GENERAL NOTES:
ELECTRICAL SYMBOLS
LOCATION PLAN THE ELECTRICAL WORK SHALL BE DONE IN ACCORDANCE WITH THE PROVISIONS OF THE LATEST
EDITION OF THE PHILIPPINE ELECTRICAL CODE, APPLICABLE ORDINANCES OF THE LOCAL
GOVERNMENT AND THE REQUIREMENTS OF THE LOCAL POWER AND TELEPHONE COMPANIES.
ALL WIRINGS SHALL BE INSTALLED IN STANDARD CONDUIT PIPES RUN EMBEDDED INSIDE THE
CONCRETE AND HALLOW BLOCK STRUCTURES,SLABS, COLUMN AND/OR RUN CONCEALED BETWEEN
DOUBLE WALL WOODEN PARTITIONS AND INSIDE THE CEILING SPACES.
TO CATAG PARDO
THE POWER SUPPLY SHALL BE 230VOLTS, THREE PHASE, THREE WIRE, 60HERTZ A.C.
UNLESS OTHERWISE INDICATED ON THE PLANS, THE MINIMUM SIZE OF WIRE AND CONDUIT TO BE
USED SHALL BE 2.0mm SQ. AND 20mm DIAM. PVC(15mm DIAM. RSC) RESPECTIVELY.
ALL LIGHTING CIRCUIT HOMERUNS AND CONVENIENCE OUTLETS SHALL BE WIRED WITH NOT LESS
THAN 3.5mm SQ. IN SIZE. ALL 15A AND 20A CIRCUIT HOMERUNS TO PANELBOARD MORE THAN
30METERS IN LENGTH SHALL BE WIRED WITH NOT LESS THAN 5.5mm SQ. IN SIZE, UNLESS EF
OTHERWISE INDICATED ON THE PLANS.
ALL NON-CURRENT CARRYING METAL PARTS OF EQUIPMENT IN THE SYSTEM SHALL BE PROPERLY
TO SHARON VILLAGE CATAG GROUNDED IN ACCORDANCE WITH THE PROVISIONS OF THE LATEST EDITION OF THE PHILIPPINE
ELECTRICAL CODE.
THIS S ALL MATERIALS SHALL BE NEW AND OF THE APPROVED TYPE.
ITE
ALL BOXES SHALL BE INSTALLED IN AN INCONSPICUOUS LOCATIONS ALTHOUGH SUCH BOXES WERE
NOT SHOWN ON THE PLANS NOR MENTIOED ON THE SPECIFICATONS.
ST STEPHEN ST
ALL WALL OUTLETS SHALL BE INSTALLED AT THE FOLLOWING HEIGHTS ABOVE THE FINISHED
FLOORLEVEL, UNLESS OTHERWISE NOTED;
WALL SWITCHES 1370mm
CONVENIENCE OUTLETS 300mm(150mm above counter/working
table)
TELEPHONE/INTERCOM/ TV OUTLETS ----------------------DO-------------------
WATER HEATER 300mm below ceiling
EXHAUST FAN OUTLET ---------DO----------
ALL ELECTRICAL WORKS SHALL BE DONE UNDER THE DIRECT AND IMMEDIATE SUPERVISION OF A
DULY LICENSED ELECTRICAL ENGINEER OR REGISTERED MASTER ELECTRICIAN.
BIRTHING CENTER
TO SM LUNA ST EXTN TOSOLANA
CEILING CEILING CEILING
UTILITY POWER LINE, 13.2KV UTILITY POWER LINE, 13.2KV UTILITY POWER LINE, 13.2KV
FIFTH FLOOR FIFTH FLOOR FIFTH FLOOR
FUSE CUT-OUT WITH LIGHTNING FUSE CUT-OUT WITH LIGHTNING FUSE CUT-OUT WITH LIGHTNING
ARRESTER ASSEMBLY ARRESTER ASSEMBLY ARRESTER ASSEMBLY
FOURTH FLOOR FOURTH FLOOR FOURTH FLOOR
REFER TO POWER REFER TO POWER
ELECTRIC ELECTRIC
REFER TO POWER ELECTRIC COOPERATIVE COOPERATIVE COOPERATIVE
1-37.5KVA DISTRIBUTION 1-50KVA DISTRIBUTION TRANSFORMER 1-50KVA DISTRIBUTION TRANSFORMER
THIRD FLOOR THIRD FLOOR THIRD FLOOR
TRANSFORMER
2ND FLOOR 2ND FLOOR
M M M M M M M M M M M M
DT DT DT DT DT DT DT DT DT DT DT DT
PBB111 PBB118 PBB-ADMIN PBB-ER GROUND FLOOR PBA201 PBA220 PBA301 PBA320 GROUND FLOOR PBA201 PBA220 PBA301 PBA320 GROUND FLOOR
GROUND FLOOR 2ND & 3RD FLOOR 4TH & 5TH FLOOR
RISER DIAGRAM RISER DIAGRAM RISER DIAGRAM
PROPOSED PROJECT TITLE: CONCURRED BY: SHEET CONTENT: SHEET No.:
PRC. REG. No. : 12350 PRC. REG. No. :
MARLON M. MABBORANG
PTR. No. : 3322069 PTR. No. : AS SHOWN
PLACE ISSUED : 01-03-25 DATE ISSUED :
REGISTERED ELECTRICAL ENGINEER PROFESSIONAL ELEECTRICAL ENGINEER
DATE ISSUED : TUG. CITY PLACE ISSUED : TUG. CITY LOCATION : OWNER ELECTRICAL