DEVELOPMENT OF EXISTING 2 LANE NH-1 FROM KM 8.660 TO KM 33.
775 (SUMBAL TO
WAYUL) TO 4 LANE DUAL CARRIAGEWAY NH STANDARD AS PART OF SRINAGAR RING
PROJECT NAME ROAD PHASE – II [DESIGNCH. 41+907 TO CH. 66+609] ON ENGINEERING, PROCUREMENT
AND CONSTRUCTION (EPC) MODEUNDER BHARATMALA PARIYOJNA PHASE - l IN THE
UNION TERRITORY OF JAMMU AND KASHMIR.
CLIENT NATIONAL HIGHWAY'S AUTHORITY OF INDIA
M/s ALMONDZ GLOBAL INFRA CONSULTANT LTD. IN JV WITH M/s AICONS ENGINEERING [Link]
AUTHORITY'S ENGINEER
IN ASSOCIATION WITH M/s AYPLEEZA CONSULTANT [Link]
EPC CONTRACTOR RAJINDER INFRASTRUCTURE PRIVATE LIMITED–SATISH AGARWAL & CO.(JV)
PENETRATION TEST OF BITUMEN
AS PER IS : 1203 1978
Source of Bitumen Date of Sampling
Grade of Bitumen Date of Testing
Activity Tested By
Description Units Test-1 Test-2
Pouring temperature o
C
Period of cooling in atmosphere minutes
Room tempearture o
C
Period of cooling in water bath minutes
Actual test temperature o
C
Penetrometre reading (Initial) 1/10th mm
Penetrometre reading (final) 1/10th mm
Penetration 1/10th mm
Average Penetration 1/10th mm
Specification Limit 3.5 mm in min As Per IS 73 2013
Remarks:-
EPC CONTRACTOR AUTHORITY'S ENGINEER
DEVELOPMENT OF EXISTING 2 LANE NH-1 FROM KM 8.660 TO KM 33.775 (SUMBAL TO WAYUL)
TO 4 LANE DUAL CARRIAGEWAY NH STANDARD AS PART OF SRINAGAR RING ROAD PHASE –
PROJECT NAME II [DESIGNCH. 41+907 TO CH. 66+609] ON ENGINEERING, PROCUREMENT AND CONSTRUCTION
(EPC) MODEUNDER BHARATMALA PARIYOJNA PHASE - l IN THE UNION TERRITORY OF
JAMMU AND KASHMIR.
CLIENT NATIONAL HIGHWAY'S AUTHORITY OF INDIA
M/s ALMONDZ GLOBAL INFRA CONSULTANT LTD. IN JV WITH M/s AICONS ENGINEERING [Link] IN
AUTHORITY'S ENGINEER
ASSOCIATION WITH M/s AYPLEEZA CONSULTANT [Link]
EPC CONTRACTOR RAJINDER INFRASTRUCTURE PRIVATE LIMITED–SATISH AGARWAL & CO.(JV)
SOFTENING POINT OF BITUMEN
As Per IS : 1205 1978
Sample No. Date of Sampling
Grade of Bitumen Date of Testing
Source of Material Tested By
OBSERVATIONS
Temperature (ºc)
Sr. No. Elapsed Time (Minute)
RING-1 RING-2
0
10
11
12
Temperature (ºc) at when ball touches to the bottom plate
Average Temperature (ºc)
Specification Limit (As Per IS 73 2013) 50 oc Min.
Remarks:-
EPC CONTRACTOR AUTHORITY ENGINEER
DEVELOPMENT OF EXISTING 2 LANE NH-1 FROM KM 8.660 TO KM 33.775 (SUMBAL TO
WAYUL) TO 4 LANE DUAL CARRIAGEWAY NH STANDARD AS PART OF SRINAGAR RING
PROJECT NAME ROAD PHASE – II [DESIGNCH. 41+907 TO CH. 66+609] ON ENGINEERING, PROCUREMENT AND
CONSTRUCTION (EPC) MODEUNDER BHARATMALA PARIYOJNA PHASE - l IN THE UNION
TERRITORY OF JAMMU AND KASHMIR.
CLIENT NATIONAL HIGHWAY'S AUTHORITY OF INDIA
M/s ALMONDZ GLOBAL INFRA CONSULTANT LTD. IN JV WITH M/s AICONS ENGINEERING [Link]
AUTHORITY'S ENGINEER
IN ASSOCIATION WITH M/s AYPLEEZA CONSULTANT [Link]
EPC CONTRACTOR RAJINDER INFRASTRUCTURE PRIVATE LIMITED–SATISH AGARWAL & CO.(JV)
SPECIFIC GRAVITY OF BITUMEN
AS PER IS : 1202 1978
Source of Bitumen Date of sampling
Grade of Bitumen Date of testing
Activity Tested By
Description Units Test 1 Test 2 Average
Weight of Specific gravity bottle (A) gms
Weight of Specific gravity bottle+distilled water (B) gms
Weight of Specific gravity bottle+ bitumen( C) gms
Weight of specific gravity bottle+ bitumen +distilled water (D) gms
(C-A)
Specific gravity of bitumen = -
((B-A) - (D -C))
Remarks:-
EPC CONTRACTOR AUTHORITY ENGINEER