Checklist Modification - RCC & Finishing
Checklist Modification - RCC & Finishing
Foreman____________________________
NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 2
Title: Checklist For Concreting Works Other Than Rev.1, dated 24-8-09
Slab.
Building Location
Date.
FOREMAN: --------------------------------------------
NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 3
Title: Checklist For Column Concreting. Rev.2, dated 24-8-09
Building Location Date.
Grade of concrete= M Grade of steel =
Sr. No. Activity Acceptance Criteria Observation
1 Column starter. Shall be free of honey combing, edge being not broken &
laitance removed with coarse aggregate top exposed
compulsorily.
2 Provision of Rebar (dia. & qty.), + dowels if As per Column schedule As per RCC Drg. No.:_______,
any Rev. No.:________
3 Position of Rebar. (Lapping, spacing of As per General drawing. As per RCC Drg. No.:_______,
stirrups with 45 degree legs & master ring). Rev. No.:________
4 Clear Cover of Rebar. Shall be provided of 55mm & 40mm, for below ground &
above ground respectively, with a + 5 mm tolerance.
5 Position of topmost stirrup of column. Shall be placed at 40mm below concreting top.
6 Position of guide/master stirrup above Shall be provided at Min. 600mm & Max. 1000mm.from
concreting level. concrete top.
7 Space of needle vibrator, insertion, for Shall be Min. 70mm gap to suit 60mm needle vibrator &
concreting works. Min 50mm gap to suit 40mm needle vibrator
8 Binding wire knots & tail Shall not be in Clear cover zone.
9 Shuttering works Soldiers shall be provided after every panel for column
length more than 750mm. 1st tie rod shall be at 125mm
from bottom. Window shall be provided for column height
more than 1400mm. Wedge clips shall be at 150mmc/c.
back to back angle Yokes shall be provided at each tie rod
level. Raker props shall be supported on firm base.
10 Provision of Empty cement bag below No gap shall be seen, in space between shuttering panel
shuttering panel. bottom & slab top.
11 Starter/ Column dimension (width, length, As per Drawing. Dwg No.__________
right angle, line & plumb). Rev. No.:________
12 Column top concreting level. As per Drawing. Dwg No.__________
Rev. No.:________
13 Working platform. Shall be supported on H frame with atleast 27” wide
platform.
14 Chute (Supda) at window level & top level. Shall be provided in 45 degrees slope with width of
minimum 300mm & to be provided in alternate window
panel.
15 Tools & materials for making cement slurry, 2 G.I. buckets, 1 ltr. Cylinder,500 ml bottle for plasticizer
& trey for concreting & rod for stirring
16 Two nos. electrical vibrator, one no. petrol Available near columns
vibrator & spare needle.
Note :All dwg numbers , to be referred should be filled in , before the Checklist is referred to , at
location , for Acceptance Criteria , by the Senior Engineer/Sector Engineer .
NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 4
Title: Checklist For Beam Bottom Rev.1, dated 24-8-09
Building Location
Date.
Note :All dwg numbers , to be referred should be filled in , before the Checklist is referred to , at
location , for Acceptance Criteria , by the Senior Engineer/Sector Engineer .
Foreman____________________________
NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 5
Title: Checklist For Shuttering Before Placing Rev.1, dated 24-8-09
Reinforcement.
Building Location Date
Sr. Activity Acceptance Criteria Observation
No.
1 Architectural details As per Drg. No.:_______,
Rev. No.:________
2 Column Dimensions (Width and Thickness.) As per RCC Drg. No.:_______,
Rev. No.:________
3 Column Reductions As per RCC Drg. No.:_______,
Rev. No.:________
4 Beam Bottoms (width and Th.) a) Width = Dimension +5mm
b) Thickness=Dimension +/-3 mm
c) Depth = Dimension+5mm
5 Slab Panel diagonals, linear dimensions. Shall be As per drawing no______. With a tolerance of + 5
mm.
6 Verticality with previous lower Panel Shall be in Plumb With a tolerance of + 5mm
7 Levels of Beam Bottom and Slab Panels. Shall be As per drawing no______. With a tolerance of + 5
mm.(No Camber to be provided unless specified by RCC
consultant)
8 Lift Pardi diagonal and verticality Shall be in vertical plumb with a tolerance of
+ 5mm, Diagonal with tolerance + 5mm.
9 Chipping of Column Junctions Laitance removed & coarse aggregate top is exposed
compulsorily.
10 Shuttering Plates. Plate Thickness shall be of min. 14 gauges, & must be free
from Rust & Structural Defect.
11 Beam/Slab Shuttering
a) Gaps between joints of shuttering material Shall be filled with ribs & masking tape of 3” width for
horizontal slab shuttering only. Masking tape shall not be
used for vertical sides.
b) Wailing 4”x1 ¼” Patti to be used as wailing. For 500mm and
600mm depth beam Internal side = 2 nos., External side = 3
nos. For 700mm & 750mm Internal side = 3 nos., External
side = 3 nos. For sides more than depth 750mm follows
approved shuttering design.
c) Studs For 500mm depth beam Internal side = 4”x1 ¼” Patti at
1’7” c/c., External side = 4”x1 ¼” Patti at 1’7” c/c. For 600
& 700mm Internal side = 4”x1 ¼” Patti at 1’3” c/c..,
External side = 3” x 3” chaavi at 1’3” c/c. For sides more
than depth 700mm follow approved shuttering design.
12 Sunk Portions As per RCC Drg. No.:_______,
Rev. No.:________
Note :All dwg numbers , to be referred should be filled in , before the Checklist is referred to , at
location , for Acceptance Criteria , by the Senior Engineer/Sector Engineer .
All Shuttering, staging and back propping must be checked by Structural Consultant.
Sr.no Activity Acceptance Criteria Observation
1 Grade of Concrete As per RCC Drg. No.:_______, Grade M______
Rev. No.:________
2 Grade of steel As per RCC Drg. No.:_______, Grade Fe______
Rev. No.:________
3 Chipping of Column Beam Junctions Laitance removed & coarse aggregate top is exposed
compulsorily.
4 Shuttering of slab Shall be in level with tolerance of + 5mm
6 Column - beams junction Shuttering Shall have minimum 50mm overlap on column
concrete. Tie rods shall be tightened with back to back
angle yokes. Wedges shall be tightened in a gap
between yokes & beam side.
7 Shikanjas at beam bottom level Shall be tightened at every stud
8 Rebar, dowels bars, cover , chairs ,column As per RCC Drg. No.:_______,
reductions Rev. No.:________
Cover slab - dimension + 2mm, Col/Beam -
Dimension + 5mm
9 Constructions joints Shall be at Locations as per approved strip system
drawing.
10 Electrical details-points ,conduits Location as per approved drawing Drg. No.:_______,
11 Inserts-water spouts, etc. Size & Location as per approved drawing Drg.
No.:_______,
13 Mechanical Needle Vibrators 60mm & 40mm, Electric Vibrators - 2 Nos & Petrol - Vibrator - 1 No.
depending on Congestion of Rebar. shall be available in working condition.
14 Screed Vibrator 1 no shall be available, as per fabricated by our Mech
Dept & Carpenters.
15 CA1,CA2 & Sand stacked Available as per requirement
Note :All dwg numbers , to be referred should be filled in , before the Checklist is referred to , at
location , for Acceptance Criteria , by the Senior Engineer/Sector Engineer .
Note :All dwg numbers , to be referred should be filled in , before the Checklist is referred to , at
location , for Acceptance Criteria , by the Senior Engineer/Sector Engineer .
NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 8
Title: Checklist , for Concrete Process Rev.1, dated 24-8-09
Building Location
Date.
NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 9
Title: Checklist For Concreting works after Rev.1, dated 24-8-09
deshuttering
Building Location
Date.
Sr.No. Activity Acceptance Criteria Observation
1. Honeycombing ( if any ) For depth up to 2” shall be repaired with Mc-Crete
Type A (red color) & for depth above 2” shall be
repaired by letter box method.
2. RCC Members Shall be in position, line, level & plumb with tolerance
of + 5 mm
Slab, beam side & ceiling shall be cleaned as soon as
3. Cleaning of slab soffit.
slab/beam is deshuttered. Any slurry leakage “ papdi “
shall be chipped off . Masking Tapes, plywood, nails
etc shall be removed.
4. Any damage to RCC Members For depth up to 2” shall be repaired with Mc-Crete
( if any ) Type A (red color) & for depth above 2” shall be
repaired by letter box method.
5. Any cracks observed Shall be approved by Project manager for
concession/Repair/ OR Rework
6. Date of Casting, written on RCC Members. Shall be written immediately after de shuttering & it
shall be Legible
7. Any realignment of rebars, required for Shall be done in the slope of 1 in 6
starter, moulding, etc.
8a. Curing of Member Shall be done using Jutex & Wata for slab or Hessian
clothe wrapped for other structures, ensured for 14
days.
8b. Curing of slab soffit and beam sides. Curing of slab soffit & beam side shall be done for 2
days after de shuttering in 5 days.
9. Any Watta, broken on top of slab. Shall be immediately repaired.
10. All, supports to RCC Members to be Shall not be de shuttered/ Removed or disturbed before
ensured intact (undisturbed) maturity period & obtaining the compressive strength
of cubes of the structure , as per norms laid down
namely 3 days ,5days, 15days & 28 days ,
50%,70%/75% , 80% & 100%.
NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 10
Title: Checklist For Block Masonry Rev.3, dated 04-03-16
Building Location
Date
6 Cement mortar proportion For PPC/OPC cement use 1:5 Ratio, Cement
50Kg: Manufactured sand 175Lit. with
350ml/bag mortar plasticizer.
7 Masons to have mortar joint thickness Kanda shall have 18mm thickness (NO GO) on
"Kandas". one end & 9mm (GO) on other side. Size of
kanda shall be 65mm.
8 Collection of fallen mortar for Re use Empty cement bags on both sides of wall shall be
provided to collect waste mortar
FOREMAN: ____________________________________________________________________
NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 11 A
Title: Checklist For Gyp. Plaster (To be filled up before starting of Rev.3, dated 04-03-16
GVP)
Building Location
Date
Sr.
Activity Acceptance Criteria Observation
No.
Block masonry completion in Block masonry should be completed without leaving any
all respect pockets (gabda). Joint between beam / slab bottom & block
1
masonry should be filled up with mortar , including 7 days
curing.
GVP on ceiling below Waterproofing should be completed including ponding for 7
2 terrace, refuge flat & kitchen
days before starting of ceiling GVP
Chasing finishing of Chasing finishing of electrical conduit should be completed
3 electrical conduits- If Any.
with 3 days curing without any cracks seen.
Cracks in masonry All cracks should be repaired with cement mortar with 3 days
4
curing.
Door frames Fixing Should be fixed as per
5 Dr. No.________________ & Rev. No. ________________.
To be in Plumb ,line and level with tolerance of + 2 mm
Hold-fast patti fixing with Should be fixed after alignment of door frame.
6
RCC member.
Electrical concealed work All electrical points shall be provided As per
along with Switch boxes, Drg. No.:_______,
7
Brackets, Distribution Rev. No.:________
boards etc.
Tie bolt holes in Bolt holes for columns, lift pardi, beams etc are to be plugged using
8
column/Pardi to be closed block masonry cement mortar or GP2 ( In case of al. formwork ).
Proper raking of masonry Raking of joints should be carried out immediately, when mortar is
9 joints fresh. Brooming should be done after raking of joint.
Slab soffit surface
10 All dirt/ waste/ oil or loose concrete should be cleaned.
preparation
Classic Bond GP Adhesive
11 application on ceiling. (if Surface completely covered with Classic Bond GP Adhesive.
any)
Classic Bond & Seal (For Surface to be completely covered with Classic Bond & Seal as per
12 Buildings with Al. formwork required coverage specified in Circular ie 50 to 55 Sft / Kg.
vertical surfaces)
Pre-wetting of Concrete/Masonry surfaces shall be saturated surface dry with light
13
Concrete/Masonry sprinkling of water.
Thickness of Gypsum Plaster a) 12mm + 5mm (Wall)
14 at Level Pad b) 10mm + 2mm (Ceiling). ( Provide cement chaat wherever
applicable )
Note: All dwg numbers, to be referred should be filled in, before the Checklist is referred to, at
location, for Acceptance Criteria, by the Senior Engineer/Sector Engineer.
SR/SECTOR ENGR________________
_________________________________________________________________________________________
N.B. Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 11 B
Title: Post Checklist For Gypsum Plaster Rev.0, dated 18-04-13
Building Location
Date
NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 12
Title: Checklist For Internal Plaster (Cement) Rev.2, dated 04-10-14
Building Location
Date
Sr. Activity Acceptance Criteria Observation
No.
1 Proper Raking of Masonry Joints Shall be done immediately, when mortar is fresh. Brooming
shall be done after raking of joint.
2 Slab soffit surface preparation No dirt/ waste/ oil or loose concrete shall be seen
3 Doors/Windows Frames Fixing Shall be fixed as per
Dr. No.______,
& Rev. No. _____.
To be in Plumb ,line and level with tolerance of + 2
mm
4 Hold-fast fixing Shall be fixed simultaneously with block work using
M.S. Pharma.
5 Electrical concealed work along with All electrical points shall be provided As per
Switch box, Brackets, Distribution Drg. No.:_______,
boards Rev. No.:________
6 Fixing of Sub frame for Aluminium Shall be in Line, Level & Plumb with tolerance of + 2
windows mm
7 Pre-wetting of Concrete/Masonry Concrete/Masonry surfaces shall be saturated surface
dry
8 Cement mortar proportion For PPC/OPC cement use (a) 50kg. Cement: 200 Lit.
Screened sand (without flyash) with adding 14.5 Kg.
Flyash & 150ml/bag mortar plasticizer. OR ( b) 50Kg.
cement : 8 Bags of 40 kg screen sand (with flyash) with
300ml/bag mortar plasticizer. *NB - Depending on
variation in fineness of sand, proportion of mortar can
be slightly adjusted to get required cohesive mortar.
9 Thickness of Level Pads for Cement a) 20mm + 5mm (Walls)
Plaster b) 10mm + 3mm (Ceiling)
10 Tie bolt holes in Column/Pardi to be Bolt hole filling as per circular No.200608 & dated
closed 20.06.08.
11 All honey-combs to be repaired For depth up to 2” shall be repaired with Mc-Crete
Type A (red color) & for depth above 2” shall be
repaired by letter box method.
12 Application for Bonding Agent Bonding agents shall be applied on clean & dry RCC
surfaces.
Note :All dwg numbers , to be referred should be filled in , before the Checklist is referred to , at
location , for Acceptance Criteria , by the Senior Engineer/Sector Engineer .
Note :All dwg numbers , to be referred should be filled in , before the Checklist is referred to , at
location , for Acceptance Criteria , by the Senior Engineer/Sector Engineer .
FOREMAN __________________
JR/SITE ENGR_______________
SR/SECTOR ENGR_________________
NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
4 a. Internal Areas where GVP to be done on the Single coat plaster with light scratch
plaster & tiles to be fixed using cement
paste. ( Kitchen, toilets etc. )
4 b. Internal Areas where tiles/ marble / granite Single coat plaster with sponge fine
to be fixed using adhesive. ( Kitchen, toilet grain finish
dado )
4 c. Internal plaster where painting to be done Single coat plaster with tyrolene
directly on plaster. finish.
(Electrical duct, Meter room, Fire fighting
duct, pump room, substation, watchman
cabin & non public areas. )
4 d. Internal Toilet ducts, staircase, Refuge area Double coat plaster with tyrolene
& public area finish
4 e. External plaster where there is Texture Double coat plaster with light scratch.
paint ( Renova ) to be done on it
4 f. External plaster where there is painting to Double coat plaster with tyrolene
be done directly on plaster ( Cement or finish
acrylic paint )
5. Cracks in Plaster. Shall be approved by Project Manager for
concession/Repair/ OR Rework
6. Post Cleaning, of plaster droppings both
on :
a) Cleaning of Plastered surface. Shall be Completely free from
droppings.
b) Waste Plaster material fallen at base, where Shall be removed immediately.
plastering is in progress.
7 Finishing around Electrical Points (especially Shall be in line & level with tolerance of + 2
junction box, switch plate, etc.) mm
8 Line and level of plaster. For Internal plaster + 2 mm
For External Plaster + 5 mm.
9. Diagonal & right angle of plaster at edges & Shall be in right angle with tolerance
corners. For Internal plaster + 2 mm
For External Plaster + 5 mm.
10. Internal Corners of plaster. No waviness shall be seen in internal
corners.
11 Curing of first coat plaster. 1st coat plaster shall be cured for 1
day before starting 2nd coat plaster
12. Curing of plaster Shall be done for 7 days from date of
plaster done
Internal Plaster :
13.
a Shall be terminated 9“above
GV Plaster termination level on wall.
structural finish level of slab.
b Shall be terminated 6 “ around Al.
GV Plaster termination around Al. windows
windows & openings
& openings
c Next flat or room, plaster shall not be
Work front for Next flat/ room
commenced without completing
previous flat or room.
NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 15
Title: Waterproofing Checklist For Toilets / Rev.1, dated 24-8-09
Kit / Balcony
Building Location
Date.
NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
Building Location
Date.
Sr.
No. Activity Acceptance Criteria Observation
Surface Preparation All Surfaces shall be micro cleaned & loose
1 Concrete /mortar & dust shall be removed
using blower.
Shall be done by removing PVC sleeve &
2 Bolt hole plugging
using Mc-Crete type A (Red colour) .
For depth up to 2” shall be repaired with
Mc-Crete Type A (red color) & for depth
3 Honey comb
above 2” shall be repaired by letter box
method.
4 Chemical application Shall be done As per tender specification
Protective coats on chemical Metal coba of 50mm thick to the bottom
5 applications as per it’s location slab & finishing plaster of cement mortar
1:4 shall be done on walls.
6 Curing of Protective coats Curing shall be done minimum 3 days.
Check for Leakage - Fill entire Leakage observed shall be stopped by
7
tank removing & re doing chemical application
Note :All Tenders, to be referred should be filled in , before the Checklist is referred to , at
location , for Acceptance Criteria , by the Senior Engineer/Sector Engineer .
NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 17
Title: Post Checklist For Waterproofing Rev.1, dated 24-8-09
Building Location
Date.
Sr.N Activity Acceptance Criteria Obs.
o.
1. Ponding test Ponding test shall be carried out for 7 days &
there shall not be any leakages on soffit
below.
2 Slope of Waterproofing Shall be min 1 in 80 unless specified, towards
Nani traps/outlets.
3. Waterproofing crevices Finish shall not be rough, uneven & left
unfinished especially at corners and edges.
4. Cracks, seen in waterproofing completed: Shall be approved by Project manager for
concession/Repair/ OR Rework
5. Line, Level & Right angle of Waterproofing Shall be Flush with plaster completed by civil
plaster , done on walls. contractor, with Tolerance For Internal plaster
+ 2 mm & For External Plaster + 5 mm.
6. Bathtub Waterproofing Internal waterproofing plaster shall be 450
mm above from top of bath tub.
7. Waterproofing finishing at floor traps. Finishing shall not be rough & uneven
NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
Building Location
Date.
Sr.
No. Activity Acceptance Criteria Observation
NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
5 Level pads to be provided in case of dado Adhesive thickness of Min. 3mm &
tiling Max 5mm shall be considered for
making level pads.
6 Slope In case of flooring. ( If specified.) Shall be Towards Nani Trap/ Outlet
Note :All dwg numbers , to be referred should be filled in , before the Checklist is referred to , at
location , for Acceptance Criteria , by the Senior Engineer/Sector Engineer .
Foreman: _____________________________
Junior / Site Engineer: _______________________________
NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
Sr.
No. Activity Acceptance Criteria Observation
1 Soil available , after Excavation or Filling Shall be free from any vegetation,
scrap
2 Compaction of External works sub grade Rolling shall be done by 10-12 T
roller/ 8 T vibratory roller to achieve
95% proctor density.
3 Compaction of Building compound Compaction shall be ensured by
works sub grade Carrying out 30 to 50 passes of Roller
4 Level of Sub-Grade Shall be As per Drg. No.:_______,
Rev. No.:________
Foreman: ______________________________
Sr.
No. Activity Acceptance Criteria Observation
Shall be Hard blue/black & free from
1 Quality of rubble cracks.
Foreman: ______________________________
NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated
above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 22
Title: Checklist For WBM Rev.1, dated 24-8-09
Building Location
Date.
DATE:
LOCATION:
Note :All dwg numbers , to be referred should be filled in , before the Checklist is referred to , at
location , for Acceptance Criteria , by the Senior Engineer/Sector Engineer .
Foreman: ______________________________
Foreman: ______________________________
NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 25
Title: Electrical Checklist For Completion of Flat Rev.1, dated 24-8-09
Building Location
Date
Sr.
Activity Acceptance Criteria Observation
No.
Wiring as per approved drawing.
& Earth wire connectivity upto vertical earthing in
1 Wiring and Earthing.
duct shall be checked.
Earth resistance should not be > 2 Ohm
Shall be fixed as per approved drawing
2 Switch Plates
& shall be horizontal in level
Fan hook shall be painted & double loop type.
3 Fan Hooks and Points Point shall be as per approved drawing.
& shall be tested in working condition.
Point shall be as per approved drawing.
4 T.V. Points & 16 SWG GI / Nylon wire shall be pulled in conduit
upto point.
Point shall be as per approved drawing.
5 Telephone Points Tel wire shall be pulled in conduit upto point. (as per
tender specs.)
Tel wire shall be pulled in conduit upto point. (as per
6 Intercom Points
tender specs.)
As per Tender Approved Make.
7 Call Bell
& shall be tested in working condition.
ELCB / MCB T.P. / D. P./ As per Tender Approved Make.
8
S. P. ELCB’s shall be checked for tripping.
Brand as per P.O. No _______
9 Exhaust Fans and Points
& shall be tested in working condition.
Shall be tested for working condition.
10 Heaters and Points
Shall be tested for working condition.
11 Aquaguard and Point
Junction Box Cover Plate As per Tender Approved Make.
12
(Round Tippa)
Location as per approved drawing.
13 Call Bell Push
& shall be tested for working condition.
Note : All the approved brands , as per Tender of particular bldg , shall be filled in , before the
Checklist is referred to , at location , for Acceptance Criteria , by the Electrical Engineer .
NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 26
Title: Checklist While Giving Possession Of Flats Rev.1, dated 24-8-09
7 Water heater for kitchen and all toilets Shall be checked for hot water supply &
any leakages.
8 Exhaust fan in kitchen and toilets Shall be in operational condition, silent &
free from vibration.
9 Marble Flooring and skirting in living, dining Shall be of required polish quality, free
and bedroom areas from scratch & in Line, Level & plumb.
10 Provision for washing machine inlet & Outlet Shall be in operational condition & finish
point in kitchen around the points shall be neat & clean.
11 Provision for telephone and intercom Point Shall be in operational condition.
12 All toilets & kitchen provided with vitrified Joints shall not be open, Hollow sound
tiles/marble patties in floor and dado shall not come while tapping. Edges &
corners of tiles shall not be chipped off.
Flooring slope shall be towards Nahni
trap.
13 In kitchen vitrified/ceramic tile flooring and Tiles Joints shall not be open, Hollow
dado and granite kitchen platform with S.S Sink sound shall not come while tapping. Edges
& corners of tiles shall not be chipped off.
S.S. sink & granite shall be scratch, stain
marks free. Flooring below kitchen
platform near Nahni trap shall be one tile
drop.
14 Shall have uniform texture & surface
Wood Polishing works finish. Vinyl nail heads shall not be
visible. All polish stains on adjacent
surfaces shall be clean.
15 Shall be free from brush marks, paint
dropping. Shall have uniform texture &
Painting on walls, ceiling, doors and frames
surface finish. Background shall not be
visible.
16 Shall be in operational condition. There
Water purifier in kitchen
shall not be any leakage from joints.
17 Dustbin 01 no. & plastic bag 100 nos.
Dustbin with plastic bags
shall be available.
18
Electrical Meter reading Record Reading at the time of possession.
Foreman: _____________________________
NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
Building Location
Date
Sr.
Activity Mode of Inspection Observation
No.
Before starting painting, GVP work
completed in all respect, including All plaster works shall be in line,
1 complete checking of edges, internal level, and plumb. All cracks in
corners , column-beam offsets, waviness plaster to be rectified.
on walls & ceiling, moulding etc.
Activities like Al. windows,
Pre Requisites to be finished before wooden work, marble polishing
2
starting painting. (floor, skirting, door jamb, sills) &
any alteration are completed.
3 Surface where painting will be applied Shall be free from dampness.
Legs to be covered by cloth or
4 Painter’s ghoda (standing tool) rubber packing to avoid scratches
on flooring.
5 Mask used during the painting.(for safety) By visual inspection
Protection of all electrical switches,
Shall be covered by Light duty
6 hardware, sanitary fittings &flooring
masking tapes.
before starting the painting work.
To be done by mechanical
abrading with the help of scraper,
7 Surface cleaning.
palti patra to remove loose
particles, dust and hollow plaster.
To be done by suitable emery
8 Making surface rough. paper (60, 80 or 100 no. sand
paper).
with approved suitable fillers.(if
9 Filling of cracks.
required)
Application of one coat primer over the Of approved brand mentioned in
10
prepared surface. tender.
Application of two coats high quality putty should be made as per brand
11
leveling putty over the surface. and specification given in tender
By feeling with palm of hand. No
Making the surface smooth and plain by
undulation should be felt. And by
12 sand paper (water paper) no. 100, 150 or
visual inspection no patra marks
200.
should be visible.
13 Application of 2nd coat primer. (Primer Of approved brand mentioned in
from approved brand). tender.
Application of 1st coat paint by Of approved brand & shade
14
roller/brush. mentioned in tender.
Application of 3rd coat putty (touch up), if
Putty should be made as per brand
15 found undulation of surface by redoing
and specification given in tender.
step no. 8, 10, 11, 12, 13 & 14.
Application of 2nd & 3rd coat paint.
Of approved brand & shade
16 (Minimum interval between two coats 4-6
mentioned in tender.
hrs.
By visual inspection, if found not
OK apply more coats of paint. No
Final appearance of desired finish and
17 back ground shall be visible. No
colour.
shade variation & patches shall be
seen.
All stain, paint marks from floor,
18 Cleaning after painting. door, window & fittings to be
removed.
SR/SECTOR ENGR________________
__________________________________________________________________________________
NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 28
Title: Melamine Polishing (for door frame, door shutter, cover Rev.0, dated 06.02.10
moulding, mirror moulding & paneling in lift lobby & entrance).
Building Location Date
Sr. Activity Acceptance Criteria Observation
All Hardware & surrounding area (like, final painting surface, mirror Completely covered by paper &
1
surface, etc) shall be covered before starting of polishing. masking tape.
Sand papering on rough wood surface (door frame, cover moulding, Smooth surface shall be
2
mirror moulding) by 60 or 80 no. paper. achieved.
Smooth surface shall be
3 Sand papering on all veneer surfaces by 120 no. paper.
achieved.
Filling up holes / cracks, roughness, minor chipped area with filling
4 Completed in all respect.
material.
Approved Shade & brand as per
Powder coating application on all wooden surfaces (including veneer)
5 tender. Surface is completely and
by manual application.
uniformly covered.
Sand papering on all wooden surfaces (including veneer) by 120 no. Smooth surface shall be
6
paper. achieved.
Surface is completely and
7 1St coat French polish (lakh polish) application to be done manually.
uniformly covered.
Sand papering on all wooden surfaces (including veneer) by 120 no. Smooth surface shall be
8
paper. achieved
Surface is completely and
9 2nd coat French polish (lakh polish) application done manually.
uniformly covered.
Two coats of Asian or approved brand Melamine sealer application by Surface is completely and
10
spray. Mix proportion=1 lit. Sealant: 100ml Hardener: 300ml thinner. uniformly covered.
Refilling of minor holes / cracks, roughness, minor chipped area with
11 All such areas are covered.
filling material. (If required).
Sand papering on all wooden surfaces (including veneer) by 150 no. Smooth surface shall be
12
paper. achieved.
13 3rd coat French polish (lakh polish) application done manually. Surface is completely covered
Fill up minor holes / cracks, gap around lock patti & hinges with matt Surface is completely and
14
mom. uniformly covered.
Sand papering on all wooden surfaces (including veneer) by 150 no.
15 Smooth surface
paper.
Surface is completely and
17 4th coat French polish (lakh polish) application Done manually.
uniformly covered.
Melamine matt polish application one / two coat by spray. (Final As per approved sample/ Shade.
18
finish) Surface shall look uniform.
FOREMAN: _______________________________ JR.ENGR/SITE ENGINEER:
_______________________
SENIOR/SECTOR ENGINEER: _________________________________________
NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 29
Title: False ceiling Rev.0, dated 19.2.2010
Date:
7 All Formwork should be cleaned and coated with Shuttering oil application should
an approved Formwork release agent (including be done with roller using Clean
form face, all side & end rails). bucket.
8 Condition of Wall ties and other accessories. Wall ties should be free from
rust and should be straight.
9 Size of columns / Shear walls. As per structural drg. No.
10 Vertical Reinforcement. ( dia, spacing etc) As per structural dwg No.
Representative of Civil Contractor: ______________________
NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated
above.
Stage II: Formwork Checklist
4 Conduits & Junction Openings Shall be sealed using Hessian cloth to avoid
choking
5 Position/Location of As per approved Electrical layout drawing of
Light/Fan/TV/Tel./ Bracket light Slab. Drg_____________
points & shall be Painted for easy identification on
slab surface soffit (Slab shuttering)
Note :All dwg numbers , to be referred should be filled in , before the Checklist is referred to , at location , for
Acceptance Criteria , by the Senior Engineer/Sector Engineer .
NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
Stage IV: Pour Card (Slab Concreting).
2 Construction joints laitance removal. For all shear walls and columns ,
make surface rough by dense
brooming.
3 Shuttering of slab. Shall be in level with tolerance of +
2mm
4 Staging/Scaffolding, including bracing Shall be as per approved staging
ties design.
5 Constructions joints Location. As per approved strip system
drawing.
6 Inserts-water spouts, etc. Size & Location as per approved
drawing Drg. No.:_______,
7 Mechanical Needle Vibrators 60mm & Electric Vibrators - 3 nos. 60 mm
40mm, depending on Congestion of needle Vibrators & 3 nos. of 40 mm
Rebar. needle vibrators , with 4 nos.
vibrators
are required to avoid frequent
shifting of same. Also spare needles
to be kept ready on site in case of
emergency.
8 All required Bulk material availability. Should be sufficient as per pour size.
Note :All dwg numbers , to be referred should be filled in , before the Checklist is referred to , at location , for Acceptance
Criteria .
NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
Stage VI: Post Concreting Checking
NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 31
Title: Checklist For filling bolt hole & cavity of wall ties : Rev.0, dated 11 July, 2015
For Aluminium formwork building
Date:
Note:
External working platform / safety platform should be removed only when all slit and bolt holes are totally filled
up with approved methodology. (Except Bolt hole of working / safety platform which will be partly filled from
outside at the time of external painting.)
NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated
above.
HIRANANDANI GROUP OF COMPANIES
FORM/FORMAT Checklist no. 32
Title: Checklist For External Painting. Rev.1, dated 13 Apr 2017
1.3 Tie rods and Tie patti Any tie patti , tie rods PVC conduit, or plastic stuck in concrete to
be removed. Any improper / balance filling or plugging of tie patti
and tie rod (especially of working platform bolt hole) to be treated
with GP2 .
Treatment to local Application of approved putty on local depressed areas to match
1.4
depression with surrounding to be carried out.
Water spray testing
Any leaking spot observed to be marked and repaired with GP2 or
2.0 from outside by Civil
concrete as per the case.
contractor.
3.0 Washing of surface Any dust of grinding etc. to be washed out.
As per required coverage / thickness and coats specified by
manufacturer and as per approved ext. paint scheme.
After dying period of this coat - as specified by Manufacturer, is
Waterproofing coat
4.0 over, again carry out water spray test to detect any leakage from
( Base coat)
inside. It is to be carried out even if inside face is not directly
visible for eg. Toilet where plaster, tile and false ceiling is over.
NB: Checklist, to be completed in all respects and signed with date by all concerned, as designated above.