Medium-Voltage AC Switch for Railways
Medium-Voltage AC Switch for Railways
Article
Medium-Voltage AC Static Switch Solution to Feed
Neutral Section in a High-Speed Railway System
Jose Maria Canales * , Iosu Aizpuru † , Unai Iraola † , Jon Andoni Barrena † and
Manex Barrenetxea †
Mondragon Goi Eskola Politeknikoa, Mondragon University, 20500 Mondragon, Spain;
iaizpuru@[Link] (I.A.); uiraola@[Link] (U.I.); jabarrena@[Link] (J.A.B.);
mbarrenetxeai@[Link] (M.B.)
* Correspondence: jmcanales@[Link]; Tel.: +34-943-794-700
† These authors contributed equally to this work.
Received: 12 September 2018; Accepted: 9 October 2018; Published: 12 October 2018
Abstract: A high-speed train (HST) is a single-phase load supplied by a three-phase AC grid. The HST
produces unbalanced three-line currents affecting the power quality of the grid. To balance the
asymmetries on average, railway feeding sections are supplied that rotate the three phases of the grid.
An electric isolation segment, called the neutral section (NS), between different sections is necessary.
The HST must pass through this 1.6 km NS without power supply. In this paper, a medium-voltage
AC static switch solution to feed the high-speed train in the NS is proposed. Thyristor technology
is selected to design the 25 KVAC static switch. A medium-voltage power electronics procedure
design is proposed to ensure proper operation in the final application. An NS operation is analyzed
to identify impacts within the electric system and solution requirements are developed. Then,
a low-scale prototype is used to experimentally validate the solution based on thyristor technology
and the medium-voltage AC static switch is designed. Limitations on power and voltage at the
Mondragon University Medium-Voltage Laboratory do not allow testing of the AC static switch
at nominal conditions. A partial test procedure to test sections of the AC static switch is proposed
and applied to validate the solution. Finally, experimental results for the Cordoba–Malaga (Spain)
high-speed railway in real conditions with an HST crossing the NS at 300 km/h are shown.
Keywords: railway; high-speed railway; neutral section; medium voltage; thyristor; AC static switch
1. Introduction
In 2003, more than 100,000 km of railway operated at 25 KVAC 50 Hz worldwide. This supposes
44.8% of the total line length of the electric railway system [1]. Using a 50 Hz public grid to feed a
25 KVAC railway eliminates the considerable cost of independent power generation, for example,
15 KVAC 162/3 Hz and DC railway systems [2]. The 25 KVAC railway system is a single-phase load
supplied by a medium-voltage three-phase AC grid, and it is produced to unbalance the three-line
currents. The grid current asymmetry produces negative effects in transformers and rotary electric
machines, reducing the power quality of the public grid [3]. A solution is to connect 25 KVAC 50 Hz
electric railway systems to national main grids with very high power capacity. It is necessary to
balance the energy consumption asymmetry on average from the main three-phase grid, and the
solution consists in supplying each railway section from different phases of the main grid to reduce
the imbalance. The voltages between sections have the same value, 25 KVAC, with different electric
phases, and it is required for an electrical isolation segment between sections, called neutral sections
(NSs). Trains must cross each NS without voltage supply for approximately 1.6 km [4]. Figure 1 shows
the typical electric supply topology from the main grid to feed one 25 KVAC 50 Hz high-speed railway
(HSR). The length of each section is about 35 km, and it is supplied by rotating the phases of the main
grid through the single-phase transformers included in the traction substations.
Figure 1. 1 × 25 KVAC 50 Hz high-speed railway electrical topology supply from the main grid.
When the train is near the NS, its main breaker is opened and the high-speed train (HST) is
disconnected from the power supply. In this condition, the HST works in regenerative mode to keep
its auxiliary power supply fed, and a little loss of speed, around 9 km/h [4], is produced. Once the
train goes out of the NS, its main breaker is closed, the power supply is reestablished in the HST,
and traction power can be applied again.
The operation through the NS causes several problems for the HST:
• When the HST main breaker is not open in the NS and the train continues feeding, an arc flash in
the catenary is produced, and in some case can be broken [5–7].
• At slow speeds, the train can be stopped in the NS. The train needs an operation of 10 min to go
out from the NS [8].
• The pantograph contact transition between the section and the NS catenary produces a voltage
feeding of the NS. This results in electromagnetic interference (EMI) and affects the signaling and
security of the railway system [5,9].
• Every 35 km, the HST crosses a neutral section and its main breaker is operated with one
connection and one disconnect. The main breaker operates approximately 10,000 times/year,
the mechanical lifetime is reduced, and the maintenance operation costs are increased [6].
• The closing instant of the main breaker produces inrush current in the HST traction transformer.
It can be an inrush current about 10 to 25 times greater than the nominal current of the train.
These high values of current cause high mechanical efforts by the transformer conductors,
accelerating the aging of the transformer and main breaker. Occasionally, it can activate the
main breaker current protection and the train is stopped [6,10,11].
• The opening instant of the main breaker demagnetizes the traction transformer, which can result
in overvoltage. An electric arc is formed in main breaker contacts and accelerates its aging [12].
According to the problems identified above, a compensation strategies review and some power
converter solutions were shown in [9], which can reduce the impact on the main grid and eliminate
the neutral section. These solutions [9,13–18], based on very high-power converters, come with
considerable cost. Engineers of the Japanese National Railways Tokaido Shinkansen HSR installed two
switch breakers to feed NSs from the adjacent catenaries. For commutation assurance between catenary
voltages and to avoid short circuit, 0.3 s without voltage in an NS are required [11,19]. The circuit
breakers must work for each train crossing the NS. Therefore, on the Tokaido Shinkansen, they must
be replaced every five years. The Central Japan Railway Company [10] proposed the use of static
switches based on thyristors in NSs to replace the circuit breakers and reduce the inrush current on the
transformer into the train. The study includes a demonstration of suppressing the inrush current on a
transformer with a thyristor prototype at low voltage. Korea Railroad Research Institute [7] proposed
Energies 2018, 11, 2740 3 of 17
the use of static switches with thyristors and a sequence to trigger when the HST is running through
the NS, but the on and off transition between static switches was not clear.
This paper describes the design and validation of a medium-voltage AC static switch solution to
feed a neutral section in an HSR system. Very little work on this topic is found in the literature; in [6]
a prototype design with some experimental results are presented, but it is a low-voltage prototype,
and they do not mention any of the problems that arise at medium-voltage levels, such as isolation
issues, or how to test and validate the prototype in the laboratory. In [10] a theoretical concept of
the solution is presented, but they do not mention any of the issues concerning real implementation,
such as the uncertainty of the commutation of the switches.
Therefore, several challenges must be solved and are presented in this paper:
• Designing thyristor drivers with high-voltage isolation to achieve triggering of the thyristor valves
at any load current, even at zero load current.
• Designing a test methodology for validation of the AC static switch at nominal conditions in the
laboratory, reducing the risks and validation times.
• Validating the proposed solution in real application tests on the Cordoba–Malaga High-Speed
Railway (Spain).
2. Solution Concept
The solution is based on two static switches, S1 and S2, connected to the neutral section, and each
one to a different section; the topology is shown in Figure 2. Four position detectors, D1 to D4,
are necessary to identify the position and direction of the train running on the NS.
Figure 2. Medium-voltage AC static switch solution to feed the neutral section (NS) in a high-speed
railway (HSR) system.
Table 1. Transition states when a train runs through the neutral section from section 1 to section 2.
In states 1, 4, and 7, the two switches are in the open position and an AC voltage, VNS , appears in
the NS because static switches in the open state have high impedance. In this condition, the current in
the NS, INS , is null. State 4 has a 60 ms timing period to detect zero current in the NS. This means that
the S1 switch is off and S2 can be switched on, avoiding a short-circuit risk.
In states 2 and 6, one static switch, either S1 or S2, is in close position and the NS is fed from one
section. In this period, the pantograph of the train is always in contact with one section catenary and
can be in contact simultaneously with the NS catenary, then the current INS is null because the current
can travel more easily through the section catenary than through the NS and static switch.
In states 3 and 5, the NS feeds from one section through one static switch, S1 or S2. The pantograph
of the train is only in contact with the NS catenary and the train current is established through the NS
and one static switch. Figure 3 shows the current flow in the different states of Table 1.
Figure 3. Cont.
Energies 2018, 11, 2740 5 of 17
Figure 3. Current flow during transition states when a train runs through the neutral section from
section 1 to section 2 in correspondence with Table 1. (a) State 1; (b) State 2; (c) State 3; (d) State 4;
(e) State 5; (f) State 6; (g) State 7.
Characteristic Data
Maximum train speed 300 km/h
Neutral section length 405 m
Number of pantographs connected 2
Distance between pantographs 395 m
Energies 2018, 11, 2740 6 of 17
The maximum switch voltage requirement is based on the 29 KVAC maximum voltage in the
2 × 25 KVAC railway systems defined in European Standard EN 50160. When one static switch is
closed, the second static switch must support the 50 KVAC voltage between section 1 and section
2. The number of neutral section operations is according to the train timetable. The time to switch
between S1 and S2 is up to 120 milliseconds and depends on the train speed and the travelled distance
where the two pantographs are connected simultaneously to the NS catenary. Table 3 shows the
requirements obtained from the above characteristics.
Requirement Value
Number of AC static switches 2
Maximum RMS switching voltage 50 KVAC
Maximum RMS switching current 685 A
Frequency 50 Hz
Ambient temperature 0 to 45 ◦ C
Number of operations Every 5 min
Switching period <120 ms
Furthermore, the AC static switch must limit the transient electricity in the connection and
disconnection of the train in the NS. In transition state 4, the switching off must commutate at zero
current to limit the transient voltage in the traction transformer of the train. In transition state 5,
the switching on must be synchronized with the maximum amplitude of voltage to avoid the inrush
current of the traction transformer.
The last requirement is to integrate the complete solution of AC static switches for the NS in one
standard container for easy transportation and installation in the application location.
where a voltage safety factor k = 1.8 is applied to switch 50 KVAC with commercial thyristors of
6500 volts. It results in 21 assemblies connected in series, meaning that each thyristor in nominal
conditions supports a maximum voltage of 3.367 V, which represents a final safety factor of 1.93,
enough to support voltage spikes. Considering an AC current of 685 A, thyristor model 5STP03D6500
from ABB in press-pack format with diameter 34 mm is selected.
Two criteria for the selection of the RC snubber are considered. For calculating the capacity value,
the maximum dispersion of the thyristor recovery charges, Qrec , is taken into account. Considering a
maximum thyristor voltage of 5 KV, Vmax , and 10% of capacitor tolerance with Equation (2) 1 µF of
snubber capacitor value is obtained:
(n − 1)·Qrec
Csnubber ≥ (2)
(1 − b)· n·Vthyristor − n·Vmax
Energies 2018, 11, 2740 7 of 17
The value of the snubber resistance is calculated by Equation (3) obtained from the mathematical
expression of electric current transition during the switching off of the thyristor.
q
Rsnubber ≥ 2ζ L/(n·Csnubber ) (3)
Considering a damping factor, ζ, between 0.5 and 1 and the magnetizing inductor of the traction
transformer, the snubber resistance result is 150 ohms.
The mode of operation of the AC switch generates little power losses in each thyristor and has
a system of cooling by natural convection. Figure 4a shows the basic module of the AC switch;
it is performed by three aluminum heat sinks, two thyristors, two drivers, and one RC snubber.
Each thyristor is mounted between two heat sinks by a mechanical clamp. Figure 4c shows the
complete solution of 50 KVAC static switch; it is performed by three stacks connected in series.
Each stack is composed of seven basic modules connected in series and is supported by post insulators
to get the electric isolation from the earth.
Figure 4. (a) Basic module of AC static switch; (b) electric scheme of 50 KVAC static switch with n = 21;
(c) 50 KVAC static switch composed of three stacks of seven basic modules.
The driver consists of two parts: the power supply and the trigger circuit [20].
The power supply is based on current transformers at high frequency. An AC current source
feeds a high-voltage conductor, which crosses the toroidal magnetic core, where a current is induced
into secondary winding to feed each thyristor driver. Figure 5 shows the topology to feed seven
Energies 2018, 11, 2740 8 of 17
thyristor drivers, half of one stack of seven basic modules. The AC HF current source includes an LLC
resonant tank working at 25 KHz, which feeds the high-voltage conductor. This topology is suitable
for working in an open loop and with variable loads such as thyristor drivers [21]. Seven toroidal
transformers are crossed by the high-voltage conductor and immersed in mineral oil to guarantee the
isolation requirement.
Figure 5. (a) AC current transformer topology with high-voltage isolation to feed thyristor drivers;
(b) toroidal transformer assembly with high-voltage conductor. The assembly is included in the mineral
oil container.
The trigger circuit transforms the optical fiber command in 5 KHz electrical gate impulses with
the current amplitude and slope specified. The 42 drivers of one AC static switch receive the same
optical fiber command with time dispersion less than 1 µs.
4.2.2. Controller
The controller is based on a hardware platform that includes a personal computer (PC), DSP,
and FPGA. The PC is the user interface for monitoring and parameterizing the full system. The DSP
operates the information between the PC and FPGA and manages the external alarms. The FPGA
executes the state machine according to travel direction and train position and controls the on/off
positions of switches S1 and S2. Other auxiliary functions executed in the FPGA are switching the
thyristors on and off in synchronization with voltage phase, generating optical fiber signals for thyristor
firing, calculating current RMS value, and treating alarms and data management with DSP.
The state machine executes the sequence listed in Table 1 when the train travels from section 1 to
section 2 and executes the reverse sequence when the train travels from section 2 to section 1.
The synchronization is based on the phase locked loop (PLL) of monophase voltages of section 1
and section 2. In state 5 in Table 1, the switching on is synchronized to avoid the inrush current of
traction transformer. In state 7, the switching off of S2 is at low current. Before state 7, switch S1 is
blocked and switch S2 is closed and the train is out of the NS; in this condition, the current path is
through switch S2 and the RC snubber of switch S1. The RC snubber limits to a low AC current value
near the holding current characteristic of the thyristors connected in series. When the thyristor firing
is removed, the anode–cathode current must be lower than the holding current characteristic of the
thyristor to get the blocking. Dispersion of the holding current characteristics can cause blocking of
several thyristors and conduction of the rest. To get simultaneous blocking of all thyristors connected
in series, the thyristor firing is removed when the anode–cathode current is near zero, synchronized
with the maximum voltage amplitude blocked by switch S1.
Energies 2018, 11, 2740 9 of 17
5. Testing
The process of experimental validation was divided into two parts: laboratory tests and final test
in real conditions with train and railway infrastructure.
The laboratory tests were based on partial testing processes due to the limited power of the facility.
The sequence of the proposed partial tests guaranteed success in the final application. The power
and voltage levels of the solution are very high and the laboratory requirements for validation are
complex and expensive. A methodology was proposed in [22] based on synthetic tests for thyristor
valves used in high-voltage direct current (HVDC) systems, and [23] applied the methodology to
modular multi-level converters (MMC) also in HVDC application. The synthetic tests validated the
ability of the power semiconductors to support the same electrical stress of the real application.
In this way, the synthetic tests were applied at partial sections of thyristor valves, testing each
section and its thyristors at working voltage and current levels. This work proposes to extend the
synthetic tests by adding the application control to reproduce and validate the real operation in the
laboratory with minimal infrastructure. The sequence of proposed partial tests guarantees success in
the final application.
The test in real conditions with train and railway infrastructure demonstrates the technical
feasibility of the AC static switch and the proposed validation methodology.
Figure 6. Procedure for the functional testing of the AC static switch. DUT, device under test.
amplitude of section 2, near the zero-crossing current. The transient response in the RC snubber results
in a voltage average value in switches and NS but within the working voltage values. Then, S1 is
switched on in the maximum voltage amplitude of section 1 to reduce the transformer inrush current,
the NS is fed from section 1, and S2 blocks 30 KV.
Figure 7. Application conditions for the test procedure of AC static switch. PLL, phased locked loop.
DUT, device under test.
Figure 8. Switching transient between AC static switches S1 and S2 at 30 KV without load obtained in
laboratory tests. SW1, S1 voltage; SW2, S2 voltage; ZN, NS voltage.
de Andalucía. More information available in Supplementary Materials which contain Adif’s press
realease. The traction substation feeds two sections of the HSR and is in front of the NS where the
container is located. Two one-phase transformers feed the sections at 27.5 KV and 800 m of neutral
section separates the two sections. Figure 9 shows the container situation and connection to the NS.
The test procedure followed three steps: control verification, commutation of NS with the same voltage
in sections, and commutation of NS with different voltage phases in sections. The commutation test
included the following conditions in both directions of circulation:
The test procedure was realized with the laboratory high-speed train from Adif, called Seneca,
out of the business exploitation timetable. Seneca HST is based on Talgo 350, 8 Mw of traction power,
200 m in length, and 330 Km/h of maximum speed. The time to complete final tests was 5 days.
The most critical test was Seneca crossing the NS at 300 km/h in traction mode, where the available
time to commutation is minimal at nominal current level.
Figure 9. (a) Container with two AC static switches and connection to the HSR; (b) electrical scheme
with protections and connection to HSR.
• First the electrical isolation between active parts to ground into the container for 24 h was tested
and the electrical isolation in nominal conditions of exploitation was verified.
Energies 2018, 11, 2740 13 of 17
• The next step consisted of the commutation of S1 and S2 without load when the Seneca HST was
crossing the NS with its main breaker disconnected. This test was realized at different speeds in
both directions and verified the correct sequence of commutation with the system energized.
• In the last step, the HST travelled through the NS electrically connected at different speeds in
both directions. Further testing was done when the HST travelled in regenerative breaking mode,
in which the current was in opposite phase with voltage. Also tested was the stop and boot of the
HST into the neutral section. The test verified the correct sequence of commutation at nominal
voltage and different currents.
Figure 10 shows the complete electric sequence of the train crossing the NS with the states from 1
to 7 described in Table 1. The HST was near the NS and caused the transition from state 1 to state 2,
where switch S2 was activated to feed the NS. The instant the HST absorbed current from the NS
through S1 was the transition from state 2 to state 3 and the HST was powered into the NS. Figure 10
shows the sinusoidal current absorbed by the train in phase with the voltage. The change to state 4
was caused by the detection of the complete train in the NS, and the control sent the switching-off
command to S2. In the transition from state 4 to 5, the switching off at zero current crossing can be
observed and the result is a null electrical transient. Once the zero current was checked in the NS for
60 milliseconds, state 5 transitioned to state 6 and S1 was triggered on the maximum voltage amplitude
of section 2. The train was fed from section 1 and the inrush current of the traction transformer was
avoided. In three electrical cycles, the nominal current was reestablished from the NS through S1 to
the train. During state 6, the train went out from the NS and the current was reduced to zero, caused
by the progressive loss of contact with the NS catenary. Finally, the detection of the complete train out
of the NS caused the transition from state 6 to 7 and S1 was switched off at zero current.
Figure 10. HST travelling at 300 km/h from section 2 to section 1. Ch1, S1 command; Ch2, S2 command;
Ch3, NS voltage; Ch4, NS current.
The test with equal voltage in sections 1 and 2 verified the correct execution of the AC static
switch solution with a real train with low risk of failure.
Energies 2018, 11, 2740 14 of 17
5.2.3. Commutation of Neutral Section with Section Voltages with 120◦ Lag
The traction substation was configured to feed section 1 and section 2 with two 27.5 KV with a lag
of 120◦ . The Seneca HST crossed the NS electrically connected at different speeds in both directions.
Figure 11 shows the transition of the train from section 2 to section 1. The switching off of the
current in state 5 was at zero current crossing and the inrush current of transformer in state 6 was null.
The change from state 6 to 7 shows the voltage transient in the NS similar to the functionality test in
laboratory, which is shown in Figure 9. In state 6, the current absorbed from the NS was low because
the input power converter of the train reacted slowly to the change of the 120◦ phase lag. This effect
was not present when the voltages in sections 1 and 2 were equal.
Figure 11. HST travelling at 280 km/h from section 2 to section 1. Ch1, S1 command; Ch2, S2 command;
Ch3, NS voltage; Ch4, NS current.
The tests with 120◦ lag in voltages of sections 1 and 2 were realized successfully and show the
viability of the AC static switch solution based on thyristor technology.
6. Conclusions
The solution to feed the NS in the HSR system is based on thyristors working at a medium voltage
level. The concept test [10] at low voltage shows the technical viability of the solution, but the design
process identifies the complexity to achieve the electrical isolation and the difficulties in testing at
nominal conditions in the laboratory.
Current transformer topology with the same primary conductor, with high isolation and immersed
in mineral oil, is the solution proposed to achieve electrical isolation for 52 KVAC.
To test the AC static switch, a test methodology is proposed with the aims to reduce:
• expensive equipment used in the medium-voltage laboratory,
• risk of failure, and
• validation time in the final application.
The validation procedure is based on a progressive test where the power electronic components
are verified separately at nominal conditions of voltage and current:
Energies 2018, 11, 2740 15 of 17
• Functionality tests of power electronics (basic module, stack, and AC static switch) to test the
ability to support nominal voltage and current.
• Application conditions tests (basic module, stack, and AC static switch) to test the control and
power electronics operation.
The procedure and laboratory tests have been demonstrated and guaranteed the success of the
final test in the real application. Five days were required to complete the tests on the Cordoba–Malaga
High-Speed Railway.
From the application point of view, the thyristor achieves the right solution to feed high-speed
trains in neutral sections, avoiding the electrical transient of connection and disconnection of traction
transformers and failure of the train’s main breaker. Also, the AC static switch solution is suitable for
conventional railways, where the speed can be very slow and there is a risk of stopping in a neutral
section without electrical power.
Supplementary Materials: Adif’s press release on the If zone project are available online at [Link]
[Link]/ade/u08/gap/[Link]/Vo000A/CD63F8963B956BA7C1257AAA00434DF5?Opendocument, http://
[Link]/ade/u08/GAP/[Link]/Vo000A/7448B72B54087C76C1257DD600363D68?Opendocument, http:
//[Link]/[Link]/documentacion/pdf/[Link].
Author Contributions: J.M.C. conceived the solution for neutral sections based on solid state switches and wrote
the paper. I.A. and U.I. designed and realized the experimental validation in the laboratory and in real conditions
of the Cordoba–Malaga High-Speed Railway. J.A.B. contributed to the control design of the global solution,
and M.B. contributed to the power electronics design including the electrical isolation.
Funding: This work was supported in part by the Spanish Ministerio de Fomento through project IFZONE (FOM
39/08).
Conflicts of Interest: The authors declare no conflict of interest.
Abbreviations
The following abbreviations are used in this manuscript:
References
1. Steimel, A. Under Europe’s incompatible catenary voltages a review of multi-system traction technology.
In Proceedings of the Electrical Systems for Aircraft, Railway and Ship Propulsion (ESARS), Bologna, Italy,
16–18 October 2012.
2. Steimel, A. Power-electronic grid supply of AC railway systems. In Proceedings of the Optimization of
Electrical and Electronic Equipment (OPTIM), Brasov, Romania, 25–27 May 2012.
3. Di Manno, M.; Varilone, P.; Verde, P.; De Santis, M.; Di Perna, C.; Salemme, M. User friendly smart distributed
measurement system for monitoring and assessing the electrical power quality. In Proceedings of the AEIT
International Annual Conference (AEIT), Naples, Italy, 14–16 October 2015.
4. Conrado, J.; Tobajas, C.; Almenara, L.F.; Iglesias, J.; Cabello, J.; Berrios, A.; Nieva, T.; Aiarzaguena, M.
“IFZONE” Project: Improving circulation in neutral sections. In Proceedings of the 9th World Congress
Railway Research, Lille, France, 22–26 May 2011.
5. Chen, S.; Wen, Y. Discussions on the generation mechanism of spark phenomenon when locomotive running
through an electricity neutral section. In Proceedings of the International Conference on Electromagnetics in
Advanced Applications, Sydney, Australia, 20–24 September 2010; pp. 749–752.
6. Shin, H.; Cho, S.; Huh, J.; Kim, J.; Kweon, D. Application on of SFCL in Automatic Power Changeover Switch
System of Electric Railways. IEEE Trans. Appl. Supercond. 2012, 22, 5600704. [CrossRef]
7. Donguk, J.; Moonseob, H. Study of composition draft on automatic changeover system in neutral section
of electric railway catenary system for highspeed train line. In Proceedings of the 9th World Congress on
Railway Research, Lille, France, 22–26 May 2011.
8. Zhou, F.; Li, Q.; Qiu, D. Co-Phased Traction Power System Based on Balanced Transformer and Hybrid
Compensation. In Proceedings of the Asia-Pacific Power and Energy Engineering Conference, Chengdu,
China, 28–31 March 2010; pp. 1–4.
9. Mousavi, S.M.; Tabakhpour, A.; Fuchs, E.F.; Al-Haddad, K. Power Quality Issues in Railway Electrification:
A Comprehensive Perspective. IEEE Trans. Ind. Electron. 2015, 62, 3081–3090. [CrossRef]
10. Ajiki, K.; Mochinaga, Y.; Uzuka, T.; Saitoh, T.; Yoshiki, Y. Investigation of Shinkansen Static Changeover
Switch Capable of Suppression of Exciting Inrush Current into Transformer on Train. IEEJ Trans. Ind. Appl.
2001, 121, 340–346. [CrossRef]
11. Hayashiya, H.; Ueda, Y.; Ajiki, K.; Watanabe, H.; Ando, M.; Nakajima, M. Investigation of closing surge in
Shinkansen Power System and proposal of a novel power electronic electronics application for changeover
section. IEEJ Trans. Ind. Appl. 2006, 126, 857–864. [CrossRef]
12. Tian, X.; Jiang, Q.; Wei, Y.; Zhang, J.; Wei, Y. Novel high speed railway uninterruptible flexible connector
based on modular multilevel converter structure. In Proceedings of the International Conference on Power
Electronics and ECCE Asia, Seoul, South Korea, 1–5 June 2015; pp. 952–958.
13. Wu, C.; Luo, A.; Shen, J.; Ma, F.J.; Peng, S. A Negative Sequence Compensation Method Based on a Two-Phase
Three-Wire Converter for a High-Speed Railway Traction Power Supply System. IEEE Trans. Power Electron.
2012, 27, 706–717. [CrossRef]
14. Grunbaum, R. FACTS to enhance availability and stability of AC Power Transmission. In Proceedings of the
Bucharest PowerTech Conference, Bucharest, Romania, 28 June–2 July 2009; pp. 1–8.
15. He, X.; Guo, A.; Peng, X.; Zhou, Y.; Shi, Z.; Shu, Z. A Traction Three-Phase to Single-Phase Cascade Converter
Substation in an Advanced Traction Power Supply System. Energies 2015, 8, 9915–9929. [CrossRef]
16. He, X.; Shu, Z. Advanced Cophase Traction Power Supply System Based on Three-Phase to Single-Phase
Converter. IEEE Trans. Power Electron. 2014, 29, 5323–5333. [CrossRef]
17. Ladoux, P.; Fabre, J.; Caron, H. Power Quality Improvement in ac Railway Substations: The concept of
chopper-controlled impedance. IEEE Electrif. Mag. 2014, 2, 6–15. [CrossRef]
18. Han, Z.; Liu, S.; Gao, S. An Automatic System for China High-speed Multiple Unit Train Running Through
Neutral Section with Electric Load. In Proceedings of the Asia-Pacific Power and Energy Engineering
Conference, Chengdu, China, 28–31 March 2010; pp. 1–3.
19. Uzuka, T. Faster than a Speeding Bullet: An Overview of Japanese High-Speed Rail Technology and
Electrification. IEEE Electrif. Mag. 2013, 1, 11–20. [CrossRef]
20. Wahl, F.P. Firing Series SCRs at Medium Voltage: Understanding the Topologies Ensures the Optimum Gate
Drive Selection. In Proceedings of the Power Systems World Conference, Chicago, IL, USA, 31 October 2002.
Energies 2018, 11, 2740 17 of 17
21. Aizpuru, I.; Canales, J.M.; Fernandez, J. Scalable High Insulation Power Supply for Medium Voltage Power
Converters. In Proceedings of the Integrated Power Electronics Systems (CIPS), Nuremberg, Germany, 6–8
March 2012; pp. 1–6.
22. Liu, L.; Yue, K.; Pang, L.; Zhang, X.; Li, Y.; Zhang, Q. A novel synthetic test system for thyristor level in the
converter valve of HVDC power transmission. In Proceedings of the MATEC Web of Conferences ICMMR,
Chongqing, China, 15–17 June 2016.
23. Tang, G.; He, Z.; Zha, K.; Luo, X.; Wu, Y.; Gao, C.; Wang, H. Type tests on MMC-based HVDC valve section
with synthetic test circuits. Int. Trans. Electr. Energy Syst. 2016, 26, 1983–1998. [CrossRef]
© 2018 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access
article distributed under the terms and conditions of the Creative Commons Attribution
(CC BY) license ([Link]