Grid-Connected PV Inverter User Manual

The document is a user manual for the SUN-��K-G�� grid-connected PV inverter, detailing its installation, operation, and maintenance. It includes safety warnings, product specifications, and guidelines for electrical connections and startup procedures. The manual emphasizes the importance of following safety instructions to prevent electric shock and ensure proper functioning of the inverter.

Uploaded by

solarsmart.win
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
154 views62 pages

Grid-Connected PV Inverter User Manual

The document is a user manual for the SUN-��K-G�� grid-connected PV inverter, detailing its installation, operation, and maintenance. It includes safety warnings, product specifications, and guidelines for electrical connections and startup procedures. The manual emphasizes the importance of following safety instructions to prevent electric shock and ensure proper functioning of the inverter.

Uploaded by

solarsmart.win
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

R

Grid-connected PV Inverter
SUN-��K-G�� SUN-��K-G��
SUN-��K-G�� SUN-��K-G��
SUN-��K-G��

User Manual
Contents
�. Introduction ���������������������� - 1 -
1.1 Appearance Introduction �������������������� - 1 -
1.2 Labels description ������������������������ - 2 -
1.3 Parts list ������������������������ - 2 -
1.4 Product handling requirements ������������������ - 3 -

�. Safety warnings and instructions ��������������� - 4 -


2.1 Safety signs ������������������� - 4 -
2.2 Safety instructions ������������������� - 4 -
2.3 Notes for using �������������������� - 5 -
�. Operation Interface ������������������ - 5 -

3.1 Interface View ���������������������� - 5 -


3.2 Status Indicator ��������������������� - 6 -
3.3 Buttons ����������������� - 6 -
3.4 LCD Display ������������������ - 6 -

�. Product installation ����������������������� - 6 -


4.1 Select installation location ������������������� - 6 -
4.2 Installations Tools ������������������� - 9 -
4.3 Inverter Installation ������������������� - 9 -
�. Electrical Connection ��������������������� - 11 -

5.1 PV Module Selection ������������������ - 11 -

5.2 DC input terminal connection ������������������ - 11 -


5.3 AC input terminal connection ������������������ - 13 -
5.4 The connection of the ground line ���������������� - 15 -
5.5 Max. over current protection device ��������������� - 16 -
5.6 Inverter monitoring connection ���������������� - 16 -
5.7 Installation of datalogger �������������������� - 17 -
5.8 Configuration of datalogger��������������������� - 17 -

�. Startup and Shutdown �������������������� - 17 -

6.1 Start up the inverter ������������������� - 18 -


6.2 Inverter Shutdown ���������������������� - 18 -
�. Zero-export function via energy meter ����������� - 19 -

7.1 Multiple strings and parallel connection meters ����������� - 28 -

7.2 Use of zero-export function ������������������ - 38 -

7.3 Notes while using zero export function ������������ - 39 -

7.4 How to browse the load power of your PV grid-tieplant on monitoring platform? - 39 -
�. General Operation ����������������� - 41 -

8.1 The initial interface ����������������� - 44 -

8.2 Submenus in the Main Menu ������������������ - 45 -

8.3 System param setting ������������������ - 47 -


8.4 Protect Param setting �������������������� - 48 -

8.5 Comm. param setting �������������������� - 50 -

�. Repair and Maintenance ������������������ - 51 -


��. Error information and processing��������������� - 51 -
10.1 Error code ���������������������� - 52 -
��. Specification ������������������������ - 56 -

��. EU Declaration of Conformity �������������� - 57 -


About This Manual
The manual mainly describes the product information, guidelines for installation, operation and
maintenance. The manual cannot include complete information about the photovoltaic (PV) system.

How to Use This Manual


Read the manual and other related documents before performing any operation on the inverter.
Documents must be stored carefully and be available at all times. Contents may be periodically
updated or revised due to product development. The information in this manual is subject
to change without [Link] latest manual can be acquired via service@[Link]

Photovoltaic Grid-connected System

PV array Inverter Metering Power grid

Family load
Application of inverter in photovoltaic power system

�. Introduction
�.� Appearance Introduction
On-grid Inverter can convert solar panel DC power into AC power which can directly input to
the grid. Its appearance is shown [Link] models contain SUN-18K-G05, SUN-20K-G05,
SUN-22K-G05, SUN-23K-G05, SUN-25K-G05.
The following is collectively referred to as “inverter”.

Pic 1.1 Front view Pic 1.2 Bottom view

- 01 -
�.� Labels description

Label Description

Caution, risk of electric shock symbol indicates important safety


instructions, which if not correctly followed, could result in electric shock.

The DC input terminals of the inverter must not be grounded.

CE mark of conformity

Please read the instructions carefully before use.

Symbol for the marking of electrical and electronics devices according to


Directive 2002/96/EC. Indicates that the device, accessories and the
packaging must not be disposed as unsorted municipal waste and must be
collected separately at the end of the usage. Please follow Local Ordinances
or Regulations for disposal or contact an authorized representative of the
manufacturer for information concerning the decommissioning of
equipment.

�.� Parts list

Please check the following table, to see whether all the parts are included in the package:

Mounting stainless steel


Grid-tied PV String Inverter Wall mounting bracket x1 screws M4×12
x1 x5

User
manual

DC+/DC- Plug connectors Stainless steel anti-collision


including metal terminal bolt M6×60 User manual x1
xN x4

- 02 -
Sensor Clamp(optional) Meter(optional) HJA4 Core Wire Female
x3 x1 Connector - Screw Crimp x1

Solar Photovoltaic
Wrench x 1 Connector Special
Spanner x1 Datalogger (optional) x1

�.� Product handling requirements


Lift the inverter out of the packaging box and transport it to the designated installation location.

transport

CAUTION:
Improper handling may cause personal injury!
• Arrange an appropriate number of personnel to carry the inverter according to
its weight, and installation personnel should wear protective equipment such
as anti-impact shoes and gloves.
• Placing the inverter directly on a hard ground may cause damage to its metal
enclosure. Protective materials such as sponge pad or foam cushion should be
placed underneath the inverter.
• Move the inverter by one or two people or by using a proper transport tool.
• Move the inverter by holding the handles on it. Do not move the inverter by
holding the terminals.

- 03 -
�. Safety warnings and instructions
Improper use may result in potential electric shock hazards or burns. This manual contains
important instructions that should be followed during installation and maintenance. Please
read these instructions carefully before use and keep them for future reference.
�.� Safety signs
Safety symbols used in this manual, which highlight potential safety risks and important
safety information, are listed as follows:

Warning:
Warning symbol indicates important safety instructions, which if not correctly
followed, could result in serious injury or death.

Shock Hazard:
Caution, risk of electric shock symbol indicates important safety instructions,
which if not correctly followed, could result in electric shock.
Safety Hint:
Note symbol indicates important safety instructions, which if not correctly
followed, could result in some damage or the destruction of the inverter.
High Temperature Hazard:
Caution, hot surface symbol indicates safety instructions, which if not correctly
followed, could result in burns.

�.� Safety instructions

Warning:
Electrical installation of the inverter must conform to the safety operation rules
of the country or local area.

Warning:
Inverter adopts non-isolated topology structure, hence must insure DC input and
AC output are electrical isolated before operating the inverter.

Shock Hazard:
Prohibit disassembling inverter case, there existing shock hazard, which may
cause serious injury or death, please ask qualified person to repair.

Shock Hazard:
When PV module is exposed to sunlight, the output will generate DC voltage.
Prohibit touching to avoid shock hazard.

Shock Hazard:
While disconnect the input and output of the inverter for maintenance,
please waits for at least 5 mins until the inverter discharge the remnant
electricity.
High Temperature Hazard:
Local temperature of inverter may exceed 80℃ while under operating.
Please do not touch the inverter case.

- 04 -
�.� Notes for using
The single phase string power inverter is designed and tested under related safety regula-
tions. It can ensure the personal safety of the user. But as a electric device, it may cause
shock or injury by incorrect operation. Please operate the unit under below requirements:
1. Inverter should be installed and maintained by qualified person under local standard
regulations.
2. Must disconnect the AC side first, then disconnect DC side while doing installation and
maintenance, after that, please wait at least 5 mins to avoid getting shocked.
3. Local temperature of the inverter may exceed 80 ℃ while under [Link] not touch
to avoid getting injured.
4. All electrical installation must be in accord with local electrical standards, and after
obtaining the permission of the local power supply department, the professionals can
connect the inverter to the grid.
5. Please take appropriate anti-static measure.
6. Please install where children can not touch.
7. The steps to start the inverter:1) switch on the AC side circuit breaker, 2) Switch on the DC
side circuit breaker of the PV panel. 3) Turn on the DC switch of the inverter.
The steps to stop the inverter:1) switch off the AC side circuit breaker, 2) switch off the DC side
circuit breaker of the PV panel. 3) Turn off the DC switch of the inverter.
8. Don’t insert or remove AC and DC terminals when the inverter is in normal operation.
9. The DC input voltage of the inverter must not exceed the maximum value of the model.

�. Operation Interface

�.� Interface View

DC AC Normal Alarm

Pic 3.1 Front panel display

- 05 -
�.� Status Indicator
There are four LED status indicator lights in the front panel of the inverter. Please see table 3.1
for details.

Indicator status Explanation


on Inverter detects DC input
off

Low DC input voltage
on Grid Connected
off

Grid Unavailable
on Under normal operating
off

Stop operating
on Detected faults or report faults
off

Under normal operating

Table 3.1 Status indicator lights


�.� Buttons
There are four keys in the front panel of the Inverter(from left to right): Esc, Up, Down and
Enter keys. The keypad is used for:

● Scrolling through the displayed options (the Up and Down keys);


● Access to modify the adjustable settings (the Esc and Enter keys).

Esc Up Down Enter

�.� LCD Display


The two-line Liquid Crystal Display (LCD) is located on the front panel of the Inverter, which
shows the following information:
● Inverter operation status and data;
● Service messages for operator;
● Alarm messages and fault indications.

�. Product installation
4.1 Select installa�on loca�on
To select a location for the inverter, the following criteria should be considered:

WARNING: Risk of fire


● Do not install the inverter in areas containing highly flammable materials or gases.
● Do not install the inverter in potentially explosive atmospheres.
● Do not install in small closed spaces where air can not circulate freely. To avoid overheating,
always make sure the flow of air around the inverter is not blocked.

- 06 -
● Exposure to direct sunlight will increase the operational temperature of the inverter and
may cause output power limiting. It is recommended that inverter installed to avoid direct
sunlight or raining.
● To avoid overheating ambient air temperature must be considered when choosing the
inverter installation location. It is recommended that using a sun shade minimizing direct
sunlight when the ambient air temperature around the unit exceeds 104°F/40℃.

Pic 4.1 Recommended installation place

● Install on a wall or strong structure capable of bearing the weight.


● Install vertically with a maximum incline of +15°. If the mounted inverter is tilted to an angle
greater than the maximum noted, heat dissipation can be inhibited, and may result in less
than expected output power.
● If install more than one inverter, must leave at least 500mm gap between each inverter. And
two adjacent inverters are also separated by at least 500 mm. And must install the inverter at
the place where children cannot touch. Please see picture 4.3.
● Consider whether the installation environment is helpful to see the inverter LCD display and
indicator status clearly.
● Must offer a ventilate environment if inverter installed in the airtight house.

Safety Hint:
Do not place or store any items next to the inverter.

- 07 -
1 5

Pic 4.2 Installation Angle

≥500mm

≥500mm

Pic 4.3 Installation Gap

- 08 -
�.� Installations Tools
Installation tools can refer to the following recommended ones. Also, use other auxiliary tools
on site.

table 4-1 Tool specification

Protective goggles Earplugs Anti-dust mask Work gloves Work shoes Utlity Knife Slotted screwdriver

Cross screwdriver Percussion drill Pliers Marker Level Rubber hammer socket wrenches set

Anti-static wrist strap Wire cutter Wire stripper Hydraulic pliers Heat gun Crimping tool4-6mm² Solar connector
wrench

Multimeter ≥1100 Vdc RJ45 crimping plier Cleaner

�.� Inverter Installation


The inverter is designed according to the wall mounted type installation, please use the wall
mounted (the brick wall of the expansion bolt) when installing.

Anchoring

Mounting bracket

Stainless steel screws

Inverter

Pic 4.4 Inverter Installation

- 09 -
Procedure shows below:
1. Locate on the appropriate wall according to the bolt position on the mounting bracket, then
mark the [Link] the brick wall, the installation must be suitable for the expansion bolt
installation.

Pic 4.5 Inverter hanging plate installation

2. Ensure that the position of the installation holes on the wall is in accordance with the
mounting plate, and the mounting rack is vertically placed.
3. Hang the inverter to the top of the mounting rack and then use the M4 screw in the
accessory to lock inverter heat sink to the hanging plate, to ensure that the inverter will not
move.

Pic 4.6 Inverter installation

- 10 -
5 Electrical Connec�on
�.� PV Module Selection:
When selecting proper PV modules, please be sure to consider below parameters:
1) Open circuit Voltage (Voc) of PV modules not exceeds max. PV array open circuit voltage of
inverter.
2) Open circuit Voltage (Voc) of PV modules should be higher than min. start voltage.
3) The PV modules used to connected to this inverter shall be Class A rating certified according
to lEC 61730.

Inverter Model SUN-��K-G�� SUN-��K-G�� SUN-��K-G�� SUN-��K-G�� SUN-��K-G��

PV Input Voltage 600V (250V~1100V)

PV Array MPPT Voltage Range 200V~1000V

No. of MPP Trackers 2

No. of Strings per MPP Tracker 2+2

�.� DC input terminal connection


1. Switch the Grid Supply Main Switch(AC)OFF.
2. Switch the DC lsolator OFF.
3. Assemble PV input connector to the inverter.

Warning:
When using PV modules, please ensure the PV+ & PV- of solar panel is not
connected to the system ground bar.
Safety Hint:
Before connection, please make sure the polarity of the output voltage of PV
array matches the “DC+” and “DC-” symbols.
Warning:
Before connecting inverter, please make sure the PV array open circuit voltage is
within the 1100V of the inverter.

Pic 5.1 DC+ male connector Pic 5.2 DC- female connector

- 11 -
Safety Hint:
Please use approved DC cable for PV system.

Cross section(mm )
Cable type
Range Recommended value
Industry generic PV cable 2.5-4.0
2.5(12AWG)
(model: PV1-F) (12-10AWG)

Table 5.1 DC Cable Specifications


The steps to assemble the DC connectors are listed as follows:
a) Strip off the DC wire about 7mm, disassemble the connector cap nut (see picture 5.3).

7mm

7mm

Pic 5.3 Disassemble the connector cap nut

b) Crimping metal terminals with crimping pliers as shown in picture 5.4.

Pic 5.4 Crimp the contact pin to the wire

c) Insert the contact pin to the top part of the connector and screw up the cap nut to the top
part of the connector. (as shown in picture 5.5).

Pic 5.5 connector with cap nut screwed on

- 12 -
d) Finally insert the DC connector into the positive and negative input of the inverter,shown as
picture 5.6.

Pic 5.6 DC input connection

Warning:
Sunlight shines on the panel will generate voltage, high voltage in series may
cause danger to life. Therefore, before connecting the DC input line, the solar
panel needs to be blocked by the opaque material and the DC switch should
be 'OFF', otherwise, the high voltage of the inverter may lead to life-
threatening conditions.

Warning:
Please use its own DC power connector from the inverter accessories. Do not
interconnect the connectors of different manufacturers. Max. DC input current
should be 20A. if exceeds, it may damage the inverter and it is not covered by
Deye warranty.

�.� AC input terminal connection


Do not close the DC switch after the DC terminal is [Link] the AC terminal to the
AC side of the inverter, the AC side is equipped with Three phase AC terminals that can be
conveniently connected. Flexible cords are recommended for easy installation. The are as
shown in Table 5.2.

Warning:
Prohibit using a single circuit breaker for multiple inverters, prohibit the
connection of load between inverter circuit breakers.

Model Cable CSA Cable outer dia AWG Breaker Max cable length

SUN-18K-G05 4mm 4-10mm 10 40A/400V


Outside cable
SUN-20/22/23K-G05 6mm 4-10mm 8 40A/400V (3L+N+PE)20m
SUN-25K-G05 10mm 4-10mm 6 60A/400V

Table 5.2 Cable information

- 13 -
Pic 5.7 AC input connection

Warning:
Be sure that AC power source is disconnected before attempting to wire it to the
unit.

1. Before making Grid port connection, be sure to turn off AC baeaker or disconnector first.
2. Remove insulation sleeve 10mm length, unscrew the bolts, insert the wires according to
polarities indicated on the terminal block and tighten the terminal screws. Make sure the
connection is complete.
3. Then, insert AC output wires according to polarities indicated on the terminal block and tighten
terminal. Be sure to connect corresponding N/L1/L2/L3 and PE wires to related terminals as well.
(as shown in picture 5.7).
4. Make sure the wires are securely connected.

- 14 -
�.� The connection of the ground line
Good grounding is good for resisting surge voltage shock and improving EMI [Link]-
fore, before connecting AC, DC and communication cables, you need to ground the cable firstly.
For a single system, just ground the PE cable. For multiple machine systems, all PE cables of the
inverter need to be connected to the same grounding copper platoon to ensure the equipoten-
tial connection. The installation of the shell ground wire is shown as picture 5.11. The external
protective earthing conductor is made of the same metal as the phase conductor.

Pic 5.11The installation of the shell ground wire

Model Wire Size Cable(mm�) Torque value(max)

SUN-18K-G05 10AWG 4mm2 8.5Nm

SUN-20/22/23K-G05 8AWG 6mm2 8.5Nm

SUN-25K-G05 6AWG 10mm2 12.4Nm

Warning:
Inverter has built-in leakage current detection circuit,The type A RCD can be
connected to the inverter for protection according to the local laws and regula-
[Link] an external leakage current protection device is connected, its operating
current must be equal to 300 mA or higher, otherwise inverter may not work
properly.

- 15 -
�.� Max. over current protection device
In order to protect the inverter AC connection, it is recommended to install a circuit breaker to
prevent overcurrent. See table 5.3 below.

Rated output Rated output Current for protection


Inverter
voltage(V) current(A) device(A)

SUN-18K-G05 220/230 27.3/26.1A 40


SUN-20K-G05 220/230 30.3/29A 40
SUN-22K-G05 220/230 33.4/31.9A 40
SUN-23K-G05 220/230 34.9/33.4A 40
SUN-25K-G05 220/230 37.9/36.2A 60

Table 5.3 Recommended current protector specifications

�.� Inverter monitoring connection


Inverter has the function of wireless remote monitoring. The inverter with Wi-Fi function is
equipped with Wi-Fi Plug to connect the inverter and network. Wi-Fi Plug's operation, installa-
tion, Internet access, APP downloading and other processes are detailed in the instructions.

Phone

GPRS

Router Web Server


WIFI

PC

Pic 5.12 Internet monitoring solution

- 16 -
�.� Installation of datalogger

When installing the WiFi stick, tear off the sealing strip on the inverter. Insert the datalogger
into the interface and fix it with a screw. The configuration of the datalogger needs to be
performed after various electrical connections have been completed and the inverter DC
power on. When the inverter is on the DC power, it is determined whether the datalogger is
normally electrified (The LED light shines out of the shell).

Pic 5.13 Datalogger installation diagram

�.� Configuration of datalogger

For the configuration of datalogger, please refer to illustrations of the datalogger.

�. Startup and Shutdown

Before starting the inverter, make sure that the inverter can meet the following conditions,
otherwise it may result in fire or damage to the inverter. In this case, we do not undertake
any responsibility. At the same time, to optimize the system configuration, it is recommended
that the two inputs be connected to the same number of photovoltaic modules.

a). The maximum open circuit voltage of each set of photovoltaic modules shall not exceed
1100Vdc under any conditions.

b). Each input of the inverter better use the same type of photovoltaic module in series.

c). Total output power of PV shall not exceed the maximum input power of inverter, each
photovoltaic modules shall not exceed the rated power of each channel.

- 17 -
�.� Start up the inverter

When starting up the three phase string inverter, should fellow steps below:

1. Starting switch on the AC breaker.

2. Turn on the DC switch of the photovoltaic module, and if the panel provides sufficient
starting voltage and power, the inverter will start.

3. The inverter will first check the internal parameters and the grid parameters, while the
liquid crystal will show that the inverter is self-checking.

4. If the parameter is within acceptable range, the inverter will generate energy.
NORMAL indicator light is on.

�.� Inverter Shutdown

Must follow below steps while shutting down the inverter:

1. Switch off the AC breaker.

2. Wait for 30 seconds, turn off the DC switch (if any), or simply disconnect the DC input
connector. The inverter will close the LCD and all LED within two minutes.

- 18 -
7. Zero-export func�on via energy meter
There're two kinds of energy meters for this series inverter. First type is Eastron SDM630-Mod-
bus V2 which is able to measure the Max. 100A current directly. More details please refer to Pic
7.1 & 7.2. For the Eastron SDM630 MCT 40mA, it needs external CT to measure the current. The
CT power range is from 5A-2000A. More details about the Eastron SDM630 MCT, please refer to
Pic 7.3 & 7.4. Also, the CHNT meter DTSU666 is supported, it can measure the Max. 80A current
directly. More details about the DTSU666, please refer to Pic 7.1 & 7.16.
When you are reading this, we believe that you have completed the connection according to
the requirements of chapter 5, if you have been running your inverter at this time, and you
want to use the zero-export function, please turn off AC and DC switch of the inverter, and
wait for 5 minutes until the inverter completely [Link] follow below Picture 7.1
to connect the energy meter.
For system wiring diagram, the red line refers to L line (L1, L2, L3), the black line refers to the
neutral line (N). Connecting energy meter RS485 cable to inverter's RS485 port. It's recommended
to install an AC switch between the inverter and the utility grid, the specs of the AC switch are
determined by the power of load.
If there is no integrated DC switch inside the inverter you purchased, we commend you to
connect the DC switch. The voltage and current of the switch depend on the PV array you access.

- 19 -
� � � � � � � �
L� N
L� L�
Eastron
L� L�
N L�
Gird Load
(�,�,�,�) (�,�,�,�)

B A G
� � � �
RS ���
RS485B RS485A GND

Eastron SDM630-Modbus V2
Pic 7.1 Eastron meter

Inverter
Solar Panel array

AC Breaker
RS 485
Male
connector L1 L2 L3 N

Family load
VCC_5V 485_B
N L3 L2 L1
RS 485
Female connector L1 L2 L3 N

GND 485_A
meter

L1 L2 L3 N
5 6 7 8

3 485_A L1 L2 L3 N
485_B
2

1 RS485 Communication
GND

Pic 7.2 Connection diagram of Eastron meter Grid

Warning:
In final installation, breaker certified according to IEC 60947-1 and IEC 60947-2 shall be installed
with the equipment.

- 20 -
� � � � � � � �
L� N
L� L�
Eastron
L� L�
N L�
Gird Load
(�,�,�,�) (�,�,�,�)

B A G
� � � �
RS ���
RS485B RS485A GND

Eastron SDM630-Modbus V2
Pic 7.3 Eastron meter

Inverter
Solar Panel array

AC Breaker
RS 485
Male
connector L1 L2 L3 N

Family load
VCC_5V 485_B
N L3 L2 L1
RS 485
Female connector L1 L2 L3 N

GND 485_A
meter

L1 L2 L3 N
5 6 7 8

3 485_A L1 L2 L3 N
485_B
2

1 RS485 Communication
GND

Generator

Pic 7.4 Connection diagram of Eastron meter

- 21 -
9 10 11 12 13 14 15 16 17 18 19 20

L1
P2 P1

3 P HA S E 4 W IR E
Eastron L2
P2 P1 S 2 S1

U/I
L3
P2 P1 S 2 S1

M S2 S1
N
P
1 2 3 4 5 6 15 16 17 18 19 20
E
Grid voltage Auxiliary Current inputs
sampling power supply

�� �� ��
1 2 3 4 5 6 7 8

RS ���
Eastron SDM630MCT RS���A RS���B GND
Pic 7.5 Eastron meter

Inverter
Solar Panel array

AC Breaker

RS 485

N L3 L2 L1
Male connector

Family load
black line

VCC_5V 485_B
White line

CT3

RS 485
black line

White line

Female
CT2
black line

connector
White line

CT1

GND 485_A
GND B A S2 S1 S2 S1 S2 S1
9 1 0 11 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0

U/I ESC

P
M

Note: the arrow direction


E

towards the inverter


N L3 L2 L1 LA NA
7
6
5
4
3

3
2

485_A
1

485_B
meter
2

L1 L2 L3 N
1 RS485 Communication
GND

Grid
Pic 7.6 Connection diagram of Eastron meter

- 22 -
9 10 11 12 13 14 15 16 17 18 19 20

L1
P2 P1

3 P HA S E 4 W IR E
Eastron L2
P2 P1 S 2 S1

U/I
L3
P2 P1 S 2 S1

M S2 S1
N
P
1 2 3 4 5 6 15 16 17 18 19 20
E
Grid voltage Auxiliary Current inputs
sampling power supply

�� �� ��
1 2 3 4 5 6 7 8

RS ���
Eastron SDM630MCT RS���A RS���B GND
Pic 7.7 Eastron meter

Inverter
Solar Panel array

AC Breaker

RS 485

N L3 L2 L1
Male connector

Family load
black line

VCC_5V 485_B
White line

CT3

RS 485
black line

White line

Female
CT2
black line

connector
White line

CT1

GND 485_A
GND B A S2 S1 S2 S1 S2 S1
9 1 0 11 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0

U/I ESC

P
M

Note: the arrow direction


E

towards the inverter


N L3 L2 L1 LA NA
7
6
5
4
3

3
2

485_A
1

485_B
meter
2

L1 L2 L3 N
1 RS485 Communication
GND

Generator

Pic 7.8 Connection diagram of Eastron meter

- 23 -
3 6 9 10
� � � � � � ��

L�
Grid L� Load
(�,�,�,��)
Three-Phase Smart Meter

(�,�,�,��) L�
N
SET ESC

�� ��
RS ���
24 25

1 4 7 10

CHNT DTSU666
Pic 7.9 CHNT meter

Inverter
Solar Panel array

AC Breaker

RS 485
Male connector
N L3 L2 L1

L1 L2 L3 N Family load
VCC_5V ���_B

RS ���
Female connector
meter
GND ���_A

L1 L2 L3 N
3 485_A
485_B
2

1 RS485 Communication

Grid

Pic 7.10 Connection diagram of CHNT meter

- 24 -
3 6 9 10
� � � � � � ��

L�
Grid L� Load
(�,�,�,��)
Three-Phase Smart Meter

(�,�,�,��) L�
N
SET ESC

�� ��
RS ���
24 25

1 4 7 10

CHNT DTSU666
Pic 7.11 CHNT meter

Inverter
Solar Panel array

AC Breaker

RS 485
Male connector
N L3 L2 L1

L1 L2 L3 N Family load
VCC_5V ���_B

RS ���
Female connector
meter
GND ���_A

L1 L2 L3 N
3 485_A
485_B
2

1 RS485 Communication
Generator

Pic 7.12 Connection diagram of CHNT meter

- 25 -
3 6 9 10
� � � �� �� �� �� �� �� ��

L�
Three-Phase Smart Meter
L�
230/400V,
L�
N
3~100A/40mA
50/60Hz

SET ESC

�� ��
Phase A current =5.000A
13 14 16 17 19 21 24 25 A B
RS���
1 4 7 10

Phase B current =5.001A


CHNT DTSU666
3x230/400V
100A/40mA Pic 7.13 CHNT meter Phase C current =5.002A

Inverter
Solar Panel array

AC Breaker
RS 485
Male connector N L3 L2 L1

Home load
VCC_�V ���_B 3 6 9 10

RS ���
Female connector 230/400V,
Three-Phase Smart Meter
L1L2L3N
GND ���_A
3~100A/40mA
50/60Hz

SET ESC

13 14 16 17 19 21 24 25

1 4 7 10

Black line

White line
Black line

3
White line

485_A
Black line

White line

Note: the arrow direction


2

485_B towards the inverter


1

RS485 Communication
L1L2L3N

Grid

Pic 7.14 Connection diagram of CHNT meter

- 26 -
3 6 9 10
� � � �� �� �� �� �� �� ��

L�
Three-Phase Smart Meter
L�
230/400V,
L�
N
3~100A/40mA
50/60Hz

SET ESC

�� ��
Phase A current =5.000A
13 14 16 17 19 21 24 25 A B
RS���
1 4 7 10

Phase B current =5.001A


CHNT DTSU666
3x230/400V
100A/40mA Pic 7.15 CHNT meter Phase C current =5.002A

Inverter
Solar Panel array

AC Breaker
RS 485
Male connector N L3 L2 L1

Home load
VCC_�V ���_B 3 6 9 10

RS ���
Female connector 230/400V,
Three-Phase Smart Meter
L1L2L3N
GND ���_A
3~100A/40mA
50/60Hz

SET ESC

13 14 16 17 19 21 24 25

1 4 7 10

Black line

White line
Black line

3
White line

485_A
Black line

White line

Note: the arrow direction


2

485_B towards the inverter


1

RS485 Communication
L1L2L3N

Generator

Pic 7.14 Connection diagram of CHNT meter

- 27 -
�.� Multiple strings and parallel connection meters

This application is that when the string inverters work in parallel, there is only one power grid
and one load, and only one meter can be connected to prevent reverse current, so only this
many-to-one anti-reverse current connection can be connected.
If there’s several inverters in a plant, also it can use 1pcs meter to realize zero export function.
For example,if there’s 3pcs inverter in the system with 1pcs [Link] need to setup 1pcs
inverter as the master and others setup as slaves. And, all of them need to connect to the meter
via RS485. Below is the system diagram and configuration of the system.

Meter OFF << Exp_Mode AVG <<


Limiter OFF CT Ratio 0
MFR ACREL Shunt OFF
FeedIn 0.0KW << ShuntQTY 1 <<
Generator ON [Link] CHNT
[Link] 1 << [Link] 0% <<
[Link] 0.0KW
Back<<
Pic 7.17 Meter function

- 28 -
Name Description Range

AVG: Average power of three phase is zero exported.


MIN: Phase with minimum load power is zero
Exp_Mode AVG/MIN
exported, while the other two phase may be
in purchase mode.

CT ratio of power grid side meter when extern CT is


CT_Ratio 1-1000
applied.

Manufacturer of the grid side meter. Modbus AUTO/CHNT/


MFR Address of it should be set as 01. EASTRON

Percentage of the Feed in power exported to the


Feedin grid. 0-110%

Parallel mode. Set one inverter as Master, others OFF/Master/


Shunt are Slave. ONLY need to set the master, Slave will Slave
follow the settings in the master.

ShuntQTY Number of inverters in parallel 1-16

Generator DG side meter function Enable/Disable ON/OFF

CT ratio of power DG side meter when extern CT is


[Link] applied. 1-1000

Manufacturer of the DG side meter. Modbus AUTO/CHNT/


[Link] Address of it should be set as 02. EASTRON

[Link] Capacity of the DG. 1-999kW

Note: Select Meter option in Run Param and long press ENTER button to enter this
Meter Setting page.

- 29 -
� � � � � � � �
L� N
L� L�
Eastron
L� L�
N L�
Gird Load
(�,�,�,�) (�,�,�,�)

B A G
� � � �
RS ���
RS485B RS485A GND

Eastron SDM630-Modbus V2
Pic 7.18 Eastron meter

Master(Mst) Grid
RS��� L1L2L3 N

3 485_B
2

1 485_A

meter
GND
(as short as possible)

(as short as possible)


(as short as possible)

(as short as possible)

(as short as possible)

(as short as possible)


485_B

485_B
485_A

485_A
GND

GND

� � � �

L1 L2 L3 N

4 4
VCC_5V 485_B

RS 485
3

2 2
Female connector
Slave1(Slv1) Slave2(Slv2)
RS��� RS���
GND 485_A

AC Breaker
L1
L2
L3
N
Master(Mst) load
AC Breaker
L1
L2
L3
N
Solar Panel array
Slave1(Slv1)
AC Breaker
L1
L2
L3
N
Solar Panel array
Slave2(Slv2)
AC Breaker
L1
L2
L3
N
Solar Panel array

Pic 7.19 Eastron Connection diagram(The pass-through table)

- 30 -
� � � � � � � �
L� N
L� L�
Eastron
L� L�
N L�
Gird Load
(�,�,�,�) (�,�,�,�)

B A G
� � � �
RS ���
RS485B RS485A GND

Eastron SDM630-Modbus V2
Pic 7.20 Eastron meter

Generator
Master(Mst)
RS��� L1L2L3 N

3 485_B
2

1 485_A

meter
GND
(as short as possible)

(as short as possible)


(as short as possible)

(as short as possible)

(as short as possible)

(as short as possible)


485_B

485_B
485_A

485_A
GND

GND

� � � �

L1 L2 L3 N

4 4
VCC_5V 485_B

RS 485
3

2 2
Female connector
Slave1(Slv1) Slave2(Slv2)
RS��� RS���
GND 485_A

AC Breaker
L1
L2
L3
N
Master(Mst) load
AC Breaker
L1
L2
L3
N
Solar Panel array
Slave1(Slv1) AC Breaker
L1
L2
L3
N
Solar Panel array
Slave2(Slv2) AC Breaker
L1
L2
L3
N
Solar Panel array

Pic 7.21 Eastron Connection diagram(The pass-through table)

- 31 -
9 10 11 12 13 14 15 16 17 18 19 20

L1
P2 P1

3 P HA S E 4 W IR E
Eastron L2
P2 P1 S 2 S1

U/I
L3
P2 P1 S 2 S1

M S2 S1
N
P
1 2 3 4 5 6 15 16 17 18 19 20
E
Grid voltage Auxiliary Current inputs
sampling power supply

�� �� ��
1 2 3 4 5 6 7 8

RS ���
Eastron SDM630MCT RS���A RS���B GND
Pic 7.22 Eastron meter

Master(Mst)
AC Breaker
L1
L2
L3
N
Solar Panel array
Slave1(Slv1) AC Breaker
L1
L2
L3
N
Solar Panel array
Slave2(Slv2) AC Breaker
L1
L2
L3
N
Solar Panel array

AC Breaker
L1
L2
L3
N
load

black line

VCC_5V 485_B
White line

CT3
black line
White line

RS 485
CT2
black line

Female connector
White line

CT1

GND 485_A Note: the arrow direction


towards the inverter

L1 L2 L3 N
19 20
GND B A S2S1S2S1S2S1

U/I

8
M

E
9 10 11 12 13 14 15 16 17 18

N L3 L2 L1 LA NA
6
5
4

Master(Mst)
Eastron

3
2

RS���
1

Grid meter Grid


3 485_B
2

1 485_A

GND
(as short as possible)

(as short as possible)


(as short as possible)

(as short as possible)

(as short as possible)

(as short as possible)


485_B

485_B
485_A

485_A
GND

GND

4 4
3

2 2

Slave1(Slv1) Slave2(Slv2)
RS��� RS���

Pic 7.23 Connection diagram(Three-phase electricity )

- 32 -
9 10 11 12 13 14 15 16 17 18 19 20

L1
P2 P1

3 P HA S E 4 W IR E
Eastron L2
P2 P1 S 2 S1

U/I
L3
P2 P1 S 2 S1

M S2 S1
N
P
1 2 3 4 5 6 15 16 17 18 19 20
E
Grid voltage Auxiliary Current inputs
sampling power supply

�� �� ��
1 2 3 4 5 6 7 8

RS ���
Eastron SDM630MCT RS���A RS���B GND
Pic 7.24 Eastron meter

Master(Mst)
AC Breaker
L1
L2
L3
N
Solar Panel array
Slave1(Slv1) AC Breaker
L1
L2
L3
N
Solar Panel array
Slave2(Slv2) AC Breaker
L1
L2
L3
N
Solar Panel array

AC Breaker
L1
L2
L3
N
load

black line

VCC_5V 485_B
White line

CT3
black line
White line

RS 485
CT2
black line

Female connector
White line

CT1

GND 485_A Note: the arrow direction


towards the inverter

L1 L2 L3 N
19 20
GND B A S2S1S2S1S2S1

U/I

8
M

E
9 10 11 12 13 14 15 16 17 18

N L3 L2 L1 LA NA
6
5
4

Master(Mst)
Eastron

3
2

RS���
1

Generator
Grid meter
3 485_B
2

1 485_A

GND
(as short as possible)

(as short as possible)


(as short as possible)

(as short as possible)

(as short as possible)

(as short as possible)


485_B

485_B
485_A

485_A
GND

GND

4 4
3

2 2

Slave1(Slv1) Slave2(Slv2)
RS��� RS���

Pic 7.25 Connection diagram(Three-phase electricity )

- 33 -
3 6 9 10
� � � � � � ��

L�
Grid L� Load
(�,�,�,��)
Three-Phase Smart Meter

(�,�,�,��) L�
N
SET ESC

�� ��
RS ���
24 25

1 4 7 10

CHNT DTSU666
Pic 7.26 CHNT meter

Master(Mst)
AC Breaker
L1
L2
L3
N
Solar Panel array
Slave1(Slv1)
AC Breaker
L1
L2
L3
N
Solar Panel array
Slave2(Slv2) AC Breaker
L1
L2
L3
N
Solar Panel array

AC Breaker
L1
L2
L3
N
load
VCC_5V 485_B

RS 485
Female connector

GND 485_A

Master(Mst)
RS��� 3 6 9 10

3
Three-Phase Smart Meter

485_B
2

SET ESC

1 485_A 24 25

GND
1 4 7 10
(as short as possible)

(as short as possible)


(as short as possible)

(as short as possible)


485_B

485_B
485_A

485_A

L1 L2 L3 N

Slave�(Slv�) Slave�(Slv�)
R S ��� R S ���

Grid
Pic 7.27 CHNT Connection diagram(The pass-through table)

- 34 -
3 6 9 10
� � � � � � ��

L�
Grid L� Load
(�,�,�,��)
Three-Phase Smart Meter

(�,�,�,��) L�
N
SET ESC

�� ��
RS ���
24 25

1 4 7 10

CHNT DTSU666
Pic 7.28 CHNT meter

Master(Mst)
AC Breaker
L1
L2
L3
N
Solar Panel array Slave1(Slv1)
AC Breaker
L1
L2
L3
N
Solar Panel array Slave2(Slv2) AC Breaker
L1
L2
L3
N
Solar Panel array

AC Breaker
L1
L2
L3
N
load
VCC_5V 485_B

RS 485
Female connector

GND 485_A

Master(Mst)
RS��� 3 6 9 10

3
Three-Phase Smart Meter

485_B
2

SET ESC

1 485_A 24 25

GND
1 4 7 10
(as short as possible)

(as short as possible)


(as short as possible)

(as short as possible)


485_B

485_B
485_A

485_A

L1 L2 L3 N

Slave�(Slv�) Slave�(Slv�)
R S ��� R S ��� Generator

Pic 7.29 CHNT Connection diagram(The pass-through table)

- 35 -
3 6 9 10
� � � �� �� �� �� �� �� ��

L�
Three-Phase Smart Meter
L�
230/400V,
L�
N
3~100A/40mA
50/60Hz

SET ESC

�� ��
Phase A current =5.000A
13 14 16 17 19 21 24 25 A B
RS���
1 4 7 10

Phase B current =5.001A


CHNT DTSU666
3x230/400V
100A/40mA Pic 7.30 CHNT meter Phase C current =5.002A

Master(Mst)
AC Breaker
L1
L2
L3
N
Solar Panel array Slave1(Slv1)
AC Breaker
L1
L2
L3
N
Solar Panel array
Slave2(Slv2) AC Breaker
L1
L2
L3
N
Solar Panel array

AC Breaker
L1
L2
L3
N
load
VCC_5V 485_B

RS 485 L1 L2 L3 N
3 6 9 10

Female connector 230/400V,


3~100A/40mA
Three-Phase Smart Meter

50/60Hz

SET ESC

GND 485_A 13 14 16 17 19 21

1 4 7
24 25

10

Master(Mst)
Black line

White line

RS���
Black line

White line

Black line

White line

3 485_B
2

1 485_A

GND
(as short as possible)

(as short as possible)


(as short as possible)

(as short as possible)


485_B

485_B
485_A

485_A

L1 L2 L3 N
4 4
3

2 2

Slave�(Slv�) Slave�(Slv�)
R S ��� R S ���

Grid

Pic 7.31 CHNT Connection diagram(The pass-through table)

- 36 -
3 6 9 10
� � � �� �� �� �� �� �� ��

L�
Three-Phase Smart Meter
L�
230/400V,
L�
N
3~100A/40mA
50/60Hz

SET ESC

�� ��
Phase A current =5.000A
13 14 16 17 19 21 24 25 A B
RS���
1 4 7 10

Phase B current =5.001A


CHNT DTSU666
3x230/400V
100A/40mA Pic 7.32 CHNT meter Phase C current =5.002A

Master(Mst)
AC Breaker
L1
L2
L3
N
Solar Panel array
Slave1(Slv1)
AC Breaker
L1
L2
L3
N
Solar Panel array
Slave2(Slv2) AC Breaker
L1
L2
L3
N
Solar Panel array

AC Breaker
L1
L2
L3
N
load
VCC_5V 485_B

RS 485 L1 L2 L3 N
3 6 9 10

Female connector 230/400V,


3~100A/40mA
Three-Phase Smart Meter

50/60Hz

SET ESC

GND 485_A 13 14 16 17 19 21

1 4 7
24 25

10

Master(Mst)
Black line

White line

RS���
Black line

White line

Black line

White line

3 485_B
2

1 485_A

GND
(as short as possible)

(as short as possible)


(as short as possible)

(as short as possible)


485_B

485_B
485_A

485_A

L1 L2 L3 N
4 4
3

2 2

Slave�(Slv�) Slave�(Slv�)
R S ��� R S ���
Generator

Pic 7.33 CHNT Connection diagram(The pass-through table)

- 37 -
�.� Use of zero-export function
When the connection is completed, the following steps should be refered to use this function:
1. Turn on the AC switch.
2. Turn on the DC switch, waiting for the inverter's LCD is turned on.
3. Press Enter button on the LCD panel in the main interface into the menu options, select
[parameter setting] to enter setup submenu, and then select [running parameters] as shown
in picture 7.34, at this time please input the default password 1234 through pressing the
button [up down, enter], enter the operation parameter setting interface, shown as
picture 7.35.

System Param << Island OFF


Run Param Meter 0FF <<
Pic 7.34 Parameter setting Pic 7.35 Meter switch

4. Operate the button [up down], move setting cursor to energy meter and press the button
[enter]. At this time you can turn on or turn off the energy meter by choosing [up down]
button, please press [enter] button to confirm when setting done.
5. Move the cursor to [OK], press [enter] to save the settings and exit the running parameters
page, otherwise the settings are invalid.
6. If set up successfully, you can return to the menu interface, and display the LCD to [home
page] by press the [up down] button. If it displays [meter power XXW], the zero-export
function setting is completed. Shown as picture 7.36.

Meter Power:
20W
Pic 7.36 Zero-export function via energy meter turn on
7. Meter power XXW shows positive means grid is supplying the load, and no power fed into
grid. if meter power shows negative, it means PV energy is being sold to grid or energy meter
wiring conncetion has problem.
8. After properly connection is done, wait for inverter starting. If the power of the PV array
meets the current power consumption, the inverter will keep a certain output to counteract
the power of the grid without backflow .

- 38 -
�.� Notes while using zero export function

For your safety and the operation of limiter function of the inverter, we put forward the following
suggestions and precautions:

Safety Hint:
Under zero export mode we strongly recommend that the two PV arrays are formed by the same
number of PV panels of the same size, which will make the inverter more responsive to limit the
power.

Safety Hint:
While the utility power is negative and inverter has no output power, that means the orientation of
the current sensor is wrong, please turn off the inverter and change orientation of the current sensor.

�.� How to browse the load power of your PV grid-tie plant on monitoring platform?
If you want to browse load power of the system and how much energy (KWH) does it export to
grid(inverter output power is used to power the load firstly and then the surplus energy will feed
into grid). You also need to connect the meter according to above diagram. After the connection
completed successfully, the inverter will show the load power on the LCD. But please don’t
setup “Meter ON”. Also, you will be able to browse the load power on the monitoring platform.
The plant setting method as below description.
Firstly, go to the solarman platform([Link] this link is for solarman
distributor account; or [Link] this link is for solarman end user
account;) plant home page and click “edit”.
Back to Plants list String inverter Solar Station ID����� Compare Add Edit More

String inverter Solar Sta...


! Partially Offline No Alerts Last update ����/��/�� ��:��:�� UTC+��:��
Edit Tags
Dashboard

Devices Cover Updated: ����/��/�� ��:��:��


Flow Graph Production Consumption Grid

Alerts ��℃
Production Power �.�� kW Grid Power �℃/��℃ Sunny MON
About
�.�� kW � m/s ��:�� ��:��
32% Capacity �� kWp

Authorizations
��℃ ��℃ ��℃ ��℃

Layout

Work Order Address YongJiang Road,Beilun,Ning...

Plant Type Residential


�℃ �℃ �℃ ��℃
Plan

System Type Self-consumption Consumption Power


Maintenance
Record �.�kW TUE WED THU FRI
Phone
�/�� �/�� �/�� �/��

- 39 -
And then choose your system type as “Self-consumption”

Edit Plant Cancel Done

* Address :
Basic Info
YongJiang Road, Beilum,NingBo, ������, China
System Info
Yield Info * Coordinates :
Owner Info Longitude ��� �� ��.�� ” Latitude �� �� ��.��
‘ ‘

Time Zone : Creation Time :


����/��/��
(UTC+��:��) Beijing,Chongqing,Hong Kong,Urumqi

System Info Collapse

Plant Type : System Type :

Residential Self-consumption

* Capacity(kWp): Azimuth( ):

30 �~���

Secondly, go to plant page, if it shows the PV power, load power and grid power, which means
the configuration is correct.
Back to Plants list String inverter Solar Station ID����� Compare Add Edit More

String inverter Solar Sta...


! Partially Offline No Alerts Last update ����/��/�� ��:��:�� UTC+��:��
Edit Tags
Dashboard

Devices Cover Updated: ����/��/�� ��:��:��


Flow Graph Production Consumption Grid

Alerts ��℃
Production Power �.�� kW Grid Power �℃/��℃ Sunny MON
About
�.�� kW � m/s ��:�� ��:��
32% Capacity �� kWp

Authorizations
��℃ ��℃ ��℃ ��℃

Layout

Work Order Address YongJiang Road,Beilun,Ning...

Plant Type Residential


�℃ �℃ �℃ ��℃
Plan

System Type Self-consumption Consumption Power


Maintenance
Record �.�kW TUE WED THU FRI
Phone
�/�� �/�� �/�� �/��

Flow Graph Production Consumption Grid

Production Power �.�� kW Grid Power


32% Capacity �� kWp �.�� kW

Consumption Power
�.�kW

- 40 -
8. General Opera�on
During normal operation, the LCD shows the current status of the inverter, including the current
power, total generation, a bar chart of power operation and inverter ID,etc. Press the Up key
and the Down key to see the current DC voltage, DC current, AC voltage, AC current,inverter
radiator temperature,software version number and Wifi connection state of the inverter.

LCD Main menu


GL3000 SN-01
Total DC Power PF:0.000
Device ID:2104149060
PV1 and Power informa�on Inv1400
LcdA244
UA and UB 1 F35 220513 07
2 F35 220513 06
UC and Freq Fault record 3 F35 220513 06
4 F35 220513 06
E-Day and E-Total
Start Time ON/OFF

*Meter

*IoaEp and Total Setup

*lmpEp and Total


*PV VA
*Load

*ExpEp and Total

Time Set
English
Polski
Language Set P cck
Nederland
Bright Delay
Setup System param Display Set Delay �me 05S
OK << Cancel
Confirm Reset
Factory Reset
Cancel
I Confirm
Set Restore
Cancel

- 41 -
QP

PFP

Ac�veP QU

Q-Mode
PF
VRated
Q(%)
ReactP

PF OFF

Fun- ISO Exp_Mode


CT_Ra�o 0
Fun RCD MFR
FeedIn
SelfCheck Shunt
Island ShuntQTY
Generator
Meter [Link]
Setup Limiter
[Link]
[Link]
Running param Feed-in [Link]
[Link] V1-V12
MPPT Num DC1-Wind OFF/ON
DC2-Wind OFF/ON
WindTurbine OK
CLR
Cancel
ARC ON
OFF
OF-Derate HYS
ON
UF-Uprate OFF
WGRa

WGraStr
ON
PU OFF
V1-V4 P1-P4
LVRT

HVRT

DRM
Sunspec

ZVRT

- 42 -
Brazil
*Note: These parameters will be avaiable after the meter is EN50549-1-PL
connected successfully. Otherwise, it won't show. EN50549-1
Attention: For running param detail on the LCD display, please IEC61727
refer to the official Deye website [Link] CUSTOM
VDE_4105
VDE_0126
Spain
CEI_0-21
G98_G99
NB/T 32004-B
Australia-A-C
NEW Zealand
E MEA
PEA
Norway
Switzerland
GridStanderd R25
Protect Param Advanced OverVolt Lv3-Lv1
Point 240.0V
Back Delay 1000ms
UnderVolt Lv1-Lv3
Point 235.0V
Delay 1000ms
Setup OverFreq Lv3-Lv1
Point 52.00Hz
Delay 1000ms
UnderFreq Lv1-Lv3
Point 48.00Hz
Delay 1000ms
Reconnec�on
Vup
Vdown
Fup
Fdown
OV 10 Minutes
Enable
Point
Grid: 127/220V

Address:01
Comm. param Meter:AUTO
BaudRate: 9600

Pic 8.1 LCD opera�on flow chart


- 43 -
�.� The initial interface

From the initial interface, you can check PV power, PV voltage, grid voltage, inverter ID, model
and other infomation.

Power: 0W Power: 0W
State: Standby State: [Link]
Pic 8.2 The initial interface

Press UP or Down, you can check inverter DC voltage, DC current, AC voltage, AC current and
inverter temperature.

Total DC POWER: PV1: 0.0V 0.0A


0W Power: 0W
Pic 8.3 PV input voltage and current Pic 8.4 Load power
information

UA: 234V 0.0A UC: 0V 0.0A


UB: 0V 0.0A Freq: 0.00Hz
Pic 8.5 Grid voltage and current information Pic 8.6 Grid voltage and frequency

E-Day: Daily generation;


E-Day : 0Wh E-Total: Total generation.

E-Total : 134KWh
Pic 8.7 PV generation

21 - 05 - 2020 Meter
15 : 57 : 08 Power: 0W
Pic 8.8 Time Pic 8.9 Meter power

LoadEp: Daily consumption;


LoadEp: 0.00KWh Total: Total energy consumption.

Total : 0.00KWh
Pic 8.10 Load consumption

- 44 -
ImpEp: Daily energy purchased from grid;
ImpEp: 0.00KWh Total: Total energy purchased from grid.

Total : 0.00KWh
Pic 8.11 Electrical energy
ExpEp: Daily energy sold to grid;
ExpEp: 0.00KWh Total: Total energy sold to grid.

Total : 0.00KWh
Pic 8.12 Electrical energy

�.� Submenus in the Main Menu

There are five submenus in the Main Menu.

�.�.� Device information


You can see the LCD software VerA238 and control board software Ver1400. In this interface,
there are parameters such as rated power communication addresses.

Device Info. << GL3000 SN-01


Fault Record PF: 0.000

ID:2104149060 Inv1400
Inv1400 LcdA244
Pic 8.13 Device information

�.�.� Fault Record


It can keep Eight fault records in the menu including time, customer can deal with it depends
on the error code.

Device Info. 1 F35 220513 07


Fault Record << 2 F35 220513 06
3 F35 220513 06
4 F35 220513 06
Pic 8.14 Fault Record

- 45 -
�.�.� ON/OFF setting

ON / OFF << Turn ON <<


Setup Turn OFF
Turn ON Turn OFF
OK << Cancel OK << Cancel
Pic 8.15 ON/OFF setting

When the inverter is turned off, it stops working immediately, and go to standby mode and
then will go to self-test program again. If it passed the self-test, it will start to work again.

�.�.� Parameter setting

There are five submenus in the [Link] includes system param, run param, protect
param, comm: param. All of these information for maintenance reference.

System Param << Protect Param


Run Param Comm. Param <<
Pic 8.16 Submenus of the parameter setup

- 46 -
�.� System param setting

System Param includes time set, language set, display set and factory reset.

Time Set << Display Set


Language Set Factory Reset <<
Factory Reset
Set Restore <<
Pic 8.17 System Param

20200522 OK English <<


[Link] Cancel Polski
Pic 8.18 Time

English Bright Delay <<


Nederland << Delay time 05S
Pic 8.19 Language Pic 8.20 LCD Screen settings

Delay time 05S Factory Reset <<


OK << Cancel Cancel
Pic 8.21 Delay time set Pic 8.22 Reset to factory setting

I Confirm <<
Cancel
Pic 8.23 Set Restore

- 47 -
�.� Protect Param setting

Warning:
Engineer Only.
We will set the param depends on the safety requirements, so customers don't
need to reset it. The password is same as 8.4 Running param

PassWord GridStanderd <<


Advanced

Back <<

Pic 8.24 Password

Braszil EN50549-1
EN50549-1-PL << IEC61727 <<
CUSTOM VDE0126
VDE4105 << Spain <<
_
CEI_0-21 G99
G98 << NBT32004-B <<
Australia-A Australia-C
Australia-B << New Zealand <<
MEA Norway
PEA << Switzerland <<
R25
OK Cancel <<
Pic 8.25 GridStanderd

- 48 -
OverVolt Lv3 OverVolt Lv3
Point 240.0V << Delay 1000ms <<
OverVolt Lv2 OverVolt Lv2
Point 240.0V << Delay 1000ms <<
OverVolt Lv1 OverVolt Lv1
Point 240.0V << Delay 1000ms <<
UnderVolt Lv1 UnderVolt Lv1
Point 235.0V << Delay 1000ms <<
UnderVolt Lv2 UnderVolt Lv2
Point 235.0V << Delay 1000ms <<
UnderVolt Lv3 UnderVolt Lv3
Point 235.0V << Delay 1000ms <<
OverFreq Lv3 OverFreq Lv3
Point 52.00Hz << Delay 1000ms <<
OverFreq Lv2 OverFreq Lv2
Point 52.00Hz << Delay 1000ms <<
OverFreq Lv1 OverFreq Lv1
Point 52.00Hz << Delay 1000ms <<
UnderFreq Lv1 UnderFreq Lv1
Point 48.00Hz << Delay 1000ms <<
- 49 -
UnderFreq Lv2 UnderFreq Lv2
Point 48.00Hz << Delay 1000ms <<
UnderFreq Lv3 UnderFreq Lv3
Point 48.00Hz << Delay 1000ms <<
Reconnection Reconnection
Vup 0.0V << Vdown 0.0V <<
Reconnection Reconnection
Fup 0.00Hz << Fdown 0.00Hz <<
OV 10 Minutes OV 10 Minutes
Enable OFF << Point 0.0% <<
Point 0.0% OK Cancel <<
Grid --- <<
Pic 8.26 “CUSTOMIZED”

Please set the proper grid parameters according to the requirements of your current country's
grid [Link] you are not clear about it, please consult your installer.

�.� Comm. param setting

Address: 01 << Func: Meter


BaudRate: 9600 Address1: 01 <<
Pic 8.27 Comm. Param

- 50 -
9. Repair and Maintenance
String type inverter doesn’t need regular maintenance. However,debris or dust will affect
heat sink’s thermal performance. It is better to clean it with a soft brush. If the surface is too
dirty and affect the reading of LCD and LED lamp, you can use wet cloth to clean it up.

High Temperature Hazard:


When the device is running, the local temperature is too high and the touch can
cause burns. Turn off the inverter and wait for it cooling, then you can clean and
maintain.
Safety Hint:
No solvent, abrasive materials or corrosive materials can be used for cleaning
any parts of the inverter.

[Link] informa�on and processing


Inverter has been designed in accordance with international grid tied standards for safety, and
electromagnetic compatibility requirements. Before delivering to the customer the inverter
has been subjected to several tests to ensure its optimal operation and reliability.

- 51 -
��.� Error code
If there is any failure,the LCD screen will display an alarm message. In this case,the inverter
may stop feeding energy into the grid. The alarm description and their corresponding alarm
messages are listed Table 10.1.

Error code Description Ongrid - Three Phase

F�� DC input polarity reverse fault Check the PV input polarity.

DC insulation impedance
F�� Check the grounding cable of inverter.
permanent fault

F�� DC leakage current fault Hardly appear the code. Never ever happened so far.

F�� Ground fault GFDI Check the solar panel output connection.

Failure in reading memory (EEPROM). Restart the inverter if the


F�� Read the memory error
fault still exists, contact your installer or Deye service.

Failure in writing memory (EEPROM). Restart the inverter if the


F�� Write the memory error
fault still exists, contact your installer or Deye service.

F�� GFDI blown fuse Hardly appear the code. Never ever happened so far.

F�� GFDI grounding touch failure Hardly appear the code. Never ever happened so far.

IGBT damaged by excessive drop


F�� Hardly appear the code. Never ever happened so far.
voltage

�. It tells the DC ��V is not existed.


Auxiliary switch power supply
F�� �. Restart the inverter, if the fault still exists, please contact
failure
your installer or Deye service.

F�� AC main contactor errors Hardly appear the code. Never ever happened so far.

F�� AC auxiliary contactor errors Hardly appear the code. Never ever happened so far.

�. Loss of one phase or AC voltage detection part failure or


relays not closed.
F�� reserved
�. Restart the inverter, if the error still exists, please contact your
installer or Deye service.

F�� DC firmware over current Hardly appear the code. Never ever happened so far.

�. The internal AC sensor or detection circuit on control board


or connection wire may loose.
F�� AC firmware over current �. Restart the inverter, if the error still exists, please contact
your installer or Deye service.

�. This fault means the average leakage current is over ���mA.


Check whether DC power supply or solar panels is ok, then
check 'Test data'-> 'diL'value is about ��; Then check the
GFCI(RCD) Ac leakage current
F�� leakage current sensor or circuit (the following picture).
fault
Checking test data needs using big LCD.
�. Restart the inverter, if the error still exists, please contact your
installer or Deye service.

Three phase current,


F�� Hardly appear the code. Never ever happened so far.
over-current fault

�. Check AC sensor or detection circuit on control board or


connection wire.
F�� AC over current fault of hardware �. Restart the inverter or factory reset, if the error still exists,
please contact your installer or Deye service.

F�� All hardware failure synthesis Hardly appear the code. Never ever happened so far.

- 52 -
Error code Description Ongrid - Three Phase
�. Check whether solar panel output current is within the
allowed range.
DC over current fault of the �. Check DC current sensor and its detection circuit.
F��
hardware �. Check if the inverter FW version is suitable for the hardware.
�. Restart the inverter, if the error still exists, please contact your
installer or Deye service.

F�� DC leakage flow fault Hardly appear the code. Never ever happened so far.

Crash stop (if there is a stop


F�� Contact your installer for help.
button)

�. This fault means the leakage current is above ��mA suddenly.


Check whether DC power supply or solar panels is ok, then
AC leakage current is transient check 'Test data'-> 'diL'value is about ��; Then check the
F�� leakage current sensor or circuit. Check test data needs
over current
using big LCD.
�. Restart the inverter, if the fault still exists, contact your installer
or Deye service.
�. Check Vpe resistance on main board or detection on control board.
Check PV panels is OK. Many times this issue is the PV problem.
�. Check whether the PV panel (aluminum frame) is grounded well and
inverter is grounded well. Open the cover of inverter and then check
F�� DC insulation impedance failure the inside ground cable is fixed well on the shell.
�. Check if the AC/DC cable, terminal block are shorted to ground or
the insulation is damaged.
�. Restart the inverter, if the fault still exists, contact your installer or
Deye service.

F�� DC feedback fault Hardly appear the code. Never ever happened so far.

�. Check whether the 'BUSN' cable or driver board power supply


F�� The DC busbar is unbalanced cable is loose.
�. Restart the inverter, if the fault still exists, contact your
installer or Deye service.

F�� DC end insulation error Hardly appear the code. Never ever happened so far.

F�� Inverter � DC high fault Hardly appear the code. Never ever happened so far.

F�� AC load switch failure Hardly appear the code. Never ever happened so far.

�. Check relays and AC voltage of relays.


�. Check relays driver circuit. Check if the software is not suitable
F�� AC main contactor failure for this inverter. (Old inverter not have relays detection
function)
�. Restart the inverter, if the fault still exists, contact your
installer or Deye service.
�. At least one Relay can't be closed. Check relays and its driver
F�� Relay open circuit fault signal. (Old inverter not have relays detection function)
�. Restart the inverter, if the fault still exists, contact your
installer or Deye service.

F�� Inverter � dc high fault Hardly appear the code. Never ever happened so far.

F�� AC over current Hardly appear the code. Never ever happened so far.

F�� AC current over load Hardly appear the code. Never ever happened so far.

�. Check AC grid voltage. Check AC voltage detection circuit.


Check if the AC connector in good condition. Check whether
F�� No AC grid the AC grid is normal in voltage.
�. Restart the inverter, if the fault still exists, contact your
installer or Deye service.

- 53 -
Error code Description Ongrid - Three Phase

F36 AC grid phase error Hardly appear the code. Never ever happened so far.

AC three-phase voltage unbalance


F37 Hardly appear the code. Never ever happened so far.
failure

AC three-phase current unbalance


F38 Hardly appear the code. Never ever happened so far.
failure

�. Check AC current sensor and its circuit.


F39 AC over current(one cycle) �. Restart the inverter, if the fault still exists, contact your
installer or Deye service.

F40 DC over current Hardly appear the code. Never ever happened so far.

Check the AC voltage protection setting. And Check if the AC


F41 AC Line W,U over voltage cable is too [Link] the voltage difference between LCD and
meter.

Check the AC voltage protec�on se�ng. Check the voltage


F42 AC Line W,U low voltage difference between LCD and meter. Also need to check whether
AC cables are all firmly and correctly connected.

Check the AC voltage protection [Link] Check if the AC


F43 AC Line V,W over voltage cable is too [Link] the voltage difference between LCD and
meter.

Check the AC voltage protection setting. Check the voltage


F44 AC Line V,W low voltage difference between LCD and meter. Also need to check whether
AC cables are all firmly and correctly connected.

Check the AC voltage protection [Link] Check if the AC


F45 AC Line U,V over voltage cable is too [Link] the voltage difference between LCD and
meter.

F46 AC Line U,V low voltage Check the AC voltage protection setting.

F47 AC Over frequency Check the frequency protection setting.

F48 AC lower frequency Check the frequency protection setting.

U phase grid current DC


F49 Hardly appear the code. Never ever happened so far.
component over current

V phase grid current DC


F50 Hardly appear the code. Never ever happened so far.
component over current

W phase grid current DC


F51 Hardly appear the code. Never ever happened so far.
component over current

AC inductor A, phase current


F52 Hardly appear the code. Never ever happened so far.
DC current high

AC inductor B, phase current


F53 Hardly appear the code. Never ever happened so far.
DC current high

AC inductor C, phase current


F54 Hardly appear the code. Never ever happened so far.
DC current high

�. Check PV voltage and Ubus voltage and its detection circuit.


F55 DC busbar voltage is too high If the PV input voltage exceeds the limit, please reduce the
number of solar panels in series.
�. For Ubus voltage, please check the LCD display.

- 54 -
Error code Description Ongrid - Three Phase

�. It tells the PV input voltage is low and it always happens in the


early morning.
�. Check PV voltage and Ubus voltage. When inverter is running,
F56 DC busbar voltage is too low then showing F��, maybe Loss of driver or need update
firmware.
�. Restart the inverter, if the fault still exists, contact your
installer or Deye service.

F57 AC reverse irrigation AC reverse irrigation.

F58 AC grid U over current Hardly appear the code. Never ever happened so far.

F59 AC grid V over current Hardly appear the code. Never ever happened so far.

F60 AC grid W over current Hardly appear the code. Never ever happened so far.

F61 Reactor A phase over current Hardly appear the code. Never ever happened so far.

F62 Reactor B phase over current Hardly appear the code. Never ever happened so far.

�. Check PV module cable connection and clear the fault;


ARC fault �. Seek help from us, if can not go back to normal state.
F63
�. Check temperature sensor. Check if firmware is suitable for
F64 IGBT heat sink high temperature the hardware. Check if the inverter is its right model.
�. Restart the inverter, if the fault still exists, contact your
installer or Deye service.

Table10.1 Error codes and their solutions

Safety Hint:
If your string inverter has any of the fault information shown in Table 10-1,and
when you reset the machine and still don’t solve the problem,please contact
our distributor and provide the below details:

1. Serial number of the inverter;


2. The distributor/dealer of the inverter(if available);
3. Installation date;
4. The discription of problem(include LCD'error code and LED starus indicator lights);
5. Your contact details.

- 55 -
��.Specification
SUN-��K- SUN-��K- SUN-��K- SUN-��K- SUN-��K-
Model G�� G�� G�� G�� G��
PV String Input Data
Max. PV Input Power(kW) 23.4 26 28.6 29.9 32.5
Max. PV Input Voltage(V) 1100
Start-up Voltage(V) 250
PV input voltage range(V) 250-1100
MPPT Voltage Range(V) 200-1000
Full Load MPPT Voltage Range(V) 500-850 550-850
Rated PV Input Voltage(V) 600
Max. Input Short Circuit Current (A) 39+39
Max. Operating PV Input Current(A) 26+26
No. of MPP Trackers/No. of Strings per MPP Tracker 2/2+2
Max. Inverter Backfeed Current To the Array 0
AC Output Data
Rated AC Output Active Power(kW) 18 20 22 23 25
[Link] Output Apparent Power(kVA) 19.8 22 24.2 25.3 27.5
Rated AC Output current (A) 27.3/26.1 30.3/29 33.4/31.9 34.9/33.4 37.9/36.2
[Link] Output Current (A) 30/28.7 33.3/31.9 36.7/35.1 38.4/36.7 41.7/39.8
Max. Output Fault Current (A) 52.5 58 63.8 66.8 72.4
Max. Output Overcurrent Protection(A) 76.9 76.9 85 85 85
Rated Output voltage/range (V) 220/380,230/400 0.85Un-1.1Un
Grid Connection Form 3L+N+PE
Rated Output Grid Frequency/range(Hz) 50Hz/45Hz-55Hz, 60Hz/55Hz-65Hz
Power Factor Adjustment Range 0.8 leading-0.8lagging
Total Current Harmonic Distortion THDi <3%
DC Injection Current <0.5%In
Efficiency
Max.Efficiency 98.5%
Euro Efficiency 98.0%
MPPT Efficiency >99%
Equipment Protection
DC Polarity Reverse Connection Protection yes
AC Output Overcurrent Protection yes
AC Output Overvoltage Protection yes
AC Output Short Circuit Protection yes
Thermal Protection yes
DC Terminal Insulation Impedance Monitoring yes
DC component monitoring yes
Ground fault current monitoring yes
Power Network Monitoring yes
Island protection monitoring yes
Earth Fault Detection yes
DC Input Switch yes
Overvoltage Load Drop Protection yes
Residual Current (RCD) Detection yes
Surge Protection Level TYPE II(DC),TYPE II(AC)

- 56 -
Interface
Communication Interface RS485/RS232
Monitor Mode GPRS/WIFI/Bluetooth/4G/LAN(optional)
Display LCD+LED
General Data
Operating Temperature Range (°C) -25 to +60℃,>45℃ derating
Permissible Ambient Humidity 0-100%
Permissible Altitude (m) 4000m
Noise (dB) ≤ 50 dB
Ingress Protection(IP) Rating IP 65
Inverter Topology Non-Isolated
Over Voltage Category OVC II(DC),OVC III(AC)
Cabinet Size(W*H*D)[mm] 362×527×220 (Excluding connectors and brackets)
Weight [kg] 20
Warranty [year] Standard 5 years, extended warranty
Type Of Cooling Intelligent air cooling
IEC 61727, IEC 62116, CEI 0-21, EN 50549, NRS 097, RD 140,
Grid Regulation
UNE 217002, OVE-Richtlinie R25, G99, VDE-AR-N 4105
Safety EMC/Standard IEC/EN 61000-6-1/2/3/4, IEC/EN 62109-1, IEC/EN 62109-2

��. EU Declaration of Conformity


within the scope of the EU directives
· Electromagnetic compatibility 2014/30/EU (EMC)
· Low Voltage Directive 2014/35/EU (LVD)
· Restriction of the use of certain hazardous substances 2011/65/EU(RoHS)

NINGBO DEYE INVERTER TECHNOLOGY CO., LTD. confirms herewith that the products
described in this document are in compliance with the fundamental requirements and other
relevant provisions of the above mentioned directives. The entire EU Declaration of Conformity
and certificate can be found at [Link]

- 57 -
230927009
[Link]

EU Declaration of Conformity
Product: Grid-connected PV Inverter
Models: SUN-18K-G05;SUN-20K-G05;SUN-22K-G05;SUN-23K-G05;SUN-25K-G05;
Name and address of the manufacturer: Ningbo Deye Inverter Technology Co., Ltd.
No. 26 South YongJiang Road, Daqi, Beilun, NingBo, China

This declaration of conformity is issued under the sole responsibility of the manufacturer. Also this product
is under manufacturer’s warranty.
This declaration of conformity is not valid any longer: if the product is modified, supplemented or changed in
any other way, as well as in case the product is used or installed improperly.

The object of the declaration described above is in conformity with the relevant Union harmonization legislation:
The Low Voltage Directive (LVD) 2014/35/EU;the Electromagnetic Compatibility (EMC) Directive 2014/30/EU;the
restriction of the use of certain hazardous substances (RoHS) Directive 2011/65/EU.

References to the relevant harmonized standards used or references to the other technical specifications in
relation to which conformity is declared:

LVD:
EN 62109-1:2010 🔴
EN 62109-2:2011 🔴
EMC:
EN IEC 61000-6-1:2019 🔴
EN IEC 61000-6-2:2019 🔴
EN IEC 61000-6-3:2021 🔴
EN IEC 61000-6-4:2019 🔴
EN IEC 61000-3-2:2019+A1:2021 🔴
EN 61000-3-3:2013/A2:2021/AC:2022-01 🔴
EN 55011:2016/A2:2021 🔴

Nom et Titre / Name and Title: Bard Dai


Senior Standard and Certification Engineer

Au nom de / On behalf of: Ningbo Deye Inverter Technology Co., Ltd.


Date / Date (yyyy-mm-dd): 2023-09-27
A / Place: Ningbo, China

EU DoC – v1 Ningbo Deye Inverter Technology Co., Ltd.


No. 26 South YongJiang Road, Daqi, Beilun, NingBo, China

2024-01-29 Ver: 2.5

- 58 -
Add. : No.�� South YongJiang Road, Daqi, Beilun, NingBo, China.
Tel. : +�� (�) ��� ���� ����
Fax. : +�� (�) ��� ���� ����
E-mail. : service@[Link]
Web. : [Link]

You might also like