I am in the process of rou ng your project and missing the following document(s).
• Structural calculations
If you have any ques ons, please reach out to the reviewer who are working on your permit.
Building- [email protected]
NOTICE
1. The submitted construction document is not approved. The comments below summarize the markups or “redlines” on the submitted
document. Redlines will have to be addressed before the document can be approved. When re-submitting corrections, provide a full set of plans
of the file marked with redlines, including a response letter detailing all corrections made.
2. Use this summary to verify all items in the Building/Construction Plans are addressed. Any revisions to documents or calculations that have
been sealed and signed by a registered design professional such as an engineer or an architect will require, they be re-sealed and re-signed for
such revisions.
FILE--BLDG-PLAN_v3.pdf
Permit(s): BLDR2405192
Callout - Building (1)
Subject: Callout - Building
Sheet 4-6:
(Previous comment, still required)
Additions to a manufactured home require structural analysis by a registered design
professional (ex: structural or civil engineer). Any documents, reports, or calculations
will have to be sealed and signed by the registered design professional. The design Page Label: 3 Sheet 4-6:
(Previous comment, still required)
professional will have to verify that any additions to the existing manufactured home
will not affect the roof, walls, floor framing, and foundation or any part of the existing
/ structure of the home in an adverse way.
Status:
// 2018 IRC 106.1,301.1.3
I
'•,
Update 2/28:
Thank you for the revisions. Please know that manufactured homes are factory built
engineered buildings, an entire remodel of a manufactured home requires structural
Author: D.Rodriguez
existing structure of the home in an adverse way. Please provide engineering design
analysis and calculations for the remodel work. Per our phone conversation please
know that I am available in case you still have questions or would like to set up an in
person meeting to discuss the comments.
2018 IRC 106.1.1, Chapter 3 Building Planning
Update 2/28:
Thank you for the revisions. Please know that
manufactured homes are factory built engineered
buildings, an entire remodel of a manufactured home
requires structural analysis by a registered design
professional (ex: structural or civil engineer). Any
documents, reports, or calculations will have to be sealed
and signed by the registered design professional. The
design professional will have to verify that any additions
and the remodel to the existing manufactured home will
not affect the existing structure of the home in an adverse
way. Please provide engineering design analysis and
calculations for the remodel work. Per our phone
conversation please know that I am available in case you
still have questions or would like to set up an in person
meeting to discuss the comments.
2018 IRC 106.1.1, Chapter 3 Building Planning
Building Codes: 2018 IBC, 2018 IRC, 2018 IPC, 2018 IMC, 2018 IFGC, 2018 IEBC, 2017 NEC
Voluntary Building Codes: 2018 IECC, 2018 IGCC
301 W. Jefferson St., Suite 170
BUILDING PLAN REVIEW Phoenix, Arizona 85003
REDLINE MARKUP SUMMARY www.maricopa.gov/planning
NOTICE
1. The submitted construction document is not approved. The comments below summarize the markups or “redlines” on the submitted
document. Redlines will have to be addressed before the document can be approved. When re-submitting corrections, provide a full set of plans
of the file marked with redlines, including a response letter detailing all corrections made.
2. Use this summary to verify all items in the Building/Construction Plans are addressed. Any revisions to documents or calculations that have
been sealed and signed by a registered design professional such as an engineer or an architect will require, they be re-sealed and re-signed for
such revisions.
Cloud+ - Building (1)
Subject: Cloud+ - Building
Page Label: 1 Sheet 2-6:
Sheet 2-6:
The construction documents need to make reference to the building codes adopted by
(ex: 2018 IBC, 2018 IRC, 2018 IPC, 2018 IMC, 2018 IFGC, 2018 IEBC, 2017 NEC).
-Maricopa County Local Additions and Addenda, 2018 IRC R106.1.1)
Status: The construction documents need to make reference to
the building codes adopted by Maricopa County. Please
Please revise plans to reference 115 MPH wind and Exposure "C".
Author: D.Rodriguez
X: 1.5947 in provide a complete list of the adopted codes.
Y: 0.1146 in (ex: 2018 IBC, 2018 IRC, 2018 IPC, 2018 IMC, 2018
Layer: IFGC, 2018 IEBC, 2017 NEC).
-Maricopa County Local Additions and Addenda, 2018
IRC R106.1.1)
Status:
coordinate all plans, notes, details, calculations, etc. Where
plans and / or calculations are prepared by an Arizona
registered design professional, please provide sealed and
signed documents.
(2018 IRC R106.1, R301.1.3)
Update 2/28:
Thank you for the revisions, however plans are still missing all
structural connection details and important details. There are
items such as window sizes, and their type that are not
Author: D.Rodriguez Building plan review was not completed. The building
plans are incomplete and the plans provided appear to be
provided in the plans. There is no reference to the type of walls
that will be built (2x4 or 2x6) insulation, how tall they are, what
is the ceiling height throughout the home, how the new walls
X: 0.6880 in
will connect to the existing ceiling. Please revise and verify
plans meet the minimum requirements.
Update 2/28:
Thank you for the revisions, however plans are still
missing all structural connection details and important
details. There are items such as window sizes, and their
type that are not provided in the plans. There is no
reference to the type of walls that will be built (2x4 or 2x6)
insulation, how tall they are, what is the ceiling height
throughout the home, how the new walls will connect to
the existing ceiling. Please revise and verify plans meet
the minimum requirements.
Building Codes: 2018 IBC, 2018 IRC, 2018 IPC, 2018 IMC, 2018 IFGC, 2018 IEBC, 2017 NEC
Voluntary Building Codes: 2018 IECC, 2018 IGCC
301 W. Jefferson St., Suite 170
BUILDING PLAN REVIEW Phoenix, Arizona 85003
REDLINE MARKUP SUMMARY www.maricopa.gov/planning
NOTICE
1. The submitted construction document is not approved. The comments below summarize the markups or “redlines” on the submitted
document. Redlines will have to be addressed before the document can be approved. When re-submitting corrections, provide a full set of plans
of the file marked with redlines, including a response letter detailing all corrections made.
2. Use this summary to verify all items in the Building/Construction Plans are addressed. Any revisions to documents or calculations that have
been sealed and signed by a registered design professional such as an engineer or an architect will require, they be re-sealed and re-signed for
such revisions.
Sheet 5-6:
(Previous comment, still required) Subject: Text Box - Building
As of right now your plans do not meet the minimum
requirements for construction documents. Based on the
described scope of the project the following are the minimum
plans needed: Existing Floor Plan/Demo Plan (legible), New
Floor Plan, Electrical Plan, Foundation Plan, Roof framing Plan,
Elevations, Cross Sections, Structural Connection Details that Page Label: 4 Sheet 5-6:
(Previous comment, still required)
include exterior finishes . Please be aware that additional
information might be needed. While construction documents
are not required to be drawn by a registered architect, they are
-~
'-'
~
<
Status:
required to be drawn according to basic architectural
standards. Along with this review a construction plan checklist C", ,
Lr1
showing the items that should be shown in plans has been .
added to aid in the preparation of the construction documents. .
Update 2/28:
There is no foundation plan for the area that used to be a
carport. The home is raised and there is no floor framing plan,
CJ;:)
-
J .)
·.D
Author: D.Rodriguez As of right now your plans do not meet the minimum
requirements for construction documents. Based on the
there are no cross-sections, and elevations. There is no
reference to how th walls will be braced. Plans are not to scale.
There is a lot of questions that are not answered in the revised
X: 0.6847 in
plan provided. Please revise to clarify.
2018 IRC R106.1.1, Chapter 3 Building Planning
Update 2/28:
There is no foundation plan for the area that used to be a
carport. The home is raised and there is no floor framing
plan, there are no cross-sections, and elevations. There is
no reference to how th walls will be braced. Plans are not
to scale. There is a lot of questions that are not answered
in the revised plan provided. Please revise to clarify.
2018 IRC R106.1.1, Chapter 3 Building Planning
Building Codes: 2018 IBC, 2018 IRC, 2018 IPC, 2018 IMC, 2018 IFGC, 2018 IEBC, 2017 NEC
Voluntary Building Codes: 2018 IECC, 2018 IGCC
301 W. Jefferson St., Suite 170
BUILDING PLAN REVIEW Phoenix, Arizona 85003
REDLINE MARKUP SUMMARY www.maricopa.gov/planning
NOTICE
1. The submitted construction document is not approved. The comments below summarize the markups or “redlines” on the submitted
document. Redlines will have to be addressed before the document can be approved. When re-submitting corrections, provide a full set of plans
of the file marked with redlines, including a response letter detailing all corrections made.
2. Use this summary to verify all items in the Building/Construction Plans are addressed. Any revisions to documents or calculations that have
been sealed and signed by a registered design professional such as an engineer or an architect will require, they be re-sealed and re-signed for
such revisions.
Sheet 5-6:
(Previous comment, still required) Subject: Text Box - Building
It appears that the permit is for as-built construction (structure
built without permit or inspections) if so, Maricopa County will
accept the use of third party inspections to verify that the
construction meets the minimum requirements of the 2018
IBC/IRC. The third party inspection will have to be performed
by a registered design professional in the state of AZ (ex:
structural engineer or architect). The design professional will Page Label: 4 Sheet 5-6:
(Previous comment, still required)
have to evaluate the construction of the structure along with all
structural members (foundations, framing, roof framing, beams,
trusses, sheathing, nailing, structural connections, etc) and
Status:
provide a copy of any analysis, reports, observations, and a
description of how to remedy any construction found deficient.
MC Directive 2018-07 Structures Without a Permit.
The registered design professional will have to seal and sign
Author: D.Rodriguez
shown in the plans and that the plans meet the minimum
requirements of the 2018 IBC/IRC. A copy of that statement
has been included at the end of this review for reference.
I •• ·~
~~
plans. 1/1,D~<
X: 0.7201 in
2018 IRC R106.1.1, Chapter 3 Building Planning \,_.J.O;_:; '.1-- X:
ll. L.u
Update 2/28:
Statement will need to be included with the revised
engineered plans.
2018 IRC R106.1.1, Chapter 3 Building Planning
Building Codes: 2018 IBC, 2018 IRC, 2018 IPC, 2018 IMC, 2018 IFGC, 2018 IEBC, 2017 NEC
Voluntary Building Codes: 2018 IECC, 2018 IGCC
301 W. Jefferson St., Suite 170
BUILDING PLAN REVIEW Phoenix, Arizona 85003
REDLINE MARKUP SUMMARY www.maricopa.gov/planning
NOTICE
1. The submitted construction document is not approved. The comments below summarize the markups or “redlines” on the submitted
document. Redlines will have to be addressed before the document can be approved. When re-submitting corrections, provide a full set of plans
of the file marked with redlines, including a response letter detailing all corrections made.
2. Use this summary to verify all items in the Building/Construction Plans are addressed. Any revisions to documents or calculations that have
been sealed and signed by a registered design professional such as an engineer or an architect will require, they be re-sealed and re-signed for
such revisions.
FILE--SITE-PLAN_v2.pdf
Permit(s): BLDR2405192
Callout - Building (1)
Subject: Callout - Building
Page Label: 1 Sheet 1-6:
Please identify all areas where work is taken place. Sheet
Sheet 1-6:
Please identify all areas where work is taken place. Sheet 3-6
and Sheet 4-6 call out that this area of as-built construction to
Status:
be demolished and re-built. Please provide notes, a square
footage table, or another way that identifies all areas that will be
demolished and rebuilt, all areas remodeled, all new additions
and their square footages,
3-6 and Sheet 4-6 call out that this area of as-built
2018 IRC R106.1.1
Author: D.Rodriguez
X: 8.9052 in construction to be demolished and re-built. Please provide
Y: 3.9041 in notes, a square footage table, or another way that
Layer: identifies all areas that will be demolished and rebuilt, all
areas remodeled, all new additions and their square
footages,
2018 IRC R106.1.1
Cloud+ - Building (1)
Subject: Cloud+ - Building
Page Label: 1 Sheet 1-6:
Sheet 1-6: Status: Please remove all references to other jurisdictions.
Maricopa County is the authority having jurisdiction.
Please remove all references to other
jurisdictions. Maricopa County is the
Author: D.Rodriguez
authority having jurisdiction.
2018 IRC R101.1
Building Codes: 2018 IBC, 2018 IRC, 2018 IPC, 2018 IMC, 2018 IFGC, 2018 IEBC, 2017 NEC
Voluntary Building Codes: 2018 IECC, 2018 IGCC
Minimum Information Required in Residential Construction Plans
Residential projects vary in design and construction. This list is made available as a convenience
and is not intended to be all inclusive; additional items may be required.