The document outlines a series of checklists for various civil works related to building construction, including rainwater protection, concreting, and plastering. Each checklist specifies activities, acceptance criteria, and observation sections to ensure compliance with construction standards. The checklists are to be completed and signed by designated personnel upon completion of each task.

Uploaded by

Aditya Kale
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
442 views52 pages

Checklist Modification - RCC & Finishing

The document outlines a series of checklists for various civil works related to building construction, including rainwater protection, concreting, and plastering. Each checklist specifies activities, acceptance criteria, and observation sections to ensure compliance with construction standards. The checklists are to be completed and signed by designated personnel upon completion of each task.

Uploaded by

Aditya Kale
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

GROUP OF COMPANIES

Forms / Formats, Issue-1, Rev.1, Dt-


Title: Table of Content Page 1 of 1

CHECLIST-CIVIL & OTHER WORKS


SR.NO TITLE Custodian Rev.no./ Retention Period
dt.
1 Checklist for protection for Building Incharge Upto Bldg Completion
rain water ingress
2 Checklist For Concreting Building Incharge Upto Bldg Completion
Works Other Than Slab
3 Checklist for Column Building Incharge Upto Bldg Completion
concreting
4 Checklist For Beam Bottom Building Incharge Upto Bldg Completion
5 Checklist For Shuttering Building Incharge Upto Bldg Completion
Before Placing Reinforcement.
6 Checklist For Slab Concreting. Building Incharge Upto Bldg Completion
7 Checklist For Electrical Works Building Incharge Upto Bldg Completion
Of Slab
8 Checklist for concrete process Building Incharge Upto Bldg Completion

9 Checklist for Concreting works Building Incharge Upto Bldg Completion


after deshuttering
10 Checklist For Block Masonry. Building Incharge Upto Bldg Completion
11 A Checklist For Gyp. Plaster (To Building Incharge Upto Bldg Completion
be filled up before starting of
GVP)
11 B Post Checklist For Gypsum Building Incharge Upto Bldg Completion
Plaster
12 Checklist For Internal Plaster Building Incharge Upto Bldg Completion
(Cement)
13 Checklist For External Plaster Building Incharge Upto Bldg Completion
14 Post checklist for Plastering Building Incharge Upto Bldg Completion
(Internal / External)
15 Waterproofing Checklist For Building Incharge Upto Bldg Completion
Toilets / Kit / Balcony
16 Checklist For U.G. Building Incharge Upto Bldg Completion
Tank/O.H.Tank Water
Proofing
17 Post checklist for Building Incharge Upto Bldg Completion
Waterproofing
18 Checklist For Marble Fixing Building Incharge Upto Bldg Completion
Before Polishing Starts
19 Checklist For Toilet / Kit. Building Incharge Upto Bldg Completion
Flooring / Dado Tiling
20 Checklist For Sub grade Building Incharge Upto Bldg Completion
Preparation
21 Checklist For Soling Building Incharge Upto Bldg Completion
22 Checklist For WBM Building Incharge Upto Bldg Completion
23 Checklist For Tremix Building Incharge Upto Bldg Completion
24 Waterproofing Checklist For Building Incharge Upto Bldg Completion
Terrace / Refuge flat / Podium
25 Electrical Checklist For Building Incharge Upto Bldg Completion
Completion of Flat
26 Checklist While Giving Building Incharge Upto Bldg Completion
Possession Of Flats
27 Checklist for Internal Painting Building Incharge Upto Bldg Completion

28 Melamine Polishing (for door Building Incharge Upto Bldg Completion


frame, door shutter, cover
moulding, mirror moulding &
paneling in lift lobby &
entrance).
29 False ceiling Building Incharge Upto Bldg Completion

30 Checklist For Buildings with Building Incharge Upto Bldg Completion


Aluminium Formwork
31 Checklist For filling bolt hole Building Incharge Upto Bldg Completion
& cavity of wall ties : For
Aluminium formwork building
32 Checklist For External Building Incharge Upto Bldg Completion
Painting
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 1
Title: Checklist For Protection for Rainwater ingress Rev.1, dated 24-8-09
Building Location
Date.

Sr. Activity Acceptance Criteria Observation


No.
1 Provision of at least 4nos Sumps plus Slope of 1: 30, shall be
temporary Periphery Drain , to drain out provided for the drains & min
sub soil water (for below ground level 4 nos Sumps of size 3’ x 3’, at
works) the 4 corners of mass
excavation done.
2 Diversion of water coming towards Shall be provided, to suit the
concreting area in form of bunds, nallah , site condition case by case.
pumping etc.
3 Cover on the top of mixer hoist. Shall be provided with a one
way slope of 1:30, with G.I
Sheets 4’ x8’, covered with
waterproof PVC sheets of 200
gsm .
4 Cover on the top of concrete tray at PVC sheet 200gsm shall be
pouring point. provided of size 6’x6’
5 Cover on the wheel barrow / trolley while PVC sheet 200gsm shall be
transporting concrete. provided of size 4’x5’
6 Covering in the form of safe/ stable/ Shall be provided of bamboos,
correct sized pandal over concreting area. with PVC sheets of 200gsm
covered on top, with a 2 way
1:30 slope, covering the entire
area of slab to be concreted,
with additional 1’6” projection.

Foreman____________________________

Junior / Site Engineer ____________________________________

Senior /Sector Engineer______________________________________________________________

NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 2
Title: Checklist For Concreting Works Other Than Rev.1, dated 24-8-09
Slab.

Building Location
Date.

Sr. Activity Acceptance Criteria Observation


No.
1 Provision of Mechanical Needle Electric Vibrators - 2 Nos
Vibrators 60mm & 40mm, depending on & Petrol - Vibrator - 1
Congestion of Rebar. No. shall be available in
working condition.
2. Provision of Screed Vibrator ( For 1 no shall be available, as
Vacuum Dewatered Concrete works only per fabricated by our
) Mech. Dept & Carpenters.
3 Position of Formwork As per RCC Drg.
No.:_______,
Rev. No.:________
4 Clear Cover of Reinforcement Shall be 75mm, 55mm, /
40mm +5 mm, for
Footing, Stub Cols below
ground & Cols above
Ground.
5 CA1,CA2 & Sand stock Available as per
requirement.
6 Provision of Cement Quantity Min 200 bags available.

7 Supports of Formwork Shall be provided on a


firm base with a Rebar
Pin, inserted preferably in
concrete.
8 Chipping of Top surface of Existing RCC Laitance removed &
surface. coarse aggregate top is
exposed compulsorily.
Note :All dwg numbers , to be referred should be filled in , before the Checklist is referred to , at
location , for Acceptance Criteria , by the Senior Engineer/Sector Engineer .

FOREMAN: --------------------------------------------

JR.ENGR/SITE ENGINEER: __________________________________________________________________

SENIOR/SECTOR ENGINEER: _______________________________________________________________

NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 3
Title: Checklist For Column Concreting. Rev.2, dated 24-8-09
Building Location Date.
Grade of concrete= M Grade of steel =
Sr. No. Activity Acceptance Criteria Observation
1 Column starter. Shall be free of honey combing, edge being not broken &
laitance removed with coarse aggregate top exposed
compulsorily.
2 Provision of Rebar (dia. & qty.), + dowels if As per Column schedule As per RCC Drg. No.:_______,
any Rev. No.:________
3 Position of Rebar. (Lapping, spacing of As per General drawing. As per RCC Drg. No.:_______,
stirrups with 45 degree legs & master ring). Rev. No.:________
4 Clear Cover of Rebar. Shall be provided of 55mm & 40mm, for below ground &
above ground respectively, with a + 5 mm tolerance.
5 Position of topmost stirrup of column. Shall be placed at 40mm below concreting top.

6 Position of guide/master stirrup above Shall be provided at Min. 600mm & Max. 1000mm.from
concreting level. concrete top.
7 Space of needle vibrator, insertion, for Shall be Min. 70mm gap to suit 60mm needle vibrator &
concreting works. Min 50mm gap to suit 40mm needle vibrator
8 Binding wire knots & tail Shall not be in Clear cover zone.

9 Shuttering works Soldiers shall be provided after every panel for column
length more than 750mm. 1st tie rod shall be at 125mm
from bottom. Window shall be provided for column height
more than 1400mm. Wedge clips shall be at 150mmc/c.
back to back angle Yokes shall be provided at each tie rod
level. Raker props shall be supported on firm base.
10 Provision of Empty cement bag below No gap shall be seen, in space between shuttering panel
shuttering panel. bottom & slab top.
11 Starter/ Column dimension (width, length, As per Drawing. Dwg No.__________
right angle, line & plumb). Rev. No.:________
12 Column top concreting level. As per Drawing. Dwg No.__________
Rev. No.:________
13 Working platform. Shall be supported on H frame with atleast 27” wide
platform.
14 Chute (Supda) at window level & top level. Shall be provided in 45 degrees slope with width of
minimum 300mm & to be provided in alternate window
panel.
15 Tools & materials for making cement slurry, 2 G.I. buckets, 1 ltr. Cylinder,500 ml bottle for plasticizer
& trey for concreting & rod for stirring
16 Two nos. electrical vibrator, one no. petrol Available near columns
vibrator & spare needle.

Note :All dwg numbers , to be referred should be filled in , before the Checklist is referred to , at
location , for Acceptance Criteria , by the Senior Engineer/Sector Engineer .

FOREMAN: _________________________JR.ENGR/SITE ENGINEER: _______________

SENIOR/SECTOR ENGINEER: ______________

NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 4
Title: Checklist For Beam Bottom Rev.1, dated 24-8-09
Building Location
Date.

Sr. Activity Acceptance Criteria Observation


No.
1 Architectural details As per Drg. No.:_______,
Rev. No.:________
2 Column Dimensions (Width and As per RCC Drg. No.:_______,
Thickness.) Rev. No.:________
3 Column Reductions As per RCC Drg. No.:_______,
Rev. No.:________
4 Beam Bottoms (width and Depth) a) Width dimension + 5mm. Max
b) Depth=Dimension+5mm
5 Level of Beam Bottoms Shall be As per drawing no. _______. With a
tolerance of + 5 mm. (no camber to be provided,
unless specified by RCC Consultant)
6 Chipping of Column Junctions Laitance removed & coarse aggregate top is
exposed compulsorily.
7 Wooden Props system Wooden prop shall be of min. 2 ½ “ diameter, at
a spacing 1’7”c/c for beam depth up to 750mm
or as per shuttering design for beam depths
more than 750mm. 1st prop from column shall
be at max. 9”for any beam depth.
8 ISLB & Acrow prop system Acrow prop shall be made of min. B class pipe.
Spacing of acrow prop shall be at 2.4m c/c for
beam depth up to 700mm. or as per shuttering
design for beam depths more than 700mm. 1st
prop from column shall be at max. 9” for any
beam depth.Variation in 3”x3” chavi shall be
max. +- 3mm.

Note :All dwg numbers , to be referred should be filled in , before the Checklist is referred to , at
location , for Acceptance Criteria , by the Senior Engineer/Sector Engineer .

Foreman____________________________

Junior / Site Engineer ____________________________________

Senior /Sector Engineer______________________________________________________________

NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 5
Title: Checklist For Shuttering Before Placing Rev.1, dated 24-8-09
Reinforcement.
Building Location Date
Sr. Activity Acceptance Criteria Observation
No.
1 Architectural details As per Drg. No.:_______,
Rev. No.:________
2 Column Dimensions (Width and Thickness.) As per RCC Drg. No.:_______,
Rev. No.:________
3 Column Reductions As per RCC Drg. No.:_______,
Rev. No.:________
4 Beam Bottoms (width and Th.) a) Width = Dimension +5mm
b) Thickness=Dimension +/-3 mm
c) Depth = Dimension+5mm
5 Slab Panel diagonals, linear dimensions. Shall be As per drawing no______. With a tolerance of + 5
mm.
6 Verticality with previous lower Panel Shall be in Plumb With a tolerance of + 5mm

7 Levels of Beam Bottom and Slab Panels. Shall be As per drawing no______. With a tolerance of + 5
mm.(No Camber to be provided unless specified by RCC
consultant)
8 Lift Pardi diagonal and verticality Shall be in vertical plumb with a tolerance of
+ 5mm, Diagonal with tolerance + 5mm.
9 Chipping of Column Junctions Laitance removed & coarse aggregate top is exposed
compulsorily.
10 Shuttering Plates. Plate Thickness shall be of min. 14 gauges, & must be free
from Rust & Structural Defect.

11 Beam/Slab Shuttering

a) Gaps between joints of shuttering material Shall be filled with ribs & masking tape of 3” width for
horizontal slab shuttering only. Masking tape shall not be
used for vertical sides.
b) Wailing 4”x1 ¼” Patti to be used as wailing. For 500mm and
600mm depth beam Internal side = 2 nos., External side = 3
nos. For 700mm & 750mm Internal side = 3 nos., External
side = 3 nos. For sides more than depth 750mm follows
approved shuttering design.
c) Studs For 500mm depth beam Internal side = 4”x1 ¼” Patti at
1’7” c/c., External side = 4”x1 ¼” Patti at 1’7” c/c. For 600
& 700mm Internal side = 4”x1 ¼” Patti at 1’3” c/c..,
External side = 3” x 3” chaavi at 1’3” c/c. For sides more
than depth 700mm follow approved shuttering design.
12 Sunk Portions As per RCC Drg. No.:_______,
Rev. No.:________
Note :All dwg numbers , to be referred should be filled in , before the Checklist is referred to , at
location , for Acceptance Criteria , by the Senior Engineer/Sector Engineer .

FOREMAN: ___________________________ JR./ SITE ENGINEER: ___________________________

SENIOR / SECTOR ENGINEER: __________________________


NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.

HIRANANDANI GROUP OF COMPANIES


FORM/FORMAT Checklist no. 6
Title: Checklist For Slab Concreting Rev.3, dated 18 July 2017

Building Location Date

All Shuttering, staging and back propping must be checked by Structural Consultant.
Sr.no Activity Acceptance Criteria Observation
1 Grade of Concrete As per RCC Drg. No.:_______, Grade M______
Rev. No.:________
2 Grade of steel As per RCC Drg. No.:_______, Grade Fe______
Rev. No.:________
3 Chipping of Column Beam Junctions Laitance removed & coarse aggregate top is exposed
compulsorily.
4 Shuttering of slab Shall be in level with tolerance of + 5mm

5 Staging/Scaffolding, including bracing ties Shall be as per approved staging design

6 Column - beams junction Shuttering Shall have minimum 50mm overlap on column
concrete. Tie rods shall be tightened with back to back
angle yokes. Wedges shall be tightened in a gap
between yokes & beam side.
7 Shikanjas at beam bottom level Shall be tightened at every stud

8 Rebar, dowels bars, cover , chairs ,column As per RCC Drg. No.:_______,
reductions Rev. No.:________
Cover slab - dimension + 2mm, Col/Beam -
Dimension + 5mm
9 Constructions joints Shall be at Locations as per approved strip system
drawing.
10 Electrical details-points ,conduits Location as per approved drawing Drg. No.:_______,

11 Inserts-water spouts, etc. Size & Location as per approved drawing Drg.
No.:_______,
13 Mechanical Needle Vibrators 60mm & 40mm, Electric Vibrators - 2 Nos & Petrol - Vibrator - 1 No.
depending on Congestion of Rebar. shall be available in working condition.
14 Screed Vibrator 1 no shall be available, as per fabricated by our Mech
Dept & Carpenters.
15 CA1,CA2 & Sand stacked Available as per requirement

16 Cement Quantity Min 300 bags shall be available

PT Slab Check points.( wherever


applicable)
17 Back Propping of Slab Back propping of slabs as per RCC and PT
requirements (i.e. Spacing, levels, locations, extent of
area etc) Dwg. No _________
18 Checking of PT strands Profile , locations , anchorage, numbers As per PT
drawing no.__________
19 PT tendons/ GI Ducting a) Any Damage to GI Ducting / PT Tendons
shall be repaired.
b) Sufficient length as per vendor available
beyond RCC surface for stressing
c) Grouting Pipe provided in sufficient number.
( For bonded type)

Note :All dwg numbers , to be referred should be filled in , before the Checklist is referred to , at
location , for Acceptance Criteria , by the Senior Engineer/Sector Engineer .

FOREMAN: ________________________________________ JR.SITE ENGINEER: ______________________

SENIOR / SECTOR ENGINEER: ________________________


NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 7
Title: Checklist For Electrical Works Of Slab Rev.1, dated 24-8-09
Building Location
Date.

Sr. Activity Acceptance Criteria Observation


No.
1 Conduiting, after Slab Rebar are laid As per approved Conduit Drawing.
Conduit should not pass through RCC
column , in plan .
2 Gap between adjacent Conduits Min = 25mm

3 Conduit Drops a) Shall be As per the locations shown


in the approved drawing.
On wall face & shall be Painted for
easy identification on slab soffit (beam
bottom).
b)Shall Not be in clear Cover zone of
rebar
4 Conduits & Junction Openings Shall be sealed using Hessian cloth to
avoid choking
5 Position/Location of As per approved Electrical layout
Light/Fan/TV/Tel./ Bracket light drawing of Slab. Drg_____________
points & shall be Painted for easy
identification on slab surface soffit
(Slab shuttering)

Note :All dwg numbers , to be referred should be filled in , before the Checklist is referred to , at
location , for Acceptance Criteria , by the Senior Engineer/Sector Engineer .

Electrical Contractors Eng. /Supervisor __________________________________________________________

Electrical Engineer ___________________________________________________________________________

Jr. /Site Engineer (Civil) _______________________________________________________________________

NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 8
Title: Checklist , for Concrete Process Rev.1, dated 24-8-09

Building Location

Date.

Sr. Activity Acceptance Criteria Observation


No.
1. Set of cement grout, superplasticzer, 2 G.I. buckets, 1 ltr. Cylinder,500 ml bottle for
bucket etc plasticizer & rod for stirring
2. Thickness Ghoda 5 nos. of Thickness ghoda of every slab depth
shall be available.
3. Walkway Ghoda, Trolley Ghoda For 100 sft area of slab to be cast, min. 4 walkway
ghodas of 1200mm x 225mm shall be made
available. Trolley ghoda of 1’ height shall be kept
900mm c/c
4. Plastic sheet laid on slab near half Shall be of min. 200 gsm thickness plastic of
round chute size 4’ x 4’
5. Slab and beam Stopper Location shall be as per approved strip system
drawing.
6. Fresh concrete covered with Jutex Jutex shall be laid as soon as concrete is dry
enough so that, no thumb impression observe
and sprinkle water on the top of jutex
a) Brooming Light brooming shall be carry out on the slab
top just before laying Jutex.
b) Clear Cover, to rebar ,displaced if Shall be provided of 75mm,55mm,40mm &
any 20mm for footing, column/beam below ground,
column/beam above ground, & slab
respectively , with a + 5 mm tolerance .
7 Mechanical Needle Vibrators 60mm Electric Vibrators - 2 Nos & Petrol - Vibrator -
& 40mm, depending on Congestion 1 No. shall be available in working condition.
of Rebar.
8 Screed Vibrator ( For slabs & 1 no shall be available, as per fabricated by our
Vacuum Dewatered Concrete works Mech. Dept & Carpenters.
only )
9 Concrete top finish Light scratch shall be done after finish
No foot prints shall be allowed to be formed on
slab.
10 Arrangement of covering during Shall be provided of bamboos, with PVC sheets
monsoon of 200gsm covered on top, with a 2 way 1:30
slope, covering the entire area of slab to be
concreted, with additional 1’6” projection.
11. Cleaning of column- beam junction Slurry shall be cleaned in wet in wet condition
slurry leakage from below, if any. at time of concreting.
12. Cleaning of Half round supra at the Shall be cleaned immediately. No concrete
end of concreting. shall be seen after cleaning.
2 nos. of Halogen lamps at slab level, 1no. of
halogen lamp below slab, 1 no. big sodium
13 Lighting arrangement during night. lamp at mixer site & 1 no. of tube light above
mixer drum shall be available.
14. Electrician, carpenter and Fitter Electrician 2 nos, Carpenters 6 nos. & Fitters 2
nos. shall be available.
Supports of hanging sides ( pair Hanging sides shall be removed after finishing
15. concrete & this portion shall be re vibrated to
lapha ) Removed after finishing fill the cavity made by legs.
concrete
17 Concreting sequence Sequence of concrete shall be as per Approved
Strip System drawing.

FOREMAN: ________________________ JR.SITE ENGINEER: ______________________

SENIOR / SECTOR ENGINEER: ________________________

NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 9
Title: Checklist For Concreting works after Rev.1, dated 24-8-09
deshuttering
Building Location
Date.
Sr.No. Activity Acceptance Criteria Observation
1. Honeycombing ( if any ) For depth up to 2” shall be repaired with Mc-Crete
Type A (red color) & for depth above 2” shall be
repaired by letter box method.
2. RCC Members Shall be in position, line, level & plumb with tolerance
of + 5 mm
Slab, beam side & ceiling shall be cleaned as soon as
3. Cleaning of slab soffit.
slab/beam is deshuttered. Any slurry leakage “ papdi “
shall be chipped off . Masking Tapes, plywood, nails
etc shall be removed.
4. Any damage to RCC Members For depth up to 2” shall be repaired with Mc-Crete
( if any ) Type A (red color) & for depth above 2” shall be
repaired by letter box method.
5. Any cracks observed Shall be approved by Project manager for
concession/Repair/ OR Rework
6. Date of Casting, written on RCC Members. Shall be written immediately after de shuttering & it
shall be Legible
7. Any realignment of rebars, required for Shall be done in the slope of 1 in 6
starter, moulding, etc.
8a. Curing of Member Shall be done using Jutex & Wata for slab or Hessian
clothe wrapped for other structures, ensured for 14
days.
8b. Curing of slab soffit and beam sides. Curing of slab soffit & beam side shall be done for 2
days after de shuttering in 5 days.
9. Any Watta, broken on top of slab. Shall be immediately repaired.
10. All, supports to RCC Members to be Shall not be de shuttered/ Removed or disturbed before
ensured intact (undisturbed) maturity period & obtaining the compressive strength
of cubes of the structure , as per norms laid down
namely 3 days ,5days, 15days & 28 days ,
50%,70%/75% , 80% & 100%.

FOREMAN: _______________________________ JR.SITE ENGINEER: ______________________

SENIOR / SECTOR ENGINEER: ________________________

NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 10
Title: Checklist For Block Masonry Rev.3, dated 04-03-16

Building Location

Date

Sr. Activity Acceptance Criteria Observation


No.
1 Chaapkaam of Block Masonry Chaapkaam of 1 block height shall be checked as
per Approved chaapkaam drg. for room
dimensions, block thickness, plumb/offset with
respect to beam bottom, door opening &
diagonal with a Tolerance of + 5 mm.
2 Application of Bonding Agent Bonding agents shall be applied on clean & dry
RCC surfaces, where the block work is touching
to RCC surface. It shall be followed by chaat
coat.
3 Pre-wetting of concrete surfaces (2 hrs Concrete surfaces shall be saturated surface dry.
in advance)
4 Slab portion to be clean of dirt/waste No dirt/ waste/ oil shall be seen.

5 Pre-wetting of Blocks (Surface dry) Blocks shall be saturated surface dry

6 Cement mortar proportion For PPC/OPC cement use 1:5 Ratio, Cement
50Kg: Manufactured sand 175Lit. with
350ml/bag mortar plasticizer.
7 Masons to have mortar joint thickness Kanda shall have 18mm thickness (NO GO) on
"Kandas". one end & 9mm (GO) on other side. Size of
kanda shall be 65mm.
8 Collection of fallen mortar for Re use Empty cement bags on both sides of wall shall be
provided to collect waste mortar

FOREMAN: ____________________________________________________________________

JR.ENGR/SITE ENGINEER: _______________________________________________________

SENIOR/SECTOR ENGINEER: _____________________________________________________

NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 11 A
Title: Checklist For Gyp. Plaster (To be filled up before starting of Rev.3, dated 04-03-16
GVP)

Building Location
Date
Sr.
Activity Acceptance Criteria Observation
No.
Block masonry completion in Block masonry should be completed without leaving any
all respect pockets (gabda). Joint between beam / slab bottom & block
1
masonry should be filled up with mortar , including 7 days
curing.
GVP on ceiling below Waterproofing should be completed including ponding for 7
2 terrace, refuge flat & kitchen
days before starting of ceiling GVP
Chasing finishing of Chasing finishing of electrical conduit should be completed
3 electrical conduits- If Any.
with 3 days curing without any cracks seen.
Cracks in masonry All cracks should be repaired with cement mortar with 3 days
4
curing.
Door frames Fixing Should be fixed as per
5 Dr. No.________________ & Rev. No. ________________.
To be in Plumb ,line and level with tolerance of + 2 mm
Hold-fast patti fixing with Should be fixed after alignment of door frame.
6
RCC member.
Electrical concealed work All electrical points shall be provided As per
along with Switch boxes, Drg. No.:_______,
7
Brackets, Distribution Rev. No.:________
boards etc.
Tie bolt holes in Bolt holes for columns, lift pardi, beams etc are to be plugged using
8
column/Pardi to be closed block masonry cement mortar or GP2 ( In case of al. formwork ).
Proper raking of masonry Raking of joints should be carried out immediately, when mortar is
9 joints fresh. Brooming should be done after raking of joint.
Slab soffit surface
10 All dirt/ waste/ oil or loose concrete should be cleaned.
preparation
Classic Bond GP Adhesive
11 application on ceiling. (if Surface completely covered with Classic Bond GP Adhesive.
any)
Classic Bond & Seal (For Surface to be completely covered with Classic Bond & Seal as per
12 Buildings with Al. formwork required coverage specified in Circular ie 50 to 55 Sft / Kg.
vertical surfaces)
Pre-wetting of Concrete/Masonry surfaces shall be saturated surface dry with light
13
Concrete/Masonry sprinkling of water.
Thickness of Gypsum Plaster a) 12mm + 5mm (Wall)
14 at Level Pad b) 10mm + 2mm (Ceiling). ( Provide cement chaat wherever
applicable )
Note: All dwg numbers, to be referred should be filled in, before the Checklist is referred to, at
location, for Acceptance Criteria, by the Senior Engineer/Sector Engineer.

FOREMAN: __________________ ELECTRICAL CONTRACTOR SUPERVISOR _____________

JR. ENGR/SITE ENGINEER: __________________

SR/SECTOR ENGR________________

_________________________________________________________________________________________
N.B. Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 11 B
Title: Post Checklist For Gypsum Plaster Rev.0, dated 18-04-13

Building Location

Date

Sr.No. Activity Acceptance Criteria Observation


Line, level, corners & all edges of wall, All corners & edges should be in
1 beams & columns. perfect right angle with sharp edges
& without waviness or undulations.
Width of door / window jambs & offset of All width should be in uniform size
2
column & beam without waviness ±2mm.
GVP surface of wall, column & beam Should be free from waviness,
3
roughness / cracks & hollow sound.
Finishing around electrical points Should be in line, level & correct as
4
per size of electrical points.
Projection of marble / tile skirting & dado Projection of marble / tile skirting
5 tile from GVP surface should be in uniform width & line
from GVP surface.
Projection of door / window frame / Should be uniform in size from door /
6 architrave from GVP surface window frame & covering of
architrave screws.
Cracks , any damage due to water seepage in Should be repaired OR reworked by
7
GVP (If any) chasing and re filling same.
Record of GVP brand application Record of GVP brand used of each
8
flat should be maintained.

FOREMAN: _______________________________ JR.SITE ENGINEER: ______________________

SENIOR / SECTOR ENGINEER: ________________________

NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 12
Title: Checklist For Internal Plaster (Cement) Rev.2, dated 04-10-14
Building Location
Date
Sr. Activity Acceptance Criteria Observation
No.
1 Proper Raking of Masonry Joints Shall be done immediately, when mortar is fresh. Brooming
shall be done after raking of joint.
2 Slab soffit surface preparation No dirt/ waste/ oil or loose concrete shall be seen
3 Doors/Windows Frames Fixing Shall be fixed as per
Dr. No.______,
& Rev. No. _____.
To be in Plumb ,line and level with tolerance of + 2
mm
4 Hold-fast fixing Shall be fixed simultaneously with block work using
M.S. Pharma.
5 Electrical concealed work along with All electrical points shall be provided As per
Switch box, Brackets, Distribution Drg. No.:_______,
boards Rev. No.:________
6 Fixing of Sub frame for Aluminium Shall be in Line, Level & Plumb with tolerance of + 2
windows mm
7 Pre-wetting of Concrete/Masonry Concrete/Masonry surfaces shall be saturated surface
dry
8 Cement mortar proportion For PPC/OPC cement use (a) 50kg. Cement: 200 Lit.
Screened sand (without flyash) with adding 14.5 Kg.
Flyash & 150ml/bag mortar plasticizer. OR ( b) 50Kg.
cement : 8 Bags of 40 kg screen sand (with flyash) with
300ml/bag mortar plasticizer. *NB - Depending on
variation in fineness of sand, proportion of mortar can
be slightly adjusted to get required cohesive mortar.
9 Thickness of Level Pads for Cement a) 20mm + 5mm (Walls)
Plaster b) 10mm + 3mm (Ceiling)
10 Tie bolt holes in Column/Pardi to be Bolt hole filling as per circular No.200608 & dated
closed 20.06.08.
11 All honey-combs to be repaired For depth up to 2” shall be repaired with Mc-Crete
Type A (red color) & for depth above 2” shall be
repaired by letter box method.
12 Application for Bonding Agent Bonding agents shall be applied on clean & dry RCC
surfaces.
Note :All dwg numbers , to be referred should be filled in , before the Checklist is referred to , at
location , for Acceptance Criteria , by the Senior Engineer/Sector Engineer .

FOREMAN ___________________ JR/SITE ENGR_______________


SR/SECTOR ENGR________________
____________________________________________________________________________________________
NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.

HIRANANDANI GROUP OF COMPANIES


FORM/FORMAT Checklist no. 13
Title: Checklist For External Plaster Rev.2, dated 04-10-14
Building Location
Date
Sr. Activity Acceptance Criteria Observation
No.
1 Details of elevation features As per Drg. No________,
Rev.no._______.
2 Application of Bonding Agents Bonding agents shall be applied on clean & dry RCC
surfaces, where the block work is touching to RCC
surface. It shall be followed by chaat coat.
3 Filling of masonry joints and raking of Filling of masonry joints balance shall be done from
joints scaffolding outside & racking shall be done
immediately. No joint shall be seen open.
4 Doors/Windows Frames Fixing Shall be fixed as per
Dr. No.______, & Rev. No. _____.
To be in Plumb ,line and level with tolerance of + 2
mm
5 Electrical concealed work along with All electrical points shall be provided As per
Switch boxs, Brackets Drg. No.:_______,
Rev. No.:________ & Shall be fixed as per Handbook
of Masonry & Plaster
6 Tie-bolt holes in col./Beams to be Bolt hole filling as per circular No.200608 & dated
plugged 20.06.08
7 Thickness of Level Pads for Cement a) 20mm + 5mm (Walls)
Plaster b) 10mm + 3mm (Ceiling)
8 Pre-wetting of concrete/masonry Concrete/Masonry surfaces shall be saturated surface
dry.
9 Cement mortar proportion For PPC/OPC cement use (a) 50kg. Cement: 200 Lit.
Screened sand (without flyash) with adding 14.5 Kg.
Flyash & 150ml/bag mortar plasticizer. OR ( b) 50Kg.
cement : 8 Bags of 40 kg screen sand (with flyash) with
300ml/bag mortar plasticizer. *NB - Depending on
variation in fineness of sand, proportion of mortar can
be slightly adjusted to get required cohesive mortar.

Note :All dwg numbers , to be referred should be filled in , before the Checklist is referred to , at
location , for Acceptance Criteria , by the Senior Engineer/Sector Engineer .

FOREMAN __________________

JR/SITE ENGR_______________
SR/SECTOR ENGR_________________

NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.

HIRANANDANI GROUP OF COMPANIES


FORM/FORMAT Checklist no. 14
Title: Post Checklist For Plastering Rev.1, dated 24-8-09
(Internal/External)
Building Location
Date.
Sr.No. Activity Acceptance Criteria Observati
on
1. Waviness in plaster For Internal plaster + 2 mm
For External Plaster + 4 mm.
2. Soundness of plaster No hollowness shall be observed
3. Location, dimension and finish of grooves. As per Drg.no._______
Grooves shall be cleaned & a brush of
thin cement paste shall be applied on
it.
4. Surface texture of plaster finish –

4 a. Internal Areas where GVP to be done on the Single coat plaster with light scratch
plaster & tiles to be fixed using cement
paste. ( Kitchen, toilets etc. )
4 b. Internal Areas where tiles/ marble / granite Single coat plaster with sponge fine
to be fixed using adhesive. ( Kitchen, toilet grain finish
dado )
4 c. Internal plaster where painting to be done Single coat plaster with tyrolene
directly on plaster. finish.
(Electrical duct, Meter room, Fire fighting
duct, pump room, substation, watchman
cabin & non public areas. )
4 d. Internal Toilet ducts, staircase, Refuge area Double coat plaster with tyrolene
& public area finish
4 e. External plaster where there is Texture Double coat plaster with light scratch.
paint ( Renova ) to be done on it
4 f. External plaster where there is painting to Double coat plaster with tyrolene
be done directly on plaster ( Cement or finish
acrylic paint )
5. Cracks in Plaster. Shall be approved by Project Manager for
concession/Repair/ OR Rework
6. Post Cleaning, of plaster droppings both
on :
a) Cleaning of Plastered surface. Shall be Completely free from
droppings.
b) Waste Plaster material fallen at base, where Shall be removed immediately.
plastering is in progress.
7 Finishing around Electrical Points (especially Shall be in line & level with tolerance of + 2
junction box, switch plate, etc.) mm
8 Line and level of plaster. For Internal plaster + 2 mm
For External Plaster + 5 mm.
9. Diagonal & right angle of plaster at edges & Shall be in right angle with tolerance
corners. For Internal plaster + 2 mm
For External Plaster + 5 mm.
10. Internal Corners of plaster. No waviness shall be seen in internal
corners.
11 Curing of first coat plaster. 1st coat plaster shall be cured for 1
day before starting 2nd coat plaster
12. Curing of plaster Shall be done for 7 days from date of
plaster done
Internal Plaster :
13.
a Shall be terminated 9“above
GV Plaster termination level on wall.
structural finish level of slab.
b Shall be terminated 6 “ around Al.
GV Plaster termination around Al. windows
windows & openings
& openings
c Next flat or room, plaster shall not be
Work front for Next flat/ room
commenced without completing
previous flat or room.

FOREMAN: _______________________________ JR.SITE ENGINEER: ______________________

SENIOR / SECTOR ENGINEER: ________________________

NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 15
Title: Waterproofing Checklist For Toilets / Rev.1, dated 24-8-09
Kit / Balcony

Building Location
Date.

Sr. Activity Acceptance Criteria Obser T1 T2 T3 T4 Ser. Kit Bal. CK


No. vation Toi D
1 Surface All Surfaces shall be micro
Preparation cleaned & loose
Concrete /mortar & dust
shall be removed using
blower.
2 Ponding ( 1 day) Leakage observed shall be
stopped by doing cement
grouting.
3 Chemical Shall be done As per Tender
Application with Specification.
Chat
4 Base Coat Base coat shall be done with
required slope
in flooring and in plumb &
right angle on walls to
match with wall plaster.
Tolerance + 2 mm
5 Ponding for 3 days Leakage observed shall be
stopped by removing & re
doing chemical application.
6 PVC Pipe fixing Encasing of PVC pipes shall
& encasing be done all round 3” in M15
grade concrete.
7 Ponding( 1 day ) Leakage observed shall be
Before brick bat stopped by removing & re
finishing doing chemical application.
8 Screeding Shall be done in 1in80 slope
/finishing & in cement mortar 1:4 with
mortar plasticizer 150
ml/bag. If Thickness is more
than 1 ½” do screed in M20
grade concrete without CA2
9 Ponding ( 7 day) Leakage observed shall be
& curing stopped by removing & re
doing chemical application.
FOREMAN: _______________________________ JR.ENGR/SITE ENGINEER: _______________________

SENIOR/SECTOR ENGINNER: _________________________________________

NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.

HIRANANDANI GROUP OF COMPANIES


FORM/FORMAT Checklist no. 16
Title: Checklist For U.G. Tank/O.H.Tank Water Rev.1, dated 24-8-09
Proofing

Building Location
Date.

Sr.
No. Activity Acceptance Criteria Observation
Surface Preparation All Surfaces shall be micro cleaned & loose
1 Concrete /mortar & dust shall be removed
using blower.
Shall be done by removing PVC sleeve &
2 Bolt hole plugging
using Mc-Crete type A (Red colour) .
For depth up to 2” shall be repaired with
Mc-Crete Type A (red color) & for depth
3 Honey comb
above 2” shall be repaired by letter box
method.
4 Chemical application Shall be done As per tender specification
Protective coats on chemical Metal coba of 50mm thick to the bottom
5 applications as per it’s location slab & finishing plaster of cement mortar
1:4 shall be done on walls.
6 Curing of Protective coats Curing shall be done minimum 3 days.
Check for Leakage - Fill entire Leakage observed shall be stopped by
7
tank removing & re doing chemical application

Note :All Tenders, to be referred should be filled in , before the Checklist is referred to , at
location , for Acceptance Criteria , by the Senior Engineer/Sector Engineer .

Foreman: __________________________ Junior / Site Engineer: ______________

Senior /Sector engineer ____________

NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 17
Title: Post Checklist For Waterproofing Rev.1, dated 24-8-09
Building Location
Date.
Sr.N Activity Acceptance Criteria Obs.
o.
1. Ponding test Ponding test shall be carried out for 7 days &
there shall not be any leakages on soffit
below.
2 Slope of Waterproofing Shall be min 1 in 80 unless specified, towards
Nani traps/outlets.
3. Waterproofing crevices Finish shall not be rough, uneven & left
unfinished especially at corners and edges.
4. Cracks, seen in waterproofing completed: Shall be approved by Project manager for
concession/Repair/ OR Rework
5. Line, Level & Right angle of Waterproofing Shall be Flush with plaster completed by civil
plaster , done on walls. contractor, with Tolerance For Internal plaster
+ 2 mm & For External Plaster + 5 mm.
6. Bathtub Waterproofing Internal waterproofing plaster shall be 450
mm above from top of bath tub.
7. Waterproofing finishing at floor traps. Finishing shall not be rough & uneven

8. Terrace Waterproofing level Shall be min 25 mm above the rainwater


outlet invert level
9. Balcony Waterproofing Shall have slope 1 in 80 towards outlet of
balcony
10. Rainwater outlet sizes Shall be as per approved Rain water drawing
No.:_______,
Rev. No.:________
11. Stagnation of water There shall not be any local ponding or water
stagnation due to uneven surface & bad slope
12. Type of Top finishing of Terrace Waterproofing Top surface of finishing shall be smooth
Ghotai finish and by line dori, make the false
square impression 1’0” x 1’0” Minimum &
1’3” x 1’3” maximum unless otherwise
specified.
Note :All dwg numbers , to be referred should be filled in , before the Checklist is referred to , at
location , for Acceptance Criteria , by the Senior Engineer/Sector Engineer .
FOREMAN: _______________________________ JR.SITE ENGINEER: ______________________

SENIOR / SECTOR ENGINEER: ________________________

NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.

HIRANANDANI GROUP OF COMPANIES


FORM/FORMAT Checklist no. 18
Title: Checklist For Marble Fixing Before Polishing Rev.1, dated 24-8-09
Starts

Building Location
Date.

Sr.
No. Activity Acceptance Criteria Observation

1 Shade/Colour/Make of marble Shall be as per approved sample

2 Thickness of marble 18mm +/- 3 mm

3 Thickness of Joint Shall be Maximum 1 mm.

4 Natural Marble & granite fixing


All Surfaces shall be micro
4 a. Surface preparation cleaned & loose Concrete /mortar
& dust shall be removed
Pre-wetting of Floor Concrete/Masonry surfaces shall
4 b.
be saturated surface dry
Cement slurry application Apply thin cement slurry with
4 c. brush on slab & let it dry for 30
min.
Bedding mortar proportion Use 1:6 (Cement: River sand)
4 d.
proportion.
Composite Marble fixing Follow the points 4 a. to d. without
4 e. using white cement for bedding &
buttering
Shall be done in Line, level &
5 Skirting Fixing plumb having tolerance + 1 mm

6 Joints of skirting Shall be Maximum 1 mm.


Grout Filling behind skirting Grouting of skirting shall be done
with grey cement & there shall not
7
be any hollow sound after tapping
the skirting.
8 Skirting offset
Skirting offset with respect to Wall
shall be 6mm + 3 mm
Foreman: _______________________________

Junior / Site Engineer: _____________________________

Senior /Sector Engineer: _________________________________________________

NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.

HIRANANDANI GROUP OF COMPANIES


FORM/FORMAT Checklist no. 19
Title: Checklist For Toilet – Kitchen Flooring / Dado Rev.1, dated 24-8-09
Tiling
Building Location
Date.
Sr. Activity Acceptance Criteria Observation
No.
1 Surface Preparation All Surfaces shall be micro cleaned
& loose Concrete /mortar & dust
shall be removed
2 Electrical concealed work along with All electrical points shall be
Switch boxes, Brackets provided As per Drg. No.:_______,
Rev. No.:________
3 Plumbing concealed work All plumbing points shall be
provided As per Drg. No.:_______,
Rev. No.:________
Pre-wall tiling, pressure testing shall
be done , to a max pressure of
5kg/Sq.cm or 10kg/sq.cm ,
depending on Gravity system or
Hydropneumatic system ,
respectively .
4 Marking of Reference level on the walls 2’ Reference level shall be marked With
respect to finish floor level.
It shall be same level for entire floor.

5 Level pads to be provided in case of dado Adhesive thickness of Min. 3mm &
tiling Max 5mm shall be considered for
making level pads.
6 Slope In case of flooring. ( If specified.) Shall be Towards Nani Trap/ Outlet

Note :All dwg numbers , to be referred should be filled in , before the Checklist is referred to , at
location , for Acceptance Criteria , by the Senior Engineer/Sector Engineer .

Foreman: _____________________________
Junior / Site Engineer: _______________________________

Senior /Sector Engineer______________________________________________________________

NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.

HIRANANDANI GROUP OF COMPANIES


FORM/FORMAT Checklist no. 20
Title: Checklist For Sub grade Preparation Rev.1, dated 24-8-09
Building Location
Date.

Sr.
No. Activity Acceptance Criteria Observation
1 Soil available , after Excavation or Filling Shall be free from any vegetation,
scrap
2 Compaction of External works sub grade Rolling shall be done by 10-12 T
roller/ 8 T vibratory roller to achieve
95% proctor density.
3 Compaction of Building compound Compaction shall be ensured by
works sub grade Carrying out 30 to 50 passes of Roller
4 Level of Sub-Grade Shall be As per Drg. No.:_______,
Rev. No.:________

Shall be As per Drg. No.:_______,


Rev. No.:________
5 Camber/Slope of Sub-Grade
Shall be As per Drg. No.:_______,
Service Chamber/Service Line (if any) Rev. No.:________
6 Location and level.
Note :All dwg numbers , to be referred should be filled in , before the Checklist is referred to , at
location , for Acceptance Criteria , by the Senior Engineer/Sector Engineer .

Foreman: ______________________________

Junior / Site Engineer: ______________________________

Senior /Sector Engineer______________________________________________________________


NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.

HIRANANDANI GROUP OF COMPANIES


FORM/FORMAT Checklist no. 21
Title: Checklist For Soling Rev.1, dated 24-8-09
Building Location
Date.

Sr.
No. Activity Acceptance Criteria Observation
Shall be Hard blue/black & free from
1 Quality of rubble cracks.

2 Size of rubble 9" to 1 ft.


Kapachi shall be separately ordered for
3 Filling voids with kapchi filling the voids between soling rubble.
Filling of small size voids with No void shall be seen between soling
4 murrum rubble.
Compaction ( by roller/ plate No loose kapchi ,should come out , by
5 compactor) applying pressure with hand
Shall be as per Drg. No.:_______,
Rev. No.:________
6 Line, level & Slope & with tolerance + 5 mm
Note :All dwg numbers , to be referred should be filled in , before the Checklist is referred to , at
location , for Acceptance Criteria , by the Senior Engineer/Sector Engineer .

Foreman: ______________________________

Junior / Site Engineer: _______________________________

Senior /Sector engineer______________________________________________________________

NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated
above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 22
Title: Checklist For WBM Rev.1, dated 24-8-09

Building Location
Date.
DATE:

LOCATION:

Sr. No. Activity Acceptance Criteria Observation


Cleaning of excess and loose
1
murrum from soling top Soling stone key surface shall be exposed. .
Metal shall be Hand broken & Size of the metal used
for WBM shall be cross checked with the help of
2 Size of metal
dumbbell shaped ring Kanda (90 - 60 & 60 - 40)
before spreading the grit powder.
3 Quality of Metal Metal should not get crushed after rolling.
As per slope given in Drg. No.:_______,
4 Level Pads
Rev. No.:________
Water shall be sprayed with sprinkler fixed behind
5 spraying of water
water tanker to ensure uniform spray of water
Shall be removed phase wise, once the compaction is
done. The excess grit powder shall be removed
before fixing the channels for tremix. The head of the
6 Excess amount of grit
metal shall be exposed by removing excess grit & no
patches of only grit shall be seen.

Shall be done as per WBM specifications in Concrete


roads manual.
No hand broken metal shall come out with finger
7 Compaction of Metal pressure. If stone comes out, then rolling shall
continue, up to any hand broken metal, does not
come out with finger pressure.

Note :All dwg numbers , to be referred should be filled in , before the Checklist is referred to , at
location , for Acceptance Criteria , by the Senior Engineer/Sector Engineer .

Foreman: ______________________________

Junior / Site Engineer: _______________________________

Senior /Sector Engineer____________________________________________________________


NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.

HIRANANDANI GROUP OF COMPANIES


FORM/FORMAT Checklist no. 23
Title: Checklist For Tremix Rev.1, dated 24-8-09
Building Location
Date.

Sr. Activity Acceptance Criteria Observation


No.
Shall be removed phase wise, once the
compaction is done. The excess grit powder
shall be removed before fixing the channels
Removal of excess grit powder from
1 for tremix . The head of the metal shall be
WBM Top
exposed by removing excess grit & no
patches of only grit shall be seen.

Shall be done as per WBM specifications in


Concrete roads manual.
No hand broken metal shall come out with
finger pressure. If stone comes out, then
2 Compaction of WBM
rolling shall continue, up to any hand broken
metal, does not come out with finger
pressure.

Shall be as per Drg. No.:_______,


3 Slope of WBM Rev. No.:________
& with tolerance + 5 mm
Shall be as per Drg. No.:_______,
4 Slope of half round channel Rev. No.:________
& with tolerance + 5 mm
Note :All dwg numbers , to be referred should be filled in , before the Checklist is referred to , at
location , for Acceptance Criteria , by the Senior Engineer/Sector Engineer .

Foreman: ______________________________

Junior / Site Engineer: _______________________________

Senior /Sector Engineer_____________________________________________________________


NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.

HIRANANDANI GROUP OF COMPANIES


FORM/FORMAT Checklist no. 24
Title: Waterproofing Checklist For Terrace / Refuge flat / Rev.1, dated 24.08.09
Podium
Building Location Date
Sr. Activity Acceptance Criteria Observation
No.
1 Confirming completion of Plaster of parapet, coping & fixing of
activities before starting the plumbing brackets shall be done.
waterproofing
2 Rain water pipe size & As per Drg. No.:_______,
location Rev. No.:________
Keep at least 3” to 3½” invert level of rain
water pipe from SFL.
3 Surface Preparation All Surfaces shall be micro cleaned & loose
Concrete /mortar & dust shall be removed
using blower.
4 Chemical application Shall be done as per tender specification.

5 Laying of mortar screed. (Only Shall be 15 to 20mm thick in cement: sand of


for Podium). 1:4 ratio, over wet cement slurry.
6 Curing of mortar screed. (Only Minimum 3 Days Curing over mortar screed
for Podium). shall be done.
7 Protective coat plaster mortar Shall be done 25mm thick in 1:4 (Cement:
River sand) proportion.
8 Ponding for 3 days Leakage observed shall be stopped by
removing & re doing chemical application.
9 Top surface finish Top surface of finishing shall be smooth
Ghotai finish and by line dori, make the false
square impression 1’0” x 1’0” minimum &
1’3” x 1’3” maximum for Terraces & rough
finish for Podium & balconies.
10 Check for Leakage. Water ponding shall be done for 7 days &
Leakage observed shall be stopped by
removing & re doing chemical application.

FOREMAN: _______________________________ JR.ENGR/SITE ENGINEER: __________________

SENIOR/SECTOR ENGINEER: _________________________________________

NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 25
Title: Electrical Checklist For Completion of Flat Rev.1, dated 24-8-09
Building Location
Date

Sr.
Activity Acceptance Criteria Observation
No.
Wiring as per approved drawing.
& Earth wire connectivity upto vertical earthing in
1 Wiring and Earthing.
duct shall be checked.
Earth resistance should not be > 2 Ohm
Shall be fixed as per approved drawing
2 Switch Plates
& shall be horizontal in level
Fan hook shall be painted & double loop type.
3 Fan Hooks and Points Point shall be as per approved drawing.
& shall be tested in working condition.
Point shall be as per approved drawing.
4 T.V. Points & 16 SWG GI / Nylon wire shall be pulled in conduit
upto point.
Point shall be as per approved drawing.
5 Telephone Points Tel wire shall be pulled in conduit upto point. (as per
tender specs.)
Tel wire shall be pulled in conduit upto point. (as per
6 Intercom Points
tender specs.)
As per Tender Approved Make.
7 Call Bell
& shall be tested in working condition.
ELCB / MCB T.P. / D. P./ As per Tender Approved Make.
8
S. P. ELCB’s shall be checked for tripping.
Brand as per P.O. No _______
9 Exhaust Fans and Points
& shall be tested in working condition.
Shall be tested for working condition.
10 Heaters and Points
Shall be tested for working condition.
11 Aquaguard and Point
Junction Box Cover Plate As per Tender Approved Make.
12
(Round Tippa)
Location as per approved drawing.
13 Call Bell Push
& shall be tested for working condition.
Note : All the approved brands , as per Tender of particular bldg , shall be filled in , before the
Checklist is referred to , at location , for Acceptance Criteria , by the Electrical Engineer .

Electrical Contractors Engineer Electrical Engineer

Junior / Site Engineer

NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 26
Title: Checklist While Giving Possession Of Flats Rev.1, dated 24-8-09

Building Flat no.


Date.

Sr. Activity Acceptance Criteria Observation


No.
1 Decorative M.S. Railing in Living Room with Shall be as per drg. No.___, Rev. No.
Teak Wood Railing
2 Aluminum Windows/Doors with locks and Glasses shall be scratch,& stain marks
glasses free.
Doors, widows & locks shall be smoothly
operated.
3 All doors with locks and Magnetic stoppers Door shutters shall have a gap of 3mm on
sides & top from door frame. At bottom
6mm. With tolerance of + 1 mm. Magnetic
stopper shall be effectively hold the
shutter.
4 a. All toilets with imported sanitary wares. CP Shall be in operational condition &
Fittings scratch, stain marks free. There shall not
be any leakage from joints.
4 b. Towel rods, mirrors, hooks Shall be fixed tightly with the base & in
level with tolerance +2 mm.
4 c. False ceiling Shall be in level with tolerance + 2 mm.
5 Kota handrail top for parapet in kitchen duct Shall be polished & in level + 2 mm

6 Electrical accessories Shall be tested in working condition.

7 Water heater for kitchen and all toilets Shall be checked for hot water supply &
any leakages.
8 Exhaust fan in kitchen and toilets Shall be in operational condition, silent &
free from vibration.
9 Marble Flooring and skirting in living, dining Shall be of required polish quality, free
and bedroom areas from scratch & in Line, Level & plumb.
10 Provision for washing machine inlet & Outlet Shall be in operational condition & finish
point in kitchen around the points shall be neat & clean.
11 Provision for telephone and intercom Point Shall be in operational condition.
12 All toilets & kitchen provided with vitrified Joints shall not be open, Hollow sound
tiles/marble patties in floor and dado shall not come while tapping. Edges &
corners of tiles shall not be chipped off.
Flooring slope shall be towards Nahni
trap.
13 In kitchen vitrified/ceramic tile flooring and Tiles Joints shall not be open, Hollow
dado and granite kitchen platform with S.S Sink sound shall not come while tapping. Edges
& corners of tiles shall not be chipped off.
S.S. sink & granite shall be scratch, stain
marks free. Flooring below kitchen
platform near Nahni trap shall be one tile
drop.
14 Shall have uniform texture & surface
Wood Polishing works finish. Vinyl nail heads shall not be
visible. All polish stains on adjacent
surfaces shall be clean.
15 Shall be free from brush marks, paint
dropping. Shall have uniform texture &
Painting on walls, ceiling, doors and frames
surface finish. Background shall not be
visible.
16 Shall be in operational condition. There
Water purifier in kitchen
shall not be any leakage from joints.
17 Dustbin 01 no. & plastic bag 100 nos.
Dustbin with plastic bags
shall be available.
18
Electrical Meter reading Record Reading at the time of possession.

Foreman: _____________________________

Junior / Site Engineer______________________________

Senior /Sector Engineer: ____________________________________________________________

NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES

FORM/FORMAT Checklist no. 27


Title: Checklist For Internal Painting Rev.1, dated 24.08.09

Building Location

Date

Sr.
Activity Mode of Inspection Observation
No.
Before starting painting, GVP work
completed in all respect, including All plaster works shall be in line,
1 complete checking of edges, internal level, and plumb. All cracks in
corners , column-beam offsets, waviness plaster to be rectified.
on walls & ceiling, moulding etc.
Activities like Al. windows,
Pre Requisites to be finished before wooden work, marble polishing
2
starting painting. (floor, skirting, door jamb, sills) &
any alteration are completed.
3 Surface where painting will be applied Shall be free from dampness.
Legs to be covered by cloth or
4 Painter’s ghoda (standing tool) rubber packing to avoid scratches
on flooring.
5 Mask used during the painting.(for safety) By visual inspection
Protection of all electrical switches,
Shall be covered by Light duty
6 hardware, sanitary fittings &flooring
masking tapes.
before starting the painting work.
To be done by mechanical
abrading with the help of scraper,
7 Surface cleaning.
palti patra to remove loose
particles, dust and hollow plaster.
To be done by suitable emery
8 Making surface rough. paper (60, 80 or 100 no. sand
paper).
with approved suitable fillers.(if
9 Filling of cracks.
required)
Application of one coat primer over the Of approved brand mentioned in
10
prepared surface. tender.
Application of two coats high quality putty should be made as per brand
11
leveling putty over the surface. and specification given in tender
By feeling with palm of hand. No
Making the surface smooth and plain by
undulation should be felt. And by
12 sand paper (water paper) no. 100, 150 or
visual inspection no patra marks
200.
should be visible.
13 Application of 2nd coat primer. (Primer Of approved brand mentioned in
from approved brand). tender.
Application of 1st coat paint by Of approved brand & shade
14
roller/brush. mentioned in tender.
Application of 3rd coat putty (touch up), if
Putty should be made as per brand
15 found undulation of surface by redoing
and specification given in tender.
step no. 8, 10, 11, 12, 13 & 14.
Application of 2nd & 3rd coat paint.
Of approved brand & shade
16 (Minimum interval between two coats 4-6
mentioned in tender.
hrs.
By visual inspection, if found not
OK apply more coats of paint. No
Final appearance of desired finish and
17 back ground shall be visible. No
colour.
shade variation & patches shall be
seen.
All stain, paint marks from floor,
18 Cleaning after painting. door, window & fittings to be
removed.

FOREMAN ___________________ JR/SITE ENGR_______________

SR/SECTOR ENGR________________

__________________________________________________________________________________

NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 28
Title: Melamine Polishing (for door frame, door shutter, cover Rev.0, dated 06.02.10
moulding, mirror moulding & paneling in lift lobby & entrance).
Building Location Date
Sr. Activity Acceptance Criteria Observation
All Hardware & surrounding area (like, final painting surface, mirror Completely covered by paper &
1
surface, etc) shall be covered before starting of polishing. masking tape.
Sand papering on rough wood surface (door frame, cover moulding, Smooth surface shall be
2
mirror moulding) by 60 or 80 no. paper. achieved.
Smooth surface shall be
3 Sand papering on all veneer surfaces by 120 no. paper.
achieved.
Filling up holes / cracks, roughness, minor chipped area with filling
4 Completed in all respect.
material.
Approved Shade & brand as per
Powder coating application on all wooden surfaces (including veneer)
5 tender. Surface is completely and
by manual application.
uniformly covered.
Sand papering on all wooden surfaces (including veneer) by 120 no. Smooth surface shall be
6
paper. achieved.
Surface is completely and
7 1St coat French polish (lakh polish) application to be done manually.
uniformly covered.
Sand papering on all wooden surfaces (including veneer) by 120 no. Smooth surface shall be
8
paper. achieved
Surface is completely and
9 2nd coat French polish (lakh polish) application done manually.
uniformly covered.
Two coats of Asian or approved brand Melamine sealer application by Surface is completely and
10
spray. Mix proportion=1 lit. Sealant: 100ml Hardener: 300ml thinner. uniformly covered.
Refilling of minor holes / cracks, roughness, minor chipped area with
11 All such areas are covered.
filling material. (If required).
Sand papering on all wooden surfaces (including veneer) by 150 no. Smooth surface shall be
12
paper. achieved.
13 3rd coat French polish (lakh polish) application done manually. Surface is completely covered
Fill up minor holes / cracks, gap around lock patti & hinges with matt Surface is completely and
14
mom. uniformly covered.
Sand papering on all wooden surfaces (including veneer) by 150 no.
15 Smooth surface
paper.
Surface is completely and
17 4th coat French polish (lakh polish) application Done manually.
uniformly covered.
Melamine matt polish application one / two coat by spray. (Final As per approved sample/ Shade.
18
finish) Surface shall look uniform.
FOREMAN: _______________________________ JR.ENGR/SITE ENGINEER:
_______________________
SENIOR/SECTOR ENGINEER: _________________________________________

NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 29
Title: False ceiling Rev.0, dated 19.2.2010

Building Location Date


Sr. Activity Acceptance Criteria Observation
Pressure testing done
Above false ceiling, all services (electrical, plumbing, A/C) &
1 wherever applicable & no
waterproofing shall be completed.
leakage observed.
Dado tiling (If any) should be completed before false ceiling, in case if
2 Completed
dado tiling is touching false ceiling.
False ceiling material & accessories shall be checked before starting of
3 As per tender
false ceiling ( Brand/ wt. thickness etc).
4 Reference level to be marked on all walls, before starting false ceiling. Completed
As per required line, & level
5 Fixing of perimeter channel on walls with PVC Rowl plug & screws
& screws @ 610mm c/c.
Spacing
6 Fixing of ceiling angle with anchor fastener.
@ 1220mm c/c.
Spacing @ 1220 c/c with
7 Fixing of Intermediate channel with ceiling angle.
screws.
Fixing of ceiling section with intermediate channel by connecting
8 Spacing @ 457mm c/c.
clip .
Leveling of ceiling section & perimeter by reference level, before Completed As per required
9
fixing of GVP board / POP sheet. line, , level & Drg.
Spacing of Screws @
10 Fixing of GVP board / POP sheet with screw.
230mm c/c.
Removal of GVP board paper & fixing of Drywall self adhesive fiber
11 Completed
tape at the junction of two GVP boards.
In required width such that
Applying & finishing of jointing compound / stucco over fiber tape &
12 no offset is seen after final
screw holes.
finish.
No screw head impression
13 POP sheet (if specified) joints& screw holes to be finish with POP.
shall be seen.
Shall be free from offset,
14 Finishing of jointing compound, surface of GVP board / POP. screw projection &
undulation.
15 All architectural features & projected edges should be completed. As per Architect drawing.
FOREMAN: _______________________________ JR.ENGR/SITE ENGINEER:
_______________________
SENIOR/SECTOR ENGINEER: _________________________________________
NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 30
Title: Checklist For Buildings with Aluminium Rev.0, dated 9 July 2015
Formwork.

Building: Floor Level: Part:

Date:

Stage I: Before Starting Formwork.

Sr. Activity Acceptance Criteria Observation


No.
1 All Working Platform Brackets. Installed as per approved
drawing / details including
provision of three planks,
railings, extensions etc.
2 Transferring of survey points. As per Center line Dwg. No.

3 Setting out lines for all walls and columns in X Completed.


and Y direction with addition of offset line
300mm away from face of vertical RCC members.
4 Vertical rebar alignment. Clear cover to rebar should be as
per requirements.
a- Shear walls / columns=40mm
b- 125mm wall=50mm-min
c- 160 mm walls=70mm- Min.
5 Existing Concrete slab level survey Necessary rectification , to be
carried out so that
a. Checking levels near wall , column lines and all wall panels are resting on a
Kicker level surface with a tolerance of
+/- 5mm .
b. Alignment of kickers.
6 Fixing of timber stay on slab for vertical members Near both ends of the wall & in
. centre of wall .

7 All Formwork should be cleaned and coated with Shuttering oil application should
an approved Formwork release agent (including be done with roller using Clean
form face, all side & end rails). bucket.
8 Condition of Wall ties and other accessories. Wall ties should be free from
rust and should be straight.
9 Size of columns / Shear walls. As per structural drg. No.
10 Vertical Reinforcement. ( dia, spacing etc) As per structural dwg No.
Representative of Civil Contractor: ______________________

Second in Command / Building Incharge of Hiranandani: ______________________

NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated
above.
Stage II: Formwork Checklist

Sr.No. Activity Acceptance criteria Observation


1 Gap between any shuttering panels Tolerance +- 2mm.
2 Fixing of G.I. electrical boxes in vertical members As per approved
drawing. No.
3 All P.E. wall tie sleeves correctly installed. As per Recommendation
of Formwork
supplier
4 External & internal wall verticality adjusted Plumb should be within
accordingly +/- 3mm.
5 Size , Verticality and alignment of Door openings Door opening should be
completed as per approved Shell
plan No.
6 Alignment of all walls , if required with help of Tolerance in Line +/-
turn buckles ,completed. 3mm.
7 All required Pins and Wedges are installed and As per Recommendation
secure. of Formwork
supplier.
8 All Props positioned vertical. As per Recommendation
of Formwork
supplier.
9 Ensure there is no vertical movement in the Prop All Props Should be
lengths. tightly erected.
10 Slab soffit formwork level. Tolerance in level +/- 3
mm.
11 Door spacers installed As per Drawings issued
by Al. formwork
supplier.
12 Alignment of Walers installed . As per Drawings issued
by Al. formwork
supplier.
13 Vertical Soldiers installed . As per Drawings issued
by Al. formwork
supplier.
14 All Kickers have been lined and adjusted Tolerance in line &
accordingly level +/- 2 mm
15 All Kickers Bolts installed correctly Dia, spacing and fixtures
are as per Al.
formwork supplier
16 All Rockers have been installed As per Drawings issued
by Al. formwork
supplier.
17 All excessive spaces between Rocker and floor Provide lean cement
level have been sealed mortar for packing of
gap.
18 All exterior elevations details like fins, bands As per Approved dwg.
especially around windows, slab level groove, of that particular
Elevational grooves –if any , drip moulds etc are floors and walls.
installed.
19 Marking of internal masonary wall position on Slab As per Approved
shuttering. chapkam dwg. of that
particular floor.
20 MEP Services cutouts in slab. As per approved
drawing. No.
21 All slab , beam and staircase shuttering. As per approved
drawing. No.
22 Checking of Dimensions, diagonals of all As per approved
windows, and openings. drawing. No.
23 Any Congestion of rebar in vertical members as Ensure Space for
well as all beam column junctions. Insertion of Needle
vibrator till bottom of
shear walls / columns
24 Bolt Hole Provision for Safety Platform of next Location, dia. and
floor. spacing as per
approved
specifications.
25 Temporary stoppers Stoppers are placed in
position / locations ,
as per approved dwg .

Representative of Civil Contractor: ______________________

Second in Command / Building Incharge of Hiranandani: ______________________


NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.

Stage III: Electrical Works of Slab

Sr. No. Activity Acceptance Criteria Observation

1 Conduiting, after Slab Rebar are As per approved Conduit Drawing.


laid Conduit should not pass through cover zone.
2 Gap between adjacent Conduits Min = 25mm

3 Conduit Drops a) Shall be As per the locations shown in the


approved drawing.
On wall face & shall be Painted for easy
identification on slab soffit (beam bottom).
b)Shall Not be in clear Cover zone of rebar

4 Conduits & Junction Openings Shall be sealed using Hessian cloth to avoid
choking
5 Position/Location of As per approved Electrical layout drawing of
Light/Fan/TV/Tel./ Bracket light Slab. Drg_____________
points & shall be Painted for easy identification on
slab surface soffit (Slab shuttering)
Note :All dwg numbers , to be referred should be filled in , before the Checklist is referred to , at location , for
Acceptance Criteria , by the Senior Engineer/Sector Engineer .

Electrical Contractors Eng. / Supervisor

Electrical Engineer of Hiranandani

Second in Command / Building Incharge

NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
Stage IV: Pour Card (Slab Concreting).

Sr. no Activity Acceptance Criteria Observation


1 Grade of Concrete for all vertical As per RCC Drg. No.:_______,
members as well as slab. Grade M______

2 Construction joints laitance removal. For all shear walls and columns ,
make surface rough by dense
brooming.
3 Shuttering of slab. Shall be in level with tolerance of +
2mm
4 Staging/Scaffolding, including bracing Shall be as per approved staging
ties design.
5 Constructions joints Location. As per approved strip system
drawing.
6 Inserts-water spouts, etc. Size & Location as per approved
drawing Drg. No.:_______,
7 Mechanical Needle Vibrators 60mm & Electric Vibrators - 3 nos. 60 mm
40mm, depending on Congestion of needle Vibrators & 3 nos. of 40 mm
Rebar. needle vibrators , with 4 nos.
vibrators
are required to avoid frequent
shifting of same. Also spare needles
to be kept ready on site in case of
emergency.

8 All required Bulk material availability. Should be sufficient as per pour size.

9 Cover of all rebar. Slab bottom= 20mm


Columns / shear walls = 40mm
125mm non structural wall=50mm- min
160 mm non structural wall=70mm-
min.
10 Any Congestion of rebars 60/40mm Needle vibrator placement
till bottom of all vertical members.
11 Proping. Proping is available for one floor below.
12 Arrangement of concrete supply pipe line Should be completed. Also required
numbers of bends, and smaller length
pipes are available.

Note :All dwg numbers , to be referred should be filled in , before the Checklist is referred to , at location , for Acceptance
Criteria .

Representative of Civil Contractor: ____________________

Second in Command / Building Incharge of Hiranandani: ______________________

NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.

Stage V: Concrete Process

Sr.No. Activity Acceptance Criteria Observation


Set of cement grout 2 G.I. buckets, 1 ltr. Cylinder,500 ml bottle
preparation, super for plasticizer & rod for stirring
plasticizer, bucket etc
Slab Thickness control. Should be strictly checked by Leveling
Instrument. Tolerance is +/- 5mm.
RMC pipe line. Supports should not scratch shuttering.
Also should not disturb rebar. Hessain
cloth to be wrapped on pipes and to be
kept wet.
Fresh concrete covered Jutex shall be laid as soon as concrete is
with Jutex dry enough so that, no thumb impression is
observed and sprinkle water on the top of
jutex .
Brooming Light brooming , which is visible , shall be
carried out on the slab top just before
laying Jutex.
Clear Cover, to Shall be rectified with a + 5 mm tolerance.
rebar ,displaced if any
Concrete top finish No foot prints shall be allowed to be
formed on slab.
Arrangement of covering Shall be provided of bamboos, with PVC
during monsoon sheets of 200gsm covered on top, with a 2
way 1:30 slope, covering the entire area of
slab to be concreted, with additional 1’6”
projection.
Mellating Mellating is to be carried out for vertical
members during concreting , but at the
same time mechanical vibration must be
done .
2 nos. of Halogen lamps at slab level, 1no.
of halogen lamp below slab, 1 no. big
Lighting arrangement sodium lamp at mixer site & 1 no. of tube
during night. light above mixer drum shall be available.
Electrician, carpenter Electrician 2 nos, Carpenters 3 nos. &
and Fitter Fitters 2 nos. shall be available with
necessary accessories.
Supports of hanging Hanging sides shall be removed after
finishing concrete & this portion shall be re
sides ( pair lapha ) vibrated , to fill the cavity made by legs.
Removed after finishing It's a must to ensure that the legs of
hanging side is removed , immediately
concrete. after slab concreting is completed .
Concreting sequence. Sequence of concrete shall be as per
Approved Strip System drawing.
Cleaning of Aluminium Cleaning of Aluminium Shuttering should
be done to remove spilled concrete, slurry,
Shuttering with water. especially from staircases, sunken slabs,
kicker top etc.
During concreting check Tolerance in finished slab level + - 3mm.
that finished slab level is
maintained 50 mm below
kicker top and at center
of groove provided,
using level instrument.

Representative of Civil Contractor: ______________________

Second in Command / Building Incharge of Hiranandani: ______________________

NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
Stage VI: Post Concreting Checking

Sr.No. Activity Acceptance Criteria Observation


1. Honeycombing ( if any ) a) All Exterior RCC members --
Minor Honeycombing , to repaired
with Grey Colour Approved Repair
material .
b) All Internal RCC members --
Minor Honeycombing , to repaired
with Red Colour Mc Crete Type A .
c) For all RCC Members --
Major Honeycombing , to repaired
by Letter Box method .
2. RCC Members Shall be in position, line, level &
plumb with tolerance of + 3 mm
3 Any cracks observed Shall be repaired as approved by EIC
for concession/Repair/ OR Rework
4. Date of Casting, written on RCC Shall be written immediately after de
Members. shuttering & it shall be Legible
5. Any realignment of rebars, required Shall be done in the slope of 1 in 6
for starter, cornices, etc.
6. Curing of Members. Shall be done using Jutex & Wata for
slab. Wet Hessian cloth wrapped on
the internal walls & Wet Hessain
cloth wrapped on External / Exterior
Shear Walls/ Columnns , after the
Aluminium Form is loosened , not by
just removing wedges , for 14 days .
7. Curing of slab soffit and beam sides. Curing of slab soffit & beam side
shall be done for 2 days after de
shuttering .
8. Any Watta, broken on top of slab. Shall be immediately repaired.
9. Checking of levels around all vertical Any undulation more than 5mm should
concrete members for level just after be rectified suitably.
slab concreting is over.
10 Grinding of offsets- if any. Should be carried out for projections
more than 2mm.
11 Slit and bolt hole filling with approved To be carried out with approved
material material and method study.
12 All electrical boxes provided in vertical To be opened out after de shuttering.
members
13 Vertical formwork removal To be removed only after 12 hrs.
14 Deshuttering of Slab Soffit, Chajjahs and After achieving 10 N/mm2 at 2 days
Beam Bottoms Soffit Panel.
15 Deshuttering of Props for Slabs , Beams After achieving 75 % Strength of Target
and Chajja ( Up to 4.5 m span) Strength at 10 days and subject to
one slab below being back propped
to receive shuttering load for above
slab.
16 Deshuttering of Props for Slabs , Beams After achieving 100 % Strength of
and Chajja ( more than 4.5 m span) Target Strength or 14 days
whichever is earlier and subject to
one slab below being back propped
to receive shuttering load for further
slab.

Representative of Civil Contractor: ______________________

Second in Command / Building Incharge of Hiranandani: ______________________

NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 31
Title: Checklist For filling bolt hole & cavity of wall ties : Rev.0, dated 11 July, 2015
For Aluminium formwork building

Building: Floor Level: Part:

Date:

Note:

External working platform / safety platform should be removed only when all slit and bolt holes are totally filled
up with approved methodology. (Except Bolt hole of working / safety platform which will be partly filled from
outside at the time of external painting.)

Sr. No. Activity Acceptance Criteria Observation


1 Filling of Wall Tie Cavities in RCC members. As per approved procedure

2 Filling of Column Tie rod Cavities. As per approved procedure

3 Filling of Kicker Bolt Cavities. As per approved procedure

4 Filling of Slab Bolt hole Cavities of As per approved procedure


Working / Safety platform
5 Filling of Exterior Wall Cavities of As per approved procedure
Working / Safety platform from Internal Side
6 Filling of Exterior Wall Cavities of Working / As per approved procedure
Safety platform from External Side at the time
of external painting.
7 Honeycombing ( if any ) a) All Exterior RCC members
-- Minor Honeycombing , to
repaired with Grey Colour
Approved Repair
material .
b) All Internal RCC members
--Minor Honeycombing , to
repaired with Red Colour Mc
Crete Type A .
c) For all RCC Members --
Major Honeycombing , to
repaired by Letter Box method

Engineer of Civil Contractor: ______________________

Building In-charge / Second In Command of Hiranandani: ______________________

NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated
above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 32
Title: Checklist For External Painting. Rev.1, dated 13 Apr 2017

Building Location Date


Date and
Sr. Activity Acceptance Criteria
Observation
Dia of bamboo shall not be less than 1.5” and erected without any
sway. Third party certificate of gondola shall be available for each
Bamboo Scaffolding / time shifted. Load on gondola shall not exceed permissible value
Note
Gondola given by Manufacturer. All required safety net shall be in position.
scaffolding or Gondola should be removed , only after the final
clearance is given by competent authority .
1.0 Surface Preparation
Grinding of cement slurry, and any projecting offsets. Cleaning of
1.1 Cleaning of surface gunny bag pieces, debris, from top of horizontal surfaces, cleaning
of any algae etc.
Any honeycombing in concrete to be repaired with MCcrete / GP as
the case may be. Any damaged edges of groove or drip mould to be
1.2 Repair / rectification repaired with GP2. Any damaged or incomplete silicon sealant
filling around window to be repaired.

1.3 Tie rods and Tie patti Any tie patti , tie rods PVC conduit, or plastic stuck in concrete to
be removed. Any improper / balance filling or plugging of tie patti
and tie rod (especially of working platform bolt hole) to be treated
with GP2 .
Treatment to local Application of approved putty on local depressed areas to match
1.4
depression with surrounding to be carried out.
Water spray testing
Any leaking spot observed to be marked and repaired with GP2 or
2.0 from outside by Civil
concrete as per the case.
contractor.
3.0 Washing of surface Any dust of grinding etc. to be washed out.
As per required coverage / thickness and coats specified by
manufacturer and as per approved ext. paint scheme.
After dying period of this coat - as specified by Manufacturer, is
Waterproofing coat
4.0 over, again carry out water spray test to detect any leakage from
( Base coat)
inside. It is to be carried out even if inside face is not directly
visible for eg. Toilet where plaster, tile and false ceiling is over.

As per required Swirl pattern (except horizontal surface), uniform


and as per approved ext. paint scheme. Texture coat shall not be
5.0 Texture coat
dark in shade.

As per approved shade and dilution specified by Manufacturer and


6.0 Top Coat.
as per approved ext. paint scheme.
Painted surface shall be free from any visible offsets/ projection ,
waviness, non-uniform texture etc. all surface touching bamboo
7.0 Final check
shall be finished during removal of bamboo. All Horizontal surface
shall be free from Texture drops.

FOREMAN ___________________ JR/SITE ENGR_______________ SR/SECTOR ENGR________________

NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.

You might also like