GHAZIABAD DEVELOPMENT AUTHORITY
UTTAR PRADESH
SANCTION LETTER
{ High Risk }
PERMIT DATE : 04 Apr 2025
FILE No. : GDA/BP/24-25/1602
Site Address : GH-10 CHERRYWOOD ENCLAVE SECTOR-08 WAVE CITY NH24 GHAZIABAD
PERMIT NO. : Group Housing/08575/GDA/BP/24-25/1602/10022025
USE : Residential
SCHEME : Wave City Sector -8
PROPERTY : Plot No./Survey No. :GH-10
CHERRYWOOD ENCLAVE
SECTOR-08
LandMark: CHERRYWOOD
ENCLAVE
Revenue Village: NA
Tehsil: Ghaziabad
District: Ghaziabad
NAME : THEMECOUNTY PVT LTD
AUTHORISED SIGNATORY
[Link] JHA
ADDRESS : Plot No 15, Sector - 135,Noida-201305,GHAZIABAD,Uttar Pradesh,201305
Your proposal submitted with reference to above has been examined as per rules and found suitable as per
proposal drawing building Bylaws-2008 (Amended till-2018/2023)
Date of Validity: 28 Mar 2032 or Expiry date of lease deed whichever is earlier.
Restrictions Required:
1. This permission is given based on the inputs on pages, documents and drawing provided by
Applicant/ Architect. Applicant/ Architect confirms that the documents/ drawings submitted
electronically or inputs by them are correct.
2. The permission accorded does not confer any ownership rights. The permission will be revoked at
later stage, if it is found that the documents or information are false and fabricated.
3. Subject to obtaining of all required NOC’s.
STANDARD CONDITIONS
1. This map is valid up to 28 Mar 2032
2. Before commencement of construction information shall be given to the Authority and after
completion of construction, Completion Certificate shall be obtained from the Authority before
occupying of the building or part thereof as per provision of Building Bye-Laws 2008 (as amended
2011/2016).
[Link]
Before isstarting
green building certified. a board 4 ft x 3 ft shall be put up at the site on which Name of
of construction,
Page 1 of 4
[Link]
Before isstarting
green building certified. a board 4 ft x 3 ft shall be put up at the site on which Name of
of construction,
approving Authority, permit number, approval date, validity date and name of architect are to be
mentioned.
4. Responsibility of Structure safety and quality shall be of Applicant.
5. Government Orders in force time to time shall be complied.
6. If approving Authority issue any demand letter in future, the applicant has to deposit the same
without any objection.
7. If any dispute at any point of ownership arises in future, the permission shall be forfeited
automatically (without giving any show cause notice). The approval of map does not give land rights
to the applicant.
8. If any information is concealed or given wrong by the applicant, the map shall be cancelable.
9. Regarding construction, the standard/conditions specified in the Building Bye-Laws shall be
implemented.
10. The building will be used only for which it is sanctioned.
11. Indian Electricity Rules shall not be violated and the conditions mentioned on NOC(s) issued by the
different departments shall also be followed.
Next Application Process:
· Apply for Work start intimation on work start for intimation to authority from UPOBPAS
· Apply for Plinth Completion after completion of Plinth from UPOBPAS
· Apply for Occupancy after completion of Building through UPOBPAS.
NGT CONDITIONS
1) Owner shall put tarpaulin on scaffolding around the area of construction and the building. No person
including owner, owner can be permitted to store any construction material particularly sand on any
part of the street, roads in any colony.
2) The construction material of any kind that is stored in the site will be fully covered in all respects so
that it does not disperse in the air in any form.
3) All the construction material and debris shall be carried in the trucks or other vehicles which are fully
covered and protected so as to ensure that the construction debris or the construction material does
not get dispersed into the air or atmosphere, in any form whatsoever.
4) The dust emissions from the construction site should be completely controlled and all precautions
taken in that behalf.
5) The vehicles carrying construction material and construction debris of any kind should be cleared
Page 2 of 4
5) The vehicles carrying construction material and construction debris of any kind should be cleared
before it is permitted to ply on the road after unloading of such material.
6) Every worker working on the construction site and involved in loading, unloading and carriage of
construction material and construction debris shall be provided with mask to prevent inhalation of
dust particles.
7) Owner shall be under obligation to provide all medical help, investigation and treatment to the
workers involved in the construction of building and carry of construction material and debris
relatable to dust emission.
8) It shall be the responsibility of owner to transport construction material and debris waste to
construction site, dumping site or any other place in accordance with rules and in terms of this order.
9) All owners/owners should take appropriate measures and strictly comply with by fixing sprinklers and
creations of green air barriers on construction site. Compulsory use of wet-jet in grinding and stone
cutting.
10) Wind breaking walls around construction site.
11) All owners shall ensure that C&D waste is transported and disposed to the C&D waste site only and
due record in that behalf shall be maintained by the owners and transporters.
12) Use of covering sheets should be done for trucks to prevent dust dispersion from the trucks,
implemented by district offices.
13) Proponent shall ensure that periodical auto maintenance report from the contractor to avoid
vehicular pollution.
14) Proponent should manage transportation route for vehicles in a well-planned manner to avoid traffic
havocs.
15) The entry and exit points design is very important as it should not disturb the existing traffic.
16) Inspection & Maintenance has definite utility on emission performance, Regular vehicle inspection to
be done by the contractor to enhance the efficiency of work and to reduce the risk of unwarranted air
pollution.
17) Fitness certification is a statutory requirement for commercial vehicles and public transport vehicles.
Periodicity for certification is once in a Year.
18) Pollution Under Control (PUC) certificates are required to be obtained every three months for all
categories of vehicles. In case of diesel vehicles, free acceleration smoke is measured.
19) Life of vehicle should be inspected to avoid further air pollution.
20) Overloading is another big challenge and the shall be dealt by the proponent as well as State
Page 3 of 4
Authorities by installing check booth at entry points.
21) Viable emission control technologies exist to reduce diesel exhaust emissions designed to control
particulate matter (PM) should be installed/used such as Diesel oxidation catalysts (DOCs), Diesel
particulate filters (DPFs), Exhaust gas recirculation (EGR), Selective catalytic reduction (SCR), Lean Nox
catalysts (LNCs), Lean NOx traps (LNTs).
22) Green belt creation will also act as a mitigating factor.
SPECIAL CONDITIONS :
The Vice chairman/competent authority has approved this map with following conditions: 1- The completion
certificate will have to be obtained before occupancy. 2- Rain water harvesting system will have to be
installed on the proposed plot. 3-All conditions would be followed by developer which mention in NOC"s
issued by various department and submitted affidavit by applicant. 4- All internal development work will have
to completed as per PWD standard. 5- Trees will have to planted as per bye laws 3.3.5. 6-Gaurd room size
allowed as per by laws 3.3.6 (viii). 7-10% parking for visitors will have to be reserved as per bye laws 3.10.3.
8- Green building FAR use will be allowed after completing all compliances regarding green building. 9-
Basement will be allowed for parking, services and domestic storage. 10-Proposed mechanical parking
allowed as per brochure. 11-Provision of air conditioning in all blocks. 12- All responsibility of Building
structural strength & safety is depend on Developer, Architect and Structure Engineer.
Signature Not Verified
Digitally signed by ARVIND KUMAR
Date: 04 Apr 2025 [Link]
Designation :Chief Architect and Town Planner
QR_CODE
SIGN_AUTH
GHAZIABAD DEVELOPMENT AUTHORITY
Page 4 of 4