0% found this document useful (0 votes)
95 views1 page

Motor Checksheet

This document is a checklist for the preventive maintenance of motors, detailing various inspection and maintenance tasks to ensure proper functioning. It includes items such as checking the motor foundation, terminals, grounding, and cable conditions, as well as performing insulation resistance tests and ensuring proper lubrication. The checklist also requires signatures from both the technician and the engineer in charge upon completion.

Uploaded by

pritiranjan9556
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
95 views1 page

Motor Checksheet

This document is a checklist for the preventive maintenance of motors, detailing various inspection and maintenance tasks to ensure proper functioning. It includes items such as checking the motor foundation, terminals, grounding, and cable conditions, as well as performing insulation resistance tests and ensuring proper lubrication. The checklist also requires signatures from both the technician and the engineer in charge upon completion.

Uploaded by

pritiranjan9556
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

CHECKLIST FOR PREVENTIVE MAINTENANCE OF MOTOR

Company Name & LOGO DOCUMENT NO

PERMIT NO: - DATE


EQUIPMENT NAME:
NEXT PREVENTIVE MAINTENANCE DATE:

SL
CHECK LIST STATUS REMARK TOOLS / LLF
NO

1 Inspection of Foundation of Motor frame , Check, Tight if require.

Terminals of motor (Tightening , Insulation ) for any opening /


2
Gasket / Gland Condition / Cut at cable / Cable Tray

4 Grounding / Double Earth of Motor body

5 Cleaning and inpection of cable (at power JB of the motors)

6 Cooling fan condition of motor

7 Lubrication of the bearing at DE and NDE side (Greeasing)

Temperature of NDE and DE of the motor (When Running before or


8
after maintenance) or any Abnormal Sound.

9 Motor phase sequence of RYB cable before meggering.

Insulation resistance values (R to G , Y to G & B to G ) After Removing


10
of link

Resistance values of coil (R to G , Y to G & B to G ) After Removing of


11
link

12 Coil Resistance of individual coils

13 Inductance values of individual coils

14 Motor phase sequence After meggering, during connection

15 Condition of cables at Field TB

16 Condition of LCS ( Pushbuttons, LED lamps )

17 Condition of Power Cables (Incoming & Outgoing) from breaker

18 Check Contactor for any looseness of Cable (tightness if require)

19 Check Contactor Kit (replace if required)

20 Double side Earthing of Panel Body.

21 Panel Cleaning and Control Tightness

Check Current OL trip Setting as per motor & Remove all bypass if
22
required