Ref: STE/ME-NEW SCK 2023 /106/06-25 Date: 14/06/2025
To
The Principal
KIND ATTEN : HOD / Mechanical Engg
Dear Sir
Sub: Test Rig/ Instruments –Quotation for Mechanical Engineering Practical New Regulation 2023 Syllabus -
V Semester
With Reference to the above, we have great pleasure in submitting our offer hereunder for your kind
consideration. We trust our below offer is quite in line with your requirement and accordingly awaiting your valued
order at the earliest which receive our prompt attention
Sl No Description of Equipments / Tools Rate /
MAINTENANCE, REPAIR AND SERVICE Qty
1 BEARING , SHAFT ASSEMBLY UNIT WITH MOTOR 28,500
Practical Exercises
Exp No 7: Bearing: Inspection, Removal, Cleaning, lubrication and refitting of bearings. Dismantle
and assemble the bearing from a shaft assembly unit
Exp No 8: Couplings: Maintenance, Repair and replacement and alignment of shaft. Installation
and alignment of driving and driven shafts using Plummer block bearings.
Exp No 9: Belts: Mounting of belts and checking of slip. Installation of belt drives using Motor, V
belt and driving and driven pulley
Exp No 10: Chain drive: Tighten and replace the chain. Installation of chain drives using
motor, sprocket and chain drive.
Tools Included
Magnetic Stand with Dial Indicator, Straight Edge, Sprit Level, Bearing Puller, Allen key set,
Rubber Hammer, Torque Wrench
2 BELT DRIVE CONVEYER 39,000
Conveyer Type : Flat Belt type conveyer
Loading Capacity : 50 KG
Including speed reduction gear box with 0.5 hp Motor
Industrial Use Model
3 DC Motor 500 W / 24 V 4850
Exp No 4 : Dismantle and assemble of D C Motor. Identify the troubles and mention the
corrective measures.
4 HYDRAULIC DOUBLE ACTING CYLINDER 6800
Exp No 5 : Dismantle and assemble the Hydraulic cylinder. Identify the troubles and
mention the corrective measures
5 DIRECTIONAL CONTROL VALVE (Hydraulic – Solenoid Operated ) 6250
Exp No 6: Dismantling and assembly of Directional control valve. Identify the troubles and
mention the corrective measures.
TERMS AND CONDITIONS
1. Sales Tax : GST@ 18% will be charged extra.
2. Transport : Extra at Actual
3. Payment : 80% Advance along with the Order 20% against proof of Dispatch
4. Delivery : 3 to 4 Weeks earlier.
Thanking you
Yours faithfully
forSMAP TECH ENTERPRISES
S VEERAKUMAR, ME
Managing Director
Cell: 8122034446