0% found this document useful (0 votes)
9 views6 pages

Simulasi Training PPIC X SRZ - Inventory Management

Uploaded by

carlossimbiak01
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views6 pages

Simulasi Training PPIC X SRZ - Inventory Management

Uploaded by

carlossimbiak01
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Metode Fix Order Quantity

Qty UOM
Pemakaian Material (a) 500 Pcs/Hari
Lead time Pemesanan (b 3 Hari
Qty Order (c = a x b) 1,500 Pcs

Metode Economic Order Quantity

Teori:
DIKETAHUI
A 120,000 Pcs/Tahun
S 30 $ / Order
C 5 $ / Unit
i 10%

Praktis:
Average Material MOQ Discount
Material Description UOM
Usage/Bulan (1) (2)
Material A KG 10,000 130,000
Material B KG 3,000 4,000
Material C KG 300 50
Material D KG 300 50
Simulasi Kedatangan Material:
Opening Stock Incoming
Date (A = D (H-1)) (B)
1-Jun 1,500 5,000
2-Jun 5,000 0
3-Jun 3,500 0
4-Jun 2,000 5,000
5-Jun 5,500 0

PERHITUNGAN
2AS 7,200,000
iC 1
EOQ (Q) 3,795 UNIT
TC 1,897 $

Xday MOQ Discount Shelf Life Material


Notes
(3=2/1) (Bulan)
13.00 12 Qty pembelian mengikuti avg usage
1.33 12 Qty pembelian mengikuti MOQ Disc (Xday < Shelf Life)
0.17 12 Memenuhi MOQ Disc
0.17 12 Memenuhi MOQ Disc
Usage End Stock
(C) (D = (A+B)-C) UOM
1,500 5,000 PCS
1,500 3,500 PCS
1,500 2,000 PCS
1,500 5,500 PCS
1,500 4,000 PCS
Perhitungan Buffer Stock
Material Standard Difference (%)
UOM Actual Usage (2)
Description Usage (1) (3 = (2-1) x 100%
Material A KG/Day 100 110 10
Material B KG/Day 30 35 5
Material C KG/Day 10 11 1
Material D KG/Day 10 12 2

PERHITUNGAN SAFETY STOCK


Teori:
Description Qty UOM
Service Level ( 99%
Safety Factor ( 2.33
Standar Devias 5 PCS/Hari
Leadtime peme 30 Hari
Safety Stock (S 64 PCS

Praktis:

Avg. Planning 3 Leadtime


Movemen
Varian / SKU Material UOM Bulan Terakhir Pemesanan (Bulan)
t Category
(1) (2)

Produk 1 Material A Fast Moving PCS 100 1


Produk 2 Material B Medium Moving PCS 30 2
Produk 3 Material C Slow Moving PCS 10 2

INVENTORY CONTROL
Kedatangan Pemakaian/Hari
Material Stock Awal
Date UOM (Incoming) (Usage)
Description (1 = 4 (H-1))
(2) (3)
1-Apr Material A KG 100 1,000 100
2-Apr Material A KG 1,000 0 100
3-Apr Material A KG 900 0 100
4-Apr Material A KG 800 0 100
Faktor
Safety Stock Qty Safety
Penyesuaian (X
(Bulan) Stock (PCS)
LT)
(4 = 2 x 3) (5 = 1 x 4)
(3)
1 1 100
1.5 3 90
2 4 40

Stock Akhir Xday/Hari Shelf Life


Note
(4 = (1+2) - 3) (5 = 4 / 3 ) (Hari)

1,000 10 360 Aman (Xday < Shelf Life)


900 9 360 Aman (Xday < Shelf Life)
800 8 360 Aman (Xday < Shelf Life)
700 7 360 Aman (Xday < Shelf Life)
Stock Akhir Kapasitas Gudang Note
#REF! 7,000 #REF!
#REF! 7,000 #REF!
#REF! 7,000 #REF!
#REF! 7,000 #REF!
#REF! 7,000 #REF!
#REF! 7,000 #REF!

Shelf Life
Note
(Bulan)
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509

You might also like