Pneumatic Hammer Incoming Checklist

This document presents a checklist for inspecting a pneumatic hammer before use. It contains 7 points to check, such as the condition of the compressor, hoses, the chisel, and controls. It also emphasizes the importance of using personal protective equipment like goggles and gloves, and authorizing the entry and exit of the equipment.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views2 pages

Pneumatic Hammer Incoming Checklist

This document presents a checklist for inspecting a pneumatic hammer before use. It contains 7 points to check, such as the condition of the compressor, hoses, the chisel, and controls. It also emphasizes the importance of using personal protective equipment like goggles and gloves, and authorizing the entry and exit of the equipment.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

CHECK LIST INCOMING PNEUMATIC HAMMER

Company: Equipment usage manager:

Activity:

No. Fecha de Ingreso Equipo: Duration of the Work: Specific Site:


Income
Days of the month
ITEM CHECK PARAMETER Cumple
NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Protective glasses, gloves,
respiratory protection against fumes
Protective elements
1 metallic, sleeves, gaiters (these
personal
elements are in meat), protection
auditory

Free from dust or notable deterioration


2 Compressor status
Loose or misaligned screws

Clean without wear, exposed threads or


3 Hoses
burned, without splices (Maximums 1)

4 Pointer Check that it is in good condition

Control knobs in good condition


5 Switch
conditions

Operation
Strange noises, short circuit or
6 general (with the machine
presence of smoke
lit)

7 Terminals With enough adjustment

OPERATE THE EQUIPMENT ONLY AFTER EXECUTING THE


ENTRY INSPECTION

CONDUCT INSPECTION DAILY ACCORDING TO USAGE TIME


SECURITY LEADERS

Personal protective equipment must be used.


CORRECTLY

IN CASE OF NON-COMPLIANCE, PROHIBIT THE ENTRY OF EQUIPMENT


(VIGILANTES)

Equipment Entry Authorization


Company__________________________

Equipment Exit Authorization


Company_________________________
REGISTER THE PROBLEMS NOTED IN THE ENTRY INSPECTION
DATE OPERATOR ITEM PROBLEMA SOLUCIÓN Responsible