CALIBRATION OF MODIFIED PROCTOR MOULD
(AH-02 )
Date of Calibration :- 08.06.2015
Due Date of Calibration :- 07.12.2015
MOULD MOULD HEIGHT OF VOLUME OF
S.NO. DIA. IN MM REMARKS
NO. WEIGHT MOULD IN MM MOULD (CC)
100 MM DIA MOULD
1 B1 3891 127 127.00 998.00
2 B2 4560 127 127.00 998.00
3 B3 4299 127 126.00 990.00
150 MM DIA MOULD
4 B4 5888 127 150.00 2245.00
5 B5 5901 127 150.00 2245.00
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Date Date
CALIBRATION OF MODIFIED PROCTOR MOULD
(AH-02 )
Date of Calibration :- 05.12.2016
Due Date of Calibration :- 04.06.2017
MOULD MOULD HEIGHT OF VOLUME OF
S.NO. DIA. IN MM REMARKS
NO. WEIGHT MOULD IN MM MOULD (CC)
100 MM DIA MOULD
1 B1 3891 127 127.00 998.00
2 B2 4560 127 127.00 998.00
3 B3 4299 127 126.00 990.00
150 MM DIA MOULD
4 B4 5888 127 150.00 2245.00
5 B5 5901 127 150.00 2245.00
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Date Date
CALIBRATION OF CBR MOULD
AH-02
Date of Calibration :- 09.06.15
Due Date of Calibration :- 08.12.15
Weight of Height of mould Dia of mould
S/No. Mould No. Volume (cc) Remarks
Mould in (gm) (mm) (mm)
1 A1 7000 127.00 150.00 2245
2 A2 6419 127.00 150.00 2245
3 A3 6436 128.00 150.00 2263
4 A4 5650 129.00 150.00 2281
5 A5 6930 126.00 150.00 2228
6 A6 6412 127.00 150.00 2245
7 A7 6150 127.00 150.00 2245
8 A8 6492 127.00 150.00 2245
9 A9 6430 126.00 150.00 2228
10 A10 6328 129.00 150.00 2281
11 A11 6980 127.00 150.00 2245
12 A12 6981 130.00 150.00 2298
13 A13 6358 127.00 150.00 2245
14 A14 6365 128.00 150.00 2263
15 A15 6377 127.00 150.00 2245
16 A16 6918 127.00 150.00 2245
17 A17 6456 128.00 150.00 2263
18 A18 6934 127.00 150.00 2245
19 A19 6217 127.00 150.00 2245
20 A20 6415 127.00 150.00 2245
21 A21 6245 128.00 150.00 2263
22 A22 6284 127.00 150.00 2245
23 A23 6368 128.00 150.00 2263
24 A24 6374 127.00 150.00 2245
25 A25 6006 128.00 150.00 2263
26 A26 6207 127.00 150.00 2245
27 A27 6889 128.00 150.00 2263
28 A28 6326 127.00 150.00 2245
29 A29 6144 128.00 150.00 2263
30 A30 6957 128.00 150.00 2263
31 A31 6033 130.00 150.00 2298
32 A32 5890 127.00 150.00 2245
33 A33 6274 128.00 150.00 2263
34 A34 6180 128.00 150.00 2263
35 A35 6332 130.00 150.00 2298
35 A36 6321 127.00 150.00 2245
36 A37 6140 129.00 150.00 2281
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Date Date
CALIBRATION OF CBR MOULD
AH-02
Date of Calibration :- 08.12.15
Due Date of Calibration :- 07.06.16
Weight of Height of mould Dia of mould
S/No. Mould No. Volume (cc) Remarks
Mould in (gm) (mm) (mm)
1 A1 7000 127.00 150.00 2245
2 A2 6419 127.00 150.00 2245
3 A3 6436 128.00 150.00 2263
4 A4 5650 129.00 150.00 2281
5 A5 6930 126.00 150.00 2228
6 A6 6412 127.00 150.00 2245
7 A7 6150 127.00 150.00 2245
8 A8 6492 127.00 150.00 2245
9 A9 6430 126.00 150.00 2228
10 A10 6328 129.00 150.00 2281
11 A11 6980 127.00 150.00 2245
12 A12 6981 130.00 150.00 2298
13 A13 6358 127.00 150.00 2245
14 A14 6365 128.00 150.00 2263
15 A15 6377 127.00 150.00 2245
16 A16 6918 127.00 150.00 2245
17 A17 6456 128.00 150.00 2263
18 A18 6934 127.00 150.00 2245
19 A19 6217 127.00 150.00 2245
20 A20 6415 127.00 150.00 2245
21 A21 6245 128.00 150.00 2263
22 A22 6284 127.00 150.00 2245
23 A23 6368 128.00 150.00 2263
24 A24 6374 127.00 150.00 2245
25 A25 6006 128.00 150.00 2263
26 A26 6207 127.00 150.00 2245
27 A27 6889 128.00 150.00 2263
28 A28 6326 127.00 150.00 2245
29 A29 6144 128.00 150.00 2263
30 A30 6957 128.00 150.00 2263
31 A31 6033 130.00 150.00 2298
32 A32 5890 127.00 150.00 2245
33 A33 6274 128.00 150.00 2263
34 A34 6180 128.00 150.00 2263
35 A35 6332 130.00 150.00 2298
35 A36 6321 127.00 150.00 2245
36 A37 6140 129.00 150.00 2281
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Date Date
CALIBRATION OF CBR MOULD
AH-02
Date of Calibration :- 07.06.16
Due Date of Calibration :- 06.12.16
Weight of Height of mould Dia of mould
S/No. Mould No. Volume (cc) Remarks
Mould in (gm) (mm) (mm)
1 A1 7000 127.00 150.00 2245
2 A2 6419 127.00 150.00 2245
3 A3 6436 128.00 150.00 2263
4 A4 5650 129.00 150.00 2281
5 A5 6930 126.00 150.00 2228
6 A6 6412 127.00 150.00 2245
7 A7 6150 127.00 150.00 2245
8 A8 6492 127.00 150.00 2245
9 A9 6430 126.00 150.00 2228
10 A10 6328 129.00 150.00 2281
11 A11 6980 127.00 150.00 2245
12 A12 6981 130.00 150.00 2298
13 A13 6358 127.00 150.00 2245
14 A14 6365 128.00 150.00 2263
15 A15 6377 127.00 150.00 2245
16 A16 6918 127.00 150.00 2245
17 A17 6456 128.00 150.00 2263
18 A18 6934 127.00 150.00 2245
19 A19 6217 127.00 150.00 2245
20 A20 6415 127.00 150.00 2245
21 A21 6245 128.00 150.00 2263
22 A22 6284 127.00 150.00 2245
23 A23 6368 128.00 150.00 2263
24 A24 6374 127.00 150.00 2245
25 A25 6006 128.00 150.00 2263
26 A26 6207 127.00 150.00 2245
27 A27 6889 128.00 150.00 2263
28 A28 6326 127.00 150.00 2245
29 A29 6144 128.00 150.00 2263
30 A30 6957 128.00 150.00 2263
31 A31 6033 130.00 150.00 2298
32 A32 5890 127.00 150.00 2245
33 A33 6274 128.00 150.00 2263
34 A34 6180 128.00 150.00 2263
35 A35 6332 130.00 150.00 2298
35 A36 6321 127.00 150.00 2245
36 A37 6140 129.00 150.00 2281
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Date Date
Calibration of Moisture Container
(AH-02)
Date of Calibration : 10.06.2015 Due Date of Calibration : As Required
Weight of Weight of Weight of Weight of
Container Container Container Container
Container Container Container Container
No. No. No. No.
(gm) (gm) (gm) (gm)
A1 22.61 A29 20.97 A57 21.63 A85 22.28
A2 20.67 A30 21.64 A58 21.66 A86 21.60
A3 21.70 A31 21.96 A59 21.35 A87 21.23
A4 22.12 A32 21.80 A60 21.64 A88 22.06
A5 21.96 A33 21.74 A61 21.71 A89 21.49
A6 21.38 A34 21.62 A62 21.67 A90 23.88
A7 21.67 A35 22.41 A63 21.90 A91 21.77
A8 22.12 A36 21.31 A64 21.73 A92 20.95
A9 21.53 A37 21.66 A65 20.88 A93 22.08
A10 20.99 A38 21.97 A66 20.76 A94 22.34
A11 21.47 A39 21.01 A67 22.32 A95 21.38
A12 21.29 A40 21.73 A68 22.16 A96 21.54
A13 21.74 A41 21.78 A69 20.77 A97 21.79
A14 21.44 A42 22.16 A70 20.30 A98 21.59
A15 21.36 A43 21.75 A71 20.79 A99 18.97
A16 21.57 A44 21.97 A72 21.21 A100 21.15
A17 21.54 A45 21.95 A73 21.29 A101 21.15
A18 21.38 A46 21.78 A74 22.53 A102 21.71
A19 21.67 A47 21.31 A75 20.92 A103 21.51
A20 21.43 A48 21.67 A76 21.07 A104 21.15
A21 21.81 A49 21.78 A77 20.75 A105 21.35
A22 21.94 A50 20.76 A78 20.84 A106 22.59
A23 21.64 A51 21.61 A79 20.71 A107 21.32
A24 21.67 A52 21.84 A80 20.84 A108 22.06
A25 22.20 A53 21.08 A81 20.49 A109 21.99
A26 21.58 A54 21.17 A82 20.85 A110 21.74
A27 22.60 A55 21.46 A83 21.33
A28 22.26 A56 21.43 A84 21.41
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Calibration of Moisture Container
(AH-02)
Date of Calibration : 10.06.2015 Due Date of Calibration : As Required
Weight of Weight of Weight of Weight of
Container Container Container Container
Container Container Container Container
No. No. No. No.
(gm) (gm) (gm) (gm)
Date Date
Calibration of Moisture Container
(AH-02)
Date of Calibration : 09.12.2015 Due Date of Calibration : As Required
Weight of Weight of Weight of Weight of
Container Container Container Container
Container Container Container Container
No. No. No. No.
(gm) (gm) (gm) (gm)
A1 22.61 A29 20.97 A57 21.63 A85 22.28
A2 20.67 A30 21.64 A58 21.66 A86 21.60
A3 21.70 A31 21.96 A59 21.35 A87 21.23
A4 22.12 A32 21.80 A60 21.64 A88 22.06
A5 21.96 A33 21.74 A61 21.71 A89 21.49
A6 21.38 A34 21.62 A62 21.67 A90 23.88
A7 21.67 A35 22.41 A63 21.90 A91 21.77
A8 22.12 A36 21.31 A64 21.73 A92 20.95
A9 21.53 A37 21.66 A65 20.88 A93 22.08
A10 20.99 A38 21.97 A66 20.76 A94 22.34
A11 21.47 A39 21.01 A67 22.32 A95 21.38
A12 21.29 A40 21.73 A68 22.16 A96 21.54
A13 21.74 A41 21.78 A69 20.77 A97 21.79
A14 21.44 A42 22.16 A70 20.30 A98 21.59
A15 21.36 A43 21.75 A71 20.79 A99 18.97
A16 21.57 A44 21.97 A72 21.21 A100 21.15
A17 21.54 A45 21.95 A73 21.29 A101 21.15
A18 21.38 A46 21.78 A74 22.53 A102 21.71
A19 21.67 A47 21.31 A75 20.92 A103 21.51
A20 21.43 A48 21.67 A76 21.07 A104 21.15
A21 21.81 A49 21.78 A77 20.75 A105 21.35
A22 21.94 A50 20.76 A78 20.84 A106 22.59
A23 21.64 A51 21.61 A79 20.71 A107 21.32
A24 21.67 A52 21.84 A80 20.84 A108 22.06
A25 22.20 A53 21.08 A81 20.49 A109 21.99
A26 21.58 A54 21.17 A82 20.85 A110 21.74
A27 22.60 A55 21.46 A83 21.33
A28 22.26 A56 21.43 A84 21.41
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Calibration of Moisture Container
(AH-02)
Date of Calibration : 09.12.2015 Due Date of Calibration : As Required
Weight of Weight of Weight of Weight of
Container Container Container Container
Container Container Container Container
No. No. No. No.
(gm) (gm) (gm) (gm)
Date Date
Calibration of Moisture Container
(AH-02)
Date of Calibration :18.06.2016 Due Date of Calibration : As Required
Weight of Weight of Weight of Weight of
Container Container Container Container
Container Container Container Container
No. No. No. No.
(gm) (gm) (gm) (gm)
A1 22.61 A29 20.97 A57 21.63 A85 22.28
A2 20.67 A30 21.64 A58 21.66 A86 21.60
A3 21.70 A31 21.96 A59 21.35 A87 21.23
A4 22.12 A32 21.80 A60 21.64 A88 22.06
A5 21.96 A33 21.74 A61 21.71 A89 21.49
A6 21.38 A34 21.62 A62 21.67 A90 23.88
A7 21.67 A35 22.41 A63 21.90 A91 21.77
A8 22.12 A36 21.31 A64 21.73 A92 20.95
A9 21.53 A37 21.66 A65 20.88 A93 22.08
A10 20.99 A38 21.97 A66 20.76 A94 22.34
A11 21.47 A39 21.01 A67 22.32 A95 21.38
A12 21.29 A40 21.73 A68 22.16 A96 21.54
A13 21.74 A41 21.78 A69 20.77 A97 21.79
A14 21.44 A42 22.16 A70 20.30 A98 21.59
A15 21.36 A43 21.75 A71 20.79 A99 18.97
A16 21.57 A44 21.97 A72 21.21 A100 21.15
A17 21.54 A45 21.95 A73 21.29 A101 21.15
A18 21.38 A46 21.78 A74 22.53 A102 21.71
A19 21.67 A47 21.31 A75 20.92 A103 21.51
A20 21.43 A48 21.67 A76 21.07 A104 21.15
A21 21.81 A49 21.78 A77 20.75 A105 21.35
A22 21.94 A50 20.76 A78 20.84 A106 22.59
A23 21.64 A51 21.61 A79 20.71 A107 21.32
A24 21.67 A52 21.84 A80 20.84 A108 22.06
A25 22.20 A53 21.08 A81 20.49 A109 21.99
A26 21.58 A54 21.17 A82 20.85 A110 21.74
A27 22.60 A55 21.46 A83 21.33
A28 22.26 A56 21.43 A84 21.41
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Calibration of Moisture Container
(AH-02)
Date of Calibration :18.06.2016 Due Date of Calibration : As Required
Weight of Weight of Weight of Weight of
Container Container Container Container
Container Container Container Container
No. No. No. No.
(gm) (gm) (gm) (gm)
Date Date
Calibration of Moisture Container
(AH-02)
Date of Calibration :05.12.2016 Due Date of Calibration : As Required
Weight of Weight of Weight of Weight of
Container Container Container Container
Container Container Container Container
No. No. No. No.
(gm) (gm) (gm) (gm)
A1 22.61 A29 20.97 A57 21.63 A85 22.28
A2 20.67 A30 21.64 A58 21.66 A86 21.60
A3 21.70 A31 21.96 A59 21.35 A87 21.23
A4 22.12 A32 21.80 A60 21.64 A88 22.06
A5 21.96 A33 21.74 A61 21.71 A89 21.49
A6 21.38 A34 21.62 A62 21.67 A90 23.88
A7 21.67 A35 22.41 A63 21.90 A91 21.77
A8 22.12 A36 21.31 A64 21.73 A92 20.95
A9 21.53 A37 21.66 A65 20.88 A93 22.08
A10 20.99 A38 21.97 A66 20.76 A94 22.34
A11 21.47 A39 21.01 A67 22.32 A95 21.38
A12 21.29 A40 21.73 A68 22.16 A96 21.54
A13 21.74 A41 21.78 A69 20.77 A97 21.79
A14 21.44 A42 22.16 A70 20.30 A98 21.59
A15 21.36 A43 21.75 A71 20.79 A99 18.97
A16 21.57 A44 21.97 A72 21.21 A100 21.15
A17 21.54 A45 21.95 A73 21.29 A101 21.15
A18 21.38 A46 21.78 A74 22.53 A102 21.71
A19 21.67 A47 21.31 A75 20.92 A103 21.51
A20 21.43 A48 21.67 A76 21.07 A104 21.15
A21 21.81 A49 21.78 A77 20.75 A105 21.35
A22 21.94 A50 20.76 A78 20.84 A106 22.59
A23 21.64 A51 21.61 A79 20.71 A107 21.32
A24 21.67 A52 21.84 A80 20.84 A108 22.06
A25 22.20 A53 21.08 A81 20.49 A109 21.99
A26 21.58 A54 21.17 A82 20.85 A110 21.74
A27 22.60 A55 21.46 A83 21.33
A28 22.26 A56 21.43 A84 21.41
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Calibration of Moisture Container
(AH-02)
Date of Calibration :05.12.2016 Due Date of Calibration : As Required
Weight of Weight of Weight of Weight of
Container Container Container Container
Container Container Container Container
No. No. No. No.
(gm) (gm) (gm) (gm)
Date Date
Calibration of Moisture Container
(AH-02)
Date of Calibration : 10.06.2015 Due Date of Calibration : As Required
Weight of Weight of Weight of Weight of
Container Container Container Container
Container Container Container Container
No. No. No. No.
(gm) (gm) (gm) (gm)
S1 13.23 S29 13.93 S57 12.49
S2 13.42 S30 13.13
S3 13.54 S31 13.42 B1 38.08 B27 146.62
S4 13.97 S32 13.42 B2 39.44 B28 143.30
S5 12.52 S33 13.55 B3 36.96
S6 13.52 S34 13.89 B4 36.54
S7 13.25 S35 13.26 B5 36.60
S8 13.72 S36 13.02 B6 38.73
S9 13.30 S37 13.12 B7 37.71
S10 13.49 S38 13.39 B8 38.50
S11 12.94 S39 12.57 B9 151.25
S12 12.96 S40 13.84 B10 147.19
S13 13.90 S41 12.98 B11 144.24
S14 13.42 S42 13.15 B12 149.29
S15 13.28 S43 13.34 B13 143.4
S16 12.76 S44 13.97 B14 147.87
S17 13.94 S45 13.25 B15 146.69
S18 13.70 S46 12.92 B16 144.96
S19 13.53 S47 14.05 B17 145.26
S20 14.09 S48 12.64 B18 149.35
S21 13.15 S49 13.54 B19 146.47
S22 13.82 S50 13.00 B20 148.25
S23 13.43 S51 13.38 B21 144.19
S24 13.19 S52 13.03 B22 150.87
S25 12.62 S53 12.90 B23 147.5
S26 12.10 S54 13.40 B24 147.23
S27 13.08 S55 13.84 B25 148.45
S28 13.56 S56 12.92 B26 149.82
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Calibration of Moisture Container
(AH-02)
Date of Calibration : 10.06.2015 Due Date of Calibration : As Required
Weight of Weight of Weight of Weight of
Container Container Container Container
Container Container Container Container
No. No. No. No.
(gm) (gm) (gm) (gm)
Date Date
Calibration of Moisture Container
(AH-02)
Date of Calibration : 09.12.2015 Due Date of Calibration : As Required
Weight of Weight of Weight of Weight of
Container Container Container Container
Container Container Container Container
No. No. No. No.
(gm) (gm) (gm) (gm)
S1 13.23 S29 13.93 S57 12.49
S2 13.42 S30 13.13
S3 13.54 S31 13.42 B1 38.08 B27 146.62
S4 13.97 S32 13.42 B2 39.44 B28 143.30
S5 12.52 S33 13.55 B3 36.96
S6 13.52 S34 13.89 B4 36.54
S7 13.25 S35 13.26 B5 36.60
S8 13.72 S36 13.02 B6 38.73
S9 13.30 S37 13.12 B7 37.71
S10 13.49 S38 13.39 B8 38.50
S11 12.94 S39 12.57 B9 151.25
S12 12.96 S40 13.84 B10 147.19
S13 13.90 S41 12.98 B11 144.24
S14 13.42 S42 13.15 B12 149.29
S15 13.28 S43 13.34 B13 143.4
S16 12.76 S44 13.97 B14 147.87
S17 13.94 S45 13.25 B15 146.69
S18 13.70 S46 12.92 B16 144.96
S19 13.53 S47 14.05 B17 145.26
S20 14.09 S48 12.64 B18 149.35
S21 13.15 S49 13.54 B19 146.47
S22 13.82 S50 13.00 B20 148.25
S23 13.43 S51 13.38 B21 144.19
S24 13.19 S52 13.03 B22 150.87
S25 12.62 S53 12.90 B23 147.5
S26 12.10 S54 13.40 B24 147.23
S27 13.08 S55 13.84 B25 148.45
S28 13.56 S56 12.92 B26 149.82
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Calibration of Moisture Container
(AH-02)
Date of Calibration : 09.12.2015 Due Date of Calibration : As Required
Weight of Weight of Weight of Weight of
Container Container Container Container
Container Container Container Container
No. No. No. No.
(gm) (gm) (gm) (gm)
Date Date
Calibration of Moisture Container
(AH-02)
Date of Calibration : 18.06.2016 Due Date of Calibration : As Required
Weight of Weight of Weight of Weight of
Container Container Container Container
Container Container Container Container
No. No. No. No.
(gm) (gm) (gm) (gm)
S1 13.23 S29 13.93 S57 12.49
S2 13.42 S30 13.13
S3 13.54 S31 13.42 B1 38.08 B27 146.62
S4 13.97 S32 13.42 B2 39.44 B28 143.30
S5 12.52 S33 13.55 B3 36.96
S6 13.52 S34 13.89 B4 36.54
S7 13.25 S35 13.26 B5 36.60
S8 13.72 S36 13.02 B6 38.73
S9 13.30 S37 13.12 B7 37.71
S10 13.49 S38 13.39 B8 38.50
S11 12.94 S39 12.57 B9 151.25
S12 12.96 S40 13.84 B10 147.19
S13 13.90 S41 12.98 B11 144.24
S14 13.42 S42 13.15 B12 149.29
S15 13.28 S43 13.34 B13 143.4
S16 12.76 S44 13.97 B14 147.87
S17 13.94 S45 13.25 B15 146.69
S18 13.70 S46 12.92 B16 144.96
S19 13.53 S47 14.05 B17 145.26
S20 14.09 S48 12.64 B18 149.35
S21 13.15 S49 13.54 B19 146.47
S22 13.82 S50 13.00 B20 148.25
S23 13.43 S51 13.38 B21 144.19
S24 13.19 S52 13.03 B22 150.87
S25 12.62 S53 12.90 B23 147.5
S26 12.10 S54 13.40 B24 147.23
S27 13.08 S55 13.84 B25 148.45
S28 13.56 S56 12.92 B26 149.82
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Calibration of Moisture Container
(AH-02)
Date of Calibration : 18.06.2016 Due Date of Calibration : As Required
Weight of Weight of Weight of Weight of
Container Container Container Container
Container Container Container Container
No. No. No. No.
(gm) (gm) (gm) (gm)
Date Date
Calibration of Moisture Container
(AH-02)
Date of Calibration : 05.12.2016 Due Date of Calibration : As Required
Weight of Weight of Weight of Weight of
Container Container Container Container
Container Container Container Container
No. No. No. No.
(gm) (gm) (gm) (gm)
S1 13.23 S29 13.93 S57 12.49
S2 13.42 S30 13.13
S3 13.54 S31 13.42 B1 38.08 B27 146.62
S4 13.97 S32 13.42 B2 39.44 B28 143.30
S5 12.52 S33 13.55 B3 36.96
S6 13.52 S34 13.89 B4 36.54
S7 13.25 S35 13.26 B5 36.60
S8 13.72 S36 13.02 B6 38.73
S9 13.30 S37 13.12 B7 37.71
S10 13.49 S38 13.39 B8 38.50
S11 12.94 S39 12.57 B9 151.25
S12 12.96 S40 13.84 B10 147.19
S13 13.90 S41 12.98 B11 144.24
S14 13.42 S42 13.15 B12 149.29
S15 13.28 S43 13.34 B13 143.4
S16 12.76 S44 13.97 B14 147.87
S17 13.94 S45 13.25 B15 146.69
S18 13.70 S46 12.92 B16 144.96
S19 13.53 S47 14.05 B17 145.26
S20 14.09 S48 12.64 B18 149.35
S21 13.15 S49 13.54 B19 146.47
S22 13.82 S50 13.00 B20 148.25
S23 13.43 S51 13.38 B21 144.19
S24 13.19 S52 13.03 B22 150.87
S25 12.62 S53 12.90 B23 147.5
S26 12.10 S54 13.40 B24 147.23
S27 13.08 S55 13.84 B25 148.45
S28 13.56 S56 12.92 B26 149.82
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Calibration of Moisture Container
(AH-02)
Date of Calibration : 05.12.2016 Due Date of Calibration : As Required
Weight of Weight of Weight of Weight of
Container Container Container Container
Container Container Container Container
No. No. No. No.
(gm) (gm) (gm) (gm)
Date Date
CALIBRATION OF PROCTOR RAMMER
AH-02
Date of Calibration :- 11.06.15
Due Date of Calibration :- 10.12.15
WEIGHT OF RAMMER
S/NO. RAMMER NO.
(Kg)
1 1 4.874
2 2 4.861
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Date Date
CALIBRATION OF PROCTOR RAMMER
AH-02
Date of Calibration :- 10.12.2015
Due Date of Calibration :- 09.06.2016
WEIGHT OF RAMMER
S/NO. RAMMER NO.
(Kg)
1 1 4.874
2 2 4.861
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Date Date
CALIBRATION OF PROCTOR RAMMER
AH-02
Date of Calibration :- 10.06.2016
Due Date of Calibration :- 09.12.2016
WEIGHT OF RAMMER
S/NO. RAMMER NO.
(Kg)
1 1 4.874
2 2 4.861
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Date Date
CALIBRATION OF PROCTOR RAMMER
AH-02
Date of Calibration :- 05.12.2016
Due Date of Calibration :- 04.06.2017
WEIGHT OF RAMMER
S/NO. RAMMER NO.
(Kg)
1 1 4.874
2 2 4.861
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Date Date
CALIBRATION OF AGGREGATE IMPACT VALUE APPARATUS
(AH-02)
Date of Calibration :- 20.06.2015
Due date of Calibration :- 19.12.2015
Observed Mean Specified
Reading Value Value
1 2 3
Weight of
13.53 13.56 13.54 13.54 13.50 ~ 14.00
hammer ,Kg
Height of Fall (mm) 380 381 382 381 380 ±5
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Date Date
CALIBRATION OF AGGREGATE IMPACT VALUE APPARATUS
(AH-02)
Date of Calibration :- 19.12.2015
Due date of Calibration :- 18.06.2016
Observed Mean Specified
Reading Value Value
1 2 3
Weight of
13.53 13.56 13.54 13.54 13.50 ~ 14.00
hammer ,Kg
Height of Fall (mm) 380 381 382 381 380 ±5
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Date Date
CALIBRATION OF AGGREGATE IMPACT VALUE APPARATUS
(AH-02)
Date of Calibration :- 18.06.2016
Due date of Calibration :- 17.12.2016
Observed Mean Specified
Reading Value Value
1 2 3
Weight of
13.53 13.56 13.54 13.54 13.50 ~ 14.00
hammer ,Kg
Height of Fall (mm) 380 381 382 381 380 ±5
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Date Date
CALIBRATION OF AGGREGATE IMPACT VALUE APPARATUS
(AH-02)
Date of Calibration :- 05.12.2016
Due date of Calibration :- 04.06.2017
Observed Mean Specified
Reading Value Value
1 2 3
Weight of
13.53 13.56 13.54 13.54 13.50 ~ 14.00
hammer ,Kg
Height of Fall (mm) 380 381 382 381 380 ±5
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Date Date
CALIBRATION OF FLAKINESS GAUGE No. 01
(AH-02)
Date of Calibration :- 18.06.2015
Due date of calibration :- 17.12.2015
Opening Size (mm) Observed reading (mm) Limit Specified (mm)
63-50 33.80 33.9±0.1
50-40 27.00 27±0.1
40-31.5 21.60 21.5±0.1
31.5-25 16.90 16.95±0.1
25-20 13.60 13.5±0.1
20-16 10.80 10.8±0.1
16-12.5 8.60 8.55±0.1
12.5-10 6.80 6.75±0.1
10-6.3 4.90 4.89±0.1
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Date Date
CALIBRATION OF FLAKINESS GAUGE No. 01
(AH-02)
Date of Calibration :- 17.12.2015
Due date of calibration :- 16.06.2016
Opening Size (mm) Observed reading (mm) Limit Specified (mm)
63-50 33.80 33.9±0.1
50-40 27.00 27±0.1
40-31.5 21.60 21.5±0.1
31.5-25 16.90 16.95±0.1
25-20 13.60 13.5±0.1
20-16 10.80 10.8±0.1
16-12.5 8.60 8.55±0.1
12.5-10 6.80 6.75±0.1
10-6.3 4.90 4.89±0.1
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Date Date
CALIBRATION OF ELONGATION GAUGE No. 01
(AH-02)
Date of Calibration :- 18.06.2015
Due date of calibration :- 17.12.2015
Opening Size (mm) Observed reading (mm) Limit Specified (mm)
50-40 81 81
40-31.5 64.4 64.4
25-20 40.5 40.5
20-16 32.4 32.4
16-12.5 25.6 25.6
12.5-10 20.2 20.2
10-6.3 14.7 14.7
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Date Date
CALIBRATION OF ELONGATION GAUGE No. 01
(AH-02)
Date of Calibration :- 17.12.2015
Due date of calibration :- 16.06.2016
Opening Size (mm) Observed reading (mm) Limit Specified (mm)
50-40 81 81
40-31.5 64.4 64.4
25-20 40.5 40.5
20-16 32.4 32.4
16-12.5 25.6 25.6
12.5-10 20.2 20.2
10-6.3 14.7 14.7
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Date Date
CALIBRATION OF FLAKINESS GAUGE No. 02
(AH-02)
Date of Calibration :- 18.06.2015
Due date of calibration :- 17.12.2015
Opening Size (mm) Observed reading (mm) Limit Specified (mm)
63-50 33.90 33.9±0.1
50-40 27.00 27±0.1
40-31.5 21.50 21.5±0.1
31.5-25 16.94 16.95±0.1
25-20 13.60 13.5±0.1
20-16 10.80 10.8±0.1
16-12.5 8.56 8.55±0.1
12.5-10 6.80 6.75±0.1
10-6.3 4.90 4.89±0.1
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Date Date
CALIBRATION OF FLAKINESS GAUGE No. 02
(AH-02)
Date of Calibration :- 17.12.2015
Due date of calibration :- 16.06.2016
Opening Size (mm) Observed reading (mm) Limit Specified (mm)
63-50 33.80 33.9±0.1
50-40 27.00 27±0.1
40-31.5 21.60 21.5±0.1
31.5-25 16.92 16.95±0.1
25-20 13.60 13.5±0.1
20-16 10.81 10.8±0.1
16-12.5 8.62 8.55±0.1
12.5-10 6.80 6.75±0.1
10-6.3 4.89 4.89±0.1
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Date Date
CALIBRATION OF FLAKINESS GAUGE No. 02
(AH-02)
Date of Calibration :- 16.06.2016
Due date of calibration :- 15.12.2016
Opening Size (mm) Observed reading (mm) Limit Specified (mm)
63-50 33.80 33.9±0.1
50-40 27.00 27±0.1
40-31.5 21.60 21.5±0.1
31.5-25 16.92 16.95±0.1
25-20 13.60 13.5±0.1
20-16 10.81 10.8±0.1
16-12.5 8.62 8.55±0.1
12.5-10 6.80 6.75±0.1
10-6.3 4.89 4.89±0.1
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Date Date
CALIBRATION OF FLAKINESS GAUGE No. 02
(AH-02)
Date of Calibration :- 05.12.2016
Due date of calibration :- 04.06.2017
Opening Size (mm) Observed reading (mm) Limit Specified (mm)
63-50 33.80 33.9±0.1
50-40 27.00 27±0.1
40-31.5 21.60 21.5±0.1
31.5-25 16.92 16.95±0.1
25-20 13.60 13.5±0.1
20-16 10.81 10.8±0.1
16-12.5 8.62 8.55±0.1
12.5-10 6.80 6.75±0.1
10-6.3 4.89 4.89±0.1
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Date Date
CALIBRATION OF ELONGATION GAUGE No. 02
(AH-02)
Date of Calibration :- 18.06.2015
Due date of calibration :- 17.12.2015
Opening Size (mm) Observed reading (mm) Limit Specified (mm)
50-40 81 81
40-31.5 64.4 64.4
25-20 40.5 40.5
20-16 32.4 32.4
16-12.5 25.6 25.6
12.5-10 20.2 20.2
10-6.3 14.7 14.7
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Date Date
CALIBRATION OF ELONGATION GAUGE No. 02
(AH-02)
Date of Calibration :- 17.12.2015
Due date of calibration :- 16.06.2016
Opening Size (mm) Observed reading (mm) Limit Specified (mm)
50-40 81 81
40-31.5 64.4 64.4
25-20 40.5 40.5
20-16 32.4 32.4
16-12.5 25.6 25.6
12.5-10 20.2 20.2
10-6.3 14.7 14.7
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Date Date
CALIBRATION OF ELONGATION GAUGE No. 02
(AH-02)
Date of Calibration :- 16.06.2016
Due date of calibration :- 15.12.2016
Opening Size (mm) Observed reading (mm) Limit Specified (mm)
50-40 81 81
40-31.5 64.4 64.4
25-20 40.5 40.5
20-16 32.4 32.4
16-12.5 25.6 25.6
12.5-10 20.2 20.2
10-6.3 14.7 14.7
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Date Date
CALIBRATION OF ELONGATION GAUGE No. 02
(AH-02)
Date of Calibration :- 05.12.2016
Due date of calibration :- 04.06.2017
Opening Size (mm) Observed reading (mm) Limit Specified (mm)
50-40 81 81
40-31.5 64.4 64.4
25-20 40.5 40.5
20-16 32.4 32.4
16-12.5 25.6 25.6
12.5-10 20.2 20.2
10-6.3 14.7 14.7
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Date Date
CALIBRATION OF MEASURING JAR
(AH-02)
Date of Calibration :- 13.06.15
Due date of Calibration :- 12.12.15
S.No. Wt. of Water (gm) Reading in ml
100ml Capacity (Glass Jar)
D1 99.58 100
D2 99.67 100
D3 100.00 100
D4 100.00 100
D5 99.85 100
D6 99.98 100
D7 100.00 100
D8 99.87 100
100ml Capacity (Plastic Jar)
C1 99.98 100
C2 99.63 100
C3 99.73 100
C4 99.90 100
C5 9.85 100
C6 99.64 100
C7 100.00 100
C8 100.00 100
C9 101.00 100
C10 99.99 100
C11 99.89 100
C12 99.78 100
C13 99.66 100
C14 100.00 100
C15 100.00 100
C16 100.00 100
C17 99.88 100
C18 99.77 100
250ml (Glass Jar)
E1 249.89 250
E2 249.67 250
E3 249.85 250
CALIBRATION OF MEASURING JAR
(AH-02)
Date of Calibration :- 13.06.15
Due date of Calibration :- 12.12.15
S.No. Wt. of Water (gm) Reading in ml
500ml (Glass Jar)
F1 500.00 500
F2 499.59 500
F3 499.95 500
500ml (Plastic Jar)
B1 499.80 500
B2 499.97 500
1000ml (Plastic Jar)
A1 999.10 1000
A2 999.00 1000
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Date Date
CALIBRATION OF MEASURING JAR
(AH-02))
Date of Calibration :- 5.12.16
Due date of Calibration :- 06.06.17
S.No. Wt. of Water (gm) Reading in ml
100ml Capacity (Glass Jar)
D1 99.58 100
D2 99.88 100
D3 100.00 100
D4 100.00 100
D5 99.80 100
D6 99.98 100
D7 100.00 100
D8 99.87 100
100ml Capacity (Plastic Jar)
C1 99.98 100
C2 99.63 100
C3 99.73 100
C4 99.90 100
C5 9.85 100
C6 99.64 100
C7 100.00 100
C8 100.00 100
C9 101.00 100
C10 99.99 100
C11 99.89 100
C12 99.78 100
C13 99.66 100
C14 100.00 100
C15 99.98 100
C16 99.89 100
C17 99.69 100
C18 100.00 100
250ml (Glass Jar)
E1 249.89 250
E2 249.67 250
E3 249.85 250
CALIBRATION OF MEASURING JAR
(AH-02))
Date of Calibration :- 5.12.16
Due date of Calibration :- 06.06.17
S.No. Wt. of Water (gm) Reading in ml
500ml (Glass Jar)
F1 500.00 500
F2 499.59 500
F3 499.95 500
500ml (Plastic Jar)
B1 499.80 500
B2 499.97 500
1000ml (Plastic Jar)
A1 999.54 1000
A2 999.58 1000
Tested by Checked/Reviewed by
For Contractor For Authority Engineer
Name Name
Designation Designation
Date Date
Sand Pouring Cylinder
Due date First FDD
First FDD Date of First FDD Date of
Date of Due date of Date of Due date of of Due date of tested
Cyl no tested Cyl no Calibratio tested Cyl no Calibratio Cyl no
Calibration Calibration Calibration Calibration Calibratio Calibration 02.10.201
02.10.2015 n 02.10.2015 n
n 5
100 mm dia 150 mm dia 200 mm dia RMM
25.08.15 24.09.15 10/C-3 25.08.15 24.09.15 add date 10/B-2 25.08.15 24.09.15 10/A-1 25.08.15 24.11.15 add date E1 not in use
24.09.15 23.10.15 10/C-3 24.09.15 23.10.15 add report 10/B-2 24.09.15 23.10.15 add report 10/A-1 25.08.15 24.11.15 add date E2
31.10.15 30.11.15 10/C-3 31.10.15 30.11.15 change date 10/B-1 31.10.15 30.11.15 change date 10/A-1 24.11.15 23.02.16 add reportE1 not in use
30.11.15 29.12.15 10/C-3 30.11.15 29.12.15 add report 10/B-1 20.11.15 20.12.15 10/A-1 24.11.15 23.02.16 add reportE2
21.12.15 20.01.16 10/C-3 21.12.15 20.01.16 10/B-1 21.12.15 20.01.16 10/A-1 23.02.16 22.05.16 add reportE1 not in use
20.01.16 20.02.16 10/C-3 20.01.16 20.02.16 10/B-1 20.01.16 20.02.16 10/A-1 23.02.16 22.05.16 add reportE2
20.02.16 21.03.16 10/C-3 20.02.16 21.02.16 change date 10/B-1 20.02.16 21.03.16 10/A-1
21.03.16 20.04.16 10/C-3 21.03.16 20.04.16 10/B-1 21.03.16 20.04.16 10/A-1