0% found this document useful (0 votes)
15 views1 page

Automatic Washing-Model

The document outlines a detailed key plan for a facility, including dimensions, specifications, and layout for various areas such as maintenance tracks, workshops, and storage. It emphasizes that all measurements are in millimeters, and no dimensions should be scaled from the drawing. Additionally, it includes notes on the removal of certain elements and the requirements for crane operations within the facility.

Uploaded by

ankit bhagat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views1 page

Automatic Washing-Model

The document outlines a detailed key plan for a facility, including dimensions, specifications, and layout for various areas such as maintenance tracks, workshops, and storage. It emphasizes that all measurements are in millimeters, and no dimensions should be scaled from the drawing. Additionally, it includes notes on the removal of certain elements and the requirements for crane operations within the facility.

Uploaded by

ankit bhagat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

KEY PLAN GENERAL NOTES

N
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS WRITTEN
OTHERWISE.
2. NO DIMENSIONS SHALL BE SCALED FROM THIS DRAWING.
OPTION: New WS23.1
3. ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED.
truck delivery Security building

4.0
EL W

entrance to depot
Gate no. 02

4. 0.00MM CORRESPONDS TO 284000 MM LVL


(access gate 6.0

w=10m and
10.0 Security building) A
70.0 2.7
Measurement tracks
CA EL W CA EL
50m lengths
Measurement-track according to
"DIN 27202-10: State of railway vehicles - Superstructure and
special equipment of vehicles - Part 10: Measurement of
superstructures" tolerances for vehicles of category B

UWL

3t crane
3t crane
Measurement track 50 m Pit Maintenance track 8 with crane
WS04.1 EL CA EL CA

Maintenance bay CM Maintenance bay CM


Maintenance track 7 with crane

35.0
EL CA EL CA

Transport way
Maintenance bay PM Maintenance bay PM
Maintenance track 6 with catenary

12.0
WS04 EL CA EL CA

30.0 30.0 Maintenance bay PM Maintenance bay PM


Maintenance track 5 with catenary
62.5 12.0 G

5t crane
3.0

5t crane
has to be
Kanban 195 m² 45.0
WS21 WS63 WS13

8.3
removed
EL CA EL CA

5.0
W
CA
EL

Road existing Auxiliary Motor WS Electromech. WS Transport way 3.5 Compressor Compressor Automatic 45.0
WS13.1 ATW Train Washing
EL CA EL CA EL CA W EL CA EL CA EL CA

5.0
W CA

WS71 Manu
EL

EL CA EL CA

room 1
Maintenance bay PM Maintenance bay PM Maintenance bay PM Maintenance bay PM room 2
Technical Room Washing Bay al Front

5.0
Maintenance track 4 with catenary

81.3
EL CA
W

8.0
EL CA EL CA EL CA EL CA

30.0 EL
CA W

Maintenance bay PM Maintenance bay PM Maintenance bay PM Maintenance bay PM


Maintenance track 3 with catenary
G

36.5
EL CA

current Building size


EL CA EL CA EL CA

Transport way
30.0 30.0 Maintenance bay OH Maintenance bay OH Maintenance bay OH Maintenance bay OH

50t crane

50t crane
Measurement tracks
Maintenance track 2 with crane 5.0
25.0 70.0 30m lengths
WS11
WS38
WS36 Preparation Area and F F
W CA EL
EL CA W EL CA W EL CA W EL CA W
Measurement-track according to

1.9
"DIN 27202-10: State of railway vehicles - Superstructure and
special equipment of vehicles - Part 10: Measurement of
Pre-cleaning pit
superstructures" tolerances for vehicles of category B

10.0 Maintenance bay OH Maintenance bay OH Maintenance bay OH Maintenance bay OH


W CA EL

5.6
5.0 10.0
painting booth Maintenance track 1 with crane - 2.30

has to be

1.5
EL CA W

6.0

4.00
8.0 J
EL CA W

3.5 J
EL CA W

has to be has to be
removed
WS36.1 PaintingTech and removed removed 108.0 24.0
Storage
EL CA W

has to be
H

15t crane
WS06

15t crane
15t crane Component workshop area Utility supply see Stabling Yard

18.3
removed
15.0 60.0 30.0

10t crane

10t crane
Logistic Area 2106 m²

12.0

W
(see details Floor plan Workshop) Floor plan

26.3

CA
Ha

EL
3.2 WS30
height 12m

27.0
2400 m²
BSC & Bogie Storage
WS12
nd
ove
EL CA EL CA EL CA EL CA

existing UWL

5.00
has to be

w=4.50
has to be

h=5.50
LEGEND
has to be

29.0
Asphalt Road

8.0

30t crane

30t crane
Utility supply see removed removed Component workshop area (GF) 847 m² removed min. crane hook height 8m rY
ard

EL
17.0
B B

CA
Floor plan 3132 m²

W
w=5.00 w=5.00
h=6.50 h=6.50
has to be 105.5 43.3

w=4.50
removed 10.0

h=5.50
35.4
D

20.0
D

22.6 6.0 130.0


Simulator & Training
Road Road

Boundary A

7.7
EL CA

78.0 WS61
W CA EL

10.0 has to be w=4.50 w=4.50


30.0 14.0 14.0 456 m² WS03

13.0
Shunter

Ramp: 8%
removed h=5.50 h=5.50
WS23
garage Utility supply see Floor plan

7.9
5.0
Security
EL W

WS10 WS17 130 m² C


Drum Storage C building Gate
Waste/Scrap Boundary 35.0 15.5 Roads should

4.0
EL
W
EL W

container WS08 be connected


no. 01
W EL

WS70First 6.0
suffiecient
Aid Room
HAZMAT 36 m²
width for New truck
delivery trucks delivery entrance
storage WS01 to depot (access
gate w=10m and
Social / Admin security building)

40.0
Building Two 2W / 4W
Parking
Floor
1400has m² each WS33
to be
floorremoved
height 4m EL W
Road existing
EL W

G.I POWDER COATED


Boundary

1 2 3 4 5 6 7 8
SHEET CLADDING
45000 AUTOMATIC WASHING
6300 6300 6300 6300 6300 6300 6600
GENERAL NOTES CONTD.: -
A 1. ALL DIMENSIONS ARE IN MM.
2. DIMENSIONS SHALL NOT BE SCALED, ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
SCHEDULE OF DOORS
3. FOUNDATION OF BUILDING SHOULD BE DESIGNED FOR ONE FLOOR EXTRA.
C 4. ALL RCC WORKS FOR BUILDINGS WILL BE OF M-25 & STEEL SHOULD BE TMT FE-500 & ABOVE
CLEAR OPENING
STRUCTURAL STEEL - FE 240 (STANDARD ROLLED STEEL SECTION)
RAIL TRACK 200MM WIDE DRAIN RAIL TRACK 200MM WIDE DRAIN -FE 315 (PLATED AND BUILT-UP SECTIONS)
PLAQUE "A"
AS PER DET. AS PER DET.
WIDTH
3875

C B A 5. WORK TO BE EXECUTED AS AS PER IS: 456-2000. TYPE HEIGHT SWINGS DESCRIPTION NOS.
6. DOOR DIMENSIONS ARE TO BE MEASURED FROM FINISHED FLOOR LEVEL.
7. WINDOW IN RELAY ROOM SHOULD BE PROVIDE WITH SLIDING GLAZED SHUTTER FROM INSIDE. D5b 1500 2200 D.L. STEEL DOOR WITH VISION PANELS --
7665

AUTOMATIC TRAIN WASHING


DN DN 8. BAR BENDING SCHEDULE MUST BE PREPARED AS PER SP-34 AND DULY CERTIFIED BY SITE ENGINEER.
9. CONCRETE MUST BE VIBRATED WITH MECHANICAL VIBRATOR. EMERGENCY DOOR WITH 2 HR
OPEN

T.O. SLAB ED 1000 2200 S.L. --

OPEN
3710

E.L +5.20M 10. PROPER CURING MUST BE DONE. FIRE RATING, PANIC BAR & DROP
DRAIN DRAIN DRAIN DRAIN
450X450 450X450 FFL 450X450 450X450 (288.60) 11. FLOORING OF ROOMS OTHER THAN BATTERY ROOM TO BE DONE WITH VITRIFIED TILES (600X600MM) OF MIN THICKNESS 9MM. SEAL-SINGLE SHUTTER
±0.00 M. 12. FLOORING OF BATTERY ROOM TO BE DONE WITH ACID AND ALKALI RESISTANT TILES (800X500MM) OF MINIMUM THICKNESS 9MM.
(283.40)
B D5b 13. PLINTH LEVEL MUST BE DECIDED AS PER THE SITE CONDITIONS. RS 2400 3000 ---- ROLLING SHUTTER --
UNDERGROUND WATER TANK
14. RAILING SHALL BE PROVIDED TO STAINLESS STEEL AS PER APPROVED BY ENGINEER IN-CHARGE.
1500
15. GRANITE STONE PROVIDED ON JAMB & SILL FOR FULL WIDTH OF WALL FOR WINDOW.

5200
FGL
DRAIN
±0.00 M. 16. GRANITE STONE IN RISERS, TREADS, LANDING AND ENTRANCE OF STAIRCASE.

4000
450X450
4980

WS13.1
5230
2400

(283.40)
RS1
ATW TECHNICAL ROOM GROUND FLOOR 17. INTERNAL WALL & CEILING TO BE TREATED WITH 2 MM THICK POP & PAINTED WITH DISTEMPER.
16770 X 4770 GROUND FLOOR
AUTOMATIC TRAIN
WS13.1
ATW TECHNICAL
F.G.L / F.F.L. 18. ALL EXTERNAL WALL PAINTED PREMIUM ACRYLIC SMOOTH WATER PROOF EXTERIOR FINISHED. SCHEDULE OF WINDOWS
F.G.L / F.F.L. ±0.00M (283.40)
1200 1000 ±0.00M (283.40) WASHING ROOM 19. WATER PROOFING TREATMENT TO R.C.C. ROOF SLAB BY APPLICATION OF TWO COATS OF CEMENT SLURRY MIXED WITH WATER PROOFING
2000 3728 2000 3028 2000
A 450
COMPOUND (ACRYLIC BASED POLYMER, SOLID CONTENT 30% ±3, PH>7) IN THE RATIO OF 1:2 (1 PART OF WATER PROOFING COMPOUND : 2 PARTS CLEAR OPENING

450
ED
W6 W6 W6 OF CEMENT BY WEIGHT), FOLLOWED BY TWO COATS OF SINGLE COMPONENT MOISTURE CURED POLYURETHANE BASED ELASTOMERIC WATER
TYPE DESCRIPTION NOS.

3000
17230 27770 PROOFING COATING CONFORMING TO ASTM C-836-89 HAVING TENSILE STRENGTH 3.1N/MM2. TOPPING LAYER OF 25MM THICK CEMENT
CONCRETE [Link] TO BE LAID. WIDTH HEIGHT
SECTION AA WATER TANK
SCALE 1:100 20. ELECTRICAL SUB-STATION EQUIPMENTS CLE-TRANSFORMER, ELECTRICAL, SWITCHGEAR, CABLES AND LOAD CALCULATION) WILL BE PROVIDED
GROUND FLOOR PLAN ALUMINIUM FRAMED
A AS PER ELECTRICAL APPLIANCES CONSIDERED WIDE RLY. BD. LETTER NO. 2013/LMB/W/15. W6 2000 1500 --
SCALE 1:100 FIXED WINDOW
21. JPO NO. SECR/SET/ POLICY 889 DATED: 05.07.13 FOR JOINT PROCEDURE ORDER FOR UNDERTAKING EARTH WORK IN THE VICINITY OF CABLES TO
BE FOLLOWED STRICTLY.

1 2 3 4 5 6 7 8
C B A 22. S&T CLEARANCE SHOULD BE TAKEN PRIOR TO THE EXCAVATION WORKS.
23. ALL COLUMNS TO BE EXTENDED UPTO HEIGHT OF 900MM ABOVE THE ROOF TOP FOR FUTURE EXTENSIONS.
SOUTH EAST CENTRAL RAILWAY
24. ELECTRIC AND WATER PIPE LINE PLAN SHALL BE SUBMITTED AND APPROVED SEPARATELY BY FIELD UNIT. DIVISION : RAIPUR SECTION : DLS
25. AC OUT DOOR UNIT DRAINAGE SHOULD BE PROVIDED TO AVOID THE WATER LOGGING.
26. WORK SHOULD BE STARTED ONLY AFTER APPROVAL OF STRUCTURAL DRAWING.
[Link]
E.L +5.20M 27. THE LOCATION OF LT PANEL (CHANGE OVER PANEL) AS PROVIDED BY ELECTRICAL DEPARTMENT SHALL BE INSTALLED ON THE VERANDA AND PROJECT :
(288.60) THE LOCATION TO BE MARKED SUITABLY, PROVIDED BOTTOM MOST PART OF THE PANEL IS AT A HEIGHT NOT LESS THAN 2000MM.
28. THE OUT DOOR UNIT OF THE AC SYSTEM TO BE FIXED ON THE EXTERNAL WALL OF THE GOOMTY FACING TOWARDS THE TRACK. THIS IS
DEVELOPMENT OF INFRASTRUCTURE FACILITIES FOR
230mm THK. WALL AS PER
STRUCT. SPECS. & DET.
ESSENTIAL TO ENSURE ANTITHEFT ARRANGEMENT. MAINTENANCE OF ELECTRIC LOCOMOTIVES AT RAIPUR
OPEN
RS1

5200
230mm THK. WALL AS PER
STRUCT. SPECS. & DET.
5200

ED W6 W6 W6 GROUND FLOOR GROUND FLOOR


F.G.L / F.F.L. F.G.L / F.F.L.
GROUND FLOOR ±0.00M (283.40) ±0.00M (283.40)
F.G.L / F.F.L.
±0.00M (283.40)

SOUTH SIDE ELEVATION


SCALE 1:100
EAST SIDE ELEVATION
SCALE 1:100 DRG TITLE : AUTOMATIC WASHING
FLOOR PLAN, ELEVATION AND SECTION, WATER
1 2 3 4 5 6 7 8
TANK AND EQUIPMENT PLAN

6300 6300 6300 6300 6300 6300 6600

A
1 2 3 4 5 6 7 8

45000 C
6300 6300 6300 6300 6300 6300 6600 6000 6000 5000 5000 6000 RAIL TRACK 200MM WIDE DRAIN
PLAQUE "A" PLAQUE "A" PLAQUE "A" PLAQUE "B" PLAQUE "B" PLAQUE "A" AS PER DET.

7665
AUTOMATIC TRAIN WASHING

C
DN DN
RUKMAYA MEENA Digitally signed by RUKMAYA MEENA
Date: 2025.10.30 [Link] +05'30'

OPEN

OPEN
DRAIN DRAIN DRAIN DRAIN
450X450 450X450 FFL 450X450 450X450
±0.00 M.
(283.40)
D5b
B

100
200

100
200 1050 100
Digitally signed by DEVANUJ SINGH
7665

1800 1500 DEVANUJ SINGH TOMAR TOMAR


P2 TANK V2 FGL Date: 2025.10.30 [Link] +05'30'

P2
250

3000
1250 1250 ±0.00 M.

P2
4980

1800

1800

5230
(283.40)

1250
RS1 TANK V3 TANK V1

420 2751 2500 2500 2500 3500 420


250 250 250
350

350
14102
B
A
200

200
ED
W6 W6 W6
Digitally signed by ANKIT KUMAR
17230 27770 ANKIT KUMAR BHAGAT BHAGAT
Date: 2025.10.30 [Link] +05'30'
4980

5230

TERRACE
FLOOR
16770 X 4770 GROUND FLOOR EQUIPMENT PLAN
A SCALE 1:100

A
17230 27770

WASHING PLATFORM LOAD DETAIL

FOOTPRINT 3320 Nm FOOTPRINT 6950 Nm FOOTPRINT FOOTPRINT


A ROOF PLAN PLAQUE
TYPE "A"
1050 N
PLAQUE
TYPE "B"
5820 N
PLAQUE
TYPE "C"
490 N
PLAQUE
TYPE "D"
1080 N

SCALE 1:100

440
300 250
180 180 40 260
40

240 30
22.5

205 22.5 200 30


30

30
180 180
440
300
240

250
205

240
180

50
50 FIXED WITH NO. 4
FIXED WITH NO. 4
50

FIXED WITH NO. 4


FIXED WITH N° 8
50

MECHANICAL MECHANICAL MECHANICAL


CHEMICAL 50 50
50 ANCHORS
ANCHORS ANCHORS
50
ANCHORS
M16 L=190 mm M12 L=125 mm M16 L=190 mm
M16 L=190 mm

WATER TANK PLAN

M/S SIEMENS

DATE : 18/09/2025 SCALE: AS SHOWN DETAILED DESIGN DESIGNATION SIGN DESIGNATION SIGN DRAWING NO. :
CONSULTANT :
DRAWN (A) DESIGNED (B) CHECKED (C) TEAM LEADER SPECIALIST MEP CAO/C/BSP:-
R2 28/10/2025 COMBINED FORMAT
ARCHITECT SPECIALIST CIVIL
SIGN R1 05/10/2025 REVISION AS PER LETTER ON 30-9-25
KEY EXPERT- SPECIALIST TRACK
CONSULTING E- LOCO SYSTEM R0 29/09/2025 ISSUED FOR REVIEW AND APPROVAL
ENGINEERS GROUP KEY EXPERT- KEY EXPERT-
NAME An ISO 9001:2008 Company DESIGN OF CIVIL MECH (M&P) REV DATE DESCRIPTION OF REVISIONS CEG/DGN/D291/DLS/ARC/2021

You might also like