0% found this document useful (0 votes)
46 views2 pages

RESS Li-Ion Battery Installation Guide V1.0

Guide d'installation de batterie Ritar

Uploaded by

Mansour SOW
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views2 pages

RESS Li-Ion Battery Installation Guide V1.0

Guide d'installation de batterie Ritar

Uploaded by

Mansour SOW
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

BAT-5KWH , 10KWH

51.2V Li-ion Battery Installation Guide W W W. R I TA R P O W E R . C O M

This guide provides guidance on the safe and effective installation and operation wall mounted
Li-ion batteries. It also provides information on how to safely connect multiple batteries in parallel 1
1 Unpacking Inspection
2 Mechanical Installation
(Max. 6), as well as how to charge and discharge the batteries.

1. Unpack the battery and visually inspect the appearance. If any shipping damage is found,
CAUTION notify the carrier immediately. 2.1. Wall mounted for 5KWH

Due to the regulations governing the transportation of Lithium Ion cells and batteries 2. Press ON/OFF button to active the battery, the SOC and RUN indicator will be light.
Take out wall mounted accessories which include bracket and screws,
internationally. The battery is only 50% SOC during transport. Please charge battery turn on MCB to measure the output voltage by multimeter, For parallel application, the
fully in the first use. voltage difference should less than 500mV. Fix the bracket on the battery and remove the floor mounted part on the
Before connecting any electrical cable, turn OFF all the switches and breakers and turn 3. Press ON/OFF button to shutdown the battery, the indicator light will turn off. bottom of battery.
OFF the batteries by press the ON/OFF button.
.Avoid any fall or collision during the installation process.
Do not remove the battery components. The maintenance of the battery should be
carried out by a professional engineer.
2 4. Check the accessories which should include: Drill 4 pcs Φ10 *110mm holes on the wall, fix wall mounted part on the wall
and fasten the screw head of the expansion bolts

4.1. Accessories for 5KWH


Do not expose the Li-ion battery to heat in excess of 55°C during operation, 60 °C in storage.

System Introduction

Left view view

- + Accessories for floor mounted (prevent tilt) Accessories for wall mounted
Bracket for floor mounted Bracket for wall mounted
ON

- + ON
2 pcs outer hexagon inner cross combination bolt _M6X16mm 4 pcs stainless steel expansion screws M8*100mm
ADD

screws
ON/OFF OFF 2 pcs outer hexagon inner cross combination bolt _M8X16mm
ADD screws
CAN RS485 LINK-IN LINK-OUT

ON/OFF OFF

CAN RS485 LINK-IN LINK-OUT

RS485 PIN MAP CAN PIN MAP LINK-IN/OUT PIN MAP


2 pcs power cable - 1pc Communication 1pc Optional Part Optional Part Optional Part
Black, Red. cable-586B,CAT5e, 2m User manual RS485-USB device Wall mounted type parallel parts for
100A distribution box-300A floor mounted
8 7 6 5 4 3 21 8 7 6 5 4 3 21 25 mm2 high flexible 2pcs RJ45 terminal. Only for install engineer
8 7 6 5 4 3 21

wire, and after-sale engineer. For several batteries or


RJ45 PIN Description RJ45 PIN Description RJ45 PIN Description SC25-6 & SC25-8, inverters in parallel
L=1500mm
1 RS485_B 1,2,3,4,5,6 NC 1,2,3,4,5,6 NC

2 RS485_A 7 CAN_H 7 RS485-2_A

3,4,5,6,7,8 NC 8 CAN_L 8 RS485-2_B Note:


Ÿ Remember that the battery is heavy ! Please be careful when doing
4.1. Accessories for 10KWH
operation.

Ÿ Use a proper hammer to fit the expansion bolt into the holes. The screw
head protruding too long may interfere with the battery cabinet.

ON/OFF Button 2.2. Floor mounted for 5KWH


Accessories for floor mounted (prevent tilt) Accessories for wall mounted
Bracket for floor mounted Bracket for wall mounted
OFF mode
2 pcs outer hexagon inner cross combination bolt 8 pcs stainless steel expansion screws M8*100mm
_M6X16mm screws
4 pcs outer hexagon inner cross combination bolt _M8X16mm screws
550 mm
During in transport, BMS ON/OFF button is at OFF status. it will turn off
the BMS power supply.

ON mode

By press ON/OFF button to active BMS to enter into working mode, if the
MCB is also ON, the battery voltage will can be measured by terminal. 2 pcs power cable -Black, Red. 1pc 1pc Optional Part Optional Part Optional Part
100A Version Communication User manual RS485-USB device Wall mounted type parallel parts for
25 mm2 high flexible wire, distribution box-300A floor mounted
Even if the button is at ON mode, The BMS will enter into dormancy mode SC25-8 & SC25-8, L=1500mm
cable-
Only for install engineer 2 pcs outer
150A Version 586B,CAT5e, and after-sale engineer. For several batteries or hexagon inner
after 24 hours when there are no charge, no discharge and no 35 mm2 high flexible wire, 2m inverters in parallel cross combination
SC35-8 & SC35-8, L=1500mm bolt _M6X16mm
communication. it can be activated again by charge or communication or 200A Version 2pcs RJ45
screws
50 mm2 high flexible wire, terminal.
repress ON/OFF button. SC50-8 & SC50-8, L=1500mm

Ver V1.0 Publish Date:2023-06-10


BAT-5KWH , 10KWH
51.2V Li-ion Battery Installation Guide W W W. R I TA R P O W E R . C O M

4.2 Single inverter with 2 batteries

2.3. Wall mounted for 10KWH


3 Parallel Connection The below power cable connection can’t increase current. can support prolong
the backup time,

Take out wall mounted accessories which include bracket and screws, For floor mounted parallel connection, it supports to install as below:

Fix the bracket on the battery.

Drill 8 pcs Φ10 *110mm holes on the wall, fix wall mounted part on the wall and fasten the screw head
of the expansion bolts.

RS485 to USB cable

COM cable

ON ON

ADD

ON/ OFF OFF


- + - +
ADD

ON/ OFF OFF

4 Cable Connection
ON ON

CAN RS485 LINK-IN LINK-OUT


1 2 3 4 OFF CAN RS485 LINK-IN LINK-OUT
1 2 3 4 OFF

4.1 Single inverter with single battery Master battery

Step 1. Make sure the battery breaker is


in off condition. Connect the
power cable to inverter. Make
sure the screws are tight.
Step 2. Connect the communication
cable.
4.3 Single inverter with 2 batteries
Step 3. Set the battery module ID by
ADD. The master battery which
The below power cable connection can increase current to support big
do communication with
inverter ADD must be 1. COM cable
capacity inverter.

Step 4. Make sure the inverter had be The length of power cable should be the same.
Note: installed correctly.
Ÿ Remember that the battery is heavy (96Kg) ! Please be careful when doing operation. Step 5. Press ON/OFF button to active
the battery BMS and connect ON
Ÿ Use a proper hammer to fit the expansion bolt into the holes. The screw head protruding too long battery to PC by BMS PC
may interfere with the battery cabinet. software, select inverter protocol
ADD

- +
on BMS (detail operation refer to ON/OFF OFF

user manual)
2.4. Floor mounted for 10KWH
Step 6. Turn on battery breaker and the
RS485 to USB cable
inverter will be activated, set the ON
inverter (battery type and CAN RS485 LINK-IN LINK-OUT

protocol). 1 2 3 4 OFF

Step7. If the communication between


BMS and inverter is nominal, the
SOC, temperature information in
PC and inverter display will be
totally same.
Step8. Charge the batteries fully in
first use.
RS485 to USB cable ON ON

ADD

ON/ OFF OFF


- + - +
ADD

ON/ OFF OFF

Note:
Ÿ For 1pcs 5KWH battery and 10KWH-100A , it max support 5KVA inverter or the real load
ON
power consumption is less than 5KW. ON

CAN RS485 LINK-IN LINK-OUT


1 2 3 4 OFF CAN RS485 LINK-IN LINK-OUT
1 2 3 4 OFF
Ÿ For 1pcs 10KWH-150A battery , it max support 8KVA inverter or the real load power
consumption is less than 7KW. Master battery COM cable

Ÿ For 1pcs 10KWH-200A battery , it max support 10KVA inverter or the real load power
consumption is less than 8KW.

Ver V1.0 Publish Date:2023-06-10