HSE INDUCTION
HEALTH & SAFETY
INDUCTION
TRAINING
"ContractorName
Here”
“PROJECT NAME HERE”
“Trainer Name Here”
INDUCTION
PLEASE SWITCH OFF
YOUR MOBILE PHONES
DURING SAFETY
INDUCTION
IF YOU HAVE
QUESTIONS…
PLEASE
ASK !
INDUCTION
Always remember that NOBODY GETS HURT…
3
INDUCTION
PROHIBITED ITEMS AT PROJECT AREA
The following are NOT
allowed:
Alcohol / Drug / Weapon
Mobile Phone
medi e n from
Fighting / Horse Play at
(Im terminati site)
o
Smoking
Only smoking in designated outdoor area is permitted
INDUCTION
INTRODUCTION
Each person,beforestarting his activities
on site, has to
attend to a HSE Induction.
HSE Objectives
Zero Fatality
Zero Lost Time Incident
An efficient emergency response
Zero negative impact on the environment
INDUCTION
HSE Policy
INDUCTION
INDUCTION
EVERYONE’S
RIGHT
INDUCTION
PROJECTS HSE RULES
At the start of each day, team supervisors shall conduct a pre-
task briefing Activity Briefing (5 – 10 min) with their team.
The topic of this talk will be based on the activity, about to
take place
(description, risks, and control measures…)
INDUCTION
RESPONSIBILITY OF EACH EMPLOYEE
o All personnel working on the site is required to work safely for
themselves as well as for others.
o Comply with all HSE working practices and procedures.
o Comply with any instruction from CONTRACTOR or
SUBCONTRACTOR HSE personnel.
o Stop immanent DANGER
o Report to their immediate supervisor any potential hazard,
incidents or injuries that may occur during the course of work.
o Use PPE according to the assigned work.
o No Permit, No work
INDUCTION
DISCIPLINARY ACTION
• For repeated breaches of safety rules;
o VERBAL WARNING (to be pro-active and correct the situation)
o WRITTEN WARNING
o REMOVAL FROM SITE
Serious offences may result to instant dismissal.
INDUCTION
WELFARE FACILITIES
Toilets
Rest Shelter
Clinic
Drinking Water Facilities
Smoking Shelter
Prayer Rooms
INDUCTION
HEALTH CONDITION
UNFIT FOR
WORK
You would be inform
"unfit for work" if you
were:
Under the influence of a
prescription drug that
affects your work
performance.
INDUCTION
EMERGENCY PREPAREDNESS
INDUCTION
PERMIT TO WORK
All work must have an approved Permit to W ork.
Only approved personnel allowed to issue and receive
permit.
Ensuring the proper authorisation of designated work.
Specifying the hazards involved & the precautions to
be taken.
INDUCTION
PERMIT TO WORK
Is as legal Requirement. A Permit to Work is required for work
involving:
1. Confined Space Entry
2. Excavation
3. Hot Works
4. Lifting work permit
5. W ork at height
6. Night work & Holiday W ork
Permit
7. Radiography Work
8. Pressure Test
9. Grating Removal/Opening
Hole
10.Commissioning and start up
INDUCTION
GENERAL SAFETY-SIGNBOARD
INDUCTION
GENERAL SAFETY- NO SMOKING
No Smoking except to the designated smoking
shelter
INDUCTION
GENERAL SAFETY
Use of Mobile phone cameras
is strictly prohibited for all
workers and laborers.
• Only for reporting and
Progress the foreman, site
engineers, supervisors, and
managers are allowed to use
the mobile camera.
INDUCTION
GENERAL SAFETY
NO Short Cut and Horseplay
INDUCTION
GENERAL SAFETY
Get Permission to cross the
INDUCTION
TRENCHİNG & EXCAVATION:
General HSE Rules :
Keep heavy equipment away
from trench edges.
Keep surcharge loads at least
2
meters from the trench edges.
Know where underground
utilities are located.
Test for low oxygen, hazardous
fumes
and toxic gases.
Inspect trenches at the start of
each
shift.
Inspect trenches following a
INDUCTION
MEPI
Equipment Working All Around
Operation of Heavy Equipment
and the Presence of Personnel
On the Ground
Be Aware,
Be Awake,
Be Alert,
Be Alive
INDUCTION
CONFINED SPACE:
A confined area is defined as an area, which occurs naturally, or
is constructed and in which ambient conditions (temperature,
air circulation, air quality) becomes affected and/or in which a
risk of formation of an explosive and/or toxic mixture exist.
You NEVER
should
ENTER a confined
space without A Permit
to Work Order and
prior to a gas test.
INDUCTION
LIFTING AND
RIGGING
No one shall ride the
load
Only the authorized rigger (in
fluorescent vest) to give signal.
Danger zones
barricaded & kept
Use tagline clear (do not walk
to control under load)
INDUCTION
LIFTING AND RIGGING
EQUIPMENT
Safe working
Competent persons Lifting plan to identify controls
additional requirements
INDUCTION
WORKING AT HEIGHT
Always use full body harness while working
above
1.8 meters.
Respect warning barriers and signs while
working at height.
THERE IS NO EXCEPTION TO THIS RULE:
“100% FALL PROTECTION AT ALL TIMES WHEN WORKING 1.8
METER OR ABOVE !!!”
INDUCTION
LADDERS
Check the condition of the ladder
before
use.
work connected
Metal with
ladders must not an electrical
be used
installation.
for any
Electricians will use wooden or
non
conductive ladders.
Working on top ladders is not permitted.
All ladders must project at least 1 meter
above the place to which they
give access
Keep access to ladder free
Do not place the ladder in the door ways
INDUCTION
SCAFFOLDING
Scaff Tags a must. Green Scaff Tag: OK for
Use; NO Scaff Tag / Red Scaff Tag: Don’t Use.
Scaff Tag to be revalidated / inspected every
7 days. More than 7 days without inspection –
DON’T USE!
Only trained scaffolders to built
/modify / dismantle scaffolds
INDUCTION
OBJECTS FALLİNG FROM HEİGHTS
Provide a safe means of raising and lowering plant, materials
and debris in the place of work
A secure physical barrier to be provided to prevent objects
falling
freely from buildings or structures in or in the vicinity of the
workplace
Wear yours PPE
INDUCTION
COLOR CODING SYSTEM
MONTH COLOR
JANUARY FEBRUARY MARCH BLUE
APRIL MAY JUNE RED
JULY AUGUST SEPTEMBER GREEN
OCTOBER NOVEMBER DECEMBER YELLOW
All Mechanical / Electrical / Rigging Tools /Fire fighting tools
/ Fall Body Harness and equipment are to be inspected on
monthly basis by Authorized Competent personnel.
INDUCTION
COLOR CODING SYSTEM
Required Monthly Inspection
INDUCTION
TOOLS AND PORTABLE POWER TOOLS
Tools will be equipped with proper safeguards and used
only in applications for which they were designed.
Portable power tools will be double insulated type
or three-wire grounded type.
Electrical equipment and power tools will be individually
identified and tested at regular intervals.
A register of all electrical power hand tools in use will be
kept.
INDUCTION
TOOLS AND PORTABLE POWER TOOLS
INDUCTION
ELECTRICAL SAFETY
All electrical works must be carried
out by competent electricians
Temporary electrical panels,
extension cables and other electrical
tools must be check and inspected prior
to use .
All connection shall be made
through ELCB/GFCI.
INDUCTION
ELECTRICAL SAFETY
INDUCTION
CONSTRUCTION POWER & ENERGIZED LINES
Permit required For All “Hot”
Electrical work
Identify energized electrical lines
Use Weather proof connections
Cables to be properly laid out and
supported
Do not Overload circuits
X
X
No IP Rating
Over loaded
INDUCTION
ELECTRICAL SAFETY LOCK-OUT / TAG-OUT (LOTO)
Do not remove any isolation tag or
lock if you are not authorized !!!
This process applies to electrical sources of energy
as well as other sources of potential stored energy
INDUCTION
WELDING/ CUTTING /
BURNING
Wear correct PPE
Permit to work available prior to work
start
Use fire blanket
Have qualified fire watcher
No combustible materials
Fire extinguisher available
Area gas tested (LEL must be 0%)
INDUCTION
NOISE
Our policy is to enforce
the wearing of hearing
protection in areas where
high noise levels are likely
(high noise is defined as 85
dB (A). Appropriate signs
will be placed at
accesses to these areas
advising personnel of the
requirement to wear the
hearing protection
provided.
INDUCTION
HAZARDOUS SUBSTANCES
All employees and subcontractors involved in the use and
handling of chemicals shall fully understand the Material Safety
Data Sheet (MSDS) of these chemicals. MSDS’s provide
extremely important information including, but not limited to,
the following:
• Full details of the chemical including
physical / chemical properties, shipping name,
UN
number, HAZCHEM code and class of
hazardous chemical if applicable (e.g.
corrosive, toxic, flammable, oxidizing agent,
radioactive, explosive);
• Hazardous properties of the chemical
(exposure / toxicity limits);
• Storage and handling requirements
(including required PPE);
• Health effects and first aid requirements in
the event of exposure;
INDUCTION
HAZARDOUS SUBSTANCES (SPILL
RESPONSE)
Discovery Response
• Mobilize
• Inform • Assess
• Limit / Contain • Deploy
• Apply
• Dispose
Communications
Spill Reporting: • Accident Type
• Time of Spill • Type of Product
• Amount of Spill • Current Status
• Source of Spill • Owner
• Location of Spill • Wind Velocity
• Proximity to Aspects • Temperature
INDUCTION
RADIOGRAPHY AND NDT
Radiation is harmful for health
Permit is mandatory to
carried Non Destructive
Testing (NDT)
Keep away from
radiation areas
INDUCTION
HOUSEKEEPING
It must be done immediately
required to avoid any hazards like
tripping, slipping and etc.
It is everyone’s responsibilities to
perform housekeeping.
Tools and materials must not be
left on elevated platform or
scaffolds.
Remove scrap / construction
waste and disposed
accordingly.
INDUCTION
HOUSEKEEPING
THE WASTE AREA HAS TO BE:
● TIDY ● CLEAN ● COVER
THE CONTANIERS NEED:
• SIGNS OF IDENTIFICATION
TO BE CLOSED
• TO BE
SOLATED/IMPERMEABLE
INDUCTION
HEAT STRESS
You must not over exert yourself
physically which may cause
dehydration and lead to heat
stress
/ heat stroke
Drink more water to prevent
dehydration at rest station or
drink station
Rest at shaded areas
which include lightning
shelter
If you are not feeling well
– report it
INDUCTION
SECURITY SITE RULES
NO STEALING
INDUCTION
DEFENSIVE DRIVING
Mobile Phone
While Driving
No smoking inside
the car Reverse Parking
Is illegal
STOP ON FOLLOW FOLLOW
STOP SIGNS ! NO ENTRY SIGN SPEED LIMIT
Vehicle Safety
INDUCTION
OBSERVE PEDESTRIANS (PEOPLE
WALKING)
Drivers must use designated
routes
Use designated parking areas
and reverse park only
Comply to the traffic signs
and
speed limit.
Seat belts must be worn at all
times by the driver &
passengers.
INDUCTION
VEHICLE SAFETY
The following: NOT ALLOWED to do:
Smoking is prohibited in all vehicles.
Sleeping inside or just outside the vehicle
even during lunch or any other break time.
Riders on equipment.
Passenger traveling on the back of the
pick
up trucks.
Use of hand phone or walkie talkie while
driving.
INDUCTION
EQUIPMENT OPERATION
EQUIPMENT OPERATION
REQUIREMENTS
• Do not operate any equipment without the following;
o License according to equipment
o Third Party Inspection of Equipment
o Training
INDUCTION
EQUIPMENT OPERATION
Riding on any vehicle/truck is Sleeping on the vehicle and
prohibited truck is prohibited
INDUCTION
FIRE EXTINGUISHERS
ABC Dry Chemical CO2 Fire Extinguishers Metal Fire
Fire Extinguishers Extinguishers
INDUCTION
FIRE EXTINGUISHERS
P - pull the pin or puncture cartridge
A - aim at base of flame
S - squeeze the trigger
W i n d
S - sweep from side to side
A P P. 3 M e t e r s
( 1 0 feet )
INDUCTION
Thank you for attending
Any questions?