0% found this document useful (0 votes)
132 views1 page

Ramp and Manhole Cost Breakdown

The document provides a detailed breakdown of costs for construction materials related to a ramp and manhole. The total cost for the ramp is 25,564.70, while the total for the manhole is 2,385.02. The summary includes quantities, rates, and amounts for various construction components such as masonry, backfill, reinforcement, formwork, and concrete.

Uploaded by

Mulugeta Beza
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
132 views1 page

Ramp and Manhole Cost Breakdown

The document provides a detailed breakdown of costs for construction materials related to a ramp and manhole. The total cost for the ramp is 25,564.70, while the total for the manhole is 2,385.02. The summary includes quantities, rates, and amounts for various construction components such as masonry, backfill, reinforcement, formwork, and concrete.

Uploaded by

Mulugeta Beza
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

RAMP

[Link]. Description Unit Quantity Rate Amount


1 Masonry M3 6.95 980.00 6,811.00
2 Backfill M 3
12.30 560.00 6,888.00
3 Reinforcement Kg 301.85 22.00 6,640.70
4 Formwork M2 2.00 670.00 1,340.00
5 Concrete M3 1.85 2,100.00 3,885.00
Total 25,564.70

MANHOLE

[Link]. Description Unit Quantity Rate Amount


3 Reinforcement Kg 28.41 22.00 625.02
4 Formwork M2 2.00 670.00 1,340.00
5 Concrete M 3
0.20 2,100.00 420.00
Total 2,385.02