CHECK LIST
20 READY BUILT FACTORIES& 12 SUPPORT UNITS-
CLIENT MODON
Project Name WAAD AL SHAMAL
PMC CONSOLIDATED CONSULTANT GROUP (CCG)
Contractor SAUDI ZAAS CONSTRUCTION COMPANY
Related ITP WAS1-05-004-SZC-QUM-ITP-0012_00
Checklist Title: CHECKLIST FOR Electrical Duct bank (HDPE/UPVC)
Related MST WAS1-05-004-SZC-QUM-MST-0012_01
READY BUILT FACTORIES AND SUPPORT UNITS Related FIR WAS1-05-004-SZC-ELE-FIR-0299_00
Works Location:
Status - Acceptable
SN Description of checking to be carried out Remarks
Yes No NA
1 Approved Method Statement obtained from Employer/Engineer.
2 Material is an approved product.
3 Check all the installation as per Approved shop drawings.
4 Check for underground utilities and clearances.
5 Confirm the quantity and quality of HDPE/UPVC ducts.
6 Ensure the trench bottom is free of rocks and debris
7 Place duct spacers as required to maintain spacing between ducts.
8 Verify that no damage occurred during installation.
9 Ensure all workers are trained in safety protocols.
10 Are sufficient pull boxes provided in horizontal runs and facilitate wiring?
Sleeves provided when exposed conduits are passing through slabs /
11
walls, etc?
Are all openings sealed with mastic compound / fire-rated sealant for fire
12
walls?
13 Check the junction boxes for location as per drawing.
Remarks:
For Contractor For Supervision Consultant (PMC)
Name Aleem Akhtar
Designation QA/QC Engineer
Signature
Date