NO.1 Which estimation technique can you use in an Agile delivery approach to size the user stories
during sprint planning?
A. Detailed top-down effort estimate by the Scrum Master in story points, based on the user story
complexity
B. Relative effort estimate in Ideal Person Days that reflects the best estimate by the Project Team
C. Product Owner's relative effort estimate that will be needed to implement and test the user story
D. Detailed bottom-up effort estimate by the Product Owner that breaks up each story into short
tasks
Answer: A
Explanation:
In Agile practices within SAP Activate, estimation is often conducted using "story points" to evaluate
relative size and complexity. A top-down approach led by the Scrum Master ensures that all aspects
of story complexity are considered, facilitating accurate, consensus-driven estimates.
NO.2 What activity do you perform during the daily stand-up meeting?
A. Refine acceptance criteria for the sprint.
B. Re-baseline the release plan.
C. Demo completed features.
D. Report showstoppers.
Answer: D
Explanation:
The daily stand-up meeting is focused on team alignment, with members reporting any roadblocks
(or "showstoppers") that hinder their progress. This activity ensures timely identification and
resolution of issues affecting sprint goals.
NO.3 Which of the following steps are part of the fit-to-standard process? Note: There are 2 correct
answers to this question.
A. Document integration requirements
B. Enable customers on standard business processes
C. Review Best Practices process flow
D. Design to-be business process models
Answer: B,C
Explanation:
The fit-to-standard process includes enabling customers to adopt standard business processes and
reviewing Best Practices process flows. These steps help align customer operations with SAP Best
Practices, reducing the need for extensive customization.
NO.4 What accelerator can help you document the configuration definition in the Explore phase?
A. Change request template
B. Test plan template
C. Data definition template
D. Backlog template
Answer: D
Explanation:
2
IT Certification Guaranteed, The Easy Way!
The backlog template is used in the Explore phase to document and track configurations and
requirements identified during workshops. It serves as a reference for configuration activities and
aligns with Agile practices by maintaining a structured list of needed changes and customizations.
NO.5 Which of the following tools can support you in managing requirements and software
development for implementation projects? Note: There are 2 correct answers to this question.
A. SAP Focused Run
B. Focused Build for SAP Solution Manager
C. SAP Cloud ALM
D. Focused Insights for SAP Solution Manager
Answer: B,C
Explanation:
Focused Build for SAP Solution Manager and SAP Cloud ALM provide functionalities for managing
requirements, tracking progress, and overseeing software development in implementation projects.
Both tools are specifically designed for project and requirements management.
NO.6 Which collaboration features are available in the SAP Community? Note: There are 2 correct
answers to this question.
A. Ask questions
B. Comment on Key Deliverables
C. Update Key Deliverable wikis
D. Follow community
Answer: A,D
Explanation:
In the SAP Community, users can ask questions to seek assistance from other members and follow
topics or communities to stay informed about relevant discussions. These features foster
collaborative learning and engagement.
NO.7 Which of the following is the customer's responsibility in both on-premise and private cloud
scenarios?
A. Database
B. Operating system
C. Middleware
D. Servers
Answer: D
Explanation:
In both on-premise and private cloud environments, customers are responsible for maintaining
physical or virtual servers. While cloud providers may manage other infrastructure components,
server maintenance is generally a customer responsibility in private cloud or on-premise settings.
NO.8 In which phase do you verify the SAP Best Practices content that meets the customer's
business needs, and capture delta requirements? Note: There are 2 correct answers to this question.
A. Discovery
B. Explore
3
IT Certification Guaranteed, The Easy Way!
C. Prepare
D. Realize
Answer: B
Explanation:
During the Explore phase, SAP Best Practices content is verified against the customer's business
needs, and any delta requirements are captured to tailor the solution. This phase ensures alignment
with business requirements before configuration.
NO.10 Which of the following are levels in the structure of an SAP Best Practices for SAP S/4HANA
Solution Package? Note: There are 2 correct answers to this question.
A. Scope Items
B. Business Process Scenarios
C. Configuration Guides
D. Building Blocks
Answer: A,D
Explanation:
In SAP Best Practices for SAP S/4HANA Solution Packages, Scope Items and Building Blocks represent
structured components. Scope Items define functional aspects, while Building Blocks provide detailed
configuration steps.
NO.12 What is the most granular level of the methodology you can view in the SAP Roadmap
4
IT Certification Guaranteed, The Easy Way!
Viewer?
A. Task
B. Workstream
C. Deliverable
D. Activities
Answer: A
Explanation:
In the SAP Roadmap Viewer, the Task level is the most detailed and granular level, breaking down
each phase into specific tasks that guide users through SAP Activate's step-by-step implementation
methodology.
NO.13 What is the objective of using scaling Scrum techniques when coordinating large teams in
complex projects?
A. To reallocate staff to skill-based teams such as developers in one single team.
B. To bring all specialists, such as the company legal advisors, into the Scrum team.
C. To manage the flow of information between the project and stakeholders.
D. To ensure alignment in architecture, configuration, and integration.
Answer: D
Explanation:
Scaling Scrum techniques, like Scrum of Scrums, aim to ensure consistent alignment in architecture,
configuration, and integration across multiple teams. This approach helps large projects maintain a
cohesive structure and unified progress, especially in complex implementations.
NO.14 What tool would you use for managing project tasks and Solution Documentation when
implementing SAP S/4HANA Cloud, public edition?
A. SAP Cloud ALM
B. SAP Signavio Process Navigator
C. SAP Roadmap Viewer
D. SAP Transformation Navigator
Answer: A
Explanation:
SAP Cloud ALM is the tool designed for managing project tasks and Solution Documentation in SAP
S/4HANA Cloud, public edition. It supports tracking project progress, documenting configurations,
and ensuring that deliverables are on track.
NO.15 What is one of the key activities performed towards the end of the Explore phase?
A. Setup of Solution Standardization Board
B. Operations Planning for operational readiness
C. Installation and setup of Sandbox system
D. Perform configuration settings in the system
Answer: A
Explanation:
Towards the end of the Explore phase, the Solution Standardization Board is set up to oversee
governance and maintain consistency across the solution, ensuring alignment with the overall design
5
IT Certification Guaranteed, The Easy Way!
NO.16 Comparing the SAP Activate methodology with Waterfall, what activities are performed by
the new project roles?
A. Product owner to discuss schedule with the customer
B. Scrum master to prepare the project plan
C. Scrum master and project sponsor to define the project charter
D. Scrum team to review best practices
Answer: D
Explanation:
In Agile methodologies like SAP Activate, Scrum teams are responsible for reviewing and applying
best practices to ensure effective solution implementation. Unlike Waterfall, where project managers
control most activities, Agile teams are self-organized and collaborate on continuous improvement.
NO.17 Which activity helps the project team identify and add user stories to the backlog?
A. Assessing documentation requirements
B. Benchmarking current business processes
C. Planning the release and sprints
D. Conducting the fit-to-standard workshop
Answer: D
Explanation:
The fit-to-standard workshop is a key activity in SAP Activate that involves aligning SAP standard
processes with business requirements. During this workshop, the team identifies gaps and additional
requirements, which are then translated into user stories and added to the backlog for
implementation.
NO.18 Who determines the tasks that are required to complete the committed backlog items in a
Sprint?
A. Project manager
B. Scrum master
C. Scrum team
D. Product owner
Answer: C
Explanation:
In Agile methodology, the Scrum team self-organizes to determine the specific tasks needed to
complete backlog items. This autonomy encourages accountability and collaboration among team
members to achieve sprint goals.
NO.19 What information does the project team need before they can correctly estimate the relative
size of backlog user stories? Note: There are 2 correct answers to this question.
A. Available project resources
B. Definition of Ready
C. Definition of Done
D. Benchmark user story
6
IT Certification Guaranteed, The Easy Way!
Answer: B,C
Explanation:
The "Definition of Ready" (DoR) ensures that user stories meet predefined criteria before estimation,
while the "Definition of Done" (DoD) clarifies the completion standards. Both definitions support
accurate estimations by establishing clear, mutual expectations for user stories.
NO.20 How do you set up Scrum teams? Note: There are 2 correct answers to this question.
A. As a cross-functional team covering multiple functions, like configuration, data loads, and testing.
B. By type of work, like configuration Scrum, documentation Scrum, and testing Scrum.
C. Based on group size, but a minimum of 12 people.
D. Based on end-to-end processes like order-to-cash.
Answer: A,D
Explanation:
Scrum teams are often set up as cross-functional teams with a mix of expertise (e.g., configuration,
data loads) or based on end-to-end processes (like order-to-cash). These setups allow teams to work
collaboratively across different aspects of the project while focusing on functional flows.
NO.21 When does the Scrum team receive formal confirmation that the user stories are completed
to the satisfaction of the product owner?
A. During the sprint review
B. During the sprint retrospective
C. During the sprint backlog review
D. During the sprint user acceptance test
Answer: A
Explanation:
In Agile project delivery, the sprint review is the formal event where the Scrum team demonstrates
the completed user stories to the product owner and stakeholders. This is when the product owner
confirms whether each user story meets the acceptance criteria and is considered complete.
NO.22 Which of the following tools are considered enablers for digital transformation? Note: There
are 3 correct answers to this question.
A. SAP Product Availability Matrix
B. SAP Roadmap Viewer
C. Software Logistics Toolset
D. SAP Activate Community
E. SAP Signavio Process Navigator
Answer: B,D,E
Explanation:
The SAP Roadmap Viewer provides project guidance, the SAP Activate Community facilitates
knowledge sharing, and the SAP Signavio Process Navigator offers process modeling tools. All three
tools support SAP's digital transformation initiatives by streamlining project planning, collaboration,
and process optimization.
NO.23 You are transitioning to SAP S/4HANA. In which phase do you adjust custom code?
7
IT Certification Guaranteed, The Easy Way!
A. Realize
B. Deploy
C. Explore
D. Prepare
Answer: A
Explanation:
Custom code adjustments are typically made in the Realize phase, where the system configuration
and development activities take place. This phase involves adapting custom code to align with SAP
S/4HANA's updated architecture and functionalities.
NO.24 What is the difference between the "New Implementation of SAP S/4HANA Cloud, public
edition" and the "New Implementation of SAP S/4HANA, private edition" transition paths? Note:
There are 2 correct answers to this question.
A. SAP S/4HANA Cloud, private edition uses the Implementation Guide (IMG), and SAP S/4HANA
Cloud, public edition uses SAP Central Business Configuration.
B. SAP S/4HANA Cloud, private edition is only available through SAP Cloud services and with
embedded implementation services from SAP.
C. SAP S/4HANA Cloud, public edition does NOT offer built-in capabilities for extensibility, while SAP
S/4HANA Cloud, private edition offers a full development environment.
D. Upgrades of SAP S/4HANA Cloud, public edition are based on SAP timelines, and upgrades of SAP
S/4HANA Cloud, private edition are based on timelines agreed upon between SAP and the customer.
Answer: A,D
Explanation:
The "New Implementation of SAP S/4HANA Cloud, public edition" leverages SAP Central Business
Configuration for guided setup, while the private edition uses the IMG for configuration. The public
edition follows a SAP-controlled upgrade schedule, whereas the private edition allows for customer-
specific upgrade timelines.
NO.25 Which of the following is part of the Explore phase in the "New Implementation of SAP
S/4HANA Cloud, public edition" transition path?
A. Request SAP S/4HANA Cloud Development System
B. Solution Validation and Delta Design
C. Develop and document Enablement Strategy
D. Fit-to-standard
Answer: D
Explanation:
In the SAP Activate methodology, the fit-to-standard workshop is a crucial component of the Explore
phase, especially in the context of the SAP S/4HANA Cloud, public edition. This workshop helps
validate standard processes against business requirements and is foundational to solution design.
8
IT Certification Guaranteed, The Easy Way!
NO.27 What findings do you document in the Explore Phase Fit-to-standard workshops? Note: There
are 3 correct answers to this question.
A. Detailed design of extensions
B. Process models
C. Key business decisions
D. Key user documentation
E. Confirmation of scope
Answer: B,C,E
Explanation:
In the Fit-to-Standard workshops during the Explore phase, findings such as process models, key
business decisions, and confirmation of scope are documented. These outputs form the basis for the
subsequent configuration and development efforts.
NO.28 When performing an SAP Readiness Check in system conversion, what areas are covered
within the result? Note: There are 3 correct answers to this question.
A. Active business functions
B. Recommended SAP Fiori apps
C. SAP and third-party interfaces
D. Sizing for SAP S/4HANA
E. Complete list of possible simplification items
Answer: A,B,E
Explanation:
The SAP Readiness Check covers areas including active business functions, recommended SAP Fiori
apps, and simplification items. It helps organizations assess the current system's compatibility and
requirements for conversion to SAP S/4HANA.
NO.29 When conducting an upgrade of an SAP S/4HANA Cloud, public edition three-system
landscape, in which phase are the Business Roles updated?
A. Explore
B. Deploy
C. Discover
D. Realize
Answer: D
Explanation:
During the Realize phase, Business Roles are updated to align with the upgraded solution's
requirements and configurations. This ensures that the roles meet both security and functional needs
in the updated environment.
9
IT Certification Guaranteed, The Easy Way!
NO.30 What are the two common approaches to Selective Data Transition adopting RISE with SAP?
Note: There are 2 correct answers to this question.
A. System Conversion
B. Shell Conversion
C. Mix and Match
D. Fit-to-Standard
Answer: B,C
Explanation:
In Selective Data Transition with RISE with SAP, Shell Conversion allows for migration with a minimal
data footprint, while Mix and Match enables flexible selection of data and configurations to migrate.
These approaches facilitate tailored migrations based on specific business needs.
NO.31 Which of the following is used to perform configuration in SAP S/4HANA Cloud, private
edition?
A. SAP Central Business Configuration
B. Self Service Configuration UIs (SSCUIs)
C. IMG (Implementation Guide)
D. SAP Solution Manager
Answer: C
Explanation:
In SAP S/4HANA Cloud, private edition, configuration is primarily performed using the IMG
(Implementation Guide), which allows for in-depth system customization similar to on-premise
systems.
NO.32 Which additional scope options does the strategic advisory service for cloud analytics offer?
Note: There are 2 correct answers to this question.
A. SAP S/4HANA for Central Finance
B. Baseline package
C. SAP Activate methodology for SAP Datasphere
D. Extended package
Answer: B,D
Explanation:
The strategic advisory service for cloud analytics includes a Baseline package, which provides
fundamental analytics capabilities, and an Extended package, offering additional options for more
comprehensive analytics support. These packages provide scalable options for organizations based
on their analytics needs.
NO.33 When applying a cloud mindset in a greenfield implementation, which of the following should
you consider? Note: There are 2 correct answers to this question.
A. Use supported extensibility technologies
B. Use quality gates
C. Ensure transparency on deviations
D. Use SAP Digital Discovery Assessment
10
IT Certification Guaranteed, The Easy Way!
Answer: A,C
Explanation:
In a greenfield implementation, a cloud mindset involves using supported extensibility technologies
to minimize customizations and ensure that any deviations are transparently managed. This approach
ensures scalability and alignment with cloud standards.
NO.34 Which of the following are levels in the structure of an SAP Best Practices for SAP S/4HANA
Solution Package? Note: There are 2 correct answers to this question.
A. Business Process Scenarios
B. Building Blocks
C. Scope Items
D. Configuration Guides
Answer: B,C
Explanation:
In SAP Best Practices for SAP S/4HANA Solution Packages, Scope Items and Building Blocks represent
structured components. Scope Items define functional aspects, while Building Blocks provide detailed
configuration steps.
NO.36 According to the Definition of Done, which activity must be completed for each Sprint?
A. Configuration must be transported to the production system.
B. Functionality must be released to the business.
C. Refinement of user story description must be completed.
D. The solution must be built and configured in the development system.
Answer: D
Explanation:
The Definition of Done specifies that all work for a sprint must be completed in the development
system to ensure that each increment is ready for potential release. This includes configuration,
testing, and documentation, preparing the solution for further testing and deployment.
NO.37 Your customer is using a non-SAP ERP system and decides to deploy SAP S/4HANA. Which of
the following options are available to your customer? Note: There are 3 correct answers to this
question.
A. System Conversion SAP S/4HANA
11
IT Certification Guaranteed, The Easy Way!
NO.38 Which of the following considerations apply when determining the project methodology?
Note: There are 3 correct answers to this question.
A. Readiness fit
B. Organizational fit
C. Integration fit
D. Project fit
E. Project Manager fit
Answer: B,C,D
Explanation:
Determining the project methodology requires evaluating the organizational fit to ensure the
methodology aligns with the company's culture, the integration fit for technical compatibility, and
the project fit to meet specific project requirements. These criteria help select a methodology that
supports project success.
NO.39 Which system tenant is the first to be provisioned when implementing SAP S/4HANA Cloud,
public edition?
A. SAP Cloud Identity Services
B. SAP S/4HANA Cloud Sandbox system
C. SAP S/4HANA Cloud Development system
D. Central Business Configuration system
Answer: D
Explanation:
The Central Business Configuration system is the first tenant provisioned, allowing configuration
settings for SAP S/4HANA Cloud, public edition. This system enables centralized and guided
configuration of the cloud environment.
NO.40 A customer with an existing SAP S/4HANA solution is exploring the best approach to move
without changing their landscape into the cloud. Which is the most suitable option for the customer?
A. Selective Data Transition
B. System Conversion
C. Mix and Match
D. Lift and Shift
Answer: D
12
IT Certification Guaranteed, The Easy Way!
NO.41 In which phase will the customer develop a preliminary strategy for building a target
Operations and Support organizational model?
A. Prepare
B. Explore
C. Discover
D. Realize
Answer: A
Explanation:
In the Prepare phase, customers develop a preliminary strategy for the Operations and Support
organizational model, setting the groundwork for operational readiness and support structures
required post-deployment.
NO.42 What technique helps a Scrum team to prioritize a large, flat backlog? Note: There are 2
correct answers to this question.
A. Splitting the backlog into epics
B. MOSCOW prioritization
C. A/B testing user stories
D. User story mapping
Answer: A,D
Explanation:
Splitting the backlog into epics organizes related user stories into larger themes, while user story
mapping helps visualize workflows, making prioritization clearer. Both techniques simplify backlog
management, helping teams focus on high-value deliverables.
NO.43 Which steps should you perform while preparing for a fit-to-standard analysis in an SAP Data
Warehouse Cloud project? Note: There are 2 correct answers to this question.
A. Review SAP S/4HANA Cloud best practices availability for your country.
B. Review Cutover Plan accelerator in the Data Management workstream.
C. Review all the necessary Implementation Design Principles (IDPs).
D. Review all the necessary leading practice process diagrams.
Answer: C,D
Explanation:
For a fit-to-standard analysis in SAP Data Warehouse Cloud, reviewing the necessary Implementation
Design Principles (IDPs) and leading practice process diagrams ensures that the design aligns with
best practices and project objectives.
NO.44 What criteria does the Scrum team use to sequence the product backlog? Note: There are 2
correct answers to this question.
A. Length of the sprint
B. Business priority
C. Experience of team members
D. Technical dependencies
Answer: B,D
Explanation:
13
IT Certification Guaranteed, The Easy Way!
The Scrum team prioritizes the backlog based on business priority, ensuring that high-value items are
addressed first. Technical dependencies are also considered to prevent delays and ensure smooth
workflow across sprints.
NO.45 For which of the following products do you find a specific set of SAP Best Practices for the
public sector?
A. SAP S/4HANA
B. SAP SuccessFactors Employee Central
C. SAP S/4HANA Cloud, public edition
D. SAP Ariba Supplier Management
Answer: C
Explanation:
SAP S/4HANA Cloud, public edition includes specific SAP Best Practices for the public sector, tailored
to address sector-specific requirements and compliance. These practices streamline implementation
by providing pre-configured processes.
NO.46 Which of the following is a key characteristic of the Agile project approach?
A. Higher business involvement in the early phases
B. Frequent and detailed release scheduling
C. Iterative build with frequent inspections
D. Frequent quality gates in each sprint
Answer: C
Explanation:
A core feature of Agile is its iterative nature, with regular inspections throughout each sprint. This
approach ensures adaptability and early issue resolution, promoting continuous alignment with
business requirements.
NO.47 What is the preferred option to migrate to SAP S/4HANA Cloud, private edition while keeping
most of the original processes and adding new configuration?
A. Mix and Match
B. System Conversion
C. Shell Conversion
D. New Implementation
Answer: C
Explanation:
Shell Conversion allows for the migration of SAP S/4HANA Cloud, private edition, by bringing over
most original processes while adding new configurations as needed, without a complete system
overhaul.
NO.48 What are the responsibilities of the product owner in release and sprint planning? Note:
There are 2 correct answers to this question.
A. Estimate the backlog user stories.
B. Define objectives for each release.
C. Analyze the functional and technical dependencies between user stories.
14
IT Certification Guaranteed, The Easy Way!
NO.49 Which accelerators support the fit-to-standard workshop in the Explore phase? Note: There
are 2 correct answers to this question.
A. Quality gate checklist and quality gate guide
B. Business-Driven Configuration questionnaire
C. Test plan document
D. Requirements feature in SAP Cloud ALM
Answer: B,D
Explanation:
The Business-Driven Configuration questionnaire helps gather business requirements relevant to SAP
Best Practices, while the Requirements feature in SAP Cloud ALM supports capturing requirements
and gaps identified in fit-to-standard workshops. Both accelerators streamline the process of
configuring the system to meet business needs.
NO.50 Which of the following cloud services are available on SAP Business Technology Platform?
Note: There are 3 correct answers to this question.
A. SAP Integration Suite
B. SAP HANA Cloud
C. SAP Cloud ALM
D. SAP Data Migration Cockpit
E. SAP Master Data Governance
Answer: A,B,E
Explanation:
SAP Business Technology Platform includes SAP Integration Suite for connecting applications, SAP
HANA Cloud for data storage, and SAP Master Data Governance for data management, all supporting
various integration, data, and governance needs.
NO.51 Which of the following tools facilitate secure communication between SAP cloud solutions
and protected on-premise networks that CANNOT be accessed directly from the Internet?
A. Identity Authentication service
B. SAP Build Cade
C. SAP BTP Connectivity service
D. Cloud Integration Automation service
Answer: C
Explanation:
The SAP BTP Connectivity service facilitates secure connections between SAP cloud solutions and on-
premise networks that are isolated from direct internet access, ensuring data security and
15
IT Certification Guaranteed, The Easy Way!
compliance.
NO.52 Which systems are part of the private cloud edition landscape? Note: There are 2 correct
answers to this question.
A. Starter
B. Sandbox
C. Evaluation
D. Production
Answer: B,D
Explanation:
In the SAP S/4HANA private cloud edition, Sandbox and Production systems are part of the
landscape, providing environments for testing and productive operations, respectively. These
systems support the full lifecycle of deployment and ongoing maintenance.
NO.53 Which of the following Accelerators can you find in the SAP Signavio Process Navigator? Note:
There are 2 correct answers to this question.
A. Process Diagram
B. Data Migration plan
C. Test Script
D. Stakeholder Identification Guide
Answer: A,C
Explanation:
SAP Signavio Process Navigator provides accelerators like Process Diagrams for visualizing workflows
and Test Scripts for validating process steps, supporting the analysis and configuration of business
processes in SAP implementations.
NO.54 Which of the following characteristics are mandatory with SAP S/4HANA Cloud, public
edition? Note: There are 2 correct answers to this question.
A. Software upgrades performed by SAP
B. Customer data center deployment
C. Activation of SAP Best Practices
D. Choice of hardware vendor
Answer: A,C
Explanation:
SAP S/4HANA Cloud, public edition is designed to have SAP-managed software upgrades to ensure
consistent quality and performance. Additionally, SAP Best Practices activation is mandatory to
ensure a standardized, streamlined implementation.
16
IT Certification Guaranteed, The Easy Way!
Explanation:
The Scrum of Scrums is a cross-team coordination meeting, allowing teams working on
interconnected deliverables to synchronize efforts, address dependencies, and manage impediments.
This approach is beneficial for large projects requiring multiple Scrum teams.
NO.56 Which of the following are capabilities of SAP Landscape Transformation Tool used in
Selective Data Transition scenarios? Note: There are 3 correct answers to this question.
A. Migration of selected applications
B. Migration of business units
C. Configuration of open backlog items
D. Consolidation of systems
E. Full set of historical transactional data
Answer: A,B,D
Explanation:
The SAP Landscape Transformation Tool enables selective migration by allowing the migration of
specific applications and business units, as well as the consolidation of systems. It provides flexibility
in data transition for selective data migration scenarios.
NO.58 Which SAP products relate to the scenarios included in the SAP Activate roadmap for the
Intelligent Enterprise? Note: There are 3 correct answers to this question.
A. SAP Fieldglass
B. SAP Integrated Business Planning for Supply Chain
C. SAP S/4HANA Cloud
D. SAP Concur
E. SAP Sales Cloud
Answer: A,C,D
Explanation:
SAP Activate's roadmap for the Intelligent Enterprise includes solutions like SAP Fieldglass for
workforce management, SAP S/4HANA Cloud as the digital core, and SAP Concur for travel and
expense management. These products align with the Intelligent Enterprise strategy to support end-
to-end business processes.
NO.59 Which of the following are capabilities of the test automation tool for SAP S/4HANA Cloud,
17
IT Certification Guaranteed, The Easy Way!
NO.60 What is the difference between the System Conversion and New Implementation transition
paths to SAP S/4HANA? Note: There are 2 correct answers to this question.
A. Custom code is developed in System Conversion and adjusted in New Implementation of SAP
S/4HANA in the Realize phase.
B. Custom code is adjusted in System Conversion and developed in New Implementation of SAP
S/4HANA in the Realize phase.
C. Data is converted in System Conversion and migrated in New Implementation of SAP S/4HANA in
the Realize phase.
D. Data is migrated in System Conversion and converted in New Implementation of SAP S/4HANA in
the Realize phase.
Answer: B,C
Explanation:
In System Conversion, custom code is adjusted to align with SAP S/4HANA requirements, while in
New Implementation, custom code is developed anew. Additionally, data is converted in System
Conversion, whereas in New Implementation, data is migrated from the legacy system.
NO.61 When working with an Agile approach, what is the minimum planning requirement expected
at the beginning of the Realize phase?
A. Sprint planning and sprint durations should be defined for the first 2 to 3 sprints.
B. Realize phase scope, planning, and budget should be completed and final.
C. User stories on the product backlog should be in a ready state for the first 2 to 3 sprints.
D. Release plan and sprint ceremony guidelines should be finalized.
Answer: A
Explanation:
At the start of the Realize phase, basic sprint planning and duration for the first few sprints should be
established to ensure a smooth start. This approach supports incremental development by setting
priorities and defining the immediate tasks for the project team.
NO.62 Which of the following are SAP Activate workstreams? Note: There are 2 correct answers to
this question.
A. Data Migration
B. Extensibility
C. Change Management
18
IT Certification Guaranteed, The Easy Way!
D. Project Management
Answer: A,D
Explanation:
SAP Activate includes workstreams such as Data Migration, which focuses on transferring data to the
SAP environment, and Project Management, which oversees project execution. These workstreams
provide structured guidance for implementing SAP solutions.
NO.63 What criteria does the product owner use to sequence the backlog? Note: There are 2 correct
answers to this question.
A. Technical dependencies
B. Duration of the sprint
C. Complexity of the story
D. Business priority
Answer: A,D
Explanation:
The product owner sequences backlog items primarily based on business priority to deliver the
highest value first, while also considering technical dependencies to prevent development delays.
This approach optimizes the team's efficiency in delivering value.
NO.64 In which phase do you collect the main functional attributes of the product as per the Agile
definition?
A. Discover
B. Prepare
C. Explore
D. Realize
Answer: C
Explanation:
In SAP Activate's Agile Project Planning, the Explore phase is when teams refine and capture the main
functional attributes of the product, often through user stories and requirements workshops. This
phase allows teams to iteratively understand, document, and confirm the main attributes before
moving to realization.
NO.65 Which tool do you use to configure SAP S/4HANA Cloud, public edition?
A. SAP Central Business Configuration
B. IMG (Implementation Guide)
C. SAP Solution Manager
D. SAP Cloud ALM
Answer: A
Explanation:
SAP Central Business Configuration is the primary tool for configuring SAP S/4HANA Cloud, public
edition. It provides a centralized interface for managing configuration settings across SAP cloud
environments.
NO.66 Which of the following capabilities does test management in SAP Cloud ALM for
19
IT Certification Guaranteed, The Easy Way!
NO.68 Which of the following activities take place during the Discover phase in an SAP BW/4HANA
implementation? Note: There are 2 correct answers to this question.
A. Create, review, and sign off the Project Charter.
B. Discuss the benefits and functionality of SAP Analytics Cloud.
C. Create, review, and sign off the Project Management Plan.
D. Discuss the benefits of SAP Data Warehouse Cloud.
Answer: B,D
Explanation:
In the Discover phase of an SAP BW/4HANA implementation, high-level discussions on the benefits of
related tools like SAP Analytics Cloud and SAP Data Warehouse Cloud take place. This phase focuses
on exploring and understanding available functionalities to inform decision-making.
NO.69 Which of the following best outlines the sequence of testing in the Realize phase?
A. Data Migration
String Test
User Acceptance Test
B. String Test
Integration Test
User Acceptance Test
C. String Test
User Acceptance Test
Integration Test
20
IT Certification Guaranteed, The Easy Way!
D. Integration Test
User Acceptance Test
String Test
Answer: B
Explanation:
The typical sequence of testing in the Realize phase begins with the String Test, followed by the
Integration Test to validate cross-functional flows, and concludes with the User Acceptance Test
(UAT) to confirm system readiness from an end-user perspective.
NO.70 A customer with an existing SAP S/4HANA solution is exploring the best approach to move
without changing their landscape into the cloud. Which is the most suitable option for the customer?
A. Selective Data Transition
B. System Conversion
C. Lift and Shift
D. Mix and Match
Answer: C
Explanation:
Lift and Shift is the preferred approach for customers aiming to move an existing SAP S/4HANA
system to the cloud with minimal changes to their current landscape. This option focuses on
infrastructure relocation rather than system transformation.
NO.72 What tool provides sizing estimations for the "System Conversion" transition path?
A. SAP Business Accelerator Hub
B. SAP Transformation Navigator
C. SAP Readiness Check
D. SAP Digital Discovery Assessment
Answer: C
Explanation:
SAP Readiness Check includes sizing estimations for system conversion to SAP S/4HANA, helping
organizations understand the system requirements and technical adjustments needed for successful
conversion.
NO.73 When deploying SAP S/4HANA Cloud, private edition using new implementation, which of the
21
IT Certification Guaranteed, The Easy Way!
following is recommended to code custom developments? Note: There are 2 correct answers to this
question.
A. SAP Support Portal
B. SAP Business Technology Platform
C. SAP ABAP Workbench
D. SAP Best Practices
Answer: B,C
Explanation:
For custom developments in SAP S/4HANA Cloud, private edition, SAP Business Technology Platform
provides the environment for side-by-side extensibility, while SAP ABAP Workbench supports in-app
custom development within the system.
NO.74 Which of the following are workshop design principles/guidelines? Note: There are 2 correct
answers to this question.
A. Expert configuration definitions
B. Fit-to-standard
C. Active participation
D. Validation by end users
Answer: B,C
Explanation:
The fit-to-standard approach and active participation are key principles in SAP Activate workshops.
Fit-to-standard ensures alignment with SAP Best Practices, while active participation engages
stakeholders in solution design, ensuring their needs are incorporated.
NO.75 From which platform are you able to deploy a trial system within a short timeframe?
A. SAP Learning Hub
B. SAP Cloud Appliance Library
C. SAP Support Portal
D. SAP Business Technology Platform
Answer: B
Explanation:
The SAP Cloud Appliance Library allows users to quickly deploy trial systems, enabling exploration
and evaluation of SAP solutions in a ready-to-use environment. This service provides preconfigured
trial instances to accelerate system setup.
NO.76 You are implementing SAP S/4HANA Cloud, public edition for your customer. How do you
activate the pre-configuration?
A. Via the SAP Contact Center
B. Via the SAP Business Technology Platform
C. Via the Central Business Configuration System
D. Via the SAP Cloud ALM
Answer: C
Explanation:
Pre-configuration for SAP S/4HANA Cloud, public edition, is activated via the Central Business
22
IT Certification Guaranteed, The Easy Way!
Configuration system, which centralizes and streamlines the configuration process for SAP Cloud
solutions.
NO.77 In which workshop do you validate SAP standard functionality and collect delta
requirements?
A. Solution design
B. Fit-to-standard
C. Fit-to-gap
D. Solution assessment
Answer: B
Explanation:
The Fit-to-Standard workshop is where SAP standard functionality is validated against business
requirements, and any additional needs (delta requirements) are identified. This approach ensures
alignment with SAP Best Practices while addressing specific business needs.
NO.78 Which of the following characteristics relate to the Focused Build for SAP Solution Manager
Functionality? Note: There are 2 correct answers to this question.
A. SAP delivers a standard solution without any additional coding required.
B. SAP delivers a standard solution with its own separate license.
C. SAP delivers all configuration values within your project.
D. SAP delivers all knowledge required with the solution.
Answer: A,D
Explanation:
Focused Build for SAP Solution Manager is a standardized solution, provided by SAP with all
necessary knowledge resources, requiring no additional coding for implementation. This functionality
supports efficient project tracking and delivery.
NO.79 What can you find in the SAP Fiori apps reference library? Note: There are 3 correct answers
to this question.
A. Shortcut to the Maintenance Planner tool to establish the technical update path
B. Related app recommendations based on your usage profile
C. Shortcut to the Quicksizer tool to estimate hardware requirements
D. Installation and configuration requirements for selected apps
E. Related app-specific solution design guidelines
Answer: B,D,E
Explanation:
The SAP Fiori apps reference library provides app recommendations, installation and configuration
requirements, and solution design guidelines. It serves as a comprehensive resource for information
about SAP Fiori apps to support implementation and customization.
NO.80 You are defining the testing strategy for your project.
What would you include in a Scope of Integration test? Note: There are 2 correct answers to this
question.
A. The procedures for data migration
23
IT Certification Guaranteed, The Easy Way!
NO.81 In which of the following do you use a work item in Focused Build?
A. Epics
B. Sprints
C. Waves
D. Releases
Answer: B
Explanation:
In SAP Focused Build, work items are assigned and managed within sprints to ensure that tasks align
with sprint goals and timelines. This facilitates tracking and completion of project work in an Agile
framework.
NO.82 When doing a new implementation on premise or private cloud, which system is
recommended to demonstrate standard functionality in the Explore phase?
A. Development
B. Starter
C. Trial
D. Sandbox
Answer: D
Explanation:
A Sandbox system is recommended in the Explore phase to demonstrate standard SAP functionality
and conduct initial testing. This environment allows for configuration and testing without affecting
the live environment, helping the project team understand standard capabilities.