location: Date: 12-06-2024
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: U PADANG Config.: Normal

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus 1 20.000 0 0 0 0 0 0 0 0 0.995 85.3 28.8

Bus 20 kV 20.000 0 0 0 0 0 0 0 0 1.317 97.0 38.0

Bus47 20.000 0.680 0.421 0.169 0.105 0 0 0 0 0.999 85.0 28.9

Bus48 20.000 0.089 0.055 0.334 0.207 0 0 0 0 0.510 84.1 14.8

Bus49 20.000 0 0 0 0 0 0 0 0 0.496 87.2 14.3

Bus50 20.000 0 0 0 0 0 0 0 0 0.147 1.9 4.3

Bus51 0.380 0 0 0.001 0.145 0 0 0 0 0.145 0.9 223.9

Bus52 20.000 0 0 0 0 0 0 0 0 0.459 94.3 13.3

Bus68 150.000 0 0 0 0 0 0 0 0 0.070 91.0 0.3

Bus69 20.000 0 0 0 0 0 0 0 0 0.070 91.0 2.0

Bus70 20.000 0 0 0 0 0 0 0 0 0.076 84.3 2.2

Bus71 0.380 0.051 0.031 0.012 0.007 0 0 0 0 0.074 85.0 115.2

Bus 150 kV 150.000 0 0 0 0 0 0 0 0 1.318 96.9 5.1

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).

# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
ETAP
Project: Page: 2
12.6.0H
Location: Date: 12-06-2024
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: U PADANG Config.: Normal

Branch Loading Summary Report

Transformer
CKT / Branch Cable & Reactor
Ampacity Loading Capability Loading (input) Loading (output)

ID Type (Amp) Amp % (MVA) MVA % MVA %

Cable 1 Cable 328.57 27.40 8.34

Cable36 Cable 328.57 28.91 8.80

Cable37 Cable 328.57 2.57 0.78

Cable38 Cable 328.57 14.77 4.49

Cable39 Cable 328.57 4.25 1.29

Cable40 Cable 328.57 13.26 4.03

Cable41 Cable 328.57 14.34 4.36

T2 Transformer 0.198 0.147 74.3 0.145 73.1

T7 Transformer 37.701 0.070 0.2 0.070 0.2

* T8 Transformer 0.063 0.076 120.7 0.074 117.3

TRAFO I Transformer 60.000 1.318 2.2 1.317 2.2

* Indicates a branch with operating load exceeding the branch capability.


ETAP
Project: Page: 3
12.6.0H
Location: Date: 12-06-2024
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: U PADANG Config.: Normal

Branch Losses Summary Report

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

Cable 1 -0.844 -0.430 0.845 0.280 1.3 -149.6 99.8 99.9 0.16

Cable36 0.849 0.519 -0.849 -0.526 0.1 -7.5 99.8 99.8 0.01

Cable37 -0.006 -0.089 0.006 0.014 0.0 -75.1 99.8 99.8 0.00

Cable40 0.433 0.040 -0.432 -0.153 0.2 -112.8 99.9 99.9 0.06

TRAFO I -1.277 -0.321 1.278 0.324 0.1 3.6 99.9 100.0 0.07

Cable38 -0.429 -0.276 0.429 0.186 0.2 -90.0 99.8 99.8 0.05

Cable39 0.003 0.057 -0.003 -0.147 0.0 -90.2 99.8 99.8 0.01

Cable41 -0.432 -0.243 0.432 0.153 0.2 -90.1 99.8 99.9 0.05

T2 0.003 0.147 -0.001 -0.145 1.5 2.3 99.8 98.2 1.57

T7 0.064 0.029 -0.064 -0.029 0.0 0.0 100.0 100.0 0.01

Cable46 0.064 0.029 -0.064 -0.041 0.0 -11.6 100.0 100.0 0.03

T8 0.064 0.041 -0.063 -0.039 1.3 1.9 100.0 97.2 2.77

4.9 -618.9
ETAP
Project: Page: 4
12.6.0H
Location: Date: 12-06-2024
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: U PADANG Config.: Normal

Alert Summary Report

% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0

Cable 100.0 95.0

Reactor 100.0 95.0

Line 100.0 95.0

Transformer 100.0 95.0

Panel 100.0 95.0

Protective Device 100.0 95.0

Generator 100.0 95.0

Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 105.0 101.0

UnderVoltage 90.0 94.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0

UnderExcited (Q Min.) 100.0

Critical Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

Fuse1 Fuse Overload 63.000 Amp 223.892 355.4 3-Phase

T8 Transformer Overload 0.063 MVA 0.076 120.7 3-Phase


ETAP
Project: Page: 5
12.6.0H
Location: Date: 12-06-2024
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: U PADANG Config.: Normal

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 1.341 0.353 1.387 96.70 Lagging

Source (Non-Swing Buses): 0.000 0.000 0.000

Total Demand: 1.341 0.353 1.387 96.70 Lagging

Total Motor Load: 0.820 0.508 0.965 85.00 Lagging

Total Static Load: 0.517 0.464 0.694 74.39 Lagging

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 0.005 -0.619

System Mismatch: 0.000 0.000

Number of Iterations: 2

You might also like