CHECKLIST FOR ON-SITE INSPECTION
ACTIVITY: Granite & Marble Dadoing
Project: Date:
Location: [Link] FABS-CL-GMD - 20
[Link] R0
NOTE:- PleaseRappropriate box or enter readings as per requirements
Sl. No. ITEM YES NO NA Remarks
Name,date and number of the
1
drawing
PRE-TILING CHECKS
Has the surface been prepared for
2 [ ] [ ] [ ]
dadoing ?
Is the surface smooth, free from
3 [ ] [ ] [ ]
dust and other contaminations?
Are any necessary works
4 [ ] [ ] [ ]
pending?
5 Are the required tools available? [ ] [ ] [ ]
Are there any specific
6 [ ] [ ] [ ]
requirements of the client?
Has the Granite code number and
7 [ ] [ ] [ ]
Granite name ensured?
Is the cement less than 3 months
8 [ ] [ ] [ ]
old?
CHECKS DURING TILING
Have the edges checked for
9 [ ] [ ] [ ]
straightness?
Is the Granite surface even and in
10 [ ] [ ] [ ]
one level?
Have the Granite been coated
11 [ ] [ ] [ ]
with a layer of cement slurry?
Have the Granite been gently
12 tapped after laying on the motar [ ] [ ] [ ]
bed?
POST-TILING CHECKS
Are the joints less than 3mm in
15 [ ] [ ] [ ]
width?
16 Are the joints properly aligned? [ ] [ ] [ ]
Is there any hollow sound on the
17 [ ] [ ] [ ]
granite when tapped?
Have the edges been checked for
18 [ ] [ ] [ ]
straightness?
Are all the layed Dado granite
19 [ ] [ ] [ ]
properly covered?
20 Has the grouting been done? [ ] [ ] [ ]
21 Is the granite surface plumb? [ ] [ ] [ ]
Have the setting of joints done
22 [ ] [ ] [ ]
only after a minimum of 24 hours?
Checked by: Approved by:
Sign Sign
Name Name
Date Date