CHECK LIST FOR ON-SITE QUALITY
ACTIVITY: PLUMBING (External Works)
Project: Date:
Location: [Link] FABS-CL-PL_EW - 30
[Link] R0
NOTE:- PleaseRappropriate box or enter readings as per requirements
Sl.
No. ITEM YES NO NA Remarks/ Clarifications
1 Name,date and number of the drawing
PRE-EXECUTION CHECKS
Have all the sewer pipes, traps and
other fittings free from cracks, holes
2 [ ] [ ] [ ]
and burrs etc., and is checked before
being put into use?
CHECKS DURING EXECUTION
Has the bottom of gully’s/channels laid
3 in slope at inlet to outlet of chambers [ ] [ ] [ ]
and be finished smooth?
POST-EXECUTION CHECKS
Are the spacing of inspection
chambers and manholes such that
4 [ ] [ ] [ ]
cleaning of sewer lines can be done
easily?
Have the inlets and outlets of
5 chambers and manholes plugged [ ] [ ] [ ]
during progress of the work?
Has it been ensured that
gully’s/channels of inspection
6 chambers/manholes have been given [ ] [ ] [ ]
a smooth curve if sewer lines are
intersecting at right angles?
Have the joints of sewer pipes
plugged with cotton yarn (packing
7 [ ] [ ] [ ]
rassi) before applying cement slurry
over joints?
Checked by: Approved by:
Sign Sign
Name Name
Date Date