Calculation Only Main
Calculation Only Main
Expenditure
to school
540000 2000
1100
1000
2200
5000
5000
1000
3500
2500
1500
10000
3100
3000
1000
10000
9000
700
500
30000
9000
13000
1800
500
1100
1800
500
1500
25000 Shekhar sir+D.E.
Kharch My 15000
161300
Sachiv 27500 Cash
Sarpanch 50000 Cash
Bawiskar 5000 Cash
Sai Gajanan 47500 Online
Nandu Jaiswal 25000 Phone Pay
Shantanu 35000 Online
Aliyar ke baki 25000
Manoj bhau 66000 Phone Pay
Extra 2000
444300
540000
95700
47850
Footing 4 24 1
Coloumn 4
Sultan + Aliyar
2000
5000
5000
1000
3500
10000
10000
9000
9000 60000
500 10000
55000 49.5
5.3262
10652.4
80652.4
25652.4
¬Ö´Ö¸ü¾ÖÖ›üß ¿ÖÖôûÖ ¤æüºþÆ´ÖÖ®Ö¾ÖÖ›üß ¾ÖÖò»Ö Û
1200 Bricks 2000 Bricks
1 brass Crusher 1 brass Crusher
7 Bag Cement 20 Bag Cement
1 brass Metal
5000
2500
2000
2000
5000
3000
19500
16700
7300
10mm6mm
8mm
72
0
11000
11000
11000
Gabhane Colou
34000
Sai Hardware
16592
Balaji Traders
12000
95592
14000
2200
3400
5000
22000
4100
16000
3000
7000
76700
1. For Footing (Wall Compound)
For Jally
2. For Coloumn
Ring
Ring
10mm 1bhari
6mm 1bhari
8mm 1bhari
55 rs kg.
üß ¾ÖÖò»Ö ÛÓú¯ÖÖ‰Óú›ü
Crusher
ement
### bamdhkam
### plaster
### RCC
### slab
### bed
### footing
Manoj Bhau Kalbande
Gabhane Colouring
Sai Hardware
Balaji Traders
Level Sabagruha
10MM 6MM 12MM 8MM
4 x 6 x 0.75 = 18.00
4 x 6 x 0.75 = 18.00
4 x 6 x 3.00 = 72.00
4 x 15 x 1.02 = 61.20
1 x 6 x 12.50 = 75.00
1 x 80 x 0.90 = 72.00
79 11
nag
Total = 0.1428 @ 0.00 =
80 17 M.T.
nag
10mm 6mm
1 Qtyl 30
0.00
3
0.23
6.23
9158058355
No. l b h total
Coloumn 6 2 0.23 3.9 10.764
6 2 0.3 3.9 14.04
No. l b h total
BB Plinth+Wall 2 4 3.3 26.4
2 6.3 3.3 41.58
62.58
BB Work 6.733608 @ 1500 10100.412
Plaster Inneer 2 4 3 24
2 6.3 3 37.8
Ceiling 1 4 6.3 25.2
Plaster Outer 2 4.23 3.6 30.456
2 6.53 3.6 47.016
STEp 3 2 0.9 5.4
169.872
Plaster 18.2782272 @ 1100 20106.04992
951.62 @ 77.00
Outer 282.22
Old School B/S 1.00 x 1.00 x 28.90 x 3.30 + 95.37
Old School R/S 1.00 x 1.00 x 7.20 x 3.60 + 3.10 27.47
Right Site 1.00 x 1.00 x 5.40 x 3.60 + 3.05 20.97
Wall 1.00 x 1.00 x 9.60 x 1.50 + 14.40
New School B/S 1.00 x 1.00 x 12.50 x 3.60 + 3.05 46.53
Side wall 1.00 x 1.00 x 5.40 x 3.65 + 3.05 21.24
1.00 x 1.00 x 7.90 x 3.65 + 3.05 30.36
Back Side W/C 1.00 x 2.00 x 10.35 x 1.50 + 31.05
1.00 x 2.00 x 6.80 x 1.20 + 16.32
Kitchen 1.00 x 2.00 x 3.00 x 3.00 + 18.00
1.00 x 1.00 x 3.20 x 3.00 + 9.60
D 331.30
2.00 x -1.00 x 2.05 x 1.00 -4.10
19.00 x -1.00 x 1.20 x 0.95 -21.66
1.00 x 1.00 x 9.60 x 1.60 15.36
1.00 x 1.00 x 5.40 x 1.30 7.02
327.92 @ 135.00
Oil Paint
D 18.00 x 2.00 x 2.05 x 1.00 + 73.80
W 29.00 x 2.00 x 1.20 x 0.95 + 66.12
Grill 26.00 x 2.00 x 1.20 x 0.95 + 59.28
Black Board 8.00 x 1.00 x 1.55 x 1.25 + 15.50
2.00 x 1.00 x 5.35 x 4.90 + 0.00
214.70 @ 55.00
3.12 @ 143.00
3.12 @ 143.00
1.00 x 2.00 x 3.60 x 0.45 x 0.45 = 1.46
1.00 x 2.00 x 3.30 x 0.45 x 0.45 = 1.34
1.00 x 4.00 x 0.45 x 0.30 x 0.60 = 0.32
3.12 @ 143.00
= 73274.74
= 44269.20
= 11808.50
129354.00
258706.44
446.00
446.00
446.00
Materials Trip/ Brass Charges (Including- Loading ,
Unloading, Spreading & other
Crusher Sand
4x5 20 5500
20MM Metal
4x2 8 3700
Cement
40x6 Trip+20no. 260 360
Nagadi Kinhiraja 0 360
Majoori
25 Brass @Mandir 25 1100
12.5 Brass @ST Area 13 1100
Total 349
116
Expenditure of Work
[Link]. Date Amount
1 2/5/2022 800
2 4/5/2022 1000
3 17/5/2022 500
4 16/5/2022 5000
5 19/5/2022 5000
6 17/5/2022 25000
7 23/5/2022 25000
8 24/5/2022 18000
9 27/5/2022 8000
10 27/5/2022 500
11 27/5/2022 200
12 28/5/2022 5000
13 29/5/2022 4000
14 1/6/2022 1000
15 1/6/2022 2000
16 2/6/2022 2000
17 3/6/2022 1000
18 4/6/2022 6000
19 5/6/2022 1000
20 5/6/2022 5000
21 10/6/2022 7200
22 13/6/2022 2500
23 14/6/2022 500
24 28/6/2022 2000
25 700
26 7/7/2022 1000
27
28
29
30
Total 129900
Jama TO Me 31400
By Cheque 58110
89510
60390
115650
20000
15000
5000
20000
175650
324350
139000
34500
99200
3800
43000
26000
23000
21000
10000
7000
20000
40000
30000
496500
278500
61000
57200
7200
2500
500
2000
700
1000
5000
1000
500
20400
Total Paid Remaining As Per Estimate
11550.00 1
11700.00
11000.00
34250.00 34250.00 0.00
110000.00 0
0
29000.00
139000.00 139000 0.00
93600.00
0.00
93600.00 0 99200.00
5600.00
27500.00
15500.00
43000.00 43000 0.00
670140
ture of Work
For What To
sham Bhau
Dust Majoor
Cash To Anil Mistri
Cash Near of Mouli Bunde Ko But Cement Laye
ACCOUNTANT MADAM FOR CHECK JAN SUVIDHA
FOR SHEKHAR TO DISEL AMRAVATI JANE BUT DEDUCT IN COMMISSION
expenditure
Ramesh Tale For Work Order
192450
89510
40390
Dene Baki
Ugale Sir
Sachiv
Sarpanch
Office
Total
Shillak
274525 Jan
498000 15th
772525 Total
136400 kharch
100000 Cement
20000 Ugale
15000 sachiv
50000 member
7000 shekhar
15000 anil mistri
89000 sand-metal
432400
340125
Saving
-309849.00
IN COMMISSION
31400 ash
58110 ash
3225 hardware
61790 hardware
37500
Excavation 1846.00
Conveying Materials 2828.00
Board 3225.00
Actual
80MM Metal 4.00 Brass 7200
(Jan Suvidha) Rs.3.00 Lakhs Murum 3 Brass 3900
Length 25.00 270559 40MM Metal 4.00 Brass 8000
Width 5.00 Crusher Met 3.00 Brass 12000
Sqm 125 Add GST 12% 32467 Sand 4.00 Brass 22000
13.45 Cement 100.00 Number 38000
Brass 15 Add TESTING CHARGES 4830.00 Majuri 15 16500
DE 6000
Add ROYALTY CHARGES 7589.00 SE 6000
ZP 24000
Total = 315445 OTHER 20000
300000 Total Expenditure 163600
Saving 136400
Excavation 1846.00
Conveying Materials 2828.00
Board 3225.00
Actual
Towards Smshanbhumi 80MM Metal 4.00 Brass 7200
(15th Finance) Rs.2.60 Lakhs Murum 3 Brass 3900
Length 21.00 228533 40MM Metal 4.00 Brass 8000
Width 5.00 Crusher Met 3.00 Brass 12000
Sqm 105 Add GST 12% 27424 Sand 4.00 Brass 22000
11.298 Cement 100.00 Number 38000
Brass 12 Add TESTING CHARGES 4830.00 Majuri 12 12978
DE 5200
Add ROYALTY CHARGES 7589.00 SE 5200
ZP 20800
Total = 268376 OTHER 20000
260000 Total Expenditure 155278
Saving 104722
Excavation 1846.00
Conveying Materials 2828.00
Board 3225.00
Actual
Bhaurao Thakare 80MM Metal 4.00 Brass 7200
(15th Finance) Rs.2.93 Lakhs Murum 3 Brass 3900
Length 20.00 218027 40MM Metal 4.00 Brass 8000
Width 5.00 Crusher Met 3.00 Brass 12000
Sqm 100 Add GST 12% 26163 Sand 4.00 Brass 22000
10.76 Cement 100.00 Number 38000
Brass 11 Add TESTING CHARGES 4830.00 Majuri 11 12386
DE 5200
Add ROYALTY CHARGES 7589.00 SE 5200
ZP 20800
Total = 256609 OTHER 20000
260000 Total Expenditure 154686
Saving 105314
Excavation 21982.00
Conveying Materials
Board 3225.00
Actual
0 80MM Metal 4.00 Brass 7200
(PHC Road) Rs.14.00 Lakhs Murum 3 Brass 3900
Length 147.00 1194598 40MM Metal 4.00 Brass 8000
Width 3.60 Crusher Met 3.00 Brass 12000
Sqm 529.2 Add GST 12% 143352 Sand 4.00 Brass 22000
56.9419 Cement 100.00 Number 38000
Brass 57 Add TESTING CHARGES 4830.00 Majuri 57 63186
DE 5200
Add ROYALTY CHARGES 7589.00 SE 5200
ZP 20800
Total = 1350369 OTHER 20000
260000 Total Expenditure 205486
Saving 54514
450
48.42
Excavation Solling &
Footing
RAFT FOUNDATION @MALEGAON
1.55 0.65
Excavation in SM 1 x 1 x 8.00 x 4.00 x 0.90 = 28.80 0.90 GL Area
RCC Wall
12MM Vertical 1 x 2 x 20.00 x 2.70 = 108.00
Horizontal 1 x 2 x 24.00 x 2.70 = 129.60
0.89 @ 237.60 = 211.46 Kg.
8MM Vertical 1 x 2 x 10.00 x 6.30 = 126.00
1 x 2 x 10.00 x 4.30 = 86.00
0.39 @ 212.00 = 82.68 Kg.
Top Slab
10MM 1 x 1 x 9.00 x 3.90 = 35.10
1 x 1 x 19.00 x 5.80 = 110.20
0.62 @ 145.30 = 90.09 Kg.
556.53 Kg.
0.557 M.T.
@ 67695.63 37675.00
34322.00
320342.00
33100.00
308932.00
2.26
8.66
53.19
9.60
73.70
10417.00
41644.00
22424.00
106400.00
75000.00 40161.00
15000.00 21625.00
260468.00 106400.00
59874.00 75000.00
15000.00
258186.00
50746.00
PAID SUMMARY
WHO Paid Amount
1 Internal Road 1.75 126000 4226 6200 6200 6200 6200 6200 6200 167426
2 Paver 0.98 67200 5309 3720 3720 3720 3720 3720 91109
3 Paver 0.50 33600 2170 2480 2480 2480 2480 45690
4 Anganwadi 0.35 0 22243 3100 3100 3100 3100 34643
5 Water Supply 0.77 11046 16192 6470 5820 4520 1280 2600 2600 23202 73730
6 Hand Wash 1.50 9526 42797 7740 7740 7740 7740 7800 3900 34786 3250 3250 3250 3250 3250 146019
558617
Total 226800 54520 58989 25990 25340 24040 14600 10400 6500 57988 13170 13170 13170 6970 6970 558617
13 4.453
15 36 1.67
19 17 1
32 38
79 91 12 7.123 1.4246 5.6984
0
PAID SUMMARY
WHO Paid Amount
Mohd.
Ashfaque Akhtar
Muktadir Eknath
Sai Ali (For Mohd. Mahesh Total
Sr. Balaji Mohd Sk. Afroz Ali Gulam Damodar
Name of Work Gajanan Sand+ Afsar Ismail Ali Sadiya Bi Iliyas Ali Waghaji
No Traders Akbar [Link] Mohamma Wankhed
Hardware Metal (For Sand+ Wankhde
d e
+Murum) Metal+
Murum)
[Link] @Bhaurao
1 99360 113490 6800 6800 6800 6800 6800 6800 6800 6800 267250
Thakare To PHC
[Link] @internal
2 Road Towards 93150 111340 4080 4080 4080 4080 4080 4080 4080 4221 237271
Smshanbhumi
Total 99360 93150 113490 111340 10880 10880 10880 10880 10880 10880 11021 504521
17.625
115228
94152
86039
269678
62912
255296
17195
900500 18500
22000
27500
5500
PAID SUMMARY
WHO Paid Amount
Sr. Shantanu Ashfaque Ali Mohd Mohd Akbar Iliyas Ali Ahmad Total
Name of Work Balaji Traders
No Interprize Afsar Mohd Afsar Ali
[Link] [Link]
1 72307 34446 53600 3290 163643
1.69
[Link] [Link]
2 69362 53004 67000 4590 193956
2.00
[Link] [Link]
3 25721 25771 40200 3290 94982
1.00
124500
24000
160800
25000
90000
424300
17325 10395
5106 3063.6
7551 4530.6
4280 2568
861
35123 20557.2
6322.14 3700.296
41445.14 24257.496
17187.644
115228
94152
86039
269678
62912
255296
17195
900500 18500
Materials Component @Borala N.K.
Name of Materials
Sr. No Name of Work Brass Rate Amount Saving Remarks
Shri Balaji Traders 22243 Cement , Tiles Tiles 3.5 Brass x 4600 16100
16100 Tiles
6143 Cement
5825 Tiles
3701 Cement
[Link]
[Link] Shri Balaji Ashfaque Ali
2 69362 53004 r Mohd 67000 4590 193956 2530 0 3265 199751
[Link] 2.00 Traders Mohd. Afsar
Afsar
Cement 38110 Metal 26432 Majuri Iliyas Ali
Steel 31252 Sand 24072
Gitta 2500
[Link]
[Link] [Link] Shri Balaji Ashfaque Ali
3 25721 25771 r Mohd 40200 3290 94982 1414 0 1581 97977
1.00 Traders Mohd. Afsar
Afsar
Cement 19382 Metal 12555 Majuri Iliyas Ali
Steel 6339 Sand 13216
Gitta 0
202
Hand Wash Station Sai Gajanan Shri Balaji Shantanu
0- 5 34786 9526 42797 58910 146019 286 690 2655 149650
@Waghlud 1.50 Hardware Traders Interprizes
21
202
Water Supply Sai Gajanan Shri Balaji Shantanu
0- 6 23202 11046 16192 23290 73730 563 690 1341 76324
@Muttha 0.77 Hardware Traders Interprizes
21
Total 0 284788 0 54520 0 58989 160320 558617 5810 8749 10158 583334
558617
Paving Block
1 73584 cement 1440 11160 87264 54 3185 1587 92090
[Link] Rs.92090/-
¸êüŸÖ
ß+ 1080
×ÝÖ™
¸êüŸÖ
ü™üß
2
[Link] [Link] ß+ 21324 cement 15725 11160 48209 559 2070 876 51714
Rs.51714/-
×ÝÖ™
ü™üß
Paving Block
3 57232 cement 1800 7440 69372 78 3185 1260 73895
[Link] Rs.73895/-
¸êüŸÖ
ß+ 2900
×ÝÖ™
Paving Block ü™üß
4 [Link] 69496 cement 9720 12400 106560 1015 3875 1938 113388
Rs.113388/-
¸êüŸÖ
ß+ 14944
×ÝÖ™
ü™üß
SR To Anganwadi
Window+Doo
5 [Link] 53144 r 15934 cement 2520 21720 100106 100 690 1820 102716
Rs.102716/-
¸êüŸÖ
ß+ 6788
×ÝÖ™
ü™üß
Paving Block
6 50691 cement 2520 9920 67362 97 4990 1225 73674
[Link] Rs.73674/-
¸êüŸÖ
ß+ 4231
×ÝÖ™
ü™üß
Total 0 304147 0 67201 0 33725 73800 1903 17995 8706 507477
Rain Water
21- Shantanu Ashfaque Ali
6 Harvesting 78512 53900 132412 0 0 2407 134819
22 Interprizes Mohd. Afsar
[Link] Rs.1.47
Majuri 53900
Rain Water
21- Shantanu Ashfaque Ali
7 Harvesting 30904 21245 52149 0 0 948 53097
22 Interprizes Mohd. Afsar
[Link] Rs.0.53
Majuri
202 SR To Borewell
Shantanu Ashfaque Ali
0- 8 (Pump Set) Interprizes 34079 Mohd. Afsar 23415 57494 0 0 1045 58539
21 [Link] Rs.0.80
Majuri
SR To Borewell
21- Shantanu Ashfaque Ali
9 (Pump Set) 42520 29215 71735 0 0 1304 73039
22 Interprizes Mohd. Afsar
[Link] Rs.0.40
Majuri
Materials Component
†) ²Ö) ÝÖÏÖ.¯ÖÓ.»ÖÖ ‹ÛãúÞ
Name of Majur+ Materials Supplyers+Hardware ÃÖÖê ¸üÖÜÖã®Ö Ö
Amount Amount Amount Test
Report
›üÖ¾ šêü¾ÖÖ¾ÖµÖÖ“Ö ¸üŒÛ
ÖµÖÖ Royaltyß ¸üŒÛú´Ö
Testing 2%GST ú´Ö
Sr. Wendor Wendor Wendor “Öß †+²Ö
No Name of Wendor Name-1 Name-2 Name-3
RCC Rapta / Drain [Link]
‹ŒÛú
Shri Balaji Ashfaque Ali
1 [Link] Year Traders 26406 Mohd. Afsar 28126 r Mohd. 40554 3290 98376 3016 0 3230 104622
21-22 Afsar
Cement+ 15505+ Mohd.
Metal 16800 Metal 25088
Steel 10901 Akbar
Sand 11326 Sand 15466
558617
83793 GS %
99000
19000 Balaji
8000 Shantanu
278793
279824
182557 0
136598 0
148383 0
145719 0
613257 0
182557 62300
182557 62300
292114 0 8536 267250
275786
259745 0 16328
551859 0
171237 0 162183
151142 0 144434
111313 0 101939
88876 0 80416
152045 0 144895
674613 0 633867
111063 0 105087
48292 0 43846
0 0 0
159355 0 148933
Labour Component
Total Amount
Sr. No Name of Work Day Per Day Total Total Saving Remarks
Labour As per Bill
1 2 3 4 5 6 7 8
1 Paving Block [Link] Rs.98000/- 6 620 3720 5 18600 18600 0
2 Paving Block [Link] Rs.50000/- 4 620 2480 4 9920 9920 0
3 Paving Block [Link] Rs.175000/- 10 620 6200 6 37200 37200 0
Total Amount
Sr. No Name of Work Day Per Day Total Total Saving Remarks
Labour As per Bill
Total Amount
Sr. No Name of Work Day Per Day Total Total Saving Remarks
Labour As per Bill
Total Amount
Sr. No Name of Work Day Per Day Total Total Saving Remarks
Labour As per Bill
Total Amount
Sr. No Name of Work Day Per Day Total Total Saving Remarks
Labour As per Bill
1 2 3 4 5 6 7 8
1 Toilet Block @Deothana Khamb Rs.1.72 10 690 6900 7 48300 48300 0
2 Toilet Block @Deothana Khamb Rs.1.52 11 690 7590 6 45540 45540 0
3 [Link] @Deothana Khamb Rs.1.11 7 690 4830 8 38640 38640 0
4 [Link] @Deothana Khamb Rs.0.89 6 690 4140 8 33120 33120 0
5 Paver Road @Deothana Khamb Rs.1.55 11 670 7370 6 44220 44220 0
Total Amount
Sr. No Name of Work Day Per Day Total Total Saving Remarks
Labour As per Bill
1 2 3 4 5 6 7 8
Total Amount
Sr. No Name of Work Day Per Day Total Total Saving Remarks
Labour As per Bill
1 2 3 4 5 6 7 8
1 Wall Compound [Link] 121000/- 8 680 5440 8 43520 43520 0
2 Wall Compound [Link] 100000/- 7 680 4760 8 38080 38080 0
3 Paver Road [Link] 90000/- 6 670 4020 6 24120 24120 0
4 [Link] [Link] 286800/- 8 700 5600 12 67200 67200 0
5 [Link] [Link] 66800/- 3 700 2100 10 21000 21000 0
6 [Link] [Link] 267400/- 9 700 6300 12 75600 75600 0
Total Amount
Sr. No Name of Work Day Per Day Total Total Saving Remarks
Labour As per Bill
1 2 3 4 5 6 7 8
1 [Link] [Link] 1.69 10 670 6700 8 53600 53600 0
2 [Link] [Link] 2.00 10 670 6700 10 67000 67000 0
3 [Link] [Link] 1.00 10 670 6700 6 40200 40200 0
1 2 3 4 5 6 7
M-10 17.50 0.9 15.75 0.353 5.56 Bras
M-20 17.17 0.85 14.5945 0.353 5.15 Bras
Sand
M-10 17.50 0.470 8.225 0.353 2.90 Bras
M-20 17.17 0.425 7.29725 0.353 2.58 Bras
Slab Flooring/tiles 0 0.022 0 0.353 0.00 Bras
Cement
M-10 17.50 4.400 77 77.00 Bags
M-20 17.17 7.000 120.19 120.00 Bags
Slab Flooring/tiles 0.00 0.200 0 0.00 Bags
Total
20MM Crushed 11.00 Bras @ 5600 61600.00
Sand 6.00 Bras @ 6800 40800.00
Cement 197.00 Bags No. @ 385 75845.00 256053.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 81033 3225.00
WITH GST
Cement 75845.00
Sand 40800.00
Metal 61600.00
Majuri BED 35600
Majuri COPING 72342
Royalty 7592.00
Test 4140.00
1 2 3 4 5 6 7
Slab Flooring/tiles 164.33 0.022 3.61526 0.353 1.28 Bras
Cement
Slab Flooring/tiles 164.33 0.200 32.866 33.00 Bags
Total
Sand 2.00 Bras @ 6800 13600.00
47836.00
Cement 33.00 Bags No. @ 385 12705.00
Majuri Amount 21531 0.00
1 2 3 4 5 6 7
Majuri Amount 28654 3225.00
Door+Window+gate 84763.00 59334.00 84763.00
1 2 3 4 5 6 7
Slab Flooring/tiles 108.75 0.020 2.175 0.353 0.77 Bras
Cement
Slab Flooring/tiles 108.75 0.250 27.1875 27.00 Bags
Total
20MM Crushed 0.00 Bras @ 5600 0.00
Sand 1.50 Bras @ 6800 10200.00 31657.00
Cement 27.00 Bags No. @ 385 10395.00
Majuri Amount 60308 3225.00
Door+Window+gate 71533.00 42920.00 71533.00
Colouring 43519.00 26111.00 43519.00
Total Rs. 149934.00 149934.00
Limiteed 149934.00 149934.00
Add GST 12% 17992.00 17992.00
Royalty 516.00 516.00
Total Rs. 168442.00 168442.00
WITH GST
Cement 11642.00 Majuri Slab 16450
Colouring 29244.00 Majuri Win 28613
Sand 11424.00 Majuri Colou 22483
Aluminium W 48070.00 Royalty 516.00
Test
1 2 3 4 5 6 7
Steel 0.381 1 0.381 38.1 381.00 Kg
80MM Metal 8.67 1 8.67 0.353 3.06 Bras
Crusher Metal 20MM
M-10 5.78 0.9 5.202 0.353 1.84 Bras
M-20 18.21 0.85 15.4785 0.353 5.46 Bras
Sand
M-10 5.78 0.470 2.7166 0.353 0.96 Bras
M-20 18.21 0.425 7.73925 0.353 2.73 Bras
Cement
M-10 5.78 4.400 25.432 25.00 Bags
M-20 18.21 7.000 127.47 127.00 Bags
Total
Steel 381.00 Kg. @ 50 19050.00 26684.00
80MM Metal 3.00 Bras @ 2500 7500.00
14651.00
Murum 1.50 Bras @ 1450 2175.00
20MM Crushed 8.00 Bras @ 5600 44800.00
Sand 4.00 Bras @ 6800 27200.00 225670.00
Cement 152.00 Bags No. @ 385 58520.00
Majuri Amount 123990 16230.00
Total Rs. 283235.00 283235.00
Limiteed 280010.00 280010.00
Add GST 12% 33601.00 33601.00
Royalty 6015.00 6015.00
Test 4575.00 4575.00
Total Rs. 324201.00 324201.00
WITH GST
Cement 65542.00
Sand 30464.00
Metal 50176.00
Majuri BED 68200.00
Majuri COPING 75200.00
80MM+Murum 13283.00
Steel 21336.00
1 2 3 4 5 6 7
Steel 0.33 1 0.33 33 330.00 Kg
80MM Metal 7.53 1 7.53 0.353 2.66 Bras
Crusher Metal 20MM
M-10 5.02 0.9 4.518 0.353 1.59 Bras
M-20 16.57 0.85 14.0845 0.353 4.97 Bras
Sand
M-10 5.02 0.470 2.3594 0.353 0.83 Bras
M-20 16.57 0.425 7.04225 0.353 2.49 Bras
Cement
M-10 5.02 4.400 22.088 22.00 Bags
M-20 16.57 7.000 115.99 116.00 Bags
Total
Steel 330.00 Kg. @ 50 16500.00 23175.00
80MM Metal 3.00 Bras @ 2500 7500.00
12725.00
Murum 1.50 Bras @ 1450 2175.00
20MM Crushed 8.00 Bras @ 5600 44800.00
Sand 4.00 Bras @ 6800 27200.00 203755.00
Cement 138.00 Bags No. @ 385 53130.00
Majuri Amount 102870 14520.00
Total Rs. 254175.00 254175.00
Limiteed 250950.00 250950.00
Add GST 12% 30114.00 30114.00
Royalty 5018.00 5018.00
Test 2640.00 2640.00
Total Rs. 288722.00 288722.00
WITH GST
Cement 59506.00
Sand 30464.00
Metal 50176.00
Majuri BED 35600.00
Majuri Drain 81213.00
80MM+Murum 13283.00
Steel 18480.00
1 2 3 4 5 6 7
Steel 0.233 1 0.233 23.3 233.00 Kg
80MM Metal 5.6 1 5.6 0.353 1.98 Bras
Crusher Metal 20MM
M-10 3.74 0.9 3.366 0.353 1.19 Bras
M-20 14.36 0.85 12.206 0.353 4.31 Bras
Sand
M-10 3.74 0.470 1.7578 0.353 0.62 Bras
M-20 14.36 0.425 6.103 0.353 2.15 Bras
Cement
M-10 3.74 4.400 16.456 16.00 Bags
M-20 14.36 7.000 100.52 101.00 Bags
Total
Steel 233.00 Kg. @ 50 11650.00 16373.00
80MM Metal 3.00 Bras @ 2500 7500.00
9470.00
Murum 1.50 Bras @ 1450 2175.00
20MM Crushed 6.00 Bras @ 5600 33600.00
Sand 3.50 Bras @ 6800 23800.00 173225.00
Cement 117.00 Bags No. @ 385 45045.00
Majuri Amount 86929 11631.00
Total Rs. 210699.00 210699.00
Limiteed 207473.00 207473.00
Add GST 12% 24897.00 24897.00
Royalty 3948.00 3948.00
Test 2650.00 2650.00
Total Rs. 238968.00 238968.00
WITH GST
Cement 50450.00
Sand 26656.00
Metal 37632.00
Majuri BED 35600.00
Majuri Drain 62299.00
80MM+Murum 13283.00
Steel 13048.00
TOTAL 238968.00 238968.00 0.00
Check Amount
1 2 3 4 5 6 7
Paver Block 108.51 1 108.51 10.76 11.68 Bras
Crusher Metal 20MM
M-10 0.70 0.9 0.63 0.353 0.22 Bras
Sand
M-10 0.70 0.470 0.329 0.353 0.12 Bras
Cement
M-10 0.70 4.400 3.08 3.00 Bags
Total
Paver Block 12.00 Bras @ 7400 88800.00 103269.00
20MM Crushed 0.20 Bras @ 5600 1120.00
Sand 0.20 Bras @ 6800 1360.00
Cement 2.00 Bags No. @ 385 770.00 4847.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 19291 3225.00
Total Rs. 111341.00 111341.00
Limiteed 111341.00 111341.00
Add GST 12% 13361.00 13361.00
Royalty 71.00 71.00
Test 4565.00 4565.00
Total Rs. 129338.00 129338.00
WITH GST
Paver 99456.00
Cement 862.00
Sand 1523.00
Metal 1254.00
Majuri 21607.00
Royalty 71.00
Test 4565.00
1 2 3 4 5 6 7
Paver Block 43.39 1 43.39 10.76 4.67 Bras
Crusher Metal 20MM
M-10 0.86 0.9 0.774 0.353 0.27 Bras
Sand
M-10 0.86 0.470 0.4042 0.353 0.14 Bras
Cement
M-10 0.86 4.400 3.784 4.00 Bags
Total
Paver Block 5.00 Bras @ 7400 37000.00 41294.00
20MM Crushed 0.20 Bras @ 5600 1120.00
Sand 0.20 Bras @ 6800 1360.00
Cement 2.00 Bags No. @ 385 770.00 5959.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 10679 3676.00
Total Rs. 50929.00 50929.00
Limiteed 50929.00 50929.00
Add GST 12% 6111.00 6111.00
Royalty 87.00 87.00
Test 465.00 465.00
Total Rs. 57592.00 57592.00
WITH GST
Paver 41440.00
Cement 862.00
Sand 1523.00
Metal 1254.00
Majuri 11961.00
Royalty 87.00
Test 465.00
1 2 3 4 5 6 7
Paver Block 17 1 17 10.76 1.83 Bras
Crusher Metal 20MM
M-10 0.38 0.9 0.342 0.353 0.12 Bras
Sand
M-10 0.38 0.470 0.1786 0.353 0.06 Bras
Cement
M-10 0.38 4.400 1.672 2.00 Bags
Total
Paver Block 2.00 Bras @ 7400 14800.00 16093.00
20MM Crushed 0.20 Bras @ 5600 1120.00
Sand 0.10 Bras @ 6800 680.00
Cement 2.00 Bags No. @ 385 770.00 2590.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 18499 3225.00
Colouring 10201.00 6121.00 10201.00
Fencing 20062.00 12037.00 20062.00
Gate 4639.00 2783.00 4639.00
Total Rs. 56810.00 56810.00
Limiteed 56810.00 56810.00
Add GST 12% 6817.00 6817.00
Royalty 40.00 40.00
Test 3185.00 3185.00
Total Rs. 66852.00 66852.00
WITH GST
Paver 16576.00
Cement 862.00
Sand 762.00
Metal 1254.00
Fencing 13481.00
Majuri Fencing 30692.00
Royalty 40.00
Test 3185.00
1 2 3 4 5 6 7
Paver Block 49.38 1 49.38 10.76 5.31 Bras
Crusher Metal 20MM
M-10 4.94 0.9 4.446 0.353 1.57 Bras
Sand
M-10 4.94 0.470 2.3218 0.353 0.82 Bras
Cement
M-10 4.94 4.400 21.736 22.00 Bags
Total
Chequrs 6.00 Bras @ 3500 21000.00 34432.00
20MM Crushed 2.00 Bras @ 5600 11200.00
Sand 1.00 Bras @ 6800 6800.00
Cement 22.00 Bags No. @ 385 8470.00 30994.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 21181 3225.00
Total Rs. 68651.00 68651.00
Limiteed 68651.00 68651.00
Add GST 12% 8238.00 8238.00
Royalty 1653.00 1653.00
Test 650.00 650.00
Total Rs. 79192.00 79192.00
WITH GST
Chequres tiles 23520.00
Cement 9486.00
Sand 7616.00
Metal 12544.00
Majuri 23723.00
Royalty 1653.00
Test 650.00
1 2 3 4 5 6 7
Paver Block 35 1 35 10.76 3.77 Bras
Crusher Metal 20MM
M-10 0.53 0.9 0.477 0.353 0.17 Bras
Sand
M-10 0.53 0.470 0.2491 0.353 0.09 Bras
Cement
M-10 0.53 4.400 2.332 2.00 Bags
Total
Paver Block 4.00 Bras @ 7400 29600.00 33133.00
20MM Crushed 0.20 Bras @ 5600 1120.00
Sand 0.10 Bras @ 6800 680.00
Cement 2.00 Bags No. @ 385 770.00 3654.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 22498 3225.00
Colouring KG. Rate 12317.00 7390.00 12317.00
Steel 159.04 75 16844.00 10106.00 16844.00
Sanitory Fitting 11928.00 7477.00 4486.00 7477.00
Total Rs. 76650.00 76650.00
Limiteed 70150.00 70150.00
Add GST 12% 8418.00 8418.00
Royalty 56.00 56.00
Test 3185.00 3185.00
Total Rs. 81809.00 81809.00
Paver 33152.00
Cement 862.00
Sand 762.00
Metal 1254.00
Steel 11319.00
Majuri 26195.00
Sanitory 5024.00
Royalty 56.00
Test 3185.00
2% GST 1403.00
1 2 3 4 5 6 7
Murum 8.1 1 8.1 0.353 2.86 Bras
Paver Block 73.2 1 73.2 10.76 7.88 Bras
Crusher Metal 20MM
M-20 0.53 0.85 0.4505 0.353 0.16 Bras
Sand
M-20 0.53 0.425 0.22525 0.353 0.08 Bras
Cement
M-20 0.53 7.000 3.71 4.00 Bags
Total
80MM Metal 0.00 Bras @ 2500 0.00
5551.00
Murum 2.00 Bras @ 1450 2900.00
Paver Block 8.00 Bras @ 7400 59200.00 69412.00
20MM Crushed 0.15 Bras @ 5600 840.00
Sand 0.15 Bras @ 6800 1020.00 3658.00
Cement 3.00 Bags No. @ 375 1125.00
Majuri Amount 17741 4205.00
Total Rs. 82826.00 82826.00
12% GST Limiteed 82826.00 82826.00
9939 Add GST 10% 8283.00 8283.00
1656.00 Royalty 1805.00 1805.00
Test 3185.00 3185.00
Total Rs. 96099.00 96099.00
Paver 66304.00 91109.00
Cement 1260.00
Sand 1142.00
Metal 941.00
Murum 2900.00
Majuri 18562.00
Royalty 1805.00
Test 3185.00
2% GST 1657.00
TOTAL 97756.00 96099.00 1657.00
Check Amount
3710
3720
1 2 3 4 5 6 7
Murum 8.1 1 8.1 0.353 2.86 Bras
Paver Block 39.45 1 39.45 10.76 4.24 Bras
Crusher Metal 20MM
M-20 0 0.85 0 0.353 0.00 Bras
Sand
M-20 0.00 0.425 0 0.353 0.00 Bras
Cement
M-20 0.00 7.000 0 0.00 Bags
Total
80MM Metal 0.00 Bras @ 2500 0.00
5551.00
Murum 2.00 Bras @ 1450 2900.00
Paver Block 4.00 Bras @ 7400 29600.00 32667.00
20MM Crushed 0.00 Bras @ 5600 0.00
Sand 0.00 Bras @ 6800 0.00
Cement 0.00 Bags No. @ 375 0.00
Majuri Amount 9170 3452.00
Total Rs. 41670.00 41670.00
12% GST Limiteed 41536.00 41536.00
4984 Add GST 10% 4154.00 4154.00
830.00 Royalty 1790.00 1790.00
Test 1689.00 1689.00
Total Rs. 49169.00 49169.00
Paver 33152.00 45690.00
Murum 2900.00
Majuri 9638.00
Royalty 1790.00
Test 1689.00
2% GST 831.00
TOTAL 50000.00 49169.00 831.00
Check Amount
1 2 3 4 5 6 7
Murum 5.4 1 5.4 0.353 1.91 Bras
Paver Block 149.71 1 149.71 10.76 16.11 Bras
Crusher Metal 20MM
M-20 0.84 0.85 0.714 0.353 0.25 Bras
Sand
M-20 0.84 0.425 0.357 0.353 0.13 Bras
Cement
M-20 0.84 7.000 5.88 6.00 Bags
Total
80MM Metal 0.00 Bras @ 2500 0.00
3701.00
Murum 2.00 Bras @ 1450 2900.00
Paver Block 16.00 Bras @ 7400 118400.00 141963.00
20MM Crushed 0.25 Bras @ 5600 1400.00
Sand 0.20 Bras @ 6800 1360.00 5832.00
Cement 6.00 Bags No. @ 375 2250.00
Majuri Amount 26367 1181.00
Total Rs. 152677.00 152677.00
12% GST Limiteed 152205.00 152205.00
18265 Add GST 10% 15221.00 15221.00
3044.00 Royalty 1252.00 1252.00
Test 2495.00 2495.00
Total Rs. 171173.00 171173.00
Paver 118400.00
Cement 2520.00 167426.00
Sand 1523.00 152205.00
Metal 1568.00 15220.5
Murum 2900.00 167425.50
Majuri 40515.00
Royalty 1252.00
Test 2495.00
2% GST 3044.00
TOTAL 174217.00 171173.00 3044.00
Check Amount
1 2 3 4 5 6 7
Tiles 28.32 1 28.32 10.76 3.05 Bras
Sand
Vetrified Tiles 28.32 0.170 4.8144 0.353 1.70 Bras
Cement
Vetrified Tiles 28.32 0.200 5.664 6.00 Bags
Total
20MM Crushed 0.30 Bras @ 5600 1680.00
Sand 0.30 Bras @ 6800 2040.00
Cement 6.00 Bags No. @ 375 2250.00 39397.00
Vetrified Tles 3.05 Bras @ 4600 14017.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 19410 0.00
Total Rs. 39397.00 39397.00
12% GST Limiteed 31494.00 31494.00
3779 Add GST 10% 3149.00 3149.00
630.00 Royalty 114.00 114.00
Test 0.00 0.00
Total Rs. 34757.00 34757.00
Tiles 15699.00
Cement 2520.00 34643.00
Sand 2285.00
Metal 1882.00
Majuri 12257.00
Royalty 114.00
2% GST 630.00
TOTAL 35387.00 34757.00 630.00
Check Amount
1 2 3 4 5 6 7
Steel Fabricated 0.256 1 0.256 25.6 256.00 Kg
[Link] 7.54 1 7.54 1 7.54 Sqm
Chequres 13.28 1 13.28 10.76 1.43 Bras
Crusher Metal 20MM
M-10 0.78 0.9 0.702 0.353 0.25 Bras
Sand
M-10 0.78 0.470 0.3666 0.353 0.13 Bras
BB Masonary 0.91 0.320 0.2912 0.353 0.10 Bras
Cement
M-10 0.78 4.400 3.432 3.00 Bags
BB Masonary 0.91 1.580 1.4378 1.00 Bags
Brick 0.91 450.000 409.5 410.00 No.
Total
Steel Fabricated 256.00 Kg. @ 78 19968.00 27232.00
Majuri Amount 7264.00
Steel 0.00 Kg. @ 50 0.00 0.00
[Link] 7.54 Sqm @ 970 7313.80 8746.00
Majuri Amount 1432.20
Chequres 0.00 Bras @ 7400 0.00 9336.00
20MM Crushed 0.25 Bras @ 5600 1400.00
Sand 0.25 Bras @ 6800 1700.00
Cement 4.00 Bags No. @ 375 1500.00 13326.00
Vetrified Tles 2.00 Bras @ 2600 5200.00
Brick 410.00 No. @ 7.00 2870.00
Majuri Amount 41438 2914.00
Sanitory Fitting 71329 42797.00 71329.00
Total Rs. 132883.00 132883.00
12% GST Limiteed 132745.00 132745.00
15929 Add GST 10% 13275.00 13275.00
2654.00 Royalty 286.00 286.00
Test 690.00 690.00
Total Rs. 146996.00 146996.00
Chequrs 5824.00
Cement 1680.00 146020.00
Sand 1904.00
Metal 1568.00
Steel+Sheet 27282.00
Majuri Shed 15200.00
Majuri Plumb 27650.00
Majuri 16590.00
Bricks 2870.00
Sanitory 45452.00
Royalty 286.00
Test 690.00
2% GST 2654.00
TOTAL 149650.00 146996.00 2654.00
Check Amount
1 2 3 4 5 6 7
Steel Fabricated 0.249 1 0.249 24.9 249.00 Kg
Crusher Metal 20MM
M-10 2.03 0.9 1.827 0.353 0.64 Bras
Sand
M-10 2.03 0.470 0.9541 0.353 0.34 Bras
BB Masonary 0 0.320 0 0.353 0.00 Bras
Cement
M-10 2.03 4.400 8.932 9.00 Bags
BB Masonary 0.00 1.580 0 0.00 Bags
Brick 0 450.000 0 0.00 No.
Total
Steel Fabricated 249.00 Kg. @ 78 19422.00 26465.00
Majuri Amount 7043.00
20MM Crushed 1.00 Bras @ 5600 5600.00
13167.00
Sand 0.50 Bras @ 6800 3400.00
Cement 9.00 Bags No. @ 375 3375.00 13167.00
Vetrified Tles 2.00 Bras @ 2600 5200.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 6796 410.00
Sanitory Fitting 26986 16192.00 26986.00
Total Rs. 67028.00 67028.00
12% GST Limiteed 67028.00 67028.00
8043 Add GST 10% 6703.00 6703.00
1340.00 Royalty 563.00 563.00
Test 690.00 690.00
Total Rs. 74984.00 74984.00
Chequrs 0.00
Cement 3780.00
Sand 3808.00
Metal 6272.00 72390.00
Steel+Sheet 19422.00
Majuri Feb 7043.00
Majuri Plumb 12750.00
Majuri 3123.00
Bricks 0.00
Sanitory 16192.00
Royalty 563.00
Test 690.00
2% GST 1341.00
TOTAL 74984.00 74984.00 0.00
Check Amount
1 2 3 4 5 6 7
Murum 0 1 0 0.353 0.00 Bras
Paver Block 111 1 111 10.76 11.94 Bras
Crusher Metal 20MM
M-20 0.81 0.85 0.6885 0.353 0.24 Bras
Sand
M-20 0.81 0.425 0.34425 0.353 0.12 Bras
Cement
M-20 0.81 7.000 5.67 6.00 Bags
Total
80MM Metal 0.00 Bras @ 2500 0.00
0.00
Murum 2.00 Bras @ 1450 2900.00
Paver Block 11.50 Bras @ 7400 85100.00 102453.00
20MM Crushed 0.25 Bras @ 5600 1400.00
Sand 0.25 Bras @ 6800 1700.00 5529.00
Cement 6.00 Bags No. @ 375 2250.00
Majuri Amount 38579 3225.00
Board+Ex 0.00 0.00
Colouring 51804.00 31082.00 51804.00
Total Rs. 163011.00 163011.00
12% GST Limiteed 162991.00 162991.00
19559 Add GST 10% 16299.00 16299.00
3260.00 Royalty 82.00 82.00
Test 3185.00 3185.00
Total Rs. 182557.00 182557.00
1 2 3 4 5 6 7
Murum 0 1 0 0.353 0.00 Bras
Paver Block 110.97 1 110.97 10.76 11.94 Bras
Crusher Metal 20MM
M-20 1.95 0.85 1.6575 0.353 0.59 Bras
Sand
M-20 1.95 0.425 0.82875 0.353 0.29 Bras
Cement
M-20 1.95 7.000 13.65 14.00 Bags
Total
80MM Metal 0.00 Bras @ 2500 0.00
0.00
0.00
Murum 0.00 Bras @ 1450 0.00
Paver Block 12.00 Bras @ 7400 88800.00 102425.00
20MM Crushed 0.50 Bras @ 5600 2800.00
Sand 0.30 Bras @ 6800 2040.00 13293.00
Cement 14.00 Bags No. @ 375 5250.00
Majuri Amount 20053 3225.00
Board+Ex 0.00 0.00
Colouring 0.00 0.00 0.00
Total Rs. 118943.00 118943.00
12% GST Limiteed 118943.00 118943.00
14273 Add GST 10% 11894.00 11894.00
2379.00 Royalty 197.00 197.00
Test 3185.00 3185.00
Total Rs. 134219.00 134219.00
1 2 3 4 5 6 7
Steel Fabricated 0.06 1 0.06 6 60.00 Kg
Crusher Metal 20MM
M-10 1.11 0.9 0.999 0.353 0.35 Bras
M-20 2.62 0.85 2.227 0.353 0.79 Bras
Sand
M-10 1.11 0.470 0.5217 0.353 0.18 Bras
M-20 2.62 0.425 1.1135 0.353 0.39 Bras
Cement
M-10 1.11 4.400 4.884 5.00 Bags
M-20 2.62 7.000 18.34 18.00 Bags
Total
Steel Fabricated 60.00 Kg. @ 60 3600.00 6787.00
Majuri Amount 3187.00
20MM Crushed 1.00 Bras @ 5600 5600.00
Sand 0.50 Bras @ 6800 3400.00 24411.00
Cement 23.00 Bags No. @ 375 8625.00
Majuri Amount 48705 3502.00
Door+Window+gate 96042.00 57625.00 96042.00
Total Rs. 130742.00 130742.00
12% GST Limiteed 130196.00 130196.00
15624 Add GST 10% 13020.00 13020.00
2604.00 Royalty 571.00 571.00
Test 1992.00 1992.00
Total Rs. 145779.00 145779.00
1 2 3 4 5 6 7
Steel Fabricated 0.59 1 0.59 59 590.00 Kg
[Link] 65.52 1 65.52 1 65.52 Sqm
Crusher Metal 20MM
M-10 0.31 0.9 0.279 0.353 0.10 Bras
Sand
M-10 0.31 0.470 0.1457 0.353 0.05 Bras
BB Masonary 0.78 0.320 0.2496 0.353 0.09 Bras
Plaster 2.24 0.015 0.0336 0.353 0.01 Bras
Slab Flooring/tiles 0 0.022 0 0.353 0.00 Bras
Cement
M-10 0.31 4.400 1.364 1.00 Bags
M-20 0.00 7.000 0 0.00 Bags
BB Masonary 0.78 1.580 1.2324 1.00 Bags
Plaster 2.24 0.110 0.2464 0.00 Bags
Slab Flooring/tiles 0.00 0.200 0 0.00 Bags
Brick 0.78 450.000 351 351.00 No.
Total
Steel Fabricated 590.00 Kg. @ 70 41300.00 63089.00
Majuri Amount 21789.00
[Link] 65.52 Sqm @ 500 32760.00 53464.00
Majuri Amount 20704.00
20MM Crushed 0.20 Bras @ 5600 1120.00
Sand 0.20 Bras @ 6800 1360.00
9350.00
Cement 3.00 Bags No. @ 375 1125.00
Brick 351.00 No. @ 7.00 2457.00
Majuri Amount 6948 0.00
Door+Window+gate 9150.00 5490.00 9150.00
Total Rs. 135053.00 135053.00
12% GST Limiteed 128026.00 128026.00
15363 Add GST 10% 12803.00 12803.00
2560.00 Royalty 155.00 155.00
Test 2175.00 2175.00
Total Rs. 143159.00 143159.00
1 2 3 4 5 6 7
80MM Metal 20.34 1 20.34 0.353 7.18 Bras
Paver Block 203.4 1 203.4 10.76 21.89 Bras
Crusher Metal 20MM
M-20 0.88 0.85 0.748 0.353 0.26 Bras
Sand
M-10 0.00 0.470 0 0.353 0.00 Bras
M-20 0.88 0.425 0.374 0.353 0.13 Bras
Cement
M-20 0.88 7.000 6.16 6.00 Bags
Total
80MM Metal 7.00 Bras @ 2500 17500.00
34324.00
Murum 2.00 Bras @ 1450 2900.00
Paver Block 22.00 Bras @ 7300 160600.00 192030.00
20MM Crushed 0.25 Bras @ 5400 1350.00
Sand 0.25 Bras @ 6500 1625.00
Cement 6.00 Bags No. @ 365 2190.00 6033.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 50505 4283.00
Total Rs. 236670.00 236670.00
12% GST Limiteed 233536.00 233536.00
28024 Add GST 12% 28024.00 28024.00
0.00 Royalty 5898.00 5898.00
Test 3878.00 3878.00
Total Rs. 271336.00 271336.00
Paver 160600.00
Cement 2453.00 235081.00
Sand 1820.00 233536.00
Metal 1512.00 23353.6
Gitta+Murum 20956.00 256889.60
Majuri 47740.00
Sanitory 0.00
Royalty 5898.00
Test 3878.00
2% GST 0.00
TOTAL 244857.00 267251.00 -22394.00
Check Amount
1 2 3 4 5 6 7
Murum 0 1 0 0.353 0.00 Bras
Paver Block 81 1 81 10.76 8.72 Bras
Crusher Metal 20MM
M-20 0.54 0.85 0.459 0.353 0.16 Bras
Sand
M-20 0.54 0.425 0.2295 0.353 0.08 Bras
Cement
M-20 0.54 7.000 3.78 4.00 Bags
Total
Paver Block 9.00 Bras @ 7300 65700.00 76073.00
20MM Crushed 0.20 Bras @ 5200 1040.00
Sand 0.00 Bras @ 6500 0.00 3076.00
Cement 4.00 Bags No. @ 360 1440.00
Majuri Amount 10969 0.00
Board+Ex 0.00 0.00
Colouring 0.00 0.00 0.00
Total Rs. 79149.00 79149.00
12% GST Limiteed 79331.00 79331.00
9520 Add GST 10% 7933.00 7933.00
1587.00 Royalty 54.00 54.00
Test 3185.00 3185.00
Total Rs. 90503.00 90503.00
92090.00
0.00
[Link] @Bhera
Materials Name Qty. As per Rate of Total Rate of Bras Total Unit
M.B. Consumpti Quantity
on
1 2 3 4 5 6 7
Murum 0 1 0 0.353 0.00 Bras
Paver Block 0 1 0 10.76 0.00 Bras
Crusher Metal 20MM
M-20 5.54 0.85 4.709 0.353 1.66 Bras
Sand
M-20 5.54 0.430 2.3822 0.353 0.84 Bras
Cement
M-20 5.54 7.000 38.78 39.00 Bags
Total
Paver Block 0.00 Bras @ 7300 0.00 0.00
20MM Crushed 2.00 Bras @ 5200 10400.00
Sand 1.00 Bras @ 6500 6500.00 46132.00
Cement 39.00 Bags No. @ 360 14040.00
Majuri Amount 15192 0.00
Board+Ex 0.00 0.00
Colouring 0.00 0.00 0.00
Total Rs. 46132.00 46132.00
12% GST Limiteed 43826.00 43826.00
5259 Add GST 10% 4383.00 4383.00
876.00 Royalty 559.00 559.00
Test 2070.00 2070.00
Total Rs. 50838.00 50838.00
51714.00
0.00
1 2 3 4 5 6 7
Murum 0 1 0 0.353 0.00 Bras
Paver Block 58.75 1 58.75 10.76 6.32 Bras
Crusher Metal 20MM
M-20 0.77 0.85 0.6545 0.353 0.23 Bras
Sand
M-20 0.77 0.425 0.32725 0.353 0.12 Bras
Cement
M-20 0.77 7.000 5.39 5.00 Bags
Total
Paver Block 7.00 Bras @ 7300 51100.00 55175.00
20MM Crushed 0.20 Bras @ 5200 1040.00
Sand 0.10 Bras @ 6500 650.00 5269.00
Cement 5.00 Bags No. @ 360 1800.00
Majuri Amount 9079 3225.00
Board+Ex 0.00 0.00
Colouring 0.00 0.00 0.00
Total Rs. 63669.00 63669.00
12% GST Limiteed 62992.00 62992.00
7559 Add GST 10% 6299.00 6299.00
1260.00 Royalty 78.00 78.00
Test 3185.00 3185.00
Total Rs. 72554.00 72554.00
73895.00
0.00
Paver Block Road [Link]
Materials Name Qty. As per Rate of Total Rate of Bras Total Unit
M.B. Consumpti Quantity
on
1 2 3 4 5 6 7
Murum 0 1 0 0.353 0.00 Bras
Paver Block 76.67 1 76.67 10.76 8.25 Bras
Crusher Metal 20MM
M-20 3.86 0.85 3.281 0.353 1.16 Bras
Sand
M-20 3.86 0.425 1.6405 0.353 0.58 Bras
Cement
M-20 3.86 7.000 27.02 27.00 Bags
Total
Paver Block 8.50 Bras @ 7300 62050.00 72005.00
20MM Crushed 1.50 Bras @ 5200 7800.00
Sand 0.70 Bras @ 6500 4550.00 24868.00
Cement 27.00 Bags No. @ 360 9720.00
Majuri Amount 12753 0.00
Board+Ex 0.00 0.00
Colouring 0.00 0.00 0.00
Total Rs. 96873.00 96873.00
12% GST Limiteed 96873.00 96873.00
11625 Add GST 10% 9687.00 9687.00
1938.00 Royalty 1015.00 1015.00
Test 3875.00 3875.00
Total Rs. 111450.00 111450.00
113388.00
0.00
SR to Anganwadi [Link]
Materials Name Qty. As per Rate of Total Rate of Bras Total Unit
M.B. Consumpti Quantity
on
1 2 3 4 5 6 7
Murum 0 1 0 0.353 0.00 Bras
Paver Block 58.05 1 58.05 10.76 6.25 Bras
Crusher Metal 20MM
M-20 0.99 0.85 0.8415 0.353 0.30 Bras
Sand
M-20 0.99 0.425 0.42075 0.353 0.15 Bras
Cement
M-20 0.99 7.000 6.93 7.00 Bags
Total
Paver Block 6.50 Bras @ 7300 47450.00 54519.00
20MM Crushed 0.30 Bras @ 5200 1560.00
Sand 0.20 Bras @ 6500 1300.00 6706.00
Cement 7.00 Bags No. @ 360 2520.00
Majuri Amount 22243 3225.00
Board+Ex 0.00 0.00
Door+Window+gate 26557.00 15934.00 26557.00
Total Rs. 91007.00 91007.00
12% GST Limiteed 91007.00 91007.00
10921 Add GST 10% 9101.00 9101.00
1820.00 Royalty 100.00 100.00
Test 690.00 690.00
Total Rs. 100898.00 100898.00
102716.00
0.00
Paver Block Road [Link] 73842/-
Materials Name Qty. As per Rate of Total Rate of Bras Total Unit
M.B. Consumpti Quantity
on
1 2 3 4 5 6 7
Murum 0 1 0 0.353 0.00 Bras
Paver Block 56.3 1 56.3 10.76 6.06 Bras
Crusher Metal 20MM
M-20 0.96 0.85 0.816 0.353 0.29 Bras
Sand
M-20 0.96 0.425 0.408 0.353 0.14 Bras
Cement
M-20 0.96 7.000 6.72 7.00 Bags
Total
Paver Block 6.20 Bras @ 7300 45260.00 52874.00
20MM Crushed 0.30 Bras @ 5200 1560.00
Sand 0.20 Bras @ 6500 1300.00 6541.00
Cement 7.00 Bags No. @ 360 2520.00
Majuri Amount 12000 3225.00
Board+Ex 0.00 0.00
Colouring 0.00 0.00 0.00
Total Rs. 62640.00 62640.00
12% GST Limiteed 61238.00 61238.00
7349 Add GST 10% 6124.00 6124.00
1225.00 Royalty 97.00 97.00
Test 4990.00 4990.00
Total Rs. 72449.00 72449.00
73674.00
0.00
[Link] [Link]
Materials Name Qty. As per Rate of Total Rate of Bras Total Unit
M.B. Consumpti Quantity
on
1 2 3 4 5 6 7
80MM Metal 10.45 1 10.45 0.353 3.69 Bras
Paver Block 0 1 0 0 0.00 Bras
Crusher Metal 20MM
M-10 10.45 0.9 9.405 0.353 3.32 Bras
M-20 10.45 0.85 8.8825 0.353 3.14 Bras
Sand
M-10 10.45 0.470 4.9115 0.353 1.73 Bras
M-20 10.45 0.425 4.44125 0.353 1.57 Bras
Cement
M-10 10.45 4.400 45.98 46.00 Bags
M-20 10.45 7.000 73.15 73.00 Bags
Total
80MM Metal 3.00 Bras @ 2500 7500.00
15794.00
Murum 2.00 Bras @ 1450 2900.00
Paver Block 0.00 Bras @ 7300 0.00 0.00
20MM Crushed 6.50 Bras @ 5400 35100.00
Sand 4.00 Bras @ 6500 26000.00
Cement 119.00 Bags No. @ 365 43435.00 141633.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 46605 4113.00
Total Rs. 161540.00 161540.00
12% GST Limiteed 161540.00 161540.00
19385 Add GST 10% 16154.00 19385.00
3231.00 Royalty 7415.00 7415.00
Test 11200.00 11200.00
Total Rs. 196309.00 199540.00
Paver 0.00
Cement 48647.00
Sand 29120.00
Metal 39312.00
Gitta+Murum 10400.00 690 72 49680.00
Majuri 50215.00
Sanitory 0.00 6210
Royalty 7415.00 49680
Test 11200.00
2% GST 3231.00
TOTAL 199540.00 0.00 199540.00
Check Amount 100
551859.00
292114.00 8526
0
235282
3225.00 -77808.00
0.00 35017.8
0.00
7979
7979
7979
12705
0.00 -21531.00
0.00 35017.8
0.00
7979
7979
7979
3225.00 -25429.00
-25429.00 84763.00 25429.00
0.00 35017.8
0.00
7979
7979
7979
10395
3225.00 -57083.00
71533.00 28613.00
43519.00 17408.00
0.00 35017.8
0.00
7979
7979
26684.00 7634.00
14651.00 9675.00 4976.00
0.00 0.00
16230.00 ###
0.00 35017.8
0.00
7979
7979
7979
23175.00 6675.00
12725.00 9675.00 3050.00
0.00 0.00
14520.00 -88350.00
0.00 35017.8
0.00
7979
7979
7979
16373.00 4723.00
9470.00 9675.00 -205.00
0.00 0.00
11631.00 -75298.00
0.00 35017.8
0.00
7979
7979
7979
103269.00 14469.00
3225.00 -16066.00
0.00 35017.8
0.00
7979
7979
7979
41294.00 4294.00
3676.00 -7003.00
0.00 35017.8
0.00
7979
7979
7979
16093.00 1293.00
3225.00 -15274.00
10201.00 4080.00
20062.00 8025.00
4639.00 1856.00
0.00 35017.8
0.00
7979
7979
7979
34432.00 13432.00
3225.00 -17956.00
0.00 35017.8
0.00
7979
7979
7979
33133.00 3533.00
3225.00 -19273.00
12317.00 4927.00
16844.00 6738.00
7477.00 2991.00
0.00 35017.8
0.00
7979
7979
7979
5551.00 2900.00 2651.00
0.00 0.00
69412.00 10212.00
4205.00 -13536.00
0.00 35017.8
0.00
7979
7979
7979
5551.00 2900.00 2651.00
0.00 0.00
32667.00 3067.00
3452.00 -5718.00
0.00 35017.8
0.00
7979
7979
7979
3701.00 2900.00 801.00
0.00 0.00
141963.00 23563.00
1181.00 -25186.00
0.00 35017.8
0.00
7979
7979
7979
2250
233032
0.00 -19410.00
0.00 35017.8
0.00
7979
7979
7979
0.00 0.00
8746.00 1432.20 8746.00 0.00
9336.00 9336.00
2914.00 -38524.00
71329.00 28532.00
0.00 35017.8
0.00
7979
7979
7979
410.00 -6386.00
26986.00 10794.00
0.00 35017.8
0.00
7979
7979
7979
3225.00 -35354.00
0.00 0.00
51804.00 20722.00
0.00 35017.8
0.00
7979
7979
7979
3225.00 -16828.00
0.00 0.00
0.00 0.00
0.00 35017.8
0.00
7979
7979
7979
235282
3502.00 -45203.00
96042.00 38417.00
0.00 35017.8
0.00
7979
7979
7979
0
0.00 -6948.00
9150.00 3660.00
0.00 35017.8
0.00
7979
7979
7979
34324.00 20400.00 13924.00
0.00 0.00
192030.00 31430.00
4283.00 -46222.00
0.00 35017.8
0.00
7979
7979
7979
76073.00 10373.00
0.00 -10969.00
0.00 0.00
0.00 0.00
0.00 35017.8
0.00
7979
7979
7979
0.00 0.00
0.00 -15192.00
0.00 0.00
0.00 0.00
0.00 35017.8
0.00
7979
7979
7979
55175.00 4075.00
3225.00 -5854.00
0.00 0.00
0.00 0.00
0.00 35017.8
0.00
7979
7979
7979
72005.00 9955.00
0.00 -12753.00
0.00 0.00
0.00 0.00
0.00 35017.8
0.00
7979
7979
7979
54519.00 7069.00
3225.00 -19018.00
0.00 0.00
26557.00 10623.00
0.00 35017.8
0.00
7979
7979
7979
52874.00 7614.00
3225.00 -8775.00
0.00 0.00
0.00 0.00
0.00 35017.8
0.00
7979
7979
7979
15794.00 10400.00 5394.00
0.00 0.00
0.00 0.00
4113.00 -42492.00
0.00 35017.8
0.00
7979
7979
7979
259745.00 7864
Materials Name Qty. As per Rate of Total Quantity Rate of Total Unit
M.B. Consumption Bras
1 2 3 4 5 6 7
Steel
1.401 1 1.401 1401 1962.80 Qtl.
Murum
15.45 0.32 4.944 0.353 1.75 Bras
Crusher Metal 20MM
M-10 3.01 0.94 2.8294 0.353 1.00 Bras
BB Masonary 5.59 0 0 0.353 0.00 Bras
Plaster 13.37 0 0 0.353 0.00 Bras
Sand
M-10 3.01 0.470 1.4147 0.353 0.50 Bras
BB Masonary 5.59 0.320 1.7888 0.353 0.63 Bras
Plaster 13.37 0.015 0.20055 0.353 0.07 Bras
Cement
M-10 3.01 4.400 13.244 13.00 Bags
BB Masonary 5.59 1.580 8.8322 9.00 Bags
Plaster 13.37 0.110 1.4707 1.00 Bags
Total
Steel 1963.00 Qtl. @ 40 78520.00 115532.00
######
[Link] 54.80 Qtl. @ 450 24660.00 37592.00
######
Murum 2.00 Bras @ 3500 7000.00 9924
20MM 1.00 Bras @ 5800 5800.00 17024
######
Sand 1.00 Bras @ 6850 6850.00 0
Cement 23.00 Bags No. @ 350 8050.00 ###
38010
Brick 2700.00 No. @ 4.5 12150.00 0
Majuri Amount 78250.00 798
Royalty 262.00 2662
Total Rs. 221542.00 221542.00
######
Limitted 220833.00 220833.00
######
Add GST 12% 26500.00 26500.00
######
Total Rs. 247333.00 247333.00
######
For Teen Shed
Materials Name Qty. As per Rate of Total Quantity Rate of Total Unit
M.B. Consumption Bras
1 2 3 4 5 6 7
Steel Fabricated 1.834 1 1.834 183.4 1834.00 Kg
Steel 0.689 1 0.689 68.9 689.00 Kg
Qtl
[Link] 83.64 1 83.64 1 83.64 Sqm
80MM Metal 7.22 1 7.22 0.353 2.55 Bras
Murum 24.09 1 24.09 0.353 8.50 Bras
Shahbad 51.75 1 51.75 10.76 5.57 Bras
Crusher Metal 20MM
M-10 6.70 0.94 6.298 0.353 2.22 Bras
M-20 4.91 0.85 4.1735 0.353 1.47 Bras
Sand
M-10 6.70 0.470 3.149 0.353 1.11 Bras
M-20 4.91 0.425 2.08675 0.353 0.74 Bras
BB Masonary 3.88 0.320 1.2416 0.353 0.44 Bras
Plaster 25.02 0.015 0.3753 0.353 0.13 Bras
Shahbad 51.75 0.022 1.1385 0.353 0.40 Bras
Cement
M-10 6.70 4.400 29.48 29.00 Bags
M-20 4.91 7.000 34.37 34.00 Bags
BB Masonary 3.88 1.580 6.1304 6.00 Bags
Plaster 25.02 0.110 2.7522 3.00 Bags
Shahbad 51.75 0.135 6.98625 7.00 Bags
Total
Steel Fabricated 1834.00 Kg. @ 40 73360.00 150573.00
Majuri Amount 77213.00
Steel 689.00 Kg. @ 40 27560.00 44214.00
[Link] 83.64 Sqm @ 825 69003.00 79541.00
Majuri Amount 10538.00
80MM Metal 2.50 Bras @ 2500 6250.00 10057.00
Murum 8.50 Bras @ 1450 12325.00 15475.00
Shahbad 5.60 Bras @ 4200 23520.00 33818.00
20MM Crushed 3.70 Bras @ 5800 21439.35
Sand 2.82 Bras @ 6850 19323.00
97879.00
Cement 79.00 Bags No. @ 350 27650.00
Brick 2445.00 No. @ 5.75 14060.00
Majuri Amount 51014 1698.00
Royalty 5623.00 5623.00
Testing Charges 2400.00 2400.00
Total Rs. 441278.00 441278.00
Add GST 12% 52953.00 52953.00
Total Rs. 494231.00 494231.00
Toilet Block
Materials Name Qty. As per Rate of Total Quantity Rate of Total Unit
M.B. Consumption Bras
1 2 3 4 5 6 7
Total
Steel 41.00 Kg. @ 40 1640.00 2632.00
Murum 0.10 Bras @ 1450 145.00 248.00
20MM Crushed 0.35 Bras @ 4200 1486.16
Sand 1.50 Bras @ 6500 9728.79
58909.00
Cement 28.00 Bags No. @ 335 9380.00
Brick 5314.00 No. @ 5.00 26570.00
WC Sheet 1.00 No. @ 5588.000 5588.00 5588.00
Grill 1.00 No. @ 2348.000 2348.00 2348.00
Colouring 3350.00 3350.00
Majuri Amount 14015 1176.00
Total Rs. 74251.00 74251.00
Add GST 12% 8910.00 8910.00
Royalty 1273.00 1273.00
Total Rs. 84434.00 84434.00
Toilet Block & Anganwadi
Materials Name Qty. As per Rate of Total Quantity Rate of Total Unit
M.B. Consumption Bras
1 2 3 4 5 6 7
Ceramic 2.42 1 2.42 10.76 0.26 Bras
Steel 0.015 1 0.015 1.5 15.00 Kg
80MM Metal 0 1 0 0.353 0.00 Bras
Murum 0.45 1 0.45 0.353 0.16 Bras
Shahbad 0 1 0 10.76 0.00 Bras
Paver 84.38 1 84.38 10.76 9.08 Bras
Crusher Metal 20MM
M-10 9.39 0.94 8.8266 0.353 3.12 Bras
M-20 1.63 0.85 1.3855 0.353 0.49 Bras
Sand
M-10 9.39 0.470 4.4133 0.353 1.56 Bras
M-20 1.63 0.425 0.69275 0.353 0.24 Bras
BB Masonary 1.33 0.320 0.4256 0.353 0.15 Bras
Plaster 5.39 0.015 0.08085 0.353 0.03 Bras
Shahbad 2.42 0.022 0.05324 0.353 0.02 Bras
Cement
M-10 9.39 4.400 41.316 41.00 Bags
M-20 1.63 7.000 11.41 11.00 Bags
BB Masonary 1.33 1.580 2.1014 2.00 Bags
Plaster 5.39 0.250 1.3475 1.00 Bags
Shahbad 2.42 0.135 0.3267 0.00 Bags
Total
Steel 15.00 Kg. @ 40 600.00 963.00
Murum 0.20 Bras @ 1450 290.00 1554.00
20MM Crushed 3.60 Bras @ 4200 15140.46
Sand 2.00 Bras @ 6500 13000.04
63777.00
Cement 55.00 Bags No. @ 335 18425.00
Brick 662.00 No. @ 5.00 3310.00
WC Sheet 1.00 No. @ 6011.000 6011.00 6011.00
Shahbad 0.50 Bras @ 4200.000 2100.00 2674.00
Paver 84.38 Bras @ 750.000 63285.00 72787.00
Door @ 0.000 11088.00 11088.00
Pipe @ 0.000 2230.00 2230.00
Colouring 1353.00 1353.00
Majuri Amount 26996 1391.00
Total Rs. 163828.00 163828.00
Add GST 12% 19960.00 19960.00
Royalty 971.00 971.00
Total Rs. 184759.00 184759.00
Total
Toilet Block
Materials Name Qty. As per Rate of Total Quantity Rate of Total Unit
M.B. Consumption Bras
1 2 3 4 5 6 7
Total
Steel 36.00 Kg. @ 40 1440.00 2312.00
Murum 0.10 Bras @ 1450 145.00 154.00
20MM Crushed 0.37 Bras @ 3800 1413.16
Sand 2.09 Bras @ 4500 9407.89
61958.00
Cement 39.00 Bags No. @ 330 12870.00
Brick 7585.00 No. @ 4.50 34132.50
WC Sheet 1.00 No. @ 5488.000 5488.00 5488.00
Grill 1.00 No. @ 2348.000 0.00 0.00
Colouring 3028.00 3028.00
Majuri Amount 5805 790.00
Total Rs. 73730.00 73730.00
Limiteed 66328.00 66328.00
Add GST 12% 7959.00 7959.00
Royalty 0.00 0.00
Total Rs. 74287.00 74287.00
For Teen Shed-Shirsala
Materials Name Qty. As per Rate of Total Quantity Rate of Total Unit
M.B. Consumption Bras
1 2 3 4 5 6 7
Steel Fabricated 1.002 1 1.002 100.2 1002.00 Kg
Steel 0.56 1 0.56 56 560.00 Kg
Qtl
[Link] 84.8 1 84.8 1 84.80 Sqm
80MM Metal 8.86 1 8.86 0.353 3.13 Bras
Murum 11.83 1 11.83 0.353 4.18 Bras
Shahbad 0 1 0 10.76 0.00 Bras
Crusher Metal 20MM
M-10 7.92 0.94 7.4448 0.353 2.63 Bras
M-20 5.74 0.85 4.879 0.353 1.72 Bras
Sand
M-10 7.92 0.470 3.7224 0.353 1.31 Bras
M-20 5.74 0.425 2.4395 0.353 0.86 Bras
BB Masonary 3.75 0.320 1.2 0.353 0.42 Bras
Plaster 13.45 0.015 0.20175 0.353 0.07 Bras
Shahbad 0 0.022 0 0.353 0.00 Bras
Cement
M-10 7.92 4.400 34.848 35.00 Bags
M-20 5.74 7.000 40.18 40.00 Bags
BB Masonary 3.75 1.580 5.925 6.00 Bags
Plaster 13.45 0.110 1.4795 1.00 Bags
Shahbad 0.00 0.135 0 0.00 Bags
Total
Steel Fabricated 1002.00 Kg. @ 40 40080.00 85995.00
Majuri Amount 45915.00
Steel 560.00 Kg. @ 40 22400.00 35350.00
[Link] 84.80 Sqm @ 825 69960.00 98368.00
Majuri Amount 28408.00
80MM Metal 3.10 Bras @ 2500 7750.00 14814.00
Murum 4.20 Bras @ 1450 6090.00 7698.00
Shahbad 0.00 Bras @ 4200 0.00 0.00
20MM Crushed 4.35 Bras @ 5800 25231.75
Sand 2.67 Bras @ 6850 18289.28
113883.00
Cement 82.00 Bags No. @ 350 28700.00
Brick 1868.00 No. @ 5.75 15500.00
Majuri Amount 50243 2459.00
Royalty 0.00
Testing Charges 0.00 0.00
Total Rs. 358567.00 358567.00
Add GST 12% 43028.00 43028.00
Add Royalty 3806.00 3806.00
Total Rs. 405401.00 405401.00
Shirsala
Materials Name Qty. As per Rate of Total Quantity Rate of Total Unit
M.B. Consumption Bras
1 2 3 4 5 6 7
Steel Fabricated 0 1 0 0 0.00 Kg
Steel 0.62 1 0.62 62 620.00 Kg
Qtl
[Link] 0 1 0 1 0.00 Sqm
80MM Metal 0 1 0 0.353 0.00 Bras
Murum 0 1 0 0.353 0.00 Bras
Shahbad 0 1 0 10.76 0.00 Bras
Crusher Metal 20MM
M-10 2.07 0.94 1.9458 0.353 0.69 Bras
M-20 7.33 0.85 6.2305 0.353 2.20 Bras
Sand
M-10 2.07 0.470 0.9729 0.353 0.34 Bras
M-20 7.33 0.425 3.11525 0.353 1.10 Bras
BB Masonary 10.3 0.320 3.296 0.353 1.16 Bras
Plaster 60 0.015 0.9 0.353 0.32 Bras
Shahbad 0 0.022 0 0.353 0.00 Bras
Cement
M-10 2.07 4.400 9.108 9.00 Bags
M-20 7.33 7.000 51.31 51.00 Bags
BB Masonary 10.30 1.580 16.274 16.00 Bags
Plaster 60.00 0.170 10.2 10.00 Bags
Shahbad 0.00 0.135 0 0.00 Bags
Total
Steel Fabricated 0.00 Kg. @ 40 0.00 0.00
Majuri Amount 0.00
Steel 620.00 Kg. @ 40 24800.00 0.00
[Link] 0.00 Sqm @ 825 0.00 98368.00
Majuri Amount 0.00
80MM Metal 0.00 Bras @ 2500 0.00 14814.00
Murum 0.00 Bras @ 1450 0.00 7698.00
Shahbad 0.00 Bras @ 4200 0.00 0.00
20MM Crushed 2.89 Bras @ 5800 0.00
Sand 2.92 Bras @ 6850 0.00
113883.00
Cement 86.00 Bags No. @ 420 36120.00
Brick 5129.00 No. @ 5.75 0.00
Majuri Amount 0 2459.00
Royalty 0.00
Testing Charges 0.00 0.00
Total Rs. 60920.00 237222.00
Add GST 12% 7310.00 28467.00
Add Royalty 3806.00 3806.00
Total Rs. 72036.00 269495.00
1 2 3 4 5 6 7
Steel 0.795 1 0.795 79.5 795.00 Kg
Crusher Metal 20MM
M-10 2.07 0.94 1.9458 0.353 0.69 Bras
M-20 7.01 0.85 5.9585 0.353 2.10 Bras
Sand
M-10 2.07 0.470 0.9729 0.353 0.34 Bras
M-20 7.01 0.425 2.97925 0.353 1.05 Bras
BB Masonary 12.42 0.320 3.9744 0.353 1.40 Bras
Plaster 421.82 0.015 6.3273 0.353 2.23 Bras
Cement
M-10 2.07 4.400 9.108 9.00 Bags
M-20 7.01 7.000 49.07 49.00 Bags
BB Masonary 12.42 1.580 19.6236 20.00 Bags
Plaster 421.82 0.250 105.455 105.00 Bags
Brick 12.42 498.000 6185.16 6185.00 No.
Gate 0 5488.000 0 0.00 No.
Colouring 1 2348.000 2348 2348.00 No.
Total
Steel 795.00 Kg. @ 35 27825.00 42574.00
20MM Crushed 3.00 Bras @ 4500 13500.00
Sand 5.00 Bras @ 7500 37500.00
193896.00
Cement 183.00 Bags No. @ 330 60390.00
Brick 6185.00 No. @ 6.00 37110.00
Gate 0.00 No. @ 5488.000 8818.00
Colouring 1.00 No. @ 2348.000 4487.00
Board 2500.00
Majuri Amount 80175 4225.00
Total Rs. 256500.00
Limiteed 256500.00 256500.00
Add GST 12% 30780.00 30780.00
Grand Total 287280.00 287280.00
Add Testing 7550.00 7550.00
Add Labour Cess 2565.00 2565.00
Royalty 1497.00 1497.00
Total Rs. 298892.00 298892.00
Sand
M-10 0 0.470 0 0.353 0.00 Bras
M-15 1.58 0.425 0.6715 0.353 0.24 Bras
Cement
M-10 0 4.400 0 0.00 Bags
M-15 1.58 7.000 11.06 11.00 Bags
Murum
0 0.32 0 0.353 0.00 Bras
Crusher Metal 20MM
M-10 0 0.94 0 0.353 0.00 Bras
M-20 41.42 0.85 35.207 0.353 12.43 Bras
Sand
M-10 0 0.470 0 0.353 0.00 Bras
M-20 41.42 0.425 17.6035 0.353 6.21 Bras
Cement
M-10 0 4.400 0 0.00 Bags
M-20 41.42 7.000 289.94 290.00 Bags
Total
80/60/40 MM Metal 0.00 Bras @ 0 0
Murum 0.00 Bras @ 0 0 0
Paver 0.00 Bras @ 0 0 0
20MM 12.43 Bras @ 4500 55926 259614
Sand 6.21 Bras @ 7500 46605
Cement 290.00 Bags No. @ 330 95700
Majuri Amount 61382 0
Add Royalty 0
45
1445.24444444444
65250 213585
[Link] @ Shirsala Double Coat
Materials Name Qty. As per Rate of Total Quantity Rate of Total Unit
M.B. Consumption Bras
1 2 3 4 5 6 7
0 0.32 0 0.353 0.00 Bras
Crusher Metal 20MM
M-10 10.76 0.94 10.1144 0.353 3.57 Bras
M-20 9.68 0.85 8.228 0.353 2.90 Bras
Sand
M-10 10.76 0.470 5.0572 0.353 1.79 Bras
M-20 9.68 0.425 4.114 0.353 1.45 Bras
Cement
M-10 10.76 4.400 47.344 47.00 Bags
M-20 9.68 7.000 67.76 68.00 Bags
Total
20MM 5.00 Bras @ 3500 17500 113000
Sand 3.00 Bras @ 5500 16500
Cement 115.00 Bags No. @ 350 40250
Majuri Amount 38750
Add Royalty 34000 0
89795
47480 62230
65036 65036
62230 47480
49795 264541 224541 159505
224541 175957 48584
Total
Steel Fabricated 0.00 Kg. @ 40 0.00 0.00
Majuri Amount 0.00
Steel 0.00 Kg. @ 45 0.00 0.00
[Link] 0.00 Sqm @ 825 0.00 0.00
Majuri Amount 0.00
80MM Metal 0.00 Bras @ 2500 0.00 0.00
Murum 0.00 Bras @ 1450 0.00 0.00
Shahbad 0.00 Bras @ 4200 0.00 0.00
20MM Crushed 0.10 Bras @ 5800 596.61
Sand 0.61 Bras @ 6850 4150.22
41126.00
Cement 14.00 Bags No. @ 420 5880.00
Brick 0.00 No. @ 11000.00
Majuri Amount 58463 38964.00
Royalty 0.00
Testing Charges 0.00 0.00
Total Rs. 80090.00 80090.00
Add GST 12% 9611.00 9611.00
Add Royalty 3084.00 3084.00
Total Rs. 92785.00 92785.00
Pipe Line @Shirsala
Materials Name Qty. As per Rate of Total Quantity Rate of Total Unit
M.B. Consumption Bras
1 2 3 4 5 6 7
Chamber
M-10 3.00 1.000 3 1 3.00 No.
Total
Pipe 13.00 No. @ 3200 41600.00 59735.00
Chamber 3.00 No. @ 2895 8685.00 17100.00
Majuri 28315.00 2150.00
Total Rs. 78985.00
Limiteed 78600.00 78600.00
Add GST 12% 9432.00 9432.00
Grand Total 88032.00 88032.00
Add Testing 0.00 0.00
Add Labour Cess 0.00 0.00
Royalty 0.00 0.00
Total Rs. 88032.00 88032.00
My 78850
Abhi 56300
0
Patil Harware se 30000
Total 165150
Then Expenditure 11000 sachiv
3000 mistri
1000 jcb work
2000 madan & other
10000 akky
5000 other
Total
396593.44 396849.00
396845
Total
Steel Fabricated 0.00 Kg. @ 60 0.00 0.00
Majuri Amount 0.00
Steel 0.00 Kg. @ 40 0.00 0.00
[Link] 0.00 Sqm @ 820 0.00 0.00
Majuri Amount 0.00
80MM Metal 12.40 Bras @ 2500 31000.00 63171.00
Murum 11.50 Bras @ 1450 16675.00 26276.00
Paver Block 25.20 Bras @ 7800 196560.00 309187.00
20MM Crushed 1.00 Bras @ 5800 5800.00
Sand 1.00 Bras @ 6850 6850.00
24043.00
Cement 15.00 Bags No. @ 350 5250.00
Brick 0.00 No. @ 6.00 0.00
Majuri Amount 160542 0.00
Board+Ex 3844.00 3844.00
Colour 33603.00 33603.00
Pipe Line 61683.00 61683.00
Total Rs. 521807.00 521807.00
Limiteed 490846.00 490846.00
Add GST 12% 58902.00 58902.00
Royalty 2281.00 2281.00
Total Rs. 552029.00 552029.00
490845.00
490845.00 0.00 12650
36450
490845
153650 kharch
15000 sachiv
5000 sarpanch
10000 raut madam 2871
107000 nitin bhau 2916
2000 216
1000 27909
5400 16158
299050 20471
191795 51947
95897.5 10262
9815
48860
50350
3225
245000
[Link] @Kukasa
Materials Name Qty. As per Rate of Total Quantity Rate of Total Unit
M.B. Consumption Bras
1 2 3 4 5 6 7
Steel Fabricated 0.53 1 0.53 53 530.00 Kg
Steel 0 1 0 0 0.00 Kg
Qtl
[Link] 64.8 1 64.8 1 64.80 Sqm
80MM Metal 0 1 0 0.353 0.00 Bras
Murum 0 1 0 0.353 0.00 Bras
Vetrified 46.39 1 46.39 10.76 4.99 Bras
Crusher Metal 20MM
M-10 4.52 0.9 4.068 0.353 1.44 Bras
M-20 0 0.85 0 0.353 0.00 Bras
Sand
M-10 4.52 0.470 2.1244 0.353 0.75 Bras
M-20 0.00 0.425 0 0.353 0.00 Bras
BB Masonary 1.89 0.320 0.6048 0.353 0.21 Bras
Plaster 57.49 0.015 0.86235 0.353 0.30 Bras
Vetrified 46.39 0.022 1.02058 0.353 0.36 Bras
Cement
M-10 4.52 4.400 19.888 20.00 Bags
M-20 0.00 7.000 0 0.00 Bags
BB Masonary 1.89 1.580 2.9862 3.00 Bags
Plaster 57.49 0.110 6.3239 6.00 Bags
Vetrified 46.39 0.200 9.278 9.00 Bags
226465
SR To PHC @ Chandas
Materials Name Qty. As per Rate of Total Quantity Rate of Total Unit
M.B. Consumption Bras
1 2 3 4 5 6 7
Steel 0.585 1 0.585 58.5 585.00 Kg
Qtl
[Link] 0 1 0 1 0.00 Sqm
80MM Metal 23.1 1 23.1 0.353 8.15 Bras
Murum 0 1 0 0.353 0.00 Bras
Paver Block 223.96 1 223.96 10.76 24.10 Bras
Crusher Metal 20MM
M-10 24.71 0.9 22.239 0.353 7.85 Bras
M-20 9.78 0.85 8.313 0.353 2.93 Bras
Sand
M-10 24.71 0.470 11.6137 0.353 4.10 Bras
M-20 9.78 0.425 4.1565 0.353 1.47 Bras
BB Masonary 10.15 0.320 3.248 0.353 1.15 Bras
Plaster 111 0.015 1.665 0.353 0.59 Bras
Cement
M-10 24.71 4.400 108.724 109.00 Bags
M-20 9.78 7.000 68.46 68.00 Bags
BB Masonary 10.15 1.580 16.037 16.00 Bags
Plaster 111.00 0.110 12.21 12.00 Bags
Cement 23800.00
Door+Window
Sand 11930.00
Metal 10775.00
Steel 35000.00
Majuri 98615.00
Brick 0.00
80MM Metal 0.00
180120.00
180120.00
[Link] @ Chandas
Materials Name Qty. As per Rate of Total Quantity Rate of Total Unit
M.B. Consumption Bras
1 2 3 4 5 6 7
Steel Fabricated 0.417 1 0.417 41.7 417.00 Kg
[Link] 112.13 1 112.13 1 112.13 Sqm
vetrified tiles 91.62 1 91.62 10.76 9.86 Bras
Crusher Metal 20MM
M-10 9.16 0.9 8.244 0.353 2.91 Bras
Sand
M-10 9.16 0.470 4.3052 0.353 1.52 Bras
BB Masonary 2.2 0.320 0.704 0.353 0.25 Bras
Plaster 18.9 0.015 0.2835 0.353 0.10 Bras
vetrified tiles 91.62 0.022 2.01564 0.353 0.71 Bras
Cement
M-10 9.16 4.400 40.304 40.00 Bags
BB Masonary 2.20 1.580 3.476 3.00 Bags
Plaster 18.90 0.110 2.079 2.00 Bags
vetrified tiles 91.62 0.135 12.3687 12.00 Bags
Brick 2.2 450.000 990 990.00 No.
Total
Steel Fabricated 417.00 Kg. @ 60 25020.00 38382.00
Majuri Amount 13362.00
[Link] 112.13 Sqm @ 550 61671.50 87125.00
Majuri Amount 25453.50
vetrified tiles 9.90 Bras @ 5200 51480.00 93142.00
20MM Crushed 2.91 Bras @ 4900 14259.65
Sand 2.58 Bras @ 6200 15995.03
83717.00
Cement 57.00 Bags No. @ 350 19950.00
Brick 990.00 No. @ 6.00 5940.00
Majuri Amount 78707 9473.00
Board+Ex 3225.00 3225.00
Colour 16412.00 16412.00
Door+Window 19802.00 19802.00
Total Rs. 351277.68 351278.00
Limiteed 348257.00 348257.00
Add GST 12% 41791.00 41791.00
Royalty 1128.00 1128.00
Total Rs. 391176.00 391176.00
tiles 51480.00
Cement 19950.00
Colour 16410.00 652990.00
Door+Window 19802.00
Sand 15995.00
Metal 14260.00
Steel 38385.00
[Link] 87125.00
Majuri 57575.00
Brick 5940.00
80MM Metal 0.00
326922
326922
SR To PHC @ Dongarkinhi
Materials Name Qty. As per Rate of Total Quantity Rate of Total Unit
M.B. Consumption Bras
1 2 3 4 5 6 7
Steel Fabricated 0 1 0 0 0.00 Kg
Steel 0 1 0 0 0.00 Kg
Qtl
[Link] 0 1 0 1 0.00 Sqm
80MM Metal 0 1 0 0.353 0.00 Bras
Murum 0 1 0 0.353 0.00 Bras
Paver Block 411.68 1 411.68 10.76 44.30 Bras
Crusher Metal 20MM
M-10 41.16 0.9 37.044 0.353 13.08 Bras
M-15 3.68 0.85 3.128 0.353 1.10 Bras
Sand
M-10 41.16 0.470 19.3452 0.353 6.83 Bras
M-15 3.68 0.425 1.564 0.353 0.55 Bras
BB Masonary 0 0.320 0 0.353 0.00 Bras
Plaster 0 0.015 0 0.353 0.00 Bras
Paver Block 0 0.022 0 0.353 0.00 Bras
Cement
M-10 41.16 4.400 181.104 181.00 Bags
M-15 3.68 7.000 25.76 26.00 Bags
BB Masonary 0.00 1.580 0 0.00 Bags
Plaster 0.00 0.110 0 0.00 Bags
Paver Block 0.00 0.000 0 0.00 Bags
Total
Steel Fabricated 0.00 Kg. @ 60 0.00 0.00
Majuri Amount 0.00
Steel 0.00 Kg. @ 50 0.00
[Link] 0.00 Sqm @ 820 0.00 0.00
Majuri Amount 0.00
80MM Metal 0.00 Bras @ 2500 0.00
Murum 0.00 Bras @ 1450 0.00
Paver Block 44.30 Bras @ 6800 301240.00 391674.00
20MM Crushed 15.00 Bras @ 5800 87000.00
Sand 8.00 Bras @ 6850 54800.00
300321.00
Cement 230.00 Bags No. @ 380 87400.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 161555 0.00
Board+Ex 3225.00 3225.00
Pipe Concrete 18380.00 18380.00
Door+Window 12434.00 12434.00
Total Rs. 726034.00 726034.00
Limiteed 707152.00 707152.00
Add GST 12% 84858.00 84858.00
Royalty 3318.00 3318.00
Total Rs. 795328.00 795328.00
Paver 241141.00
Cement 87400.00
Pipe 18380.00
Gate 12434.00
Sand 54800.00
Metal 87000.00
Majuri 161555.00
662710.00
662710 0.00
Tiles 132300.00
Cement 98050.00
Door+Window 49289.00
Sand 55800.00
Metal 72800.00
Murum 7685.00
Majuri 115098.00
Colouring 96634.00
Electrification 42818.00
Sanitory Fitting 130541.00
801015.00
801015.00 0.00
723170.00 423170.00
423170.00 423170.00
300000.00
723170.00
1040460.00
1040460.00 0.00 30.726617647
318656.06
318656.00
0.06
0.00
16000
10000
15000
8000
20000
84850
153850
5000
158850
Jamkhed Road
Materials Name Qty. As per Rate of Total Quantity Rate of Total Unit
M.B. Consumption Bras
1 2 3 4 5 6 7
Steel Fabricated 0 1 0 0 0.00 Kg
Steel 0 1 0 0 0.00 Kg
Qtl
[Link] 0 1 0 1 0.00 Sqm
80MM Metal 108.93 1 108.93 0.353 38.45 Bras
Murum 0 1 0 0.353 0.00 Bras
Paver Block 0 1 0 10.76 0.00 Bras
Crusher Metal 20MM
M-10 108.93 0.9 98.037 0.353 34.61 Bras
M-20 108.93 0.85 92.5905 0.353 32.68 Bras
Sand
M-10 108.93 0.470 51.1971 0.353 18.07 Bras
M-20 108.93 0.425 46.29525 0.353 16.34 Bras
BB Masonary 0 0.320 0 0.353 0.00 Bras
Plaster 0 0.015 0 0.353 0.00 Bras
Slab Flooring/tiles 0 0.022 0 0.353 0.00 Bras
Cement
M-10 108.93 4.400 479.292 479.00 Bags
M-20 108.93 7.000 762.51 763.00 Bags
BB Masonary 0.00 1.580 0 0.00 Bags
Plaster 0.00 0.110 0 0.00 Bags
Slab Flooring/tiles 0.00 0.200 0 0.00 Bags
Total
Steel Fabricated 0.00 Kg. @ 60 0.00 0.00
Majuri Amount 0.00
Steel 0.00 Kg. @ 50 0.00 0.00
[Link] 0.00 Sqm @ 820 0.00 0.00
Majuri Amount 0.00
80MM Metal 38.50 Bras @ 2500 96250.00 143946.00
Murum 0.00 Bras @ 1450 0.00 0.00
Paver Block 0.00 Bras @ 6800 0.00 0.00
Tiles 0.00 Bras @ 4900 0.00 0.00
20MM Crushed 68.00 Bras @ 5100 346800.00
Sand 35.00 Bras @ 6200 217000.00
1162888.00
Cement 1242.00 Bags No. @ 370 459540.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 194444.00 3975.00
Board+Ex 0.00 3225.00
Cement 481320.00
Door+Window 0.00
Sand 217000.00
Metal 346800.00
Brick 0.00
Majuri 194444.00
Colouring 0.00
Steel 0.00
80MM Metal 96250.00
1335814.00
453155.00 0.00
Providing Repairs To [Link] [Link]
Materials Name Qty. As per Rate of Total Quantity Rate of Total Unit
M.B. Consumption Bras
1 2 3 4 5 6 7
Steel 0.72 1 0.72 72 720.00 Kg
80MM Metal 5.74 1 5.74 0.353 2.03 Bras
Murum 9.56 1 9.56 0.353 3.37 Bras
Paver Block 76 1 76 10.76 8.18 Bras
Crusher Metal 20MM
M-10 2.87 0.9 2.583 0.353 0.91 Bras
M-20 9.98 0.85 8.483 0.353 2.99 Bras
Sand
M-10 2.87 0.470 1.3489 0.353 0.48 Bras
M-20 9.98 0.425 4.2415 0.353 1.50 Bras
BB Masonary 15.18 0.320 4.8576 0.353 1.71 Bras
Plaster 164.1 0.015 2.4615 0.353 0.87 Bras
Cement
M-10 2.87 4.400 12.628 13.00 Bags
M-20 9.98 7.000 69.86 70.00 Bags
BB Masonary 15.18 1.580 23.9844 24.00 Bags
Plaster 164.10 0.110 18.051 18.00 Bags
Brick 15.18 450.000 6831 6831.00 No.
Steel 720.00 Kg. @ 55 39600.00 51862.00
80MM Metal 2.00 Bras @ 2500 5000.00 10870.00
Murum 3.40 Bras @ 1450 4930.00 7362.00
20MM Crushed 5.00 Bras @ 4800 24000.00
Sand 6.00 Bras @ 5800 34800.00
334905.00
Cement 125.00 Bags No. @ 370 46250.00
Brick 6831.00 No. @ 8.00 54648.00
Majuri Amount 214657.00 12519.00
Colouring 6367.00 9551.00 15918.00
Total Rs. 433436.00 433436.00
Limiteed 432564.00 432564.00
Add GST 12% 51908.00 51908.00
Royalty 4386.00 4386.00
Test Report 5207.00 5207.00
Total Rs. 494065.00 494065.00
Tiles 0.00 0 0.00
Cement 46250.00 5550 51800.00 Transfer Amount 452684.00
Sand 34800.00 0 34800.00
20mmMetal 24000.00 0 24000.00
Paver 0.00 0 0.00
Majuri 98000.00 0 98000.00
Majuri Bandhkam 97500.00 0 97500.00
majuri Coloring 6367.00 0 6367.00
Colouring 9551.00 1146 10697.00
80MM Metal 5000.00 5000.00
Murum 4930.00 4930.00
Gitta+Murum Majuri 10997.00 10997.00
Brick 54648.00 54648.00
Steel 39600.00 4752 44352.00
Royalty 4386.00 0 4386.00
Test Report 5207.00 0 5207.00
441236.00 11448.00 452684.00 0.00
452684.00
Toilet Block
Materials Name Qty. As per Rate of Total Quantity Rate of Total Unit
M.B. Consumption Bras
1 2 3 4 5 6 7
Tiles 8400.00
Cement 54400.00
Sand 21399.34
20mmMetal 8546.00
Paver 6066.00
Majuri 93569.00
Colouring 3350.00
80MM Metal 10085.00
Door 19862.00
Sanitory Fitting 26500.00
Brick 42462.00
Steel 5361.00
300000.34
Paver 99500
Cement 99560.0 262x380
Brick 241000
Steel 99840.00
Colouring+Gate 59920.00
80 Metal 74910.00
Sand+Crusher 99950
20MM Metal 99765
Bandhkarm 99700
Bandhkarm 98500
Colouring Majuri 22000
Plaster Majuri 88950
Pave Majuri 57000
Febriocatin Labour 15000
Excavation Majuri 15000
RCC Work Majuri 98200
Pani Marne, Dekhrekh 15000
Other 9005
Total 1392800
0.00
Sand
M-10 40.8 0.470 19.176 0.353 6.77 Bras
M-20 40.8 0.425 17.34 0.353 6.12 Bras
Cement
M-10 40.8 4.400 179.52 180.00 Bags
M-20 40.8 7.000 285.6 286.00 Bags
Paver 0 1 0 10.76 0.00 Bras
Total
80/60/40 MM Metal 14.00 Bras @ 2500 35000 67903
Murum 2.00 Bras @ 0 0 0
Paver 0.00 Bras @ 0 0 0
20MM 26.00 Bras @ 5800 150800 605233
Sand 14.00 Bras @ 6950 97300
Cement 466.00 Bags No. @ 400 186400
Majuri Amount 220631 16995
Add Royalty 0
With GST
Sand 186400.00
Cement 247107.00
Metal 97300.00
Majuri 110666.00
80MM Metal 67903.00
709376.00
709376.00 0.00
SR To [Link] @ DUBALWEL
Materials Name Qty. As per Rate of Total Quantity Rate of Total Unit
M.B. Consumption Bras
1 2 3 4 5 6 7
M-10 7.20 0.9 6.48 0.353 2.29 Bras
M-20 0 0.85 0 0.353 0.00 Bras
Sand
M-10 7.20 0.470 3.384 0.353 1.19 Bras
M-20 0.00 0.425 0 0.353 0.00 Bras
Slab Flooring/tiles 72 0.022 1.584 0.353 0.56 Bras
Cement
M-10 7.20 4.400 31.68 32.00 Bags
M-20 0.00 7.000 0 0.00 Bags
Slab Flooring/tiles 72.00 0.200 14.4 14.00 Bags
Total
20MM Crushed 2.29 Bras @ 5600 12810.00
Sand 1.75 Bras @ 6200 10873.00
Cement 46.00 Bags No. @ 380 17480.00 104478.00
104478.00
Shahbad Tiles 14.00 Bras @ 2300 32200.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 97736 3024.00
Board+Ex 3225.00 3225.00
Sanitory Fitting 0.00 0.00
Door+Window+gate 22444.00 13466.00 22444.00
Electrification 0.00 0.00
Colouring 136547.00 81928.00 136547.00
WITH GST
Tiles 36064.00
Cement 19578.00
Gate 15082.00
Colouring 91759.00
Sand 12178.00
Metal 14347.00
Majuri Fixing 42000
Majuri coloring 44432
SR To [Link] @ AMKHEDA
Materials Name Qty. As per Rate of Total Quantity Rate of Total Unit
M.B. Consumption Bras
1 2 3 4 5 6 7
[Link] 0 1 0 1 0.00 Sqm
80MM Metal 27.73 1 27.73 0.353 9.79 Bras
Murum 0 1 0 0.353 0.00 Bras
Paver Block 227.3 1 227.3 10.76 24.46 Bras
Crusher Metal 20MM
M-10 0.00 0.9 0 0.353 0.00 Bras
M-20 1.6 0.85 1.36 0.353 0.48 Bras
Sand
M-10 0.00 0.470 0 0.353 0.00 Bras
M-20 1.60 0.425 0.68 0.353 0.24 Bras
BB Masonary 0 0.320 0 0.353 0.00 Bras
M-10 0.00 4.400 0 0.00 Bags
M-20 1.60 7.000 11.2 11.00 Bags
Total
80MM Metal 10.00 Bras @ 2400 24000.00 29094.00
Murum 0.00 Bras @ 1450 0.00 0.00
Paver Block 25.00 Bras @ 6800 170000.00 215174.00
20MM Crushed 1.00 Bras @ 5600 5600.00
Sand 1.00 Bras @ 6200 6200.00 11026.00
Cement 11.00 Bags No. @ 380 4180.00
Majuri Amount 45314 0.00
Board+Ex 3225.00 3225.00
WITH GST
Paver 190400.00
Cement 4682.00
Gate 0.00
Colouring 0.00
Sand 6944.00
Metal 6272.00
Majuri Paver 58702
& Other
SR To [Link] @ GUNJ
Materials Name Qty. As per Rate of Total Quantity Rate of Total Unit
M.B. Consumption Bras
1 2 3 4 5 6 7
Crusher Metal 20MM
M-10 6.94 0.9 6.246 0.353 2.20 Bras
M-20 0 0.85 0 0.353 0.00 Bras
Sand
M-10 6.94 0.470 3.2618 0.353 1.15 Bras
Slab Flooring/tiles 69.64 0.022 1.53208 0.353 0.54 Bras
Cement
M-10 6.94 4.400 30.536 31.00 Bags
Slab Flooring/tiles 69.64 0.200 13.928 14.00 Bags
WITH GST
Tiles 20608.00
Cement 19152.00
Door +Gate 7591.00
Colouring 98419.00
Sand 13888.00
Metal 15680.00
Majuri Bed & Farshi 42000
Majuri coloring 56222
Water Supply Arragengement And Other Work To PHC Sub Center @ Dubalwel
Materials Name Qty. As per Rate of Total Quantity Rate of Total Unit
M.B. Consumption Bras
1 2 3 4 5 6 7
Steel 1.09 1 1.09 109 1090.00 Kg
80MM Metal 6.41 1 6.41 0.353 2.26 Bras
Crusher Metal 20MM
M-10 16.08 0.9 14.472 0.353 5.11 Bras
M-20 23.19 0.85 19.7115 0.353 6.96 Bras
Sand
M-10 16.08 0.470 7.5576 0.353 2.67 Bras
M-20 23.19 0.425 9.85575 0.353 3.48 Bras
BB Masonary 22.73 0.320 7.2736 0.353 2.57 Bras
Plaster 224.28 0.150 33.642 0.353 11.88 Bras
Cement
M-10 16.08 4.400 70.752 71.00 Bags
M-20 23.19 7.000 162.33 162.00 Bags
BB Masonary 22.73 1.580 35.9134 36.00 Bags
Plaster 224.28 0.110 24.6708 25.00 Bags
Brick 22.73 450.000 10228.5 10229.00 No.
Steel 1090.00 Kg. @ 62 67580.00 78496.00
80MM Metal 2.30 Bras @ 2900 6670.00 11822.00
20MM Crushed 12.07 Bras @ 5800 69987.00
Sand 20.59 Bras @ 6850 141042.00
626000.00
Cement 294.00 Bags No. @ 395 116130.00
Brick 10229.00 No. @ 6.00 61374.00
Majuri Amount 319824 10388.00
Board+Ex 3225.00 3225.00
Borewell 104614.00 62768.00 104614.00
Colour 21755.00 13053.00 21755.00
Door+Window 13383.00 8030.00 13383.00
Total Rs. 869683.00 869683.00
Limiteed 869683.00 869683.00
Add GST 12% 104362.00 104362.00
Royalty 9697.00 9697.00
Test 5940.00 5940.00
Total Rs. 989682.00 989682.00
546390.00
WITH GST
Paver 195300.00 Paver 195300.00
Paver Majuri 45000.00 Paver Majuri 45000.00
6MM Dust 34091.00 6MM Dust 34091.00
Cement 13194.00 Cement+colour 20409.00
Gate 2998.00 Sand+Metal 14736.00
Colouring 4217.00 majuri+Tractor 82364
Sand 6944.00 391900.00
Metal 7792.00
Majuri 82364
Paver 99500
6MM Crusher 99500
Cement 99560.0
Brick 241000
Steel 50896.00
Colouring+Gate 43785.00
80 Metal 5522.00
Sand+Crusher 99950
20MM Metal 99765
Bandhkarm 99700
Bandhkarm 98500
Colouring Majuri 22000
Plaster Majuri 88950
Pave Majuri 57000
Febriocatin Labour 15000
Excavation Majuri 15000
RCC Work Majuri 98200
Pani Marne, Dekhrekh 15000
Other 9005
Total 1357833
-465578.00
Water Supply Arragengement And Other Work To PHC Sub Center @ KENWAD
Materials Name Qty. As per Rate of Total Quantity Rate of Total Unit
M.B. Consumption Bras
1 2 3 4 5 6 7
[Link] 0 1 0 1 0.00 Sqm
80MM Metal 3.51 1 3.51 0.353 1.24 Bras
Crusher Metal 20MM
M-10 4.39 0.9 3.951 0.353 1.39 Bras
M-20 4.87 0.85 4.1395 0.353 1.46 Bras
Sand
M-10 4.39 0.470 2.0633 0.353 0.73 Bras
M-20 4.87 0.425 2.06975 0.353 0.73 Bras
BB Masonary 6.5 0.320 2.08 0.353 0.73 Bras
Plaster 10.92 0.150 1.638 0.353 0.58 Bras
Cement
M-10 4.39 4.400 19.316 19.00 Bags
M-20 4.87 7.000 34.09 34.00 Bags
BB Masonary 6.50 1.580 10.27 10.00 Bags
Plaster 10.92 0.110 1.2012 1.00 Bags
Total
80MM Metal 2.00 Bras @ 2900 5800.00 6626.00
Murum 0.00 Bras @ 1450 0.00
Paver Block 0.00 Bras @ 6800 0.00 0.00
20MM Crushed 3.00 Bras @ 5800 17400.00
Sand 4.00 Bras @ 6850 27400.00
114838.00
Cement 64.00 Bags No. @ 395 25280.00
Brick 2925.00 No. @ 6.00 17550.00
Majuri Amount 194176 11981.00
Board+Ex 0.00 0.00
Borewell 156851.00 78426.00 156851.00
Sanitory Fitting 151473.00 75737.00 151473.00
Colour 0.00 0.00 0.00
Door+Window 0.00 0.00 0.00
Total Rs. 441769.00 441769.00
Limiteed 439587.00 439587.00
Add GST 12% 52750.00 52750.00
Royalty 7642.00 7642.00
Test 0.00 0.00
Total Rs. 499979.00 499979.00
Total
20MM Crushed 15.00 Bras @ 5600 84000.00
Sand 8.00 Bras @ 6800 54400.00
Cement 346.00 Bags No. @ 360 124560.00 360068.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 97108 0.00
WITH GST
Tiles 0.00
Cement Ultratek 71750.00
Cement Ambhuja 66690.00
Colouring 0.00
Sand 61200.00
Metal 96420.00
Majuri 97434
0
WITH GST
245545.00
Brick 60547.00 Bandhkarm 87500
Majuri
WITH GST
1065543.00
Cement 386445.00 Majuri 266210
Total
Steel Fabricated 2519.00 Kg. @ 60 151140.00 259301.00
Majuri Amount 108161.00
Steel 750.00 Kg. @ 60 45000.00 51870.00
[Link] 145.00 Sqm @ 820 118900.00 164372.00
Majuri Amount 45472.00
80MM Metal 7.00 Bras @ 2500 17500.00 36379.00
Murum 19.00 Bras @ 1450 27550.00 39766.00
Vetrified Tiles 14.00 Bras @ 4200 58800.00 0.00
20MM Crushed 7.00 Bras @ 5800 40600.00
Sand 5.00 Bras @ 6850 34250.00
256815.00
Cement 145.00 Bags No. @ 350 50750.00
Brick 2171.00 No. @ 6.00 13026.00
Majuri Amount 105449 8095.00
Board 0.00 0.00
Colour 0.00 0.00
Total Rs. 816598 816598.00
Limiteed 864737.00 864737.00
Add GST 12% 103768.00 103768.00
Royalty 18236.00 18236.00
Test 7102.00 7102.00
Total Rs. 993843.00 993843.00
239068.00
Cement 38360.00 Sheet 118900
80MM Metal 17500.00 Fabrication 151140
Brick 13026.00 Majuri fab 108161
Sand Natural/Crush 38360.00 All Majuri 300910
Tiles 58800.00
Metal Gitta 45472.00
Murum 27550.00
WITH GST
Cement 404746.00
0.00 287300.00
287300.00 423170.00
-287300.00
0.00
Total
80MM Metal 150.00 Bras @ 2100 315000.00 394262.00
Murum 155.00 Bras @ 1275 197625.00 237479.00
Paver Block 0.00 Bras @ 6800 0.00 0.00
20MM Crushed 17.00 Bras @ 5800 98600.00
Sand 9.00 Bras @ 6700 60300.00
Cement 343.00 Bags No. @ 380 130340.00 365664.00
Tiles 0.00 Brass @ 4500 0.00
Brick 0.00 No. @ 5.50 0.00
Majuri Amount 289240.00 369708 165754.00
Pipe 42069.00 33655.00 42069.00
Total Rs. 1205228.00 1205228.00
Limiteed 1201013.00 1201013.00
Add GST 12% 144122.00 144122.00
Royalty 127953.00 127953.00
Test 11247.00 11247.00
Total Rs. 1484335.00 1484335.00
WITH GST
874268.00
Cement 145981.00 Majuri 78500 Gitta Fodane+Pasarvine
Total
20MM Crushed 9.50 Bras @ 5600 53213.00
Sand 4.86 Bras @ 6800 33067.00
Cement 175.00 Bags No. @ 360 63000.00 222834.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 73554 0.00
WITH GST
Cement 63000.00
Sand 33067.00
Metal 53213.00
Majuri 99835
Royalty 5897.00
Test 4830.00
Total
20MM Crushed 3.22 Bras @ 5600 18035.00
Sand 1.65 Bras @ 6800 11222.00
Cement 58.00 Bags No. @ 360 20880.00 74706.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 24569 0.00
Royalty 2052.00
Test 3450.00
Total
20MM Crushed 9.30 Bras @ 5600 52099.00
Sand 4.76 Bras @ 6800 32354.00
Cement 171.00 Bags No. @ 360 61560.00 219178.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 76390 3225.00
WITH GST
Cement 61560.00
Sand 32354.00
Metal 52099.00
Majuri 93282
Royalty 5704.00
Test 4830.00
Total
Steel 850.00 Kg. @ 75 63750.00 76629.00
Murum 0.00 Bras @ 1450 0.00 0.00
20MM Crushed 3.00 Bras @ 4800 14400.00
Sand 4.00 Bras @ 6800 27200.00
242680.00
Cement 122.00 Bags No. @ 385 46970.00
Brick 2639.00 No. @ 7.00 18473.00
WC Sheet 1.00 No. @ 0.000 0.00 6374.00
Shahbad 0.50 Bras @ 44188.000 22094.00 44188.00
Paver 0.00 Bras @ 750.000 0.00 0.00
Door @ 0.000 0.00 0.00
Pipe @ 6749.000 6749.00 6749.00
Colouring 1353.00 13382.00
Majuri Amount 202252 13239.00
Total Rs. 403241.00 403241.00
Limiteed 387710.00 387710.00
Add GST 12% 46525.00 46525.00
Royalty 2374.00 2374.00
Test 6450.00 6450.00
Total Rs. 443059.00 443059.00
WITH GST
124046.00
Cement 46970.00 Brick/Vit 18473
Crusher/Sand 27200.00 Steel 63750
Tiles 22094.00 Sanitory 13123
Colouring Majuri RCC 38900
Colouring 13382.00 Majuri 88954
Bandhkar+Plast
er+Slab
Flooring+Tiles
Murum
Tiles 6630
Cement 48400
Sand 10733
20mmMetal 3944
Paver 0
Majuri 61218
Colouring 3350
80MM rubble 5800
Door 17246
Sanitory Fitting 16450
Brick 22729
Steel 3500
200000
Construction of Road From Bhaurao Thakare Towards PHC Center Road [Link] N.K.
Materials Name Qty. As per Rate of Total Quantity Rate of Total Unit
M.B. Consumption Bras
1 2 3 4 5 6 7
80MM Metal 16.61 1 16.61 0.353 5.86 Bras
Murum 2.4915 1 2.4915 0.353 0.88 Bras
Crusher Metal 20MM
M-10 16.61 0.9 14.949 0.353 5.28 Bras
M-20 12.15 0.85 10.3275 0.353 3.65 Bras
Sand
M-10 14.06 0.470 6.6082 0.353 2.33 Bras
M-20 40.13 0.425 17.05525 0.353 6.02 Bras
Cement
M-10 14.06 4.400 61.864 62.00 Bags
M-20 40.13 6.000 240.78 241.00 Bags
Total
80MM Metal 7.00 Bras @ 2100 14700.00 29398.00
Murum 0.00 Bras @ 1275 0.00
Paver Block 0.00 Bras @ 6800 0.00 0.00
20MM Crushed 8.00 Bras @ 5350 42800.00
Sand 8.00 Bras @ 6400 51200.00
Cement 288.00 Bags No. @ 345 99360.00 212459.00
Tiles 0.00 Brass @ 4500 0.00
Brick 0.00 No. @ 5.50 0.00
Majuri Amount 193360.00 44098 10301.00
Pipe
Total Rs. 252158.00 252158.00
Limiteed 250008.00 250008.00
Add GST 12% 30001.00 30001.00
Royalty 8526.00 8526.00
Test 3579.00 3579.00
Total Rs. 292114.00 292114.00
WITH GST
212851.00
Cement 99360.00 Majuri 22100 Gitta Fodane+Pasarvine
Total
80MM Metal 6.00 Bras @ 2100 12600.00 28212.00
Murum 0.00 Bras @ 1275 0.00
Paver Block 0.00 Bras @ 6800 0.00 0.00
20MM Crushed 8.00 Bras @ 5350 42800.00
Sand 8.50 Bras @ 6400 54400.00
Cement 265.00 Bags No. @ 345 91425.00 200589.00
Tiles 0.00 Brass @ 4500 0.00
Brick 0.00 No. @ 5.50 0.00
Majuri Amount 188625.00 37882 10306.00
Pipe
Total Rs. 239107.00 239107.00
Limiteed 221698.00 221698.00
Add GST 12% 26604.00 26604.00
Royalty 7864.00 7864.00
Test 3579.00 3579.00
Total Rs. 259745.00 259745.00
WITH GST
204631.00
Cement 93425.00 Majuri 14500 Gitta Fodane+Pasarvine
Brick 12936.00
Cement 18648.00
Steel 13776.00
Sand 20832.00
Metal 9408.00 690 70 48300
Colouring 3752.00 7 -51371.1
Majuri 48300.00
Majuri Door+sanitory 5074.00
Sanitory 29457.00
Royalty 2550.00
Test 3555.00
2% GST 2949.00 171237.00
TOTAL 171237.00 171237.00 0.00
Check Amount
Brick 13544.00
Cement 16576.00
Steel 15483.00
Sand 21832.00
Metal 10408.00 690 66 45540
Colouring 11 -45342.6
Majuri 45540.00
Majuri Door+sanitory 7229.00
Sanitory 13822.00
Royalty 2702.00
Test 1380.00
2% GST 2626.00 151142.00
TOTAL 151142.00 151142.00 0.00
Check Amount
Cement 28594.00
Sand 13888.00
Metal 20817.00 690 56 38640
Colouring 7 -33393.9
Majuri 38640.00
Majuri Door+sanitory 0.00
Sanitory 0.00
Royalty 2690.00
Test 4830.00
2% GST 1854.00 111313.00
TOTAL 111313.00 111313.00 0.00
Check Amount
Total
20MM Crushed 2.50 Bras @ 4200 10500.00
Sand 2.00 Bras @ 6200 12400.00
Cement 55.00 Bags No. @ 370 20350.00 71771.00
Tiles 0.00 Brass @ 3200 0.00
Brick 0.00 No. @ 7.00 0.00
Sanitory 0.00 No. @ 0.000 0.00 0.00
Door+ 0.00 No. @ 0.000 0.00 0.00
Colouring 3350.00 0.00
Majuri Amount 26946 3225.00
Total Rs. 74996.00 74996.00
12% GST Limiteed 73105.00 73105.00
8773 Add GST 10% 7311.00 8773.00
1462.00 Royalty 2168.00 2168.00
7311.00 Test 4830.00 4830.00
Total Rs. 87414.00 88876.00
Cement 22792.00
Sand 13888.00
Metal 10616.00 690 48 33120
Colouring 8 -26662.8
Majuri 33120.00
Majuri Door+sanitory 0.00 46.342028986
Sanitory 0.00
Royalty 2168.00
Test 4830.00
2% GST 1462.00 88876.00
TOTAL 88876.00 88876.00 0.00
Check Amount
Cement 4973.00
Sand 3472.00
Metal 4784.00 670 66 44220
Paver 82184.00 11 -45613.2
Majuri 44220.00
Metal 5262.00 46.342028986
Sanitory 0.00
Royalty 1330.00
Test 3185.00
2% GST 2635.00 152044.00
TOTAL 152045.00 152045.00 0.00
Check Amount
tiles 12768.00
Cement 12432.00
Steel 0.00
Sand 16666.00
Metal 4704.00 690 50 34500
Colouring 24017.00 5 -33318.6
Majuri 34500.00
Majuri Door+sanitory
Sanitory 0.00
Royalty 1200.00
Test 2865.00
2% GST 1911.00 111062.00
TOTAL 111063.00 111063.00 0.00
Check Amount
Total
Steel 0.00 Kg. @ 60 0.00 0.00
Rubble 0.00 Bras @ 1450 0.00 0.00
Murum 0.00 Bras @ 1450 0.00 0.00
20MM Crushed 0.50 Bras @ 4200 2100.00
Sand 2.00 Bras @ 6200 12400.00
Cement 15.00 Bags No. @ 370 5550.00 30225.00
Tiles 0.50 Brass @ 3800 1900.00
Brick 0.00 No. @ 7.00 0.00
Sanitory 0.00 No. @ 0.000 7598.00 7598.00
Door+ 0.00 No. @ 0.000 0.00 0.00
Colouring 611.000 1426.00 2037.00
Majuri Amount 8886 0.00
Total Rs. 39860.00 39860.00
12% GST Limiteed 39860.00 39860.00
4783 Add GST 10% 3986.00 4783.00
797.00 Royalty 844.00 844.00
3986.00 Test 2805.00 2805.00
Total Rs. 47495.00 48353.00
tiles 2128.00
Cement 6216.00
Steel 0.00
Sand 13888.00
Metal 2352.00 690 20 13800
Colouring 1426.00 4 -14505.9
Majuri 13800.00
Majuri Door+sanitory
Sanitory 4036.00
Royalty 844.00
Test 2805.00
2% GST 797.00 48353.00
TOTAL 48292.00 48292.00 0.00
Check Amount
tiles 4256.00
Cement 4144.00
Steel 0.00
Sand 6944.00
Metal 2352.00 690 25 17250
Colouring 0.00 5 -16134.3
Majuri 17250.00
Majuri Door+sanitory
Sanitory 14280.00
Royalty 795.00
Test 2865.00
2% GST 895.00 53781.00
TOTAL 53781.00 53781.00 0.00
Check Amount
Total
Steel Fabricated 0.00 Kg. @ 60 0.00 0.00
Majuri Amount 0.00
Steel 286.00 Kg. @ 60 17160.00 20066.00
80MM Metal 2.00 Bras @ 2500 5000.00 6323.00
20MM Crushed 4.00 Bras @ 5600 22400.00
Sand 2.03 Bras @ 6800 13809.00
Cement 85.00 Bags No. @ 360 30600.00 126703.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 72546 8423.00
187203.00
TOTAL 187203.00 187203.00 0.00
Check Amount
[Link] [Link] Rs.2.00
Materials Name Qty. As per Rate of Total Quantity Rate of Total Unit
M.B. Consumption Bras
1 2 3 4 5 6 7
Steel 0.326 1 0.326 32.6 326.00 Kg
80MM Metal 5.52 1 5.52 0.353 1.95 Bras
Murum 0 1 0 0.353 0.00 Bras
Paver Block 0 1 0 10.76 0.00 Bras
Crusher Metal 20MM
M-10 3.44 0.9 3.096 0.353 1.09 Bras
M-20 10.36 0.85 8.806 0.353 3.11 Bras
Sand
M-10 3.44 0.470 1.6168 0.353 0.57 Bras
M-20 10.36 0.425 4.403 0.353 1.55 Bras
Cement
M-10 3.44 4.400 15.136 15.00 Bags
M-20 10.36 7.000 72.52 73.00 Bags
Total
Steel Fabricated 0.00 Kg. @ 60 0.00 0.00
Majuri Amount 0.00
Steel 326.00 Kg. @ 60 19560.00 23586.00
80MM Metal 2.50 Bras @ 2500 6250.00 9065.00
20MM Crushed 4.50 Bras @ 5600 25200.00
Sand 2.50 Bras @ 6800 17000.00
Cement 88.00 Bags No. @ 360 31680.00 130195.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 71858 8702.00
199041.00
TOTAL 199041.00 199041.00 0.00
Check Amount
Total
20MM Crushed 0.00 Bras @ 5600 0.00
Sand 3.00 Bras @ 7200 21600.00
Cement 25.00 Bags No. @ 375 9375.00 57101.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 23101 3225.00
68000.00
TOTAL 68000.00 68000.00 0.00
Check Amount
SR Urinal & Toilet Blcok @Wakad Rs.32000/-
Materials Name Qty. As per Rate of Total Quantity Rate of Total Unit
M.B. Consumption Bras
1 2 3 4 5 6 7
Crusher Metal 20MM
M-10 0.17 0.94 0.1598 0.353 0.06 Bras
M-20 0.00 0.85 0 0.353 0.00 Bras
Sand
M-10 0.17 0.470 0.0799 0.353 0.03 Bras
Tiles 7.46 0.022 0.16412 0.353 0.06 Bras
Cement
M-10 0.17 4.400 0.748 1.00 Bags
Tiles 7.46 0.135 1.0071 1.00 Bags
Total
Steel 0.00 Kg. @ 60 0.00 0.00
Rubble 0.00 Bras @ 1450 0.00 0.00
Murum 0.00 Bras @ 1450 0.00 0.00
20MM Crushed 0.00 Bras @ 4200 0.00
Sand 0.50 Bras @ 6200 3100.00
Cement 3.00 Bags No. @ 370 1110.00 10356.00
Tiles 1.00 Brass @ 3250 3250.00
Brick 0.00 No. @ 7.00 0.00
Sanitory 0.00 No. @ 0.000 18725.00 18725.00
Door+ 0.00 No. @ 0.000 0.00 0.00
Colouring 0.000 0.00 0.00
Majuri Amount 2896 0.00
Total Rs. 29081.00 29081.00
12% GST Limiteed 28455.00 28455.00
3415 Add GST 10% 2846.00 3415.00
569.00 Royalty 88.00 88.00
2846.00 Test 0.00 0.00
Total Rs. 31389.00 31958.00
tiles 3640.00
Cement 1243.00
Steel 0.00
Sand 3472.00
Metal 0.00 690 9 6210
Colouring 0.00 3 -9587.4
Majuri 6210.00
Majuri Door+sanitory
Sanitory 16736.00
Royalty 88.00
Test 0.00
2% GST 569.00 31958.00
TOTAL 31958.00 31958.00 0.00
Check Amount
Total
20MM Crushed 0.30 Bras @ 4200 1260.00
Sand 0.80 Bras @ 6200 4960.00
Cement 7.00 Bags No. @ 370 2590.00 26391.00
Tiles 2.00 Brass @ 3200 6400.00
Brick 0.00 No. @ 7.00 0.00
Sanitory 0.00 No. @ 0.000 6602.00 6602.00
Door+ 0.00 No. @ 0.000 20007.00 20007.00
Colouring 0.000 0.00 0.00
Majuri Amount 14406 3225.00
Total Rs. 56225.00 56225.00
12% GST Limiteed 56225.00 56225.00
6747 Add GST 10% 5623.00 6747.00
1124.00 Royalty 677.00 677.00
5623.00 Test 650.00 650.00
Total Rs. 63175.00 64299.00
tiles 7168.00
Cement 2901.00
Steel 0.00
Sand 5555.00
Metal 1411.00 690 30 20700
Colouring 0.00 5 -19289.7
Majuri 20700.00
Majuri Door+sanitory
Sanitory+Door 24113.00
Royalty 677.00
Test 650.00
2% GST 1124.00 64299.00
TOTAL 64299.00 64299.00 0.00
Check Amount
Total
20MM Crushed 7.50 Bras @ 4200 31500.00
Sand 4.00 Bras @ 6200 24800.00
Cement 130.00 Bags No. @ 375 48750.00 168027.00
Tiles 0.00 Brass @ 3200 0.00
Brick 0.00 No. @ 7.00 0.00
Sanitory 0.00 No. @ 0.000 0.00 0.00
Door+ 0.00 No. @ 0.000 0.00 0.00
Colouring 3350.00 0.00
Majuri Amount 58177 0.00
Total Rs. 168027.00 168027.00
12% GST Limiteed 167039.00 167039.00
20045 Add GST 10% 16704.00 20045.00
3341.00 Royalty 4963.00 4963.00
16704.00 Test 4830.00 4830.00
Total Rs. 193536.00 196876.00
Cement 54600.00
Sand 27776.00 Concrete
Metal 34136.00 700 84 58800
Colouring 7 -59062.8
Majuri Concrete 58800.00
Majuri Pani Marne 8431.00 Pani Marne 46.342028986
Sanitory 0.00 650 12 7800
Royalty 4963.00 4
Test 4830.00
2% GST 3341.00 196876.00
TOTAL 196877.00 196877.00 0.00
Check Amount
Total
20MM Crushed 7.50 Bras @ 4200 31500.00
Sand 4.00 Bras @ 6200 24800.00
Cement 115.00 Bags No. @ 375 43125.00 148577.00
Tiles 0.00 Brass @ 3200 0.00
Brick 0.00 No. @ 7.00 0.00
Sanitory 0.00 No. @ 0.000 0.00 0.00
Door+ 0.00 No. @ 0.000 0.00 0.00
Colouring 3350.00 0.00
Majuri Amount 47577 3225.00
Total Rs. 151802.00 151802.00
12% GST Limiteed 146980.00 146980.00
17638 Add GST 10% 14698.00 17638.00
2940.00 Royalty 4198.00 4198.00
14698.00 Test 4830.00 4830.00
Total Rs. 170706.00 173646.00
Cement 48300.00
Sand 27776.00 Concrete
Metal 34136.00 700 70 49000
Colouring 7 -52093.8
Majuri Concrete 49000.00
Majuri Pani Marne 2466.00 Pani Marne 46.342028986
Sanitory 0.00 650 4 2600
Royalty 4198.00 2
Test 4830.00
2% GST 2940.00 173646.00
TOTAL 173646.00 173646.00 0.00
Check Amount
Cement 1110.00
Sand 1240.00
Metal 941.00 670 28 18760
Paver 43227.00 7 -20912.7
Majuri 18760.00
Metal 0.00 46.342028986
Sanitory 0.00
Royalty 59.00
Test 3185.00 27.611940299
2% GST 1187.00 69709.00
TOTAL 69709.00 69709.00 0.00
Check Amount
Total
Steel 675.00 Kg. @ 55 37125.00 48610.00
Murum 11.00 Bras @ 1600 17600.00 22824.00
20MM Crushed 3.00 Bras @ 5200 15600.00
Sand 4.00 Bras @ 7200 28800.00
232057.00
Cement 91.00 Bags No. @ 390 35490.00
Brick 9009.00 No. @ 7.00 63063.00
Door @ 41321.000 18594.00 41321.00
Majuri Amount 137511 8971.00
Total Rs. 353783.00 353783.00
Limiteed 353783.00 353783.00
Add GST 12% 42454.00 42454.00
Royalty 6678.00 6678.00
Test 0.00 0.00
Total Rs. 402915.00 402915.00
146912
WITH GST
109189.00 70631.00
Cement 39749.00 Brick/Vit 70631
Crusher/Sand 32256.00 Steel 41580 41580.00
Tiles Sanitory 0
Metal 17472.00 Majuri 139425
Murum 19712.00 0
Brick 14205.00
Cement 16520.00
Steel 12277.00
Sand 16992.00
Metal 5570.00 680 64 43520
Colouring 6144.00 8 42300.3
Majuri 43520.00
Majuri Door+sanitory 0.00
Sanitory 0.00
Royalty 778.00
Test 2865.00 115228.00
2% GST 1987.00
TOTAL 120858.00 120858.00 0.00
Check Amount
Brick 10974.00
Cement 11800.00
Steel 9228.00
Sand 16992.00
Metal 4553.00 680 56 38080
Colouring 2525.00 7 34731.9
Majuri 38080.00
Majuri Door+sanitory 0.00
Sanitory 0.00
Royalty 594.00
Test 2865.00 94152.00
2% GST 1623.00
TOTAL 99234.00 99234.00 0.00
Check Amount
Cement 1760.00
Sand 4248.00
Metal 1770.00 670 36 24120
Paver 54141.00 6 -27254.4
Majuri 24120.00
Metal 0.00 46.342028986
Sanitory 0.00
Royalty 73.00
Test 3185.00
2% GST 1552.00 86039.00
TOTAL 90849.00 90849.00 0.00
Check Amount
Total
20MM Crushed 10.00 Bras @ 5900 59000.00
Sand 5.50 Bras @ 7800 42900.00
Cement 175.00 Bags No. @ 400 70000.00 228201.00
Tiles 0.00 Brass @ 3200 0.00
Brick 0.00 No. @ 7.00 0.00
Sanitory 0.00 No. @ 0.000 0.00 0.00
Door+ 0.00 No. @ 0.000 0.00 0.00
Colouring 0.00 0.00
Majuri Amount 59131 4280.00
Total Rs. 232481.00 232481.00
18% GST Limiteed 232481.00 232481.00
4650 Add GST 18% 41847.00 41847.00
Royalty 6480.00 6480.00
Test 4140.00 4140.00
Total Rs. 284948.00 284948.00
Cement 82236.00
Sand 50622.00 Concrete 112
Metal 69620.00 700 96 67200
Colouring 8 -85484.4
Majuri Concrete 67200.00
Majuri Pani Marne 0.00 Pani Marne
Sanitory 0.00 650 4 0
Royalty 6480.00 2
Test 4140.00
2% GST 4650.00 269678.00
TOTAL 284948.00 284948.00 0.00
Check Amount
Total
20MM Crushed 2.00 Bras @ 5900 11800.00
Sand 1.50 Bras @ 7800 11700.00
Cement 35.00 Bags No. @ 400 14000.00 49955.00
Tiles 0.00 Brass @ 3200 0.00
Brick 0.00 No. @ 7.00 0.00
Sanitory 0.00 No. @ 0.000 0.00 0.00
Door+ 0.00 No. @ 0.000 0.00 0.00
Colouring 0.00 0.00
Majuri Amount 15285 4280.00
Total Rs. 54235.00 54235.00
18% GST Limiteed 54235.00 54235.00
1085 Add GST 18% 9762.00 9762.00
Royalty 1502.00 1502.00
Test 1380.00 1380.00
Total Rs. 66879.00 66879.00
Cement 16020.00
Sand 13206.00 Concrete 112
Metal 12686.00 700 30 21000
Colouring 3 -20063.7
Majuri Concrete 21000.00
Majuri Pani Marne 0.00 Pani Marne
Sanitory 0.00 650 4 0
Royalty 1502.00 2
Test 1380.00
2% GST 1085.00 62912.00
TOTAL 66879.00 66879.00 0.00
Check Amount
Total
20MM Crushed 8.50 Bras @ 5900 50150.00
Sand 4.50 Bras @ 7800 35100.00
Cement 175.00 Bags No. @ 400 70000.00 215803.00
Tiles 0.00 Brass @ 3200 0.00
Brick 0.00 No. @ 7.00 0.00
Sanitory 0.00 No. @ 0.000 0.00 0.00
Door+ 0.00 No. @ 0.000 0.00 0.00
Colouring 0.00 0.00
Majuri Amount 63383 4280.00
Total Rs. 220083.00 220083.00
18% GST Limiteed 220083.00 220083.00
4402 Add GST 18% 39615.00 39615.00
Royalty 4521.00 4521.00
Test 2760.00 2760.00
Total Rs. 266979.00 266979.00
Cement 81101.00
Sand 40418.00 Concrete 112
Metal 58177.00 700 108 75600
Colouring 9 -80093.7
Majuri Concrete 75600.00
Majuri Pani Marne 0.00 Pani Marne
Sanitory 0.00 650 4 0
Royalty 4521.00 2
Test 2760.00
2% GST 4402.00 255296.00
TOTAL 266979.00 266979.00 0.00
Check Amount
Total
Steel Fabricated 0.00 Kg. @ 60 0.00 0.00
0.00
Majuri Amount 0.00
Steel 650.00 Kg. @ 60 39000.00 26965.00
80MM Metal 0.50 Bras @ 2500 1250.00 1400.00
20MM Crushed 3.50 Bras @ 5600 19600.00
Sand 2.00 Bras @ 6800 13600.00
Cement 71.00 Bags No. @ 360 25560.00 104716.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 39226 5155.00
Total
Steel Fabricated 0.00 Kg. @ 60 0.00 0.00
Majuri Amount 0.00
Steel 79.00 Kg. @ 68 5372.00 7036.00
80MM Metal 0.00 Bras @ 2500 0.00 0.00
20MM Crushed 2.00 Bras @ 5600 11200.00
Sand 1.50 Bras @ 6800 10200.00
Cement 45.00 Bags No. @ 365 16425.00 63943.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 35848 8066.00
Total
Steel Fabricated 0.00 Kg. @ 60 0.00 0.00
Majuri Amount 0.00
Steel 357.00 Kg. @ 68 24276.00 31737.00
80MM Metal 2.00 Bras @ 2500 5000.00 9171.00
20MM Crushed 2.50 Bras @ 5600 14000.00
Sand 2.75 Bras @ 6800 18700.00
Cement 83.00 Bags No. @ 365 30295.00 114680.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 71125 7808.00
Brick 27727.00
Cement 10768.00
Steel 2124.00
Sand 12036.00
Metal 3304.00 690 72 49680
Colouring 12 -43739.4
Majuri 49680.00
Majuri Door+sanitory 31805.00
Sanitory
Royalty 1050.00
Test 7300.00
2% GST 2330.00 145798.00
TOTAL 148124.00 148124.00 0.00
Check Amount
Total
Steel Fabricated 0.00 Kg. @ 60 0.00 0.00
Majuri Amount 0.00
Steel 17.00 Kg. @ 68 1156.00 1522.00
80MM Metal 1.00 Bras @ 2500 2500.00 2883.00
20MM Crushed 1.50 Bras @ 5600 8400.00
Sand 1.00 Bras @ 6800 6800.00
Cement 26.00 Bags No. @ 365 9490.00 40433.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 18108 1616.00
Brick 31410.00
Cement 19797.00
Steel 3717.09
Sand 18134.00
Metal 7619.00 690 72 49680
Colouring 12 -46210.2
Majuri 49680.00
Majuri Door+sanitory 15457.00
Sanitory
Royalty 1581.00 0.00 149939.09
Test 4125.00 4095.00
2% GST 2514.00 154034.00 154034.09
TOTAL 154034.00 154034.00 0.00
Check Amount
Brick 21477.00
Cement 22240.00
Steel 23745.00
Sand 33984.00
Metal 10443.00 695 125 86875
Colouring 6827.00 12 74830
Majuri 86875.00
Majuri Door+sanitory
Sanitory 0.00
Royalty 1904.00 208351.00
Test 2760.00 205591.00 5449.00
2% GST 3545.00 213800.00
TOTAL 213800.00 213800.00 0.00 414126.09
Check Amount 11959.00
426085.09
Total
Steel Fabricated 0.00 Kg. @ 60 0.00 0.00
Majuri Amount 0.00
Steel 149.00 Kg. @ 62 9238.00 10420.00
20MM Crushed 3.00 Bras @ 5600 16800.00
Sand 1.50 Bras @ 6800 10200.00
Cement 36.00 Bags No. @ 365 13140.00 54459.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 21600 6099.00
Cement 15505.00
Steel 10901.00
Sand 11326.00
Metal 16800.00 695 40 27800
Gitta+Murum 0.00 8 26424
Majuri Concrete 27800.00
Majuri Steel
0.00
Royalty 1038.00
Test 3290.00 85622.00
2% GST 1420.00 2458.00
88080.00
88080.00
TOTAL 88080.00 88080.00 0.00
Check Amount
Total 1.08
Steel 1080.00 Kg. @ 55 59400.00 77632.00
Murum 0.00 Bras @ 1600 0.00 0.00
20MM Crushed 9.00 Bras @ 5200 46800.00
Sand 8.00 Bras @ 7200 57600.00
285798.00
Cement 180.00 Bags No. @ 390 70200.00
Brick 1400.00 No. @ 7.00 9800.00
Sanitory fitting @ 19429.000 8743.00 19429.00
Tiles 4950.00 16504.00
Majuri Amount 142935 1065.00
Total Rs. 400428.00 400428.00
Limiteed 377117.00 377117.00
Add GST 18% 67881.00 67881.00
Royalty 1982.00 1982.00
Test 0.00 0.00
Total Rs. 446980.00 446980.00
146912
WITH GST
179550.00 10976.00
Cement 70200.00 Brick/Vit 9800
Crusher/Sand 57600.00 Steel 59400 66528.00
Tiles 4950.00 Sanitory 8743
Metal 46800.00 Majuri 87143
Murum 0.00 0
Providing Repair To Toilet Block For [Link] At. Malegaon N.K. 114900/-
Materials Name Qty. As per Rate of Total Quantity Rate of Total Unit
M.B. Consumption Bras
1 2 3 4 5 6 7
Steel 0.598 1 0.598 59.8 598.00 Kg
80MM Metal 4.03 1 4.03 0.353 1.42 Bras
Murum 0 1 0 0.353 0.00 Bras
Paver Block 0 1 0 10.76 0.00 Bras
Crusher Metal 20MM
M-10 4.03 0.9 3.627 0.353 1.28 Bras
M-20 12.93 0.85 10.9905 0.353 3.88 Bras
Sand
M-10 4.03 0.470 1.8941 0.353 0.67 Bras
M-20 12.93 0.425 5.49525 0.353 1.94 Bras
Cement
M-10 4.03 4.400 17.732 18.00 Bags
M-20 12.93 7.000 90.51 91.00 Bags
Total
Steel Fabricated 0.00 Kg. @ 60 0.00 0.00
Majuri Amount 0.00
Steel 598.00 Kg. @ 68 40664.00 53042.00
80MM Metal 2.00 Bras @ 2500 5000.00 7507.00
20MM Crushed 6.00 Bras @ 5600 33600.00
Sand 3.00 Bras @ 6800 20400.00
Cement 115.00 Bags No. @ 365 41975.00 144426.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 67495 4159.00
Total
Steel Fabricated 0.00 Kg. @ 60 0.00 0.00
Majuri Amount 0.00
Steel 175.00 Kg. @ 68 11900.00 15535.00
80MM Metal 1.00 Bras @ 2500 2500.00 3020.00
20MM Crushed 2.00 Bras @ 5600 11200.00
Sand 1.50 Bras @ 6800 10200.00
Cement 35.00 Bags No. @ 365 12775.00 51499.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 23157 1678.00
Total
Steel Fabricated 0.00 Kg. @ 60 0.00 0.00
Majuri Amount 0.00
Steel 270.00 Kg. @ 68 18360.00 24012.00
80MM Metal 2.00 Bras @ 2500 5000.00 6306.00
20MM Crushed 3.00 Bras @ 5600 16800.00
Sand 2.50 Bras @ 6800 17000.00
Cement 60.00 Bags No. @ 365 21900.00 82426.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 42831 9147.00
Total 1.08
Steel 1170.00 Kg. @ 55 64350.00 76482.00
Murum 0.00 Bras @ 1600 0.00 0.00
20MM Crushed 3.50 Bras @ 5200 18200.00
Sand 4.00 Bras @ 7200 28800.00
256270.00
Cement 132.00 Bags No. @ 390 51480.00
Brick 981.00 No. @ 7.00 6867.00
Sanitory fitting @ 13092.000 9164.40 13092.00
Pipe @ 0.000 0.00 0.00
Colouring 13382.000 9367.40 13382.00
Tiles 44265.000 30985.00 44265.00
Majuri Amount 205569 3997.00
Total Rs. 424782.60 407488.00
Limiteed 386604.00 386604.00
Add GST 18% 69589.00 69589.00
Royalty 1674.00 1674.00
Test 6450.00 6450.00
Total Rs. 464317.00 464317.00
WITH GST
129465 7691.00
Cement 51480.00 Brick/Vit 6867
Crusher/Sand 28800.00 Steel 64350 72072.00
Tiles 30985.00 Sanitory 9164
Metal 18200.00 Majuri 206623
Murum 0.00 Colouring 9367
Paver Road
471230
0
Teen Shed
Total 1.08
Steel 0.00 Kg. @ 55 9573.0 15955.00
Murum 0.00 Bras @ 1600 0.00 0.00
20MM Crushed 0.50 Bras @ 5200 2600.00
Sand 0.50 Bras @ 7200 3600.00
9420.00
Cement 3.00 Bags No. @ 390 1170.00
Brick 0.00 No. @ 7.00 0.00
Door @ 0.000 4676.0 7793.00
Colouring 0.000 0.00 0.00
Tiles 0.00 15827.0 26378.00
Majuri Amount 23932 1832.00
Total Rs. 61378.00 61378.00
2% GST Limiteed 61378.00 61378.00
221 Add GST 18% 11048.00 11048.00
Royalty 528.00 528.00
Test 690.00 690.00
Total Rs. 73644.00 73644.00
Cement 1170.00
Steel 9573.00
Sand 3600.00
Metal 2600.00 695 40 27800
Tiles 15827.00 4 -22093.2
Majuri Concrete 0.00
Majuri Steel 27800.00
Steel [Link] 11635.00
Royalty 528.00
Test 690.00 72895.00
2% GST 221.00 749.00
73644.00
0.00
TOTAL 73644.00 73644.00 0.00
Check Amount
Providing Repair To Toilet Block For [Link] At. Malegaon N.K. 114900/-
Materials Name Qty. As per Rate of Total Quantity Rate of Total Unit
M.B. Consumption Bras
1 2 3 4 5 6 7
M-10 1.04 0.9 0.936 0.353 0.33 Bras
Sand
M-10 1.04 0.470 0.4888 0.353 0.17 Bras
M-20 0.00 0.425 0 0.353 0.00 Bras
Slab Flooring/tiles 24 0.022 0.528 0.353 0.19 Bras
Cement
M-10 1.04 4.400 4.576 5.00 Bags
Slab Flooring/tiles 24.00 0.200 4.8 5.00 Bags
Total
Steel Fabricated 0.00 Kg. @ 60 10427.00 14895.00
Majuri Amount 4468.00
Steel 0.00 Kg. @ 68 0.00 0.00
[Link] 0.00 Sqm @ 820 6620.00 9457.00
Majuri Amount 2837.00
20MM Crushed 1.00 Bras @ 5600 5600.00
Sand 1.00 Bras @ 6800 6800.00
Cement 15.00 Bags No. @ 365 5475.00 35991.00
Shahbad Tiles 5.00 Bras @ 2300 11500.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 27149 10277.00
Door+Window+gate 17076.00 10246.00 17076.00
Colouring 8564.00 5138.00 8564.00
Providing Repair To [Link] & Toilet Block At. Dharamwadi Rs. 101000/-
Materials Name Qty. As per Rate of Total Quantity Rate of Total Unit
M.B. Consumption Bras
1 2 3 4 5 6 7
Crusher Metal 20MM
M-10 0.60 0.9 0.54 0.353 0.19 Bras
M-20 0 0.85 0 0.353 0.00 Bras
Sand
M-10 0.60 0.470 0.282 0.353 0.10 Bras
BB Masonary 3.09 0.320 0.9888 0.353 0.35 Bras
Plaster 17.64 0.015 0.2646 0.353 0.09 Bras
Cement
M-10 0.60 4.400 2.64 3.00 Bags
BB Masonary 3.09 1.580 4.8822 5.00 Bags
Plaster 17.64 0.110 1.9404 2.00 Bags
Cement 4307.00
Fabrication 0.00
Sand 4012.00
Metal 3304.00 695 60 41700
Colouring 25994.00 12 -30174.6
Brick 11490.00 2.4 0
Majuri 41700.00
Colouring Majuri 8282.00
Door 0.00
Royalty 500.00
Test 690.00 99779.00
2% GST 303.00 803.00
100582.00
100582.00
TOTAL 100582.00 100582.00 0.00
Check Amount
Cement 2620.00
Fabrication 0.00
Sand 9487.00
Metal 3068.00 695 20 13900
Colouring 0.00 4 -11908.8
Brick 9513.00 0.8 0
Majuri 13900.00
Colouring Majuri 0.00
Door 0.00
Royalty 300.00
Test 690.00 39278.00
2% GST 118.00 418.00
39696.00
39696.00
TOTAL 39696.00 39696.00 0.00
Check Amount
Total
Steel Fabricated 0.00 Kg. @ 60 0.00 0.00
Majuri Amount 0.00
Steel 179.00 Kg. @ 62 11098.00 15880.00
80MM Metal 2.00 Bras @ 2500 5000.00 0.00
20MM Crushed 2.00 Bras @ 5200 10400.00
Sand 1.50 Bras @ 6700 10050.00
Cement 34.00 Bags No. @ 370 12580.00 42223.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 16315 7340.00
Total
Steel Fabricated 0.00 Kg. @ 60 0.00 0.00
Majuri Amount 0.00
Steel 358.00 Kg. @ 62 22196.00 31729.00
80MM Metal 2.00 Bras @ 2500 5000.00 10034.00
20MM Crushed 5.00 Bras @ 5200 26000.00
Sand 2.50 Bras @ 6700 16750.00
Cement 95.00 Bags No. @ 370 35150.00 111132.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 57190 9391.00
Total
Steel Fabricated 0.00 Kg. @ 60 0.00 0.00
Majuri Amount 0.00
Steel 0.00 Kg. @ 62 0.00 0.00
80MM Metal 2.00 Bras @ 2500 5000.00 0.00
20MM Crushed 1.90 Bras @ 5200 9861.00
Sand 0.95 Bras @ 6700 6353.00
Cement 46.00 Bags No. @ 370 17020.00 51776.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 13542 0.00
Total
Steel Fabricated 0.00 Kg. @ 60 0.00 0.00
Majuri Amount 0 0.00
Steel 0.00 Kg. @ 62 0.00 0.00
80MM Metal 2.00 Bras @ 2500 5000.00 0.00
20MM Crushed 1.76 Bras @ 5200 9138.00
Sand 0.90 Bras @ 6700 6013.00
Cement 33.00 Bags No. @ 370 12210.00 43063.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 10702 0.00
Total
Steel Fabricated 0.00 Kg. @ 60 0.00 0.00
Majuri Amount 0.00
Steel 261.00 Kg. @ 0 0.00 23118.00
80MM Metal 0.00 Bras @ 0 0.00 0.00
20MM Crushed 5.24 Bras @ 0 0.00
Sand 1.75 Bras @ 2500 4383.00
112345.00
Cement 69.00 Bags No. @ 1450 100050.00 112345.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 39806 8776.00
Total
Steel Fabricated 0.00 Kg. @ 0 0.00 0.00
Majuri Amount 0 0.00
Steel 0.00 Kg. @ 0 0.00 0.00
80MM Metal 0.00 Bras @ 0 0.00 0.00
20MM Crushed 6.00 Bras @ 5200 31200.00
Sand 3.00 Bras @ 6700 20100.00
Cement 95.00 Bags No. @ 370 35150.00 125195.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
125195.00
Total
Steel Fabricated 0.00 Kg. @ 0 0.00 0.00
Majuri Amount 0 0.00
Steel 0.00 Kg. @ 0 0.00 0.00
80MM Metal 0.00 Bras @ 0 0.00 0.00
20MM Crushed 1.50 Bras @ 5600 8400.00
Sand 1.00 Bras @ 6800 6800.00
Cement 36.00 Bags No. @ 365 13140.00 40059.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 11719 0.00
Brick 17478.00
Cement 19382.00
Steel 11328.00
Sand 28477.00
Metal 13688.00 690 65 44850
Colouring 8310.00 13 44955.3
Majuri 44850.00
Majuri Door+sanitory 0.00
Sanitory 0.00
Royalty 999.00 3473.00
Test 2865.00
2% GST 2474.00 2865.00
TOTAL 149851.00 149851.00 0.00
Check Amount
Brick 16743.00
Cement 19647.00
Steel 7729.00
Sand 32096.00
Metal 18110.00 690 70 48300
Colouring 0.00 14 45237
Majuri 49300.00
Majuri Door+sanitory 0.00
Sanitory 0.00
Royalty 3332.00 5808.00
Test 1357.00
2% GST 2476.00 1357.00
TOTAL 150790.00 150790.00 0.00
Check Amount
Majuri 90000.00
TOTAL 90000.00 300000.00 -210000.00
Check Amount
Total
Steel Fabricated 622.00 Kg. @ 78 48516.00 55084.00
Majuri Amount 0.00
Steel 622.00 Kg. @ 0 0.00 0.00
80MM Metal 0.00 Bras @ 50 0.00 0.00
20MM Crushed 6.00 Bras @ 5950 35700.00
Sand 3.00 Bras @ 7800 23400.00
Cement 110.00 Bags No. @ 375 41250.00 136372.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 55779 13189.00
Total
Steel Fabricated 259.00 Kg. @ 78 20202.00 22908.00
Majuri Amount 0 0.00
Steel 259.00 Kg. @ 0 0.00 0.00
80MM Metal 2.00 Bras @ 50 100.00 0.00
20MM Crushed 2.00 Bras @ 5950 11900.00
Sand 1.50 Bras @ 7800 11700.00
Cement 42.00 Bags No. @ 375 15750.00 53338.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7 0.00
Majuri Amount 22882 6288.00
Total
Steel Fabricated 317.00 Kg. @ 78 24726.00 28119.00
Majuri Amount 0 0.00
Steel 317.00 Kg. @ 0 0.00 0.00
80MM Metal 3.00 Bras @ 50 149.99 0.00
20MM Crushed 3.00 Bras @ 5950 17850.00
Sand 1.90 Bras @ 7800 14820.00
Cement 60.00 Bags No. @ 375 22500.00 68509.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7 0.00
Majuri Amount 27251 10669.00
Total
Steel Fabricated 574.00 Kg. @ 78 44772.00 48856.00
Majuri Amount 0 0.00
Steel 574.00 Kg. @ 0 0.00 0.00
80MM Metal 0.00 Bras @ 50 0.00 0.00
20MM Crushed 4.20 Bras @ 5950 24990.00
Sand 2.15 Bras @ 7800 16770.00
Cement 85.00 Bags No. @ 375 31875.00 100777.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7 0.00
Majuri Amount 43052 11826.00
Total
Steel Fabricated 427.00 Kg. @ 78 33306.00 37790.00
Majuri Amount 0 0.00
Steel 427.00 Kg. @ 0 0.00 0.00
80MM Metal 0.00 Bras @ 50 0.00 0.00
20MM Crushed 3.00 Bras @ 5950 17850.00
Sand 2.00 Bras @ 7800 15600.00
Cement 65.00 Bags No. @ 375 24375.00 78211.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7 0.00
Majuri Amount 34211 9341.00
Total
Steel Fabricated 0.00 Kg. @ 78 0.00 0.00
Majuri Amount 0 0.00
Steel 0.00 Kg. @ 0 0.00 0.00
80MM Metal 0.00 Bras @ 50 0.00 0.00
20MM Crushed 3.00 Bras @ 5950 17850.00
Sand 1.50 Bras @ 7800 11700.00
Cement 65.00 Bags No. @ 375 24375.00 68743.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7 0.00
Majuri Amount 19098 4280.00
Total
Steel Fabricated 0.00 Kg. @ 78 0.00 0.00
Majuri Amount 0 0.00
Steel 0.00 Kg. @ 0 0.00 0.00
80MM Metal 0.00 Bras @ 50 0.00 0.00
20MM Crushed 3.00 Bras @ 5950 17850.00
Sand 1.50 Bras @ 7800 11700.00
Cement 65.00 Bags No. @ 375 24375.00 68499.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7 0.00
Majuri Amount 18854 4280.00
Total
Steel Fabricated 0.00 Kg. @ 78 0.00 0.00
Majuri Amount 0 0.00
Steel 0.00 Kg. @ 0 0.00 0.00
80MM Metal 0.00 Bras @ 50 0.00 0.00
20MM Crushed 2.50 Bras @ 5950 14875.00
Sand 1.20 Bras @ 7800 9360.00
Cement 50.00 Bags No. @ 375 18750.00 54946.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7 0.00
Majuri Amount 16241 4280.00
Total
Steel Fabricated 0.00 Kg. @ 78 0.00 0.00
Majuri Amount 0 0.00
Steel 0.00 Kg. @ 0 0.00 0.00
80MM Metal 0.00 Bras @ 50 0.00 0.00
20MM Crushed 1.50 Bras @ 5950 8925.00
Sand 0.90 Bras @ 7800 7020.00
Cement 25.00 Bags No. @ 375 9375.00 28870.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7 0.00
Majuri Amount 7830 4280.00
Total
Steel Fabricated 0.00 Kg. @ 78 0.00 0.00
Majuri Amount 0 0.00
Steel 0.00 Kg. @ 0 0.00 0.00
80MM Metal 0.00 Bras @ 50 0.00 0.00
20MM Crushed 0.90 Bras @ 5950 5355.00
Sand 0.50 Bras @ 7800 3900.00
Cement 20.00 Bags No. @ 375 7500.00 21305.00
Shahbad Tiles 0.00 Bras @ 2300 0.00
Brick 0.00 No. @ 7 0.00
Majuri Amount 8830 4280.00
146912
Brick 171452
Cement 213875
Steel 14372
Sand 164005
Metal 266361
Excavation 9637
Majuri 408958
Majuri Door+sanitory 0
[Link] 42347
Steel Fabrication 71493 408750.00
Test 0
2% GST 0 1499566.00
TOTAL 1362500.00 1362500.00 0.00
Check Amount
Construction of WallCompount & Cement Otta To Mungsaji Maharaj Sansthan [Link] [Link]
Materials Name Qty. As per Rate of Total Quantity Rate of Total Unit
M.B. Consumption Bras
1 2 3 4 5 6 7
Steel 0.35 1 0.35 35 350.00 Kg
Crusher Metal 20MM
M-10 4.47 0.94 4.2018 0.353 1.48 Bras
M-20 3.67 0.85 3.1195 0.353 1.10 Bras
Sand
M-10 4.47 0.470 2.1009 0.353 0.74 Bras
M-20 3.67 0.425 1.55975 0.353 0.55 Bras
BB Masonary 3.68 0.320 1.1776 0.353 0.42 Bras
Cement
M-10 4.47 4.400 19.668 20.00 Bags
M-20 3.67 7.000 25.69 26.00 Bags
BB Masonary 3.68 1.580 5.8144 6.00 Bags
Total 1.08
Steel 350.00 Kg. @ 70 24500.00 31356.00
Murum 4.00 Bras @ 1600 6400.00 7882.00
20MM Crushed 3.50 Bras @ 5900 20650.00
Sand 3.00 Bras @ 7800 23400.00
110334.00
Cement 75.00 Bags No. @ 250 18750.00
Brick 1833.00 No. @ 8.00 14664.00
Door @ 0.000 6427.0 10711.00
Majuri Amount 52543 7051.00
Total Rs. 167334.00 167334.00
2% GST Limiteed 166625.00 166625.00
3333 Add GST 18% 29993.00 29993.00
Royalty 3899.00 3899.00
Test 3555.00 3555.00
Total Rs. 204072.00 204072.00
Brick 17304
Cement 22125
Steel 28910
Sand 27612 695 100 69500
Metal 27834 10 61221.6
Excavation 0
Majuri Steel 69500.00
Steel [Link] 0.00
Royalty 3899.00
Test 3555.00 196840.00
2% GST 3333.00 7232.00
204072.00
0.00
TOTAL 204072.00 204072.00 0.00
Check Amount
Total 1.08
Steel 62.70 Kg. @ 70 4389.00 5649.00
Murum 0.00 Bras @ 1600 0.00 0.00
20MM Crushed 0.50 Bras @ 5900 2950.00
Sand 1.50 Bras @ 7800 11700.00
73951.00
Cement 20.00 Bags No. @ 250 5000.00
Brick 3425.00 No. @ 8.00 27400.00
Door @ 0.000 0.0 0.00
Majuri Amount 31386 3225.00
Total Rs. 82825.00 82825.00
2% GST Limiteed 81805.00 81805.00
1636 Add GST 18% 14725.00 14725.00
Royalty 556.00 556.00
Test 2175.00 2175.00
Total Rs. 99261.00 99261.00
Brick 32332
Cement 5900
Steel 5179
Sand 13252 695 50 34750
Metal 3481 5 29778.3
Excavation 0
Majuri Steel 34750.00
Steel [Link] 0.00
Royalty 556.00
Test 2175.00 97069.00
2% GST 1636.00 2192.00
99261.00
0.00
TOTAL 99261.00 99261.00 0.00
Check Amount
Total
Steel Fabricated 0.00 Kg. @ 0 0.00 0.00
Majuri Amount 0 0.00
Steel 3.00 NO. @ 15000 45000.00 88425.00
Majuri Amount 43425 0.00
Cement 64733.00
Majuri Concrete 36898.00
2% GST 1769.00 1769.00
103400.00
104342.00
TOTAL 103400.00 103400.00 0.00
Check Amount
[Link] At. Shirsala 200000/-
Materials Name Qty. As per Rate of Total Quantity Rate of Total Unit
M.B. Consumption Bras
1 2 3 4 5 6 7
Steel 0.536 1 0.536 53.6 536.00 Kg
80MM Metal 5.21 1.26 6.5646 0.353 2.32 Bras
Crusher Metal 20MM
M-10 5.21 0.9 4.689 0.353 1.66 Bras
M-20 6.4 0.85 5.44 0.353 1.92 Bras
Sand
M-10 5.21 0.470 2.4487 0.353 0.86 Bras
M-20 6.40 0.425 2.72 0.353 0.96 Bras
Cement
M-10 5.21 4.400 22.924 23.00 Bags
M-20 6.40 7.000 44.8 45.00 Bags
Total
Steel Fabricated 536.00 Kg. @ 75 40200.00 47355.00
80MM Metal 3.00 Bras @ 2500 7500.00 11861.00
20MM Crushed 4.00 Bras @ 6100 24400.00
Sand 2.50 Bras @ 7800 19500.00 85784.00
Cement 75.00 Bags No. @ 300 22500.00
Majuri Amount 47625 16725.00
Total
80MM Metal 9.00 Bras @ 2500 22500.00
33437.00
Murum 4.00 Bras @ 1450 5800.00
20MM Crushed 12.00 Bras @ 6300 75600.00
Sand 6.00 Bras @ 7800 46800.00
Cement 209.00 Bags No. @ 375 78375.00 273722.00
Shahbad Tiles 0.00 Bras @ 0 0.00
Brick 0.00 No. @ 0 0.00
Majuri Amount 86730 8646.00
Cement 92483.00
Steel 0.00
Sand 55224.00
Metal 89564.00 695 140 97300
Gitta+Murum 28300.00 14 119925
Majuri Concrete 95144.00
Majuri Gitta Murum 15600.00
0.00
Royalty 17119.00
Test 0.00 360715.00
2% GST 6316.00 23435.00
384150.00
399750.00
TOTAL 399750.00 399750.00 0.00
Check Amount
Cement 13275.00
Steel 1770.00
Sand 18408.00
Metal 8781.00 695 55 38225
Gitta+Murum 0.00 5.5 35919
Majuri Concrete 36069.00
Sanitory+Col 12074.00
Brick 21900.00
Royalty 1057.00
Test 4460.00 82763.00
2% GST 1936.00 2993.00
85756.00
119730.00
TOTAL 119730.00 119730.00 0.00
Check Amount
Cement 6638.00
Steel 4779.00
Sand 7363.00
Metal 3867.00 695 20 13900
Gitta+Murum 0.00 2 13700.4
Majuri Concrete 8497.00
Sanitory+Col 8124.00
Brick 903.00
Royalty 679.00
Test 4125.00 35269.00
2% GST 693.00 1372.00
36641.00
45668.00
TOTAL 45668.00 45668.00 0.00
Check Amount
77403.00
Sand 3.00 Bras @ 7800 23400.00
77403.00
Cement 30.00 Bags No. @ 375 11250.00
Brick 2500.00 No. @ 7 17500.00
Sanitory 0.00 No. @ 0 0.00 0.00
Door+ 0.00 No. @ 17584 0.00 0.00
Colouring 0 0.00 0.00
Majuri Amount 24579 8267.00
Total Rs. 96039.00 96039.00
2% GST Limiteed 96039.00 96039.00
1921 Add GST 18% 17287.00 17287.00
Royalty 3206.00 3206.00
Test 2900.00 2900.00
Total Rs. 119432.00 119432.00
Cement 13275.00
Steel 2655.00
Sand 27612.00
Metal 12994.00 695 55 38225
Gitta+Murum 0.00 5.5 35829.6
Majuri Concrete 37369.00
Sanitory+Col 0.00
Brick 17500.00
Royalty 3206.00
Test 2900.00 96805.00
2% GST 1921.00 5127.00
101932.00
119432.00
TOTAL 119432.00 119432.00 0.00
Check Amount
Total
Murum 1.10 Bras @ 1800 1980.00 3023.00
20MM Crushed 0.40 Bras @ 5400 2160.00
Sand 0.20 Bras @ 7500 1500.00 9474.00
Cement 9.00 Bags No. @ 350 3150.00
Paver 2.00 Brass @ 6800 13600.00 21334.00
Door+ 0.00 No. @ 0 0.00 0.00
Colouring 0 0.00 0.00
Majuri Amount 11441 0.00
Total Rs. 33831.00 33831.00
2% GST Limiteed 33831.00 33831.00
677 Add GST 18% 6090.00 6090.00
Royalty 784.00 784.00
Test 725.00 725.00
Total Rs. 41430.00 41430.00
Cement 3717.00
Sand 1770.00
Metal 2549.00 695 20 13900
Gitta+Murum 1980.00 2 12429
Majuri Concrete 13180.00
Paver 16048.00
Brick 0.00
Royalty 784.00
Test 725.00 39244.00
2% GST 677.00 2186.00
41430.00
41430.00
TOTAL 41430.00 41430.00 0.00
Check Amount
Total
Murum 4.20 Bras @ 1800 7560.00 12093.00
20MM Crushed 0.40 Bras @ 5400 2160.00
5479.00
Sand 0.20 Bras @ 7500 1500.00 5479.00
Cement 5.00 Bags No. @ 350 1750.00
Paver 6.80 Brass @ 6800 46240.00 66899.00
Door+ 0.00 No. @ 0 0.00 0.00
Colouring 0 0.00 0.00
Majuri Amount 29541 4280.00
Total Rs. 88751.00 88751.00
2% GST Limiteed 88751.00 88751.00
1775 Add GST 18% 15975.00 15975.00
Royalty 2673.00 2673.00
Test 3345.00 3345.00
Total Rs. 110744.00 110744.00
Cement 2065.00
Sand 1770.00
Metal 2548.00 695 50 34750
Gitta+Murum 7560.00 5 33223.2
Majuri Concrete 34445.00
Paver 54563.00
Brick 0.00
Royalty 2673.00
Test 3345.00 102951.00
2% GST 1775.00 7793.00
110744.00
110744.00
TOTAL 110744.00 110744.00 0.00
Check Amount
Total
Murum 3.20 Bras @ 1800 5760.00 9070.00
20MM Crushed 0.40 Bras @ 5400 2160.00
Sand 0.20 Bras @ 7500 1500.00 3530.00
Cement 4.00 Bags No. @ 350 1400.00
Paver 11.50 Brass @ 6800 78200.00 119962.00
Door+ 0.00 No. @ 0 0.00 0.00
Colouring 0 0.00 0.00
Majuri Amount 47822 4280.00
Total Rs. 136842.00 136842.00
2% GST Limiteed 136842.00 136842.00
2737 Add GST 18% 24632.00 24632.00
Royalty 1997.00 1997.00
Test 3345.00 3345.00
Total Rs. 166815.00 166815.00
Cement 1652.00
Sand 1770.00
Metal 2548.00 695 80 55600
Gitta+Murum 5760.00 8 50044.5
Majuri Concrete 55295.00
Paver 91711.00
Brick 0.00
Royalty 1997.00
Test 3345.00 158736.00
2% GST 2737.00 8079.00
166815.00
166815.00
TOTAL 166815.00 166815.00 0.00
Check Amount
44214.00 16654.00
79541.00 10538.00
10057.00 3807.00
15475.00 3150.00
33818.00 10298.00
1698.00 -49315.65
5623.00 0.00
2400.00 0.00
0.00
40249
2632.00 992.00
248.00 103.00
5588.00 0.00
2348.00 0.00
3350.00 0.00
1176.00 -12839.05
963.00 363.00
1554.00 1264.00
6011.00 0.00
2674.00 574.00
72787.00 9502.00
11088.00 0.00
2230.00 0.00
1353.00 0.00
0.00
Brick
30284
75878.00 22778.00
5116.00 931.00
5465.00 -88578.96
4646.00 0.00
2315.00 0.00
4000.00 0.00
0.00 -258065.00
44749
2312.00 872.00
154.00 9.00
5488.00 0.00
0.00 0.00
3028.00 0.00
790.00 -5015.44
0.00 -73730.00
7402.00 -58926.00
85995.00 45915.00
35350.00 12950.00
98368.00 28408.00
14814.00 7064.00
7698.00 1608.00
0.00 0.00
2459.00 -47783.97
0.00 0.00
0.00 0.00
0.00
0.00 0.00
0.00 -24800.00
98368.00 98368.00
14814.00 14814.00
7698.00 7698.00
0.00 0.00
2459.00 2459.00
0.00 0.00
0.00 0.00
176302.00
0.00 0.00
102451.00 30028.60 102451.00 0.00
152000.00 87740.00
31509.00 8968.50
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
41270.58
42574.00 14749.00
8818.00 8818.00
4487.00 4487.00
2500.00 2500.00
4225.00 -75950.00
-182770.00 -182770.00
-182770.00 -439270.00
88215.00 10585.8 =
108560.00 42859.00
7980.00 1368.00
Board
-90391.00 -90391.00
-90391.00 -254512.00
188573
0.00
1350.00 162 =
-185884.00 -185884.00
-182570.00 -438870.00
188573
-109982.00
46605.27 5592.63195 =
12720
12720
12720
12720
50880
12600
12600
74250 38750
16800
42000
-39270.00 -39270.00
-39270.00 -152270.00
188573
58783.00
16500.00 1980 =
sand metal
16990 15120
16990 15120
16990 15120
8495 10080
0
0
59465 55440 114905
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
41126.00 21626.83 19499.17
38964.00 -19499.17
0.00 0.00
0.00 0.00
0.00
50285.00 78600.00 28315.00
88030.00
Brick
30284
105637.00 41187.18
13481.00 3131.00
151578.00 47178.00
55577.00 8327.00
10772.00 2272.00
0.00 -95000.00
2922.00
47144.13 -793186.87
396849
0.00 0.00 0.00 0.00
0.00 0.00
0.00 0.00 0.00 0.00
63171.00 32171.00
26276.00 9601.00
309187.00 112627.00
0.00 -160542.00
3844.00 0.00
33603.00 0.00
61683.00 0.00
0.00
0.00
7979
7979
48860.00 14410.00 48860.00 0.00
0.00 0.00
50350.00 11470.00 50350.00 0.00
0.00 0.00
0.00 0.00
51947.00 17947.00
13681.00 -76884.00
3225.00 0.00
9815.00 0.00
0.00 0.00
-25880.50
38221.00 8971.00
0.00 0.00 0.00 0.00
35681.00 15181.00
0.00 0.00
203105.00 39225.00
7018.00 -207051.00
3225.00 0.00
7992.00 0.00
62755.00 0.00
0.00
0.00
7979
7979
45233.00 9233.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 -102112.00
3225.00 0.00
0.00 0.00
7560.00 0.00
0.32
0.00
7979
7979
38382.00 13362.00 38382.00 0.00
93142.00 41662.00
9473.00 -69234.00
3225.00 0.00
16412.00 0.00
19802.00 0.00
0.32
0.00
7979
7979
0.00 0.00 0.00 0.00
0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00
0.00 0.00
391674.00 90434.00
0.00 -161555.00
3225.00 0.00
18380.00 0.00
12434.00 0.00
0.00
0.00
7979
7979
18130
217152
9323.00 1638.00
216662.00 84362.00
0.00 -158510.00
11208.00 0.00
130541.00 0.00
49289.00 0.00
42818.00 0.00
96634.00 0.00
0.00
0.00
7979
7979
8140
3855.00 905.00
281796.00 54441.07
125173.00 17373.00
0.00 -231025.07
91895.00 0.00
111844.00 0.00
20925.00 0.00
203548.00 0.00
0.00
0.00
7979
7979
99588.00 23288.00
13037.00 5287.00
0.00 -335345.00
19557.00 19557.00
9173.00 0.00
20892.00 0.00
0.00
0.00
7979
7979
740
234542
111759.00 56759.00
46215.00 14315.00
380503.00 74503.00
8599.00 -1201.00
516926.00 367830.00 149096.00
0.00 -298777.00
5305.00 5305.00
0.00 0.00
0.00 0.00
0.00 0.00
68212.00 0.00
0.00
0.00
7979
7979
3330
181024.00 91774.00
74858.00 23093.00
47624.00 3524.00
0.00 -189438.00
27544.00 27544.00
249839.00 0.00
31635.00 0.00
166086.00 0.00
0.00
0.00
7979
7979
43601.00 10251.00
0.00 0.00
0.00 -184621.00
7186.00 7186.00
20667.00 0.00
16146.00 0.00
0.00 0.00
-0.06
0.00
7979
7979
0.00 0.00
0.00 0.00
143946.00 47696.00
0.00 0.00
0.00 0.00
0.00 0.00
3975.00 -190469.00
3225.00 3225.00
0.00 0.00
0.00
0.00
7979
7979
5550
26506.00 13006.00
0.00 0.00
71752.00 10552.00
103258.00 31258.00
6363.00 -150628.00
152836.00 76418.00
0.00
0.00
7979
7979
7979
51862.00 12262.00
10870.00 5870.00
7362.00 2432.00
334905.00 159698.00 175207.00
12519.00 -202138.00
15918.00 6367.00
0.00
0.00
7979
7979
7979
7208.00 1848.00
43302.00 33218.56
0.00 0.00
26500.00 0.00
19862.00 0.00
4051.00 701.00
4103.00 -72376.61
-268443.00
125000
339000
214000
132708.00 40708.00
0.00 0.00 0.00 0.00
74910.00 32860.00
0.00 0.00
146605.00 33045.00
16403.00 -402625.00
3225.00 0.00
42000.00 23880.00
11500.00 5156.00
29036.00
0.00
7979
7979
7979
35000 32903
0 0
0 0
434500 170733
-616401.00 -1306532.00
-614382.00 -1302494.00
188573
-606387.00
5320
229962
3024.00 -94712.00
3225.00 0.00
0.00 0.00
22444.00 8978.00
0.00 0.00
136547.00 54619.00
0.00 35017.8
0.00
7979
7979
29094.00 5094.00
0.00 0.00
215174.00 45174.00
0.00 -45314.00
3225.00 0.00
0.00 35017.8
0.00
7979
7979
5320
229962
101253.00 61900.00 39353.00
2925.00 -102453.00
3225.00 0.00
0.00 0.00
11296.00 4518.00
0.00 0.00
146456.00 58582.00
0.00 35017.8
0.00
7979
7979
125000
339000
214000
78496.00 10916.00
11822.00 5152.00
10388.00 -309436.00
3225.00 0.00
104614.00 41846.00
21755.00 8702.00
13383.00 5353.00
0.00
0.00
7979
7979
7979
235282
96194.00 96194.00
274391.00 79091.00
201.00 -179165.00
3225.00 0.00
4462.00 1785.00
6275.00 2510.00
0.00 35017.8
0.00
7979
7979
125000
339000
214000
69491.00 21191.00
8621.00 3691.00
72491.00 27396.00
173891.00 38571.00
7142.00 -299280.00
21607.00 11884.00
17487.00 9618.00
0.00
0.00
7979
7979
7979
125000
339000
214000
6626.00 826.00
0.00 0.00
0.00 0.00
11981.00 -182195.00
0.00 0.00
156851.00 78425.00
151473.00 75736.00
0.00 0.00
0.00 0.00
0.00
0.00
7979
7979
7979
125000
339000
214000
7425.00 1225.00
0.00 0.00 0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
988.00 -274144.00
0.00 0.00
0.00 0.00
0.00 0.00
62784.00 25114.00
73279.00 29312.00
0.00
0.00
7979
7979
7979
125000
339000
214000
60266.00 22566.00
163159.00 33959.00
12577.00 -198688.00
172169.00 86084.00
11296.00 4518.00
0.00
0.00
7979
7979
7979
0
235282
0.00 -97108.00
0.00 35017.8
0.00
7979
7979
7979
125000
339000
214000
63077.00 8827.00
12236.00 3536.00
11132.00 -147282.00
5032.00 2013.00
0.00
0.00
7979
7979
7979
125000
339000
214000
97924.00 -15176.00
38709.00 8259.00
0.00 0.00
34635.00 -287534.00
40335.00 8067.00
0.00
0.00
7979
7979
7979
259301.00 108161.00 259301.00 0.00
51870.00 6870.00
164372.00 45472.00 164372.00 0.00
36379.00 18879.00
39766.00 12216.00
0.00
112990.00 17290.00
22838.00 3988.00
3225.00 -343447.00
0.00
0.00
7979
7979
7979
125000
339000
214000
30585.00 9335.00
6349.00 549.00
0.00 0.00
0.00 0.00
8693.00 0.00
0.00
0.00 0.00
0.00 5762.00 -251729.00
0.00
7979
7979
7979
0.00 0.00
26018.00 11018.00
8063.00 -83827.00
0.00 0.00
0.00 0.00
0.00 0.00
8062.87
0.00
7979
7979
7979
125000
339000
214000
394262.00 79262.00
237479.00 39854.00
0.00 0.00
165754.00 -203954.00
42069.00 8414.00
0.00
0.00
7979
7979
7979
0
235282
0.00 -73554.00
0.00 35017.8
0.00
7979
7979
7979
0
235282
0.00 -24569.00
0.00 35017.8
0.00
7979
7979
7979
0
235282
3225.00 -73165.00
0.00 35017.8
0.00
7979
7979
7979
76629.00 12879.00
0.00 0.00
6374.00 6374.00
44188.00 22094.00
0.00 0.00
0.00 0.00
6749.00 0.00
13382.00 12029.00
0.00
0.00
0.00 -264.00
53633.00 47833.00
0.00 0.00
16450.00 0.00
17246.00 0.00
1783.00 -1567.00
2250.00 -68350.66
-200000.00
125000
339000
214000
29398.00 14698.00
0.00 0.00
0.00 0.00
10301.00 -33797.00
0.00 0.00
0.00
0.00
7979
7979
7979
125000
339000
214000
28212.00 15612.00
0.00 0.00
0.00 0.00
10306.00 -27576.00
0.00 0.00
0.00
0.00
7979
7979
7979
14998.00 2698.00
0.00 0.00
3326.00 1876.00
26301.00 0.00
7994.00 0.00
0.00 -3350.00
6283.00 -36731.00
-151689.00
11479.00 2119.00
0.00 0.00
4296.00 4296.00
0.00 0.00
0.00 0.00
0.00 -3350.00
3225.00 -30025.00
-92780.00
71771.00 43250.00 28521.00
0.00 0.00
0.00 0.00
0.00 -3350.00
3225.00 -23721.00
-74996.00
0.00 0.00
8646.00 2926.00
106408.00 31922.40 32008.00
0.00 0.00
0.00 0.00
0.00 -3350.00
3225.00 -34758.00
-131723.00
0.00 0.00
0.00 0.00
0.00 -1450.00
58531.00 41580.00 16951.00
0.00 0.00
0.00 0.00
33778.00 10133.00 10133.00
3225.00 -25634.00
-95534.00
0.00 0.00
0.00 0.00
0.00 0.00
7598.00 0.00
0.00 0.00
2037.00 611.00 611.00
0.00 -8886.00
-39860.00
0.00 0.00
0.00 0.00
0.00 0.00
10091.00 0.00
2320.00 0.00
0.00 0.00 0.00
0.00 -16540.00
-44751.00
0.00 0.00 0.00 0.00
20066.00 2906.00
6323.00 1323.00
8423.00 -64123.00
0.00 35017.8
0.00
7979
7979
7979
0.00 0.00 0.00 0.00
23586.00 4026.00
9065.00 2815.00
8702.00 -63156.00
0.00 35017.8
0.00
7979
7979
7979
6000
229282
3225.00 -19876.00
0.00 35017.8
0.00
7979
7979
7979
0.00 0.00
0.00 0.00
0.00 0.00
18725.00 0.00
0.00 0.00
0.00 0.00 0.00
0.00 -2896.00
-29081.00
26391.00 15210.00 11181.00
6602.00 0.00
20007.00 0.00
0.00 0.00 0.00
3225.00 -11181.00
0.00 -56225.00
168027.00 105050.00 62977.00
0.00 0.00
0.00 0.00
0.00 -3350.00
0.00 -58177.00
-168027.00
148577.00 99425.00 49152.00
0.00 0.00
0.00 0.00
0.00 -3350.00
3225.00 -44352.00
-151802.00
0.00 0.00
0.00 -5720.00
57272.00 17181.60 13872.00
0.00 0.00
0.00 0.00
0.00 -3350.00
0.00 -5592.00
-61252.00
48610.00 11485.00
22824.00 5224.00
0.00
0.00
125000
339000
214000
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00
0.00 0.00
257491.00 0.00 257491.00
0.00
7979
7979
7979
125000
339000
214000
13736.00 3332.00
0.00 0.00
0.00 0.00
0.00 0.00
1908.00 0.00
0.00
0.00 0.00
154304.00 4933.00 56050.00
0.00
7979
7979
7979
125000
339000
214000
10401.00 2581.00
0.00 0.00
0.00 0.00
0.00 0.00
1435.00 0.00
0.00
7611.00 3044.00
174173.00 2140.00 92995.00
0.00
7979
7979
7979
75707
7611
0.00 0.00
0.00 0.00
68004.00 20401.20 21204.00
0.00 0.00
0.00 0.00
0.00 -3350.00
4280.00 -15823.00
-77623.00
228201.00 171900.00 56301.00
0.00 0.00
0.00 0.00
0.00 0.00
4280.00 -54851.00
-232481.00
49955.00 37500.00 12455.00
0.00 0.00
0.00 0.00
0.00 0.00
4280.00 -11005.00
-54235.00
0.00 0.00
0.00 0.00
0.00 0.00
4280.00 -59103.00
-220083.00
5155.00 -34071.00
0.00 35017.8
0.00
7979
7979
7979
0.00 0.00 0.00 0.00
33499.00 7863.00
5196.00 2696.00
9145.00 -52141.00
0.00 35017.8
0.00
7979
7979
7979
0.00 0.00 0.00 0.00
7036.00 1664.00
0.00 0.00
8066.00 -27782.00
0.00 35017.8
0.00
7979
7979
7979
0.00 0.00 0.00 0.00
31737.00 7461.00
9171.00 4171.00
7808.00 -63317.00
0.00 35017.8
0.00
7979
7979
7979
2070.00 270.00
0.00 0.00
0.00 0.00
1522.00 366.00
2883.00 383.00
1616.00 -16492.00
0.00 35017.8
0.00
7979
7979
7979
4870.00 1719.91
0.00 0.00
0.00 0.00
24428.00 6000.00
0.00 0.00
0.00 0.00
0.00 0.00
5862.00 0.00
14465.00 8679.00
13877.00 6938.00
80257.00 0.00 -96977.00
0.00
7979
7979
7979 -72656.00
75707
7611
0.00 0.00 0.00 0.00
10420.00 1182.00
6099.00 -15501.00
0.00 35017.8
0.00
7979
7979
7979
77632.00 18232.00
0.00 0.00
0.00 0.00
0.00
0.00 0.00 0.00 0.00
53042.00 12378.00
7507.00 2507.00
4159.00 -63336.00
0.00 35017.8
0.00
7979
7979
7979
0.00 0.00 0.00 0.00
15535.00 3635.00
3020.00 520.00
1678.00 -21479.00
0.00 35017.8
0.00
7979
7979
7979
0.00 0.00 0.00 0.00
24012.00 5652.00
6306.00 1306.00
9147.00 -33684.00
0.00 35017.8
0.00
7979
7979
7979
76482.00 12132.00
0.00 0.00
-17294.60 -7060.00
0.00
15955.00 6382.00
0.00 0.00
7793.00 3117.00
0.00 0.00 0.00
26378.00 10551.00 0.00
0.00 339050.00
0.00
1825
0.00 0.00
9457.00 2837.00 9457.00 0.00
10277.00 -16872.00
17076.00 6830.00
8564.00 3426.00
0.00 35017.8
0.00
7979
7979
7979
235282
4695.00 -37921.00
36715.00 14686.00
0.00 35017.8
0.00
7979
7979
7979
0.00
235282
4280.00 -6105.00
0.00 0.00
0.00 35017.8
0.00
7979
7979
7979
0.00
0.00 0.00 0.00 0.00
15880.00 4782.00
0.00 -5000.00
7340.00 -8975.00
0.00 35017.8
0.00
7979
7979
7979
0.00 0.00 0.00 0.00
31729.00 9533.00
10034.00 5034.00
9391.00 -47799.00
0.00 35017.8
0.00
7979
7979
7979
0.00 0.00
0.00 -5000.00
0.00 -13542.00
0.00 35017.8
0.00
7979
7979
7979
0.00 0.00 0.00 0.00
0.00 0.00
0.00 -5000.00
0.00 -10702.00
-1.00 35017.8
0.00
7979
7979
7979
100076.00 19133.90
4280.00 -21790.90
0.00 35017.8
0.00
7979
7979
7979
23118.00 23118.00
0.00 0.00
8776.00 -31030.00
0.00 35017.8
0.00
7979
7979
7979
0.00 0.00
0.00 0.00
4280.00 -38745.00
-1.00 35017.8
0.00
7979
7979
7979
235282
22023.00 6832.50
28038.00 12838.00
5770.00 -60735.50
16172.00 4852.00
0.00 35017.8
0.00
7979
7979
7979
0.00 0.00
0.00 0.00
0.00 -30597.00
87419.00 30597.00
0.00 35017.8
0.00
7979
7979
7979
0.00 0.00 0.00 0.00
0.00 0.00
0.00 0.00
0.00 -11719.00
-1.00 35017.8
0.00
7979
7979
7979
125000
339000
214000
17234.00 7634.00 823
7992
4117
87865.00 66637.00 21228.00
7359
9242
6216.00 0.00 11286
0.00 0.00
4093.00 42750
0.00 0.00 20282
123718.00 -4093.00 -4093.00 12403
0.00 4000
7979 123718
7979
7979
0.00
125000
339000
214000
11633.00 5083.00 823
8496.00 2696.00 588
7992
4117
96725.00 71937.00 24788.00
7359
9242
6960.00 0.00 11286
123814.00 0.00 0.00 12403
0.00 4000
7979 123718
7979
7979
-96.00
2400
40249
10046.00 3496.00
26500.00 0.00
19862.00 0.00
0.00 -3350.00
2285.00 -67438.00
-254300.00
55084.00 6568.00 48516.00 -6568.00
0.00 0.00
0.00 0.00
13189.00 -42590.00
0.00 35017.8
0.00
7979
7979
7979
22908.00 2706.00 20202.00 -2706.00
0.00 0.00
0.00 -100.00
6288.00 -16594.00
0.00 35017.8
0.00
7979
7979
7979
28119.00 3393.00 24726.00 -3393.00
0.00 0.00
0.00 -149.99
10669.00 -16582.01
0.00 35017.8
0.00
7979
7979
7979
48856.00 4084.00 44772.00 -4084.00
0.00 0.00
0.00 0.00
11826.00 -31226.00
0.00 35017.8
0.00
7979
7979
7979
37790.00 4484.00 33306.00 -4484.00
0.00 0.00
0.00 0.00
9341.00 -24870.00
0.00 35017.8
0.00
7979
7979
7979
0.00 0.00 0.00 0.00
0.00 0.00
0.00 0.00
4280.00 -14818.00
0.00 35017.8
0.00
7979
7979
7979
0.00 0.00 0.00 0.00
0.00 0.00
0.00 0.00
4280.00 -14574.00
0.00 35017.8
0.00
7979
7979
7979
0.00 0.00 0.00 0.00
0.00 0.00
0.00 0.00
4280.00 -11961.00
0.00 35017.8
0.00
7979
7979
7979
0.00 0.00 0.00 0.00
0.00 0.00
0.00 0.00
4280.00 -3550.00
0.00 35017.8
0.00
7979
7979
7979
0.00 0.00 0.00 0.00
0.00 0.00
0.00 0.00
4280.00 -4550.00
0.00 35017.8
0.00
7979
7979
7979
121655.00 61915.00
18875.00 6695.00
40646.00 5606.00
117394.00 53834.00
24668.00 9878.00
0.00 0.00
4280.00 -338416.02
9637.00 0.00
0.00 0.00
0.00
31356.00 6856.00
7882.00 1482.00
10711.00 4284.00
0.00 233094.00
0.00
5649.00 1260.00
0.00 0.00
0.00 0.00
0.00 317603.00
0.00
0.00 0.00 0.00 0.00
88425.00 43425.00
0.00 -43425.00
0.00 35017.8
0.00
7979 45000.00
7979
7979
88425.00
0.00
47355.00 7155.00 40200.00 -7155.00
11861.00 4361.00
16725.00 -30900.00
0.00 35017.8
0.00
7979
7979
7979
40240.00 6490.00 33750.00 -6490.00
8407.00 907.00
16406.00 -27471.00
0.00 35017.8
0.00
7979
7979
7979
33437.00 28300.00 5137.00
8646.00 -78084.00
0.00 35017.8
0.00
7979
7979
7979
0.00
2400
2646.00 1146.00
4007.00 0.00
4717.00 0.00
996.00 -2354.00
5002.00 -24360.00
-96791.00
0.00
7979
7979
7979
-307.00
2400
10737.00 6687.00
4007.00 0.00
4117.00 0.00
0.00 0.00
5099.00 -1635.00
-34630.00
0.00
7979
7979
7979
21.00
2400
4019.00 1769.00
0.00 0.00
0.00 0.00
0.00 0.00
8267.00 -16312.00
-96039.00
0.00 0.00
7979
7979
7979
0.00
2400
0.00 0.00
0.00 0.00
0.00 0.00
2839.00 2839.00
3000.00 -27919.00
-79145.00
0.00 16894.00
7979
7979
7979
0.00
2400
3023.00 1043.00
0.00
2400
12093.00 4533.00
66899.00 20659.00
0.00 0.00
0.00 0.00
4280.00 -25261.00
-88751.00
0.00 7288.00
7979
7979
7979
0.00
2400
9070.00 3310.00
119962.00 41762.00
0.00 0.00
0.00 0.00
4280.00 -43542.00
-136842.00
0.00 -40803.00
7979
7979
7979
0.00
121489.00 44914.00 76575.00 -44914.00
0.00 0.00
5796.00 -42605.00
0.00 35017.8
0.00
7979
7979
7979
ÛúÖ´ÖÖ“Öê ®ÖÖÓ¾Ö :- ²ÖÖ²Öã¸üÖ¾Ö šüÖÛú¸êü ŸÖê
´Ö㻵ÖÖÓÛú®Ö 262113
GST ײִֻ֬Öᯙ 30001
¤êüµÖ ¸üŒÛú´Ö 292114
Ûú¯ÖÖŸÖ 24863
´Ö㻵ÖÖÓÛú®Ö 233141
GST ײִֻ֬Öᯙ 26604
¤êüµÖ ¸üŒÛú´Ö 259745
Ûú¯ÖÖŸÖ 22474
504522
100000
20000
128000 40000
31500 103000
96500 5000
56500 268000
87500 236000
128000 155300
96500
31500
71500
56500
424800
ú¸êü ŸÖê ˆ¯ÖÛêú®¦üÖÛú›êü •ÖÖÞÖÖ¸üÖ ¸üßÖÖ , ²ÖÖê¸üÖ
ú›êü •ÖÖÞÖÖ¸üÖ ÝÖÖ¾ÖÖÓŸÖÝÖÔŸÖ ¸üßÖÖ , ²ÖÖê¸üÖôû
336400
503000
166600
83300 161400 ###
244700 ###
78000
###
ÖÖê¸üÖôûÖ ®Ö.ÛúÖ
Öê¸üÖôûÖ ®Ö.ÛúÖ
Full rate Total Materials Total
Rate
365039.00
Beutification of Hindu Smshanbhumi [Link]
1) Removing Sheet Full rate Total
Shed-1 1 2 5.80 x 1.80 = 20.88
Top 1 2 5.80 x 0.90 = 10.44
Shed-2 1 1 6.10 x 1.70 = 10.37
Top 1 1 6.10 x 0.95 = 5.79
47.49 @ 46.80 2222.00
2) Structural Steel Purling & Nut bolts
Wt
Shed-1 1 2 6.00 @ 4.50 = 54.00
Top 1 1 6.00 @ 4.50 = 27.00
Shed-2 1 3 6.30 @ 4.50 = 85.05
Top 1 4 6.30 @ 4.50 = 113.40
279.45
Nut-Bolts 10 20 0.10 @ 2.47 = 49.40
328.85 Kg.
328.85 / 1000 = 0.3289 @ 95615.79 31443.00
M.t.
Truss
Shed-2 1 3 1.20 x 7.65 = 27.54
3 3 1.00 x 7.65 = 68.85
Top Member 1 1 6.30 x 7.65 = 48.20
144.59 Kg.
144.59 / 1000 = 0.1446 @ 96370.83 13934.00
M.t.
Sheet
Shed-1 1 2 6.10 x 1.50 = 18.30
Top 1 2 6.10 x 1.25 = 15.25
Shed-2 1 2 6.30 x 1.50 = 18.90
Top 1 2 6.30 x 1.25 = 15.75
Deduction
8% Security deposite = 12302
1% Income Tax TDS = 1538
2% GST TDS = 3076
1% LWC = 1538
Royalty = 0
Total Deduction 18454
1 2 3 4 5 6 7
Steel Fabri 0 1 0 0 0.00 Kg
Steel 0 1 0 0 0.00 Kg
Qtl
[Link] 0 1 0 1 0.00 Sqm
80MM Met 0 1 0 0.353 0.00 Bras
Murum 0 1 0 0.353 0.00 Bras
Paver Bloc 0 1 0 10.76 0.00 Bras
Crusher Metal 20MM
M-10 0.00 0.9 0 0.353 0.00 Bras
M-20 0 0.85 0 0.353 0.00 Bras
Sand
M-10 0.00 0.470 0 0.353 0.00 Bras
M-20 0.00 0.425 0 0.353 0.00 Bras
BB Masona 0 0.320 0 0.353 0.00 Bras
Plaster 0 0.015 0 0.353 0.00 Bras
Slab Floori 0 0.022 0 0.353 0.00 Bras
Cement
M-10 0.00 4.400 0 0.00 Bags
M-20 0.00 7.000 0 0.00 Bags
BB Masona 0.00 1.580 0 0.00 Bags
Plaster 0.00 0.110 0 0.00 Bags
Slab Floori 0.00 0.200 0 0.00 Bags 0
235282
Brick 0 450.000 0 0.00 No.
Total
Steel Fabri 0.00 Kg. @ 60 0.00 0.00 0.00
Majuri Amount 0.00
Steel 0.00 Kg. @ 50 0.00 0.00 0.00
[Link] 0.00 Sqm @ 820 0.00 0.00 0.00
Majuri Amount 0.00
80MM Met 0.00 Bras @ 2500 0.00 0.00
Murum 0.00 Bras @ 1450 0.00 0.00 0.00
Paver Bloc 0.00 Bras @ 6800 0.00 0.00 0.00
Tiles 0.00 Bras @ 4900 0.00 0.00 0.00
20MM Cru 0.00 Bras @ 5200 0.00
Sand 0.00 Bras @ 6200 0.00
0.00 0.00 ###
Cement 0.00 Bags No. @ 370 0.00
Brick 0.00 No. @ 7.00 0.00
Majuri Amount 0.00 0.00 0.00
Board+Ex 0.00 0.00 0.00
Sanitory Fitting 0.00 0.00 0.00
Door+Window 0.00 0.00 0.00
Electrification 0.00 0.00 0.00
Colouring 0.00 0.00 0.00
###
### ###
0.00 0.00 0.00
0.00
0.00 0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
פü®ÖÖÓÛú
ÜÖ“ÖÔ Ûú¿ÖÖÃÖÖšüß / ÛúÖêÞÖÖ»Öê
25/10/21 27310 EMD, Tender Fee
13/11/21 2000 500/-ÛúÖ ²ÖÖò®›ü ׯ֔û»Öê ŸÖÖ¸üßÜÖ ÛúÖ
### 8250 ÃÖã¸üõÖÖ šêü¾Ö ¸üŒÛú´Ö “ÖêÛú«üÖ¸êü
### 500 Ûú¸üÖ¸ü®ÖÖ´ÖÖ Ûú¸üߟÖÖ
### 8000 ›üÖò.´ÖÖ®Ö¬Ö®Öê- CEO ÃÖÖÆêü²ÖÖÓ“Öê
20/12/21 25000 5 ²ÖÎÖÃÖ Crusher sand
20/12/21 5250 1.50 ²ÖÎÖÃÖ ×ÝÖ™ü™üß
4/1/2022 500 ˆ¤ü‘ÖÖ™ü®Ö פü¾Ö¿Öß
ÛúÖ´Ö ÃÖæºþ
4/8/2022 2000 •Öê²Öß²ÖÖ †ò›ü¾ÆüÖ®ÃÖ
19/8/2022 20000 ¸üÖ´Ö¤üÖÃÖ ¤êü¾Æüôêû
20/8/22 1000 ´Ö•Öã¸ü ¤êü¾Æüôêû µÖÖÓ“Öê
24/8/22 600 ×›ü—Öê»Ö Roller
24/8/22 20000 ¸üÖ´Ö¤üÖÃÖ ¤êü¾Æüôêû
24/8/22 1000 ¯Ö¸üŸÖ ×›ü—Öê»Ö ¾Ö ›ÒüÖµÖ¾Æü¸ü »ÖÖ
26/8/22 2000 ¿Ö²²Ö߸ü ×´ÖáÖß †ò›ü¾ÆüÖ®ÃÖ
30/8/22 3000 ×¾ÖÛúÖÃÖ ²Öôûß
1/9/2022 2000 ×¾ÖÛúÖÃÖ ²Öôûß (2000 ²ÖÖÛúß)
25/8/22 1100 ×ÝÖ™ü™üß ³Ö¸üÞÖê ´Ö•Öã¸ü + פü¯Öã ³ÖÖÃÛú¸ü
31/8/22 10000 ¿Ö²²Ö߸ü ×´ÖáÖß Phone Pay
8/22 to 1/9/22 800 “Öã®ÖÖ+“ÖÖµÖ+®ÖÖ¿ŸÖÖ
2/9/2022 700 ¯Ö®®Öß
2/9/2022 300 ÝÖÖ›üß ³ÖÖ›üÖ †Öê—ÖÖ Ûú›ãü®Ö ´Ö™êü׸üµÖ»Ö
3/9/2022 25500 ¿Ö²²Ö߸ü ×´ÖáÖß All Clear
3/9/2022 2000 ÃÖã×®Ö»Ö ÃÖã¯Ö¸ü¾ÖÖµÖ—Ö¸ü
3/9/2022 1500 פü¯Öã ÛúÖÓ²Öôêû ´Ö™êü׸üµÖ¸ü ˆ“Ö®Öã †ÖÞÖÞ
3/9/2022 700 ¯ÖÖÞÖß Ûòú®Ö+µÖ¿Ö ÛúÖê —ÖÖ›ü ŸÖÖê›üÞÖê Ûú
5/9/2022 1200 Æü´Öߤü “Ö“ÖÖ ²ÖÖ¸ü¤üÖÞÖÖ
5/9/2022 320 ¯ÖÖÞÖß ™ÑüÛú¸ü 2 ×™Òü¯Ö
4/9/2022 2000 ÃÖã×®Ö»Ö ÃÖã¯Ö¸ü¾ÖÖµÖ—Ö¸ü (1000 ²ÖÖÛúß)
5/9/2022 4000 פü¯Öã ÛúÖÓ²Öôêû ¯ÖÖÞÖß ™æÑüÛú¸ü ³ÖÖ›üÖ 5 ×
5/9/2022 500 ÝÖÖê»Öã ´Ö•Öã¸ü ÛúÖòÛÎúß™ü ´ÖÓ¤ü߸üÖÃÖ´ÖÖê
6/9/2022 16500 ¤êü¾Öôêû All Clear
7/9 to 11/9/22 800 ¸üÖê›ü¾Ö¸ü ¯ÖÖÞÖß ´ÖÖ¸üÞÖê ™ÑüÛú¸ü ³ÖÖ›üÖ
### 300 †¸ü²ÖÖ•Ö ÛúÖê ¸üÖê›ü ÃÖÖ‡Ô›ü ³Ö¸üÞÖê Ûú¸üߟÖÖ
16/9/22 15000 ¤êü¿Ö´ÖãÜÖ ÃÖÖÆü²Ö JE
18/9/22 1600 ÝÖÞÖê¿Ö ¸üÖšüÖê›ü JCB ³ÖÖ›üÖ
213230
581430
“ÖêÛú †´ÖÖ‰Óú™ü
740000
ˆ¸ü»ÖêŸÖ 158570
ׯüÃÃÖÖ 79285
164850 My Expenditure
72150
237000 My Cheque ###
47500 Wasanta bhau Shirpur
24000 Tushar Kanhed 5000 Already Tr
10000 Akky Percentage ### Wasanta b
### Tushar Ka
### Akky Perce
###
318500
323500 Cheque ### My Chequ
5000
Ö×´ÖÛú †Ö¸üÖêÝµÖ Ûêú®¦ü ¤æüºþßÖß , ´ÖÖî•Öê ²ÖÖê¸üÖôûÖ ®Ö.Ûú
פü®ÖÖÓÛú
ÜÖ“ÖÔ Ûú¿ÖÖÃÖÖšüß / ÛúÖêÞÖÖ»Öê
ÜÖ“ÖÔ- 153850 /-
26/7/2021 5000 /-
‹ÛãúÞÖ ÜÖ“ÖÔ-
158850 60350
ue Amount- 490845
192875
60350 ‘ÖêÞÖê ²ÖÖÛúß
132525
42230
90295
ÖÃÛú¸ü ÛúÖÓ²Öôêû µÖÖ»ÖÖ ×›ü—Öê»Ö
ÖÛúß)
Ö›üÖ 5 פü¾ÖÃÖ All clear
ÃÖ´ÖÖê¸ü
ÖÖ›üÖ
ú¸üߟÖÖ
ar
ÖêÛú
Already Transfer
Wasanta bhau Shirpur
Tushar Kanhed
Akky Percentage
20000
10000
My Cheque 20000
105800
4600
98900
48900
ã¸üÖÓ®ÖÖ
ÖÖšüß
²»ÖÖòÛú (online Transfer)
ê™üÖ)
Ö›üÖ
Materials Qty. As Rate of Total Rate of Total Unit
Name per M.B. Consumpti Quantity Bras
on
1 2 3 4 5 6 7
80/60/40 MM Metal
70.63 1.21 85.4623 0.353 30.17 Bras
Murum
70.63 0.32 22.6016 0.353 7.98 Bras
Crusher Metal 20MM
M-10 105.94 0.94 99.5836 0.353 35.15 Bras
M-20 83.46 0.85 70.941 0.353 25.04 Bras
Sand
M-10 105.94 0.470 49.7918 0.353 17.58 Bras
M-20 83.46 0.425 35.4705 0.353 12.52 Bras
Cement
M-10 105.94 4.400 466.136 466.00 Bags
M-20 83.46 7.000 584.22 584.00 Bags
Total
80/60/40 30.00 Bras @ 2800 84000.00 138467.00 98400.00 40067.00
Murum 8.00 Bras @ 1800 14400.00
20MM 60.00 Bras @ 4100 246000.00 944227 793500.00 150727.00
Sand 30.00 Bras @ 6700 201000.00
Cement 1050.00 Bags No. @ 330 346500.00
Majuri Amount 195774.00 4980 Board
Add Royalty 27025.00 27025
Total Rs. 1114699.00 1114699.00 0.00
Add GST 12%
Total Rs. 1114699.00 1114699.00
Materials Qty. As Rate of Total Rate of Total Unit
Name per M.B. Consumpti Quantity Bras
on
1 2 3 4 5 6 7
80/60/40 MM Metal
0 1.21 0 0.353 0.00 Bras
Murum
0 0.32 0 0.353 0.00 Bras
Crusher Metal 20MM
M-10 16.22 0.94 15.2468 0.353 5.38 Bras
M-15 1.23 0.85 1.0455 0.353 0.37 Bras
Sand
M-10 16.22 0.470 7.6234 0.353 2.69 Bras
M-15 1.23 0.425 0.52275 0.353 0.18 Bras
Cement
M-10 16.22 4.400 71.368 71.00 Bags
M-15 1.23 7.000 8.61 9.00 Bags
Total
80/60/40 0.00 Bras @ 2800 0.00 0.00 0.00 0.00
Murum 0.00 Bras @ 1800 0.00
Paver 17.50 Bras @ 6200 108500.00 121877 108500.00 13377.00
20MM 6.00 Bras @ 4500 27000.00 84122 72000.00 12122.00
Sand 3.00 Bras @ 6200 18600.00
Cement 80.00 Bags No. @ 330 26400.00
Majuri Amount 25499.00 0 Board
Add Royalty 1154.00 1154.00
Total Rs. 207153.00 207153.00 0.00
Add GST 12% 24858.00 24858.00
Total Rs. 232011.00 232011.00
Materials Qty. As Rate of Total Rate of Total Unit
Name per M.B. Consumpti Quantity Bras
on
1 2 3 4 5 6 7
80/60/40 MM Metal
19.92 1.21 24.1032 0.353 8.51 Bras
Murum
19.92 0.32 6.3744 0.353 2.25 Bras
Crusher Metal 20MM
M-10 0 0.94 0 0.353 0.00 Bras
M-15 3.12 0.85 2.652 0.353 0.94 Bras
Sand
M-10 0 0.470 0 0.353 0.00 Bras
M-15 3.12 0.425 1.326 0.353 0.47 Bras
Cement
M-10 0 4.400 0 0.00 Bags
M-15 3.12 7.000 21.84 22.00 Bags
Total
80/60/40 9.00 Bras @ 2800 25200.00 38167.00 28800.00 9367.00
Murum 2.00 Bras @ 1800 3600.00
Paver 21.40 Bras @ 6200 132680.00 151484 132680.00 18804.00
20MM 1.00 Bras @ 4500 4500.00 17729 11760.00 5969.00
Sand 0.00 Bras @ 6200 0.00
Cement 22.00 Bags No. @ 330 7260.00
Majuri Amount 49556.00 15416 Board
Add Royalty 0.00 0.00
Total Rs. 222796.00 222796.00 0.00
Add GST 12% 26736.00 26736.00
Royalty 4500.00 4500.00
Total Rs. 254032.00 254032.00
Materials Qty. As Rate of Total Rate of Total Unit
Name per M.B. Consumpti Quantity Bras
on
1 2 3 4 5 6 7
80/60/40 MM Metal
1.88 1 1.88 0.353 0.66 Bras
Murum
0 0.32 0 0.353 0.00 Bras
Crusher Metal 20MM
M-10 1.41 0.94 1.3254 0.353 0.47 Bras
M-15 16.63 0.85 14.1355 0.353 4.99 Bras
Sand
M-10 1.41 0.470 0.6627 0.353 0.23 Bras
M-15 16.63 0.425 7.06775 0.353 2.49 Bras
Cement
M-10 1.41 4.400 6.204 6.00 Bags
M-15 16.63 7.000 116.41 116.00 Bags
Total
80/60/40 1.00 Bras @ 1950 1950.00 2858.00 1950.00 908.00
Murum 0.00 Bras @ 1800 0.00
Steel 577.00 Kg. @ 45 25965.00 36286 25965.00 10321.00
20MM 5.00 Bras @ 4800 24000.00 135258 85270.00 49988.00
Sand 3.00 Bras @ 6800 20400.00
Cement 122.00 Bags No. @ 335 40870.00
Majuri Amount 62536.00 1319
Add Royalty
Total Rs. 175721.00 175721.00 0.00
Limiteed 170554.00 170554.00 0.00
Add GST 12% 20466.00 20466.00
Royalty 1404.00 1404.00
Total Rs. 192424.00 192424.00
5167.00
57369.00
1 2 3 4 5 6 7
80/60/40 MM Metal
0 1 0 0.353 0.00 Bras
Murum
31.28 0.32 10.0096 0.353 3.53 Bras
Crusher Metal 20MM
M-10 0 0.94 0 0.353 0.00 Bras
M-15 1.49 0.85 1.2665 0.353 0.45 Bras
Sand
M-10 0 0.470 0 0.353 0.00 Bras
M-15 1.49 0.425 0.63325 0.353 0.22 Bras
Cement
M-10 0 4.400 0 0.00 Bags
M-15 1.49 7.000 10.43 10.00 Bags
Total
80/60/40 0.00 Bras @ 1950 0 0
Murum 4.00 Bras @ 2500 10000 15619 10000 5619
Paver 19.54 Bras @ 6200 121149 137665 121149 16516
20MM 0.45 Bras @ 5200 2325 8099 7365 734
Sand 0.30 Bras @ 5800 1740
Cement 10.00 Bags No. @ 330 3300
Majuri Amount 32914 10045
Add Royalty 4520 4520
Testing 4000 4000
Total Rs. 179948 179948 0
Limiteed 177452 177452 0.00
Add GST 12% 21294 21294
Total Rs. 198746 198746
[Link] [Link]
Materials Qty. As Rate of Total Rate of Total Unit
Name per M.B. Consumpti Quantity Bras
on
1 2 3 4 5 6 7
80/60/40 MM Metal
0 1.21 0 0.353 0.00 Bras
Murum
0 0.32 0 0.353 0.00 Bras
Crusher Metal 20MM
M-10 22 0.94 20.68 0.353 7.30 Bras
M-15 22 0.85 18.7 0.353 6.60 Bras
Sand
M-10 22 0.470 10.34 0.353 3.65 Bras
M-15 22 0.425 9.35 0.353 3.30 Bras
Cement
M-10 22 4.400 96.8 97.00 Bags
M-15 22 7.000 154 154.00 Bags
Total
80/60/40 0.00 Bras @ 1950 0 0
Murum 0.00 Bras @ 2500 0 0 0 0
Paver 0.00 Bras @ 6200 0 0 0 0
20MM 13.90 Bras @ 5200 72286 251416 195429 55987
Sand 6.95 Bras @ 5800 40313
Cement 251.00 Bags No. @ 330 82830
Majuri Amount 55987 0
Add Royalty 0
1 2 3 4 5 6 7
80/60/40 MM Metal
21.93 1.21 26.5353 0.353 9.37 Bras
Murum
21.93 0.32 7.0176 0.353 2.48 Bras
Crusher Metal 20MM
M-10 0 0.94 0 0.353 0.00 Bras
M-15 1.98 0.85 1.683 0.353 0.59 Bras
Sand
M-10 0 0.470 0 0.353 0.00 Bras
M-15 1.98 0.425 0.8415 0.353 0.30 Bras
Cement
M-10 0 4.400 0 0.00 Bags
M-15 1.98 7.000 13.86 14.00 Bags
Total
80/60/40 10.00 Bras @ 1950 19500 42018 27000 15018
Murum 3.00 Bras @ 2500 7500
Paver 25.00 Bras @ 7000 175000 200169 175000 25169
20MM 0.59 Bras @ 5000 2970 11227 8820 2407
Sand 0.30 Bras @ 5500 1650
Cement 14.00 Bags No. @ 300 4200
Majuri Amount 44902 2308
Add Royalty 0 0
Board 4000 4000
Total Rs. 259722 259722 0
Add GST 12% 31167 31167 0.00
Add Royalty 4863 4863
Total Rs. 295752 295752
[Link] [Link]
Materials Qty. As Rate of Total Rate of Total Unit
Name per M.B. Consumpti Quantity Bras
on
1 2 3 4 5 6 7
80/60/40 MM Metal
15.46 1 15.46 0.353 5.46 Bras
Murum
0 0.32 0 0.353 0.00 Bras
Crusher Metal 20MM
M-10 15.46 0.94 14.5324 0.353 5.13 Bras
M-20 15.46 0.85 13.141 0.353 4.64 Bras
Sand
M-10 15.46 0.470 7.2662 0.353 2.56 Bras
M-20 15.46 0.425 6.5705 0.353 2.32 Bras
Cement
M-10 15.46 4.400 68.024 68.00 Bags
M-20 15.46 7.000 108.22 108.00 Bags
Total
80/60/40 5.00 Bras @ 2600 13000 21511 13000 8511
Murum 0.00 Bras @ 2500 0 0 0 0
Paver 0.00 Bras @ 6200 0 0 0 0
20MM 9.77 Bras @ 4500 43959 176442 146208 30234
Sand 4.88 Bras @ 5800 28329
Cement 176.00 Bags No. @ 420 73920
Majuri Amount 47952 9207
Add Royalty 0
Total Rs. 207160 207160 0
207160 207160
Add GST 12% 24859 24859
Add Royalty 4887 4887
Testing charges 10350 10350
1% Labour Cess 2072 2072
Total Rs. 249328 249328
1 2 3 4 5 6 7
80/60/40 MM Metal
18.74 1 18.74 0.353 6.62 Bras
Murum
0 0.32 0 0.353 0.00 Bras
Crusher Metal 20MM
M-10 18.74 0.94 17.6156 0.353 6.22 Bras
M-20 18.74 0.85 15.929 0.353 5.62 Bras
Sand
M-10 18.74 0.470 8.8078 0.353 3.11 Bras
M-20 18.74 0.425 7.9645 0.353 2.81 Bras
Cement
M-10 18.74 4.400 82.456 82.00 Bags
M-20 18.74 7.000 131.18 131.00 Bags
Total
80/60/40 7.00 Bras @ 2600 18200 26080 18200 7880
Murum 0.00 Bras @ 2500 0 0 0 0
Paver 0.00 Bras @ 6200 0 0 0 0
20MM 11.84 Bras @ 4500 53286 213914 177085 36829
Sand 5.92 Bras @ 5800 34340
Cement 213.00 Bags No. @ 420 89460
Majuri Amount 54155 9446
Add Royalty 0
1 2 3 4 5 6 7
80/60/40 MM Metal
21.12 1.21 25.5552 0.353 9.02 Bras
Murum
21.12 0.32 6.7584 0.353 2.39 Bras
Crusher Metal 20MM
M-10 0 0.94 0 0.353 0.00 Bras
M-15 5.46 0.85 4.641 0.353 1.64 Bras
Sand
M-10 0 0.470 0 0.353 0.00 Bras
M-15 5.46 0.425 2.3205 0.353 0.82 Bras
Cement
M-10 0 4.400 0 0.00 Bags
M-15 5.46 7.000 38.22 38.00 Bags
Total
80/60/40 10.00 Bras @ 1950 19500 28735 19500 9235
Murum 3.00 Bras @ 0 0
Paver 25.00 Bras @ 6500 162500 183442 162500 20942
20MM 1.64 Bras @ 5000 8191 26048 21241 4807
Sand 0.30 Bras @ 5500 1650
26048 21241 4807
1 2 3 4 5 6 7
80/60/40 MM Metal
0 1.21 0 0.353 0.00 Bras
[Link]
79.72 0 0 0 79.72 Sqm
Crusher Metal 20MM
M-10 12.81 0.94 12.0414 0.353 4.25 Bras
M-15 0.79 0.85 0.6715 0.353 0.24 Bras
Sand
M-10 12.81 0.470 6.0207 0.353 2.13 Bras
M-15 0.79 0.425 0.33575 0.353 0.12 Bras
Cement
M-10 12.81 4.400 56.364 56.00 Bags
M-15 0.79 7.000 5.53 6.00 Bags
Total
[Link] 79.72 Sqm @ 900 71748 92475 71748 20727
Murum 3.00 Bras @ 0 0
Paver 13.78 Bras @ 6400 88215 93129 88215 4914
20MM 0.24 Bras @ 5000 1185 65053 31035 34018
Sand 0.30 Bras @ 6500 1950
Cement 62.00 Bags No. @ 450 27900
Majuri Amount 59659 0
Add Royalty 911 911
Board 0 0
Total Rs. 251568 251568 0
Add GST 12% 30188 30188 0.00
Add Royalty 0 0
Total Rs. 281756 281756
[Link]
Materials Qty. As Rate of Total Rate of Total Unit
Name per M.B. Consumpti Quantity Bras
on
1 2 3 4 5 6 7
80/60/40 MM Metal
3.42 1 3.42 0.353 1.21 Bras
Murum
0 0.32 0 0.353 0.00 Bras
Crusher Metal 20MM
M-10 1.71 0.94 1.6074 0.353 0.57 Bras
M-20 8.05 0.85 6.8425 0.353 2.42 Bras
Sand
M-10 1.71 0.470 0.8037 0.353 0.28 Bras
M-20 8.05 0.425 3.42125 0.353 1.21 Bras
Cement
M-10 1.71 4.400 7.524 8.00 Bags
M-20 8.05 7.000 56.35 56.00 Bags
Total
80/60/40 1.00 Bras @ 1950 1950.00 5256.00 1950.00 3306.00
Steel 291.00 Kg. @ 45 13095.00 18284 13095.00 5189.00
20MM 3.00 Bras @ 4800 14400.00 69834 42640.00 27194.00
Sand 1.00 Bras @ 6800 6800.00
Cement 64.00 Bags No. @ 335 21440.00
Majuri Amount 37993.00 2304
Board 8078.00 8078.00
Total Rs. 103756.00 103756.00 0.00 0.00
Limiteed 103756.00 103756.00 0.00
Add GST 12% 12451.00 12451.00
Royalty 1211.00 1211.00
Test 3900.00 3900.00
Labour 1075.00 1075.00
Total Rs. 122393.00 122393.00
[Link] [Link]
Materials Qty. As Rate of Total Rate of Total Unit
Name per M.B. Consumpti Quantity Bras
on
1 2 3 4 5 6 7
80/60/40 MM Metal
0 1 0 0.353 0.00 Bras
Murum
0 0.32 0 0.353 0.00 Bras
Crusher Metal 20MM
M-10 9.36 0.94 8.7984 0.353 3.11 Bras
M-20 9.36 0.85 7.956 0.353 2.81 Bras
Sand
M-10 9.36 0.470 4.3992 0.353 1.55 Bras
M-20 9.36 0.425 3.978 0.353 1.40 Bras
Cement
M-10 9.36 4.400 41.184 41.00 Bags
M-20 9.36 7.000 65.52 66.00 Bags
1 2 3 4 5 6 7
80/60/40 MM Metal
47.43 1 47.43 0.353 16.74 Bras
Murum
16.74 0.32 5.3568 0.353 1.89 Bras
Crusher Metal 20MM
M-10 0 0.94 0 0.353 0.00 Bras
M-15 4.32 0.85 3.672 0.353 1.30 Bras
Sand
M-10 0 0.470 0 0.353 0.00 Bras
M-15 4.32 0.425 1.836 0.353 0.65 Bras
Cement
M-10 0 4.400 0 0.00 Bags
M-15 4.32 7.000 30.24 30.00 Bags
Paver 525.09 1 525.09 10.76 56.50 Bras
Total
80/60/40 17.00 Bras @ 1500 25500 33691 25500 8191
Murum 2.00 Bras @ 2500 5000 7740 5000 2740
Paver 56.50 Bras @ 6200 350298 441600 350298 91302
20MM 1.30 Bras @ 4000 5185 19061 16555 2506
Sand 0.30 Bras @ 4900 1470
Cement 30.00 Bags No. @ 330 9900
Majuri Amount 106750 2011
Add Royalty 0 0
Testing 0 0
Total Rs. 504103 504103 0
Limiteed 498129 498129 0.00
Add GST 12%
Total Rs. 498129 498129
1 2 3 4 5 6 7
80/60/40 MM Metal
0 1 0 0.353 0.00 Bras
Murum
0 0.32 0 0.353 0.00 Bras
Crusher Metal 20MM
M-10 0 0.94 0 0.353 0.00 Bras
M-15 1.63 0.85 1.3855 0.353 0.49 Bras
Sand
M-10 0 0.470 0 0.353 0.00 Bras
M-15 1.63 0.425 0.69275 0.353 0.24 Bras
Cement
M-10 0 4.400 0 0.00 Bags
M-15 1.63 7.000 11.41 11.00 Bags
Total
80/60/40 0.00 Bras @ 1500 0 0 0 0
Murum 0.00 Bras @ 2500 0 0 0 0
Paver 7.40 Bras @ 6200 45905 60243 45905 14338
20MM 0.49 Bras @ 4000 1956 9295 7056 2239
Sand 0.30 Bras @ 4900 1470
Cement 11.00 Bags No. @ 330 3630
Majuri Amount 24655 8078
Add Royalty 0 0
Testing 0 0
Total Rs. 77616 77616 0
Add GST 12% 9314 9314 0.00
Royalty+testing+Labour 3894 3894
Total Rs. 90824 90824
1 2 3 4 5 6 7
80/60/40 MM Metal
0 1 0 0.353 0.00 Bras
Murum
0 0.32 0 0.353 0.00 Bras
Crusher Metal 20MM
M-10 0 0.94 0 0.353 0.00 Bras
M-15 1.18 0.85 1.003 0.353 0.35 Bras
Sand
M-10 0 0.470 0 0.353 0.00 Bras
M-15 1.18 0.425 0.5015 0.353 0.18 Bras
Cement
M-10 0 4.400 0 0.00 Bags
M-15 1.18 7.000 8.26 8.00 Bags
Total
80/60/40 0.00 Bras @ 1500 0 0 0 0
Murum 0.00 Bras @ 2500 0 0 0 0
Paver 9.78 Bras @ 6200 60655 79833 60655 19178
20MM 0.35 Bras @ 4000 1416 6729 5526 1203
Sand 0.30 Bras @ 4900 1470
Cement 8.00 Bags No. @ 330 2640
Majuri Amount 20381 0
Add Royalty 0 0
Testing 0 0
Total Rs. 85156 85156 0
Add GST 12% 10219 10219 0.00
Royalty+testing+Labour 3936 3936
Total Rs. 99311 99311
Anganwadi [Link]
Materials Qty. As Rate of Total Rate of Total Unit
Name per M.B. Consumpti Quantity Bras
on
1 2 3 4 5 6 7
Total
Kitchen otta @ 1500 3923 5604 3923 1681
Door @ 2500 6414 9163 6414 2749
Window @ 6200 15143 21633 15143 6490
Majuri Amount 8330 11900 8330 3570
Majuri Amount 14260 0
[Link] [Link]
Materials Qty. As Rate of Total Rate of Total Unit
Name per M.B. Consumpti Quantity Bras
on
1 2 3 4 5 6 7
80/60/40 MM Metal
0 1.21 0 0.353 0.00 Bras
Murum
0 0.32 0 0.353 0.00 Bras
Crusher Metal 20MM
M-10 22 0.94 20.68 0.353 7.30 Bras
M-15 22 0.85 18.7 0.353 6.60 Bras
Sand
M-10 22 0.470 10.34 0.353 3.65 Bras
M-15 22 0.425 9.35 0.353 3.30 Bras
Cement
M-10 22 4.400 96.8 97.00 Bags
M-15 22 7.000 154 154.00 Bags
Total
80/60/40 0.00 Bras @ 1950 0 0
Murum 0.00 Bras @ 2500 0 0 0 0
Paver 0.00 Bras @ 6200 0 0 0 0
20MM 13.90 Bras @ 5200 72286 251416 195429 55987
Sand 6.95 Bras @ 5800 40313
Cement 251.00 Bags No. @ 330 82830
Majuri Amount 55987 0
Add Royalty 0
[Link] [Link]
Materials Qty. As Rate of Total Rate of Total Unit
Name per M.B. Consumpti Quantity Bras
on
1 2 3 4 5 6 7
80/60/40 MM Metal
21.4 1.21 25.894 0.353 9.14 Bras
Murum
21.4 0.32 6.848 0.353 2.42 Bras
Crusher Metal 20MM
M-10 21.14 0.94 19.8716 0.353 7.01 Bras
M-20 21.14 0.85 17.969 0.353 6.34 Bras
Sand
M-10 21.14 0.470 9.9358 0.353 3.51 Bras
M-20 21.14 0.425 8.9845 0.353 3.17 Bras
Cement
M-10 21.14 4.400 93.016 93.00 Bags
M-20 21.14 7.000 147.98 148.00 Bags
Total
80/60/40 9.00 Bras @ 2400 21600
38594 26600 11994
Murum 2.00 Bras @ 2500 5000
Paver 0.00 Bras @ 0 0 0 0 0
20MM 13.36 Bras @ 4500 60110 209352 186420 22932
Sand 6.68 Bras @ 5200 34730
Cement 241.00 Bags No. @ 380 91580
Majuri Amount 36926 2000
Add Royalty 0
Add Royalty 6286 6286
Add Royalty 8500 8500
Total 264732 264732
Limiteed 259500 259500
Add GST 12% 31140 31140
1% Labour Cess 2595 2595
Total Rs. 293235 293235
[Link] [Link]
Materials Qty. As Rate of Total Rate of Total Unit
Name per M.B. Consumpti Quantity Bras
on
1 2 3 4 5 6 7
80/60/40 MM Metal
21.01 1 21.01 0.353 7.42 Bras
Murum
0 0.32 0 0.353 0.00 Bras
Crusher Metal 20MM
M-10 21.01 0.94 19.7494 0.353 6.97 Bras
M-20 21.01 0.85 17.8585 0.353 6.30 Bras
Sand
M-10 21.01 0.470 9.8747 0.353 3.49 Bras
M-20 21.01 0.425 8.92925 0.353 3.15 Bras
Cement
M-10 21.01 4.400 92.444 92.00 Bags
M-20 21.01 7.000 147.07 147.00 Bags
Total
80/60/40 8.00 Bras @ 2400 19200
28766 19200 9566
Murum 0.00 Bras @ 2500 0
Paver 0.00 Bras @ 0 0 0 0 0
20MM 13.28 Bras @ 4500 59740 237688 177907 59781
Sand 6.64 Bras @ 5200 34517
Cement 239.00 Bags No. @ 350 83650
Majuri Amount 71847 2500
Add Royalty 0
268954 268954
Limiteed 249000 249000
Add Royalty 6759 6759
Add Royalty 10350 10350
1% Labour Cess 2490 2490
Add GST 12% 29880 29880
[Link] [Link]
Materials Qty. As Rate of Total Rate of Total Unit
Name per M.B. Consumpti Quantity Bras
on
1 2 3 4 5 6 7
80/60/40 MM Metal
13.9 1 13.9 0.353 4.91 Bras
Murum
0 0.32 0 0.353 0.00 Bras
Crusher Metal 20MM
M-10 14.77 0.94 13.8838 0.353 4.90 Bras
M-20 14.22 0.85 12.087 0.353 4.27 Bras
Sand
M-10 14.77 0.470 6.9419 0.353 2.45 Bras
M-20 14.22 0.425 6.0435 0.353 2.13 Bras
Cement
M-10 14.77 4.400 64.988 65.00 Bags
M-20 14.22 7.000 99.54 100.00 Bags
Total
80/60/40 8.00 Bras @ 2400 19200
19031 19200 -169
Murum 0.00 Bras @ 2500 0
Paver 0.00 Bras @ 0 0 0 0 0
20MM 9.17 Bras @ 4500 41255 163802 122841 40961
Sand 4.58 Bras @ 5200 23836
Cement 165.00 Bags No. @ 350 57750
Majuri Amount 40792 0
Add Royalty 0
182833 182833
Limiteed 157000 157000
Add Royalty 4558 4558
Add Test 10000 10000
1% Labour Cess 1570 1570
Add GST 12% 18840 18840