100% found this document useful (4 votes)
2K views55 pages

HSE Induction - Template

Uploaded by

Nabil Abdelsamea
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
100% found this document useful (4 votes)
2K views55 pages

HSE Induction - Template

Uploaded by

Nabil Abdelsamea
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 55

HSE INDUCTION

HEALTH & SAFETY


INDUCTION
TRAINING

"ContractorName
Here”
“PROJECT NAME HERE”

“Trainer Name Here”


INDUCTION

PLEASE SWITCH OFF


YOUR MOBILE PHONES
DURING SAFETY
INDUCTION

IF YOU HAVE
QUESTIONS…
PLEASE
ASK !
INDUCTION

Always remember that NOBODY GETS HURT…


3
INDUCTION
PROHIBITED ITEMS AT PROJECT AREA

The following are NOT


allowed:

 Alcohol / Drug / Weapon

 Mobile Phone
medi e n from
 Fighting / Horse Play at
(Im terminati site)
o
 Smoking
Only smoking in designated outdoor area is permitted
INDUCTION
INTRODUCTION
Each person,beforestarting his activities
on site, has to
attend to a HSE Induction.

HSE Objectives

Zero Fatality
Zero Lost Time Incident
An efficient emergency response
Zero negative impact on the environment
INDUCTION
HSE Policy
INDUCTION
INDUCTION
EVERYONE’S
RIGHT
INDUCTION
PROJECTS HSE RULES
At the start of each day, team supervisors shall conduct a pre-
task briefing Activity Briefing (5 – 10 min) with their team.
The topic of this talk will be based on the activity, about to
take place
(description, risks, and control measures…)
INDUCTION
RESPONSIBILITY OF EACH EMPLOYEE

o All personnel working on the site is required to work safely for


themselves as well as for others.
o Comply with all HSE working practices and procedures.
o Comply with any instruction from CONTRACTOR or
SUBCONTRACTOR HSE personnel.
o Stop immanent DANGER
o Report to their immediate supervisor any potential hazard,
incidents or injuries that may occur during the course of work.
o Use PPE according to the assigned work.
o No Permit, No work
INDUCTION
DISCIPLINARY ACTION
• For repeated breaches of safety rules;

o VERBAL WARNING (to be pro-active and correct the situation)


o WRITTEN WARNING
o REMOVAL FROM SITE

Serious offences may result to instant dismissal.


INDUCTION
WELFARE FACILITIES
 Toilets
 Rest Shelter
 Clinic
 Drinking Water Facilities
 Smoking Shelter
 Prayer Rooms
INDUCTION
HEALTH CONDITION

UNFIT FOR
WORK
You would be inform
"unfit for work" if you
were:

Under the influence of a


prescription drug that
affects your work
performance.
INDUCTION
EMERGENCY PREPAREDNESS
INDUCTION
PERMIT TO WORK

 All work must have an approved Permit to W ork.


 Only approved personnel allowed to issue and receive
permit.
 Ensuring the proper authorisation of designated work.
 Specifying the hazards involved & the precautions to
be taken.
INDUCTION
PERMIT TO WORK
Is as legal Requirement. A Permit to Work is required for work
involving:

1. Confined Space Entry


2. Excavation
3. Hot Works
4. Lifting work permit
5. W ork at height
6. Night work & Holiday W ork
Permit
7. Radiography Work
8. Pressure Test
9. Grating Removal/Opening
Hole
10.Commissioning and start up
INDUCTION
GENERAL SAFETY-SIGNBOARD
INDUCTION
GENERAL SAFETY- NO SMOKING

No Smoking except to the designated smoking


shelter
INDUCTION
GENERAL SAFETY

 Use of Mobile phone cameras


is strictly prohibited for all
workers and laborers.

• Only for reporting and


Progress the foreman, site
engineers, supervisors, and
managers are allowed to use
the mobile camera.
INDUCTION
GENERAL SAFETY

NO Short Cut and Horseplay


INDUCTION

GENERAL SAFETY

Get Permission to cross the


INDUCTION
TRENCHİNG & EXCAVATION:

General HSE Rules :

 Keep heavy equipment away


from trench edges.
Keep surcharge loads at least
2
meters from the trench edges.
 Know where underground
utilities are located.
Test for low oxygen, hazardous
fumes
and toxic gases.
Inspect trenches at the start of
each
shift.
Inspect trenches following a
INDUCTION
MEPI

 Equipment Working All Around


 Operation of Heavy Equipment
and the Presence of Personnel
On the Ground

Be Aware,
Be Awake,
Be Alert,
Be Alive
INDUCTION
CONFINED SPACE:
A confined area is defined as an area, which occurs naturally, or
is constructed and in which ambient conditions (temperature,
air circulation, air quality) becomes affected and/or in which a
risk of formation of an explosive and/or toxic mixture exist.

You NEVER
should
ENTER a confined
space without A Permit
to Work Order and
prior to a gas test.
INDUCTION
LIFTING AND
RIGGING

No one shall ride the


load
Only the authorized rigger (in
fluorescent vest) to give signal.

Danger zones
barricaded & kept
Use tagline clear (do not walk
to control under load)
INDUCTION
LIFTING AND RIGGING
EQUIPMENT

Safe working
Competent persons Lifting plan to identify controls
additional requirements
INDUCTION
WORKING AT HEIGHT
 Always use full body harness while working
above
1.8 meters.

 Respect warning barriers and signs while


working at height.

THERE IS NO EXCEPTION TO THIS RULE:


“100% FALL PROTECTION AT ALL TIMES WHEN WORKING 1.8
METER OR ABOVE !!!”
INDUCTION
LADDERS
 Check the condition of the ladder
before
use.
 work connected
Metal with
ladders must not an electrical
be used
installation.
for any
 Electricians will use wooden or
non
conductive ladders.
 Working on top ladders is not permitted.
 All ladders must project at least 1 meter
above the place to which they
give access
 Keep access to ladder free
 Do not place the ladder in the door ways
INDUCTION
SCAFFOLDING

 Scaff Tags a must. Green Scaff Tag: OK for


Use; NO Scaff Tag / Red Scaff Tag: Don’t Use.

 Scaff Tag to be revalidated / inspected every


7 days. More than 7 days without inspection –
DON’T USE!

 Only trained scaffolders to built


/modify / dismantle scaffolds
INDUCTION
OBJECTS FALLİNG FROM HEİGHTS

 Provide a safe means of raising and lowering plant, materials


and debris in the place of work
 A secure physical barrier to be provided to prevent objects
falling
freely from buildings or structures in or in the vicinity of the
workplace
 Wear yours PPE
INDUCTION
COLOR CODING SYSTEM

MONTH COLOR
JANUARY FEBRUARY MARCH BLUE
APRIL MAY JUNE RED
JULY AUGUST SEPTEMBER GREEN
OCTOBER NOVEMBER DECEMBER YELLOW

All Mechanical / Electrical / Rigging Tools /Fire fighting tools


/ Fall Body Harness and equipment are to be inspected on
monthly basis by Authorized Competent personnel.
INDUCTION
COLOR CODING SYSTEM
Required Monthly Inspection
INDUCTION
TOOLS AND PORTABLE POWER TOOLS

 Tools will be equipped with proper safeguards and used


only in applications for which they were designed.

 Portable power tools will be double insulated type


or three-wire grounded type.

 Electrical equipment and power tools will be individually


identified and tested at regular intervals.

 A register of all electrical power hand tools in use will be


kept.
INDUCTION
TOOLS AND PORTABLE POWER TOOLS
INDUCTION
ELECTRICAL SAFETY
All electrical works must be carried
out by competent electricians

Temporary electrical panels,


extension cables and other electrical
tools must be check and inspected prior
to use .
All connection shall be made
through ELCB/GFCI.
INDUCTION
ELECTRICAL SAFETY
INDUCTION
CONSTRUCTION POWER & ENERGIZED LINES

 Permit required For All “Hot”


Electrical work
 Identify energized electrical lines
 Use Weather proof connections
 Cables to be properly laid out and
supported
 Do not Overload circuits

X
X
No IP Rating

Over loaded
INDUCTION
ELECTRICAL SAFETY LOCK-OUT / TAG-OUT (LOTO)

Do not remove any isolation tag or


lock if you are not authorized !!!

This process applies to electrical sources of energy


as well as other sources of potential stored energy
INDUCTION
WELDING/ CUTTING /
BURNING

 Wear correct PPE


 Permit to work available prior to work
start
 Use fire blanket
 Have qualified fire watcher
 No combustible materials
 Fire extinguisher available
 Area gas tested (LEL must be 0%)
INDUCTION
NOISE

Our policy is to enforce


the wearing of hearing
protection in areas where
high noise levels are likely
(high noise is defined as 85
dB (A). Appropriate signs
will be placed at
accesses to these areas
advising personnel of the
requirement to wear the
hearing protection
provided.
INDUCTION
HAZARDOUS SUBSTANCES
All employees and subcontractors involved in the use and
handling of chemicals shall fully understand the Material Safety
Data Sheet (MSDS) of these chemicals. MSDS’s provide
extremely important information including, but not limited to,
the following:
• Full details of the chemical including
physical / chemical properties, shipping name,
UN
number, HAZCHEM code and class of
hazardous chemical if applicable (e.g.
corrosive, toxic, flammable, oxidizing agent,
radioactive, explosive);
• Hazardous properties of the chemical
(exposure / toxicity limits);
• Storage and handling requirements
(including required PPE);
• Health effects and first aid requirements in
the event of exposure;
INDUCTION
HAZARDOUS SUBSTANCES (SPILL
RESPONSE)

Discovery Response
• Mobilize
• Inform • Assess
• Limit / Contain • Deploy
• Apply
• Dispose

Communications
Spill Reporting: • Accident Type
• Time of Spill • Type of Product
• Amount of Spill • Current Status
• Source of Spill • Owner
• Location of Spill • Wind Velocity
• Proximity to Aspects • Temperature
INDUCTION
RADIOGRAPHY AND NDT
 Radiation is harmful for health

 Permit is mandatory to
carried Non Destructive
Testing (NDT)

 Keep away from


radiation areas
INDUCTION
HOUSEKEEPING
It must be done immediately
required to avoid any hazards like
tripping, slipping and etc.

It is everyone’s responsibilities to
perform housekeeping.

Tools and materials must not be


left on elevated platform or
scaffolds.

Remove scrap / construction


waste and disposed
accordingly.
INDUCTION
HOUSEKEEPING

THE WASTE AREA HAS TO BE:


● TIDY ● CLEAN ● COVER

THE CONTANIERS NEED:


• SIGNS OF IDENTIFICATION
TO BE CLOSED
• TO BE
SOLATED/IMPERMEABLE
INDUCTION
HEAT STRESS

 You must not over exert yourself


physically which may cause
dehydration and lead to heat
stress
/ heat stroke

 Drink more water to prevent


dehydration at rest station or
drink station

 Rest at shaded areas


which include lightning
shelter

 If you are not feeling well


– report it
INDUCTION
SECURITY SITE RULES

NO STEALING
INDUCTION
DEFENSIVE DRIVING

Mobile Phone
While Driving
No smoking inside
the car Reverse Parking
Is illegal

STOP ON FOLLOW FOLLOW


STOP SIGNS ! NO ENTRY SIGN SPEED LIMIT
Vehicle Safety
INDUCTION
OBSERVE PEDESTRIANS (PEOPLE
WALKING)

Drivers must use designated


routes
Use designated parking areas
and reverse park only
Comply to the traffic signs
and
speed limit.

Seat belts must be worn at all


times by the driver &
passengers.
INDUCTION
VEHICLE SAFETY

The following: NOT ALLOWED to do:


Smoking is prohibited in all vehicles.
Sleeping inside or just outside the vehicle
even during lunch or any other break time.
Riders on equipment.
Passenger traveling on the back of the
pick
up trucks.
Use of hand phone or walkie talkie while
driving.
INDUCTION
EQUIPMENT OPERATION
EQUIPMENT OPERATION
REQUIREMENTS

• Do not operate any equipment without the following;


o License according to equipment
o Third Party Inspection of Equipment
o Training
INDUCTION
EQUIPMENT OPERATION

Riding on any vehicle/truck is Sleeping on the vehicle and


prohibited truck is prohibited
INDUCTION
FIRE EXTINGUISHERS

ABC Dry Chemical CO2 Fire Extinguishers Metal Fire


Fire Extinguishers Extinguishers
INDUCTION
FIRE EXTINGUISHERS
P - pull the pin or puncture cartridge

A - aim at base of flame

S - squeeze the trigger


W i n d

S - sweep from side to side

A P P. 3 M e t e r s
( 1 0 feet )
INDUCTION

Thank you for attending


Any questions?