Material Purchase Bills
[Link] Date Particulars Amount
1 4/16/2025 Welding rods 330.00
2 4/17/2025 Cutting, Grinding & Buffing wheels 2,485.00
3 4/17/2025 Putty 760.00
4 4/19/2025 Laser cutting 250.00
5 4/19/2025 Tinner 500.00
6 4/21/2025 Sheet Bending 180.00
7 4/22/2025 Black Paint 1,400.00
8 4/22/2025 Tools 400.00
9 Petrol and other expenses 870.00
10 4/23/2025 Laser cutting 1,700.00
11 24-04-2025 Purchase of NRV Valve for azista TWA paid by vijay 9,930.00
12 27-04-2025 welding Rods 340.00
13 29-04-2025 16 amps sockets for extension board 385.00
14
Total 19,530.00
Transportation charges
[Link] Date Particulars Amount
1 4/14/2025 Porter for transport of Electrical items from Ranigunj 1,000.00
2 4/17/2025 Subbaiah sir cab charges 1,000.00
3 4/17/2025 Porter for transport of Electrical items from Ranigunj 300.00
4 4/19/2025 Porter charges fro transport of fasteners from ranigunj 500.00
5 4/22/2025 Porter For transport of resin bath from uppal 550.00
6 4/22/2025 Subbaiah sir cab charges 1,000.00
7 4/23/2025 Subbaiah sir cab charges 1,000.00
8 4/23/2025 Porter charges for transport of 1600mm dia ring from factory to balanagar2,300.00
sudha engineering
9 29-04-2025 Porter Charges for transport of TWA to azista,medchel 3,000.00
Total 10,650.00
Meals and snacks for staff
[Link] Date Particulars Amount
1 4/12/2025 Meals 200.00
2 4/13/2025 Meals 150.00
3 4/16/2025 Tiffins & Meals 250.00
4 4/17/2025 Meals 200.00
5 4/20/2025 Lunch 1,440.00
6 4/22/2025 Tiffinns and meals 700.00
7 26-04-2025 Tiffins and snaks 450.00
8 27-04-2025 Lunch 1,200.00
9 29-04-2025 Tiffins and Dinner 850.00
10
Total 5,440.00