REQUEST FOR INSPECTION
4239 - REHABILITATION OF PORT HARTCOURT MOD-RFI-201 Is.1
REFINERY PROJECT (Port Harcourt – Nigeria) 28 July 2021
RFI NUMBER MUP-TCM-PHRC-PNTG -12282 DATE 12 June 2024
CONTRACTOR /SUBCONTRACTOR TECNIMONT NIGERIA LTD/MONTEGO UPSTREAM SERVICES/PIVOTGIS
DISCIPLINE PAINTING
FROM CONTRACTOR/ SUBCONTRACTOR SIGNATURE
TO OWNER CC ALABI O. OLUBODUN JESUJOBA
ITEMS TO BE INSPECTED
BLASTING & PAINTING:
12D58, 12D53, 12D59
SECTION 1
INSPECTION DATE/TIME 13-Jun-24 08:00am UNIT/AREA AREA 02
REFERENCE TO ITP NR. 4239-LZ-VD-QS30100139010 ITP PHASE Sections: 4.0 - 24.0
FORMS ATTACHED MOD-ITP-WL_611
REFERENCE DRAWINGS 4239-CD-SE-0012D53,4239-CD-SE-0012D58, 4239-CD-SE-0012D59
CONTRACTOR INSPECTION POINT Hold Point Witness point
OWNER INSPECTION POINT Hold Point Witness point
THIRD PARTY INSPECTION POINT Hold Point Witness point X N.A.
NOTES:
ACKNOWLEDGEMENT OF RECEIPT
(for RFI by e-mail, copy of mail receipt is sufficient and shall be attached during inspection)
PMC OWNER THIRD PARTY
Name
Signature
Date (dd-mmm-yy)
PRESENCE DURING INSPECTION
Signature
CONTRACTOR o N.A. o No o Yes
(if present)
Signature
PMC/OWNER o N.A. o No o Yes
(if present)
Signature
THIRD PARTY o N.A. o No o Yes
(if present)
ASSESSMENT
SECTION 2
INSPECTION RESULTS o Accepted o Rejected o Cancelled
REASONS FOR REJECTION (if any):
SUBCONTRACTOR CONTRACTOR PMC OWNER THIRD PARTY
Name
Signature
Date (dd-mm-yyyy)
This document is PHRC/Tecnimont's property, and cannot be used by others for any purpose, without prior written constent