DMC Project Timeline and Evaluation Plan

The document outlines the tasks and timeline of a 26-week project. It involves policy design in weeks 2-4, selecting a project team in weeks 6-8, acquiring equipment in weeks 10-12, designing an upgrading a data management and control (DMC) system in weeks 14-16, installing anti-virus and firewall software in weeks 18-20, monitoring and evaluating the DMC project in weeks 22-24, and generating a project report and closing the project in weeks 26. Progress is monitored on a weekly basis on a scale from Excellent to Poor.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
61 views3 pages

DMC Project Timeline and Evaluation Plan

The document outlines the tasks and timeline of a 26-week project. It involves policy design in weeks 2-4, selecting a project team in weeks 6-8, acquiring equipment in weeks 10-12, designing an upgrading a data management and control (DMC) system in weeks 14-16, installing anti-virus and firewall software in weeks 18-20, monitoring and evaluating the DMC project in weeks 22-24, and generating a project report and closing the project in weeks 26. Progress is monitored on a weekly basis on a scale from Excellent to Poor.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd

Task Week

2 4 6 8 10 12 14 16 18 20 22 24 26
Project Start
Policy Design
Selection of Project team

Employee Empowerment

DMC equipment acquisition

Designing and/or upgrading


TAs DMC system

Installation of anti-virus
software & firewalls.

DMC program
Monitoring & evaluation of
DMC project success.

Project Report
Project Closure