0% found this document useful (0 votes)
69 views1 page

Plumbing Quality Check List

The document is a checklist for on-site quality control specifically for plumbing external works. It includes pre-execution, during execution, and post-execution checks to ensure proper installation and maintenance of sewer systems. Each item requires a yes, no, or not applicable response, along with space for remarks and signatures for verification.

Uploaded by

Amit Mondal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
69 views1 page

Plumbing Quality Check List

The document is a checklist for on-site quality control specifically for plumbing external works. It includes pre-execution, during execution, and post-execution checks to ensure proper installation and maintenance of sewer systems. Each item requires a yes, no, or not applicable response, along with space for remarks and signatures for verification.

Uploaded by

Amit Mondal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

CHECK LIST FOR ON-SITE QUALITY

ACTIVITY: PLUMBING (External Works)


Project: Date:
Location: [Link] FABS-CL-PL_EW - 30
[Link] R0
NOTE:- PleaseRappropriate box or enter readings as per requirements
Sl.
No. ITEM YES NO NA Remarks/ Clarifications

1 Name,date and number of the drawing


PRE-EXECUTION CHECKS
Have all the sewer pipes, traps and
other fittings free from cracks, holes
2 [ ] [ ] [ ]
and burrs etc., and is checked before
being put into use?
CHECKS DURING EXECUTION
Has the bottom of gully’s/channels laid
3 in slope at inlet to outlet of chambers [ ] [ ] [ ]
and be finished smooth?
POST-EXECUTION CHECKS
Are the spacing of inspection
chambers and manholes such that
4 [ ] [ ] [ ]
cleaning of sewer lines can be done
easily?
Have the inlets and outlets of
5 chambers and manholes plugged [ ] [ ] [ ]
during progress of the work?
Has it been ensured that
gully’s/channels of inspection
6 chambers/manholes have been given [ ] [ ] [ ]
a smooth curve if sewer lines are
intersecting at right angles?
Have the joints of sewer pipes
plugged with cotton yarn (packing
7 [ ] [ ] [ ]
rassi) before applying cement slurry
over joints?
Checked by: Approved by:
Sign Sign
Name Name
Date Date