0% found this document useful (0 votes)
198 views28 pages

Masonry Construction Costs in Bangalore

Uploaded by

al Paresh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
198 views28 pages

Masonry Construction Costs in Bangalore

Uploaded by

al Paresh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Sl no.

TYPE OF CONSTRUCTION WORK % CONSTRUCTION COST


A EARTHWORK 1.36 89,680.00
B P C C WORKS 1.87 123,670.00
C R C C WORKS 17.29 1,143,162.30
D MASONRY 12.34 815,750.00
E DOORS AND WINDOWS 12.18 805,530.00
F FLOORING 8.52 563,350.00
G IRON & STEELWORK 20.43 1,350,970.00
H PLASTERING 9.57 632,600.00
I WATERPROOFING 1.81 119,715.00
J PAINTING & POLISHING 4.72 311,875.00
K SINK & DRAINBOARD 0.52 34,560.00
L CLADDING 0.00 0.00
M DADOING 0.00 0.00
N STAIRCASE/BALCONY RAILING 2.04 135,000.00
O Extra /Miscellaneous works 0.28 18,600.00
P ANTI TERMITE TREATMENT 0.28 18,600.00
Q OVERHEAD WATER TANK 1.52 100,437.50
R UNDERGROUND SUMP TANK 1.83 121,250.00
S COMPOUND WALL 3.44 227,252.50
TOTAL 6,612,002.30

DETAILED
No Description CONSTRUCTION
UnitCOST
Qty Rate Amount
A EARTHWORK :
A1 Earthwork excavation in ordinary/hardsoil for
foundation, trenches, column,footings, including
bailing out rain and subsoil water, if any and
removing excavated material, stocking the same for
any period, filling back around the foundation and
retaining walls, column footings with the approved
soil spread in layers of 15 cms to the required
gradient & profiles, leveling, watering

a) Depth up to 5’0″ Cum 220.00 275.00 60,500.00


b) Beyond 5’0″ depth Cum 15.00 325.00 4,875.00

A2 Earth cutting Cum 23.00 210.00 4,830.00


A3 Refilling the area with available earth in successive 6″ Cum 47.00 175.00 8,225.00
layers including watering & compaction with manual
hand rammer to avoid voids. Earth filling should be
free of rubbish and refuse matter and all clods should
be broken before filling.

Cum 47.00 175.00 8,225.00


A4 Disposing earth Cum 30.00 375.00 11,250.00

Total 89,680.00
B PLAIN CEMENT CONCRETE :
B1 providing and laying PCC [Link] using 40mm graded Cum 11.00 3,200.00 35,200.00
granite aggregate in foundation & below flooring as
leveling course including edge shuttering and
formwork, consolidation,ramming and compacting,
curing etc.-200mm thick

100mm thick Cum 16.00 3,100.00 49,600.00


B2 Providing and laying PCC [Link] using 20mm & 0.00
downgraded granite aggregate in Damp Proof Course
over the plinth mixed with a waterproof compound.
(Make- Impermio) including formwork,
compacting,curing, etc.,

Cum 2.00 3,850.00 7,700.00


Note: quantity and method of using Impermio as per
product literature.
B3 Same as above but PCC [Link] below toilet flooring as
leveling course, before Laying the finish flooring.

a) Base and GF floor Cum 0.21 3,900.00 819.00


b)FF Cum 0.21 4,000.00 840.00
c)SF Cum 0.21 4,100.00 861.00
B4 Same as above but PCC [Link] below flooring as
leveling course, before laying the floor tiles.

a) Ground floor Cum 1.30 3,900.00 5,070.00


b) First floor Cum 1.30 4,000.00 5,200.00
c)SF Cum 1.30 4,100.00 5,330.00
B5 Providing & laying PCC [Link] below flooring using
20m & downgraded granite aggregate as leveling
course, including compacting curing

a) Ground Floor Cum 1.00 4,250.00 4,250.00


b) First Floor Cum 1.00 4,350.00 4,350.00
c) Second Floor Cum 1.00 4,450.00 4,450.00

Total 123,670.00

C REINFORCED CEMENT
CONCRETE
(Note: Rate:quoted will be excluding the cost of steel
reinforcement but including all the cost of necessary
centering, scaffolding, edge shuttering, etc. and
Formwork, mechanical vibration, curing.) PLY
SHUTTERING to be used for columns, beams and
lintels, for others steel shuttering can be used.
The contractor should use a 53 [Link]
cement.–ACC, L&T [Link] coarse aggregates
should be free of dirt and rubbish, and their size
should be 20mm downsize. The sand should be free
of20mm downsize. The sand hould be free of dirt
organic matter and rubbish and should have hard,
sharp, and angular grain and should pass through
5mm square mesh.

C1 Providing and casting in-situ RCC grade in column


footing
a) M 200 in footing Cum 23.00 5,400.00 124,200.00
b) pedestal Cum 10.00 5,550.00 55,500.00
C1 Same as above column up
to stilt
Column from stilt to GF Cum 3.32 6,350.00 21,082.00
Column from GF to FF Cum 3.44 6,525.00 22,446.00
Column from FF to SF Cum 3.44 6,700.00 23,048.00
Column from SF to TF Cum 3.44 6,990.00 24,045.60
C2 Same as above for column Cum 17.75 5,550.00 98,512.50
and pedestal
C3 Providing and Casting in-situ RCC grade
M 200 in lintels
a) Ground floor Cum 5.43 6,700.00 36,381.00
b) First floor Cum 5.43 6,990.00 37,955.70
c) Second floor Cum 5.43 7,050.00 38,281.50

C4 Providing and casting in


situ
gradeRCC
M 200 in flat roof
slabs
a) Ground floor Cum 49.00 6,000.00 294,000.00
b) First floor Cum 24.50 6,150.00 150,675.00
c) Second floor Cum 24.50 6,300.00 154,350.00

C5 Providing and casting in


situ
gradeRCC
M 200 in slope roof
slabs
a) Ground floor Cum
b) First floor Cum
c) Second floor Cum

C7 Providing & casting in-situ RCC grade M 200 in waist


slab staircase, steps, side shuttering, formwork,
mechanical vibration, curing, etc.

a) Basement to Ground Cum 1.25 7,050.00 8,812.50


floor
b) Ground to First floor. Cum 1.25 7,250.00 9,062.50
c) First Floor to Second Cum 1.25 7,450.00 9,312.50
floor
d) Second floor to Third Cum 1.25 7,650.00 9,562.50
floor
C9 Providing and fixing in position RCC chajja & fascia
with necessary scaffolding centering, curing, and
finishing the top surface with a waterproofing
compound

b) Ground to First floor. Cum 0.95 8,900.00 8,455.00


c) First Floor to Second Cum 0.95 9,100.00 8,645.00
floor
d) Second floor to Third Cum 0.95 9,300.00 8,835.00
floor
Total : 1,143,162.30

D MASONRY :
D1 Providing & laying size stone masonry in the Cum 70.00 3,350.00 234,500.00
foundation and plinth up to finished
floor level in CM 1:8 in course not less 20 to 23 cm
high, using through bond stones in every course
spaced at 2m intervals including raking out the
joints, curing, etc.

D1 Providing and laying first-class table molded brick in


CM 1:6 to 225mm thick walls & above, including
raking out the joints, scaffolding, curing, etc.

b) Ground floor Cum QR 4,875.00


c) First floor Cum QR 5,300.00
d) Second floor Cum QR 5,475.00
e) Third floor Cum QR 5,650.00

D5 Using 6″ solid cement Cum 125.00 4,650.00 581,250.00


blocks
Total : 815,750.00

E DOORS AND WINDOWS :


E1 Teak wood main door Sq Mt 2.50 15,000.00 37,500.00
MS hold fasteners No’s 108.00 40.00 4,320.00
SS hinges No’s 36.00 65.00 2,340.00
Tower bolts-150mm No’s 36.00 90.00 3,240.00
SS magnetic door closer No’s 3.00 200.00 600.00
Mortise lock with handle No’s 18.00 1,000.00 18,000.00

E2 Flush door Sqm 48.00 6,400.00 307,200.00


Sal wood frame with kutty shutter
4 nos of SS hinges-100mm No’s 88.00 65.00 5,720.00
2 nos buff finished tower bolts-150mm No’s 44.00 90.00 3,960.00
SS buff finished night latch No’s 22.00 1,000.00 22,000.00
SS magnetic door closer No’s 22.00 200.00 4,400.00
SS buff finished aldrop No’s 22.00 250.00 5,500.00
E3 Toilet door Sqm 16.50 5,500.00 90,750.00

E4 Hardwood windows Sqm 50.00 6,000.00 300,000.00

Total : 805,530.00

F FLOORING :
F1 Providing and laying 50 mm thick cement concrete Sqm 155.00 400.00 62,000.00
flooring with PCC 1:1½:3 using 12mm downgraded
granite aggregate laid in alternate bays of
approximate 1 x 1 m or as directed, top finished with
a floating coat of neat cement trowelled smooth,
including compacting curing, etc.

F2 Providing and laying Vitrified Tile flooring on 20 – 25 Sqm 130.00 1,200.00 156,000.00
mm thick 1:5 CM bed in level and line. Joints are to
be finished neatly with slurry and mixed with the
pigment to match the color/shade of the tile. (Basic
rate of Vitrified Tile: 55/-sft)

Same for skirting Rmt 225.00 125.00 28,125.00


F4 Providing & fixing Granite flooring laid on 20-25mm Sqm 120.00 2,500.00 300,000.00
thick CM 1:5 base jointed
with neat cement slurry with pigment to match the
colour of the tiles.B.R -120/sft

F5 same as but skirting Rmt 65.00 265.00 17,225.00

F6 Soling Sqm 180.00


Total 563,350.00

G IRON AND STEEL WORKS


G1 :Supplying & providing steel reinforcement bars for all M.T 17.00 65,000.00 1,105,000.00
RCC works, including cutting, bending, hoisting and
placing in position fabricating / binding & tying at all
levels
as per detailed drawings including the cost of 18
gauge binding wire to tie the rods &
necessary precast concrete cover blocks to ensure
the specific cover for concrete all complete. (Rate
quoted should include for wastages). Basic rate –
55 /Kg
G2 Providing and fixing in position purpose made MS Sqm 50.00 1,850.00 92,500.00
grills to windows/ventilators using standard sections,
flats/bars, etc.,
outer frame with 20mm flat & infill with 10mm bars
welded horizontally or at 45* spaced at 100mm c/c
all as per design and details are shown in the drawing
including painting with necessary primer-zinc
chromite putty & finish with 2 or more
coats of synthetic enamel paint.(refer door window
drawing)

G3 Same as in item 2 above but with


a) 20mm at 15cm c/c Sqm 9.00 1,880.00 16,920.00
b)16mm at 15mm c/c Sqm 25.00 2,160.00 54,000.00
c)12mm at 15cm c/c Sqm 13.00 1,850.00 24,050.00
H3 Weldmesh Sqm 30.00 1,950.00 58,500.00

Total 1,350,970.00

H PLASTERING :
(Note: Rate quoted should include for necessary
hacking the RCC surface, scaffolding curing, fixing
necessary chicken wire mesh at the junction of brick
& RCC works) Make of Cement – Blended ACC/Birla

H1 Providing and plastering 6 to 12 mm thick cement


plaster in CM 1:4 to the ceiling of slabs, soffits and
sides of beams (which are not above walls) finished
smooth with Neeru (lime rendering).

a) Basement floor Sqm 170.00 320.00 54,400.00


b) Ground floor Sqm 170.00 325.00 55,250.00
c) First floor Sqm 170.00 330.00 56,100.00
d) Second floor Sqm 170.00 340.00 57,800.00

H2 Providing and plastering 10 to 16 mm thick cement


plaster in CM 1:6 to the
internal wall finished smooth
a) Ground floor Sqm 233.00 320.00 74,560.00
b) First floor Sqm 233.00 325.00 75,725.00
c) Second floor Sqm 233.00 330.00 76,890.00
H3 Providing and plastering 12 to 20 mm thick sand
faced cement plaster (sponge finish) in CM 1:6 to
external brick / RCC surface, providing and making
grooves,drip molding, etc. wherever necessary as
directed. ( all floors)

a) Ground floor Sqm 150.00 340.00 51,000.00


b) First floor Sqm 150.00 345.00 51,750.00
c) Second floor Sqm 150.00 350.00 52,500.00
d)Terrace floor Sqm 75.00 355.00 26,625.00

H4 Same as above item 3 but


rough
below plaster
glazed tiles in kitchen
and bathrooms
a) Basement floor
b) Ground floor Sqm 500.00 0.00
c) First floor Sqm 515.00 0.00
d) Second floor Sqm 530.00 0.00
e) Third floor Sqm 545.00 0.00
560.00 0.00
Total 632,600.00

I WATERPROOFING :
I1 Providing and plastering 18 mm thick waterproof
cement plaster in two coats
under layer:12 mm thick cement plaster 1:4 finished
with 6 mm thick CM 1:3 to inside walls and bottom,
sides of sunken slabs, slabs, balcony projections,
terrace, etc., finished neatly using waterproofing
compound mixed with cement(as per the
manufacturer's specifications) Including necessary
[Link] quoted will include providing a necessary
slope.

Make – high guard c/o ROFFE chemicals.


use as per product literature.
a) Ground floor Sqm 21.00 390.00 8,190.00
b) First floor Sqm 21.00 400.00 8,400.00
c) Second floor Sqm 21.00 410.00 8,610.00
I2 Each 420.00
430.00
I3 Supplying and filling in
with Cindercompaction
necessary with in
sunken
a) Groundareas
floor Cum 1.30 2,500.00 3,250.00
b) First floor Cum 1.30 2,600.00 3,380.00
c) Second floor Cum 1.30 2,700.00 3,510.00

I4 Terrace waterproof- brickbat coba Sqm 125.00 675.00 84,375.00


Total 119,715.00

J PAINTING AND
POLISHING:
J1 Same as above but Oil bound distemper for ceiling.

all floors Sqm 680.00 120.00 81,600.00


J2 Providing and painting
with Plastic Emulsion of approved make
and shade thoroughly sandpapering the
surface, removing loose burrs, dust,
dirt. Applying a coat of cement primer and
two coats of enamel putty, then one more
coat of primer and finally 2 coats of paint
including scaffolding, curing, etc.

Make – ASIAN, BERGER. Sqm 680.00 155.00 105,400.00


J3 Providing & painting with Sandex mat of approved Sqm 525.00 165.00 86,625.00
make & shade, thoroughly cleaning/preparing the
surface, removing loose burrs, dust, dirt and
repairing of dents, cracks, holes washing and wetting
the surfaces, applying a coat of primer, followed by
two or more coats of paint including scaffolding,
curing, etc.

J4 Synthetic enamel paint


all floors Sqm 90.00 175.00 15,750.00

J5 Supplying and polishing door shutters, door


and window frames with _1 _2 _3 _4
polish as per specifications
manufacturers
including
a basic coat of putty and
primer.
a) hand polishing (French) Sqm 45.00 500.00 22,500.00

Total 311,875.00

K SINK & DRAIN


K1 BOARDS/COUNTERS:
Providing & fixing Machine cut/ Machine polished Sqm 2.16 16,000.00 34,560.00
granite slab for kitchen counter.
Total 34,560.00

L CLADDING / COPING
As per work required on
Site.
Total 0.00

M DADOING
As per work on Site
Total 0.00

N STAIRCASE / BALCONY
RAILING:
N1 Supplying, providing & fixing in position staircase Sqm 25.00 3,400.00 85,000.00
railing approximately 80 to 90 mm high with 16mm
MS square bars fixed vertically to every step with
with 50 mm x 6mm MSmm flat welded to the square
bars as shown in the drawing including supplying
and fixing 100 x 50 mm teak wood handrail brought
to shape and screwed to 25x6mm flat runner welded
on top of square bars as per design, including
painting the MS section and polishing the wooden
sections

N2 Supplying, providing & fixing with 16mm sq rod and Sqm 10.00 1,900.00 19,000.00
50mm box sec
N3 Teak wood railing Rmt 20.00 1,550.00 31,000.00

Total 135,000.00

O Extra /Miscellaneous
works:
O1 75mm thick flagging concrete Sqm 23.00 375.00 8,625.00
O2 PCC [Link] with bitumen Sqm 25.00 800.00 20,000.00
O3 RCC drain covers Sqm 12.00 1,500.00 18,000.00
O4 Granite slab for drain Sqm 20.00 980.00 19,600.00
O7 Sand filling Cum 10.00 1,900.00 19,000.00

Total 85,225.00

P ANTI TERMITE
TREATMENT
P1 Providing anti-termite treatment to ground floor &
foundations by pest control agencies.-as per P.C.I
control norms.
a at plinth fitting Sqm 23.00 75.00 1,725.00
b at wall-floor junction Sqm 150.00 75.00 11,250.00
c extnl perimeter Rmt 75.00 75.00 5,625.00

Total 18,600.00

Q OVERHEAD WATER
TANK:
Q1 RCC water tank-Beams Cum 1.25 9,200.00 11,500.00
Q2 RCC water tank-top slab Cum 2.25 9,000.00 20,250.00
Q3 225 brick masonry Cum 4.75 5,250.00 24,937.50
Q4 122mm thick Rcc wall Cum 2.65 9,500.00 25,175.00
Q5 Waterproof plaster Sqm 20.00 400.00 8,000.00
Q6 Ext plastering Sqm 22.00 350.00 7,700.00
Q7 Cement paint Sqm 23.00 125.00 2,875.00
Q8 Additional Work

Total 100,437.50

R UNDERGROUND SUMP
R1 TANK:
Earthwork Cum 37.50 300.00 11,250.00
R2 PCC 1: 4:8 Cum 2.25 3,200.00 7,200.00
R3 225 mm Brick masonry Cum 9.00 4,600.00 41,400.00
R4 RCC roof slab Cum 2.25 6,000.00 13,500.00
R5 Steel (basic price-52000/Ton MT 0.05 65,000.00 3,250.00
R6 IPS flooring Sqm 15.00 490.00 7,350.00
R7 Waterproof plaster Sqm 38.00 450.00 17,100.00
R8 Waterproof -Top Slab Sqm 15.00 400.00 6,000.00
R9 Rough plaster Sqm 40.00 355.00 14,200.00
R 10 PVC rungs Each
R 11 Chamber cover Each
Total 121,250.00

S COMPOUND WALL :

S1 Earthwork Cum 30.00 300.00 9,000.00


S2 PCC 1: 4:8 Cum 4.50 3,200.00 14,400.00
S3 SSM Cum 17.00 3,650.00 62,050.00
S4 DPC [Link] Cum 10.00 4,950.00 49,500.00
S5 DPC [Link] Cum 1.00 4,950.00 4,950.00
S6 112mm brick masonry Sqm 36.00 630.00 22,680.00
S7 PCC [Link] Cum 0.75 3,700.00 2,775.00
S8 Rough plaster Sqm 72.00 355.00 25,560.00
S9 Cement paint Sqm 72.00 125.00 9,000.00
S 10 MS gate Sqm 10.50 2,425.00 25,462.50
S 11 pink granite Sqm 0.50 3,750.00 1,875.00
S 12 Other works if Any
S 13 Extra cost

Total 227,252.50

GRAND TOTAL : 6,612,002.30


Cost /sqft ₹ 2,361.43
Total Cost of Construction for Building your Residential House of
(Ground +1 Floor(G+1)) on (1200 sq ft) Site is
₹ 5,025,579.40
1 Foundation
i Earthwork and Excavation
Item Quantity Price
Labour 1848 cft @ ₹ 12.00 cft ₹ 22,176.00
Total ₹ 22,176.00

ii Layering and Curing Concrete


Item Quantity Price
Material 185 cft @ ₹ 110.00 cft ₹ 20,350.00
Labour 185 cft @ ₹ 35.00 cft ₹ 6,475.00
Total ₹ 26,825.00

iii Providing and constructing the SSM


Item Quantity Price
Material 378 cft @ ₹ 130.00 cft ₹ 49,140.00
Labour 378 cft @ ₹ 30.00 cft ₹ 11,340.00
Total ₹ 60,480.00

iv Providing and laying Concrete


a Footing
Item Quantity Price
Material 378 cft @ ₹ 290.00 cft ₹ 109,620.00
Labour 756 cft @ ₹ 30.00 cft ₹ 22,680.00
Total ₹ 132,300.00

b Column
Item Quantity Price
Material 51 cft @ ₹ 290.00 cft ₹ 14,790.00
Labour 51 cft @ ₹ 60.00 cft ₹ 3,060.00
Total ₹ 17,850.00

c Plinth Beam
Item Quantity Price
Material 84 cft @ ₹ 290.00 cft ₹ 24,360.00
Labour 84 cft @ ₹ 60.00 cft ₹ 5,040.00
Total ₹ 29,400.00

Total Foundation Cost ₹ 289,031.00

2 Steel Structure
Providing and Fabricating steel
a Footing
Item Quantity Price
Material 0.63 Mton @ ₹ 69,000.00 Mton ₹ 43,470.00
Labour 0.63 Mton @ ₹ 2,800.00 Mton ₹ 1,764.00
Total ₹ 45,234.00

b Column
Item Quantity Price
Material 0.18 Mton @ ₹ 69,000.00 Mton ₹ 12,420.00
Labour 0.18 Mton @ ₹ 2,800.00 Mton ₹ 504.00
Total ₹ 12,924.00

c Plinth Beam
Item Quantity Price
Material 0.24 Mton @ ₹ 69,000.00 Mton ₹ 16,560.00
Labour 0.24 Mton @ ₹ 2,800.00 Mton ₹ 672.00
Total ₹ 17,232.00

Total Steel Structure Cost ₹ 75,390.00

3 Roofing
Providing and laying Base
Item Quantity Price
Material 672 Cft @ ₹ 110.00 Cft ₹ 73,920.00
Labour 672 Cft @ ₹ 35.00 Cft ₹ 23,520.00
Total ₹ 97,440.00

Providing and laying 1:1.5:3 concrete


a Column
Item Quantity Price
Material 169.68 Cft @ ₹ 290.00 Cft ₹ 49,207.20
Labour 169.68 Cft @ ₹ 60.00 Cft ₹ 10,180.80
Total ₹ 59,388.00

b Beam
Item Quantity Price
Material 168 Cft @ ₹ 290.00 Cft ₹ 48,720.00
Labour 168 Cft @ ₹ 60.00 Cft ₹ 10,080.00
Total ₹ 58,800.00

c Slab
Item Quantity Price
Material 707.28 Cft @ ₹ 280.00 Cft ₹ 198,038.40
Labour 707.28 Cft @ ₹ 50.00 Cft ₹ 35,364.00
Total ₹ 233,402.40

d Lintel
Item Quantity Price
Material 92.4 Cft @ ₹ 290.00 Cft ₹ 26,796.00
Labour 92.4 Cft @ ₹ 70.00 Cft ₹ 6,468.00
Total ₹ 33,264.00

e Chajja
Item Quantity Price
Material 235.2 Cft @ ₹ 320.00 Cft ₹ 75,264.00
Labour 235.2 Cft @ ₹ 80.00 Cft ₹ 18,816.00
Total ₹ 94,080.00

f Staircase
Item Quantity Price
Material 201.6 Cft @ ₹ 290.00 Cft ₹ 58,464.00
Labour 201.6 Cft @ ₹ 50.00 Cft ₹ 10,080.00
Total ₹ 68,544.00

g Granite Slab
Item Quantity Price
Material 50.4 Cft @ ₹ 600.00 Cft ₹ 30,240.00
Total ₹ 30,240.00
Total Roofing Cost ₹ 675,158.40

4 Super Structure
a Column
Item Quantity Price
Material 1.01 Mton @ ₹ 69,000.00 Mton ₹ 69,690.00
Labour 1.01 Mton @ ₹ 2,800.00 Mton ₹ 2,828.00
Total ₹ 72,518.00

b Beam
Item Quantity Price
Material 1.51 Mton @ ₹ 69,000.00 Mton ₹ 104,190.00
Labour 1.51 Mton @ ₹ 2,800.00 Mton ₹ 4,228.00
Total ₹ 108,418.00

c Slab
Item Quantity Price
Material 2.02 Mton @ ₹ 69,000.00 Mton ₹ 139,380.00
Labour 2.02 Mton @ ₹ 2,800.00 Mton ₹ 5,656.00
Total ₹ 145,036.00

d Lintel
Item Quantity Price
Material 0.5 Mton @ ₹ 69,000.00 Mton ₹ 34,500.00
Labour 0.5 Mton @ ₹ 2,800.00 Mton ₹ 1,400.00
Total ₹ 35,900.00

e Chajja
Item Quantity Price
Material 0.25 Mton @ ₹ 69,000.00 Mton ₹ 17,250.00
Labour 0.25 Mton @ ₹ 2,800.00 Mton ₹ 700.00
Total ₹ 17,950.00

f Staircase
Item Quantity Price
Material 1.51 Mton @ ₹ 69,000.00 Mton ₹ 104,190.00
Labour 1.51 Mton @ ₹ 2,800.00 Mton ₹ 4,228.00
Total ₹ 108,418.00

Total Super Structure Cost ₹ 488,240.00

5 Wall Construction
a 9 inh thk burnt brick
Item Quantity Price
Material 1848 Sft @ ₹ 140.00 Sft ₹ 258,720.00
Labour 1848 Sft @ ₹ 20.00 Sft ₹ 36,960.00
Total ₹ 295,680.00

b 4.5 inh thk burnt brick


Item Quantity Price
Material 1344 Sft @ ₹ 50.00 Sft ₹ 67,200.00
Labour 1344 Sft @ ₹ 15.00 Sft ₹ 20,160.00
Total ₹ 87,360.00
Total Wall Construction Cost ₹ 383,040.00

6 Flooring
a Vetrified Tiles
Item Quantity Price
Tiles 1848 Sft @ ₹ 70.00 Sft ₹ 129,360.00
Material 1848 Sft @ ₹ 40.00 Sft ₹ 73,920.00
Labour 1848 Sft @ ₹ 35.00 Sft ₹ 64,680.00
Total ₹ 267,960.00
Total Flooring Cost ₹ 267,960.00

7 Wall Tiles
a Kitchen
Item Quantity Price
Tiles 100.8 Sft @ ₹ 45.00 Sft ₹ 4,536.00
Material 100.8 Sft @ ₹ 40.00 Sft ₹ 4,032.00
Labour 100.8 Sft @ ₹ 35.00 Sft ₹ 3,528.00
Total ₹ 12,096.00

b Toilet
Item Quantity Price
Tiles 470.4 Sft @ ₹ 45.00 Sft ₹ 21,168.00
Material 470.4 Sft @ ₹ 40.00 Sft ₹ 18,816.00
Labour 470.4 Sft @ ₹ 35.00 Sft ₹ 16,464.00
Total ₹ 56,448.00

c Bathroom
Item Quantity Price
Tiles 100.8 Sft @ ₹ 45.00 Sft ₹ 4,536.00
Material 100.8 Sft @ ₹ 40.00 Sft ₹ 4,032.00
Labour 100.8 Sft @ ₹ 35.00 Sft ₹ 3,528.00
Total ₹ 12,096.00

Total Wall Tiles Cost ₹ 80,640.00

8 Wood Work
a Doors(Main Door & Puja Door)
Item Quantity Price
Teak wood
Material 84 Sft @ ₹ 2,300.00 Sft ₹ 193,200.00
Labour 84 Sft @ ₹ 400.00 Sft ₹ 33,600.00
Total ₹ 226,800.00

b Doors(others)
Item Quantity Price
OST Doors
Material 168 Sft @ ₹ 550.00 Sft ₹ 92,400.00
Labour 168 Sft @ ₹ 250.00 Sft ₹ 42,000.00
Total ₹ 134,400.00

c Windows
Item Quantity Price
UPVC
Material 504 Sft @ ₹ 1,100.00 Sft ₹ 554,400.00
Labour 504 Sft @ ₹ 200.00 Sft ₹ 100,800.00
Total ₹ 655,200.00

c MS Grills
Item Quantity Price
MS Grrills
Material 420 Sft @ ₹ 140.00 Sft ₹ 58,800.00
Labour 420 Sft @ ₹ 80.00 Sft ₹ 33,600.00
Total ₹ 92,400.00
Total Wood Work Cost ₹ 1,108,800.00

9 Painting
a Exterior Painting
Item Quantity Price
Material 2184 Sft @ ₹ 26.00 Sft ₹ 56,784.00
Labour 2184 Sft @ ₹ 14.00 Sft ₹ 30,576.00
Total ₹ 87,360.00

b Interior Painting
Item Quantity Price
Material 5040 Sft @ ₹ 26.00 Sft ₹ 131,040.00
Labour 5040 Sft @ ₹ 14.00 Sft ₹ 70,560.00
Total ₹ 201,600.00

Total Painting Cost ₹ 288,960.00

10 Plastering
a Ceiling
Item Quantity Price
Material 1680 Sft @ ₹ 30.00 Sft ₹ 50,400.00
Labour 1680 Sft @ ₹ 30.00 Sft ₹ 50,400.00
Total ₹ 100,800.00

b Internal Walls
Item Quantity Price
Material 3360 Sft @ ₹ 30.00 Sft ₹ 100,800.00
Labour 3360 Sft @ ₹ 30.00 Sft ₹ 100,800.00
Total ₹ 201,600.00

c External Walls
Item Quantity Price
Material 2184 Sft @ ₹ 30.00 Sft ₹ 65,520.00
Labour 2184 Sft @ ₹ 35.00 Sft ₹ 76,440.00
Total ₹ 141,960.00

Total Plastering Cost ₹ 444,360.00

11 Electrical & Plumbing


a Electrical
Item Quantity Price
Material 1680 Sft @ ₹ 250.00 Sft ₹ 420,000.00
Total ₹ 420,000.00

b Plumbing
Item Quantity Price
Material 1680 Sft @ ₹ 300.00 Sft ₹ 504,000.00
Total ₹ 504,000.00
Total Electrical & Plumbing Cost ₹ 924,000.00

Total Cost of Construction ₹ 5,025,579.40


Cost /sqft ₹ 2,716.53
Construction cost
in Bangalore 2025
per sq ft SITE
DIMENSION 20×30 BUILT UP Costruction
30×40 30×50 30×60 SITE area NO OF AREA Costruction Cost in
Sl no 40×50 40×60 50×80 (sq ft) FLOORS (BUA) Cost Trichy
20×30
Construction cost
1 20 X 30 600 Sft G 450 Sft 8 lakh 10.35 lakh
2 20 X 30 600 Sft G+1 1000 Sft 17 lakh 23.00 lakh
3 20 X 30 600 Sft G+2 1450 Sft 25 lakh 33.35 lakh
4 20 X 30 600 Sft G+3 1950 Sft 33 lakh 44.85 lakh
5 20 X 30 600 Sft G+4 2450 Sft 41 lakh 56.35 lakh
30×40
Construction cost
6 30 X 40 1200 Sft G 900 Sft 15 lakh 20.70 lakh
7 30 X 40 1200 Sft G+1 1850 Sft 31 lakh 42.55 lakh
8 30 X 40 1200 Sft G+2 2800 Sft 47 lakh 64.40 lakh
9 30 X 40 1200 Sft G+3 3750 Sft 63 lakh 86.25 lakh
10 30 X 40 1200 Sft G+4 4700 Sft 79 lakh 108.10 lakh
30×50
Construction cost
11 30 X 50 1500 Sft G 1050 Sft 17 lakh 24.15 lakh
12 30 X 50 1500 Sft G+1 2400 Sft 40 lakh 55.20 lakh
13 30 X 50 1500 Sft G+2 3750 Sft 63 lakh 86.25 lakh
14 30 X 50 1500 Sft G+3 5100 Sft 86 lakh 117.30 lakh
15 30 X 50 1500 Sft G+4 6450 Sft 100 lakh 148.35 lakh
30×60
Construction cost
16 30 X 60 1800 Sft G 1300 Sft 22 lakh 29.90 lakh
17 30 X 60 1800 Sft G+1 2800 Sft 47 lakh 64.40 lakh
18 30 X 60 1800 Sft G+2 4100 Sft 69 lakh 94.30 lakh
19 30 X 60 1800 Sft G+3 5500 Sft 93 lakh 126.50 lakh
20 30 X 60 1800 Sft G+4 6900 Sft 117 lakh 158.70 lakh
40×50
Construction cost
21 40 X 50 2000 Sft G 1400 Sft 24 lakh 32.20 lakh
22 40 X 50 2000 Sft G+1 3000 Sft 51 lakh 69.00 lakh
23 40 X 50 2000 Sft G+2 4600 Sft 78 lakh 105.80 lakh
24 40 X 50 2000 Sft G+3 6200 Sft 100 lakh 142.60 lakh
25 40 X 50 2000 Sft G+4 7800 Sft 130 lakh 179.40 lakh
40×60
Construction cost
21 40 X 60 2400 Sft G 1600 Sft 27 lakh 36.80 lakh
22 40 X 60 2400 Sft G+1 3600 Sft 61 lakh 82.80 lakh
23 40 X 60 2400 Sft G+2 5600 Sft 95 lakh 128.80 lakh
24 40 X 60 2400 Sft G+3 7600 Sft 130 lakh 174.80 lakh
25 40 X 60 2400 Sft G+4 9600 Sft 160 lakh 220.80 lakh

50×80
Construction cost
21 50 X 80 4000 Sft G 3000 Sft 51 lakh 69.00 lakh
22 50 X 80 4000 Sft G+1 6400 Sft 100 lakh 147.20 lakh
23 50 X 80 4000 Sft G+2 9800 Sft 160 lakh 225.40 lakh
24 50 X 80 4000 Sft G+3 13000 Sft 220 lakh 299.00 lakh
25 50 X 80 4000 Sft G+4 16000 Sft 280 lakh 368.00 lakh
Sl . No. Construction item rates in Bangalore for residential Hosue construction in
Bangalore DESCRIPTION OF WORK Unit Rate
1 Excavation in hard/ soft soil for foundation, and removing the excavated earth to a
distance not exceeding 50 m and with a lift up to 1. 5 m in hard soil. Cft 8
2 Providing and laying granite jelly concrete using 40 mm down size jelly for
foundation and well compacted curing etc. complete in cement concrete ( 1 : 4 : 8 ).
Cft 70
3 Providing and constructing granite or trap size stone masonry with bond stones 2m
apart in each course including curing etc complete as per specification in cement
mortar ( 1 : 8).
Cft 90
4 Providing and laying granite or trap jelly cement concrete using 20 mm down size
including curing etc. complete in cement concrete ( 1 : 3 : 6 )for plinth beam.
Cft 150
5 Providing and laying cement concrete (1:11/2:3) for R.C.C. Column footing using
20mm and down size granite jelly with necessary centering and shuttering including
machine mixing lifting laying tamping finishing exposed faces in cement mortar (1:3)
curing etc , complete (Exclusive of cost of steel and fabrication charges).

Cft 150
6 Providing and laying cement concrete ([Link]) for R.C.C. Column using 20mm and
down size granite jelly with necessary centering and shuttering including machine
mixing lifting laying tamping finishing exposed faces in cement mortar (1:3) curing
etc , complete (Exclusive of cost of steel and fabrication charges).
Cft 150
7 Providing and laying cement concrete ([Link]) for R.C.C. Beam using 20mm and down
size granite jelly with necessary centering and shuttering including machine mixing
lifting laying tamping finishing exposed faces in cement mortar (1:3) curing etc ,
complete (Exclusive of cost of steel and fabrication charges).
Cft 150
8 Providing and constructing brick masonry with approved quality of table moulded
modular Bricks of standard size with necessary scaffolding and curing etc, in cement
mortar(1:6).(9″ thick wall).
Cft 100
9 Providing and constructing brick masonry with approved quality of table moulded
modular Bricks of standard size with necessary scaffolding and curing etc, in cement
mortar(1:6)(4 1/2″ thick wall).
Sft 70
10 Providing and laying cement concrete ([Link]) for R.C.C. Lintels using 20mm and
down size granite jelly including vibrating, curing and with, complete. (Exclusive of
cost of steel and fabrication charges).
Cft 150
11 Providing and laying cement concrete for R.C.C Chajja and loft as per design in
cement concrete ([Link]) in granite of 20 mm and down size along with plastering in
cement mortar (1:3) including plastering complete (Excluding cost of steel and
fabrication charges) .
Sft 120
12 Providing and laying cement concrete ([Link]) for R.C.C. Stair case using 20 mm and
down size granite jelly including vibrating curing and with necessary centering and
form work , including smooth finish in cement mortar (1:3) etc, complete (Exclusive
of cost of steel and fabrication charges).
Cft 200
13 Providing and laying cement concrete ([Link]) for R.C.C. Roof slab using 20mm and
down size granite jelly with necessary centering and shuttering including machine
mixing lifting laying tamping finishing exposed faces in cement mortar (1:3) curing
etc, complete (Exclusive of cost of steel and fabrication charges).
Cft 150
14 Providing and fabricating mild/HYSD steel reinforcement including straightening ,
cutting, bending ,hooking ,lapping ,tieing, with binding wire and anchoring to the
adjoining members wherever etc , complete as per design and specification .
Tons 45000
15 Providing & Laying P.C.C ([Link]) For Portico with 40mm and down size jelly including
tamping, curing, finishing etc, complete. Sft 30
16 Providing plain plastering for external walls of burnt brick masonry in cement mortar
(1:6) including providing and removing scaffolding smooth rendering , curing etc,
complete.
Sft 30
17
Providing plain plastering for internal walls of burnt brick masonry in cement mortar
(1:6) including providing and removing scaffolding, lime rendering curing etc ,
complete Sft 35
18 Providing plastering to ceiling with cement mortar (1:3) with necessary scaffolding
and curing ,complete . Sft 40
19 Providing and fixing doors with Sal wood frames & Skin doors fixed in the masonry
with flat iron hold fasts embedded in cement concrete ([Link]) with fully paneled
shutters including fixing the fittings. etc, complete.(Skin Doors)
Sft 400
20
Providing and fixing windows & Ventilators of sal & Honne wood frames fixed in the
masonry with iron hold fasts embedded in cement concrete ([Link]) with fully
paneled Honne wood shutters as per design and drawing including fixing the
fittings . etc , complete. Sft 800
21 Providing and fixing Main door with Teak wood, including fixing & fittings etc,
complete. Sft 1500
22 Providing flooring with Vertified tiles, including finishing etc, complete.(Basic price
=80/-) Sft 130
23 Skirting(Vetrified tiles): Rft 70
24 Providing & laying Antiskid flooring for Toilet.) Sft 80
25 Glazed tiles Dadooding for toilet & kitchen walls in cement mortar in clading, oxalic
acid wash, finishing etc, complete.(basic rate Rs. 70/- per Sft) Sft 120
26 Providing emulsion painting to internal walls over the primer coat of approved make
and colour and finishing as per specification and directions Sft 14
27 Providing Distemper painting to ceiling over the primer coat of approved make and
colour and finishing as per specification and directions. Sft 10
28 Providing Asian Apex Matte painting for External walls over the primer coat of
approved make and colour and finishing as per specification and directions. Sft 12
29 Providing and laying weather proof course to the required slope as per detailed
specification and directions etc., complete. Sft 30
30 Providing parapet wall of 4 ½” thick and 2’ 6” high with approved quality of modular
bricks including plastering in cement mortar (1:6).etc , complete. Rft 300
31 Providing and fixing of M.S. grill for windows and fixing of all fittings, finishing etc.,
complete, as per design & specification. Sft 120
32 Providing Enamel painting for Grills/ Staircase Railing & Balcony Railing etc,
complete. Sft 12
33 Providing & construction of Sump tank with burnt brick maonry walls & providing &
laying of RCC Roof slab including plastering etc .,complete along with sump cover.
/litre 3
34 Providing & construction of 4 1/2″ Compound wall upto a height of 4’6″ including
foundation, plastering, painting etc, complete. Rft 750
35 Providing & fixing of [Link] as per design & specification, etc., complete. Sft 200
36 Providing & fixing of [Link] as per design & specification for balcony railings. Sft 150
Sl NO. Labour/Labor rates for Construction work UNIT RATE
1 Footing Sqm 160.00
2 Columns Sqm 160.00
3 Plinth beams Sqm 160.00
4 Flat Slab Sqm 160.00
5 Staircase Sqm 250.00
6 GF & FF Slope Slab Sqm 250.00
7 TF Slope Slab Sqm 270.00
8 Making Charges Sqm 70.00
9 Lintel & Sunshade Shuttering Floor 10,000.00
10 Arch Beam Shuttering Villa 2,000.00
11 Parapet Beam Shuttering Rmt 110.00
12 RCC Cornice Rmt 160.00
13 RCC Drop Rmt 175.00
14 Staging Sqm 70.00
15 Remarking works Sqm 70.00

B BAR BENDING
Steel Fabrications(Excluding Lintels &
1 Chajja) M.T 6,500.00
2 Lintel & Sunshade Steel Floor 3,000.00
3 Arch Beam Steel Villa 1,500.00
4 Parapet Beam Steel Villa 2,000.00
5 RCC Cornice Steel Villa 1,500.00
C SOLID BLOCK MASONRY
1 Plinth Beam Sqm 150.00
2 Ground Floor Sqm 150.00
3 First Floor Sqm 170.00
4 Terrace Floor Sqm 190.00
5 Duct Sqm 200.00
6 Parapet Sqm 190.00
7 Base Coarse marking Floor 2,500.00

D PLASTERING
1 Ceiling(Flat) Sqm 130.00
2 Ceiling(Slope) Sqm 130.00
3 Internal wall plastering Sqm 120.00
4 Rough wall plastering Sqm 80.00
5 Stepped Staircase plastering Sqm 235.00
6 External Plastering Sqm 180.00
7 Pergola Plastering Rmt 350.00
8 Groove Cutting Rmt 20.00
9 Elevation Band Rmt 229.67
10 Drip Mould Rmt 30.00
11 Ele pipe packing Floor 750.00
12 Mesh Fixing Rmt 6.00
13 Level Pad fixing Floor 1,500.00
14 Hacking Sft 1.40
15 Drilling Hrs 87.50
16 Chipping Hrs 120.00
17 Cornice Rft 140.00

ITEM DESCRIPTION for


[Link] Labour Rates UNITS RATE

1 Earthwork excavation cft 9.00


2 Sump
Earth filling
water tank solid block cft 5.00
3 wall
sump tank rcc wall -sump Lts 3.00
4 tank Lts 5.00
5 Shuttering sft 45.00
6 Bar bending kg 9.00
7 P.C.C Concrete sft 40.00
8 Footing concrete cft 45.00
9 Size stone masonry cft 40.00
10 R.C.C
column concrete
Roof slab & Beam cft 65.00
11 concrete cft 60.00
12 R.C.C Slope roof concrete cft 75.00
13 8″ Block work sft 33.00
14 6″ Block work sft 25.00
15 4″Block work sft 20.00
16 Internal Ceiling Plastering sft 20.00
17 Internal Wall plastering sft 18.00
18 External Wall plastering sft 22.00
19 Door & Windows Fixing sft 35.00
20 Ventilators fixing nos 350.00
21 2″&3″ Band rft 30.00
22 3/4″ Groove rft 15.00
23 Parapet
Cylinder Wall
Filling(Block
(BathWork&
Room) cft 30.00
24 Plastering) sft 55.00
25 Water proof plastering sft 25.00
26 (Lead & Lift )
27 First floor 10 %
28 Second floor 15 %
29 Third floor 20 %
30 Fourth floor 25 %
31 Watchman salary per month 3,000.00
Item
Column1 Description
per 28.30 cum _1 _2 _3 _4 _5
1 (1000cft)
30m and lift of — — —
1.5m
consolidation in 28.3 Cum 5 4 —
15cms
within alayers
lead of 28.3 Cum 3 2 0.5
30m
per 2.83cum 28.3 Cum — 1 —
2 (100
Layingcft)
Cement — — —
concrete 2.83 Cum 2 3 0.75
3 R.C.C work
Reinforced — — —
concrete
shuttering for 2.83 Cum 3 3 1.5
Flat surface 9.6 Sqm 4 — —
_6 _7 _8
— — —
— — —
— — —
— — —
— — —
0.25 — —
— — —
0.5 — —
— 4 —
Column1 Column2
Reinforcement Column3 Column4
work for RCC
2.83 cum 100 Kgs
4 (100Cft)
with blue stone
in foundations
Brickwork per 2.83 Cum
5 2.83 cum
walls and string
course 2.83 Cum
6 Flooring
flooring of
40Sqm 40 Sqm
7 Finishing
any mortar
12mm thick
washing 40 Sqm
(3coats)
greyetc., on 60 Sqm
wood or steel 10 Sqm
Column5 Column6 Column7 Column8 Column9 Column10
1 — — — — 1
— — — — — —
3 2 0.5 3 — —
— — — — — —
— 4.5 0.5 2.25 — —
— — — — — —
4 3 1 — — —
— — — — — —
— 3 1 3 — —
— 1 — 1 — —
— 2 — 3 — —
Labor/Labour work requirement for different Construction works in Bangalore for Earthworks, Concrete, RCC
work, Stone work, Brick work, Flooring, Plastering, Painting, etc
Labour Required
Mason/
Skilled Curing white Carpenter
Sno Item Description Qty Unit labour Helpers Labour washer s Fitter
1 Earthworks
per 28.30 cum
(1000cft)
— — — — — —
Earthworks excavation in foundations,
trenches etc., in ordinary soil including
disposal up to 30m and lift of 1.5m
28.3 Cum 5 4— — — —
Refilling excavated earth in
foundations, plinth etc. including
consolidation in 15cms layers
28.3 Cum 3 2 0.5 — — —
Disposal of surplus earth within a lead
of 30m 28.3 Cum — 1— — — —
2 Cement concrete work per 2.83cum
(100 cft) — — — — — —
Laying Cement concrete 2.83 Cum 2 3 0.75 0.25 — —
3 R.C.C work — — — — — —
Laying Reinforced concrete 2.83 Cum 3 3 1.5 0.5 — —
Centring and shuttering for Flat surface
9.6 Sqm 4— — — 4—
Reinforcement work for RCC 100 kgs 1— — — — 1
4 Stone work per 2.83 cum (100Cft) — — — — — —
RR Masonry with blue stone in
foundations 2.83 Cum 3 2 0.5 3— —
5 Brickwork per 2.83 cum — — — — — —
Ist class brickwork in 1:4 CM in super
structure partition walls, junctions of
roof, parapet walls and string course.
2.83 Cum — 4.5 0.5 2.25 — —
6 Flooring — — — — — —
4cm thick CC flooring of 40Sqm 40 Sqm 4 3 1— — —
7 Finishing — — — — — —
Plastering with any mortar 12mm thick
40 Sqm — 3 1 3— —
Whitewashing or color washing (3coats)
60 Sqm — 1— 1— —
Painting two coats such as chocolate,
red, greyetc., on
wood or steel
10 Sqm — 2— 3— —