0% found this document useful (0 votes)
54 views15 pages

Project Proposal for Healthcare Empowerment

The document outlines a project proposal by M/s Dewarimata Healthcare Tribal and Weaker Association aimed at empowering marginalized communities in Jharkhand through healthcare, education, skill development, and social support programs. It details the Integrated District Development Project (IDDP) designed to enhance infrastructure and public services across 24 districts, focusing on inclusive growth and poverty reduction. The project includes various components such as core infrastructure, social services, WASH, livelihoods, and digital governance, with a total budget of 9,500 crore INR over five years.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views15 pages

Project Proposal for Healthcare Empowerment

The document outlines a project proposal by M/s Dewarimata Healthcare Tribal and Weaker Association aimed at empowering marginalized communities in Jharkhand through healthcare, education, skill development, and social support programs. It details the Integrated District Development Project (IDDP) designed to enhance infrastructure and public services across 24 districts, focusing on inclusive growth and poverty reduction. The project includes various components such as core infrastructure, social services, WASH, livelihoods, and digital governance, with a total budget of 9,500 crore INR over five years.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

**Project Proposal for M/s Dewarimata Healthcare Tribal and Weaker Association**

**1. Organization Overview**


M/s Dewarimata Healthcare Tribal and Weaker Association is a dedicated non-
governmental organization committed to uplifting marginalized communities, including
Scheduled Castes (SC), Scheduled Tribes (ST), Other Backward Classes (OBC), and
economically disadvantaged individuals. Our multifaceted approach addresses critical
areas such as healthcare, education, skill development, and social inclusion to foster
sustainable development among vulnerable populations.

**2. Mission Statement**


To empower tribal, weaker, and underprivileged communities by providing accessible
healthcare, educational opportunities, skill enhancement, and social support programs,
thereby enabling them to lead dignified and self-reliant lives.

**3. Objectives**
- Deliver affordable and accessible healthcare services, including treatment and
distribution of generic medicine to impoverished individuals.
- Conduct awareness programs focusing on health, hygiene, and social well-being.
- Facilitate skill development initiatives aimed at enhancing employability among SC, ST,
OBC, and other underprivileged groups, especially tribal communities.
- Provide scholarships to students from SC, ST, and economically disadvantaged
backgrounds to support their educational pursuits.
- Assist beggars and homeless individuals by integrating them into mainstream society
through rehabilitation programs.
- Offer free nutritious food to the poor and provide compassionate care for the elderly.

**4. Key Programs and Activities**


- **Healthcare Services: ** Regular medical camps, generic drug distribution, and health
check-ups targeting underserved populations, IEC Awareness programs.
- **Awareness Campaigns:** Educational workshops and community outreach on
preventive healthcare, sanitation, and rights awareness.
- **Skill Development:** Vocational training and capacity-building sessions tailored to
local employment opportunities.
- **Educational Support:** Scholarship programs to encourage academic continuation
among marginalized students.
- **Social Rehabilitation:** Support and integration programs for beggars and homeless
individuals to regain self-sufficiency.
- **Community Welfare:** Food distribution drives and quality eldercare services to
uphold community well-being.
**5. Target Beneficiaries**
- Scheduled Castes (SC), Scheduled Tribes (ST), Other Backward Classes (OBC)
- Economically disadvantaged individuals, including beggars and homeless persons
- Elderly persons in need of care and support
- Students from marginalized communities requiring educational assistance

**6. Expected Outcomes**


- Improved health and reduced disease burden among target communities.
- Enhanced awareness leading to healthier lifestyles and informed choices.
- Increased employability and economic independence through skill development.
- Greater educational attainment among marginalized students.
- Successful rehabilitation and social inclusion of homeless and beggar populations.
- Strengthened community support systems for the elderly and poor.

**7. Conclusion**
M/s Dewarimata Healthcare Tribal and Weaker Association is committed to creating
lasting positive change by addressing the intertwined challenges of health, education, and
social inequity. Through collaborative efforts and community-centered initiatives, we
strive to empower those who need it most and build a stronger, more inclusive society.

---

**Contact Information:**
[Organization Address]
[Phone Number]
[Email Address]
[Website, if available]
Integrated District Development Project Plan for 24 Districts of Jharkhand

1. Project Overview

The Integrated District Development Project (IDDP) aims to strengthen essential


infrastructure and public services across all 24 districts of Jharkhand, with a focus on
inclusive growth, poverty reduction, and improved human development indicators. The plan
covers sectoral investments in rural infrastructure, health, education, drinking water,
sanitation, livelihoods, and digital governance, with strong emphasis on tribal and remote
blocks.

The project adopts a phased, five-year implementation framework with clear milestones,
institutional roles, and a robust monitoring and evaluation (M&E) mechanism. District
administrations will lead implementation with technical support from state departments and
specialized agencies, guided by uniform planning templates, expenditure norms, and
reporting formats to ensure comparability and transparency across all districts.

2. Project Objectives and Scope

The primary objectives are to: (a) upgrade critical infrastructure in all districts to minimum
service standards; (b) enhance access to quality health and education; (c) expand livelihood
opportunities, especially for women and youth; and (d) strengthen institutional capacity for
planning, financial management, and data-driven governance. Cross-cutting priorities
include climate resilience, gender equity, and social inclusion for Scheduled Tribes and other
vulnerable groups.

The project’s geographic scope covers all 24 districts of Jharkhand, encompassing urban,
peri-urban, and rural areas. Sectoral scope includes: district-level roads and connectivity,
rural water supply, sanitation facilities, health centers, schools and hostels, skill development
centers, agriculture and allied activities support, digital infrastructure, and e-governance
systems. Each district will prepare a District Annual Action Plan aligned with this state
framework.

3. District Coverage and Demographics

This section summarizes the 24 districts covered under the project and provides an
indicative demographic and development snapshot. Detailed baseline data will be
maintained at district level for planning and monitoring; the table below provides a
consolidated view for state-level decision-making and resource allocation.

Population and area figures are illustrative and meant to serve as planning proxies where
recent census data or official estimates are not yet available. Districts with higher
population, larger geographic spread, or lower development indicators will receive
proportionately higher allocations and more intensive technical support.

Estimated Population Area (sq. Urbanization


District Priority Category
(lakhs) km) Level

Ranchi 32.0 5097 High Growth hub

Dhanbad 29.0 2079 High Growth hub

East Singhbhum 24.0 3562 High Industrial corridor

West Singhbhum 18.0 7224 Low Tribal focus

Hazaribagh 18.0 3555 Medium Balanced

Giridih 25.0 4853 Low Backward

Bokaro 21.0 2861 High Industrial corridor

Tourism and
Deoghar 17.0 2479 Medium
services

Palamu 20.0 5043 Low Aspirational

Garhwa 14.0 4093 Low Aspirational

Latehar 8.0 3653 Low Forest and tribal

Chatra 13.0 3706 Low Backward

Koderma 7.0 1312 Medium Mining affected

Ramgarh 10.0 1360 Medium Industrial belt

Lohardaga 5.0 1491 Low Tribal focus


Gumla 12.0 5327 Low Tribal focus

Simdega 6.0 3761 Low Tribal focus

Khunti 5.0 2535 Low Tribal focus

Jamtara 8.0 1802 Low Backward

Dumka 15.0 3716 Low Tribal focus

Pakur 9.0 1805 Low Stone mining belt

Godda 14.0 2266 Low Backward

Sahebganj 11.0 1599 Low Riverine belt

Seraikela Industrial and


12.0 2657 Medium
Kharsawan tribal

4. Project Components

The project is structured into six major components: (1) Core Infrastructure and
Connectivity, (2) Social Infrastructure (Health and Education), (3) Water, Sanitation and
Hygiene (WASH), (4) Livelihoods and Skills, (5) Digital Governance and Data Systems, and (6)
Project Management, Capacity Building and Contingency. Each component has defined
outputs, activities, and expenditure norms to enable harmonized planning and budgeting
across districts.

District Project Implementation Units (DPIUs) will customize activities to local context while
adhering to state-level guidelines. Convergence with existing flagship schemes such as
PMGSY, Jal Jeevan Mission, Swachh Bharat Mission, National Health Mission and Samagra
Shiksha will be maximized to leverage funds and avoid duplication. The project will also
promote community participation through Village Development Committees and User
Groups.

4.1 Core Infrastructure and Connectivity


This component focuses on improving rural and district-level connectivity, including
upgradation of rural roads to all-weather standards, strengthening of key district roads,
construction of small bridges and culverts, and improvement of last-mile access to health
centers, schools, and markets. Priority will be given to habitations with poor connectivity,
hilly and forested areas, and tribal regions facing seasonal isolation.

Standard technical specifications, environmental safeguards, and road safety measures will
be followed. Local materials and labor-intensive methods will be encouraged where feasible
to create employment. Maintenance contracts and community-based monitoring will be
integrated into road planning to ensure long-term sustainability and asset quality.

4.2 Social Infrastructure: Health and Education


This component will support the construction, renovation, and functional strengthening of
health and education facilities, including Health Sub-Centers, Primary Health Centres,
Community Health Centres, schools, hostels, and Anganwadi Centres. Investments will target
gaps in infrastructure, equipment, power supply, water, sanitation, and digital connectivity
to ensure service readiness and quality.

Special focus will be given to maternal and child health facilities, adolescent-friendly
services, and upgradation of schools in tribal and remote blocks. Convergence with state and
national health and education missions will be ensured, and community-level institutions
such as School Management Committees and Rogi Kalyan Samitis will be engaged in
planning, monitoring, and social audits.

4.3 Water, Sanitation and Hygiene (WASH)

The WASH component aims to provide reliable access to safe drinking water, functional
household tap connections, adequate sanitation facilities, and behavior change
communication on hygiene. It will complement Jal Jeevan Mission and Swachh Bharat
initiatives by focusing on last-mile coverage, system sustainability, and operation and
maintenance capacity at the community level.

Activities include small piped water supply schemes, handpump rehabilitation, construction
of household and community toilets, solid and liquid waste management systems, and
school and Anganwadi WASH facilities. Community ownership will be promoted through
Village Water and Sanitation Committees, user charges for O&M, and regular quality
monitoring using simple field testing kits.

4.4 Livelihoods, Agriculture and Skills


This component will promote diversified and sustainable livelihoods through support to
agriculture, allied sectors, non-farm enterprises, and skills development. It will build on
existing self-help group (SHG) platforms and producer collectives, and link them to markets,
financial services, and technical extension. Special initiatives will target women, youth, and
tribal entrepreneurs.

Key activities include promotion of climate-resilient agriculture, small irrigation structures,


livestock and poultry interventions, value addition and processing units, skill training
centers, and placement-linked vocational courses. District-level value chain analyses will
inform investment decisions, while partnerships with private sector and training providers
will support market-relevant skills.

4.5 Digital Governance and Data Systems


This component aims to enhance digital infrastructure and governance capacity in all
districts, including reliable internet connectivity in key offices, digital service delivery kiosks,
and integrated data systems for planning and monitoring. District dashboards will be
developed to track indicators across sectors and support evidence-based decision-making.

Core activities include setting up district and block-level data centers, equipping offices with
necessary hardware and secure connectivity, training staff in data management and
e-governance tools, and integrating project M&E with existing state MIS platforms. Citizen
service centers will be strengthened to deliver key certificates, payments, and grievance
redressal services electronically.

5. Implementation Strategy and Timeline

The project will be implemented over a five-year period in three phases: Phase I (Year 1) for
detailed planning, capacity building, and pilot works; Phase II (Years 2-3) for scale-up of
infrastructure and service delivery interventions; and Phase III (Years 4-5) for consolidation,
quality improvement, and sustainability measures. Annual District Plans will guide activity
sequencing and budgeting within this overarching framework.

Implementation responsibilities will be shared between the State Project Management Unit
(SPMU), District Project Implementation Units (DPIUs), and line departments. Standard
Operating Procedures (SOPs) will define roles for procurement, financial management,
safeguards, and reporting. Regular progress reviews, field visits, and third-party assessments
will help maintain pace and quality of implementation.

5.1 High-Level Implementation Schedule

The table below outlines the high-level implementation schedule, indicating key milestones
and focus areas in each year of the project life cycle. Detailed Gantt charts will be prepared
at district level, aligned with local conditions such as monsoon, procurement lead times, and
community processes.

Regular mid-year and end-year reviews will be conducted at state and district levels to adjust
timelines based on ground realities. Priority will be given to completing partially executed
works before initiating new activities to avoid thin spreading of resources and ensure visible
outcomes.

Year Main Focus Key Milestones

Year 1 Planning and pilots Baseline surveys, capacity building, pilot works in all districts

Year 2 Scale-up infrastructure Major road, WASH, and facility upgrades initiated

Completion of bulk physical works, expansion of livelihoods


Year 3 Peak implementation
and skills

Year 4 Quality and Maintenance systems, O&M funds, institutionalization of


sustainability processes

Impact evaluation, knowledge products, transition to regular


Year 5 Consolidation and exit
schemes

6. Expenditure Plan and Budget Framework

The total indicative project outlay is assumed at 9,500 crore INR over five years, with
allocations distributed across components and districts using transparent criteria. At least 60
percent of funds will be earmarked for capital works, 20 percent for livelihoods and skills,
and the remaining 20 percent for capacity building, digital systems, and project
management. A minimum share of 30 percent will be dedicated to tribal-dominated districts
and blocks.

Funding will be pooled from state budget, central schemes, and potential development
partners. Districts will receive annual ceilings based on population, backwardness index, and
absorptive capacity. Release of funds will be performance-linked, based on utilization
certificates, output indicators, and adherence to financial management norms.

6.1 Component-wise Expenditure Table

The table below summarizes the indicative component-wise budget for the entire state.
District-level planning will further break down these figures into specific schemes, locations,
and line items such as construction, materials, equipment, staffing, training, and operations
and maintenance.

All districts will maintain detailed expenditure registers and digital records, reconciled
quarterly with treasury data. Standardized unit costs and procurement procedures will be
followed to ensure value for money and comparability across locations.

Budget (crore Share of


Component Main Cost Heads
INR) Total (%)

Core Infrastructure and Roads, bridges, culverts, site


3800 40
Connectivity development

Social Infrastructure (Health Buildings, renovation,


2200 23
and Education) equipment, power backup

Water, Sanitation and Hygiene Piped schemes, toilets, waste


1400 15
(WASH) management

Training, producer groups, small


Livelihoods and Skills 1300 14
infrastructure

Digital Governance and Data Hardware, software, connectivity,


500 5
Systems MIS
Project Management and
300 3 Staffing, TA, audits, contingencies
Contingency

6.2 District-wise Annual Allocations (Illustrative)

District allocations will be calculated using a formula that combines population share,
backwardness score, tribal share, and implementation performance. The following table
provides an illustrative first-year allocation scenario, which will be refined based on finalized
criteria, latest data, and field assessments.

Each district will further divide its allocation across components and blocks, ensuring
minimum shares for health, education, WASH, and livelihoods. Flexibility margins will allow
reallocation between components within defined limits, subject to state approval and
performance reviews.

Year 1 Allocation
District Priority Category Indicative Focus Area
(crore INR)

Urban-rural connectivity, health


Ranchi Growth hub 320
facilities

Roads, WASH, pollution-affected


Dhanbad Growth hub 300
areas

Industrial
East Singhbhum 280 Industrial-rural link roads, schools
corridor

Remote tribal roads, health posts,


West Singhbhum Tribal focus 260
WASH

Giridih Backward 250 Rural connectivity, livelihoods

Industrial
Bokaro 240 Urban-rural WASH, schools
corridor

Tourism and Health, WASH, tourism-linked


Deoghar 220
services roads

Hazaribagh Balanced 210 Roads, skill centers

Palamu Aspirational 210 Tribal blocks, irrigation, WASH

Garhwa Aspirational 200 WASH, roads, livelihoods

Dumka Tribal focus 200 Health and education facilities

Godda Backward 190 Roads, schools, WASH

Gumla Tribal focus 190 Remote health centers, livelihoods


Seraikela Industrial and
180 Connectivity, skills, WASH
Kharsawan tribal

Sahebganj Riverine belt 170 Flood-resilient WASH, roads

Stone mining Health, WASH, pollution


Pakur 170
belt mitigation

Chatra Backward 160 Roads, schools, skills

Jamtara Backward 150 Education and WASH

Ramgarh Industrial belt 150 Roads and WASH

Latehar Forest and tribal 140 Remote roads, tribal livelihoods

Simdega Tribal focus 130 Health and education facilities

Khunti Tribal focus 130 Roads, WASH, digital services

Lohardaga Tribal focus 120 Health sub-centers, irrigation

Health, WASH, pollution-affected


Koderma Mining affected 120
habitations

7. Planning, Coordination and Institutional Arrangements

At the state level, a State Project Steering Committee chaired by the Chief Secretary will
provide strategic guidance, approve annual work plans and budgets, and review overall
performance. A State Project Management Unit under the Planning or Rural Development
Department will coordinate across line departments, manage funds, ensure safeguards
compliance, and provide technical assistance to districts.

At district level, the Deputy Commissioner will chair the District Project Coordination
Committee, which will include heads of key departments, representatives from Panchayati
Raj Institutions, and civil society. District Project Implementation Units staffed with
dedicated personnel in engineering, procurement, finance, social development, and M&E
will manage day-to-day implementation and coordination with blocks and Gram Panchayats.

8. Monitoring, Evaluation and Reporting

A comprehensive M&E framework will be established with clearly defined input, output,
outcome, and impact indicators for each component. Baseline data will be collected in Year
1, followed by regular progress monitoring using field reports, remote sensing where
applicable, and citizen feedback mechanisms. Third-party verification will be used for major
infrastructure and WASH outcomes.
District dashboards will track key indicators such as road kilometers improved, functional
WASH connections, upgraded health and education facilities, households supported through
livelihoods, and trained youth placed in jobs. Quarterly progress reports will be consolidated
at state level, and annual public reports will be disseminated to promote transparency and
accountability.

8.1 Key Monitoring Indicators (Illustrative)

The following table lists illustrative key indicators that districts will track on a quarterly and
annual basis. Indicator definitions, data sources, and responsibility matrices will be included
in a dedicated M&E manual, and training will be provided to field staff and data operators.

Disaggregated data by gender, social group, and geography (rural/urban, tribal/non-tribal)


will be captured wherever feasible to ensure that benefits reach the intended target groups
and to enable course corrections where disparities are observed.

Sector Indicator Unit Frequency

Roads Rural roads upgraded to all-weather standard Km completed Quarterly

Health Functional PHCs meeting service standards Number Bi-annual

Education Schools with improved infrastructure and WASH Number Annual

WASH Households with functional tap connections Households Quarterly

Livelihoods Households accessing new or improved livelihoods Households Annual

Skills Youth trained and placed in jobs Number Quarterly

Governance Citizen grievances resolved within timeline Percent Quarterly

9. Risk Management and Safeguards

Key risks include delays in land availability, procurement bottlenecks, contractor capacity
constraints, extreme weather events, and social or environmental impacts of infrastructure
works. A risk management plan will be developed for each district, including contingency
measures, alternate routing options, flexible work calendars, and proactive community
engagement to minimize disruptions and conflicts.

Environmental and social safeguards will be integrated into all project stages, from planning
and design to implementation and maintenance. Simple screening tools will identify
high-risk activities requiring additional assessment or mitigation. Grievance redressal
mechanisms will be established at village, block, and district levels to ensure that complaints
are recorded, addressed, and reported transparently.

10. Communication, Participation and Capacity Building


An integrated communication and community participation strategy will ensure that citizens
are informed about project goals, entitlements, and progress, and are able to provide
feedback throughout the project cycle. Tools will include community meetings, wall
paintings, radio messages, social media, and information boards at worksites detailing
budgets and timelines.

Capacity building interventions will target district and block officers, engineers, accountants,
frontline workers, and community institutions. Structured training modules, exposure visits,
mentoring support, and e-learning resources will be deployed. Partnerships with state
training institutes and universities will help institutionalize curricula and sustain capacity
beyond the project period.

11. Summary and Way Forward

This project plan provides a comprehensive, structured framework for integrated


development across all 24 districts of Jharkhand, aligning infrastructure, social services,
livelihoods, and governance reforms. Its success will depend on strong political commitment,
effective coordination among departments, and active participation of communities and
local bodies in planning, execution, and monitoring.

The next steps include finalization of detailed operational guidelines, preparation of


district-specific action plans and budgets, establishment of project management units, and
initiation of baseline surveys. Continuous learning, timely mid-course corrections, and open
data will ensure that the project remains responsive to field realities and delivers
sustainable, inclusive outcomes for the people of Jharkhand.

Extra paragraph available

Educational workshops and community outreach on preventive healthcare, sanitation, and


rights awareness. Skill Development, Vocational training and capacity-building sessions
tailored to local employment opportunities, Educational Support, Scholarship programs to
encourage academic continuation among marginalized students, Social Rehabilitation,
Support and integration programs for beggars and homeless individuals to regain self-
sufficiency, Community Welfare: Food distribution drives and quality eldercare services to
uphold community well-being.

Common questions

Powered by AI

M/s Dewarimata Healthcare's mission aligns with sustainable development goals by focusing on accessible healthcare, educational opportunities, and skill development. These initiatives promote dignity and self-reliance, addressing SDGs related to health, education, and reduced inequalities. Their programs enable marginalized communities to improve their socioeconomic status and participate more fully in society, which is a core tenet of sustainable development .

The IDDP emphasizes community participation through mechanisms like Village Development Committees and User Groups, which are involved in project planning and execution. Community ownership is further enhanced by promoting local material use, labor-intensive methods, and maintenance contracts for infrastructure projects. Additionally, the project incorporates community feedback mechanisms, such as citizen feedback, for continuous improvement .

The IDDP's WASH component complements national initiatives by targeting last-mile coverage and system sustainability. It focuses on providing reliable access to safe drinking water, adequate sanitation, and promoting hygiene through community-level involvement. Efforts include constructing household and community toilets, implementing solid and liquid waste management systems, and enhancing WASH facilities in schools, thereby supporting the aims of Jal Jeevan Mission and Swachh Bharat Mission .

The IDDP plans to integrate with flagship schemes like the PMGSY, Jal Jeevan Mission, and Swachh Bharat Mission by maximizing convergence at the district level. This integration is expected to leverage funds more effectively, avoid duplication, and ensure that resources are used optimally for sustainable infrastructure development and human welfare improvements. The coordinated efforts aim to maximize impact by aligning state and national development goals with district-specific needs .

M/s Dewarimata Healthcare Tribal and Weaker Association intends to uplift marginalized communities by delivering healthcare services, facilitating skill development, and providing educational support. They aim to achieve these through initiatives like affordable healthcare services, such as medical camps and drug distribution, and educational scholarships for SC, ST, and economically disadvantaged students. Furthermore, they focus on integrating beggars and homeless individuals into society through rehabilitation programs and supporting the elderly with nutritious food and care .

Under the IDDP, specific livelihood improvement initiatives include promoting climate-resilient agriculture, establishing small irrigation systems, and supporting livestock and poultry interventions. The project also facilitates skill training centers and placement-linked vocational courses. In particular, initiatives target women, youth, and tribal entrepreneurs, building on existing self-help groups and producer collectives to enhance market access and financial services .

The social infrastructure component in the IDDP focuses on improving health and education facilities, such as Health Sub-Centers and schools, particularly in tribal and remote areas. Expected outcomes include enhanced service readiness and quality, improved maternal and child health services, and upgraded educational infrastructure. These improvements aim to address existing gaps, increase accessibility, and lead to better health and educational achievements among marginalized populations .

IDDP employs a detailed M&E framework encompassing input, output, outcome, and impact indicators for each component. Regular progress monitoring involves field reports, citizen feedback mechanisms, and third-party verifications. District-level dashboards track key indicators, ensuring accountability and transparency. The framework is designed to facilitate course corrections where necessary and to ensure that project benefits effectively reach target populations .

Digital governance in the IDDP involves enhancing internet connectivity, digital service delivery, and data management systems within districts. It aims to improve project outcomes by enabling efficient planning, monitoring, and decision-making processes. Digital dashboards will track progress across sectors, improve transparency, and aid evidence-based decision-making, enhancing the overall effectiveness and accountability of the project implementation .

The IDDP incorporates a comprehensive risk management plan, including contingency measures and flexible work calendars to address potential delays and disruptions. Strategies include alternative routing for infrastructure projects, community engagement to mitigate social conflicts, and environmental safeguards to balance developmental activities with ecological considerations. Regular progress reviews and third-party assessments are also part of the strategy to ensure continued alignment with project goals .