Guggenheim Abu Dhabi FF&E Package Report

The Guggenheim Abu Dhabi FF&E Package outlines the project details, including a commencement date of May 19, 2025, and a completion date of May 18, 2026, with a total cost of AED 21,965,613. The document includes various sections such as project summary, work breakdown structure, progress measurement, and cost distribution. It also provides information on project calendars, manpower histograms, and key performance indicators.

Uploaded by

Rolly Bisenio
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views24 pages

Guggenheim Abu Dhabi FF&E Package Report

The Guggenheim Abu Dhabi FF&E Package outlines the project details, including a commencement date of May 19, 2025, and a completion date of May 18, 2026, with a total cost of AED 21,965,613. The document includes various sections such as project summary, work breakdown structure, progress measurement, and cost distribution. It also provides information on project calendars, manpower histograms, and key performance indicators.

Uploaded by

Rolly Bisenio
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

GUGGENHEIM ABU DHABI

FF&E Package

PROGRAM NARRATION

REPORT DATE: 25-JUN-2025


FF&E PACKAGE

INDEX

1. PROJECT SUMMARY

2. WBS

3. PROGRAM WEIGHTAGE

4. CALENDAR

5 PROJECT S-CURVE

6. MANPOWER HISTOGRAM

7. EARNED VALUE

8. CRITICAL PATH

9. KPI’S

P|2
FF&E PACKAGE
01. PROJECT SUMMARY

PROJECT COMMENCEMENT DATE : 19-MAY-2025

PROJECT FINISH DATE : 18-MAY-2026

PROJECT DURATION : 365 DAYS

PROJECT TOTAL COST : AED 21,965,613.00

P|3
FF&E PACKAGE
02. WBS

P|4
FF&E PACKAGE
02. WBS_LEVEL 3

P|5
FF&E PACKAGE
04. PROGRESS MEASUREMENT-WEIGHTAGE DISTRIBUTION

WEIGHTAGE DISTRIBUTION

CATEGORY PERCENTAGE WEIGHTAGE

MOBILIZATION 2.0% 439,312

ENGINEERING 10.0% 2,196,561

PROCUREMENT 45.0% 9,884,526

MOCKUPS & SAMPLE 10.0% 2,196,561

INSTALLATION 23.0% 5,052,091

SNAGGING & DESNAGGING 5.0% 1,098,281

CLOSEOUT/HANDING OVER 5.0% 1,098,281


100.00% 21,965,613

P|6
FF&E PACKAGE
04. COST DISTRIBUTION

COST DISTRIBUTION

CATEGORY PERCENTAGE COST (AED)

MOBILIZATION 2.39% AED524,551.95

ENGINEERING 11.94% AED2,622,759.76

PROCUREMENT 53.73% AED11,802,418.93

MOCKUPS & SAMPLE 11.94% AED2,622,759.76

INSTALLATION 13.94% AED3,062,006.45

SNAGGING & DESNAGGING 3.03% AED665,558.07

CLOSEOUT/HANDING OVER 3.03% AED665,558.07


100.00% AED21,965,613.00

P|7
FF&E PACKAGE
05. CALENDAR

PROJECT CALENDAR

EMPLOYER CALENDAR : 5 Days Work Week UAE Calendar

ENGINEER CALENDAR : 5 Days Work Week UAE Calendar

CONTRACTOR CALENDAR : 6 Days Work Week UAE Calendar

PROCURMENT CALENDAR : 7 Days Work Week

HOLIDAYS : 2025
JUNE - 05th 06th & 26th
SEPTEMBER - 04th
NOVEMBER -30th
DECEMBER - 01st & 02nd

2026
JANUARY - 01st
MARCH - 18th 19th & 20th
MAY - 26th 27th 28th & 29th

P|7
PROGRESS %

weekly
Weekly

Actual%
DATA DATE : #######

Planned%
Actual %-
Planned %-

Cumulative

Cumulative-
Description
0.00%
1.00%
1.50%
2.00%
2.50%
3.00%
3.50%
4.50%

0.50%
4.00%
0.11% 0.11% 23-May-25

0.26% 0.15% 30-May-25

0.53% 0.26% 6-Jun-25

0.99% 0.46% 13-Jun-25

1.56% 0.57%
Actual %- weekly

20-Jun-25
Planned %- Weekly

Cumulative-Actual%
Cumulative Planned%

2.33% 0.77% 27-Jun-25

3.77% 1.45% 4-Jul-25

5.47% 1.69% 11-Jul-25

7.62% 2.16% 18-Jul-25

9.96% 2.34% 25-Jul-25

12.03% 2.07% 1-Aug-25

14.37% 2.33% 8-Aug-25

17.19% 2.83% 15-Aug-25

20.07% 2.88% 22-Aug-25

22.96% 2.89% 29-Aug-25

25.08% 2.12% 5-Sep-25

26.84% 1.75% 12-Sep-25

28.12% 1.28% 19-Sep-25

29.64% 1.52% 26-Sep-25

31.26% 1.62% 3-Oct-25

33.01% 1.76% 10-Oct-25

34.82% 1.81% 17-Oct-25

36.68% 1.86% 24-Oct-25

38.45% 1.77% 31-Oct-25

40.36% 1.91% 7-Nov-25

42.34% 1.98% 14-Nov-25

44.39% 2.05% 21-Nov-25


FF&E Package

46.51% 2.12% 28-Nov-25


GUGGENHEIM ABU DHABI

48.82% 2.31% 5-Dec-25


PROJECT S CURVE-WEEKLY

51.10% 2.28% 12-Dec-25

53.38% 2.28% 19-Dec-25

55.65% 2.27% 26-Dec-25

57.94% 2.30% 2-Jan-26

60.24% 2.30% 9-Jan-26

62.52% 2.28% 16-Jan-26

64.72% 2.20% 23-Jan-26

66.59% 1.87% 30-Jan-26

67.64% 1.05% 6-Feb-26

69.00% 1.35% 13-Feb-26

71.41% 2.42% 20-Feb-26

74.31% 2.90% 27-Feb-26

78.42% 4.10% 6-Mar-26

82.59% 4.18% 13-Mar-26

86.46% 3.86% 20-Mar-26

88.49% 2.04% 27-Mar-26

89.84% 1.34% 3-Apr-26

91.14% 1.31% 10-Apr-26

93.16% 2.02% 17-Apr-26

95.27% 2.10% 24-Apr-26

97.31% 2.05% 1-May-26

99.06% 1.75% 8-May-26

99.89% 0.83% 15-May-26

100.00% 0.11% 18-May-26


0%
20%
40%
60%
80%
100%
120%
GUGGENHEIM ABU DHABI

FF&E Package
DATA DATE : #######
16% 120%
Planned %- Monthly PROJECT S CURVE- MONTHLY
Actual %- Monthly
14% Cumulative Planned% 100%
Cumulative-Actual%
12%
80%
10%

8% 60%

6%
40%
4%
20%
2%

0% 0%
May-25

May-26
Aug-25

Dec-25
Nov-25

Mar-26
Sep-25

Oct-25

Feb-26
Jan-26

Apr-26
Jun-25

Jul-25

Description
10.93%

11.43%

14.18%
0.26%

2.07%

9.71%

8.30%

7.19%

8.06%

8.65%

7.72%

8.82%

2.69%
Planned %-
MONTHLY PROGRESS %

Monthly

Actual %-
Monthly

100.00%
12.03%

22.96%

31.26%

38.45%

46.51%

57.94%

66.59%

74.31%

88.49%

97.31%
0.26%

2.33%

Cumulative
Planned%

Cumulative-
Actual%
GUGGENHEIM ABU DHABI

FF&E Package
DATA DATE : 11-Jul-25
16% 120%
Planned %- Weekly
Actual %- weekly
ENGINEERING
14% Cumulative Planned%
Cumulative-Actual% 100%

12%

80%
10%

8% 60%

6%
40%

4%

20%
2%

0% 0%

15-Aug-25

22-Aug-25

29-Aug-25

12-Sep-25
27-Jun-25

1-Aug-25

8-Aug-25
11-Jul-25

18-Jul-25

25-Jul-25

5-Sep-25
4-Jul-25

Description

12.10%

12.77%

13.39%
1.55%

6.28%

7.84%

9.59%

9.02%

5.84%

6.97%

9.68%

4.99%
Planned %- Weekly
ENG-PROGRESS

Actual %- weekly

100.00%
15.67%

25.26%

34.27%

40.11%

47.08%

59.18%

71.95%

85.33%

95.01%
1.55%

7.83%

Cumulative
Planned%

Cumulative-Actual%
PRO-PROGRESS

DATA DATE : #######

weekly
Weekly

Actual%
Planned%
Actual %-
Planned %-

Cumulative
Description
0%
2%
3%
4%
5%

1%
6%

Cumulative-
0.09% 0.09% 30-May-25

0.48% 0.39% 6-Jun-25

1.21% 0.73% 13-Jun-25

2.18% 0.97% 20-Jun-25


Actual %- weekly
Planned %- Weekly

Cumulative-Actual%

3.30% 1.12% 27-Jun-25


Cumulative Planned%

4.82% 1.52% 4-Jul-25

6.51% 1.69% 11-Jul-25

8.83% 2.32% 18-Jul-25

11.46% 2.63% 25-Jul-25

13.77% 2.31% 1-Aug-25

16.12% 2.36% 8-Aug-25

18.28% 2.16% 15-Aug-25

20.18% 1.90% 22-Aug-25

21.83% 1.65% 29-Aug-25

22.88% 1.04% 5-Sep-25

23.72% 0.84% 12-Sep-25

24.26% 0.54% 19-Sep-25

25.68% 1.42% 26-Sep-25


PROCURMENT

27.57% 1.89% 3-Oct-25


FF&E Package

29.75% 2.18% 10-Oct-25


GUGGENHEIM ABU DHABI

32.49% 2.74% 17-Oct-25

35.91% 3.41% 24-Oct-25

39.11% 3.20% 31-Oct-25

42.41% 3.30% 7-Nov-25

46.08% 3.67% 14-Nov-25

50.12% 4.04% 21-Nov-25

54.47% 4.35% 28-Nov-25

59.60% 5.13% 5-Dec-25

64.66% 5.06% 12-Dec-25

69.73% 5.06% 19-Dec-25

74.77% 5.04% 26-Dec-25

79.87% 5.10% 2-Jan-26

84.98% 5.10% 9-Jan-26

90.04% 5.06% 16-Jan-26

94.93% 4.89% 23-Jan-26

99.09% 4.17% 30-Jan-26

100.00% 0.91% 2-Feb-26


0%
40%
60%
80%

20%
100%
120%
MOCKUP & SAMPLE - PROGRESS

Actual
Weekly
Weekly

Planned
DATA DATE : 6-Feb-26

Cumulative

Cumulative-
Actual Value-
Description
0%
8%

2%
4%
6%
10%
12%

Planned Value-
0.15% 0.15% 11-Jul-25

0.37% 0.22% 18-Jul-25

1.58% 1.20% 25-Jul-25


Cumulative-Actual
Cumulative Planned

4.71% 3.13% 1-Aug-25


Actual Value- Weekly
Planned Value- Weekly

9.12% 4.41% 8-Aug-25

14.25% 5.12% 15-Aug-25

20.35% 6.10% 22-Aug-25

27.12% 6.78% 29-Aug-25

32.84% 5.72% 5-Sep-25

41.61% 8.78% 12-Sep-25

51.99% 10.38% 19-Sep-25


FF&E Package

60.80% 8.81% 26-Sep-25


GUGGENHEIM ABU DHABI

MOCK UP & SAMPLE

68.46% 7.66% 3-Oct-25

76.22% 7.75% 10-Oct-25

81.91% 5.70% 17-Oct-25

85.14% 3.23% 24-Oct-25

88.40% 3.25% 31-Oct-25

92.65% 4.25% 7-Nov-25

96.05% 3.41% 14-Nov-25

98.34% 2.29% 21-Nov-25

100.00% 1.66% 28-Nov-25


0%
20%
40%
60%
80%
100%
120%
GUGGENHEIM ABU DHABI

FF&E Package
DATA DATE : 6-Feb-26
20% 120%
Planned Value- Weekly INSTALLATION
18% Actual Value- Weekly
Cumulative Planned
100%
16% Cumulative-Actual

14%
80%
12%

10% 60%

8%
40%
6%

4%
20%
2%

0% 0%

18.17% 13-Mar-26

16.28% 20-Mar-26

27-Mar-26
13-Feb-26

10.52% 20-Feb-26

12.61% 27-Feb-26

10-Apr-26

17-Apr-26

24-Apr-26
6-Mar-26
6-Feb-26

3-Apr-26
Description
INSTALLATION - PROGRESS

17.83%
2.80%

5.88%

7.30%

3.51%

2.58%

1.92%

0.62%
Planned Value-
Weekly

Actual Value-
Weekly

100.00%
19.19%

31.80%

49.63%

67.80%

84.08%

91.38%

94.89%

97.47%

99.38%
2.80%

8.67%

Cumulative Planned

Cumulative-Actual
GUGGENHEIM ABU DHABI

FF&E Package
80
Planned - Manpower
MANPOWER HISTOGRAM -WEEKLY
70 Actual- Manpower

60

50

40

30

20

10

01-May-26

08-May-26

15-May-26

18-May-26
06-Mar-26

13-Mar-26

20-Mar-26

27-Mar-26
06-Feb-26

13-Feb-26

20-Feb-26

27-Feb-26

03-Apr-26

10-Apr-26

17-Apr-26

24-Apr-26
Weekly Manpower

Description

Planned - Manpower 11 23 40 48 68 70 65 33 20 18 20 13 10 10 10 10

Actual- Manpower
Earned Value-Weekly

weekly
Weekly

Actual%
DATA DATE : #######

Planned%
Actual %-
Planned %-

Cumulative

Cumulative-
Description
0
100,000
300,000
400,000
500,000
600,000
700,000
800,000

200,000
5,686 5,686 23-May-25

19,836 14,150 30-May-25

62,693 42,857 6-Jun-25

141,678 78,985 13-Jun-25

20-Jun-25
Actual %- weekly

248,013 106,335
Planned %- Weekly

Cumulative-Actual%
Cumulative Planned%

407,776 159,763 27-Jun-25

736,413 328,637 4-Jul-25

1,130,548 394,135 11-Jul-25

1,657,583 527,035 18-Jul-25

2,240,070 582,487 25-Jul-25

2,760,850 520,781 1-Aug-25

3,365,312 604,462 8-Aug-25

4,100,696 735,384 15-Aug-25

4,847,928 747,233 22-Aug-25

5,598,517 750,588 29-Aug-25

6,144,744 546,227 5-Sep-25

6,631,242 486,498 12-Sep-25

6,983,930 352,688 19-Sep-25

7,396,379 412,449 26-Sep-25

7,834,357 437,977 3-Oct-25

8,308,259 473,902 10-Oct-25

8,805,453 497,194 17-Oct-25

9,315,783 510,329 24-Oct-25

9,801,565 485,782 31-Oct-25

10,324,796 523,231 7-Nov-25

10,866,919 542,123 14-Nov-25

11,425,831 558,912 21-Nov-25


FF&E Package

12,005,538 579,707 28-Nov-25

12,625,370 619,832 5-Dec-25


GUGGENHEIM ABU DHABI

EARNED VALUE- WEEKLY

13,245,531 620,161 12-Dec-25

13,865,692 620,161 19-Dec-25

14,478,393 612,702 26-Dec-25

15,095,928 617,534 2-Jan-26

15,713,462 617,534 9-Jan-26

16,326,185 612,723 16-Jan-26

16,918,222 592,037 23-Jan-26

17,417,098 498,876 30-Jan-26

17,612,933 195,835 6-Feb-26

17,795,997 183,064 13-Feb-26

18,121,282 325,284 20-Feb-26

18,510,498 389,216 27-Feb-26

19,059,689 549,191 6-Mar-26

19,619,187 559,498 13-Mar-26

20,136,717 517,530 20-Mar-26

20,410,840 274,122 27-Mar-26

20,592,712 181,872 3-Apr-26

20,769,821 177,108 10-Apr-26

21,041,598 271,777 17-Apr-26

21,324,827 283,229 24-Apr-26

21,600,257 275,431 1-May-26

21,836,552 236,294 8-May-26

21,950,155 113,603 15-May-26

21,965,613 15,462 18-May-26


0
5,000,000
10,000,000
20,000,000
25,000,000

15,000,000
GUGGENHEIM ABU DHABI

FF&E Package
DATA DATE : 6-Feb-26 3,500,000 Planned Value- Monthly
25,000,000
EARNED VALUE-MONTHLY
Actual Value- Monthly
Cumulative-Actual
3,000,000 Cumulative Planned
20,000,000
2,500,000

15,000,000
2,000,000

1,500,000
10,000,000

1,000,000
5,000,000
500,000

0 0
May-25

May-26
Aug-25

Dec-25
Nov-25

Mar-26
Sep-25

Oct-25

Feb-26
Jan-26

Apr-26
Jun-25

Jul-25

Description
2,353,074

2,837,667

2,235,840

1,967,208

2,203,973

3,090,390

2,321,170

1,093,400

2,082,214

1,007,545
Planned Value-
387,940

365,356
19,836

Monthly
Earned Value

Actual Value-
Monthly
12,005,538

15,095,928

17,417,098

18,510,498

20,592,712

21,600,257

21,965,613
2,760,850

5,598,517

7,834,357

9,801,565

Cumulative
407,776
19,836

Planned

Cumulative-
Actual
FF&E PACKAGE
0. CRITICAL PATH

P|8
GUGGENHEIM, ABU DHABI - BASELINE -
R7
Activity ID Activity Name Original Start Finish Total FloatMay June July August S October November December January February March April May
Duration 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 2 2 0 1 1 2 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 5 5 5
GUGGENHEIM, ABU DHABI - BASELINE - R7 365 19-May-25 18-May-26 0

GENERAL MILESTONE 306 19-May-25 18-May-26 0


GUG-GEN-PRE-1010 Commencement Date 0 19-May-25 0
GUG-GEN-PRE-1000 Award of the Project 0 19-May-25 0
GUG-GEN-PRE-1020 Receipt of IFC 0 19-May-25 0
GUG-GEN-PRE-1030 Project Handover 0 18-May-26 0

MOBILIZATION 90 19-May-25 05-Sep-25 0


GUG-ENG-SD-1010 Mobilization 90 19-May-25 05-Sep-25 0

ENGINEERING 68 21-Jun-25 27-Aug-25 0

SHOP DRAWING/BIM MODEL 68 21-Jun-25 27-Aug-25 0


LOOSE FURNITURE/GENERAL ARRANGEMENT 64 25-Jun-25 27-Aug-25 0
SHOP DRAWING/BIM MODEL - REV 00 (REVIEW & COMMENTS) 36 25-Jun-25 30-Jul-25 0
SHOP DRAWING/BIM MODEL SUBMISSION 18 25-Jun-25 16-Jul-25 0
GG-E-SD-R0-S-1450 Preparation / Submission of SD for GA Drawing/BIM Model Room - 1.713, 1.716, 1.717, 1.71812 25-Jun-25 09-Jul-25 0
GG-E-SD-R0-S-1530 Preparation / Submission of SD for GA Drawing/BIM Model Room - 1.734, 1.743 12 25-Jun-25 09-Jul-25 0
GG-E-SD-R0-S-1630 Preparation / Submission of SD for GA Drawing/BIM Model Room - 0.712, 0.713 12 03-Jul-25 16-Jul-25 0
SHOP DRAWING/BIM MODEL REVIEW & COMMENTS 15 10-Jul-25 30-Jul-25 0
GG-E-SD-R0-A-1450 Review / Comments of SD for GA Drawing/BIM Model Room - 1.713, 1.716, 1.717, 1.718 10 10-Jul-25 23-Jul-25 0
GG-E-SD-R0-A-1530 Review / Comments of SD for GA Drawing/BIM Model Room - 1.734, 1.743 10 10-Jul-25 23-Jul-25 0
GG-E-SD-R0-A-1630 Review / Comments of SD for GA Drawing/BIM Model Room - 0.712, 0.713 10 17-Jul-25 30-Jul-25 0
SHOP DRAWING/BIM MODEL - REV 01 (REVIEW & APPROVAL) 35 24-Jul-25 27-Aug-25 0
SHOP DRAWING/BIM MODEL SUBMISSION 18 24-Jul-25 13-Aug-25 0
GG-E-SD-R1-S-1450 Resubmission of SD for GA Drawing/BIM Model Room - 1.713, 1.716, 1.717, 1.718 13 24-Jul-25 07-Aug-25 0
GG-E-SD-R1-S-1530 Resubmission of SD for GA Drawing/BIM Model Room - 1.734, 1.743 13 24-Jul-25 07-Aug-25 0
GG-E-SD-R1-S-1630 Resubmission of SD for GA Drawing/BIM Model Room - 0.712, 0.713 12 31-Jul-25 13-Aug-25 0
SHOP DRAWING/BIM MODEL REVIEW & APPROVAL 14 08-Aug-25 27-Aug-25 0
GG-E-SD-R1-A-1450 Review /Approval of SD for GA Drawing/BIM Model Room - 1.713, 1.716, 1.717, 1.718 10 08-Aug-25 21-Aug-25 0
GG-E-SD-R1-A-1530 Review /Approval of SD for GA Drawing/BIM Model Room - 1.734, 1.743 10 08-Aug-25 21-Aug-25 0
GG-E-SD-R1-A-1630 Review /Approval of SD for GA Drawing/BIM Model Room - 0.712, 0.713 10 14-Aug-25 27-Aug-25 0
CUSTOM MADE ITEMS 56 21-Jun-25 15-Aug-25 0
SHOP DRAWING/BIM MODEL- REV 00 (REVIEW & COMMENTS) 28 21-Jun-25 18-Jul-25 0
SHOP DRAWING/BIM MODEL SUBMISSION 12 21-Jun-25 05-Jul-25 0
GG-E-SD-R0-S-1030 Preparation / Submission of Item Shop Drawing/BIM Model - CF.02.01 12 21-Jun-25 05-Jul-25 0
GG-E-SD-R0-S-1040 Preparation / Submission of Item Shop Drawing/BIM Model - CF.03.01 12 21-Jun-25 05-Jul-25 0
SHOP DRAWING REVIEW & COMMENTS 10 07-Jul-25 18-Jul-25 0
GG-E-SD-R0-A-1030 Review / Comments of Item Shop Drawing/BIM Model - CF.02.01 10 07-Jul-25 18-Jul-25 0
GG-E-SD-R0-A-1040 Review / Comments of Item Shop Drawing/BIM Model - CF.03.01 10 07-Jul-25 18-Jul-25 0
SHOP DRAWING/BIM MODEL- REV 01 (REVIEW & APPROVAL) 28 19-Jul-25 15-Aug-25 0
SHOP DRAWING/BIM MODEL SUBMISSION 13 19-Jul-25 02-Aug-25 0
GG-E-SD-R1-S-1030 Preparation / Submission of Item Shop Drawing/BIM Model - CF.02.01 13 19-Jul-25 02-Aug-25 0
GG-E-SD-R1-S-1040 Preparation / Submission of Item Shop Drawing/BIM Model - CF.03.01 13 19-Jul-25 02-Aug-25 0
SHOP DRAWING/BIM MODEL - REV 01 (REVIEW & APPROVAL) 10 04-Aug-25 15-Aug-25 0
GG-E-SD-R1-A-1030 Review /Approval of Item Shop Drawing/BIM Model - CF.02.01 10 04-Aug-25 15-Aug-25 0
GG-E-SD-R1-A-1040 Review /Approval of Item Shop Drawing/BIM Model - CF.03.01 10 04-Aug-25 15-Aug-25 0

PROCUREMENT 227 21-Jun-25 02-Feb-26 0

MATERIAL SUBMITTAL 56 21-Jun-25 15-Aug-25 0


CUSTOM MADE FURNITURE 56 21-Jun-25 15-Aug-25 0
MATERIAL SUBMITTAL - REV 00 (REVIEW & COMMENTS) 28 21-Jun-25 18-Jul-25 0

Remaining Level of Effort Critical Remaining Work Date Revision Checked Approved
Page 1 of 4
Actual Level of Effort Milestone 19-May-25
Primary Baseline Summary
Actual Work
Remaining Work
GUGGENHEIM, ABU DHABI - BASELINE -
R7
Activity ID Activity Name Original Start Finish Total FloatMay June July August S October November December January February March April May
Duration 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 2 2 0 1 1 2 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 5 5 5
MATERIAL SUBMISSION 12 21-Jun-25 05-Jul-25 0
GG-E-MS-R0-S-1160 MS Preparation / Submission for Circulation Bench (CF.02.01, CF.03.01) 12 21-Jun-25 05-Jul-25 0
MATERIAL REVIEW & COMMENTS 10 07-Jul-25 18-Jul-25 0
GG-E-MS-R0-A-1160 MS Review / Comments for Circulation Bench (CF.02.01, CF.03.01) 10 07-Jul-25 18-Jul-25 0
MATERIAL SUBMITTAL - REV 01 (REVIEW & APPROVAL) 10 04-Aug-25 15-Aug-25 0
MATERIAL REVIEW & APPROVAL 10 04-Aug-25 15-Aug-25 0
GG-E-MS-R1-A-1160 MS Review /Approval for Circulation Bench (CF.02.01, CF.03.01) 10 04-Aug-25 15-Aug-25 0
MATERIAL ORDER 24 31-Oct-25 23-Nov-25 0
LOOSE FURNITURE ITEMS 6 31-Oct-25 05-Nov-25 0
GUG-PRO-ORD-1370 Material Order for Make Up Counter Chair (CH.13.01) 6 31-Oct-25 05-Nov-25 0
CUSTOM MADE ITEMS 18 06-Nov-25 23-Nov-25 0
GUG-PRO-ORD-1160 Material Order for Circulation Bench (CF.02.01, CF.03.01) 6 06-Nov-25 11-Nov-25 0
GUG-PRO-ORD-1000 Material Order for Desk Chair (DC.02.01, IF-03) 6 12-Nov-25 17-Nov-25 0
GUG-PRO-ORD-1010 Material Order for Desk Chair (DC.01.01, LIB-04) 6 12-Nov-25 17-Nov-25 0
GUG-PRO-ORD-1050 Material Order for Guest Chair (CH.06.02, IF-02) 6 18-Nov-25 23-Nov-25 0
MATERIAL PRODUCTION AND DELIVERY 89 06-Nov-25 02-Feb-26 0
LOOSE FURNITURE ITEMS 89 06-Nov-25 02-Feb-26 0
GUG-PRO-PRD-1370 Material Production and Delivery for Make Up Counter Chair (CH.13.01) 89 06-Nov-25 02-Feb-26 0
CUSTOM MADE ITEMS 83 12-Nov-25 02-Feb-26 0
GUG-PRO-PRD-1000 Material Production and Delivery for Desk Chair (DC.02.01, IF-03) 75 18-Nov-25 31-Jan-26 0
GUG-PRO-PRD-1010 Material Production and Delivery for Desk Chair (DC.01.01, LIB-04) 75 18-Nov-25 31-Jan-26 0
GUG-PRO-PRD-1160 Material Production and Delivery for Circulation Bench (CF.02.01, CF.03.01) 82 12-Nov-25 01-Feb-26 0
GUG-PRO-PRD-1050 Material Production and Delivery for Guest Chair (CH.06.02, IF-02) 71 24-Nov-25 02-Feb-26 0

MOCK UP & SAMPLES 94 16-Aug-25 17-Nov-25 0

MOCKUP - CUSTOM MADE ITEMS 94 16-Aug-25 17-Nov-25 0


PREPARATION SUBMISSION 55 16-Aug-25 20-Oct-25 0
GG-PRO-MK-S-1160 Mock Up Preparation / Submission for Circulation Bench (CF.02.01, CF.03.01) 45 16-Aug-25 08-Oct-25 0
GG-PRO-MK-S-1000 Mock Up Preparation / Submission for Desk Chair (DC.02.01, IF-03) 45 22-Aug-25 14-Oct-25 0
GG-PRO-MK-S-1010 Mock Up Preparation / Submission for Desk Chair (DC.01.01, LIB-04) 45 22-Aug-25 14-Oct-25 0
GG-PRO-MK-S-1050 Mock Up Preparation / Submission for Guest Chair (CH.06.02, IF-02) 45 28-Aug-25 20-Oct-25 0
APPROVAL BY THE ENGINEER 18 09-Oct-25 03-Nov-25 0
GG-PRO-MK-A-E-1160 Mock Up Review /Approval for Circulation Bench (CF.02.01, CF.03.01) 10 09-Oct-25 22-Oct-25 0
GG-PRO-MK-A-E-1000 Mock Up Review /Approval for Desk Chair (DC.02.01, IF-03) 10 15-Oct-25 28-Oct-25 0
GG-PRO-MK-A-E-1010 Mock Up Review /Approval for Desk Chair (DC.01.01, LIB-04) 10 15-Oct-25 28-Oct-25 0
GG-PRO-MK-A-E-1050 Mock Up Review /Approval for Guest Chair (CH.06.02, IF-02) 10 21-Oct-25 03-Nov-25 0
APPROVAL BY THE EMPLOYER 18 23-Oct-25 17-Nov-25 0
GG-PRO-MK-A-F-E-1160 Mock Up Review /Approval for Circulation Bench (CF.02.01, CF.03.01) 10 23-Oct-25 05-Nov-25 0
GG-PRO-MK-A-F-E-1000 Mock Up Review /Approval for Desk Chair (DC.02.01, IF-03) 10 29-Oct-25 11-Nov-25 0
GG-PRO-MK-A-F-E-1010 Mock Up Review /Approval for Desk Chair (DC.01.01, LIB-04) 10 29-Oct-25 11-Nov-25 0
GG-PRO-MK-A-F-E-1050 Mock Up Review /Approval for Guest Chair (CH.06.02, IF-02) 10 04-Nov-25 17-Nov-25 0
SAMPLES - LOOSE FURNITURE ITEMS 56 05-Sep-25 30-Oct-25 0

INSTALLATION 64 03-Feb-26 17-Apr-26 0

PLINTH ( GROUND LEVEL + GROUND MEZZANINE) 0 03-Feb-26 03-Feb-26 0


CLEARANCES 0 03-Feb-26 03-Feb-26 0
GUG-INS-PL-CL-1000 Site Readiness for Installation Works - Zone 1 - Plinth 0 03-Feb-26* 0
BUILDING 01 - ZONE 1 64 03-Feb-26 17-Apr-26 0
CLEARANCES 0 03-Feb-26 03-Feb-26 0
GUG-INS-B1Z1-1000 Site Readiness for Installation Works - Level 01 - B1Z1 0 03-Feb-26* 0
LEVEL 01 53 16-Feb-26 17-Apr-26 0

Remaining Level of Effort Critical Remaining Work Date Revision Checked Approved
Page 2 of 4
Actual Level of Effort Milestone 19-May-25
Primary Baseline Summary
Actual Work
Remaining Work
GUGGENHEIM, ABU DHABI - BASELINE -
R7
Activity ID Activity Name Original Start Finish Total FloatMay June July August S October November December January February March April May
Duration 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 2 2 0 1 1 2 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 5 5 5
COMMON AREA 15 16-Feb-26 04-Mar-26 0
GUG-INS-B1Z1-L1-1020 Installation of Adjustable Wall Mounted Shelving (3 Shelves) (SH.01.01) 15 16-Feb-26 04-Mar-26 0
GALLERY - 106 12 24-Mar-26 06-Apr-26 0
GUG-INS-B1Z1-L1-1170 Installation of Gallery Bench (CF.01.01) 12 24-Mar-26 06-Apr-26 0
GALLERY - 107 - FLEXIBLE THEATRE 15 01-Apr-26 17-Apr-26 0
GUG-INS-B1Z1-L1-1000 Installation of Flexible Theater Chair (CH.15.01) 15 01-Apr-26 17-Apr-26 0
GUG-INS-B1Z1-L1-1010 Installation of Flexible Theater Table (TB.13.01) 15 01-Apr-26 17-Apr-26 0
GUG-INS-B1Z1-L1-1030 Installation of Make Up Counter Chair (CH.13.01) 15 01-Apr-26 17-Apr-26 0
GUG-INS-B1Z1-L1-1090 Installation of Red Sofa (LC.07.01, SF.03.01) 15 01-Apr-26 17-Apr-26 0
GUG-INS-B1Z1-L1-1100 Installation of Side Table (CT.08.01) 15 01-Apr-26 17-Apr-26 0
GUG-INS-B1Z1-L1-1110 Installation of Coffee Table (CT.03.01) 15 01-Apr-26 17-Apr-26 0
LEVEL 01 MEZZANINE 15 24-Feb-26 12-Mar-26 0
COMMON AREA 15 24-Feb-26 12-Mar-26 0
GUG-IN-B1Z1-L1M-1000 Installation of Desk Chair (DC.01.01, LIB-04) 15 24-Feb-26 12-Mar-26 0
LEVEL 02 25 13-Mar-26 10-Apr-26 0
COMMON AREA 25 13-Mar-26 10-Apr-26 0
GUG-IN-B1Z1-L2-1000 Installation of Desk Chair (DC.01.01, LIB-04) 15 13-Mar-26 30-Mar-26 0
GUG-IN-B1Z1-L2-1010 Installation of Adjustable Wall Mounted Shelving (3 Shelves) (SH.01.01) 15 13-Mar-26 30-Mar-26 0
GUG-IN-B1Z1-L2-1050 Installation of Back Of House Standard Shelving 15 13-Mar-26 30-Mar-26 0
GUG-IN-B1Z1-L2-1060 Installation of Guest Chair (CH.06.01) 15 13-Mar-26 30-Mar-26 0
GUG-IN-B1Z1-L2-1080 Installation of Quran Stand (QS.01.01) 15 13-Mar-26 30-Mar-26 0
GUG-IN-B1Z1-L2-1100 Installation of Circulation Bench (CF.02.01, CF.03.01) 15 13-Mar-26 30-Mar-26 0
GUG-IN-B1Z1-L2-1020 Installation of Lateral File Cabs (ADM-04,ADM-40, LF.01.01) 25 13-Mar-26 10-Apr-26 0
GUG-IN-B1Z1-L2-1030 Installation of Type C Desk - Large Straight Worksurface (DK.03.01) 25 13-Mar-26 10-Apr-26 0
GUG-IN-B1Z1-L2-1040 Installation of Worksurface & Storage (CB.01.01, CB.09.01) 25 13-Mar-26 10-Apr-26 0
GUG-IN-B1Z1-L2-1070 Installation of Pedestal File Cabinet (DS.01.01,ADM-13, ADM-23,ASO-21, EFW-108, PHO-24)25 13-Mar-26 10-Apr-26 0
GALLERY - 207 12 13-Mar-26 26-Mar-26 0
GUG-IN-B1Z1-L2-1150 Installation of Gallery Screen (CF.26.01) 12 13-Mar-26 26-Mar-26 0
GALLERY - 208 12 16-Mar-26 28-Mar-26 0
GUG-IN-B1Z1-L2-1090 Installation of Gallery Bench (CF.01.01) 12 16-Mar-26 28-Mar-26 0
LEVEL 03 17 24-Mar-26 11-Apr-26 0
GALLERY - 305 12 24-Mar-26 06-Apr-26 0
GUG-IN-B1Z1-L3-1000 Installation of Gallery Bench (CF.01.01) 12 24-Mar-26 06-Apr-26 0
GALLERY - 306 12 30-Mar-26 11-Apr-26 0
GUG-IN-B1Z1-L3-1030 Installation of Gallery Bench (CF.01.01) 12 30-Mar-26 11-Apr-26 0
LEVEL 04 12 04-Apr-26 17-Apr-26 0
GALLERY - 405 12 04-Apr-26 17-Apr-26 0
GUG-IN-B1Z1-L4-1020 Installation of Gallery Bench (CF.01.01) 12 04-Apr-26 17-Apr-26 0
BUILDING 02 - ZONE 2 15 03-Feb-26 19-Feb-26 0
CLEARANCES 0 03-Feb-26 03-Feb-26 0
GUG-IN-B2Z2-CL-1000 Site Readiness for Installation Works - Level 01 - B2Z2 0 03-Feb-26* 0
LEVEL 01 15 03-Feb-26 19-Feb-26 0
COMMON AREA 15 03-Feb-26 19-Feb-26 0
GUG-IN-B2Z2-L1-1000 Installation of Guest Chair (CH.06.02, IF-02) 15 03-Feb-26 19-Feb-26 0
BUILDING 03 - ZONE 3 23 03-Feb-26 28-Feb-26 0
CLEARANCES 0 03-Feb-26 03-Feb-26 0
GUG-IN-B3Z3-CL-1000 Site Readiness for Installation Works - Level 01 - B3Z3 0 03-Feb-26* 0
LEVEL 01 15 12-Feb-26 28-Feb-26 0
COMMON AREA 15 12-Feb-26 28-Feb-26 0

Remaining Level of Effort Critical Remaining Work Date Revision Checked Approved
Page 3 of 4
Actual Level of Effort Milestone 19-May-25
Primary Baseline Summary
Actual Work
Remaining Work
GUGGENHEIM, ABU DHABI - BASELINE -
R7
Activity ID Activity Name Original Start Finish Total FloatMay June July August S October November December January February March April May
Duration 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 2 2 0 1 1 2 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1
- 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 5 5 5 5
GUG-IN-B3Z3-L1-1000 Installation of Desk Chair (DC.02.01, IF-03) 15 12-Feb-26 28-Feb-26 0
ADMINISTRATION 0 03-Feb-26 03-Feb-26 0
CLEARANCES 0 03-Feb-26 03-Feb-26 0
GUG-INS-ADM-1190 Site Readiness for Installation Works -Administration Building - Level-1 Mezzanine 0 03-Feb-26* 0

SNAGGING & DESNAGGING 14 18-Apr-26 04-May-26 0


GUG-CL-SN-1010 Snagging & Desnagging - Building 01 - Zone 1 14 18-Apr-26 04-May-26 0

HANDING OVER 31 13-Apr-26 18-May-26 0

CLOSEOUT DOCUMENTS 28 13-Apr-26 14-May-26 0


GUG-CL-CD-1000 Submission of Closeout Documents - Warranties & O&M Manuals 21 13-Apr-26 06-May-26 0
GUG-CL-CD-1010 Approval of Closeout Documents - Warranties & O&M Manuals 21 21-Apr-26 14-May-26 0
CLOSEOUT/HANDOVER 14 02-May-26 18-May-26 0
GUG-CL-HND-1010 Handing over & TOC 14 02-May-26 18-May-26 0
GUG-CL-HND-1000 Handing Over Spares 14 02-May-26 18-May-26 0

Remaining Level of Effort Critical Remaining Work Date Revision Checked Approved
Page 4 of 4
Actual Level of Effort Milestone 19-May-25
Primary Baseline Summary
Actual Work
Remaining Work
FF&E PACKAGE
09. KPI’s

KEY PERFORMANCE INDEX PROGRESS CHART

ENGINEERING PROCUREMENT DELIVERY INSTALLATION


PROCUREMENT

Legend:

% COMPLETE % REMAINING % COMPLETE % REMAINING


Delay ≤ 15 Days 0 < Delay < 15 Days Delay > 15 Days

SUBMITTALS TOTAL SUBMITTTED APPROVED

SHOP DRAWINGS

METHOD STATEMENT

MATERIAL SUBMITTAL

MOCKUP SUBMISSION