Bộ biến tần
nếu cần cung
cấp cho bơm
nếu sản xuất ~ 5 đến 10 Tỷ
tại nhật: cần
Ebara cần 3 12 tháng xản
tháng để lắp xuất, vận Thời gian sx
đặt chạy thử. chuyển 1 động cơ điện
tháng ~10 đến 11
tháng
Remaining Level of Effort Actual Work Critical Remaining W... Page 1 of 10 TASK filter: All Activities
Project Baseline Bar Remaining Work Milestone © Oracle Corporation
O Mon IV CCPP Classic Schedule Layout 11-Jul-24 12:59
Activity Name Original Start Finish Total 2026 2027 2028
Duration Float
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
08-Jul-28, PROJECT SUMMARY
PROJECT SUMMARY 1004d 08-Oct-25 08-Jul-28 2d
WHOLE PROJECT SCHEDULE 1112d 08-Oct-25 08-Jul-28 2d WHOLE PROJECT SCHEDULE
BOP ERECTION 0d 0d
GT & GEN ERECTION 305d 31-Dec-26 01-Nov-27 26d 01-Nov-27, GT & GEN ERECTION
GT1 285d 31-Dec-26 12-Oct-27 46d GT1
GEN1 273d 31-Dec-26 30-Sep-27 46d GEN1
GT2 288d 17-Jan-27 01-Nov-27 26d GT2
GEN2 258d 17-Jan-27 01-Oct-27 4d GEN2
HRSG ERECTION 300d 08-Nov-26 04-Sep-27 18d 04-Sep-27, HRSG ERECTION
HRSG 1 269d 08-Nov-26 04-Aug-27 49d HRSG 1
HRSG 2 269d 09-Dec-26 04-Sep-27 2d HRSG 2
ST & GEN ERECTION 248d 22-Apr-27 27-Dec-27 27d 27-Dec-27, ST & GEN ERECTION
GEN 3 248d 22-Apr-27 27-Dec-27 4d GEN 3
ST 197d 27-Apr-27 10-Nov-27 73d ST
COMMISSIONING 280d 01-Oct-27 07-Jul-28 2d 07-Jul-28, COMMISSIONING
COLD COMMISIONING 157d 01-Oct-27 05-Mar-28 4d COLD COMMISIONING
Remaining Level of Effort Actual Work Critical Remaining W... Page 2 of 10 TASK filter: All Activities
Project Baseline Bar Remaining Work Milestone © Oracle Corporation
O Mon IV CCPP Classic Schedule Layout 11-Jul-24 12:59
Activity Name Original Start Finish Total 2026 2027 2028
Duration Float
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
27-Dec-27, Detail activities
Detail activities 810d 08-Oct-25 27-Dec-27 196d
Early work 0d 0d
Investigation work 0d 0d
Pipe test 0d 0d
Power block area 810d 08-Oct-25 27-Dec-27 196d 27-Dec-27, Power block area
TRANSFORMER AREA 0d 0d
AUX TRANSFORMERS 0d 0d
LCI & EXCITATION TRANSFORMER 0d 0d
LCI & EXCITATION COMPARTMENT 0d 0d
ISOLATED PHASE BUD-DUCT (IPB) 0d 0d
GENERATOR CIRCUIT BREAKER (GCB) 0d 0d
MAIN TRANSFORMERS 0d 0d
GAS & STEAM TURBINE AREA 810d 08-Oct-25 27-Dec-27 196d 27-Dec-27, GAS & STEAM TURBINE AREA
CLEAN & DIRTY OIL DRAIN SYSTEM 0d 0d
PEECC 0d 0d
TURBINE BUILDING 4d 08-Oct-25 12-Oct-25 1002d 12-Oct-25, TURBINE BUILDING
HVAC, LIGHTING, LIGHTNING PROTECTION, PLUMPING... 0d 0d
STRUCTURE & FINISHING WORK 5d 08-Oct-25 12-Oct-25 1109d 12-Oct-25, STRUCTURE & FINISHING WORK
BOM ISSUE FOR STEEL FABRICATION 5d 08-Oct-25 12-Oct-25 1109d BOM ISSUE FOR STEEL FABRICATION
RFQ/QUOTATION & TBE/CBE 5d 08-Oct-25 12-Oct-25 1109d RFQ/QUOTATION & TBE/CBE
PO - TURBINE BUILDING STRUCTURE (STL) 5d 08-Oct-25 12-Oct-25 1109d PO - TURBINE BUILDING STRUCTURE (STL)
STEEL STRUCTURE ERECTION 5d 08-Oct-25 12-Oct-25 1109d STEEL STRUCTURE ERECTION
ROOF & WALL CLADDING 5d 08-Oct-25 12-Oct-25 1109d ROOF & WALL CLADDING
FOUNDATITON WORK 5d 08-Oct-25 12-Oct-25 1109d 12-Oct-25, FOUNDATITON WORK
PILE DRIVING 5d 08-Oct-25 12-Oct-25 1109d PILE DRIVING
EXCAVATION / PILE CAP PREP 5d 08-Oct-25 12-Oct-25 1109d EXCAVATION / PILE CAP PREP
FOUNDATION / SLAB WORK 5d 08-Oct-25 12-Oct-25 1109d FOUNDATION / SLAB WORK
OVERHEAD CRANE 0d 0d
GT / GT AUXILIARY 506d 01-Aug-26 01-Nov-27 29d 01-Nov-27, GT / GT AUXILIARY
GT/ GT AUXILIARY #1 484d 01-Aug-26 12-Oct-27 51d 12-Oct-27, GT/ GTAUXILIARY #1
MATERIAL AVAILABLE 54d 01-Dec-26 19-Jan-27 52d 19-Jan-27, MATERIAL AVAILABLE
EMBEDDED PART & ANCHOR BOLT ONSITE 0d 01-Dec-26 10d EMBEDDED PART & ANCHOR BOLT ONSITE
GT1 AUXILIARY ONSITE 0d 12-Jan-27 60d GT1 AUXILIARY ONSITE
GT1 ONSITE 0d 19-Jan-27 5d GT1 ONSITE
FOUNDATION WORK 169d 01-Aug-26 31-Dec-26 10d 31-Dec-26, FOUNDATION WORK
PILE DRIVING 30d 01-Aug-26* 28-Aug-26 5d PILE DRIVING
EXCAVATION / PILE CAP PREP 20d 28-Aug-26 15-Sep-26 69d EXCAVATION / PILE CAP PREP
LEAN CONCRETE 2d 15-Sep-26 16-Sep-26 69d LEAN CONCRETE
REBAR INSTALLATION 30d 17-Sep-26 14-Oct-26 69d REBAR INSTALLATION
EMBEDDED PART & ANCHOR BOLT SETING 5d 01-Dec-26 06-Dec-26 10d EMBEDDED PART & ANCHOR BOLT SETING
CONCRETE POURING 28d 06-Dec-26 31-Dec-26 10d CONCRETE POURING
ERECTION WORK 315d 31-Dec-26 12-Oct-27 51d 12-Oct-27, ERECTION WORK
FOUNDATION PREPARATION 16d 31-Dec-26 15-Jan-27 10d FOUNDATION PREPARATION
GANTRY CRANE INSTALATION 16d 31-Dec-26 15-Jan-27 10d GANTRY CRANE INSTALATION
GT ON FOUNDATION 1d 19-Jan-27 20-Jan-27 5d GT ON FOUNDATION
GTAUXILIARY INSTALATION 293d 20-Jan-27 12-Oct-27 51d GTAUXILIARY INSTALATION
GT/ GT AUXILIARY #2 472d 01-Sep-26 01-Nov-27 29d 01-Nov-27, GT/ GT AUXILIARY #2
MATERIAL AVAILABLE 53d 22-Dec-26 08-Feb-27 30d 08-Feb-27, MATERIAL AVAILABLE
EMBEDDED PART & ANCHOR BOLT ONSITE 0d 22-Dec-26 14d EMBEDDED PART & ANCHOR BOLT ONSITE
GT ONSITE 0d 08-Feb-27 4d GT ONSITE
GTAUXILIARY ONSITE 0d 08-Feb-27 30d GTAUXILIARY ONSITE
FOUNDATION WORK 153d 01-Sep-26 17-Jan-27 14d 17-Jan-27, FOUNDATION WORK
PILE DRIVING 30d 01-Sep-26* 28-Sep-26 2d PILE DRIVING
Remaining Level of Effort Actual Work Critical Remaining W... Page 3 of 10 TASK filter: All Activities
Project Baseline Bar Remaining Work Milestone © Oracle Corporation
O Mon IV CCPP Classic Schedule Layout 11-Jul-24 12:59
Activity Name Original Start Finish Total 2026 2027 2028
Duration Float
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
EXCAVATION / PILE CAP PREP 20d 28-Sep-26 16-Oct-26 57d EXCAVATION / PILE CAP PREP
LEAN CONCRETE 2d 16-Oct-26 17-Oct-26 57d LEAN CONCRETE
REBAR INSTALLATION 30d 17-Oct-26 13-Nov-26 57d REBAR INSTALLATION
EMBEDDED PART & ANCHOR BOLT SETING 5d 18-Dec-26 22-Dec-26 14d EMBEDDED PART & ANCHOR BOLT SETING
CONCRETE POURING 28d 22-Dec-26 17-Jan-27 14d CONCRETE POURING
ERECTION WORK 319d 17-Jan-27 01-Nov-27 29d 01-Nov-27, ERECTION WORK
FOUNDATION PREPARATION 16d 17-Jan-27 31-Jan-27 14d FOUNDATION PREPARATION
GANTRY CRANE DISMANTLE & TRANSPORT 5d 20-Jan-27 25-Jan-27 5d GANTRY CRANE DISMANTLE & TRANSPORT
GANTRY CRANE INSTALATION 16d 25-Jan-27 08-Feb-27 5d GANTRY CRANE INSTALATION
GT ON FOUNDATION 1d 08-Feb-27 09-Feb-27 4d GT ON FOUNDATION
GTAUXILIARY INSTALATION 293d 09-Feb-27 01-Nov-27 29d GTAUXILIARY INSTALATION
AIR INTAKE 0d 0d
AIR INTAKE #2 0d 0d
AIR INTAKE #1 0d 0d
ST / ST AUXILIARY 376d 31-Oct-26 10-Nov-27 73d 10-Nov-27, ST / ST AUXILIARY
MATERIAL AVALABLE 70d 23-Mar-27 01-Jun-27 73d 01-Jun-27, MATERIAL AVALABLE
EMBEDDED PART & ANCHOR BOLT ONSITE 0d 23-Mar-27 4d EMBEDDED PART & ANCHOR BOLT ONSITE
ST HP & IP ONSITE 0d 01-Jun-27 81d ST HP & IP ONSITE
STAUXILIARY ONSITE 0d 01-Jun-27 81d STAUXILIARY ONSITE
ST LP ONSITE 0d 01-Jun-27 73d ST LP ONSITE
FOUNDATION WORK 197d 31-Oct-26 27-Apr-27 84d 27-Apr-27, FOUNDATION WORK
PILE DRIVING 30d 31-Oct-26* 27-Nov-26 87d PILE DRIVING
EXCAVATION / PILE CAP PREP 20d 27-Nov-26 15-Dec-26 171d EXCAVATION / PILE CAP PREP
LEAN CONCRETE 2d 15-Dec-26 16-Dec-26 171d LEAN CONCRETE
REBAR INSTALLATION 30d 17-Dec-26 13-Jan-27 171d REBAR INSTALLATION
EMBEDDED PART & ANCHOR BOLT SETING 10d 23-Mar-27 01-Apr-27 84d EMBEDDED PART & ANCHOR BOLT SETING
CONCRETE POURING 28d 01-Apr-27 27-Apr-27 84d CONCRETE POURING
ERECTION WORK 303d 09-Feb-27 10-Nov-27 81d 10-Nov-27, ERECTION WORK
GANTRY CRANE DISMANTLE & TRANSPORT 5d 09-Feb-27 14-Feb-27 79d GANTRY CRANE DISMANTLE & TRANSPORT
GANTRY CRANE INSTALATION 16d 14-Feb-27 28-Feb-27 79d GANTRY CRANE INSTALATION
Foundation Supports setup 37d 27-Apr-27 30-May-27 84d Foundation Supports setup
ST INSTALATION SUMMARY 179d 01-Jun-27 10-Nov-27 81d ST INSTALATION SUMMARY
GENERATOR / AUXILIARY 568d 01-Aug-26 27-Dec-27 4d 27-Dec-27, GENERATOR /AUXILIARY
GENERATOR / AUXILIARY #1 472d 01-Aug-26 30-Sep-27 51d 30-Sep-27, GENERATOR /AUXILIARY #1
MATERIAL AVAILABLE 78d 01-Dec-26 09-Feb-27 51d 09-Feb-27, MATERIAL AVAILABLE
EMBEDDED PART & ANCHOR BOLT ONSITE 0d 01-Dec-26 78d EMBEDDED PART & ANCHOR BOLT ONSITE
GEN STATOR ONSITE 0d 19-Jan-27 73d GEN STATOR ONSITE
GEN ROTOR & AUXILIARY ONSITE 0d 09-Feb-27 51d GEN ROTOR & AUXILIARY ONSITE
FOUNDATION WORK 169d 01-Aug-26 31-Dec-26 78d 31-Dec-26, FOUNDATION WORK
PILE DRIVING 30d 01-Aug-26 28-Aug-26 137d PILE DRIVING
EXCAVATION / PILE CAP PREP 20d 28-Aug-26 15-Sep-26 137d EXCAVATION / PILE CAP PREP
LEAN CONCRETE 2d 15-Sep-26 16-Sep-26 137d LEAN CONCRETE
REBAR INSTALLATION 30d 17-Sep-26 14-Oct-26 137d REBAR INSTALLATION
EMBEDDED PART & ANCHOR BOLT SETING 5d 01-Dec-26 06-Dec-26 78d EMBEDDED PART & ANCHOR BOLT SETING
CONCRETE POURING 28d 06-Dec-26 31-Dec-26 78d CONCRETE POURING
ERECTION WORK 303d 31-Dec-26 30-Sep-27 51d 30-Sep-27, ERECTION WORK
FOUNDATION PREPARATION 16d 31-Dec-26 15-Jan-27 78d FOUNDATION PREPARATION
GEN STATOR ON FOUNDATION 1d 20-Jan-27 21-Jan-27 72d GEN STATOR ON FOUNDATION
GENAUXILIARY INSTALATION 258d 09-Feb-27 30-Sep-27 51d GENAUXILIARY INSTALATION
GENERATOR / AUXILIARY #2 438d 01-Sep-26 01-Oct-27 4d 01-Oct-27, GENERATOR /AUXILIARY #2
LABLE 54d 22-Dec-26 09-Feb-27 5d 09-Feb-27, LABLE
EMBEDDED PART & ANCHOR BOLT ONSITE 0d 22-Dec-26 15d EMBEDDED PART & ANCHOR BOLT ONSITE
Remaining Level of Effort Actual Work Critical Remaining W... Page 4 of 10 TASK filter: All Activities
Project Baseline Bar Remaining Work Milestone © Oracle Corporation
O Mon IV CCPP Classic Schedule Layout 11-Jul-24 12:59
Activity Name Original Start Finish Total 2026 2027 2028
Duration Float
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
GEN STATOR ONSITE 0d 09-Feb-27 4d GEN STATOR ONSITE
GEN ROTOR & AUXILIARY ONSITE 0d 09-Feb-27 5d GEN ROTOR & AUXILIARY ONSITE
FOUNDATION WORK 153d 01-Sep-26 17-Jan-27 15d 17-Jan-27, FOUNDATION WORK
PILE DRIVING 30d 01-Sep-26 28-Sep-26 58d PILE DRIVING
EXCAVATION / PILE CAP PREP 20d 28-Sep-26 16-Oct-26 58d EXCAVATION / PILE CAP PREP
LEAN CONCRETE 2d 16-Oct-26 17-Oct-26 58d LEAN CONCRETE
REBAR INSTALLATION 30d 17-Oct-26 13-Nov-26 58d REBAR INSTALLATION
EMBEDDED PART & ANCHOR BOLT SETING 5d 18-Dec-26 22-Dec-26 15d EMBEDDED PART & ANCHOR BOLT SETING
CONCRETE POURING 28d 22-Dec-26 17-Jan-27 15d CONCRETE POURING
ERECTION WORK 285d 17-Jan-27 01-Oct-27 4d 01-Oct-27, ERECTION WORK
FOUNDATION PREPARATION 16d 17-Jan-27 31-Jan-27 15d FOUNDATION PREPARATION
GEN STATOR ON FOUNDATION 1d 09-Feb-27 10-Feb-27 4d GEN STATOR ON FOUNDATION
GEN AUXILIARY INSTALATION 258d 10-Feb-27 01-Oct-27 4d GEN AUXILIARY INSTALATION
GENERATOR / AUXILIARY #3 467d 31-Oct-26 27-Dec-27 4d 27-Dec-27, GENERATOR /AUXILIARY #3
MATERIAL AVAILABLE 47d 09-Feb-27 23-Mar-27 54d 23-Mar-27, MATERIAL AVAILABLE
GEN ROTOR & AUXILIARY ONSITE 0d 09-Feb-27 101d GEN ROTOR & AUXILIARY ONSITE
GEN STATOR ONSITE 0d 23-Feb-27 84d GEN STATOR ONSITE
EMBEDDED PART & ANCHOR BOLT ONSITE 0d 23-Mar-27 4d EMBEDDED PART & ANCHOR BOLT ONSITE
FOUNDATION WORK 192d 31-Oct-26 22-Apr-27 4d 22-Apr-27, FOUNDATION WORK
PILE DRIVING 30d 31-Oct-26 27-Nov-26 87d PILE DRIVING
EXCAVATION / PILE CAP PREP 20d 27-Nov-26 15-Dec-26 87d EXCAVATION / PILE CAP PREP
LEAN CONCRETE 2d 15-Dec-26 16-Dec-26 87d LEAN CONCRETE
REBAR INSTALLATION 30d 17-Dec-26 13-Jan-27 87d REBAR INSTALLATION
EMBEDDED PART & ANCHOR BOLT SETING 5d 23-Mar-27 28-Mar-27 4d EMBEDDED PART & ANCHOR BOLT SETING
CONCRETE POURING 28d 28-Mar-27 22-Apr-27 4d CONCRETE POURING
ERECTION WORK 275d 22-Apr-27 27-Dec-27 4d 27-Dec-27, ERECTION WORK
FOUNDATION PREPARATION 16d 22-Apr-27 07-May-27 4d FOUNDATION PREPARATION
GEN STATOR ON FOUNDATION 1d 07-May-27 08-May-27 4d GEN STATOR ON FOUNDATION
GENAUXILIARY INSTALATION 258d 08-May-27 27-Dec-27 4d GENAUXILIARY INSTALATION
SURFACE CONDENSER / CONDENSATE 0d 0d
HRSG AREA 424d 01-Aug-26 29-Sep-27 18d 29-Sep-27, HRSG AREA
HRSG AREA#1 393d 01-Aug-26 29-Aug-27 49d 29-Aug-27, HRSG AREA #1
HRSG PIPERACK #1 0d 0d
STEAM & WATER ANALYSIS SYSTEM #1 0d 0d
CONTINUOUS EMISSION MONITORING SYSTEM (CEMS) #1 0d 0d
BOILER FEED WATER SYSTEM #1 0d 0d
BLOWDOWN TANK #1 0d 0d
HRSG #1 393d 01-Aug-26 29-Aug-27 49d 29-Aug-27, HRSG #1
MATERIAL AVAILABLE 42d 22-Sep-26 03-Nov-26 9d 03-Nov-26, MATERIAL AVAILABLE
HRSG Embedded/Anchor 0d 22-Sep-26 17d HRSG Embedded/Anchor
HRSG 0d 03-Nov-26 9d HRSG
HRSG #1 CIVIL WORK 110d 01-Aug-26 08-Nov-26 5d 08-Nov-26, HRSG #1 CIVIL WORK
PILE DRIVING 30d 01-Aug-26 28-Aug-26 5d PILE DRIVING
EXCAVATION / PILE CAP PREP 20d 28-Aug-26 15-Sep-26 5d EXCAVATION / PILE CAP PREP
LEAN CONCRETE 2d 15-Sep-26 16-Sep-26 5d LEAN CONCRETE
REBAR INSTALLATION 30d 17-Sep-26 14-Oct-26 5d REBAR INSTALLATION
EMBEDDED PART & ANCHOR BOLT SETING 10d 22-Sep-26 01-Oct-26 18d EMBEDDED PART & ANCHOR BOLT SETING
CONCRETE POURING 28d 14-Oct-26 08-Nov-26 5d CONCRETE POURING
HRSG #1 ERECTION WORK 294d 08-Nov-26 29-Aug-27 49d 29-Aug-27, HRSG #1 ERECTION WORK
HRSG Steel Structure & Casing Erection 24d 08-Nov-26 02-Dec-26 5d HRSG Steel Structure & Casing Erection
Pressure Part Modules 28d 02-Dec-26 30-Dec-26 5d Pressure Part Modules
Pressure Part OT Modules 12d 30-Dec-26 11-Jan-27 49d Pressure Part OT Modules
OCC, Secondary Steel Structure,Auxiliary 175d 11-Jan-27 05-Jul-27 49d OCC, Secondary Steel Structure,Auxiliary
Remaining Level of Effort Actual Work Critical Remaining W... Page 5 of 10 TASK filter: All Activities
Project Baseline Bar Remaining Work Milestone © Oracle Corporation
O Mon IV CCPP Classic Schedule Layout 11-Jul-24 12:59
Activity Name Original Start Finish Total 2026 2027 2028
Duration Float
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
HYDRO TEST OF HRSG#1 PRESSURE PART 30d 05-Jul-27 04-Aug-27 49d HYDRO TEST OF HRSG#1 PRESSURE PART
Chemical cleaning HRSG #1 25d 04-Aug-27 29-Aug-27 49d Chemical cleaning HRSG #1
STACK #1 ERECTION 80d 11-Jan-27 01-Apr-27 144d 01-Apr-27, STACK #1 ERECTION
Stack erection summary 80d 11-Jan-27 01-Apr-27 144d Stack erection summary
HRSG AREA#2 393d 01-Sep-26 29-Sep-27 2d 29-Sep-27, HRSG AREA #2
HRSG PIPERACK #2 0d 0d
STEAM & WATER ANALYSIS SYSTEM #2 0d 0d
CONTINUOUS EMISSION MONITORING SYSTEM (CEMS) #2 0d 0d
BOILER FEED WATER SYSTEM #2 0d 0d
BLOWDOWN TANK #2 0d 0d
HRSG #2 393d 01-Sep-26 29-Sep-27 2d 29-Sep-27, HRSG #2
MATERIAL AVAILABLE 42d 20-Oct-26 01-Dec-26 9d 01-Dec-26, MATERIAL AVAILABLE
HRSG Embedded/Anchor 0d 20-Oct-26 17d HRSG Embedded/Anchor
HRSG 0d 01-Dec-26 9d HRSG
HRSG #2 CIVIL WORK 110d 01-Sep-26 09-Dec-26 2d 09-Dec-26, HRSG #2 CIVIL WORK
PILE DRIVING 30d 01-Sep-26 28-Sep-26 2d PILE DRIVING
EXCAVATION / PILE CAP PREP 20d 28-Sep-26 16-Oct-26 2d EXCAVATION / PILE CAP PREP
LEAN CONCRETE 2d 16-Oct-26 17-Oct-26 2d LEAN CONCRETE
REBAR INSTALLATION 30d 17-Oct-26 13-Nov-26 2d REBAR INSTALLATION
EMBEDDED PART & ANCHOR BOLT SETING 10d 20-Oct-26 29-Oct-26 18d EMBEDDED PART & ANCHOR BOLT SETING
CONCRETE POURING 28d 14-Nov-26 09-Dec-26 2d CONCRETE POURING
HRSG #2 ERECTION WORK 294d 09-Dec-26 29-Sep-27 2d 29-Sep-27, HRSG #2 ERECTION WORK
HRSG Steel Structure & Casing Erection 24d 09-Dec-26 02-Jan-27 2d HRSG Steel Structure & Casing Erection
Pressure Part Modules 28d 02-Jan-27 30-Jan-27 2d Pressure Part Modules
Pressure Part OT Modules 12d 30-Jan-27 11-Feb-27 2d Pressure Part OT Modules
OCC, Secondary Steel Structure,Auxiliary 175d 11-Feb-27 05-Aug-27 2d OCC, Secondary Steel Structure,Auxiliary
HYDRO TEST OF HRSG#1 PRESSURE PART 30d 05-Aug-27 04-Sep-27 2d HYDRO TEST OF HRSG#1 PRESSURE PART
Chemical cleaning HRSG #1 25d 04-Sep-27 29-Sep-27 2d Chemical cleaning HRSG #1
STACK #2 ERECTION 80d 11-Feb-27 02-May-27 97d 02-May-27, STACK #2 ERECTION
Stack erection summary 80d 11-Feb-27 02-May-27 97d Stack erection summary
Remaining Level of Effort Actual Work Critical Remaining W... Page 6 of 10 TASK filter: All Activities
Project Baseline Bar Remaining Work Milestone © Oracle Corporation
O Mon IV CCPP Classic Schedule Layout 11-Jul-24 12:59
Activity Name Original Start Finish Total 2026 2027 2028
Duration Float
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
BALANCE OF PLANT 0d 0d
AUXILIARY BOILER 0d 0d
FOUNDATION 0d 0d
EQUIPMENT 0d 0d
EMERGENCY DIESEL GENERATOR 0d 0d
BUILDING 0d 0d
HVAC, LIGHTING, LIGHTNING PROTECTION, PLUMPING... 0d 0d
STRUCTURE & FINISHING WORK 0d 0d
FOUNDATITON WORK 0d 0d
STRUCTURE 0d 0d
COMPRESSOR AIR HOUSE 0d 0d
EQUIPMENT 0d 0d
BUILDING 0d 0d
HVAC, LIGHTING, LIGHTNING PROTECTION, PLUMPING... 0d 0d
STRUCTURE & FINISHING WORK 0d 0d
FOUNDATITON WORK 0d 0d
WATER PLANT & TANKS 0d 0d
ULTRA PURE WATER / POLISHING 0d 0d
RAW WATER TREATMENT 0d 0d
WASTE WATER TREATMENT 0d 0d
WATER TREATMENT CONTROLBUILDING 0d 0d
HVAC, LIGHTING, LIGHTNING PROTECTION, PLUMPING... 0d 0d
STRUCTURE & FINISHING WORK 0d 0d
FOUNDATITON WORK 0d 0d
DEMIN. WATER TREATMENT PLANT 0d 0d
WASTE WATER TANK 0d 0d
FILTERED STORAGE TANK 0d 0d
DEMIN. WATER TANK 0d 0d
RAW WATER TANK 0d 0d
SERVICE GAS SYSTEM 0d 0d
HYDROGEN GENERATION HOUSE 0d 0d
BUILDING 0d 0d
HVAC, LIGHTING, LIGHTNING PROTECTION, PLUMPING... 0d 0d
STRUCTURE & FINISHING WORK 0d 0d
FOUNDATITON WORK 0d 0d
EQUPMENT 0d 0d
CO2 & N2 HOUSE 0d 0d
BUILDING 0d 0d
HVAC, LIGHTING, LIGHTNING PROTECTION, PLUMPING... 0d 0d
STRUCTURE & FINISHING WORK 0d 0d
FOUNDATITON WORK 0d 0d
EQUPMENT 0d 0d
FIRE WATER SYSTEM 0d 0d
FIRE FIGHTING TRUCK STATION 0d 0d
HVAC, LIGHTING, LIGHTNING PROTECTION, PLUMPING... 0d 0d
STRUCTURE & FINISHING WORK 0d 0d
FOUNDATITON WORK 0d 0d
FIRE RINGMAIN 0d 0d
FIRE WATER PUMP STATION 0d 0d
BUILDING 0d 0d
HVAC, LIGHTING, LIGHTNING PROTECTION, PLUMPING... 0d 0d
STRUCTURE & FINISHING WORK 0d 0d
FOUNDATITON WORK 0d 0d
EQUIPMENT 0d 0d
MAIN PIPERACK / PIPING 0d 0d
MAIN PIPERACK 0d 0d
CLOSED COOING WATER(CCW) SYSTEM 0d 0d
Remaining Level of Effort Actual Work Critical Remaining W... Page 7 of 10 TASK filter: All Activities
Project Baseline Bar Remaining Work Milestone © Oracle Corporation
O Mon IV CCPP Classic Schedule Layout 11-Jul-24 12:59
Activity Name Original Start Finish Total 2026 2027 2028
Duration Float
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
TRENCH / DUCT / SLEEPER / BRIDGE 0d 0d
PIPE SLEEPERS 0d 0d
PIPE BRIDGES 0d 0d
FUEL OIL SUPPLY SYSTEM 0d 0d
DO SUPPLY LINE 0d 0d
DO TANK AREA 0d 0d
DO PUMP STATION 0d 0d
BUILDING 0d 0d
HVAC, LIGHTING, LIGHTNING PROTECTION, PLUMPING... 0d 0d
STRUCTURE & FINISHING WORK 0d 0d
FOUNDATITON WORK 0d 0d
EQUIPMENT 0d 0d
COOLING WATER SYSTEM 0d 0d
CW SIPHONG PIT / STRUCTURE 0d 0d
CW DISCHARGE LINE / OUTFALL 0d 0d
CW SUPPLY LINE 0d 0d
CHLORINE HOUSE 0d 0d
BUILDING 0d 0d
HVAC, LIGHTING, LIGHTNING PROTECTION, PLUMPING... 0d 0d
STRUCTURE & FINISHING WORK 0d 0d
FOUNDATITON WORK 0d 0d
EQUIPMENT 0d 0d
ELECTRICAL BUILDING FOR CWP 0d 0d
BUILDING 0d 0d
HVAC, LIGHTING, LIGHTNING PROTECTION, PLUMPING... 0d 0d
STRUCTURE & FINISHING WORK 0d 0d
FOUNDATITON WORK 0d 0d
EQUIPMENT 0d 0d
CW INTAKE CANAL / PUMP STATION 0d 0d
BUILDING/ STRUCTURE 0d 0d
HVAC, LIGHTING, LIGHTNING PROTECTION, PLUMPING... 0d 0d
STRUCTURE & FINISHING WORK 0d 0d
FOUNDATITON WORK 0d 0d
EQUIPMENT 0d 0d
ST/GT CONTROL BUILDING 0d 0d
BUILDING / STRUCTURE 0d 0d
HVAC, LIGHTING, LIGHTNING PROTECTION, PLUMPING... 0d 0d
STRUCTURE & FINISHING WORK 0d 0d
FOUNDATITON WORK 0d 0d
EQUIPMENT 0d 0d
CENTRAL CONTROL BUILDING 0d 0d
BUILDING / STRUCTURE 0d 0d
HVAC, LIGHTING, LIGHTNING PROTECTION, PLUMPING... 0d 0d
STRUCTURE & FINISHING WORK 0d 0d
FOUNDATITON WORK 0d 0d
EQUIPMENT 0d 0d
NON-PROCESS BUILDING & SHELTERS 0d 0d
WATCH TOWER 0d 0d
BUILDING / STRUCTURE 0d 0d
HVAC, LIGHTING, LIGHTNING PROTECTION, PLUMPING... 0d 0d
STRUCTURE & FINISHING WORK 0d 0d
FOUNDATITON WORK 0d 0d
EQUIPMENT 0d 0d
SECURITY HOUSE 0d 0d
BUILDING / STRUCTURE 0d 0d
HVAC, LIGHTING, LIGHTNING PROTECTION, PLUMPING... 0d 0d
STRUCTURE & FINISHING WORK 0d 0d
Remaining Level of Effort Actual Work Critical Remaining W... Page 8 of 10 TASK filter: All Activities
Project Baseline Bar Remaining Work Milestone © Oracle Corporation
O Mon IV CCPP Classic Schedule Layout 11-Jul-24 12:59
Activity Name Original Start Finish Total 2026 2027 2028
Duration Float
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
FOUNDATITON WORK 0d 0d
EQUIPMENT 0d 0d
HAZARDOUS WASTE STORAGE 0d 0d
BUILDING / STRUCTURE 0d 0d
HVAC, LIGHTING, LIGHTNING PROTECTION, PLUMPING... 0d 0d
STRUCTURE & FINISHING WORK 0d 0d
FOUNDATITON WORK 0d 0d
EQUIPMENT 0d 0d
LAB ROOM 0d 0d
BUILDING / STRUCTURE 0d 0d
HVAC, LIGHTING, LIGHTNING PROTECTION, PLUMPING... 0d 0d
STRUCTURE & FINISHING WORK 0d 0d
FOUNDATITON WORK 0d 0d
EQUIPMENT 0d 0d
WORKSHOP 0d 0d
BUILDING / STRUCTURE 0d 0d
HVAC, LIGHTING, LIGHTNING PROTECTION, PLUMPING... 0d 0d
STRUCTURE & FINISHING WORK 0d 0d
FOUNDATITON WORK 0d 0d
WAREHOUSE 0d 0d
BUILDING / STRUCTURE 0d 0d
HVAC, LIGHTING, LIGHTNING PROTECTION, PLUMPING... 0d 0d
STRUCTURE & FINISHING WORK 0d 0d
FOUNDATITON WORK 0d 0d
OWNER'S SCOPE BUIDING (REFERENCE ONLY) 0d 0d
FUEL GAS SUPPLY SYSTEM 0d 0d
GAS DISTRIBUTION STATION 0d 0d
GAS TREATMENT STATION 0d 0d
YARD 0d 0d
FENCE / GATE 0d 0d
ROAD AND PAVING 0d 0d
SWITCHYARD 0d 0d
TRANSMISSION LINE 0d 0d
EQUIPMENT 0d 0d
08-Jul-28, PROJECT COMMISSIONING
PROJECT COMMISSIONING 314d 29-Aug-27 08-Jul-28 2d