0% found this document useful (0 votes)
38 views6 pages

Enabling Work

The document discusses the construction of a temporary access bridge (TAB) including enabling works like clearing sites, building platforms, piling, and access roads. A casting yard will be set up to cast and cure precast concrete segments using formworks, gantries, and other equipment. The cured segments will then be transported and erected using a launcher. Major equipment for building the TAB and casting yard includes piling gantry, crawler crane, concrete pumps, batching plant and gantry cranes.

Uploaded by

deepak kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views6 pages

Enabling Work

The document discusses the construction of a temporary access bridge (TAB) including enabling works like clearing sites, building platforms, piling, and access roads. A casting yard will be set up to cast and cure precast concrete segments using formworks, gantries, and other equipment. The cured segments will then be transported and erected using a launcher. Major equipment for building the TAB and casting yard includes piling gantry, crawler crane, concrete pumps, batching plant and gantry cranes.

Uploaded by

deepak kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd

Enabling

Site Works including


Clearance platorms
Pile with pilling in mangraoves and marine, temporary jetty and access roads:-
Pier/Abutment
Construction
and Marking of TemporaryRig access bridge (TAB)Pile Cap Pier/Abutment
Cap
Pedestal
The Temporary access bridge (TAB) shall be used for movement of equipment, material and workmen. The alignment of
the access bridge shall be parallel to the proposed alignment of the interchanges and main bridge.
Major Equipment required for construction of Access Bridge are as under:
􀀹 Piling Gantry
􀀹 Crawler Crane

Casting of Erection of Pre-


Curing of Segments Transportation of Stressing of Precast
Segments at Cast Segments via
at Casting Yard Pre-cast segment Segments
Casting Yard launcher
Enabling
Site Works including
Clearance platorms
Pile with pilling in mangraoves and marine, temporary jetty and access roads:-
Pier/Abutment
Casting yard Pile Cap Pier/Abutment Pedestal
and Marking Rig Cap
Components of Casting Yard
The various components involved in the casting yard are listed below:
• 􀀹 Long line moulds for running segments.
• 􀀹 Short line moulds for pier head segments
• 􀀹 Gantries for handling segments from casting bed
• Gantries for handling reinforcement cage
• 􀀹 Stacking yard and rebar yard
• 􀀹 Batching plant
• 􀀹 Fabrication yard
• 􀀹 Material Storage yard
Casting of Erection of Pre-
• 􀀹 Aggregate
Segments at Stacking Yardof Segments
Curing Transportation of
Cast Segments via
Stressing of Precast
TheCasting plant & equipmentatrequired
majorYard Casting Yard
at the yard are Pre-cast
as under:segment
launcher
Segments
• 􀀹 Casting Yard Area
• 􀀹 Gantry Cranes
• 􀀹 Precasting Moulds
• 􀀹 Ancillary and Support Equipment’s
Enabling
Site Works including
Clearance platorms
Pile with pilling in mangraoves and marine, temporary jetty and access roads:-
Pier/Abutment
Pile Cap Pier/Abutment Pedestal
and Marking Rig Cap

Casting of Erection of Pre-


Curing of Segments Transportation of Stressing of Precast
Segments at Cast Segments via
at Casting Yard Pre-cast segment Segments
Casting Yard launcher
Enabling
Site Works including
Clearance platorms
Pile with pilling in mangraoves and marine, temporary jetty and access roads:-
Pier/Abutment
Pile Cap Pier/Abutment Pedestal
and Marking Rig Cap

Casting of Erection of Pre-


Curing of Segments Transportation of Stressing of Precast
Segments at Cast Segments via
at Casting Yard Pre-cast segment Segments
Casting Yard launcher
Enabling
Site Works including
Clearance platorms
Pile with pilling in mangraoves and marine, temporary jetty and access roads:-
Pier/Abutment
Pile Cap Pier/Abutment Pedestal
and Marking Rig Cap

Casting of Erection of Pre-


Curing of Segments Transportation of Stressing of Precast
Segments at Cast Segments via
at Casting Yard Pre-cast segment Segments
Casting Yard launcher
Enabling
Site Works including
Clearance platorms
Pile with pilling in mangraoves and marine, temporary jetty and access roads:-
Pier/Abutment
Pile Cap Pier/Abutment Pedestal
and Marking Rig Cap

Casting of Erection of Pre-


Curing of Segments Transportation of Stressing of Precast
Segments at Cast Segments via
at Casting Yard Pre-cast segment Segments
Casting Yard launcher