The document outlines the proposed building survey work for Lot 240, Jalan Timah 3, Pasir Gudang, detailing the scope of works including building inspections, surveys, integrity testing, and preparation of plans and reports. It specifies deliverables such as structural plans, reports, and site photographs, along with a mention of applicable taxes. The survey aims to assess the building's condition and document findings for maintenance and structural integrity.

Uploaded by

Lim C A
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views2 pages

SOW - Building Survey

The document outlines the proposed building survey work for Lot 240, Jalan Timah 3, Pasir Gudang, detailing the scope of works including building inspections, surveys, integrity testing, and preparation of plans and reports. It specifies deliverables such as structural plans, reports, and site photographs, along with a mention of applicable taxes. The survey aims to assess the building's condition and document findings for maintenance and structural integrity.

Uploaded by

Lim C A
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Proposed Building Survey Work for Lot 240, Jalan Timah 3, Pasir Gudang

Industrial Area, Johor


========================================================

Scope of Works for Building Survey


=========================

Item Description Amount


RM
1. Preparatory

2. Building Inspection
• Conduct detailed inspections of the existing building,
focusing on both structural and architectural components.
• Identify structural issues, defects, or maintenance
requirements, including signs of deterioration in materials
such as concrete and steel.
• Perform condition assessments to evaluate the overall state of
the building and document findings with photographs.

3. Building Survey
• Carry out surveying work to determine the accurate size and
dimensions of the building structure.
• Measure and document both Reinforced Concrete (RC) and Steel
Structure elements.
o Prepare structural drawings, including Plans, elevations,
o structural detailing, accurate measurements of beams,
columns, slabs.

4. Building Integrity Testing (Optional – number of sample subject to


specialist recommendation based on building inspection result)
• Conduct necessary tests to determine the structural integrity of the
building (e.g., non-destructive testing, core testing, load testing,
etc.).
• Analyse results to evaluate the safety and functionality of the
structure.
• Provide a professional report endorsed by qualified personnel to
confirm building integrity.

5. Preparation of Plans and Reports


• Prepare structural plans and site plans complete with endorsement
(to submit draft plans for confirmation before final printing)
showing:
o Building location and orientation.
o Structural layouts with dimensions and annotations. Proper
scaling and formatting
• Generate detailed reports (to submit draft reports for confirmation
before final printing) covering:
o Findings from the building inspection.
o Results of integrity tests. (optional)
o Photographic evidence of building conditions.
o Observations and recommendations for repairs,
maintenance, or upgrades.

6. Deliverables
I. Plans:
• Three (3) copies of endorsed structural plans, including:
\\nas\Temporary\2024-12-02\SOW - Building [Link] 1/1
o Floor plans, elevations, and structural dimensions.
• One (1) softcopy of structural and site plans in AutoCAD format.
II. Reports:
• Three (3) copies of endorsed reports, including:
o Building inspection findings.
o Building integrity test results (optional).
o Recommendations and conclusions.
• One (1) softcopy of the reports in digital format.
III. Site Photographs:
• Digital soft copies of all site photographs taken during inspection.
• Supplied on a CD or equivalent digital storage medium.

7. 8% SST

TOTAL

Survey Period : ________________weeks