Remote Operator Panel / ROP Sub Operator Panel / SOP
Level 2
Level 1 Level 1
Main Operator Panel / MOP
Level 0 Level 2
Workflow Operator Panel / WOP
Level 2
Level 1
Level 0
Level 0
Lite Operator Panel / LOP
SIMATIC NET Date: 04/06/23 SITRAIN Training
Automation and Industrial Solutions
Siemens AG 2005. All rights reserved. File: 03_IE. Page 1
What Are You Going to Learn in This Chapter?
At the end of this chapter you will know ...
... the basis of the S3 architecture
... the architecture of level 2 network (N2)
... the architecture of level 1 network (N1)
... the principles of IP addressing
... the Renault architecture
SIMATIC NET Date: 04/06/23 SITRAIN Training
Automation and Industrial Solutions
Siemens AG 2005. All rights reserved. File: 03_IE. Page 2
S3 Base Architecture – Body in White - Paintshop - Assembly
Control Resource Antivirus Backup PC Users
Telephone
System Tracing Teleservice System (SPOT Stations)
Supervision Switchboard
SIPTOL, PSF SMP99 (GEDTMI)
(Cimplicity)
N2
Ethernet
Level 1 network
SMP
Display Unit MOP Sub Operator Panel SOP
(9 max.)
Ethernet N1 :
@ IP identical for all islands
N1
Inter PLCs Bay robot Bay robot
Exchange tables
Large data volumes 16 robots Tags Converters,
max for Motor
each PLC (RF 300)
branches
Exchanges
N0 Inter critical PLCs Profinet (Safe)
PN /
Limited data volumes PN
Data: 128 words
SIMATIC NET Date: 04/06/23 SITRAIN Training
Siemens AG 2005. All rights reserved. File: 03_IE. Page 3 Mise Automation and
à jour of 13 Industrial
/ 04 / 2007Solutions
Level 2 (N2) Network Architecture
Supervision Control Resource Antivirus Backup PC Users
Telephone
(Cimplicity) System Tracing Teleservice System (SPOT Stations)
Switchboard
SIPTOL, PSF SMP99 (GEDTMI)
Office network
Proofction network
VLAN SERVERS
VLAN CONTROL
VLAN TRACE
SMP99,
GEDTMI
Antivirus Legend
Teleservice Green: Specs and functional scope
SMP by DTSI – Project financing DDIV
Display Unit Main Operator Red: Specs and functional scope
Panel DTSI and functional scope ESIL.
MOP Ethernet Level 1 : Sub Operator Financing DTSI
@ IP identique sur Panel SOP Blue: Specs DPSI and functional
chaque îlot 9 panels max. scope by FBE. Project financing
DDIV
Bay robot Bay robot
Yellow: Specs DTSI and
functional scope ESIL. Financing
DF
Feedthrough for
Terminal
Cimplicity
connection to Plant
Control
RJ45 network
SIMATIC NET Date: 04/06/23 SITRAIN Training
Siemens AG 2005. All rights reserved. File: 03_IE. Page 4 Mise Automation and
à jour of 20 Industrial
/ 04 / 2007Solutions
Definition of the Level 2 Network (N2)
Level 2 network (N2 for Niveau 2) is the communication network that
encompasses the entire plant process environment. This environment
comprises a network infrastructure and application servers for the
process. Management of the latter (i.e., process management) lies in the
responsibility of each plant.
Connected to the Level 2 network (N2) are the following:
PLCs / Servers for flow control
PLCs / Servers for plant supervision
Operations PCs / Server for production ressource tracing
Operations PCs / Identified Web servers
Operations PCs / Backup server
Operations PCs / Security server
(Antivirus, Operating system update)
Operations PCs / Teleservice server
SIMATIC NET Date: 04/06/23 SITRAIN Training
Automation and Industrial Solutions
Siemens AG 2005. All rights reserved. File: 03_IE. Page 5
Levels 1 and 2: Schematic Overview
SIMATIC NET Date: 04/06/23 SITRAIN Training
Automation and Industrial Solutions
Siemens AG 2005. All rights reserved. File: 03_IE. Page 6
Data Flow in the Network Architecture (Schematic Overview)
SIMATIC NET Date: 04/06/23 SITRAIN Training
Automation and Industrial Solutions
Siemens AG 2005. All rights reserved. File: 03_IE. Page 7
Backup Oscar Current Standard Architecture
Oscar Server
ESIL Level
Level 2
Archive
Production Network, VLAN “Trace”
Level 1
Backup Backup OP
P P
SM SM
Level 1
Switch
Level 0
Components Level 0 Switch Level 0 Switch
Operator
Operator
Panel
Panel
Island Island
SIMATIC NET Date: 04/06/23 SITRAIN Training
Automation and Industrial Solutions
Siemens AG 2005. All rights reserved. File: 03_IE. Page 8
Tomorrow: Oscar Integrated in the Operator Control Panel
Oscar Server
ESIL Level
Level 2
Archive
Production network, VLAN “Trace”
M P+ g M P+ g
S i v in S iv in
h h
Ar c Arc
Backup and Backup and
Operator Panel Operator Panel
Levels 0 and 1
Components
Level 0 Switch Level 0 Switch
Oscar Oscar
Island Island
SIMATIC NET Date: 04/06/23 SITRAIN Training
Automation and Industrial Solutions
Siemens AG 2005. All rights reserved. File: 03_IE. Page 9
Definition of the Level 1 Networks (or: Data Networks)
The Level 1 Networks (N1 for Niveau 1) are communication networks that
interconnect the actual plant equipment, except the equipment belonging
to the field bus sector and the applications that are encompassed by the
island processes (installed by the suppliers of the equipment links).
Connected to the Level 1 network (N1) are the following:
PLC / Operations PC
PLC / Robot (other than those connected to the field bus)
PLC island / PLC other islands
PLC / special equipment (e.g., dynamic labels)
Operations PC / remote operator panel
Operations PC / Zone operator panel
SIMATIC NET Date: 04/06/23 SITRAIN Training
Automation and Industrial Solutions
Siemens AG 2005. All rights reserved. File: 03_IE. Page 10
IP Addressing Plan of the Level 1 Network (N1)
All production islands connected to the Level 1 network have
identical IP addressing plans.
Level 0 and Level 1 networks are completely isolated from the Plant
network.
Level 2 networks (N2) (control, tracing) that are connected to the Plant
network make use of equipment that is independent from Level 0 and Level
1 networks. Their IP address is managed and provided by the factories.
The two network cards of the MOP computer must be assigned to two
different networks.
The two Level 1 (N1) and Level 0 (N0) networks (Profinet) must be located
in the same logic network in order to enable the Level 0 PC card in the Main
Operator Panel (MOP) to specify the parameters for these two networks.
SIMATIC NET Date: 04/06/23 SITRAIN Training
Automation and Industrial Solutions
Siemens AG 2005. All rights reserved. File: 03_IE. Page 11
Exchange between S7 PLCS through the Level 1 Network (N1)
Critical Inter-PLC link Non-Critical Inter-PLC link
PN /PN Coupler CP343-1 coupler (classical)
dedicated
SIMATIC NET Date: 04/06/23 SITRAIN Training
Automation and Industrial Solutions
Siemens AG 2005. All rights reserved. File: 03_IE. Page 12
S7 Inter-PLC: Tree Topology, Cascading of Installations
Installation n Installation n+1 Installation n+2
MOP Level 1 network MOP Level 1 network MOP
Inter-PLC Inter-PLC
PLC PLC PLC
CP343-1 dedicated CP343-1 dedicated CP343-1 dedicated
Switch of Switch of Switch of
MOP MOP MOP
Level 1 network Level 1 network Level 1 network
HMI / Backup HMI / Backup HMI / Backup
Display Display Display
SIMATIC NET Date: 04/06/23 SITRAIN Training
Automation and Industrial Solutions
Siemens AG 2005. All rights reserved. File: 03_IE. Page 13
S7 Inter-PLC : Tree / Star Mixed Topology
Installation A Installation B Installation C
MOP MOP MOP
PLC PLC PLC
CP343-1
dedicated
CP343-1 CP343-1
dedicated dedicated
Switch of
MOP
Switch
Level 1 network dedicated
HMI / Backup
Inter-PLC
Afficheur
Installation D Installation E
MOP MOP
PLC PLC
CP343-1 CP343-1
dedicated dedicated
SIMATIC NET Date: 04/06/23 SITRAIN Training
Automation and Industrial Solutions
Siemens AG 2005. All rights reserved. File: 03_IE. Page 14
Island Interconnection – IMPERATIVE Precautions
Installation n Installation n+1
MOP Level 1network MOP Level 1 network
Inter-PLC Inter-PLC
PLC PLC
Absolutely
NO ! CP343-1
dedicated
Switch of
MOP Switch of
MOP
Level 1 network Level 1 network
HMI / Backup HMI / Backup
Display Display
SIMATIC NET Date: 04/06/23 SITRAIN Training
Automation and Industrial Solutions
Siemens AG 2005. All rights reserved. File: 03_IE. Page 15
Island Interconnection – IMPERATIVE Precautions
Interconnection of Level 1 networks
Installation n Installation n+1
MOP Level 1 network MOP Level 1 network
Inter-PLC Inter-PLC
PLC PLC
CP343-1
dedicated
Switch of Absolutely
Switch of
MOP
NO ! MOP
Level 1 network Level 1 network
HMI / Backup HMI / Backup
Zone
switches
Display Display
SIMATIC NET Date: 04/06/23 SITRAIN Training
Automation and Industrial Solutions
Siemens AG 2005. All rights reserved. File: 03_IE. Page 16
Island Interconnection – IMPERATIVE Precautions
SIMATIC NET Date: 04/06/23 SITRAIN Training
Automation and Industrial Solutions
Siemens AG 2005. All rights reserved. File: 03_IE. Page 17
Data Exchange between SIMATIC PLC and April 5000 Controller
Jbus Slave i
JBus Master
Read or
Write
Serial link
Jbus protocol
SIMATIC NET Date: 04/06/23 SITRAIN Training
Automation and Industrial Solutions
Siemens AG 2005. All rights reserved. File: 03_IE. Page 18