Framing Plans
Framing Plans
A B C D E F G H J
66' - 1 1/2"
12' - 7" 4' - 7" 8' - 10" 9' - 1" 9' - 8" 11' - 0 1/2" 6' - 2 1/2" 4' - 1 1/2"
PLOT LIMIT
A
ST011 NOTES:
1. CONCRETE MIX -
FOOTING - M20(1:1.5:3).
COLUMN - M25(1:1:2).
BEAMS & SLABS - M20(1:1.5:3).
1 FB1 (8"X18") FB1 (8"X18") FB1 (8"X18") FB1 (8"X18") FB1 (8"X18")
UG SUMP WALLS - M25(1:1:2).
2. T - REPRESENTS TOR STEEL OF GRADE Fe500.
3. CLEAR COVER TO MAIN REINFORCEMENT:
FOOTINGS - 3".
COLUMNS - 1 1/2".
BEAMS - 1".
FB10 (8"X18")
FB13 (8"X18")
FB11 (8"X18")
FB11 (8"X18")
SLABS - 3/4".
FB15 (8"X18")
6" THK.
10' - 6"
6" THK.
4. 4" THK. P.C.C SHALL BE LAID WITH 4" OFFSET WHEREVER POSSIBLE.
6" THK. 5. FOOTINGS ARE DESIGNED FOR GROUND+2 FLR (3 SLABS).
6. NET S.B.C CONSIDERED FOR DESIGN IS 180/Sq.m (SOIL REPORT
FB14 (8"X18")
FB16 (8"X18")
6" THK. AWAITED).
7. DEPTH OF EXCAVATION SHALL BE 5'-0" MINIMUM OR UPTO HARD
STRATA FOR FOOTINGS.
FB3 (8"X18")
8. FOOTINGS ADJACENT TO UNDER GROUND SUMP SHOULD
FB2 (8"X18") BE TAKEN TO SUMP BOTTOM SLAB LEVEL.
3 FB4 (8"X18")
36' - 6"
FB13 (8"X18")
6" THK.
FB15 (8"X18")
FB16 (8"X18")
FB14 (8"X18")
6" THK.
14' - 1"
FB6 (8"X18")
6' - 0"
6" THK. 6" THK. 6" THK.
FB17 (8"X18")
FB7 (8"X24") FB7 (8"X24") FB7 (8"X18") FB7 (8"X18") FB7 (8"X18")
4
R1 24/11/2024 ISSUED FOR APPROVAL
FB15 (8"X18")
FB16 (8"X18")
6' - 10"
OWNER
Mr RAVISHANKAR
STRUCTURAL CONSULTANT :
FIRST FLOOR FORMWORK LAYOUT
COLUMN STOPS AT THIS LEVEL. SAFFRON Design Consultants
Nandish Prasad G.M
REFER ARCH. DWGS.
DRAWING TITLE
BEAM
ST011 R1 A3
C:\Users\shamb\OneDrive\Documents\RAVISHANKRA_STRU_241012_mutturkalmesh.rvt
11/26/2024 12:03:15 AM
ORIENTATION :
A B C D E F G H J
62' - 0"
12' - 7" 4' - 7" 8' - 10" 9' - 1" 9' - 8" 11' - 0 1/2" 6' - 2 1/2"
A
ST012
NOTES:
1. CONCRETE MIX -
FOOTING - M20(1:1.5:3).
COLUMN - M25(1:1:2).
1 RB1 (8"X18") RB1 (8"X18") RB1 (8"X18") RB1 (8"X18") RB1 (8"X18")
BEAMS & SLABS - M20(1:1.5:3).
UG SUMP WALLS - M25(1:1:2).
2. T - REPRESENTS TOR STEEL OF GRADE Fe500.
3. CLEAR COVER TO MAIN REINFORCEMENT:
FOOTINGS - 3".
COLUMNS - 1 1/2".
RB6 (8"X18")
RB7 (8"X18")
RB8 (8"X18")
BEAMS - 1".
10' - 6"
SLABS - 3/4".
6" THK. 6" THK. 6" THK. 6" THK. 4. 4" THK. P.C.C SHALL BE LAID WITH 4" OFFSET WHEREVER POSSIBLE.
5. FOOTINGS ARE DESIGNED FOR GROUND+2 FLR (3 SLABS).
RB11 (8"X18")
RB9 (8"X18")
RB12 (8"X18")
6. NET S.B.C CONSIDERED FOR DESIGN IS 180/Sq.m (SOIL REPORT
AWAITED).
7. DEPTH OF EXCAVATION SHALL BE 5'-0" MINIMUM OR UPTO HARD
RB3 (12"X12") STRATA FOR FOOTINGS.
RB2 (8"X18") 8. FOOTINGS ADJACENT TO UNDER GROUND SUMP SHOULD
RB14 (12"X12")
9. SUMP SOIL BACKFILLING SHOULD BE DONE AFTER CASTING OF SUMP
6" THK. ROOF SLAB.
10. READ THIS DRAWING ALONG WITH FOOTING LAYOUT, COLUMN
5' - 1"
3 RB3 (12"X12")
RB6 (8"X18")
RB8 (8"X18")
RB9 (8"X18")
6" THK.
2B12 (8"X18")
RB10 (8"X18")
14' - 1"
6" THK.
RB5 (8"X18") RB5 (8"X18") RB5 (8"X18") RB5 (8"X18") RB5 (8"X18")
4
R1 24/11/2024 ISSUED FOR APPROVAL
6' - 10"
5 RESIDENTIAL BUILDING
OWNER
Mr RAVISHANKAR
1' - 4"
Nandish Prasad G.M
1' - 0"
DRAWING TITLE
0' - 6"
1' - 6"
0' - 8 1/2"
ROOF FLOOR FORMWORK
BEAM LAYOUT
0' - 8" DESIGNED CHECKED APPROVED
- - -
DRAWN SCALE DATE
SECTION-A - As indicated 24/11/2024
1 : 20 DRAWING No. REVISION SIZE
ST012 R1 A3
C:\Users\shamb\OneDrive\Documents\RAVISHANKRA_STRU_241012_mutturkalmesh.rvt
11/26/2024 12:03:16 AM
ORIENTATION :
A B C D E F G H J
62' - 0"
12' - 7" 4' - 7" 8' - 10" 9' - 1" 9' - 8" 11' - 0 1/2" 6' - 2 1/2"
A
ST013 NOTES:
1. CONCRETE MIX -
FOOTING - M20(1:1.5:3).
TRB1 (8"X18") TRB1 (8"X18") TRB1 (8"X18") COLUMN - M25(1:1:2).
BEAMS & SLABS - M20(1:1.5:3).
1 UG SUMP WALLS - M25(1:1:2).
2. T - REPRESENTS TOR STEEL OF GRADE Fe500.
3. CLEAR COVER TO MAIN REINFORCEMENT:
FOOTINGS - 3".
COLUMNS - 1 1/2".
TRB6 (8"X18")
TRB7 (8"X18")
TRB8 (8"X18")
BEAMS - 1".
SLABS - 3/4".
10' - 6"
4. 4" THK. P.C.C SHALL BE LAID WITH 4" OFFSET WHEREVER POSSIBLE.
5. FOOTINGS ARE DESIGNED FOR GROUND+2 FLR (3 SLABS).
TRB10 (8"X18")
TRB9 (8"X18")
6. NET S.B.C CONSIDERED FOR DESIGN IS 180/Sq.m (SOIL REPORT
AWAITED).
7. DEPTH OF EXCAVATION SHALL BE 5'-0" MINIMUM OR UPTO HARD
STRATA FOR FOOTINGS.
TRB2 (8"X18") 8. FOOTINGS ADJACENT TO UNDER GROUND SUMP SHOULD
BE TAKEN TO SUMP BOTTOM SLAB LEVEL.
2 9. SUMP SOIL BACKFILLING SHOULD BE DONE AFTER CASTING OF SUMP
ROOF SLAB.
10. READ THIS DRAWING ALONG WITH FOOTING LAYOUT, COLUMN
5' - 1"
3
TRB6 (8"X24")
TRB8 (8"X24")
TRB10 (8"X18")
TRB9 (8"X18")
14' - 1"
TRB4 (8"X18")
4
6' - 10"
5 RESIDENTIAL BUILDING
OWNER
Mr RAVISHANKAR
DRAWING TITLE
1' - 6"
ST013 A3
C:\Users\shamb\OneDrive\Documents\RAVISHANKRA_STRU_241012_mutturkalmesh.rvt
11/26/2024 12:03:16 AM