Deswik User Conference Agenda 2023
Deswik User Conference Agenda 2023
subject to changes
Case Study: Small-Medium Size Deswik MDM Materials Handling System Simulation Analysis
Implementation Simulation can be used to evaluate capability for materials handling
13:30 - 14:10 A common misconception is that MDM is for large clients and sites and processing systems with consideration for maintenance
only. This presentation will recap an MDM implementation at a requirements and unplanned failures. This presentation provides an
smaller scale site. introduction to simulation for MHS and continuous mining systems.
Drill & Blast Workshop
New Product Launch Dependencies Getting Savvy With Deswik Let’s explore the next steps for Measure
Join us for an exciting presentation as we unveil the next- Applying ORB to SLC Production Dispatch Application of automatic dependency Spatial While Drilling data in Deswik Spatial. An
generation Deswik planning tool for open pit mines. This presentation explores the evolution of Deswik’s ORB at rules, with practical tips for managing interactive session where we’ll discuss what
In this masterclass we’ll run through a
a sub-level caving operation and its data capture initiatives. It both automatic and manual dependencies can or can’t be done right now, where we’re
Realising the Value of Reporting menagerie of lesser known tips and tricks in
highlights key successes in deploying real-time dashboards, running
14:10 - 14:50 efficiently. Deswik Spatial. headed and what the challenges are that
Insight into how data standardisation can power reporting outputs. production dispatch, and orepass accounting & dispatch. It also we’re working on.
delves into essential lessons learned, emphasising that a clear
production philosophy is crucial for guiding decision-making and
ensuring effective implementation.
Integrated Block Cave and SLC schedule Rio Tinto Iron Ore’s Lead Up to Probe Revolutionising Caving Productivity at Cadia
This presentation will review the processes followed by Deswik and
Deswik GO Valley with Deswik ORB
BHP Carapateena to update an existing Deswik Sub Level Cave Advances in computing and mathematical optimisation have
11:10 - 11:50 project to include the addition of a new Block cave. We will outline This presentation will summarise the differences between the
enabled significant progress in automating mining decisions. At
some of the approaches taken to ensure a long-term viable CAD historical approach to pit optimisation, versus opportunities
Newmont’s Cadia Valley, we examine the impact of the world’s first
Direct Block Scheduling can potentially unlock and how this is of
and Schedule file that enables timely reporting for ongoing Budget
relevance for Rio Tinto’s iron ore business.
highly automated short-interval control system, on maximising cave Open Pit Drill & Blast
and LOM purposes but also allow for scenario generation. productivity. This masterclass will show you how to do
Survey for Underground Deswik Enviro Tools Workshop
a drill & blast design from a baseline, copy
Streamline your survey processing and An interactive workshop on the future plans
Permit To Tunnel reporting in Deswik.
to a new pattern, use the plane definition
for Deswik’s Enviro Tools.
Permit To Tunnel is the industry standard approach for ensuring Which Tool? Which Lever? How to Leverage attributes in plots and use alternative target
Applications for Direct Block Scheduling
11:50 - 12:30 ongoing tunnelling works are following Geological and Survey as-
In this session we’ll provide case study examples of the application
Digital Tools for Your Site surfaces.
builts. By using MDM over the standard Excel approach Deswik The secret sauce to getting your bonus. A systematised approach
of Direct Block Scheduling for strategic planning.
and John Holland are looking to bring the process into the digital to increasing mine output.
21st century on the Borumba PHES Project.