0% found this document useful (0 votes)
76 views21 pages

Material Calculation 1

The document provides detailed calculations for various construction materials, including quantities of dry and wet concrete, cement bags, and materials for brickwork, plastering, and flooring. It includes specific ratios for mortar mixes and the number of bricks or blocks required for different wall thicknesses. Additionally, it outlines the volume of sand and aggregate needed for different construction tasks.

Uploaded by

psychosingle581
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
76 views21 pages

Material Calculation 1

The document provides detailed calculations for various construction materials, including quantities of dry and wet concrete, cement bags, and materials for brickwork, plastering, and flooring. It includes specific ratios for mortar mixes and the number of bricks or blocks required for different wall thicknesses. Additionally, it outlines the volume of sand and aggregate needed for different construction tasks.

Uploaded by

psychosingle581
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

CALCULATIONS FOR M

[Link] DESCRIPTION
1

QTY OF DRY CONCRETE

QTY OF WET CONCRETE

CEMENT IN BAGS

2 BRICKWORK/230 mm thk - CM 1 : 6 / CUM

AS PER CODE MORTAR THICKNESS = 10 MM

NO. OF BRICKS / CUM = 500 NOS

[Link] BRICKWORK WITH MORTAR

VOL. OF BRICKWORK

[Link] WET MORTAR

VOL. OF DRY MORTAR

VOL. OF CEMENT IN CUM

CEMENT I BAG

[Link] SAND
3 BRICKWORK IN PARTITION/115 MM THK/CM 1:4

NO. OF BRICKS REQUIRED

VOL. OF BRICKS WITH MORTAR

VOL. OF BRICKS

VOL. OF WET MORTAR

VOL. OF DRY MORTAR

VOL. OF CEMENT REQUIRED

NO. OF CEMENT BAGS REQUIRED

400 x 200 x200 (CM - 1:6)PER CUM/400x200x150 CM-(1:6) PER


CUM/ 400 x 200 x 100 CM 1:4 PER SQM

4 INSIDE WALL PLASTERING / 1:6 / 12 - 15 MM THK/SQM

VOL. OF WET MORTAR

VOL. OF DRY MORTAR


VOL OF CEMENT

NO. OF BAGS OF CEMENT

[Link] SAND
5 CEILING PLASTERING / 1:3 CM/ 8 - 10 MM THK
6 OUTSIDE PLASTERING / 1:6/20 - 25 MM THK

7 VITRIFIED TILES/ 0.040 M(40MM)/1:6 CM/FLOOR TILE/SQM


VOLUME OF WET MIX
VOLUME OF DRY MIX
CEMENT BAGS REQUIRED

CEMENT REQUIRED FOR SLURRY


GRANITE FLOORING/ 50 MM THK BED/1:6 /SLURRY 4
8 KG/SMT

9 WALL TILES / 10 MM THK/1:6 /SLURRY 4 KG/SMT

PAINTING / SQM
10
1 COAT OF PRIMER + 2 COATS WALL PATTY + 2 COATS OF
Err:522 PAINT

1 COAT OF PRIMER

2 COATS WALL PATTY

2 COATS OF PAINT

1 COAT OF WALL PRIMER

2 COATS OF WALL PATTY

2 COATS OF PAINT

2 COATS OF OIL BOUND DISTEMPER


2 COATS OF TRACTOR EMULSION

2 COATS OF PREMIUM EMULSION


CALCULATIONS FOR MATERIALS

DESCRIPTION
[Link]

QTY OF DRY CONCRETE 0.455

QTY OF WET CONCRETE 0.303

CEMENT IN BAGS 3.297

KWORK/230 mm thk - CM 1 : 6 / CUM

PER CODE MORTAR THICKNESS = 10 MM

NO. OF BRICKS / CUM = 500 NOS

[Link] BRICKWORK WITH MORTAR

VOL. OF BRICKWORK

[Link] WET MORTAR

VOL. OF DRY MORTAR

VOL. OF CEMENT IN CUM

CEMENT I BAG

[Link] SAND
WORK IN PARTITION/115 MM THK/CM 1:4 SMT

NO. OF BRICKS REQUIRED

VOL. OF BRICKS WITH MORTAR

VOL. OF BRICKS

VOL. OF WET MORTAR

VOL. OF DRY MORTAR

VOL. OF CEMENT REQUIRED

NO. OF CEMENT BAGS REQUIRED

0 (CM - 1:6)PER CUM/400x200x150 CM-(1:6) PER


UM/ 400 x 200 x 100 CM 1:4 PER SQM BLOCKWORK

ALL PLASTERING / 1:6 / 12 - 15 MM THK/SQM

VOL. OF WET MORTAR

VOL. OF DRY MORTAR


VOL OF CEMENT

NO. OF BAGS OF CEMENT

[Link] SAND
G PLASTERING / 1:3 CM/ 8 - 10 MM THK
DE PLASTERING / 1:6/20 - 25 MM THK

ES/ 0.040 M(40MM)/1:6 CM/FLOOR TILE/SQM TILES REQUIRED


VOLUME OF WET MIX
VOLUME OF DRY MIX
CEMENT BAGS REQUIRED

CEMENT REQUIRED FOR SLURRY 4 KG /SMT


LOORING/ 50 MM THK BED/1:6 /SLURRY 4
KG/SMT

LES / 10 MM THK/1:6 /SLURRY 4 KG/SMT

PAINTING / SQM

RIMER + 2 COATS WALL PATTY + 2 COATS OF


PAINT

1 COAT OF PRIMER

2 COATS WALL PATTY

2 COATS OF PAINT

1 COAT OF WALL PRIMER COVERING CAPACITY

2 COATS OF WALL PATTY 10 - 15 SFT/KG

2 COATS OF PAINT

COATS OF OIL BOUND DISTEMPER 80 - 100 SFT/LTR


2 COATS OF TRACTOR EMULSION 70 - 80 SFT/LTR

2 COATS OF PREMIUM EMULSION 130 -150 SFT/LTR


1 METRE 3.28 FEET

CEMENT = 50 KG /1440 = 0.035 CUM


[Link] 1 CEMENT BAG = 1.25 CFT = 0.035

0.035 + 0.14 + 0.28 = 0.455

0.455 X 2/3 = 0.303 CUM

1/0.303 = 3.3 BAGS + 5% = 3.46 BAGS =

QTY OF SAND = 0.49 CUM/ [Link] AGG

SIZE OF BRICK = 9" X 4.5" X 3

230 X 115 X75/ 0.230 X 0.115 X0.

1/ 0.23 X 0.115X0.075 = 504 N

WET MORTAR BRICK+ MORTAR- 0.24 X 0.125 X 0.085 X

VOL OF BRICK - 0.23 x 0.115x0.075 x500

(1.275-1.00) VOL. OF WET MORTAR = 0.275 C

VOL. OF DRY MORTAR = 0.275 X 1.5 = 0

0.413CUM

VOL. OF CEMENT = 0.413 X 1 /7 = 0.0

0.059/0.035 = 1.685 BAGS/+ 5% WASTAGE

1.769 X 0.035 X 6 = 0.372 CUM X 35.


1/0.23 X 0.075 = 58 BRICKS

0.24 x0.085 X 0.125 X 58 = 0.148

0.23x0.075 X 0.115 X 58 = 0.115 C

0.148 - 0.115 = 0.033 CUM

0.033 X 1.5 = 0.0495 CUM

0.0495 x 1/5 = 0.0099 CUM

0.0099/0.035 = 0.282 BAGS /SAND = 0.282X 1.2

PLS CALCULATE
CEMENT, SAND AND
BLOCKS REQUIRED

1 X 1 X 0.015 = 0.015 CUM

0.015 X 1.5 = 0.0225 CUM


0.0225x 1/7 = 0.0032 CUM

0.0032/0.035 = 0.091 BAGS = 4

0.091 x 1.25 = X 6 = 0.1137

1/0.6 X 0.6 = 2.70 = 3 TIL


1 X 1 X 0.04 = 0.04 CUM
0.04 X 1.5 = 0.06 CUM ; 0.06x 1/7 =
0.008/0.035 = 0.22 BAGS
0.22 + 0.08 = 0.30 BAGS/ QTY OF SAND = 0.
4/50 = 0.08 BAGS CFT

OIL BOUND DISTEMPER/ TRACTOR EMUL


EMULSION/PLASTIC EMULSI

covering area/litre =

RATE/LTR COST/SFT
130 - 150 SFT/LTR 140 SFT/LTR 125/LITRE 0.893

12.5 KG/SFT 6.16 70/KG 5.6

90 SFT/LTR 0.86 65/LTR 0.72


75 SFT/LTR 1.03 190/LTR 2.53

140 SFT/LTR 0.55 375/LTR 2.68


1440 = 0.035 CUM X 35.28
G = 1.25 CFT = 0.035 CUM

0.14 + 0.28 = 0.455

2/3 = 0.303 CUM

+ 5% = 3.46 BAGS = 3.5 BAGS

CUM/ [Link] AGG .= 0.98 CUM

RICK = 9" X 4.5" X 3"

5/ 0.230 X 0.115 X0.075

115X0.075 = 504 NOS 10

4 X 0.125 X 0.085 X 500 = 1.275 1000

x 0.115x0.075 x500 = 1.00 CUM 0.01 DRY WET

MORTAR = 0.275 CUM

AR = 0.275 X 1.5 = 0.413 CUM 1cum 0.67 cum

0.413CUM 0.67 1.5 1.005

= 0.413 X 1 /7 = 0.059CUM 1 6 7

AGS/+ 5% WASTAGE= 1.769 BAGS

.372 CUM X 35.28 =13.12 CFT


0.075 = 58 BRICKS

0.125 X 58 = 0.148 CUM 2 0.23 0.115 0.01 0.000529

0.115 X 58 = 0.115 CUM 5 0.115 0.075 0.01 0.000431

0.115 = 0.033 CUM 0.00096 1.5

1.5 = 0.0495 CUM 0.92 0.075 0.069

1/5 = 0.0099 CUM 0.020875

/SAND = 0.282X 1.25 X 4 = 1.397 CFT 410 210 210

0.41 0.21 0.21 62.5

0.4 0.2 0.2 62.5

015 = 0.015 CUM

1.5 = 0.0225 CUM 0.13 1.5

1/7 = 0.0032 CUM

= 0.091 BAGS = 4.55 KG

= X 6 = 0.1137 CFT 0.795 0.035 6

6 = 2.70 = 3 TILES
0.04 = 0.04 CUM
UM ; 0.06x 1/7 = 0.008 CUM
.035 = 0.22 BAGS
QTY OF SAND = 0.22 x 1.25 x 6 = 1.65
CFT

/ TRACTOR EMULSION/PREMIUM
/PLASTIC EMULSION

ng area/litre =

LABOUR
LABOUR COST/SFT COST/SFT TOTAL COST/SFT
2.125

2.83

7.215 2.83 15.000


9.026 2.125 16.106

9.171 2.125 16.251


0.23 0.075 0.01725

58 0.23 0.075 1.0005

0.02

0.9805

0.00144 0.069

1.130063

0.130062

0.195

0.027857

0.795918

0.16695

5.889996
MATERIAL CALCULATION
[Link] DESCRIPTION QTY IN CUM
PCC [Link] FOR 1 CUM
1 VOLUMNE OF DRY CONCRETE 0.455
VOLUMNE OF WET CONCRETE 0.303
NO. OF CEMENT BAGS 3.30

VOLUME OF SAND REQUIRED 0.46


VOLUME OF AGGREGATE REQUIRED 0.92

2 BRICKWORK CM 1:6 - 230 MM THICK FOR 1 CUM


BRICKS 500
CEMENT 1.68
SAND 0.35

3 BRICKWORK CM 1:4 - 115 MM THICK FOR 1 SQM


BRICKS 58
CEMENT
SAND
4 BLOCKWORK 400 X 200 X 200 - CM 1: 6/CUM
BLOCKS 62
CEMENT
SAND
5 BLOCKWORK 400 X 200 X 150 - CM 1: 6/CUM
BLOCKS 83
CEMENT
SAND
6 BLOCKWORK 400 X 200 X 100 - CM 1: 6/SQM
BLOCKS 12.50
CEMENT
SAND
N CUM CEMENT = 50 KG /1440 = 0.035 CUM X 35.28 = 1.25 CFT

455
303
.30 BAGS

.46
.92

9" X 4.5" X 3"


SIZE OF BRICK - 230 MM X 115 MM X 75 MM
00 NOS
.68 BAGS
.35 CUM

58 NOS

62

83

2.50