RECORD OF MOORING ROPE INSPECTION - SIAM LUCKY MARINE
SHIP’S NAME : DATE : FORM NO : SEHQ/TEC-24
LENGTH BREAKING IN SERVICE *CONDITION DATE OF TAILS
NO. LOCATION MATERIAL CERT NO. DIA (MM)
(M) LOAD SINCE REPLACED
1) 2) 3) 4)
1 FORWARD
2 FORWARD
3 FORWARD
4 FORWARD
5 FWD SPING
6 FWD SPING
7 AFT
8 AFT
9 AFT
10 AFT
11 AFT SPRING
12 AFT SPRING
13 SPARE
14 SPARE
The left figureCondition
*CAUTION: may be changed to fit
of mooring for ship’s
ropes to be
All Mooring Ropes to be
7 1 5
9 NO. 3 NO. 2 NO. 1 3 1 evaluated on the basis of criteria
AFT CGO TANK FWD Plan Maintenance procedures
CGO TANK CGO TANK
1 4 2 Working Instruction
8 1 6
Apply << Mooring Ropes and its tails to be Inspected every 3 months /// Tails should be replaced at least every 18 months
1) Very Good Condition
2) Good Condition
3) Fair Condition
4) Poor Condition as retire (New mooring rope to be requested by submission Purchase Order to operators within one month or as fast as possible)
Chief Officer Master