Just-in-Time and
Lean Systems
Just-in-Time and Lean Systems
• JIT Defined
• The Japanese Approach to Productivity
• JIT Implementation Requirements
• JIT in Services
Just-In-Time (JIT)
Defined
• JIT can be defined as an integrated set of
activities designed to achieve high-volume
production using minimal inventories (raw
materials, work in process, and finished goods).
• JIT also involves the elimination of waste in
production effort.
• JIT also involves the timing of production
resources (e.g., parts arrive at the next
workstation “just in time”).
Exhibit
Exhibit10.1
10.1
JIT Demand-Pull Logic
Fab Vendor
Sub
Fab Vendor
Final
Customers Assembly
Sub Fab Vendor
Fab Vendor
The Japanese Approach to Productivity
• Imported technologies
• Efforts concentrated on shop floor
• Quality improvement focus
• Elimination of waste
• Respect for people
Waste in Operations
(1) Waste from overproduction
(2) Waste of waiting time
(3) Transportation waste
(4) Inventory waste
(5) Processing waste
(6) Waste of motion
(7) Waste from product defects
Minimizing Waste:
Focused Factory Networks
Coordination
System Integration
Final Assembly
Minimizing Waste:
•
Group Technology (Part 1)
Using Departmental Specialization for plant layout can cause a lot of
unnecessary material movement.
Saw Saw Saw Grinder Grinder
Heat Treat
Lathe Lathe Lathe Press Press Press
Minimizing Waste:
Group Technology (Part 2)
• Revising by using Group Technology Cells can reduce movement and improve
product flow.
Grinder 1 2
Saw Lathe Lathe Press
Heat Treat
Grinder
Saw Lathe A B Lathe Press
Minimizing Waste:
Uniform Plant Loading
Suppose we operate a production plant that produces a single
product. The schedule of production for this product could be
accomplished using either of the two plant loading schedules below.
Not uniform Jan. UnitsFeb. Units Mar. Units Total
1,200 3,500 4,300 9,000
or
Uniform Jan. UnitsFeb. Units Mar. Units Total
3,000 3,000 3,000 9,000
How does the uniform loading help save labor costs?
Exhibit
Exhibit10.3
10.3
Minimizing Waste: Just-In-Time
Production
WHAT IT IS WHAT IT DOES
• Management philosophy • Attacks waste
• Exposes problems and bottlenecks
• “Pull” system though the plant
• Achieves streamlined production
WHAT IT REQUIRES WHAT IT ASSUMES
• Employee participation
• Industrial engineering/basics • Stable environment
• Continuing improvement
• Total quality control
• Small lot sizes
Exhibit
Exhibit10.4
Minimizing Waste: Inventory 10.4
Hides Problems
Example: By identifying
defective items from a
Machine
downtime vendor early in the
production process the
Scrap Vendor downstream work is
Work in delinquencies Change saved.
orders
process
queues Engineering design Design
(banks) redundancies backlogs
Example: By identifying
Paperwork Inspection Decision defective work by
backlog backlogs backlogs employees upstream,
the downstream work is
saved.
Exhibit
Exhibit10.6
10.6
Minimizing Waste:
Kanban Production Control
Withdrawal kanban
Systems
Storage Storage
Machine Part A Part A Assembly
Center
Line
Production kanban Material Flow
Card (signal) Flow
Determining the Number of
Kanbans Needed
• Setting up a kanban system requires
determining the number of kanbans (or
containers) needed.
• Each container represents the minimum
production lot size.
• An accurate estimate of the lead time required
to produce a container is key to determining
how many kanbans are required.
The Number of Kanban Card Sets
Expected demand during lead time Safety stock
k
Size of the container
dL (1 S )
C
k = Number of kanban card sets (a set is a card)
d = Average number of units demanded over some time period
L = lead time to replenish an order (same units of time as demand)
S = Safety stock expressed as a percentage of demand during lead
time
C = Container size
Example of Kanban Card
Determination: Problem Data
• A switch assembly is assembled in batches of 4 units from
an “upstream” assembly area and delivered in a special
container to a “downstream” control-panel assembly
operation.
• The control-panel assembly area requires 5 switch
assemblies per hour.
• The switch assembly area can produce a container of
switch assemblies in 2 hours.
• Safety stock has been set at 10% of needed inventory.
Example of Kanban Card
Determination: Calculations
Expected demand during lead time Safety stock
k
Size of the container
dL (1 S ) 5(2)(1.1)
2.75, or 3
C 4
Always round up!
Respect for People
• Level payrolls
• Cooperative employee unions
• Subcontractor networks
• Bottom-round management style
• Quality circles (Small group involvement activities)
JIT Requirements: Design See
SeeExhibit
Exhibit10.8
10.8
Flow Process
• Link operations
• Balance workstation capacities
• Relayout for flow
• Emphasize preventive maintenance
• Reduce lot sizes
• Reduce setup/changeover time
JIT Requirements: Total Quality
Control
• Worker responsibility
• Measure SQC
• Enforce compliance
• Fail-safe methods
• Automatic inspection
JIT Requirements: Stabilize
Schedule
• Level schedule
• Underutilize capacity
• Establish freeze windows
JIT Requirements: Kanban-Pull
• Demand pull
• Backflush
• Reduce lot sizes
JIT Requirements: Work with
Vendors
• Reduce lead times
• Frequent deliveries
• Project usage requirements
• Quality expectations
JIT Requirements: Reduce
Inventory More
• Look for other areas
• Stores
• Transit
• Carousels
• Conveyors
JIT Requirements: Improve
Product Design
• Standard product configuration
• Standardize and reduce number of parts
• Process design with product design
• Quality expectations
JIT in Services (Examples)
• Organize Problem-Solving Groups
• Upgrade Housekeeping
• Upgrade Quality
• Clarify Process Flows
• Revise Equipment and Process Technologies
JIT in Services (Examples)
• Level the Facility Load
• Eliminate Unnecessary Activities
• Reorganize Physical Configuration
• Introduce Demand-Pull Scheduling
• Develop Supplier Networks