Project id of student chapter heading
[SUMMER INTERNSHIP PROJECT]
A PROJECT REPORT
Submitted by
[Kishan Dhanani]
[220130106006]
In partial fulfillment for the award of the degree of
BACHELOR OF ENGINEERING
in
[Civil Engineering]
[Government Engineering College Gandhinagar]
Gujarat Technological University, Ahmedabad
[July, 2025]
Gujarat Technological University 2 GEC Gandhinagar
Project id of student chapter heading
[Name of the Institute]
Institute Address
CERTIFICATE
This is to certify that the project report submitted along with the project entitled
<Internship / Project Title> has been carried out by Kishan Dhanani under my
guidance in partial fulfillment for the degree of Bachelor of Engineering in Civil
Engineering, 7th Semester of Gujarat Technological University, Ahmadabad during the
academic year 2025-26.
<Sign> <Sign>
<Name of Internal Guide> <Name of Head of the Department>
Internal Guide Head of the Department
Gujarat Technological University 2 GEC Gandhinagar
Project id of student chapter heading
[Industry Letter Head]
Date: DD/MM/YYYY
TO WHOM IT MAY CONCERN
This is to certify that <Kishan Dhanani>, a student of <Institute Name> has successfully
completed his/her internship in the field of <Internship Area / Field> from <Start Date>
to <End Date> (Total number of Weeks: 02) under the guidance of <Industry Mentor>.
His internship activities include <Internship Activities>.
During the period of her/ his internship program with us, he / she had been exposed to
different processes and was found diligent, hardworking and inquisitive.
We wish him every success in his life and career.
For <Industry Name>
Authorised Signature with Industry Stamp
Gujarat Technological University 2 GEC Gandhinagar
Project id of student chapter heading
[Name of the Institute]
Institute Address
DECLARATION
We hereby declare that the Internship / Project report submitted along with the Internship
/ Project entitled <Internship / Project Title> submitted in partial fulfillment for the
degree of Bachelor of Engineering in <Name of the Branch> to Gujarat Technological
University, Ahmedabad, is a bonafide record of original project work carried out by me /
us at <Industry / Institute Name> under the supervision of <External / Internal Guide
Name> and that no part of this report has been directly copied from any students’ reports
or taken from any other source, without providing due reference.
Name of the Student Sign of Student
1 ___________________________________ __________________
2 ___________________________________ __________________
Table of Contents
Gujarat Technological University 2 GEC Gandhinagar
Project id of student chapter heading
Acknowledgement .............................................................................................................................i
Project details .................................................................................................................................. ii
List of Figures ................................................................................................................................ iii
List of Tables ...................................................................................................................................iv
Chapter 1 Introduction .................................................................................................................. 1
1.1 Types of buildings .................................................................................................................. 2
1.2 Safety induction ...................................................................................................................... 4
1.3 Site location ............................................................................................................................ 5
1.4 Form work .............................................................................................................................. 6
Chapter 2 Construction steps of building .................................................................................... 8
2.1 Site clearance ........................................................................................................................ 22
2.2 Surveying and layout ............................................................................................................ 22
2.3 Excavation ............................................................................................................................ 22
2.4 Foundation ............................................................................................................................ 22
2.5 Concreting ............................................................................................................................ 02
2.6 Wall construction.................................................................................................................. 20
2.7 Beams & columns construction ............................................................................................ 20
2.8 Slab construction .................................................................................................................... 9
Chapter 3 Materials& equipment's ............................................................................................ 10
3.1 Materials used at site ............................................................................................................ 14
3.2 Equipment's used .................................................................................................................. 16
Chapter 4 Quality control ............................................................................................................ 10
4.1 Quality control in concrete works ........................................................................................ 89
4.2 Quality control in reinforcement .......................................................................................... 11
Chapter 5 Contribution ............................................................................................................... 11
5.1 Reinforcement and casting of slab ....................................................................................... 11
5.2 Construction of retaining wall .............................................................................................. 22
Gujarat Technological University 2 GEC Gandhinagar
Project id of student chapter heading
5.3 Construction of shear wall .................................................................................................... 21
5.4 Tremix flooring .................................................................................................................... 12
5.5 Column reinforcement & concreting .................................................................................... 12
References ..................................................................................................................................... 40
Appendix ....................................................................................................................................... 42
List of Figures
Gujarat Technological University 2 GEC Gandhinagar
Project id of student chapter heading
Fig 1.1 Use case / Procedure Diagram...............................................................................02
Fig 1.2 Activity / Process Diagram....................................................................................05
Fig 2.1 Use case / Procedure Diagram...............................................................................12
Fig 2.2 Activity / Process Diagram....................................................................................15
Fig 2.3 Use case / Procedure Diagram...............................................................................22
Fig 2.4 Activity / Process Diagram....................................................................................25
Fig 3.1 Use case / Procedure Diagram...............................................................................32
Fig 4.1 Activity / Process Diagram....................................................................................35
Fig 4.2 Use case / Procedure Diagram...............................................................................42
Fig 4.3 Activity / Process Diagram....................................................................................43
List of Tables
Gujarat Technological University 2 GEC Gandhinagar
Project id of student chapter heading
Table 1.1 Popular Methods / Techniques...........................................................................02
Table 1.2 User / Reading / Observation Table...................................................................05
Table 2.1 Popular Methods / Techniques...........................................................................12
Table 2.2 User / Reading / Observation Table...................................................................15
Table 2.3 Popular Methods / Techniques...........................................................................22
Table 2.4 User / Reading / Observation Table...................................................................25
Table 3.1 Popular Methods / Techniques...........................................................................32
Table 4.1 User / Reading / Observation Table...................................................................35
Table 4.2 Popular Methods / Techniques...........................................................................42
Table 4.3 User / Reading / Observation Table...................................................................43
Gujarat Technological University 2 GEC Gandhinagar