Water Managers' Pune
Consulting Hydro Engineers and Contractors, Lift Schemes, Pipeline, Hydraulic Structures, Liaison Services
Office No.310,Spectra,Madhuraj Nagar, Paud Road, Kothrud, Pune 411 038.
Mobile (O) 94220 01389 E-Mail : watermanagerspune@[Link]
Ref: WM/QUOTE/MHC/75/2024-25 Date: 28.02.2025
To,
Sushil Kumar Deshmukh
The Maharastra Housing Corporation
Pune.
Name of Work :- Rising main pipeline - Urawade [Link]
Subject :- Quotation for Raw Water Rising Main
Dear Sir,
Reference to the meeting, site visit and subsequent discussions, We are submitting herewith our best offer for
the above work as following.
Sr. No Sub head Amount Time limit
1 Rising Main for 5.76 Km Rs. 46402306
4 months
Total Amount Rs. 46402306
Rs. 464.02 Lakhs
Business terms and conditions
· The time limit for completion of this work shall as mentioned above, depends upon the timely decisions and
availability of required material on site from your side. The period mentioned above may vary due the natural
calamities such as monsoon etc.
· Machinery & labour idling charges are applicable at actual.
· Rates quotated above are valid upto 30 days.
· Pipes or any other material if supplied by your side the cost of material shall be recovered from the running
bills at the basic price
· Responsibility of Land acquisition for laying the pipeline & other activities will remain with owner.
· All statutory fees of government departments or regulatory agencies such as Gram Panchayat, Tahshildar,
Irrigation, PWD etc shall be paid by you directly.
· Nalla and Road crossing structures for pipe line will be extra as per actual.
· In case of the unlikely event of abandonment or cancellation or curtailment of the said project or our scope of
work, we shall be fully compensated for the work done as per the terms and scope of the contract. All partially
completed work will be completed by us and submitted to you for which payment shall be made to us as per the
terms of the contract.
· Inordinate delays in payment against our invoices may lead to temporary suspension of work till the payments
are released. We shall then, not be responsible for delays in submittals.
· You shall furnish us valid certificates for taxes deducted at source (TDS), if any, within 15 days of the
deduction.
· In case of extension of the time period beyond the stipulated tenure of the contract, we shall be at liberty to
review and modify our fees and payment terms which shall be duly considered by you.
Payment Schedule
· Payment schedule will be discussed across the table. However 30 % payment should be made in advance
alongwith the work order, further payment weekly according to the progress of work within eight days from the
date of submission of our bill, final payment within fifteen days from the date of submission of bill.
· Bills for the supply items of material shall be paid 100% immediately against proforma invoice.
· There shall not be any retention in the R.A. Bills against the work done.
· 10 % amount of the bill amount shall deducted in each R. A. Bill against advance paid .
· Bills shall be prepared on the basis of actual quantity executed on site.
We trust you will find this offer in line with your requirements & look forward your valued order at the earliest
possible please.
Due care will be taken to avoid any pollution to water stream/river.
Thanking you
Truly yours,
For Water Managers' Pune
D. A. Quotations as above
Annexure-1
Detailed BoQ
SR.
Qty DESCRIPTION Rate Unit Total amount
NO
1 Item No.1
Supplying, unloading, lowering, laying and jointing with SBR
rubber gaskets D.I. pipes in proper position, grade and
alignment including leveling of trenches at required level,
required tools, tackles, chain-pulleys, crane/JCB etc. as
directed by Engineer-in-charge including conveyance of
materials from stores to site of work including cost of jointing
materials and rubber rings, labour along with thrid party testing
of pipes etc. complete
5760 For 150 mm dia. D.I. K-9 pipes (Supply) 3352 Rmt 19307520
5760 For 150 mm dia. D.I. K-9 pipes (Installation) 1090 Rmt 6278400
2 Item No.2
Providing and Installing ISI standard D.I. specials, and fittings
with sealing rubber gasket of SBR complete and bolts coated or
otherwise protected from rusting and suitable for D.I. pipes
including cost of all labour and material and transportation to
store/site, loading, unloading, etc. complete.
(ISI Kartar or equivalent Make)
2304 For 150 mm dia. 475 kg 1093691
3 Item No.3
Providing & Laying valves PN1.6 rating with companion flanges,
nut bolts as per test pressure, transportation etc. complete
(without bypass arrangement)
5 150 mm Sluice valve 35922 nos 179610
3 150 mm Scour Valve 38875 nos 116625
14 DN 50 Double Acting Air valve 27474 nos 384636
4 Item No.4
Supply and Fixing in position steel bar reinforcement of various
diameters for RCC footings, foundations, thrust blocks etc. as
1 per detailed designs, drawings and schedules including cutting, 100000 M.T 100000
bending, hooking the bars, binding with wires and supporting as
required, etc. all complete.
Page 3 of 7
Annexure-1
Detailed BoQ
SR.
Qty DESCRIPTION Rate Unit Total amount
NO
5 Item No.5
Excavation for pipe trenches in earth, soils of all types, sand
gravel, soft murum, hard murum, boulders, soft rock, hard rock
including chiseling trimming and leveling the bed, removing the
excavated material up to a distance of 50 M and lift up to 1.2 m,
stacking, excluding backfilling, etc. complete.
5760 By mechanical means 1896 Rmt. 10920960
R.O By manual means 7315 Rmt.
6 Item No.6
Filling in pipe trenches as material bedding in trench 200mm
thick layers including watering and compaction, etc. complete.
1037 (a) With Crush Sand 3040 Cum 3151872
7 Item No. 7
Providing and casting in situ cement concrete of for approved
quality for R.C.C. work as per detailed drawings and designs of
Anchor block / Thrust block or as directed by Engineer-in-
Charge including normal dewatering, centering, form work,
compaction, finishing the formed surfaces with CM 1:3 of
sufficient minimum thickness if special finish is to be provided
and curing etc. complete.
10 For anchor/thrust block (M20) 12000 Cum 120000
8 Item No.8
Providing and constructing B.B. masonry valve chamber with 23
cm thick [Link] proportion PCC bedding, B.B. masonry in CM 1:5
proportion, 12 mm thick cement plaster in CM 1:4 proportion on
both sides with providing and fixing C.I. manhole frame and
cover etc. complete as directed by Engineer-in-charge.
14 Air valve Size : 1.7 x 1.67 x 1.35 M 46141 No 645974
4 Sluice valve 2.20 M x 1.67 M x 1.35 M 54284 No 217136
Page 4 of 7
Annexure-1
Detailed BoQ
SR.
Qty DESCRIPTION Rate Unit Total amount
NO
9 Item No.9
Refilling the trenches with available excavated stuff with soft
murrum first over pipe line and then hard material in 15 cm to
5781 290 Cum 1676432
20 cm layers with all leads and lifts including consolidation,
surcharging, with required surplus hump etc. complete.
10 Item No.10
Hydraulic testing for D.I. Pipeline to the specified pressureas
5760 per design with hydraulic pressure pump & water supply will be 130 M 748800
arranged by contractor.
11 Item No.11
Providing and fixing mechanical collar joints to D.I. pipes
5 10000 No. 50000
including labour charges etc. complete as directed.
12 Item No.12
Carrying out repairs to the existing local pipe lines during
5 25000 No 125000
execution including material and labour
Page 5 of 7
Annexure-1
Detailed BoQ
SR.
Qty DESCRIPTION Rate Unit Total amount
NO
13 Item No.13
Providing & erecting structural steel work to support for
pipelines across nala crossing composed of RSJ channel, angle,
steel plates anchor bolts including position, making riveted/
4 bolted / welded connections & including cutting fabricating, 140000 No 560000
erecting, fixing in applying one coat of anticorrosive zinc cromet
& coat epoxy paint with all leads & lifts of material etc.
complete as directed.
14 Item No.14
Dewatering During excavation , laying pipe including cost of
pumping machinary fuel charges/electrical charges all other BHP
1000 130 130000
accessories and labour etc complete as per log book Hour
maintained.
15 Item No.15
Providing and laying of premixed good quality of Bituminious /
Concrete material of thickness 100 mm laying over excavated
road crossing as per drawing and design & as per instruction of
EIC including all lead, lift, all machinary, compaction
30 2385 Rmt 71550
transportation etc complete. Sub-Base preparation for laying of
premix bituminious material over road crossing surface should
be well compacted in the scope of contractor as per instruction
of EIC.
16 Item No.16
Installation of DI. pipe of 150 mm Dia. by HDD method including
30 17470 Rmt 524100
preparing and setting up the equipment.
TOTAL = RS. 4,64,02,306
Page 6 of 7
ANNEXURE-2
Machinery & labour idling charges
S. No. Name of Machinery Rate Unit
1 Poclain -200 Rs. 12000 per day per No.
2 Poclain -70 Rs. 8000 per day per No.
3 JCB Rs. 8000 per day per No.
4 Tipper 3 Brass Rs. 6000 per day per No.
5 Tippers Haiwa Rs. 7000 per day per No.
6 Compressor Rs. 5000 per day per No.
7 Diamond breaker Rs. 800 per day per No.
8 Skilled Labours Rs. 1000 per day per No.
9 Unskilled Labours Rs. 750 per day per No.
10 Centering plate 600x1200 mm Rs. 10.00 per day per No.
NOTE:
Idle charge shall be applicable only if the work remains stop due to any
kind of interruption for more than four (4) consecutive days