DESILTING OF BAHAWALPUR DISTY RD: 111+000 TO RD: 125+000 IN
BAHAWALPUR SECTION.
EARTH WORK STATEMENT (SILT CLEARANCE)
SILT CLEARANCE
DIST
FT
RD
Area Total Mean Qty
Ft Ft Sft Sft Sft Cft
111+000 0 7 0 0.00 0
112+000 1000 21 28 14.00 14000
113+000 1000 18 39 19.50 19500
114+000 1000 6 24 12.00 12000
115+000 1000 6 12 6.00 6000
116+000 1000 5 11 5.50 5500
117+000 1000 7 12 6.00 6000
118+000 1000 8 15 7.50 7500
119+000 1000 8 16 8.00 8000
120+000 1000 15 23 11.50 11500
121+000 1000 6 21 10.50 10500
122+000 1000 3 9 4.50 4500
123+000 1000 2 5 2.50 2500
124+000 1000 2 4 2.00 2000
125+000 1000 2 4 2.00 2000
[Link] 111500
Sub Engineer Sub Divisional Officer Executive Engineer
Bahawalpur Section Baghdad Canal Sub Division Bahawalpur Canal Division
Bahawalpur Bahawalpur.