Tunnel Work Schedule and Manpower Plan

The document outlines the 24-hour work cycle for the ILEP (Tatopani) Khola Hydropower Project, detailing tasks such as drilling, blasting, and mucking, along with their respective time allocations. It also includes manpower planning for Adit-1, listing various roles and necessary equipment for the project. Additionally, a monthly work schedule is provided, indicating the progress and tasks to be completed in the upcoming months.

Uploaded by

Rahul Shah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
82 views8 pages

Tunnel Work Schedule and Manpower Plan

The document outlines the 24-hour work cycle for the ILEP (Tatopani) Khola Hydropower Project, detailing tasks such as drilling, blasting, and mucking, along with their respective time allocations. It also includes manpower planning for Adit-1, listing various roles and necessary equipment for the project. Additionally, a monthly work schedule is provided, indicating the progress and tasks to be completed in the upcoming months.

Uploaded by

Rahul Shah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

RK Hydro Engineering & Associates Pvt.

Ltd
ILEP (TATOPANI) KHOLA HYDROPOWER PROJECT(25MW)
24 hours Tunnel Work Time Cycle
S.N Work Description Time Hours
AM PM
1 Shift Change 7am 7:30am 30mins
2 Arrangements For Drilling 7:30am 8am 30mins
3 Face Drilling Work 8am 10:30am 2hrs30mins
4 Loading & Blasting 10.30am 11:15am 45 mins
5 Mucking 11:15am 1:15pm 2hrs
6 Survey /Face maping 1:15pm 1:45pm 30mins
7 Arrangements For Drilling 1:45pm 2:15pm 30mins
8 Face Drilling Work 2:15pm 4:45pm 2hrs30mins
9 Loading & Blasting 4:45pm 5:30pm 45mins
10 Mucking 5:30pm 7:30pm 2hrs
11 Survey /Face maping 7:30pm 8pm 30mins
12 Arrangements For Drilling 8pm 8:30pm 30mins
13 Face Drilling Work 8:30pm 11pm 2.30hrs
14 Loading & Blasting 11pm 11:45pm 45mins
15 Mucking 11:45pm 1:45am 2hrs
16 Survey /Face maping 1:45am 2:15am 30mins
17 Arrangements For Drilling 2:15am 2:45am 30mins
18 Face Drilling Work 2:45am 5:15am 2hrs30mins
19 Loading & Blasting 5:15am 6am 45mins
20 Mucking 6am 7am 1hrs
t. Ltd
T(25MW)

Remarks

Mucking work is going on…......


RK Hydro Engineering & Associates Pvt. Ltd
ILEP (TATOPANI) KHOLA HYDROPOWER PROJECT(25MW)
Manpower Planning for Adit-1
MANPOWER DETAILS
Civil Department Mechanical Departm
S.N Designation nos Remarks Designation
1 Site Incharge/Engineer 1 Mechanical Engineer
2 Surveyor 1 [Link]
3 Geologist 1 Wheel Loader Opt.
4 Excutive HR 1 Tractor Driver
5 Supervisor 2 Camper Driver
6 Foreman 2 Tyre Fitter
7 Electrican 2 Mechanic Helper
9 Store Keeper 2 Muckloader Operator
10 All Rounder 2 Muckloader Helper
11 Driller 4
12 Welder 1
13 Helper 5
14 Survey Helper 1
15 Store Helper 2
16 Blaster 1
17 Cook 2
18 Cook Helper 2
19
Total 32

NECESSARY EQUIPMENT
S.N. Name Nos Remarks
1 DG-125kva 1
2 Electric Compressor 1
3 Diesel Compressor 1
4 Wheel Loader 1
5 camper 1
6 Tractor 3
7 Concrete Placer 1
8 Ventilation Fan 1
9 Shotcrete Machine 1
10 Concrete Mixer 1
11 Muckloader 1
12 TM 1
Total 14
vt. Ltd
WER PROJECT(25MW)

Mechanical Department
nos Remarks
1
1
1 call duty
3 call duty
2 call duty
1
2
1 call duty
1 call duty

13
[Link] ENGINEERING ASSOCIATES PVT.L
ILEP (TATOPANI) KHOLA HYDROPOWER PROJECT(25
MONTHLY WORK SCHEDULE

Chainage Monthly Qu
S.N Name of the Documents Unit
From To
1 HRT-Headrace Tunnel
A. Adit-1(299m)
A.1. Portal Area 15-Jan
1 Site Clearance Sqm 0+000.00 Completed
2 Open Excavation Cum Completed
3 ISMB (Rib) Set 5set
4 Spotbolt Nos -
5 Rock Bolt Nos -
6 Spilling Rod Nos 20.00
7 Wiremesh Sqm -
8 Shotcrete Sqm -
9 MS Formwork Sqm 54.66sqm
10 Concrete Backfill cum -
A.2. Inside Tunnel
1 Underground Excavation m 0+000.00 0+299.00
2 Shotcrete Sqm
3 Spotbolt Nos
4 Rock Bolt Nos. 0+000.00 0+299.00
5 Spilling Rod Nos.
6 ISMB (Rib) Set
7 Tie Rod Kg
8 Anchor Bolt Kg
9 MS Formwork Sqm
10 Wiremesh Sqm
11 Cement Grouting (Cement Bags) Kg
12 Resin Capsule Nos.
13 De-watering KW
14 Concrete Backfill Cum
15 Weep Holes Nos

A.1. Face-1 January


1 Underground Excavation m
2 Shotcrete Sqm
3 Spotbolt Nos
4 Rock Bolt Nos.
5 Spilling Rod Nos.
6 ISMB (Rib) Set
7 Tie Rod Kg
8 Anchor Bolt Kg
9 MS Formwork Sqm
10 Wiremesh Sqm
11 Cement Grouting (Cement Bags) Kg
12 Resin Capsule Nos.
13 De-watering KW
14 Concrete Backfill Cum
15 Weep Holes Nos -
A.2. Face-2
1 Underground Excavation m
2 Shotcrete Sqm
3 Spotbolt Nos
4 Rock Bolt Nos.
5 Spilling Rod Nos.
6 ISMB (Rib) Set
7 Tie Rod Kg
8 Anchor Bolt Kg
9 MS Formwork Sqm
10 Wiremesh Sqm
11 Cement Grouting (Cement Bags) Kg
12 Resin Capsule Nos.
13 De-watering KW
14 Concrete Backfill Cum
15 Weep Holes Nos
ASSOCIATES [Link]
OPOWER PROJECT(25MW)
K SCHEDULE
Year-2026
Monthly Quantity
Remarks

February March April May

80.00 80.00 90.00 49.00

-
1100.00
-
-
-
-
-
-
-
- 996.00
-
-
-

February March
-
-
-
-
-
-
-
-
-
-