Bhopal Metro Rail Project Area Details

The document outlines the area calculations and requirements for the Bhopal Metro Rail Project, specifically the Orange Line from Pulbogda to Karond Chauraha. It includes details on permanent and temporary land usage, as well as the dimensions of various structures involved in the project. The drawing also lists the general consultants and key personnel associated with the project.

Uploaded by

23cvp010
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views1 page

Bhopal Metro Rail Project Area Details

The document outlines the area calculations and requirements for the Bhopal Metro Rail Project, specifically the Orange Line from Pulbogda to Karond Chauraha. It includes details on permanent and temporary land usage, as well as the dimensions of various structures involved in the project. The drawing also lists the general consultants and key personnel associated with the project.

Uploaded by

23cvp010
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

y Saw Milis

AIIMS KAROND SQ.


S to

Shed
re

Shed
R oom

Area
Imang
OVERLAP OF WAY-LEAVE &
PHC

G+1

N ew Ka
G+1
TEMPORARY LAND

o Furn

Krishn
trol P ump BHOPAL METRO STATION

s
Bharat Pe

m
iture

a
a Bais
Sh e d
6M

n y
els
t Trav

S
Bhara 04

Sai Sankar Hotel

aw Mill's
haba B
H

Shed

Sagar Hotel

10M
Hotel Anamika

11M
Axis Bank ATM
hojana

Deluxe T
Shop
Area
otel

Shed

Bajrabasi Hotel
Sai H

Shed
Sh e d

Jen Hotel
Shed

Sh e d

24M
laya

RK Hotel
Guru Krupa Hotel

01
12M
oil
Shed

12.00

et
8M
10M 5M 68M 5M 66
10M
1.5

Bus St
2M PERMANENT LAND Parking Area
1.96 5M

10M
op
Bus St

3
8M

Auto ChTEMPORARY
eck Gate LAND

6
28M 7
31M 35M
16 To
op
S ta

Station Building Bh
32M
5.5 tion

G+3 Building
41M 01 5
03 Roa
d
02 5

G+ opal
Bh
22.00

0 i

G+0
TickBuild
17.001

et C ing
PLATFORM
NO. 6

o
opal

u nt
er
AREA REQUIRED (Sqm)
Railway Temporary PLATFORM
CHAINAGE MARKED TYPE OF AREA ON GROUND
OVERHEAD (0.5m including)
Within track portion Beyond track
portion NO. 4 & 5
(Crossing in No.) portion
1.96

1
(1.96+1.5)x68 = 118
1.5

1 2
68.44
1
2 (8+5.5)x41 = 276.75
5.5

68 5x7 = 35
3
8

2
7

41 5
5 16 68x5 = 340
29+300 TO 29+600 5x6 = 30
16x3 = 48
BHOPAL RAILWAY
4.8

1
STATION (1.2+4.8)x31 = 93
1.2

2
3
5

31 35 35x5 = 175
24 1
4 2 (6+8)x24 = 168
6

TOTAL 118 1165.75 ≈1166

REVISIONS LEGEND GENERAL CONSULTANT CLIENT

C/L OF ALIGNMENT RAILWAY PERMANENT DB Engineering & Consulting GmbH


GEODATA Engineering S.p.A PROJECT BHOPAL METRO RAIL PROJECT (ORANGE LINE)
Louis Berger SAS
METRO VIADUCT RAILWAY WAY LEAVE PULBOGDA TO KAROND CHAURAHA
METRO ROW
DRAWING TITLE DRAWING SHOWING AREA
RAILWAY TEMPORARY
CALCULATION SHEET (15 OF 20)
IR BOUNDARY DRAWING NUMBER REV
STATION STRUCTURE
B001-BIG-ALI-DWG-LOGW001-00027
Sachin Deshmukh Sudhir Kamal Seem Prasad Babu Reddy Arvind Singh
R2
ALL DIMENSIONS ARE IN METER SCALE
NTS
DATE STATUS
Architect Chief Architectural Expert Chief Structures Expert Dy. Project Director FEB 2025

You might also like