Mittal
Date: 2025.05.09
[Link] IST
Reason: IREPS File [Link]-EL/0/MEC(WC)/1/2023-O/o PED/TRACTION/RDSO 198
4
Document
I/75419/2025
3802530/2025/O/o WM/Design/DMW/PTA
Location: IREPS-CRIS
Hkkjr ljdkj&jsy ea=ky; Government of India - Ministry of Railways
vuqla/kku vfHkdYi vkSjekud laxBu Research, Designs & Standards Organization,
y[kuÅ& LUCKNOW – 226011
E-mail: dse4group@[Link]
Telephone : 2465754 & 42226(Rly)
No. EL/3.1.10/1 (WLU) Dated: As signed
Principal Chief Electrical Engineer,
1. Central Railway, Mumbai, CST-400 001.
2. East Central Railway, Hazipur-844101.
3. East Coast Railway, Chandrashekharpur, Bhubaneshwar-751016.
4. Eastern Railway, Fairlie Place, Calcutta-700001.
5. North Central Railway, Block-A, Subedarganj, Allahabad- 211033.
6. Northern Railway, Baroda House, New Delhi-110001.
7. North Eastern Railway, Gorakhpur-273001.
8. South Central Railway, Secunderabad-500 071.
9. South East Central Railway, Bilaspur-495004.
10. South Eastern Railway, Garden Reach, Calcutta-700 043.
11. Southern Railway, Park Town, Chennai-600 003.
12. South Western Railway, Hubli-580020.
13. West Central Railway, Jabalpur-482001.
14. Western Railway, Churchgate, Mumbai-400 020
15. North East Frontier Railway, Maligaon, Guwahati-781011
16. North Western Railway, Jaipur- 302 006
17. Chittaranjan Locomotive Works, Chittaranjan - 713 331
18. Banaras Locomotive Works, Varanasi- 221004
19. Patiala locomotive Works, Patiyala- 147 003
Sub: Modification sheet no. RDSO/2025/EL/MS/0508, Rev. ‘0’ dated 23.04.2025
for provision of Waterless Urinal in WAP-7 Three Phase Electric
Locomotives.
*******
Modification sheet no. RDSO/2025/EL/MS/0508, Rev. ‘0’ dated 23.04.2025
for provision of Waterless Urinal in WAP-7 three phase electric locomotives has
been issued and enclosed here with.
This is for kind information and necessary action please.
Encl: As above
(Amit Yadav)
Joint Director Standard Electrical
File [Link]-EL/0/MEC(WC)/1/2023-O/o PED/TRACTION/RDSO 192
5
I/75418/2025
3802530/2025/O/o WM/Design/DMW/PTA
Hkkjr ljdkj&jsy ea=ky; Government of India - Ministry of Railways
vuqla/kku vfHkdYi vkSjekud laxBu Research, Designs & Standards Organization,
y[kuÅ& 226011
LUCKNOW – 226011
E-mail: dse4group@[Link]
Telephone : 2465754 & 42226(Rly)
No. EL/3.1.10/1 (WLU) Dated: As signed
Principal Chief Electrical Engineer,
1. Central Railway, Mumbai, CST-400 001.
2. East Central Railway, Hazipur-844101.
3. East Coast Railway, Chandrashekharpur, Bhubaneshwar-751016.
4. Eastern Railway, Fairlie Place, Calcutta-700001.
5. North Central Railway, Block-A, Subedarganj, Allahabad- 211033.
6. Northern Railway, Baroda House, New Delhi-110001.
7. North Eastern Railway, Gorakhpur-273001.
8. South Central Railway, Secunderabad-500 071.
9. South East Central Railway, Bilaspur-495004.
10. South Eastern Railway, Garden Reach, Calcutta-700 043.
11. Southern Railway, Park Town, Chennai-600 003.
12. South Western Railway, Hubli-580020.
13. West Central Railway, Jabalpur-482001.
14. Western Railway, Churchgate, Mumbai-400 020
15. North East Frontier Railway, Maligaon, Guwahati-781011
16. North Western Railway, Jaipur- 302 006
17. Chittaranjan Locomotive Works, Chittaranjan - 713 331
18. Banaras Locomotive Works, Varanasi- 221004
19. Patiala locomotive Works, Patiyala- 147 003
Modification Sheet No. RDSO/2025/EL/MS/0508, Rev. ‘0’ Dated: 23.04.2025
1. TITLE:
Provision of Waterless Urinal in WAP-7 Three Phase Electric Locomotives.
2. Object:
Indian Railway has always endeavour to provide best in class facilities to the
passengers. Provision of superior toilets in trains has been one of the key focus
areas of Indian Railway. In the same pursuit, it becomes imminent for Indian
Railway to provide safe and hygienic urinal facility to its Loco Pilots who are the
fountain head of the exemplary services offered by Indian Railway to its
passengers.
The Waterless Urinal in WAG-9HC locomotives are being provided in the space
available near Cab-1 (LHS). Since there is no such required space (1050 L X 600
W X 1830 H) available in WAP-7 locomotives. Waterless urinal shall be installed
at the space vacated by harmonic filter as per RDSO Modification Sheet No.
RDSO/2024/EL/MS/0504, Rev. 1 dated 23.04.2025.
3. Modified Arrangement:
This scheme shall be applicable to those locomotives where Harmonic
Filter can be removed as per RDSO Modification Sheet No.
RDSO/2024/EL/MS/0504, Rev. 1 dated 23.04.2025 or latest. Waterless urinal
Page 1 of 3
File [Link]-EL/0/MEC(WC)/1/2023-O/o PED/TRACTION/RDSO 193
6
I/75418/2025
3802530/2025/O/o WM/Design/DMW/PTA
shall be installed at vacated space on suitable mounting frame after
removal of Harmonic Filter as annexure-I.
Work to be done
i. Complete Harmonic filter cubicle shall be removed from the Loco and
the Waterless Urinal shall be installed after providing the mounting
frame. Shown as given below:
ii. The Waterless Urinal mounting stand shall be as per drawing attached as
annexure-II.
iii. The design of urinal has been prepared for WAG9 locomotives with
maximum permissible height of 1830 mm. However for fitment in
WAP7 locomotives as per this modification sheet the vendor supplying
urinals with height above 1750 mm will have to shorten the door from
bottom by 40 mm and a U channel shall be provided to fit the
waterless urinal as per drawing attached as annexure-III.
iv. The discharge pipe for the waterless urinal shall be fitted beside
wheel no. 6. The discharge pipe shall be secured with additional
clamps as shown below.
Discharge pipeline
4. Material required:
i. 01 No. Waterless Urinal.
ii. 01 No. Mounting Frame.
iii. Drainage pipe as per requirement.
iv. Clamp and Nut & Bolt as per requirement.
Page 2 of 3
File [Link]-EL/0/MEC(WC)/1/2023-O/o PED/TRACTION/RDSO 194
7
I/75418/2025
3802530/2025/O/o WM/Design/DMW/PTA
5. Reference: (i) FRS No. RDSO/2023/EL/FRS/0034 (Rev-01) or latest.
(ii) RDSO Modification Sheet No. RDSO/2024/EL/MS/0504,
Rev. 1 dated 23.04.2025 or latest.
6. Applicable to class of Locomotives: WAP-7
7. Agency of Implementation: All POH workshop/Electric Loco Sheds/PUs
Encl: as above.
(Amit Yadav)
Joint Director Standard Electrical
Copy to: As per standard mailing list.
Page 3 of 3
File [Link]-EL/0/MEC(WC)/1/2023-O/o PED/TRACTION/RDSO 195
8
I/75418/2025
3802530/2025/O/o WM/Design/DMW/PTA
File [Link]-EL/0/MEC(WC)/1/2023-O/o PED/TRACTION/RDSO 196
9
I/75418/2025
3802530/2025/O/o WM/Design/DMW/PTA
File [Link]-EL/0/MEC(WC)/1/2023-O/o PED/TRACTION/RDSO 197
10
I/75418/2025
3802530/2025/O/o WM/Design/DMW/PTA