0% found this document useful (0 votes)
78 views10 pages

7th Pay Commission Arrears Manual

The document is a user manual for the Pension 7th Pay Commission Arrears Configuration, detailing the steps for calculating pension arrears from January 1, 2016, to December 31, 2018. It includes instructions for auditors on how to log in, configure arrears, generate reports, and print them. The manual emphasizes the confidentiality and proprietary nature of the information contained within.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
78 views10 pages

7th Pay Commission Arrears Manual

The document is a user manual for the Pension 7th Pay Commission Arrears Configuration, detailing the steps for calculating pension arrears from January 1, 2016, to December 31, 2018. It includes instructions for auditors on how to log in, configure arrears, generate reports, and print them. The manual emphasizes the confidentiality and proprietary nature of the information contained within.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

DAT: User Manual for 7th Pay Arrears Configuration

User Manual Document

For

Pension 7Th Pay Commission Arrears Configuration

Directorate of Accounts and Treasuries (DAT)


Finance Department

Ver.1.0

Prepared By

DAT Development Team (MahaIT)


User Manual for Revision of 6Th Pay Commission to 7Th Pay
Document Name: Commission

Version Number: Ver.1.0


Release Date:
Author Name: Sangram Kamble.
Approval Name:
Owner of the document: Directorate of Accounts and Treasuries (DAT), Mantralaya

Document History and Version Control Table


Version Action Approval Authority Action Date
Writing of the User Manual for
V 1.0 Pension 7th Pay Arrears Project Manager
Configuration.

©DAT Version 1.0 @MahaIT Corporation

Directorate of Accounts and Treasuries (DAT), Mantralaya


DAT: User Manual for 7th Pay Arrears Configuration

Confidentiality
This document contains confidential information, which is provided for the sole purpose of permitting the
recipient to evaluate the proposal submitted herewith. In consideration of receipt of this document, the
recipient agrees to maintain such information in confidence and to not reproduce or otherwise disclose
this information to any person outside the group or the evaluation committee directly responsible for
evaluation of its contents, except that there is no obligation to maintain the confidentiality of any
information which was known to the recipient prior to receipt of such information from Directorate of
Accounts and Treasuries (DAT), or becomes publicly known through no fault of recipient, from DAT, or is
received without obligation of confidentiality from a third party owing no obligation of confidentiality to
DAT.

Security
The information contained herein is proprietary to DAT and may not be used, reproduced or disclosed to
others except as specifically permitted in writing by DAT. The recipient of this document, by its retention
and use, agrees to protect the same and the information contained therein from loss or theft.

©DAT Version 1.0 @MahaIT Corporation

Directorate of Accounts and Treasuries (DAT), Mantralaya


DAT: User Manual for 7th Pay Arrears Configuration

1. INTRODUCTION

7th PC Arrears utility is used to calculate the arrears amount of the pensioners whose
configuration was already done this arrears amount calculation for the period 01st Jan
2016 to 31st Dec 2018.

Below mentioned steps have to be follow for utilize the 7th PC Arrears Calculation.

 Step 1: 7th PC Arrears calculation configuration through Auditor login.

 Auditor Login: Please login through respective Auditor Login from below
mentioned path.

Current Path: Work List > Pension Payment > Admin Utilities > 7th Pc Arrear
Configuration.

Case 1: Bank Branch wise - Choose Bank, Branch and Click the Configuration Button
for Configuration and wait for Configuration status alert.

Note: Every bank branch will be generate slotwise 50 PPO’s Arrear


configuration allowed (i.e if 200 ppo is present each auditor then 50,50,50,50)

Fig No.1.

©DAT Version 1.0 @MahaIT Corporation

Directorate of Accounts and Treasuries (DAT), Mantralaya


DAT: User Manual for 7th Pay Arrears Configuration

Case 2 : After configuration massage will be display like “Arrears


configuration successfully 50 PPO out of 115”

Please refer screen shot.

©DAT Version 1.0 @MahaIT Corporation

Directorate of Accounts and Treasuries (DAT), Mantralaya


DAT: User Manual for 7th Pay Arrears Configuration

Case 3: Report will be displayed on clicking all the Total configured PPO, Seven
pay arrears configuration & remaining PPO No in same screen. User can export
data into .PDF & .xls format.

©DAT Version 1.0 @MahaIT Corporation

Directorate of Accounts and Treasuries (DAT), Mantralaya


DAT: User Manual for 7th Pay Arrears Configuration

Case 4: PPO Wise

Enter the PPO in text box and Click the Config Button for Configuration and
wait for Configuration status alert.

©DAT Version 1.0 @MahaIT Corporation

Directorate of Accounts and Treasuries (DAT), Mantralaya


DAT: User Manual for 7th Pay Arrears Configuration

For checking effect arrear amount, open ppo and go to payment details tab
and check below highlighted text field.

(Note: Showing amount in PPO is Arrears Calculate 1st Installment)

©DAT Version 1.0 @MahaIT Corporation

Directorate of Accounts and Treasuries (DAT), Mantralaya


DAT: User Manual for 7th Pay Arrears Configuration

Step 2: 7th PC Arrears Calculation report by Auditor

Auditor Login: Please login through respective Auditor Login from below mentioned
path.

Current Path : Pension Report > Pension Payment > Other Report > Seventh Pay
Arrear Statement.

To check 36 months entry from 1-1-2016 to 31-01-2018,go to above showing


path.

Step 3: Select the bank & branch Or enter PPO no which is already configured through
utility and click Arrear report button.

Note: User please note that the PPO where configured by Auditor login only
those PPO will be generate there reports (i.e On select Auditor Configured
button)

Please Refer below screen.

©DAT Version 1.0 @MahaIT Corporation

Directorate of Accounts and Treasuries (DAT), Mantralaya


DAT: User Manual for 7th Pay Arrears Configuration

Step 4: Report will be generate as below screen.

Step 5: If we wish to print the generated report then click PrintD button.

Please refer below screen shot for same.

©DAT Version 1.0 @MahaIT Corporation

Directorate of Accounts and Treasuries (DAT), Mantralaya


DAT: User Manual for 7th Pay Arrears Configuration

Thank you
Directorate of Accounts and Treasuries (DAT)
Finance Department

10

©DAT Version 1.0 @MahaIT Corporation

Directorate of Accounts and Treasuries (DAT), Mantralaya

You might also like