Inspection Request for Port Harcourt Project

This document is a Request for Inspection (RFI) related to the Rehabilitation of the Port Harcourt Refinery Project, dated June 12, 2024. It outlines the items to be inspected, inspection date and time, and references to relevant drawings and inspection points. The document also includes sections for acknowledgment of receipt and assessment of inspection results.

Uploaded by

camila.vez55
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views1 page

Inspection Request for Port Harcourt Project

This document is a Request for Inspection (RFI) related to the Rehabilitation of the Port Harcourt Refinery Project, dated June 12, 2024. It outlines the items to be inspected, inspection date and time, and references to relevant drawings and inspection points. The document also includes sections for acknowledgment of receipt and assessment of inspection results.

Uploaded by

camila.vez55
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

REQUEST FOR INSPECTION

4239 - REHABILITATION OF PORT HARTCOURT MOD-RFI-201 Is.1


REFINERY PROJECT (Port Harcourt – Nigeria) 28 July 2021

RFI NUMBER MUP-TCM-PHRC-PNTG -12282 DATE 12 June 2024


CONTRACTOR /SUBCONTRACTOR TECNIMONT NIGERIA LTD/MONTEGO UPSTREAM SERVICES/PIVOTGIS

DISCIPLINE PAINTING

FROM CONTRACTOR/ SUBCONTRACTOR SIGNATURE

TO OWNER CC ALABI O. OLUBODUN JESUJOBA

ITEMS TO BE INSPECTED
BLASTING & PAINTING:
12D58, 12D53, 12D59
SECTION 1

INSPECTION DATE/TIME 13-Jun-24 08:00am UNIT/AREA AREA 02

REFERENCE TO ITP NR. 4239-LZ-VD-QS30100139010 ITP PHASE Sections: 4.0 - 24.0

FORMS ATTACHED MOD-ITP-WL_611

REFERENCE DRAWINGS 4239-CD-SE-0012D53,4239-CD-SE-0012D58, 4239-CD-SE-0012D59

CONTRACTOR INSPECTION POINT Hold Point Witness point

OWNER INSPECTION POINT Hold Point Witness point

THIRD PARTY INSPECTION POINT Hold Point Witness point X N.A.

NOTES:

ACKNOWLEDGEMENT OF RECEIPT
(for RFI by e-mail, copy of mail receipt is sufficient and shall be attached during inspection)

PMC OWNER THIRD PARTY

Name

Signature

Date (dd-mmm-yy)

PRESENCE DURING INSPECTION


Signature
CONTRACTOR o N.A. o No o Yes
(if present)
Signature
PMC/OWNER o N.A. o No o Yes
(if present)
Signature
THIRD PARTY o N.A. o No o Yes
(if present)

ASSESSMENT
SECTION 2

INSPECTION RESULTS o Accepted o Rejected o Cancelled

REASONS FOR REJECTION (if any):

SUBCONTRACTOR CONTRACTOR PMC OWNER THIRD PARTY

Name

Signature

Date (dd-mm-yyyy)

This document is PHRC/Tecnimont's property, and cannot be used by others for any purpose, without prior written constent